JPH03279123A - Load handling device - Google Patents

Load handling device

Info

Publication number
JPH03279123A
JPH03279123A JP2161099A JP16109990A JPH03279123A JP H03279123 A JPH03279123 A JP H03279123A JP 2161099 A JP2161099 A JP 2161099A JP 16109990 A JP16109990 A JP 16109990A JP H03279123 A JPH03279123 A JP H03279123A
Authority
JP
Japan
Prior art keywords
group
works
pallets
shipping
workpieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2161099A
Other languages
Japanese (ja)
Inventor
Noburo Yagi
八木 信郎
Hisao Kato
久夫 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2161099A priority Critical patent/JPH03279123A/en
Priority to KR1019910003008A priority patent/KR960004174B1/en
Priority to GB9104752A priority patent/GB2242419B/en
Publication of JPH03279123A publication Critical patent/JPH03279123A/en
Priority to HK147194A priority patent/HK147194A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/137Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
    • B65G1/1373Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses

Abstract

PURPOSE:To prevent mixture of manufacturing designation and to eliminate dissatisfaction of customers by dividing a specific type of works into a plurality of groups, by providing a stacking means to a corresponding supplying machine and pellet, and by carrying out stacking according to a filling state of the number of works in each of the supplying machine. CONSTITUTION:Opposite to the end part of conveyer 1a, a stacking means 1b to the delivery pallet 9 of a work, a first supplying machine 2 for a first type first group work, a second supplying machine 3 for a first type second group work whose manufacturing designation is different, and supplying machines 4 to 7 in the similar order of a second and a third type works are provided. Under energization of a supply command controller 11 by a delivery command of the same destination, a filling state of the number of works in each of the supplying machines are sequentially examined, and stacking is sequentially carried out giving priority to the supplying machine which has been filled so as to prevent mixture of the works with different manufacturing designation for the same destination.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、出荷指令ごとにワークをパレットに積付け
る荷扱い装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a cargo handling device that stacks workpieces onto pallets in response to shipping orders.

〔従来の技術〕[Conventional technology]

例えば、特開昭61−33426号公報に示されている
ようにワークの自動積付システムがあり、複数種ワーク
の所要種類、及び種類ごとの所要数をパレットに、積付
は要領に基づいて積付ける装置がある。
For example, as shown in Japanese Patent Application Laid-open No. 61-33426, there is an automatic workpiece loading system, in which the required types of multiple types of workpieces and the required number of each type are loaded onto pallets based on the instructions. There is a loading device.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

上記のような装置では1客先ごとの出荷伝票。 For the above-mentioned equipment, there is a shipping slip for each customer.

すなわち出荷指令により所要ワークをパレットに積付け
るロボット作業が行なわれる。しかし、供給されるワー
クは同種のものであっても製造日付。
In other words, a robot operation is performed to stack required workpieces onto pallets in response to a shipping command. However, even if the workpieces supplied are of the same type, the date of manufacture is different.

製造ロット番号等の製造表示の異なるものが供給され、
製造順序どおり供給されるのが一般的である。このため
1つの出荷指令や、同じ自失の出荷指令に対して積付け
られたワーク中に製造表示の異なるものが混在すること
になり1客先に不満が生じるという問題点があった。
Items with different manufacturing indications such as manufacturing lot numbers are supplied,
Generally, products are supplied in the order of manufacture. For this reason, there is a problem in that workpieces with different manufacturing indications are mixed among the workpieces stacked for one shipping order or for the same unintentional shipping order, causing dissatisfaction to one customer.

この発明は、かかる問題点を解決するためになされたも
のであり、同自失の同種ワークについては同一製造表示
のワークが自動積付けされる荷扱い装置を得ることを目
的としている。
The present invention has been made to solve this problem, and an object of the present invention is to provide a cargo handling device that automatically stacks workpieces of the same type and with the same production designation.

〔課題を解決するための手段〕[Means to solve the problem]

この発明にかかわる荷扱い装置においては、特定種の第
1群ワークを供給する第1供給機と、上記特定種と同種
の第2群ワークを供給する第2供給機と、ワークをパレ
ットに積付ける積付は手段と、積付は作業を指令する制
御装置が設けられる。
The material handling device according to the present invention includes a first feeder that supplies a first group of workpieces of a specific type, a second feeder that feeds a second group of workpieces of the same type as the specific type, and a second feeder that loads the workpieces onto a pallet. A means for stowing and a control device for instructing the stowing work are provided.

また、出荷指令によるワークの所要数により。Also, depending on the required number of workpieces according to shipping instructions.

第1群パレットの第1パレツト、第1群パレットの複数
パレット、第2群パレットの順で、パレットの供給を供
給手段に指令する制御装置が設けられる。
A control device is provided that instructs the supply means to supply pallets in the order of the first pallet of the first group of pallets, the plurality of pallets of the first group of pallets, and the second group of pallets.

また、複数の出荷指令を一緒に処理するために複数出荷
指令のワーク所要数により、第1群パレット、少なくと
も1つの出荷指令を充足する第1群パレットと残余の出
荷指令に対して第2群パレットの順で、パレットの供給
を供給手段に指令する制御装置が設けられる。
In addition, in order to process multiple shipping orders together, depending on the required number of workpieces for multiple shipping orders, a first group of pallets, a first group of pallets that satisfies at least one shipping order, and a second group of pallets for the remaining shipping orders are added. A control device is provided for instructing the supply means to supply the pallets in the order of the pallets.

〔作用〕[Effect]

上記のように構成された荷扱い装置では、同自失の出荷
指令中の特定種の所要ワーク数を第1群ワーク数が充足
する場合は第1供給機からワークが積付けられ、上記所
要ワーク数に第1群ワーク数が不足するときには第2供
給機からワークが積付けられる。
In the cargo handling device configured as described above, if the number of works in the first group suffices the required number of works of a specific type in the same shipping order, the works are loaded from the first feeding machine, and the required work is When the number of works in the first group is insufficient, the works are stacked from the second supply machine.

また、所要ワーク数により、第1群パレットの第1パレ
ツトのワークを優先に、以下、第1群パレットの複数パ
レットのワーク、第2群パレットのワークが積付けられ
る。
Furthermore, depending on the required number of works, the works on the first pallet of the first group of pallets are given priority, and then the works of the plurality of pallets of the first group of pallets and the works of the second group of pallets are stacked.

また、複数の出荷指令の所要ワーク数により第1群パレ
ットのワークを優先し、第1群パレットのワーク数が不
足するときはこのワーク数で充足する出荷指令のみに第
1群パレットのワークが積付けられ、残余の出荷指令に
は第2群パレットのワークか積付けられる。
Also, depending on the required number of works for multiple shipping orders, the workpieces on the first group pallet are given priority, and when the number of works on the first group pallet is insufficient, the workpieces on the first group pallet are given only to the shipping commands that are satisfied with this number of works. The workpieces on the second group of pallets are then stacked on the remaining shipping orders.

〔実施例〕〔Example〕

第1図〜第3図はこの発明の一実施例を示す図で1図中
、(1)は制御手段(laa)を有するコンベヤ(1a
)と、このコンベヤ(1a)の端部に対向して設置され
制御手段(lha)を有する産業ロボット(1b)から
なる積付は手段、(2)〜(7)はそれぞれ端部がコン
ベヤ(1a)の側部に対向したコンベヤからなる供給機
で、(2)は第1種ワークの第1群ワークを供給する第
1種第1供給機、(3)は第1種ワークの第1群ワーク
よりも製造ロフト番号が新しいか、又は製造日が新しい
、すなわち第1群ワークに対し同じ第1種ワークであり
ながら第1群ワークよりも製造表示の新しい第2群ワー
クを供給する第1種第2供給機である。なお、後述する
第1種ワーク以外の第1群ワークと第2群ワークの関係
は第1種ワークと同様の関係にある。
Figures 1 to 3 are diagrams showing an embodiment of the present invention. In Figure 1, (1) is a conveyor (1a) having a control means (laa).
) and an industrial robot (1b) installed opposite to the end of this conveyor (1a) and having a control means (lha). 1a) is a feeding machine consisting of a conveyor facing the side, (2) is a first type first feeding machine that supplies a first group of first type workpieces, and (3) is a first type first feeding machine that supplies a first group of first type workpieces. The second group of workpieces that have a newer manufacturing loft number or newer manufacturing date than the group of workpieces, that is, the second group of workpieces that are the same type 1 workpieces but have a newer manufacturing indication than the first group of workpieces, This is a type 1 second feeder. Note that the relationship between the first group of works and the second group of works other than the first type of work, which will be described later, is the same as that of the first type of work.

(4)は第2種ワークの第1群ワークを供給する第2種
第1供給機、(5)は第2種ワークの第2群ワークを供
給する第2種第2供給機、(6)は第3種ワークの第1
群ワークを供給する第3種第1供給機、(7)は第3種
ワークの第2群ワークを供給する第3種第2供給機、(
8)はコンベヤ(1a)の産業ロボット(1b)寄り端
部に設けられた排出コンベヤ、(9)は産業ロボット(
]b)近くに配置された出荷パレットで、 (9’)は
予備のパレット、 (10)は積付は済みの出荷パレッ
ト(9)を搬出する搬出コンベヤ、 (11)は供給プ
ログラムを有する供給指令手段(lla)及び積付プロ
グラムを有する積付指令手段(llb)が設けられた制
御装置で、I10ボート(llc)及びRAM(lid
)、CPU(lie)、ROM(llf)を有するコン
ピュータ(l1g)が配置されている。(12)は出荷
伝票等によって形成される出荷指令である。
(4) is a second type first feeder that supplies the first group of second type workpieces; (5) is a second type second feeder that supplies the second group of second type workpieces; ) is the first type of third type work.
(7) is a third type first feeding machine that supplies a group of workpieces; (7) is a third type second feeding machine that supplies a second group of third type workpieces;
8) is a discharge conveyor installed at the end of the conveyor (1a) closer to the industrial robot (1b), and (9) is an industrial robot (1b).
] b) Shipping pallets placed nearby, (9') is a spare pallet, (10) is an unloading conveyor for taking out the loaded shipping pallet (9), (11) is a supply with a feeding program This control device is equipped with a command means (lla) and a loading command means (llb) having a loading program, and is equipped with an I10 boat (llc) and a RAM (lid).
), a CPU (lie), and a computer (l1g) having a ROM (llf). (12) is a shipping instruction formed by a shipping slip or the like.

上記のように構成された荷扱い装置の動作を第3図に示
すフローチャートによって説明する。客先ごとの出荷伝
票等が入力されるとステップ(101)の出荷指令が発
せられて制御装置(11)が付勢される。そしてステッ
プ(102)を経てステップ(103)へ進み第1一種
ワーク積付けが積付は手段(1)に発せられ、ステップ
(104)へ進み第1種第1供給機(2)の第1種第1
群ワークの数が出荷指令(12)による第1種ワークの
所要数を充足すれば、ステップ(105)へ進む。ステ
ップ(105)において第1種第1供給機(2)からの
積付作業が指令され、第1種第1供給機(2)が供給指
令手段(lla)により動作しコンベヤ(1a)に所要
数の第1種第1群ワークが供給されるので、それらのワ
ークが産業ロボット(lb)により積付指令手段(ll
b)によって、所定の積付要領に基づいてパレット(9
)に積付けられてステップ(107)へ進む。一方、ス
テップ(104)において第1種第1供給機(2)の第
1種第1群ワークの数が出荷指令(12)による第1種
第1群ワークの所要数に不足すればステップ(106)
へ進む。
The operation of the cargo handling device configured as described above will be explained with reference to the flowchart shown in FIG. When the shipping slip for each customer is input, a shipping command is issued in step (101) and the control device (11) is energized. Then, the process proceeds to step (103) via step (102), where the first type workpiece stacking is sent to the means (1), and the process proceeds to step (104), where the first type workpiece stacking is sent to the first type first feeder (2). Type 1
If the number of group works satisfies the required number of type 1 works according to the shipping instruction (12), the process proceeds to step (105). In step (105), the stowage work from the first type first feeder (2) is instructed, and the first type first feeder (2) is operated by the supply command means (lla) to transfer the required amount to the conveyor (1a). Since the first group of workpieces of the first type are supplied, these workpieces are transferred to the loading command means (llb) by the industrial robot (lb).
b), pallets (9
) and proceeds to step (107). On the other hand, in step (104), if the number of first-class, first-group workpieces in the first-class, first-feeder (2) is insufficient to the required number of first-class, first-group workpieces according to the shipping instruction (12), step ( 106)
Proceed to.

そして、ステップ(1,06)により第1種第2供給機
(3)からの積付作業が指令され、第1種第2供給機(
3)が供給指令手段(]、laaにより動作しコンベヤ
(1a)に所要数の第1種第2群ワークが供給されるの
で、それらワークが産業ロボット(1b)により積付指
令手段(llb)によって、所定の積付要領に基づいて
出荷パレット(9)に積付られてステップ(107)へ
進む。ステップ(107)において第1種ワークの積付
けが終了していなければ、ステップ(105)又はステ
ップ(106)の動作が継続され、また第1種ワーク積
付終了であればステップ(108)へ進む。そしてステ
ップ(108)でNが出荷指令(12)の最終値でなけ
ればステップ(109)を経て、ステップ(103)に
戻る。そしてステップ(103)において、第2種ワー
ク積付指令が制御装置(11)から発せられて、詳細な
説明を省略するが第1種ワーク積付けと同様な動作が第
2種ワークについて行なわれる。また第2種ワークの積
付が終了すると。
Then, in step (1,06), the loading operation from the first type second feeder (3) is ordered, and the first type second feeder (
3) is operated by the supply command means (], laa, and the required number of first-class, second-group workpieces are supplied to the conveyor (1a), so that these works are transferred to the loading command means (llb) by the industrial robot (1b). Then, the work is stacked on the shipping pallet (9) according to the predetermined stowage procedure, and the process proceeds to step (107).If the stowage of the first type work is not completed in step (107), step (105) is carried out. Alternatively, the operation in step (106) is continued, and if the first type work loading is completed, the process advances to step (108).If N is not the final value of the shipping command (12) in step (108), step ( 109), the process returns to step (103).In step (103), a second type workpiece loading command is issued from the control device (11), and the first type workpiece loading command is omitted. The same operation as above is performed for the second type of work.Furthermore, when the stowage of the second type of work is completed.

ステップ(108) 、  ステップ(109)を経て
第3種ワークの積付が指令される。そして第3種ワーク
の積付が終了してステップ(108)においてNが出荷
指令(12)の最終値となると、他の出荷指令(12)
の動作に移るか、又は制御装置(11)が消勢される。
Through steps (108) and (109), a command is given to stow the third type workpiece. When the loading of the third type work is completed and N becomes the final value of the shipping command (12) in step (108), other shipping commands (12)
, or the control device (11) is deenergized.

そして、積付けが終了した出荷パレット(9)は搬出コ
ンベヤ(10)によって出荷場、トラックターミナル等
へ搬送される。また第1種第1供給機(2)。
Then, the shipping pallet (9) on which the loading has been completed is conveyed to a shipping site, truck terminal, etc. by an unloading conveyor (10). Also, the first type first feeder (2).

第2種第1供給機(4)、第3種第1供給機(6)上に
取引単位、以下、すなわち取引基準を下廻る端数ワーク
が残った場合は制御装置(11)により第1供給機(2
) (4) (6) 、 コンベヤ(la)、排出コン
ベヤ(8)の動作によって排除される。なお、端数ワー
ク排除後の第1供給機(2)(4) (6)には第2群
ワークの次の製造表示のワークが収納されて1次の第2
供給機に置替えられ、また先の第2供給機(3) (5
) (7)が第1供給機に置換えられる。
If a transaction unit, that is, a fractional work that is less than the transaction standard, remains on the second type first feeder (4) or the third type first feeder (6), the control device (11) supplies the work to the first feeder. machine (2
) (4) (6) , conveyor (la), discharge conveyor (8). After eliminating the fractional workpieces, the first feeder (2), (4), and (6) store the workpieces with the manufacturing display next to the second group of workpieces, and then
It was replaced by the feeder, and the second feeder (3) (5
) (7) is replaced by the first feeder.

以上の動作によって1つの出荷指令(12)、又は同自
失の出荷を1つの出荷指令(12)とすることによって
、特定の出荷指令(12)中の同種ワークについて同じ
製造表示のワークが積付けられる。このため1つの出荷
指令に対し製造表示の異なるワークが混在することによ
る不具合を解消することができる。また同じ製造表示の
ワークの出荷先が整理されるのでそのワークの追跡調査
が容易にでき。
Through the above operations, by making one shipping command (12), or by making the same shipping command (12) one shipping command (12), workpieces with the same manufacturing label are stacked for the same type of work in a specific shipping command (12). It will be done. Therefore, it is possible to eliminate problems caused by the coexistence of workpieces with different manufacturing indications for one shipping command. In addition, since the shipping destinations of workpieces with the same manufacturing label are organized, it is easy to trace the workpieces.

品質管理、市場管理に便利である。Convenient for quality control and market management.

第4図〜第6図はこの発明の他の実施例を示す図で1図
中、第1図〜第3図と同符号は相当部分を示し、(2)
はスタッカクレーンからなり、制御手段(2a)を有す
る供給手段、 (2b)は積付は手段(1)近くに設け
られた供給用コンベヤ、 (91)は積付は済の出荷パ
レット (13)はスタッカクレーンに設けられた計数
装置、 (14)は収納棚、 (15)〜(17)はそ
れぞれ供給ワークが積載されたパレットで、(15A)
〜(15C)は収納棚(14)の下段に収納されて第1
種ワークが積載され(15A)は第1群パレット(15
B)は第2群パレット(15C)は第3群パレットであ
る。(16A)〜(16C)は収納棚(14)の中段に
収納されて第2種ワークが積載され(16A)は第1群
パレット、 (16B)は第2群パレット、 (16C
)は第3群パレットである。(17A)〜(17c)は
収納棚(14)の上段に収納されて第3種ワークが積載
され(17A)は第1群パレット、 (17B)は第2
群パレット(17C)は第3群パレットである。
Figures 4 to 6 are diagrams showing other embodiments of the present invention, and in Figure 1, the same reference numerals as in Figures 1 to 3 indicate corresponding parts, (2)
(2b) is a supply conveyor provided near the means (1) for loading; (91) is a loaded shipping pallet (13); (14) is a storage shelf, (15) to (17) are pallets loaded with supplied workpieces, and (15A) is a counting device installed on the stacker crane.
- (15C) are stored in the lower part of the storage shelf (14) and are placed in the first
The seed work is loaded (15A) on the first group pallet (15A).
In B), the second group of pallets (15C) is the third group of pallets. (16A) to (16C) are stored in the middle of the storage shelf (14) and loaded with type 2 workpieces, (16A) is the first group pallet, (16B) is the second group pallet, (16C)
) is the third group palette. (17A) to (17c) are stored in the upper part of the storage shelf (14) and the third type work is loaded, (17A) is the first group pallet, (17B) is the second group
The group pallet (17C) is the third group pallet.

上記のように構成された荷扱い装置の動作を第6図に示
すフローチャートによって説明する。計数装置(13)
は供給手段(2)とともに移動し、各パレット(15)
〜(17)の上のワーク数を検出して制御装置!(11
)に入力する。そして1客先ごとの出荷伝票等が入力さ
れるとステップ(201)の出荷指令(12)が発せら
れて制御装置(11)が付勢される。そして、ステップ
(202)を経てステップ(203)へ進み第1種ワー
クの積付指令が発せられステップ(204)を経てステ
ップ(205)へ進む。ステップ(205)において、
第1種ワークの第1群パレット (15A)の1パレツ
ト上のワーク数が出荷指令(12)による第1種ワーク
数を充足すればステップ(206)へ進む。
The operation of the cargo handling device configured as described above will be explained with reference to the flowchart shown in FIG. Counting device (13)
is moved together with the supply means (2) and each pallet (15)
~ (17) A control device that detects the number of works above! (11
). When the shipping slip and the like for each customer are input, a shipping command (12) in step (201) is issued and the control device (11) is energized. Then, the process proceeds to step (203) via step (202), where a stowage command for the first type work is issued, and the process proceeds to step (205) via step (204). In step (205),
If the number of works on one pallet of the first group pallet (15A) of the first type work satisfies the number of first type work according to the shipping instruction (12), the process advances to step (206).

またステップ(205)において出荷指令(12)によ
る第1種ワーク数に不足すればステップ(207)へ進
み、第1種ワークの第1群パレット(15A)の複数の
パレット上のワーク数が出荷指令(12)による第1種
ワーク数を充足すればステップ(206)へ進む。
If the number of workpieces of type 1 according to the shipping instruction (12) is insufficient in step (205), the process proceeds to step (207), and the number of workpieces on the plurality of pallets of the first group of pallets (15A) of type 1 workpieces is shipped. If the number of type 1 works according to command (12) is satisfied, the process proceeds to step (206).

そして、ステップ(207)において出荷指令(12)
による第1種ワーク数に不足すればステップ(208)
を経てステップ(209)へ進み1Mが準備された第1
種ワークの群数、すなわち規定値内であればステップ(
205)へ戻り、また規定値内でなければステップ(2
14)により供給ワーク不足が報知されステップ(21
5)により荷扱い中止指令が発せられる。
Then, in step (207), the shipping command (12) is
If the number of Type 1 works is insufficient, step (208)
The process proceeds to step (209) and the first step where 1M is prepared.
If the number of groups of seed work is within the specified value, step (
Return to step (205), and if the value is not within the specified value, step (205) is returned to.
14), the shortage of supplied work is notified and step (21) is performed.
5), a command to stop cargo handling is issued.

ステップ(206)でステップ(205) 、  ステ
ップ(207)における当該パレットの供給が供給手段
(2)に指令され、それらパレットが供給用コンベヤ(
2b)に搬出される。ついで、ステップ(210)によ
り供給用コンベヤ(2b)上のパレットから第1種ワー
クの出荷パレット(9)への積付作業が積付手段(1)
に指令される。そして、ステップ(211)により第1
種ワークの積付けが終了していなければステップ(21
0)が継続され、終了していればステップ(212)へ
進む。ステップ(212)でNが出荷指令(12)によ
る最終値でなければステップ(213)を経てステップ
(203)へ戻り第2種ワークについてステップ(20
3)以降が繰返えされる。
In step (206), the supply means (2) is instructed to supply the pallets in step (205) and step (207), and these pallets are transferred to the supply conveyor (
2b). Next, in step (210), the loading operation of the first type workpieces from the pallet on the supply conveyor (2b) to the shipping pallet (9) is carried out by the loading means (1).
is ordered. Then, in step (211), the first
If the loading of the seed work is not completed, proceed to step (21).
0) is continued, and if completed, the process advances to step (212). If N is not the final value according to the shipping command (12) in step (212), the process returns to step (203) via step (213) and step (20
3) The subsequent steps are repeated.

以上の動作により1つの出荷指令(12)について同種
ワークにつき第1群パレットの第1パレツトのワークを
優先に、以下第1群パレットの複数パレットのワーク、
第2群パレットのワークが出荷パレット(9)に積付け
られる。したがって特定の出荷指令(]2)中の同種ワ
ークについて同じ、製造表示のワークが積付けられて、
第1図〜第3図の実施例と同様な作用を得ることができ
る。また、第4図〜第6図の実施例では、積付は作業後
の端数残ワークが積載された供給用パレットが収納棚(
14)へ返送され、ステップ(205) 、  ステッ
プ(207)の動作において残ワーク数か出荷指令(1
2)により所要ワーク数を充足すれば、これらの残ワー
ク積載パレットが供給される。したがって、製造表示の
古いワークを早期に能率よく出荷することができる。
With the above operation, for one shipping command (12), priority is given to the work on the first pallet of the first group of pallets for the same type of work, and the following works on multiple pallets of the first group of pallets are given priority.
Works on the second group of pallets are stacked on the shipping pallet (9). Therefore, for the same type of work in a specific shipping order (]2), work with the same manufacturing label is stacked,
The same effect as the embodiment shown in FIGS. 1 to 3 can be obtained. In addition, in the embodiments shown in FIGS. 4 to 6, the supply pallet loaded with fractional workpieces after loading is placed on the storage shelf.
14), and in the operations of step (205) and step (207), the number of remaining works or the shipping command (1
If the required number of works is satisfied according to 2), these remaining workpiece loading pallets are supplied. Therefore, workpieces with outdated manufacturing labels can be shipped quickly and efficiently.

第7図及び第8図もこの発明の他の実施例を示す図で1
図中、第4図〜第6図と同符号は相当部分を示し、 (
12)は3つの出荷先1例えば1.  II。
7 and 8 are also diagrams showing other embodiments of the present invention.
In the figure, the same symbols as in Figures 4 to 6 indicate corresponding parts; (
12) For example, 1. II.

■からなる複数の出荷指令、 (9A)〜(9C)はそ
れぞれ出荷パレットで、出荷指令(12)のI、n、H
にそれぞれ対応して準備される。
■Multiple shipping commands consisting of (9A) to (9C) are shipping pallets, respectively, and shipping commands (12) I, n, H
Prepared accordingly.

上記のように構成された荷扱い装置の動作を第8図に示
すフローチャートによって説明する。ステップ(301
)で複数の出荷指令(12)が発せられると制御装置(
11)が付勢されステップ(302)を経て。
The operation of the cargo handling device configured as described above will be explained with reference to the flowchart shown in FIG. Step (301
), when multiple shipping commands (12) are issued, the control device (
11) is energized and goes through step (302).

ステップ(303)へ進み第1一種ワークの積付指令が
発せられてステップ(304)を経てステップ(305
)へ進む。ステップ(305)において、第1種ワーク
の第1群バレツ) (15A)上のワーク数が出荷指令
(12)による第1種ワーク数を充足すればステップ(
306)へ進み、第1群パレット(15A)の所要ノく
レットの供給が供給手段(2)に指令されて、それらパ
レットが供給用コンベヤ(2b)に搬出される。ついで
ステップ(307)により供給用コンベヤ(2b)のパ
レットから第1種ワークの積付作業が積付手段(1)に
指令されて、出荷指令(12)のそれぞ帽こ対応した出
荷パレット(9A)〜(9C)に第1種ワークの所要数
が積付けられ、ステップ(308)へ進む。ステップ(
308)において第1種ワーク積付終了でなければステ
ップ(307)が継続され、積付終了であればステップ
(318)へ進む。
Proceeding to step (303), a stowage command for the first class workpiece is issued, the process proceeds to step (304), and then step (305)
). In step (305), if the number of works on the first group of workpieces (15A) satisfies the number of first type workpieces according to the shipping instruction (12), step (
306), the supply means (2) is instructed to supply the required number of pellets of the first group of pallets (15A), and these pallets are conveyed to the supply conveyor (2b). Next, in step (307), the loading operation of the first type work from the pallet of the supply conveyor (2b) is instructed to the loading means (1), and the shipping pallet (1) corresponding to each of the shipping instructions (12) is 9A) to (9C) are stacked with the required number of first type workpieces, and the process proceeds to step (308). Step (
In step 308), if the first type workpiece loading has not been completed, step (307) is continued, and if loading has been completed, the process advances to step (318).

ステップ(305)において、第1種ワークの第1群パ
レット(15A)上のワーク数が出荷指令(12)!こ
よる第1種ワーク数に不足すればステ゛ンブ(309)
へ進み、第1群パレット(15A)上のワーク数が出荷
指令(12)中の1つの出荷指令の所要ワーク数に不足
すればステップ(310)を経てステップ(311)へ
進む。ステップ(311)においてMか準備された第1
種ワークの群数、すなわち規定値内であればステップ(
305)へ戻り、ステップ(305)以降が繰返えされ
る。ステップ(309)において第1群パレット(15
A)上のワーク数が出荷指令(12)中の少なくとも1
つの出荷指令の所要ワーク数に不足しなければステップ
(312)へ進み、第1群パレット(15A)の所要パ
レットの供給が供給手段(2)に指令され、それら所要
のパレットが供給用コンベヤ(2b)に搬出される。そ
して、ステップ(313)により出荷指令(12)中の
所要ワーク数が充足した出荷指令先の出荷パレットに対
し、供給用コンベヤ(2b)上のパレットから第1種ワ
ークの積付作業が積付手段(1)に指令されて積付けが
行なわれる。ついでステップ(314)へ進み、供給用
コンベヤ(2b)上の第1群パレットからの第1種ワー
クの積付終了でなければステップ(313)が継続され
、終了であればステップ(315)へ進む。ステップ(
315)において、第1群パレット(15A)上のワー
ク数が不足した出荷指令(12)中の残余の出荷指令に
対する第1種ワークの第2群パレット(15B)の所要
パレットの供給が供給手段(2)に指令され、それら所
要のパレットか供給用コンベヤ(2b)に搬出される。
In step (305), the number of workpieces on the first group pallet (15A) of the first type workpieces is the shipping command (12)! If the number of Type 1 works is insufficient, step (309)
If the number of works on the first group pallet (15A) is insufficient to the required number of works for one shipping command among the shipping commands (12), the process advances to step (311) via step (310). The first M prepared in step (311)
If the number of groups of seed work is within the specified value, step (
The process returns to step (305), and steps after step (305) are repeated. In step (309), the first group of pallets (15
A) The number of works above is at least 1 in shipping command (12)
If the required number of works for one shipping command is not insufficient, the process advances to step (312), where the supply means (2) is commanded to supply the required pallets of the first group of pallets (15A), and these required pallets are transferred to the supply conveyor ( 2b). Then, in step (313), the loading work of the first type work is carried out from the pallet on the supply conveyor (2b) to the shipping pallet of the shipping command destination where the required number of works in the shipping command (12) has been satisfied. The stowage is performed by commanding the means (1). Next, the process proceeds to step (314), and if the loading of the first type workpieces from the first group of pallets on the supply conveyor (2b) is not completed, step (313) is continued, and if it is completed, the process proceeds to step (315). move on. Step (
In 315), the supply means supplies the required pallets of the second group pallet (15B) of the first type workpieces in response to the remaining shipping command in the shipping command (12) in which the number of works on the first group pallet (15A) is insufficient. (2), and the required pallets are delivered to the supply conveyor (2b).

そしてステップ(316)により残余の出荷指令先の出
荷パレットに対し、供給用コンベヤ(2b)上のパレッ
トから第1種ワークの積付作業か積付手段(1)に指令
されて積付けが行なわれる。ついでステップ(317)
へ進み、供給用コンベヤ(2b)上の第2群パレットか
らの第1種ワークの積付終了でなければステップ(31
6)が継続され、終了であればステップ(318)へ進
む。ステップ(318)において出荷指令(12)によ
る最終値でなければステップ(31,9)を経てステッ
プ(303)へ戻り第2種ワークについてステップ(3
03)以降か繰返えされる。
Then, in step (316), the remaining shipping pallets to which the shipping command is directed are loaded with first-class workpieces from the pallets on the supply conveyor (2b), or the loading means (1) is instructed to load them. It will be done. Then step (317)
If the loading of the first type workpieces from the second group of pallets on the supply conveyor (2b) is not completed, proceed to step (31).
6) is continued, and if completed, the process advances to step (318). If it is not the final value according to the shipping command (12) in step (318), the process returns to step (303) via steps (31, 9) and step (3)
03) and thereafter are repeated.

なお、ステップ(311)において1Mが準備された第
1種ワークの群数、すなわち規定値内でなければ、ステ
ップ(320)により供給ワーク不足が報知され、また
ステップ(321)によって荷扱い中止が指令される。
Note that if 1M is not within the number of groups of prepared type 1 workpieces, that is, within the specified value in step (311), a shortage of supplied workpieces will be notified in step (320), and handling will be stopped in step (321). commanded.

以上の動作により複数の出荷指令(12)について所要
ワーク数によって第1群パレットのワークを優先し、第
1群パレットのワーク数が不足するときは、このワーク
数で充足する出荷指令のみに第1群パレットのワークが
積付けられ、残余の出荷指令には第2群パレットのワー
クが積付けられる。
With the above operation, the workpieces on the first group pallet are given priority according to the required number of works for multiple shipping orders (12), and when the number of works on the first group pallet is insufficient, only the shipping commands that are satisfied with this number of works are given priority. Works on the first group of pallets are stacked, and works on the second group of pallets are stacked on the remaining shipping instructions.

したがって、特定の出荷指令(12)中の同種ワークに
ついて同じ製造表示のワークが積付けられるので、第1
図〜第3図、また第4図〜第6図の実施例と同様な作用
を得ることができる。また第7図。
Therefore, since the workpieces with the same manufacturing label are stacked for the same kind of workpieces in the specific shipping order (12), the first
It is possible to obtain the same effect as the embodiments shown in FIGS. 3 to 3 and 4 to 6. Also, Figure 7.

第8図の実施例では複数の出荷指令が一緒に処理される
ので、−層能率よく供給、積付は作業することができる
In the embodiment shown in FIG. 8, a plurality of shipping commands are processed at the same time, so that supply and stowage operations can be carried out efficiently.

〔発明の効果〕〔Effect of the invention〕

この発明は9以上説明したように特定の出荷指令に対し
、特定種の所要ワーク数を第1群ワーク数が不足する場
合は第1群ワークを積付け、所要ワーク数に第1群ワー
ク数が不足するときは上記特定種の第2群ワークを積付
け、また特定の出荷指令によるワークの所要数により第
1群パレットの第1パレツト、第1群パレットの複数パ
レット第2群パレットの順でワークを積付け、さらに複
数の出荷指令によるワークの所要数により、第1群パレ
ット少なくとも1つの出荷指令を充足する第1群パレッ
トと残余の出荷指令に対して第2群パレットの順でワー
クを積付けるようにしたものである。これにより特定の
出荷指令に対して製造表示の異なるワークが混在するこ
とがなく、製造表示の異なるワークの混在によって生じ
る客先の不満等の不具合を解消する効果がある。
As explained above, in response to a specific shipping order, this invention sets the required number of works of a specific type, if the number of works in the first group is insufficient, stacks the first group of works, and adds the required number of works to the number of works in the first group. When there is a shortage of the above-mentioned specific types of workpieces, the second group of workpieces will be loaded, and depending on the required number of workpieces according to a specific shipping order, the first pallet of the first group of pallets, the multiple pallets of the first group of pallets, and the second group of pallets will be stacked. Then, depending on the required number of workpieces according to multiple shipping orders, the workpieces are stacked on the first group pallet that satisfies at least one shipping order on the first group pallet, and then on the second group pallet for the remaining shipping orders. It was designed to be stacked. This prevents workpieces with different manufacturing indications from being mixed in response to a specific shipping order, and has the effect of eliminating problems such as customer dissatisfaction caused by mixing of workpieces with different manufacturing indications.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明による荷扱い装置の一実施例を示す全
体構成概念図、第2図は第1図の機器の電気的接続を示
す概念回路図、第3図は第1図の動作を説明した要部フ
ローチャート第4図はこの発明による荷扱い装置の他の
実施例を示す第1図相当図、第5図は第4図に対応した
第2図相当図、第6図は第4図に対応した第3図相当図
、第7図もこの発明の他の実施例を示す第1図相当図。 第8図は第7図に対応した第3図相当図である。 (1)・・・積付は手段、 (2) (4) (6)・
・・第1供給機、(2)・・・供給手段、 (3) (
5) (7)・・・第2供給機、 (9) (9A) 
(9B) (9C)・・・出荷パレット。 (11)・・・制御装置、 (12)・・・出荷指令、
 (15A)(15B) (15c)・・・第1種ワー
ク群パレット、 (16A)(16B) (16C)・
・・第2種ワーク群パレット、  (17A)(17B
) (17C)・・・第3種ワーク群パレット。 なお1図中同一部分または相当部分は同一符号により示
す。
Fig. 1 is a conceptual diagram of the overall configuration of an embodiment of the cargo handling device according to the present invention, Fig. 2 is a conceptual circuit diagram showing the electrical connections of the equipment shown in Fig. 1, and Fig. 3 shows the operation of Fig. 1. FIG. 4 is a flowchart of the main parts explained, which corresponds to FIG. 1 showing another embodiment of the material handling device according to the present invention, FIG. 5 corresponds to FIG. FIG. 3 is a diagram corresponding to FIG. 3, and FIG. 7 is also a diagram corresponding to FIG. 1 showing another embodiment of the present invention. FIG. 8 is a diagram corresponding to FIG. 3 corresponding to FIG. 7. (1)...Stowage is a means, (2) (4) (6)...
...first supply machine, (2) ...supply means, (3) (
5) (7)...Second supply machine, (9) (9A)
(9B) (9C)...Shipping pallet. (11)...Control device, (12)...Shipping command,
(15A) (15B) (15c)... 1st type work group pallet, (16A) (16B) (16C)
・2nd type work group pallet, (17A) (17B
) (17C)...Third type work group pallet. In addition, the same parts or corresponding parts in FIG. 1 are indicated by the same reference numerals.

Claims (3)

【特許請求の範囲】[Claims] (1)それぞれ同種のワークからなる第1群ワーク及び
第2群ワーク、上記第1群ワークを供給する第1供給機
及び上記第2群ワークを供給する第2供給機と、上記ワ
ークの出荷指令により上記ワークを出荷パレットに積付
ける積付け手段と、特定の上記出荷指令中の上記ワーク
の所要数を上記第1群ワーク数が充足する場合は上記積
付け手段に上記第1供給機のワークの積付けを指令し、
上記所要数に上記第1群ワーク数が不足するときは上記
第2供給機のワークの積付けを上記積付け手段に指令す
る制御装置とを備えた荷扱い装置。
(1) A first group of workpieces and a second group of workpieces each consisting of the same type of workpieces, a first feeding machine that supplies the first group of workpieces, a second feeding machine that supplies the second group of workpieces, and shipping of the workpieces. A stacking means for stacking the above-mentioned works onto a shipping pallet according to a command, and a first supply machine for the above-mentioned stacking means if the number of works in the first group suffices the required number of the above-mentioned works in a specific above-mentioned shipping command. Commands the loading of workpieces,
and a control device for instructing the stacking means to stack the works in the second feeder when the number of works in the first group is insufficient to the required number.
(2)それぞれ同種のワークからなる複数の群ワーク、
それぞれの上記群ワークがそれぞれ積載された複数の群
パレット、上記ワークの出荷指令により所要数の上記ワ
ークを出荷パレットに積付ける積付け手段と、上記群パ
レットのパレットを上記積付け手段に供給する供給手段
と、特定の上記出荷指令中の上記ワークの所要数を1つ
の上記群パレットの第1のパレット上の上記ワーク数が
充足する場合は上記第1のパレットの供給を上記供給手
段に指令し、上記所要数に上記第1のパレットの上記ワ
ーク数が不足する場合は上記1つの群パレットの複数の
パレットの供給を上記供給手段に指令し、上記所要数に
上記1つの群パレットのすべてのパレット上の上記ワー
ク数が不足する場合は次の上記群パレットのパレットの
供給を上記供給手段に指令する制御装置とを備えた荷扱
い装置。
(2) Multiple group works each consisting of the same type of work,
A plurality of group pallets each loaded with each of the group workpieces, a stacking means for stacking a required number of the workpieces onto the shipping pallet in response to a shipping command for the workpieces, and supplying the pallets of the group pallet to the stacking means. a supply means; and if the number of works on the first pallet of one pallet group satisfies the required number of works in the particular shipping command, the supply means is instructed to supply the first pallet; However, if the number of works on the first pallet is insufficient to the required number, the supply means is instructed to supply a plurality of pallets in the one group of pallets, and all of the pallets in the one group are added to the required number. and a control device for instructing the supply means to supply pallets of the next group of pallets when the number of works on the pallets is insufficient.
(3)それぞれ同種のワークからなる複数の群ワーク、
それぞれの上記群ワークがそれぞれ積載された複数の群
パレット、上記ワークの複数の出荷指令に対してそれぞ
れの所要数の上記ワークを、上記出荷指令にそれぞれ対
応した複数の出荷パレットに積付ける積付け手段と、上
記群パレットのパレットを上記積付け手段に供給する供
給手段と、次に述べる指令その1及びその2のいずれか
を発する制御装置とを備えた荷扱い装置。 指令その1 複数の上記出荷指令中の上記ワークの所要数を1つの上
記群パレット上の上記ワーク数が充足する場合の、上記
1つの群パレットの所要パレット数供給についての上記
供給手段に対する供給指令。 指令その2 複数の上記出荷指令中の上記ワークの所要数に上記1つ
の群パレット上の上記ワーク数が不足し、かつ少なくと
も1つの上記出荷指令中の上記ワークの所要数を上記1
つの群パレット上の上記ワーク数が充足する場合の、上
記1つの群パレットの所要パレット数供給についての上
記供給手段に対する供給指令、この供給指令による上記
ワーク数が充足する上記出荷指令に対応した上記出荷パ
レットに上記ワークの所要数積付けについての上記積付
け手段に対する積付指令、上記ワーク数に不足する上記
出荷指令に対応した残余の上記出荷パレットにつき次の
上記群パレットの所要パレット数供給についての上記供
給手段に対する供給指令、及び上記残余の上記出荷パレ
ットに上記次の群パレットの上記ワークの所要数積付け
についての上記積付け手段に対する積付指令。
(3) Multiple group works each consisting of the same type of work,
A plurality of group pallets each loaded with each of the above-mentioned group workpieces, and a stacking process in which the required number of the above-mentioned workpieces are stacked on a plurality of shipping pallets corresponding to each of the above-mentioned shipping orders in response to a plurality of shipping orders for the above-mentioned workpieces. a means for supplying pallets of the group of pallets to the stowage means; and a control device for issuing one of commands 1 and 2 described below. Directive 1: A supply command to the supplying means regarding the supply of the required number of pallets of one group of pallets when the number of works on one group of pallets satisfies the required number of works in the plurality of shipping instructions. . Directive 2: The number of works on one group pallet is insufficient for the required number of works in the plurality of shipping orders, and the required number of works in at least one shipping command is
A supply command to the supply means for supplying the required number of pallets for one group of pallets when the number of works on one group of pallets is sufficient, and the above corresponding to the shipping command for which the number of works by this supply command is sufficient A stowage command to the above-mentioned stowage means for stowing the required number of the above-mentioned workpieces on the shipping pallet, and a supply of the required number of pallets for the next group of pallets for the remaining shipping pallets corresponding to the above-mentioned shipping command that is insufficient for the above-mentioned number of works. a supply command to the supply means, and a stowage command to the stowage means for stowing the required number of works of the next group of pallets onto the remaining shipping pallets.
JP2161099A 1990-03-06 1990-06-19 Load handling device Pending JPH03279123A (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2161099A JPH03279123A (en) 1990-03-06 1990-06-19 Load handling device
KR1019910003008A KR960004174B1 (en) 1990-03-06 1991-02-25 Work handing apparatus
GB9104752A GB2242419B (en) 1990-03-06 1991-03-06 Work handling apparatus
HK147194A HK147194A (en) 1990-03-06 1994-12-22 Work handling apparatus

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP5438890 1990-03-06
JP2-54388 1990-03-06
JP2161099A JPH03279123A (en) 1990-03-06 1990-06-19 Load handling device

Publications (1)

Publication Number Publication Date
JPH03279123A true JPH03279123A (en) 1991-12-10

Family

ID=26395150

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2161099A Pending JPH03279123A (en) 1990-03-06 1990-06-19 Load handling device

Country Status (4)

Country Link
JP (1) JPH03279123A (en)
KR (1) KR960004174B1 (en)
GB (1) GB2242419B (en)
HK (1) HK147194A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10306356A1 (en) * 2003-02-15 2004-09-02 Bo* Frost Dienstleistungs Gmbh & Co Kg Method and device for automatically picking a large number of orders
KR101602132B1 (en) * 2014-05-13 2016-03-10 주식회사 메카티엔에스 System and method for intelligent loading freight

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4336589A (en) * 1980-04-07 1982-06-22 Rapistan Division, Lear Siegler, Inc. Warehousing monitor and control system
US4656591A (en) * 1983-04-18 1987-04-07 Goody Products, Inc. Order processing method and apparatus (II)
US4641271A (en) * 1983-11-09 1987-02-03 Hitachi, Ltd. Piling planning method and piling system of cargoes by palletizing robot
US4692876A (en) * 1984-10-12 1987-09-08 Hitachi, Ltd. Automatic freight stacking system
JPH0611618B2 (en) * 1984-12-01 1994-02-16 村田機械株式会社 Article palletizing device
CA2034813C (en) * 1990-01-24 2001-04-24 Sean C. Mcdonald System for filling orders

Also Published As

Publication number Publication date
GB2242419A (en) 1991-10-02
KR960004174B1 (en) 1996-03-27
HK147194A (en) 1994-12-30
KR910016594A (en) 1991-11-05
GB9104752D0 (en) 1991-04-17
GB2242419B (en) 1994-04-27

Similar Documents

Publication Publication Date Title
CN103764523A (en) Method for storing and/or order-picking product units
CN113966304A (en) Device and method for preparing pallets with beverage packages
KR20180005914A (en) Auto palletizing system
JPH06286823A (en) Picking system
JPH03279123A (en) Load handling device
CN214085185U (en) Server material pretreatment system
JPH05246546A (en) Loading device
JP2002037422A (en) Physical distribution facility
JPH03205223A (en) Industrial robot apparatus
JP3812640B2 (en) Automatic warehouse shipping system
JP3063494B2 (en) Loading equipment
JPH0664755A (en) Loading device
JP2002037412A (en) Physical distribution facilities
JP7167644B2 (en) Container transport system
JP2616590B2 (en) Loading equipment
JPS6357182B2 (en)
JP2927569B2 (en) Loading method
JP2675711B2 (en) Loading equipment
JP3218353B2 (en) Loading method
JP3503006B2 (en) Picking method
JP3166424B2 (en) Loading command device
JPH03192026A (en) Industrial robot device
JPH05155405A (en) Stratified picking system
CN115196270A (en) Material distribution device and method
CN116468370A (en) Nuclear power station spare part digital warehouse management system and method