JPH03277128A - Deciding method for switch operating sequence in generating substation - Google Patents

Deciding method for switch operating sequence in generating substation

Info

Publication number
JPH03277128A
JPH03277128A JP2078196A JP7819690A JPH03277128A JP H03277128 A JPH03277128 A JP H03277128A JP 2078196 A JP2078196 A JP 2078196A JP 7819690 A JP7819690 A JP 7819690A JP H03277128 A JPH03277128 A JP H03277128A
Authority
JP
Japan
Prior art keywords
procedure
concept
information
sequence
procedures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2078196A
Other languages
Japanese (ja)
Other versions
JP2654225B2 (en
Inventor
Tsugio Hasegawa
長谷川 次夫
Tooru Takenuki
竹貫 徹
Akira Tanaka
明 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Tokyo Electric Power Co Holdings Inc
Original Assignee
Meidensha Corp
Tokyo Electric Power Co Inc
Meidensha Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Tokyo Electric Power Co Inc, Meidensha Electric Manufacturing Co Ltd filed Critical Meidensha Corp
Priority to JP2078196A priority Critical patent/JP2654225B2/en
Publication of JPH03277128A publication Critical patent/JPH03277128A/en
Application granted granted Critical
Publication of JP2654225B2 publication Critical patent/JP2654225B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • Y04S10/54

Landscapes

  • Devices For Executing Special Programs (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Feedback Control In General (AREA)

Abstract

PURPOSE:To freely realign a sequence and to automatically form an operating sequence merely by adding or altering facility information at the time of increasing new facility by setting a concept key of a switch type, an operating direction, etc., and combining the operating sequence and a plurality of concept keys. CONSTITUTION:A knowledge base 1 stores information for forming an operating sequence, a power facility information unit 1a expresses facility of a generating substation, switches, connecting relation of the facility in a frame structure, and sequence table forming logic information unit 1b expresses knowledge for forming sequence in a production rule. An inferring mechanism 2 refers to information of the base 1 to inter forward, and outputs the sequence to a working area 3. The area 3 is an area used by the mechanism 2, and outputs the sequence. The information in which individual sequences are summarized in knowledge concept is reserved, and the sequences are freely realigned by referring to a group of the sequences by the expression of various levels.

Description

【発明の詳細な説明】 A 産業上の利用分野 本発明は、発変電所における開閉器操作手順を自動的に
決定する手順決定方法に関する。
DETAILED DESCRIPTION OF THE INVENTION A. Field of Industrial Application The present invention relates to a procedure determining method for automatically determining switch operating procedures in power generation and substations.

B9発明の概要 本発明は、発変電所における開閉器操作手順を自動的に
決定する手順決定方法において、開閉器種別、操作方向
、設備種別、ルールセット別にそれらの具体的な内容に
対する概念キーを設定し、手順作成ルールが個々の操作
手順にその概念キーを付属させることにより手順を作成
する工程と、作成した手順を概念キーで特定する工程と
、複数の概念キーをアンドとオアで組み合わせる工程と
を備えることにより、 各種レベルの表現による手順のかたまりを参照すること
かでき、手順の並へ替えを自在に行えるようにする技術
を提供するものである。
B9 Summary of the Invention The present invention provides a procedure determination method for automatically determining switch operation procedures in power generation and substations, which provides concept keys for specific contents of each switch type, operation direction, equipment type, and rule set. The process of creating a procedure by setting the procedure creation rule and attaching the concept key to each operation procedure, the process of identifying the created procedure with the concept key, and the process of combining multiple concept keys with AND and OR. By having this, it is possible to refer to a group of procedures expressed at various levels, and it provides a technology that allows the order of procedures to be freely rearranged.

C0従来の技術 発電所や変電所では、設備の保守点検の作業のために、
変圧器、母線、送電線などの設備を停止したり停止状態
から使用状態にしたりすることがある。
C0 Conventional technology At power plants and substations, for equipment maintenance and inspection work,
Equipment such as transformers, busbars, and power transmission lines may be stopped or put into use from a stopped state.

その際には設備周辺の開閉器を操作しなければならず、
この開閉器の操作は、設備の運用規則に従って、設備毎
に予め設定された手順(シーケンス)で実行される。手
順は、主回路の操作の他に安全確認の各種手順や他部署
への連絡事項手順等も含んでいて大変複雑なものである
。また各設備毎に操作手順を作成するので、設備の新設
や増設時に新たな操作手順の作成が必要になる。
In that case, the switches around the equipment must be operated.
The operation of this switch is performed according to a procedure (sequence) that is preset for each piece of equipment in accordance with the operation rules of the equipment. The procedures are extremely complex, including not only the operation of the main circuit, but also various safety confirmation procedures and procedures for contacting other departments. Furthermore, since operating procedures are created for each piece of equipment, it is necessary to create new operating procedures when new or expanded equipment is installed.

開閉器の操作手順を作成する際の知識は基本的には下記
の2概念に分類することができる。
Knowledge when creating operating procedures for switches can basically be classified into the following two concepts.

(1)どの開閉器を入れるか、又は切るか。(1) Which switch should be turned on or off?

(2)どのような順番で操作するか。(2) In what order should the operations be performed?

設備を停止する場合の操作手順はその操作順番に意味が
ある。例えば、操作手順の並びに関する知識には、 ■CBを開放した後にLSを開放する。
The order of operations when stopping equipment has meaning. For example, knowledge regarding the sequence of operation procedures includes: (1) Release LS after releasing CB.

■母線を停止する前に母線に繋がってる変圧器を他の母
線にループ切替えする。
■Before stopping the bus, loop-switch the transformer connected to the bus to another bus.

■変圧器を周辺の設備から切り離す順番は、3次側CB
、2次側CB、1次側CBの順に行う。
■The order in which the transformer is disconnected from the surrounding equipment is the tertiary side CB.
, secondary side CB, and primary side CB in this order.

なとの規則があって、どの開閉器を開いたらよいかとい
った知識を有した手順作成ルールで作成した個々の開閉
器操作手順をそれらの規則に従って並へ替える必要が生
じてくる。この手順の並へ替え処理しルールにより設定
され、作成済み手順を具体的な開閉器の種別又は動作名
で指定する前記■、■の場合や、複数手順を抽象的な概
念でとらえて指定する前記■のループ切替えの場合があ
り、それぞれ指定された手順を取り出して並べ替える。
There are several rules, and it becomes necessary to rearrange the individual switch operation procedures created using procedure creation rules that have knowledge such as which switch should be opened, according to those rules. In the case of ■ and ■ above, where the procedure is set by the reordering rule and the created procedure is specified by a specific switch type or operation name, or multiple procedures are specified by abstract concept. In the case of loop switching described in (2) above, each designated procedure is extracted and rearranged.

03発明か解決しようとする課題 ここで、操作手順の認識の一例を示すと、ある設備を停
止する場合、一連の操作手順中の個別の手順は下記の如
き要素から成る。言い替えると、操作手順を使用する人
間は、手順の内容を下記の如き複数の視点から認識して
操作を実施するわけである。
03 Problems to be Solved by the Invention Here, to give an example of recognition of operating procedures, when a certain equipment is to be stopped, each individual procedure in a series of operating procedures consists of the following elements. In other words, the person using the operating procedure recognizes the content of the procedure from multiple viewpoints as described below and performs the operation.

(+)CBの入り/切り (2)LSの入り/切り (3)CBの操作 (4)CBの状態確認 (5)LSの操作 (6)LSの状態確認 (7)開閉器の操作 (8)開閉器の状態確認 (9)ループ切替え操作群 (10)設備切り離し操作群 (11)設備の接続操作群 (I2)設備の併用操作群 (13)設備の併用操作解除群 (14)その他。(+) CB on/off (2) LS turning on/off (3) CB operation (4) Checking the status of CB (5) LS operation (6) Checking the LS status (7) Switch operation (8) Check the status of the switch (9) Loop switching operation group (10) Equipment disconnection operation group (11) Equipment connection operation group (I2) Combined equipment operation group (13) Equipment combination operation cancellation group (14) Others.

以上のように、手順を特定する表現レベルが、具体的な
種別から抽象的な概念の手順群までそれぞれ異なってい
るため、それらの混在した全体の手順(前記概念の(1
)の知識で作成した手順)から、必要とする1個または
複数個の手順を取り出す処理は複雑となり、設備の新設
や増設の際に、新たに開閉器操作手順を作成する作業が
極めて難しい。
As mentioned above, since the expression level for specifying a procedure is different from a concrete type to a group of procedures of an abstract concept, the whole procedure ((1) of the above concept
The process of extracting one or more necessary procedures from the procedures (procedures created using the knowledge of ) is complicated, and it is extremely difficult to create new switch operating procedures when installing or expanding equipment.

本発明は、このような課題に鑑みて創案されたもので、
各種レベルの表現による手順の集団を参照することがで
き、手順の並へ替えを自在に行い、設備の新設や増設時
には設備情報の追加変更だけで操作手順を自動的に作成
する発変電所の開閉器操作手順決定方法を提供すること
を目的とする。
The present invention was created in view of these problems, and
It is possible to refer to a group of procedures expressed at various levels, freely rearrange the order of procedures, and automatically create operating procedures by simply adding and changing equipment information when installing or expanding equipment. The purpose of this invention is to provide a method for determining switch operation procedures.

E 課題を解決するための手段 本発明における上記課題を解決するための手段は、設備
、開閉器及びその接続関係をフレーノ、構造で表現する
電力設備情報部と、手順作成に必要な知識を手順作成ル
ールで表現する手順表作成論理情報部とで成る知識ベー
スに所要の情報を格納し、それらの情報の前向き推論に
より操作手順を作成する開閉器操作手順の決定方法にお
いて、開閉器種別、操作方向、設備種別、ルールセット
別にそれらの具体的な内容に対する概念キーを設定し、
手順作成ルールが個々の操作手順にその概念キーを付属
させることで手順を作成する工程と、作成した手順を概
念キーで特定する工程と、複数の概念キーをアンドとオ
アて組み合わせる工程とを備えた発変電所の開閉器操作
手順の決定方法によるものとする。
E. Means for Solving the Problems The means for solving the above problems in the present invention are a power equipment information department that expresses equipment, switches, and their connection relationships in the form of a structure, and a power equipment information department that expresses the knowledge necessary for creating procedures. In a method for determining a switch operation procedure, the required information is stored in a knowledge base consisting of a procedure table creation logical information section expressed by a creation rule, and an operation procedure is created by forward inference of this information. Set concept keys for specific contents for each direction, equipment type, and rule set,
The procedure creation rule includes a step of creating a procedure by attaching its concept key to each operation procedure, a step of specifying the created procedure with a concept key, and a step of combining multiple concept keys using AND and OR. This shall be based on the method used to determine switch operation procedures for power generation and substations.

F 作用 本発明は、発変電所の開閉器をどのような順番で操作す
るか決定する際、知識ベースンステムで手順を作成する
ものである。開閉器の操作は設備の運用規則に従って実
行されるので、知識ベースを電力設備情報部と手順表作
成論理情報部で構成し、電力設備情報部は設備、開閉器
及びその接続関係をフレーム構造で、手順表作成論理情
報部は手順作成に必要な知識を手順作成ルール(プロダ
クンヨンルール)で表現するようにしておいて、それら
に所要の情報を格納し、前向き推論により操作手順を作
成する。その際、手順情報の他に、手順の性質(開閉器
種別、操作方向、設備種別当該手順を生成したルールセ
ット)に関する情報(本発明で概念キーと呼称する)を
付属させて出力し、整理保存しておいて、作成された複
数の手順の中から概念キーを指定して特定する。1手順
に付属する概念キーか複数ある場合はそれらをアンドと
オアて組み合わせることにより、所望の手順を取り出す
ようにする。個別の操作手順を上位の知識概念でまとめ
た情報を保存しておくので、各種レベルの表現による手
順の集団を参照することができ、手順の並へ替えか自由
になる。
F. Function The present invention creates a procedure using a knowledge-based system when determining the order in which to operate the switches in a power generation and substation. Since the operation of the switch is performed according to the equipment operation rules, the knowledge base is composed of the power equipment information section and the procedure chart creation logic information section, and the power equipment information section describes the equipment, switches, and their connection relationships in a frame structure. The procedure chart creation logic information unit expresses the knowledge necessary for creating a procedure in the form of procedure creation rules, stores the necessary information in these rules, and creates an operating procedure by forward reasoning. At that time, in addition to the procedure information, information (referred to as a concept key in the present invention) regarding the nature of the procedure (switch type, operation direction, equipment type, and the rule set that generated the procedure) is output and organized. Save it and specify and identify the concept key from among the multiple procedures created. If there are multiple concept keys attached to one procedure, the desired procedure is retrieved by combining them with AND and OR. Since information that summarizes individual operating procedures using higher-level knowledge concepts is stored, it is possible to refer to a group of procedures expressed at various levels, and the procedures can be rearranged freely.

G 実施例 以下、図面を参照して、本発明の実施例を詳細に説明す
る。
G. Embodiments Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

第1図は、本発明の一実施例の構成図である。FIG. 1 is a configuration diagram of an embodiment of the present invention.

第1図において、操作手順を作成する知識ベースンステ
ムは、知識ベース部1と、推論機構2と、作業エリア3
とで構成され、知識ベース部lは、電力設備情報部1a
と手順表作成論理情報部1bを備えている。
In FIG. 1, the knowledge base system for creating operating procedures consists of a knowledge base section 1, an inference mechanism 2, and a work area 3.
The knowledge base section 1 is composed of the power equipment information section 1a and the knowledge base section 1a.
and a procedure chart creation logic information section 1b.

知識ベース部lには、操作手順を作成するfコめの情報
が格納されていて、電力設備情報部1aは発変電所の設
備、開閉器、設備の接続関係をフレーム構造で表現し、
手順表作成論理情報部1bは手順作成のための知識をプ
ロダクンヨンルールで表現する。ルールは、例えば「“
if”により設備と設備の間に開状態の遮断器がある場
合を判定し、“then”によりその遮断器を開く手順
を作成する。」という具合である。これらの知識ベース
を備えたンステムは、前向き推論機能とフレーム表現機
能を有する汎用のエキスバートンステム構築ツールを使
用すれば、容易に構築できる。
The knowledge base part 1 stores f-level information for creating operating procedures, and the power equipment information part 1a expresses the connection relationships among equipment, switches, and equipment of power generation and substations in a frame structure.
The procedure chart creation logic information unit 1b expresses knowledge for creating a procedure using production rules. A rule can be, for example, ““
``If'' is used to determine if there is an open circuit breaker between the equipment, and ``then'' is used to create a procedure to open the circuit breaker.'' Systems with these knowledge bases can be easily constructed using general-purpose Exverton stem construction tools that have forward inference and frame representation capabilities.

推論機構2は、知識ベース1の情報を参照して前向き推
論を行い、作業エリア3へ操作手順を出力する。作業エ
リア3は、推論機構2が使用する作業エリアであって、
操作手順が出力される。
The inference mechanism 2 performs forward inference with reference to the information in the knowledge base 1 and outputs operating procedures to the work area 3. The work area 3 is a work area used by the inference mechanism 2,
The operating procedure will be output.

本発明では、手順の順番を自由に変更するために、ルー
ル表現とその実行において下記を実行する。
In the present invention, in order to freely change the order of procedures, the following is performed in the rule expression and its execution.

(1)手順作成ルール(前記概念の(1)の知識を有す
るルール)で個々の手順を作成する際に手順情報の他に
、手順の性質に関する概念キーを出力し、整理保存して
おく。
(1) When creating individual procedures using procedure creation rules (rules that have the knowledge of concept (1) above), in addition to procedure information, a concept key regarding the nature of the procedure is output and stored in an organized manner.

(2)前記概念の(2)の知識を有するルールにおいて
、1つの概念キーを指定して複数の手順の中から所望の
手順を取り出す。
(2) In the rule having the knowledge of concept (2), one concept key is specified and a desired procedure is extracted from a plurality of procedures.

(3)前記概念の(2)の知識を有するルールにおL)
で、複数の概念キーのANDとORで手順を取り出せる
ようにする。
(3) L for rules that have knowledge of (2) of the above concept)
Then, the procedure can be retrieved by AND and OR of multiple concept keys.

第1表は、 実施例に使用される概念キーの一例 を示す表である。Table 1 is An example of a concept key used in the example This is a table showing

第1表 このように設定しておくと、 (1 )■【こより所望の種別の開閉器の手順をすへて取り出
せる。
Table 1 If you set it up like this, (1) ■[You can retrieve the procedure for the desired type of switch from here.

(2)■と■とのANDにより所望の開閉器種別の特定
方向の操作手順をすべて取り出せる。
(2) By ANDing ■ and ■, all operating procedures for a desired switch type in a specific direction can be retrieved.

(3)■により所望の操作方向の手順たけを取り出せる
(3) With (■), the number of steps in the desired direction of operation can be retrieved.

(4)■により所望の設備に関する手順をすへて取り出
仕る。
(4) Complete the procedures related to the desired equipment according to () and take out the equipment.

(5)■によりある概念の手順の集団を取り出せる。(5) A group of procedures for a certain concept can be extracted using ■.

なとか可能になる。It becomes possible somehow.

次に、概念キーと具体的な手順との関係を説明する。第
2表は、第2図の単線結線図に示す設備構成の母線Bを
停止させる手順の一例を示す表である。
Next, the relationship between concept keys and specific procedures will be explained. Table 2 is a table showing an example of a procedure for stopping bus B in the equipment configuration shown in the single line diagram of FIG. 2.

以下余白 第2表 上記の各手順は下表に示す概念キーを付属情報として備
えている。例えば、手順NOIは、開閉器種別、LS、
操作方向;ON1設備種別、変圧器及びルールセット、
ループ切替えという概念キーを備えている。
Table 2 in the margin below Each of the above procedures has the concept key shown in the table below as attached information. For example, the procedure NOI includes switch type, LS,
Operation direction: ON1 equipment type, transformer and rule set,
It has a concept key called loop switching.

第3表は、そのような概念側手順情報の一例を示す表で
ある。
Table 3 is a table showing an example of such concept-side procedure information.

第3表 概念キー 当該キーを備える手順N。Table 3 concept key Step N with the key.

た情報を保存しておくことにより、 各種レベルの 表現による手順の集団を容易に参照でき、手順を自在に
並べ替えることが可能になる。
By storing this information, it is possible to easily refer to a group of procedures expressed at various levels, and to rearrange the procedures at will.

11  発明の効果 以上、説明したとおり、本発明によれは、個別手順を上
位の知識概念でまとめた情報を保存しておくことにより
、各種レベルの表現による手順の集団を参照でき、手順
の並へ替えを自由に行し)、設備の新設や増設時には設
備情報の追加変更だけで操作手順を自動的に作成する発
変電所の開閉器操作手順の決定方法を提供することかで
きる。
11. Effects of the Invention As explained above, according to the present invention, by storing information that summarizes individual procedures using higher-level knowledge concepts, it is possible to refer to a group of procedures expressed at various levels, and the sequence of procedures can be It is possible to provide a method for determining switch operation procedures for power generation and substations that automatically creates operation procedures by simply adding and changing equipment information when installing or expanding equipment.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例の構成図、第2図は対象設備
構成の単線結線図である。 1・・知識ベース部、2・・・推論機構、3・・・作業
エリア、1a・・・電力設備情報部、1b・・手順表作
成論理情報部。
FIG. 1 is a configuration diagram of an embodiment of the present invention, and FIG. 2 is a single line diagram of the target equipment configuration. 1...Knowledge base section, 2...Inference mechanism, 3...Work area, 1a...Power equipment information section, 1b...Procedure chart creation logic information section.

Claims (1)

【特許請求の範囲】[Claims] (1)設備、開閉器及びその接続関係をフレーム構造で
表現する電力設備情報部と、手順作成に必要な知識を手
順作成ルールで表現する手順表作成論理情報部とで成る
知識ベースに所要の情報を格納し、それらの情報の前向
き推論により操作手順を作成する開閉器操作手順の決定
方法において、開閉器種別、操作方向、設備種別、ルー
ルセット別にそれらの具体的な内容に対する概念キーを
設定し、手順作成ルールが個々の操作手順にその概念キ
ーを付属させることで手順を作成する工程と、作成した
手順を概念キーで特定する工程と、複数の概念キーをア
ンドとオアで組み合わせる工程とを備えることを特徴と
する発変電所における開閉器操作手順の決定方法。
(1) The knowledge base consists of the power equipment information section that expresses equipment, switches, and their connection relationships in a frame structure, and the procedure chart creation logic information section that expresses the knowledge necessary for procedure creation using procedure creation rules. In a method for determining switch operation procedures that stores information and creates operating procedures by forward inference from that information, concept keys are set for specific contents for each switch type, operation direction, equipment type, and rule set. However, the procedure creation rule includes a process of creating a procedure by attaching its concept key to each operation procedure, a process of specifying the created procedure with a concept key, and a process of combining multiple concept keys with AND and OR. 1. A method for determining switch operation procedures in a power generation substation, comprising:
JP2078196A 1990-03-27 1990-03-27 How to determine switch operating procedures at substations Expired - Fee Related JP2654225B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2078196A JP2654225B2 (en) 1990-03-27 1990-03-27 How to determine switch operating procedures at substations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2078196A JP2654225B2 (en) 1990-03-27 1990-03-27 How to determine switch operating procedures at substations

Publications (2)

Publication Number Publication Date
JPH03277128A true JPH03277128A (en) 1991-12-09
JP2654225B2 JP2654225B2 (en) 1997-09-17

Family

ID=13655257

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2078196A Expired - Fee Related JP2654225B2 (en) 1990-03-27 1990-03-27 How to determine switch operating procedures at substations

Country Status (1)

Country Link
JP (1) JP2654225B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60129845U (en) * 1984-02-10 1985-08-31 株式会社日立製作所 Automatic operation sheet creation device for power system operation
JPH01166224A (en) * 1987-12-23 1989-06-30 Matsushita Electric Ind Co Ltd Forward inference device
JPH01238429A (en) * 1988-03-17 1989-09-22 Meidensha Corp Decision procedure of switching operation of power facility
JPH01274242A (en) * 1988-04-26 1989-11-02 Meidensha Corp Inference system
JPH01274243A (en) * 1988-04-26 1989-11-02 Meidensha Corp Inference system
JPH0228726A (en) * 1988-07-18 1990-01-30 Fujitsu Ltd Arrangement/integration system for frame type knowledge expression

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60129845U (en) * 1984-02-10 1985-08-31 株式会社日立製作所 Automatic operation sheet creation device for power system operation
JPH01166224A (en) * 1987-12-23 1989-06-30 Matsushita Electric Ind Co Ltd Forward inference device
JPH01238429A (en) * 1988-03-17 1989-09-22 Meidensha Corp Decision procedure of switching operation of power facility
JPH01274242A (en) * 1988-04-26 1989-11-02 Meidensha Corp Inference system
JPH01274243A (en) * 1988-04-26 1989-11-02 Meidensha Corp Inference system
JPH0228726A (en) * 1988-07-18 1990-01-30 Fujitsu Ltd Arrangement/integration system for frame type knowledge expression

Also Published As

Publication number Publication date
JP2654225B2 (en) 1997-09-17

Similar Documents

Publication Publication Date Title
CN108233536A (en) A kind of intelligent program remote handling system
Parise et al. Switching procedures and business continuity management: the flock logic of multiple source systems
CN109711567A (en) Service work safety measure Automatic generation of information method and system
Fountas et al. Hierarchical time-extended Petri nets as a generic tool for power system restoration
Chouhan et al. Hybrid MAS fault location, isolation, and restoration for smart distribution system with microgrids
JPH03277128A (en) Deciding method for switch operating sequence in generating substation
JP4698173B2 (en) Automatic creation method of system control procedure
Parise et al. A syntax and semantics of a language for operational procedures
CN113708501A (en) Method and system for improving scheduling operation ticket standard rate
KR101197962B1 (en) Control system for supplying load of power transformer automatically using logic circuit and the method thereof
JP2637245B2 (en) How to determine switchgear operating procedures for substations
CN112541601B (en) Application form generation method, application form generation device, computer equipment and storage medium
JP2778741B2 (en) Power system accident recovery support device
CN112687151B (en) Power distribution room operation drilling and guiding device and logic control method
JP2530042B2 (en) Rule maintenance method for confirmation items in power system equipment operation procedures
JPH06245381A (en) Forming method for recovery operation procedure of power system
CN105869072A (en) Method for automatically creating transformer station five-prevention database
JPH0531374B2 (en)
Pye et al. Intelligent energy management systems. An operator view
JPH01274623A (en) Loop operation judging system in power system operation
JPH03278233A (en) Expert system
JPH02184225A (en) Power system controller
Hatziargyriou et al. Petri Net Models in the Restoration of Power Systems Following System Collapse
JPS63117624A (en) Electric source system controller
JPH0568170B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees