JPH03247819A - Construction of concrete foundation - Google Patents

Construction of concrete foundation

Info

Publication number
JPH03247819A
JPH03247819A JP4639590A JP4639590A JPH03247819A JP H03247819 A JPH03247819 A JP H03247819A JP 4639590 A JP4639590 A JP 4639590A JP 4639590 A JP4639590 A JP 4639590A JP H03247819 A JPH03247819 A JP H03247819A
Authority
JP
Japan
Prior art keywords
foundation
concrete
construction
concrete foundation
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4639590A
Other languages
Japanese (ja)
Inventor
Futoshi Isshiki
太 一色
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National House Industrial Co Ltd
Original Assignee
National House Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National House Industrial Co Ltd filed Critical National House Industrial Co Ltd
Priority to JP4639590A priority Critical patent/JPH03247819A/en
Publication of JPH03247819A publication Critical patent/JPH03247819A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE:To greatly reduce construction manpower at site by constructing a precast concrete foundation body forming reinforced concrete to the lower part of the foundation beam together as a unit to the foundation post. CONSTITUTION:Reinforced concrete 2 is formed to the lower part of the foundation beam 1 as a lattice beam together as a unit in a factory, and a precast concrete foundation body 3 is formed. After that, bolt holes 5 are formed on the side of the foundation beam 1, and female screw holes 6 are formed on the foundation post 4 respectively. In a construction site, bolts are screwed into the female holes 6 from the bolt holes 5 to build the foundation beam 1. In addition, concrete 7 is placed in a space between the foundation post 4 and the reinforce concrete 2 of the precast concrete foundation body 3 to construct the construction of concrete foundation.

Description

【発明の詳細な説明】[Detailed description of the invention] 【産業上の利用分野】[Industrial application field]

本発明は施工工数が大幅に削減されたコンクリート基礎
構造に関する。
The present invention relates to a concrete foundation structure in which the number of construction steps is significantly reduced.

【従来技術1 従来より、第2図に示すように、ラチス梁である基礎梁
1を基礎束4を介して組立てた後、下部で鉄筋8を組み
、この後コンクリート7を打設してコンクリート基礎が
構築されている。 【発明が解決しようとする課題】 従来にあっては、全て現場での施工となり、しかも湿式
1法で施工に手間を要するものになってしまっていた。 本発明は上記事情に鑑みて為されたものであり、その目
的とするところは、現場での施工工数が大幅に削減され
、しかもほとんど乾式1法となり、施工性に優れるコン
クリート基礎構造を提供することにある。 [8F題を解決するための手段] 本発明のコンクリート基礎構造は、基礎梁1の下部に鉄
筋コンクリート2を一体成形したプレキャストコンクリ
ート基礎体3を基礎束4に架設させて成るものであり、
この構成により上記課題が解決されたものである。 [作用] 現場においてプレキャストコンクリート基礎体3を基礎
束4に架設するだけで施工でき、施工性に優れるもので
ある。 [実施例1 ラチス梁である基礎梁1の下部には鉄筋コンクリート2
が一体成形されている。このブレキャストコンクリート
基礎体3は工場において成形される。基礎梁1の側部に
はボルト孔5からボルトを基礎束4の雌ねじ孔6に螺入
して基礎梁1が架設される。基礎束4とプレキャストコ
ンクリート基礎体3の鉄筋コンクリート2との間隙には
コンクリート7が打設されてコンクリート基礎構造が構
築されている。而して、現場においては、基礎梁1を基
礎束4にボルト接合し、コンクリート7を打設するだけ
でよく、施工工数を大幅に削減できるものである。 【発明の効果1 本発明にあっては基礎梁の下部に鉄筋コンクリートを一
体成形したプレキャストコンクリート基礎体を基礎束に
架設させているので、現場においてプレキャストコンク
リート基礎体を基礎束に架設するだけで施工できるもの
であり、施工工数を大幅に削減でき、しかも1!とんと
乾式1法となり、施工性に優れるものである。
[Prior Art 1] Conventionally, as shown in Fig. 2, after a foundation beam 1, which is a lattice beam, is assembled via a foundation bundle 4, reinforcing bars 8 are assembled at the lower part, and then concrete 7 is poured to make concrete. The foundation has been built. [Problems to be Solved by the Invention] In the past, all construction was done on-site, and moreover, the wet method required a lot of work. The present invention has been made in view of the above circumstances, and its purpose is to provide a concrete foundation structure with excellent workability, which greatly reduces the number of on-site construction work, and moreover, requires only a dry method. There is a particular thing. [Means for solving the 8F problem] The concrete foundation structure of the present invention is constructed by constructing a precast concrete foundation 3, which is integrally formed with reinforced concrete 2 at the bottom of a foundation beam 1, on a foundation bundle 4,
This configuration solves the above problem. [Function] Construction can be carried out by simply erecting the precast concrete foundation 3 on the foundation bundle 4 at the site, and the workability is excellent. [Example 1 Reinforced concrete 2 is placed at the bottom of the foundation beam 1, which is a lattice beam.
is integrally molded. This precast concrete foundation 3 is formed in a factory. The foundation beam 1 is constructed on the side of the foundation beam 1 by screwing bolts from the bolt holes 5 into the female screw holes 6 of the foundation bundle 4. Concrete 7 is placed in the gap between the foundation bundle 4 and the reinforced concrete 2 of the precast concrete foundation 3 to construct a concrete foundation structure. Therefore, at the site, it is only necessary to bolt the foundation beam 1 to the foundation bundle 4 and pour the concrete 7, which can significantly reduce the number of construction steps. [Effect of the invention 1] In the present invention, the precast concrete foundation body integrally formed with reinforced concrete is erected on the foundation bundle at the bottom of the foundation beam, so construction can be carried out by simply erecting the precast concrete foundation body on the foundation bundle at the site. It is possible to significantly reduce the number of construction steps, and it is also possible! It is a dry method and has excellent workability.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例を示す一部省略斜視図、v4
2図(a)(b)は従来における施工を示す説明図であ
って、1は基礎梁、2は鉄筋コンクリート、3はプレキ
ャストコンクリート基礎体、4は基礎束である。
FIG. 1 is a partially omitted perspective view showing one embodiment of the present invention, v4
2(a) and 2(b) are explanatory diagrams showing conventional construction, in which 1 is a foundation beam, 2 is reinforced concrete, 3 is a precast concrete foundation, and 4 is a foundation bundle.

Claims (1)

【特許請求の範囲】[Claims] (1)基礎梁の下部に鉄筋コンクリートを一体成形した
プレキャストコンクリート基礎体を基礎束に架設させて
成ることを特徴とするコンクリート基礎構造。
(1) A concrete foundation structure comprising a precast concrete foundation body integrally formed with reinforced concrete at the bottom of a foundation beam and constructed on a foundation bundle.
JP4639590A 1990-02-26 1990-02-26 Construction of concrete foundation Pending JPH03247819A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4639590A JPH03247819A (en) 1990-02-26 1990-02-26 Construction of concrete foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4639590A JPH03247819A (en) 1990-02-26 1990-02-26 Construction of concrete foundation

Publications (1)

Publication Number Publication Date
JPH03247819A true JPH03247819A (en) 1991-11-06

Family

ID=12745960

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4639590A Pending JPH03247819A (en) 1990-02-26 1990-02-26 Construction of concrete foundation

Country Status (1)

Country Link
JP (1) JPH03247819A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5431903A (en) * 1977-08-16 1979-03-09 Kentarou Kawai Foundation of reinforced concrete cloth produced in factory assembled by using fittings and adhesives while laying emphasis on foundation unit under post

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5431903A (en) * 1977-08-16 1979-03-09 Kentarou Kawai Foundation of reinforced concrete cloth produced in factory assembled by using fittings and adhesives while laying emphasis on foundation unit under post

Similar Documents

Publication Publication Date Title
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
EA200500622A1 (en) METHOD AND DEVICE FOR CONSTRUCTION FROM COMBINED AND FRAME ELEMENTS
JPH03247819A (en) Construction of concrete foundation
CN215926273U (en) Prefabricated frame concrete structure connected node
JPH0280747A (en) Girder structure
JPH03247818A (en) Construction of concrete foundation
JP3137448B2 (en) Construction method of concrete main tower
CN111706006A (en) Integrated reinforced bar mould-free cast-in-situ concrete column
JP2000212930A (en) Joint structure of prefabricated caisson and prefabricated caisson
JPS5922814Y2 (en) Precast reinforced concrete external wall semi-finished product
ATE192530T1 (en) FORMWORK ELEMENT
CN210177348U (en) Box girder diaphragm
JPH0732708Y2 (en) Precast concrete pillar members
JPS61290137A (en) Construction of columnar pillar
JPS62178634A (en) Framework construction method of structure
JP3351886B2 (en) Thin-walled precast concrete beam and method of manufacturing the same
JPH06294135A (en) Underground beam construction method
JPH0649897A (en) Joining method for beam and pillar and precast concrete pillar applied to above method
JPH04247127A (en) Outer wall construction works for underground floor
JPH06136821A (en) Construction method for steel frame reinforced concrete structure
JP2699812B2 (en) Industrialized structure of middle- and high-rise houses
JPH06158713A (en) Joint construction
JPH0327690B2 (en)
JPH08232565A (en) Arch gate
JPH0366852A (en) Construction method for complex structure of precast reinforced concrete column and steel beam