JPH0310764B2 - - Google Patents

Info

Publication number
JPH0310764B2
JPH0310764B2 JP656783A JP656783A JPH0310764B2 JP H0310764 B2 JPH0310764 B2 JP H0310764B2 JP 656783 A JP656783 A JP 656783A JP 656783 A JP656783 A JP 656783A JP H0310764 B2 JPH0310764 B2 JP H0310764B2
Authority
JP
Japan
Prior art keywords
water supply
water
pit
lawns
vegetation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP656783A
Other languages
Japanese (ja)
Other versions
JPS59134217A (en
Inventor
Hisashi Yanagi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOYO GURIIN KK
Original Assignee
TOYO GURIIN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOYO GURIIN KK filed Critical TOYO GURIIN KK
Priority to JP656783A priority Critical patent/JPS59134217A/en
Publication of JPS59134217A publication Critical patent/JPS59134217A/en
Publication of JPH0310764B2 publication Critical patent/JPH0310764B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C13/00Pavings or foundations specially adapted for playgrounds or sports grounds; Drainage, irrigation or heating of sports grounds
    • E01C13/08Surfaces simulating grass ; Grass-grown sports grounds
    • E01C13/083Construction of grass-grown sports grounds; Drainage, irrigation or heating arrangements therefor

Description

【発明の詳細な説明】 本発明はゴルフ場などの芝生等地表植生物の給
水および排水方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for watering and draining surface vegetation such as lawns on golf courses and the like.

芝生、特にゴルフ場のグリーン等の芝生地では
気象条件、作業時間、プレー時間等の制約から散
水時間に制約が見られる。すなわち夏期等の高温
乾燥時には含水量が不足して芝生が乾燥し易いた
め無制限に散水すると日焼けを起すことになる。
For lawns, especially lawns such as golf course greens, there are restrictions on watering time due to constraints such as weather conditions, working hours, and playing hours. In other words, when the grass is dry at high temperatures such as in the summer, the water content is insufficient and the lawn tends to dry out, so if water is watered without limit, it will cause sunburn.

また多湿になり過ぎると病虫害が発生すること
になる。
Also, if the humidity is too high, pests and diseases will occur.

また冬期に潅水を行うと凍土が生じ易く、芝生
が凍結して傷んだり、霜付の原因になつて霜枯れ
ることになる。
Irrigation in the winter also tends to cause frozen soil, which can freeze and damage the lawn, causing frost and withering.

さらにターフ等の芝生地ではスプリンクラーで
散水すると、散水された水が表面を流れて地中に
は浸透しない欠点がある。
Furthermore, when watering lawn areas such as turf with sprinklers, the water that is sprinkled flows over the surface and does not penetrate into the ground.

本発明は上述の如き欠点に着目してなされたも
のでありその目的とするところは散水時間に制約
を受けずに特に傾斜地における客土内での給水と
客土からの排水等の必要適当量の水分の確保を可
能として水の管理が人為的に行え、以て地表面に
育成する芝生等の植物の育成が好適に行える芝生
等地表植生物の給水および排水方法を提供するの
にある。
The present invention has been made in view of the above-mentioned drawbacks, and its purpose is to supply the required amount of water within the top soil and drain water from the top soil, etc., especially on sloped land, without being restricted by the watering time. To provide a water supply and drainage method for surface vegetation such as lawns, which enables water to be secured, artificially manages water, and allows suitable growth of plants, such as lawns, grown on the ground surface.

以下、第1図乃至第3図に従つてゴルフ場を造
成する場合を一実施例として説明する。
Hereinafter, a case in which a golf course is constructed will be described as an example according to FIGS. 1 to 3.

第1工程で、傾斜した地表面Hを所定深さDに
掘削して縦断面がその地表面Hと略平行になる基
盤Bを形成する。
In the first step, the sloping ground surface H is excavated to a predetermined depth D to form a base B whose longitudinal section is substantially parallel to the ground surface H.

深さDは、地表面H、即ちグリーン面より50cm
前後に掘削することが望ましい。掘削はブルドー
ザー、ユンボ等で行い、掘削土は両車で指定地に
搬出する。そして基盤B面はブルドーザー等で整
地する。
Depth D is 50cm from the ground surface H, i.e. the green surface.
It is desirable to excavate forward and backward. Excavation will be carried out using bulldozers, lift trucks, etc., and the excavated soil will be transported to the designated area using both vehicles. The B side of the foundation will be leveled using bulldozers, etc.

第2工程で、前工程で形成された基盤B面に複
数の等高線に沿つて仕切板1を段状に立設する。
In the second step, the partition plates 1 are erected in steps along a plurality of contour lines on the surface B of the substrate formed in the previous step.

仕切板1は、巾約40cm以下、長さ約50mの板材
を現場に適合する長さに切つてその巾方向を垂直
に立てるものである。
The partition plate 1 is a board with a width of about 40 cm or less and a length of about 50 m, cut into a length suitable for the site, and erected vertically in the width direction.

第3工程で、前工程で仕切板1が段状に立設さ
れている基盤B面の全面に不透水性のシート2を
敷設する。シート2の材質はポリエチレン、ビニ
ール等が使用される。
In the third step, a water-impermeable sheet 2 is laid over the entire surface of the base B on which the partition plates 1 were erected in a stepped manner in the previous step. The material used for the sheet 2 is polyethylene, vinyl, or the like.

第4工程で、前工程でシート2の敷設されてい
る各仕切板1を挟んで基盤B面と交叉する部分の
高所側の該シート2面上に、即ち仕切板1で区画
された傾斜部分の低位置に細孔、小孔、スリツト
等のある集水管3を配設してその一端3aを集水
兼水位調整用のピツト4に臨ませる。このピツト
4はコンクリートで構築する。5はこのピツト4
内に垂直に配置された垂直管で、この垂直管5は
前記集水管3に接続されている。またこの垂直管
5には地下水位を調整するために、図示しない開
閉自在になる孔が上下に複数個設けられている。
In the fourth step, the sheet 2 is placed on the high side of the sheet 2 at the part intersecting with the base B surface across the partition plates 1 laid down in the previous step, that is, on the slope partitioned by the partition plates 1. A water collection pipe 3 having pores, small holes, slits, etc. is arranged at a low position of the part, and one end 3a thereof faces a pit 4 for water collection and water level adjustment. This pit 4 is constructed of concrete. 5 is this pit 4
A vertical pipe 5 is arranged vertically within the pipe 5 and is connected to the water collection pipe 3. Further, in order to adjust the underground water level, this vertical pipe 5 is provided with a plurality of holes (not shown) above and below that can be opened and closed freely.

第5工程で仕切板1を挟んで低所側の基盤B面
と交叉する部分のシート2面上に、すなわち仕切
板1,1で区画された傾斜部分の高位置に給水管
6を敷設する。この給水管6の一端には給水ピツ
ト7が接続されている。
In the fifth step, the water supply pipe 6 is laid on the sheet 2 surface at the part intersecting with the base B surface on the lower side with the partition plate 1 in between, that is, at the high position of the slope section divided by the partition plates 1, 1. . A water supply pit 7 is connected to one end of the water supply pipe 6.

第6工程で、前工程でシート2が敷設され且つ
集水管3が配設された基盤B面上に所定粒度の砂
8を客土する。
In the sixth step, sand 8 of a predetermined grain size is poured onto the base B surface on which the sheet 2 was laid in the previous step and the water collection pipe 3 was arranged.

第7工程では、前工程で客土した砂8の上面に
植生用表土9を元の地表面Hに略揃うように層設
する。
In the seventh step, topsoil 9 for vegetation is layered on the top surface of the sand 8 that was added in the previous step so as to be substantially aligned with the original ground surface H.

本発明の一実施例は上述のような構成からな
り、植生用表土9中の過剰な水分は集水管3に集
水されて集水兼水位調整用のピツト4から排水さ
れる。また排水量はピツト4によつてコントロー
ルされる。このため、植生用表土9に植生された
芝生の根腐れや病虫害が生じない。
One embodiment of the present invention has the above-described configuration, and excess moisture in the topsoil for vegetation 9 is collected in the water collection pipe 3 and drained from the pit 4 for water collection and water level adjustment. Further, the amount of drainage is controlled by the pit 4. Therefore, root rot of the grass grown on the topsoil 9 for vegetation and damage from pests and diseases do not occur.

また給水は、植生用表土9の表面から潅水する
のではなく、給水管6によつて給水され植生用表
土9に対して毛管作用により水が浸透する。かつ
給水ピツト7によりその給水量はコントロールで
きる。
Moreover, water is not supplied from the surface of the topsoil 9 for vegetation, but is supplied through the water supply pipe 6, and water permeates into the topsoil 9 for vegetation by capillary action. Moreover, the water supply amount can be controlled by the water supply pit 7.

従つて夏期等の高温乾燥時にも砂8、その上面
の植生用表土9の含水量が不足することになり、
気象条件、作業時間、プレー時間に制約されずに
適当量の水分を給水できる。このため夏期におけ
る芝生等の日焼けや病虫害の発生を防止でき、ま
た冬期における霜枯れが防止される。
Therefore, even during hot and dry times such as summer, the moisture content of the sand 8 and the top soil for vegetation 9 on top of it becomes insufficient.
An appropriate amount of water can be supplied without being restricted by weather conditions, working hours, or playing hours. Therefore, it is possible to prevent the lawn from being sunburned and damaged by pests and diseases in the summer, and to prevent frost damage in the winter.

上述のように本発明にれば夏期または冬期等の
気象条件や作業中、プレー中等の散水時間に制約
を受けずに特に傾斜地における客土内での給水と
客土からの排水等の必要適当量の水分の確保を可
能として水の管理が人為的に行なえる。従つて一
年を通じて植生用表土等の客土内の水分の乾湿の
差がなく、必要適当量の給水や肥培を行なえるの
で地表面に育成する芝生等の植物の成育に好適で
ある。
As mentioned above, according to the present invention, it is possible to supply water within the soil and drain water from the soil as necessary, especially on sloped land, without being restricted by weather conditions such as summer or winter, or watering time during work or play. Water management can be done artificially by making it possible to secure a sufficient amount of water. Therefore, throughout the year there is no difference in moisture content in the soil such as topsoil for vegetation, and the appropriate amount of water and fertilizer can be supplied, making it suitable for growing plants such as lawns on the ground surface.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の芝生等地表植生物の給水およ
び排水方法の施工により造成されたグランドの一
実施例の平面図、第2図は縦断面図、第3図は同
じく集水管に沿つた縦断面図である。 1……仕切板、2……シート、3……集水管、
4……ピツト、5……垂直管、6……給水管、7
……給水ピツト、8……砂、9……植生用表土。
Figure 1 is a plan view of an embodiment of a ground created by the water supply and drainage method for surface vegetation such as lawns of the present invention, Figure 2 is a longitudinal cross-sectional view, and Figure 3 is a view along the water collection pipe. FIG. 1... Partition plate, 2... Sheet, 3... Water collection pipe,
4... Pit, 5... Vertical pipe, 6... Water supply pipe, 7
...Water supply pit, 8...Sand, 9...Top soil for vegetation.

Claims (1)

【特許請求の範囲】 1 傾斜した地表面に略平行して掘削した基盤上
に不透水性のシートを敷設すると共に、複数の等
高線に沿つて仕切板を立設し、該仕切板を挟んで
傾斜基盤の低所側に給水手段を、また仕切板を挟
んで傾斜基盤の高所側に集水手段を配設し、これ
ら給水手段および集水手段の一端を給水源および
集水ピツトに夫々連結し得るようにしたことを特
徴とする芝生等地表植生物の給水および排水方
法。 2 前記給水手段は、多数の小孔またはスリツト
を有する有穴管をもつて構成し、前記仕切板を挟
んで傾斜基盤上の所定側の土中に埋設すると共に
一端を給水ピツトに連結したことを特徴とする特
許請求項第1項記載の芝生等地表植生物の給水お
よび排水方法。
[Claims] 1. An impermeable sheet is laid on a foundation excavated approximately parallel to the sloping ground surface, partition plates are erected along a plurality of contour lines, and the partition plates are sandwiched between the sheets. A water supply means is arranged on the lower side of the sloped base, and a water collection means is arranged on the higher side of the sloped base with a partition plate in between, and one end of these water supply means and the water collection means is connected to the water supply source and the water collection pit, respectively. A water supply and drainage method for surface plants such as lawns, characterized in that they can be connected. 2. The water supply means is constituted by a perforated pipe having a large number of small holes or slits, and is buried in the soil on a predetermined side of the sloped base with the partition plate in between, and one end is connected to a water supply pit. A water supply and drainage method for surface vegetation such as lawns according to claim 1, characterized in that:
JP656783A 1983-01-20 1983-01-20 Formation of ground surface for vegetation of turf and the like Granted JPS59134217A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP656783A JPS59134217A (en) 1983-01-20 1983-01-20 Formation of ground surface for vegetation of turf and the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP656783A JPS59134217A (en) 1983-01-20 1983-01-20 Formation of ground surface for vegetation of turf and the like

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP8100790A Division JPH03110213A (en) 1990-03-30 1990-03-30 Water supply and drainage for surface vegitation including lawn

Publications (2)

Publication Number Publication Date
JPS59134217A JPS59134217A (en) 1984-08-01
JPH0310764B2 true JPH0310764B2 (en) 1991-02-14

Family

ID=11641907

Family Applications (1)

Application Number Title Priority Date Filing Date
JP656783A Granted JPS59134217A (en) 1983-01-20 1983-01-20 Formation of ground surface for vegetation of turf and the like

Country Status (1)

Country Link
JP (1) JPS59134217A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63311976A (en) * 1987-06-13 1988-12-20 渡辺 義雄 Turf of green etc.
JP2630847B2 (en) * 1990-01-30 1997-07-16 緑営建設 株式会社 Golf green structure with underground reservoir
JPH04128408A (en) * 1990-09-18 1992-04-28 Sanki Syst Prod Kk Green of golf links
JPH04117005U (en) * 1991-04-01 1992-10-20 邦欣 菅 Golf course underground regulation pond structure

Also Published As

Publication number Publication date
JPS59134217A (en) 1984-08-01

Similar Documents

Publication Publication Date Title
US3461675A (en) Watering and drainage system
CN110258589B (en) Ecological slope protection structure for preventing and treating slump of expansive soil slope and construction method
US4878780A (en) Apparatus and method of creating and controlling an artifical water table
JPH0310764B2 (en)
JP2631958B2 (en) Sports ground drainage system, porous layer forming unit used in this system, sports ground drainage system pipe unit, and sports ground construction method
RU2380480C2 (en) Method of land drainage in permafrost zone
JPH0573846B2 (en)
JP2003102258A (en) Method for cultivating fruit or vegetable
Schoeneweiss Prevention and treatment of construction damage to shade trees
CN115104396B (en) Soil improvement and soil preparation forestation method for arid abrupt slope sandy soil
JPS6122082B2 (en)
JP2000166386A (en) Mat for preventing growth of plant, and a cylindrical body
Fortier Irrigation of alfalfa
Fortier Irrigation of orchards
Quackenbush Land modification for efficient use of water
JPS6140121Y2 (en)
JPH0321126B2 (en)
JPH0149850B2 (en)
Roe et al. Soil erosion control in farm operation (revised September 1937)
Scott Handbook of Irrigation and Drainage
Roberts Soil erosion
Kumar et al. In situ and ex situ rainwater conservation in Kandi region of Punjab for sustainable agriculture.
RU2125134C1 (en) Method for creation of man-made lawn
JP3031832B2 (en) Greening method for structures
JPH0874221A (en) Weed preventive structure and construction thereof