JPH0291338A - Steel frame construction - Google Patents

Steel frame construction

Info

Publication number
JPH0291338A
JPH0291338A JP24269188A JP24269188A JPH0291338A JP H0291338 A JPH0291338 A JP H0291338A JP 24269188 A JP24269188 A JP 24269188A JP 24269188 A JP24269188 A JP 24269188A JP H0291338 A JPH0291338 A JP H0291338A
Authority
JP
Japan
Prior art keywords
steel
steel pipe
steel frame
reduce
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24269188A
Other languages
Japanese (ja)
Other versions
JPH0711164B2 (en
Inventor
Hiroshi Ogawa
浩 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP63242691A priority Critical patent/JPH0711164B2/en
Publication of JPH0291338A publication Critical patent/JPH0291338A/en
Publication of JPH0711164B2 publication Critical patent/JPH0711164B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE:To make a beam structure small, reduce the height of a whole construction, reduce the cost, and reduce the construction period by fixing a plurality of parallel steel beams at joint metals provided protruding on the steel pipe columns. CONSTITUTION:Steel pipe columns 1 are used for columns, and joint metals 2 are protruded horizontally on their sides. Each joint metal is composed of two plate flanges 3, 3, an upper one and a lower one, and two plate webs 4, 4 disposed in parallel between them and welded. A steel beam 5 consisting of two H-steels 6, 6 is then fixed at the joint metal 2. Assembling of moulds, placing concrete, removing the moulds, etc., can thus be eliminated.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は建築構造物における鉄骨架構に関するもので
ある。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] This invention relates to a steel frame in a building structure.

〔実 施 例〕〔Example〕

本件出願人は特願昭57−153672号(特開昭59
−44443号公報)において、組柱に組梁を接合した
鉄骨架構を開示している。該発明は、第3図(1) 、
(II)に示すように、H形鋼の鉄骨二本を平行に立て
て組柱とし、この組柱の側方に張出した接合金物に二本
のH形鋼から成る組梁を固定したものである。
The applicant of this case is Japanese Patent Application No. 57-153672 (Japanese Unexamined Patent Publication No. 59
Japanese Patent Publication No. 44443) discloses a steel frame structure in which a set of beams is connected to a set of columns. The invention is shown in FIG. 3 (1),
As shown in (II), two steel frames of H-beams are erected in parallel to form a column, and a beam made of two H-beams is fixed to the joint metal fittings that extend to the sides of the column. It is.

梁を複数本の鉄骨を組合わせた組梁とすることで梁の耐
力を向上させ、その分梁成を小さくすることが可能とな
って、建物全体の高さを低くすることができるものであ
る。
By making the beam a composite beam made by combining multiple steel frames, the strength of the beam can be improved, and the beam size can be reduced accordingly, making it possible to lower the overall height of the building. be.

〔この発明が解決すべき課題〕[Problems to be solved by this invention]

上記したような鉄骨架構は、複数本の鉄骨から成ってい
るため、細軸方向の座屈と柱の方向性を考慮すると、S
RC造にしなければならない。したがって鉄骨建方及び
柱の型枠組立て、コンクリートの打設、養生によって工
期が長くなる。また柱型が大きくなるとともに、鉄骨の
加工工数、建方時のピース数が多くなってしまう。
Since the above-mentioned steel frame consists of multiple steel frames, considering the buckling in the thin axis direction and the directionality of the columns, the S
It must be made of RC construction. Therefore, the construction period will be longer due to the erection of the steel frame, the assembly of column formwork, concrete pouring, and curing. Additionally, as the column size becomes larger, the number of man-hours required for machining the steel frame and the number of pieces required during erection also increase.

この発明は以上のような課題を解決するためになされた
もので、構造が簡易で部材点数が少なく、工期も短かく
なる鉄骨架構を提供することとを目的とする。
This invention was made to solve the above problems, and an object thereof is to provide a steel frame structure that is simple in structure, has a small number of members, and has a short construction period.

〔課題を解決するための手段〕[Means to solve the problem]

この発明にかかる鉄骨架構は、柱として鋼管を使用する
ものである。
The steel frame according to the present invention uses steel pipes as columns.

この鋼管柱の側方に接合金物を突出し、接合金物に複数
本の平行な鉄骨梁を固定するものである。
A metal fitting is protruded from the side of this steel pipe column, and a plurality of parallel steel beams are fixed to the metal fitting.

〔実 施 例〕〔Example〕

以下、図に示す一実施例に基づきこの発明を説明する。 The present invention will be explained below based on an embodiment shown in the drawings.

図において1は鋼管柱であり、第1図に示す実施例では
円形の鋼管柱lが使用されている。
In the figure, 1 is a steel pipe column, and in the embodiment shown in FIG. 1, a circular steel pipe column l is used.

鋼管柱1の側方には、接合金物2が水平に突出している
。接合金物2は上下の二枚の板状フランジ3.3間に二
本の板状ウェブ4,4が平行に配されて溶接組みされた
もので、フランジ3.3の先端は二股状に形成されてい
る。
A joining metal fitting 2 projects horizontally from the side of the steel pipe column 1. The joining hardware 2 is constructed by welding together two plate-shaped webs 4, 4 arranged in parallel between two upper and lower plate-shaped flanges 3.3, and the tip of the flange 3.3 is formed into a bifurcated shape. has been done.

梁5は二本のH形鋼6.6から成っており、H形鋼6,
6の各ウェブ7が前記接合金物2のウェブ4,4と連続
するよう平行に配されている。接合金物2のウェブ4.
4とH形鋼6.6の突き合せ部には、両手面に継手板7
,7が当接されて、ボルト・ナツト8によって連結され
ている。接合金物2のフランジ3.3とH形鋼6.6の
フランジ9.9の突き合せ部にも上下から継手Fi10
.10が当接されて、ボルト・ナツト8によって連結さ
れている。
The beam 5 consists of two H-beams 6.6,
Each of the webs 7 of 6 is disposed in parallel with the webs 4 of the joining hardware 2 so as to be continuous with each other. Web of joining hardware 2 4.
4 and H-shaped steel 6.6, there is a joint plate 7 on both hands.
, 7 are abutted and connected by bolts and nuts 8. Fitting Fi10 is also installed from above and below at the butt part between flange 3.3 of joint hardware 2 and flange 9.9 of H-beam 6.6.
.. 10 are abutted and connected by bolts and nuts 8.

以上のような梁5上にデツキプレート等を載置し、コン
クリートを打設してスラブ11を構築する。
A deck plate or the like is placed on the beam 5 as described above, and concrete is poured to construct the slab 11.

この発明は以上のような構成を有するが、その他網管柱
1として第2図に示すように断面角型の鋼管柱1が使用
できる。
Although the present invention has the above configuration, a steel pipe column 1 having a rectangular cross section as shown in FIG. 2 can also be used as the mesh tube column 1.

〔発明の効果〕〔Effect of the invention〕

この発明は以上のような構成を有し、梁を複数本の鉄骨
によって構成するため、梁成を小さくすることができ、
その分建物全体の高さが低くなり、コストダウンを図る
ことができる。
This invention has the above configuration, and since the beam is composed of a plurality of steel frames, the beam size can be reduced.
As a result, the height of the entire building is reduced, which helps reduce costs.

また柱として鋼管柱を使用するため、型枠の組立て、コ
ンクリートの打設、脱型が不要で、施工を短期化するこ
とができる。
In addition, since steel pipe columns are used as columns, there is no need to assemble formwork, pour concrete, or demold, reducing construction time.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図はこの発明の実施例を示し、第3図は
従来例を示すもので、第1図〜第3図の各(I)は横断
面図、各(n)は縦断面図、第1図及び第2図の各(n
l)は各(II)の■−■線断面図である。 1・・・鋼管柱、2・・・接合金物、3・・・フランジ
、4・・・ウェブ、5・・・梁、6・・・H形鋼第 2
 図 CI) (Ji) (I[[)
1 and 2 show an embodiment of the present invention, and FIG. 3 shows a conventional example, each (I) in FIGS. 1 to 3 is a cross-sectional view, and each (n) is a longitudinal Each of the side views, Figures 1 and 2 (n
1) is a sectional view taken along the line ■-■ of each (II). 1... Steel pipe column, 2... Joining hardware, 3... Flange, 4... Web, 5... Beam, 6... H-shaped steel 2nd
Figure CI) (Ji) (I[[)

Claims (1)

【特許請求の範囲】[Claims] 鋼管柱の側方に接合金物を突出し、この接合金物に複数
本の平行な鉄骨梁を固定したことを特徴とする鉄骨架構
A steel frame structure characterized by a metal fitting protruding from the side of a steel pipe column, and a plurality of parallel steel beams fixed to the metal fitting.
JP63242691A 1988-09-28 1988-09-28 Steel frame Expired - Lifetime JPH0711164B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63242691A JPH0711164B2 (en) 1988-09-28 1988-09-28 Steel frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63242691A JPH0711164B2 (en) 1988-09-28 1988-09-28 Steel frame

Publications (2)

Publication Number Publication Date
JPH0291338A true JPH0291338A (en) 1990-03-30
JPH0711164B2 JPH0711164B2 (en) 1995-02-08

Family

ID=17092806

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63242691A Expired - Lifetime JPH0711164B2 (en) 1988-09-28 1988-09-28 Steel frame

Country Status (1)

Country Link
JP (1) JPH0711164B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06240746A (en) * 1993-02-16 1994-08-30 Kajima Corp Structure of column/beam connection part
JP2008031644A (en) * 2006-07-26 2008-02-14 East Japan Railway Co Floor frame of steel frame building and construction method of this floor frame

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6143843U (en) * 1984-08-27 1986-03-22 株式会社クボタ threshing equipment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6143843U (en) * 1984-08-27 1986-03-22 株式会社クボタ threshing equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06240746A (en) * 1993-02-16 1994-08-30 Kajima Corp Structure of column/beam connection part
JP2008031644A (en) * 2006-07-26 2008-02-14 East Japan Railway Co Floor frame of steel frame building and construction method of this floor frame

Also Published As

Publication number Publication date
JPH0711164B2 (en) 1995-02-08

Similar Documents

Publication Publication Date Title
JP2000170285A (en) Connecting method for steel sheet concrete structural wall and junction structure
JP2927402B2 (en) Column-beam joint structure of concrete building
JPH0291338A (en) Steel frame construction
JPH08144370A (en) Joint structure of closed cross sectional steel frame column and steel frame beam
JPH06288033A (en) Steel member for building construction
JP3327184B2 (en) Column-to-beam joints between steel pipe structure or filled steel pipe concrete structure column and SRC structure beam
JP2002322614A (en) Composite structure in steel construction
JPH10102659A (en) Concrete casting method in steel framed concrete composite beam
JPH04106256A (en) Steel pipe concrete column
JPH0444545A (en) Joint of column and beam and reinforcing metal
JPH04124338A (en) Construction for column/beam joining section
JP4003444B2 (en) Support method
JPH1181454A (en) Connecting structure for column and beam
JPH03212534A (en) Pillar-beam joint part
JPS6347201Y2 (en)
JPH0637128Y2 (en) Joint structure of columns and beams
JPS6232303B2 (en)
JP2004124370A (en) Column and beam join structure of square steel pipe column
JPS6139457B2 (en)
JPS6023371Y2 (en) composite precast concrete beam
JP3749935B2 (en) Column and beam construction method and enclosure
JPH0356572Y2 (en)
JP2020056239A (en) Steel frame beam reinforcement structure
JPH0643709B2 (en) Column-beam joint structure
JPH0823176B2 (en) Steel plate concrete structure joining method