JPH02300455A - Construction method of roof - Google Patents

Construction method of roof

Info

Publication number
JPH02300455A
JPH02300455A JP1120103A JP12010389A JPH02300455A JP H02300455 A JPH02300455 A JP H02300455A JP 1120103 A JP1120103 A JP 1120103A JP 12010389 A JP12010389 A JP 12010389A JP H02300455 A JPH02300455 A JP H02300455A
Authority
JP
Japan
Prior art keywords
roof
crane
attached
steel frame
internal temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1120103A
Other languages
Japanese (ja)
Other versions
JP2808448B2 (en
Inventor
Fumio Nakahara
中原 文雄
Kanjiro Yamada
山田 貫次郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP1120103A priority Critical patent/JP2808448B2/en
Publication of JPH02300455A publication Critical patent/JPH02300455A/en
Application granted granted Critical
Publication of JP2808448B2 publication Critical patent/JP2808448B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To obtain a safe condition, by lifting steel beams previously fitted with brackets to attach roof panels and inner scaffolds by a crane to construct steel frames and fitting the roof panels with the work on the scaffolds. CONSTITUTION:Steel beams 3a, 3b fitted with brackets to attach roof panels and inner scaffolds 4 are lifted by a crane 13 to construct steel frames. And the roof panels 6 are lifted by the crane 13 are attached to the brackets for fitting the roof panels with the work on the inner scaffolds 4. In this way, time of construction can be reduced.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、急勾配金属屋根の施工に適した安全性の高い
屋根の施工方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a highly safe roof construction method suitable for constructing a steeply sloped metal roof.

〔従来の技術〕[Conventional technology]

従来、急勾配金属屋根は、鉄骨建て方が完了した後、屋
根勾配に対応した勾配の外部仮設足場を組み、この外部
仮設足場からの作業によって、梁鉄骨への下地貼り、下
地への防水シート貼りおよび仕上げ金属貼りを行うとい
った手順で施工されていた。
Conventionally, for steep-slope metal roofs, after the steel frame construction is completed, external temporary scaffolding with a slope corresponding to the roof slope is erected, and work from this external temporary scaffolding is used to attach the base to the steel beams and apply a waterproof sheet to the base. Construction was carried out using a procedure that included pasting and finishing metal pasting.

このため、工期が長くかかるばかりでなく、施工中にお
けるどの作業をとっても、材料、工具、作業員の落下の
恐れを伴う危険作業が強いられてきた。
For this reason, not only does construction take a long time, but any work performed during construction is dangerous, with the risk of falling materials, tools, and workers.

このような工期、安全面での問題を解決するために、本
発明者らは、下地と仕上げ金属を複合化した防水性の高
い屋根パネルを工場で組み立てておき、この屋根パネル
をクレーン等で吊り上げて建物内方に設置した内部仮設
足場からの作業によって梁鉄骨に取り付けるようにした
屋根の施工方法を既に開発している。
In order to solve these problems in terms of construction time and safety, the present inventors assembled highly waterproof roof panels made of a composite base and finishing metal at a factory, and then used cranes etc. to assemble these roof panels. We have already developed a method for constructing roofs that are attached to steel beams by working from internal temporary scaffolding that is lifted and placed inside the building.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、上記の屋根の施工方法では、鉄骨建て方
の完了後に、鉄骨間にわたって内部仮設足場を組み立て
ていたので、当該内部仮設足場を鉄骨建て古詩の安全確
保には利用できず、しかも、鉄骨建て方と屋根パネル取
付は工程との間に内部仮設足場を組み立てるための工程
があるので、内部仮設足場を組み立てるのに必要な時間
だけ屋根パネルの取付けが遅れることになり、安全面で
も工期面でも改良の余地があった。
However, in the above roof construction method, after the steel frame construction was completed, internal temporary scaffolding was erected between the steel frames, so the internal temporary scaffolding could not be used to ensure the safety of the steel frame construction. Since there is a process for assembling internal temporary scaffolding between the roof panel installation process and the roof panel installation process, the installation of the roof panel will be delayed by the time required to assemble the internal temporary scaffolding, which will cause a delay in terms of both safety and construction time. There was room for improvement.

本発明は、これらの点を改良し、鉄骨建て方の時点で簡
便な作業足場(こう鋲足場)が得られ、且つ、鉄骨建て
方後、直ちに、屋根パネルの取付は工程に移行できるよ
うにした屋根の施工方法を提供するものである。
The present invention improves these points, and makes it possible to obtain a simple work scaffold (tack scaffolding) at the time of steel frame erection, and to be able to move on to the roof panel installation process immediately after the steel frame is erected. The present invention provides a method for constructing a roof with

〔課題を解決するための手段〕[Means to solve the problem]

上記の目的を達成するために、本発明が講した技術的手
段は、次の通りである。即ち、本発明による屋根の施工
方法は、予め、地上で、梁鉄骨に、屋根パネル取付は用
のブラケットと、内部仮設足場とを取り付けておき、こ
の梁鉄骨をクレーン等で吊り上げて鉄骨建て方を行い、
しかる後、クレーン等で吊り上げた屋根パネルを前記内
部仮設足場からの作業によって前記ブラケットに取り付
けるようにしたことを特徴としている。
The technical means taken by the present invention to achieve the above object are as follows. That is, in the roof construction method according to the present invention, brackets for attaching roof panels and internal temporary scaffolding are attached to the steel beams on the ground in advance, and the steel beams are hoisted by a crane or the like to construct the steel frame. and
Thereafter, the roof panel lifted by a crane or the like is attached to the bracket by work from the internal temporary scaffolding.

内部仮設足場を梁鉄骨に取り付けるための部材としては
、内部仮設足場専用の仮設材であってもよいが、本設キ
ャツトウオークを吊り下げ支持するための吊り金具を利
用することが望ましい。
The member for attaching the internal temporary scaffold to the beam steel frame may be a temporary material specifically for the internal temporary scaffold, but it is preferable to use hanging fittings for suspending and supporting the permanent catwalk.

即ち、地上で、梁鉄骨に、屋根パネル取付は用のブラケ
ットと、天井裏に据え付けられる本設キャツトウオーク
を吊り下げ支持するための複数対の吊り金具の上側部分
と、該上側部分間に架設された内部仮設足場とを取り付
けておき、この梁鉄骨をクレーン等で吊り上げて鉄骨建
て方を行い、しかる後、本設キャツトウオークおよび吊
り金具の下側部分をクレーン等で吊り上げて、当該下側
部分を前記内部仮設足場からの作業によって前記上側部
分に連結すると共に、クレーン等で吊り上げた屋根パネ
ルを前記内部仮設足場からの作業によって前記ブラケッ
トに取り付けるようにしたり、あるいは、地上で、梁鉄
骨に、屋根パネル取付は用のブラケットと、天井裏に据
え付けられる本設キャツトウオークおよび当該本設キャ
ツトウオークを吊り下げ支持するための複数対の吊り金
具と、該吊り金具の上側部分間に架設された内部仮設足
場とを取り付けておき、この梁鉄骨をクレーン等で吊り
上げて鉄骨建て方を行い、しかる後、クレーン等で吊り
上げた屋根パネルを前記内部仮設足場からの作業によっ
て前記ブラケットに取り付けるようにすることが望まし
い。
That is, on the ground, on the beam steel frame, there is a bracket for mounting the roof panel, an upper part of multiple pairs of hanging brackets for suspending and supporting the permanent catwalk installed in the ceiling, and a structure installed between the upper parts. The steel beams are then lifted with a crane, etc. to construct the steel frame.Then, the lower part of the permanent catwalk and the lifting fittings are lifted with a crane, etc., and the lower part of the The roof panel may be connected to the upper part by working from the internal temporary scaffolding, and the roof panel lifted by a crane or the like may be attached to the bracket by working from the internal temporary scaffolding, or the roof panel may be attached to the beam steel frame on the ground. , a roof panel mounting bracket, a permanent catwalk installed in the ceiling, multiple pairs of hanging fittings for suspending and supporting the permanent catwalk, and an upper part of the hanging fittings. An internal temporary scaffold is attached, and the beam steel frame is hoisted by a crane or the like to construct the steel frame, and then the roof panel lifted by the crane or the like is attached to the bracket by work from the internal temporary scaffold. This is desirable.

また、本設キャツトウオークを吊り下げ支持するための
吊り金具は、屋根パネル取付は用のブラケットと別個に
設けてもよいが、前記吊り金具の上側部分を前記ブラケ
ットの両端から垂下し、当該ブラケットを吊り金具の一
部に利用することが望ましい。
Although the hanging fittings for suspending and supporting the catwalk may be provided separately from the brackets for roof panel mounting, the upper part of the hanging fittings may be suspended from both ends of the bracket, and It is desirable to use it as part of the hanging fittings.

〔作用〕[Effect]

上記の構成によれば、梁鉄骨に内部仮設足場を先付けし
であるので、この梁鉄骨をクレーン等で吊り上げて鉄骨
建て方を行うことによって、内部仮設足場が完了するこ
とになり、鉄骨建て方後、直ちに、屋根パネルの取付は
作業に移行できる。
According to the above configuration, since the internal temporary scaffolding is attached to the steel beam in advance, the internal temporary scaffolding is completed by lifting this beam steel frame with a crane etc. and performing the steel frame erection. After that, you can immediately begin installing the roof panels.

また、クレーン等で吊り上げた屋根パネルを内部仮設足
場からの作業によって梁鉄骨のブラケットに取り付ける
ので、外部仮設足場が不要であり、急勾配の屋根を施工
する場合であっても、材料、工具、作業員の落下の危険
が低減される。
In addition, since the roof panels lifted by a crane or the like are attached to the beam steel brackets using internal temporary scaffolding, there is no need for external temporary scaffolding, and even when constructing a steeply sloped roof, materials, tools, etc. The risk of falling for workers is reduced.

〔実施例〕〔Example〕

以下、本発明の実施例を図面に基づいて説明する。 Embodiments of the present invention will be described below based on the drawings.

第1図は、急勾配の金属屋根の施工途中の状態 。Figure 1 shows a steeply sloped metal roof in the middle of construction.

を示し、第2図はその要部を示す。図において、la、
 lbは柱、2は建物内部のスパン中央部に設置した構
台である。3aは一方の柱1aと構台2とにわたって架
設された梁鉄骨、3bは前記梁鉄骨3aと他方の柱1b
とにわたって架設される梁鉄骨である。
FIG. 2 shows the main part. In the figure, la,
lb is a pillar, and 2 is a pedestal installed at the center of the span inside the building. 3a is a beam steel frame constructed across one column 1a and the gantry 2; 3b is a beam steel frame erected between the beam steel frame 3a and the other column 1b.
This is a beam steel frame that will be erected across the area.

前記構台2は鉄骨建て方の完了後の適当な時点で、つま
り、梁鉄骨3a、 3bと柱1a、 lbの連結(連結
ボルトの本締め又は溶接)ならびに梁鉄骨3a、 3b
同士の連結(連結ボルトの本締め又は溶接)が完了した
後、解体され撤去される。4は梁鉄骨3a、 3bに取
り付けられた内部仮設足場、5は天井裏に据え付けられ
るエキスバンドメタル製の本設キャツトウオーク(天井
部分や天井裏に設けられた各種設備の保守点検等に使用
される細長い歩行路)である。第1図中の6は屋根パネ
ル、7は天井板であり、屋根パネル6の施工後に天井下
地に取り付けられる。
The gantry 2 is installed at an appropriate time after the steel frame erection is completed, that is, the steel beams 3a, 3b and the columns 1a, lb are connected (full tightening or welding of connection bolts), and the steel beams 3a, 3b are connected.
After the connection between them is completed (full tightening of connection bolts or welding), they are dismantled and removed. 4 is an internal temporary scaffold attached to the steel beams 3a and 3b, and 5 is a permanent expanded metal catwalk installed in the ceiling (used for maintenance and inspection of various equipment installed in the ceiling and behind the ceiling). It is a long and narrow walking path. In FIG. 1, 6 is a roof panel, and 7 is a ceiling board, which is attached to the ceiling base after the roof panel 6 is constructed.

屋根の施工方法は次の通りである。The roof construction method is as follows.

即ち、第2図〜第4図に示すように、予め、地上で、梁
鉄骨3a、 3bに、屋根パネル取付は用のブラケット
8と、内部仮設足場4とを取り付けておき、この梁鉄骨
3a、 3bをクレーン等で吊り上げて鉄骨建て方を行
い、しかる後、クレーン等で吊り上げた屋根パネル6を
前記内部仮設足場4からの作業によって前記ブラケット
8に取り付けるのである。
That is, as shown in FIGS. 2 to 4, brackets 8 for attaching roof panels and internal temporary scaffolding 4 are attached to the steel beams 3a and 3b on the ground in advance, and the steel beams 3a and 3b are , 3b is hoisted up by a crane or the like to construct a steel frame, and then the roof panel 6 hoisted up by a crane or the like is attached to the bracket 8 by work from the internal temporary scaffolding 4.

内部仮設足場4を梁鉄骨3a、 3bに取り付けるため
の部材としては、内部仮設足場専用の仮設材とし、内部
仮設足場4が不要になった時点で当該内部仮設足場4と
一緒に解体撤去すべく構成してもよいが、図示の実施例
では、仮設材を少なくするために、前記本設キャツトウ
オーク5を吊り下げ支持するための吊り金具9を利用し
ている。
The members for attaching the internal temporary scaffolding 4 to the steel beams 3a and 3b are made exclusively for internal temporary scaffolding, and when the internal temporary scaffolding 4 is no longer needed, it is to be dismantled and removed together with the internal temporary scaffolding 4. However, in the illustrated embodiment, a hanging fitting 9 for suspending and supporting the permanent catwalk 5 is used in order to reduce the amount of temporary construction materials.

即ち、第2図〜第4図に示すように、屋根パネル取付は
用のブラケット8を、本設キャツトウオーク5の横幅に
対応した長さく例えば、7501程度)にしておき、地
上で該ブラケット8を梁鉄骨に所要個数適当間隔おきに
取り付け、さらに、各ブラケット8の両端には複数対の
吊り金具9の上側部分9aを垂下させ、該上側部分98
間には前記内部仮設足場4を架設しておく。
That is, as shown in FIGS. 2 to 4, the bracket 8 used for attaching the roof panel is made to have a length corresponding to the width of the main catwalk 5 (for example, about 750 mm), and the bracket 8 is mounted on the ground. are attached to the beam steel frame at appropriate intervals, and furthermore, a plurality of pairs of hanging fittings 9 are suspended from both ends of each bracket 8, and the upper portions 98
The internal temporary scaffolding 4 is erected between them.

この梁鉄骨をクレーン等で吊り上げて鉄骨建て方を行う
This steel beam will be lifted up by a crane, etc., and the steel frame will be erected.

これにより、内部仮設足場4が完成し、当該内部仮設足
場4は鉄骨建て古詩の作業足場(連結ボルトの本締め又
は溶接等の作業を行う際のこう鋲足場)として利用され
る。
As a result, the internal temporary scaffolding 4 is completed, and the internal temporary scaffolding 4 is used as a work scaffolding for steel-framed ancient poetry (tacked scaffolding when performing work such as final tightening of connecting bolts or welding).

しかる後、本設キャツトウオーク5および吊り金具9の
下側部分9bをクレーン等で吊り上げて、当該下側部分
9bを前記内部仮設足場4からの作業により前記上側部
分9aにボルト・ナツト等で連結すると共に、クレーン
等で吊り上げた屋根パネル6を前記内部仮設足場4から
の作業によって前記ブラケット8に取り付けるのである
After that, the permanent catwalk 5 and the lower part 9b of the hanging fitting 9 are lifted up by a crane or the like, and the lower part 9b is connected to the upper part 9a by bolts, nuts, etc. from the internal temporary scaffolding 4. At the same time, the roof panel 6 lifted by a crane or the like is attached to the bracket 8 by work from the internal temporary scaffolding 4.

10は仮設手摺、11は本設手摺、12は内部仮設足場
4の撤去後、必要に応じて吊り金具9に取り付けられる
振れ止め用プレースである。13はクレーン等による吊
りワイヤー、14は屋根パネル6の吊り治具であり、内
部仮設足場4からの作業により屋根パネル6から取り外
せるようになっている。
10 is a temporary handrail, 11 is a permanent handrail, and 12 is a steady rest place that can be attached to the hanging fitting 9 as needed after the internal temporary scaffolding 4 is removed. Reference numeral 13 indicates a hanging wire by a crane or the like, and reference numeral 14 indicates a hanging jig for the roof panel 6, which can be removed from the roof panel 6 by work from the internal temporary scaffolding 4.

即ち、吊り治具14は、第3図に示すように、屋根パネ
ル6の下地枠部分の両側面に連結ボルト15で着脱自在
に取り付けられた第一部材14aと、屋根パネル6同士
の目地幅よりも薄い板材によって形成された平板状の第
二部材14bとから構成され、第二部材14bには、第
一部材14a先端に設けた頭付き突起部14cに対して
係脱自在な係合用切欠き部14dが形成されている。
That is, as shown in FIG. 3, the hanging jig 14 includes a first member 14a that is removably attached to both sides of the base frame portion of the roof panel 6 with connecting bolts 15, and a joint width between the roof panels 6. The second member 14b has a flat plate-like second member 14b formed of a plate material thinner than the first member 14a. A notch 14d is formed.

屋根パネル6の施工が完了し、内部仮設足場4を撤去し
たら、建物内部の床に天井仕上げ工事用の足場(図示せ
ず)を設置し、当該足場や本設キャツトウオーク5上で
の作業により、第4図に示すように、隣接する本設キャ
ツトウオーク5の吊り金具9の下端近傍部間に天井吊り
ボルト下地となる横桟16を架設し、該横桟16に吊り
ポル目7を介して天井下地18および空調ダクト等の天
井設備19を取り付け、天井下地18に天井板7を取り
付けるのである。
After the construction of the roof panel 6 is completed and the internal temporary scaffolding 4 is removed, scaffolding for ceiling finishing work (not shown) is installed on the floor inside the building, and work on the scaffolding and permanent catwalk 5 is carried out. As shown in FIG. 4, a horizontal beam 16 serving as a base for ceiling hanging bolts is installed between the lower ends of the hanging fittings 9 of the adjacent permanent catwalks 5, and a hanging hole 7 is installed on the horizontal beam 16. Then, the ceiling base 18 and ceiling equipment 19 such as air conditioning ducts are attached, and the ceiling board 7 is attached to the ceiling base 18.

尚、図示の建物は大スパンの講堂であり、屋根は高さの
一様な切妻屋根であるが、天井は室内の音響効果を考慮
した設計となっている。このため天井板7の高さは、一
方の妻側から他方の妻側に行く程高くなっており、本設
キャツトウオーク5の高さく吊り金具9の長さ)もこれ
に対応している。従って、吊り金具9の長さが短い部位
では、本設キャツトウオーク5まで梁鉄骨に先付けして
おいても支障はないが、天井板7の高さが低い所では、
吊り金具9の長さが長く、これを梁鉄骨に先付けするに
あたっては、地上に梁鉄骨を載置するだめの背の高い架
台が必要となり、地−トでの諸作業が煩雑なものとなる
ので、この実施例では、上述した通り、吊り金具9のう
ち、内部仮設足場4の構成に必要な上側部分9aだけを
先付けし、下側部分9bおよび本設キャツトウオーク5
は別途、クレーン等で吊り上げて、前記上側部分9aに
連結しているのである。本設キャツトウオーク5および
吊り金具9の下側部分9bを吊り上げて前記上側部分9
aに連結する作業は、屋根パネル6の施工後に行うこと
も可能である。
The building shown is a large-span lecture hall, and the roof is a gable roof of uniform height, but the ceiling is designed with consideration to the acoustics in the room. For this reason, the height of the ceiling board 7 increases from one gable side to the other gable side, and the height of the catwalk 5 and the length of the hanging fittings 9 also correspond to this. Therefore, in areas where the length of the hanging bracket 9 is short, there is no problem in attaching up to the permanent catwalk 5 to the beam steel frame, but in areas where the height of the ceiling board 7 is low,
The length of the hanging bracket 9 is long, and in order to attach it to the steel beam first, a tall frame is required to place the steel beam on the ground, making various operations on the ground complicated. Therefore, in this embodiment, as described above, only the upper part 9a of the hanging fittings 9 necessary for constructing the internal temporary scaffolding 4 is attached first, and the lower part 9b and the permanent catwalk 5 are attached.
is separately lifted by a crane or the like and connected to the upper portion 9a. The main cat walk 5 and the lower part 9b of the hanging fitting 9 are lifted up and the upper part 9 is lifted up.
It is also possible to perform the work of connecting to a after the construction of the roof panel 6.

上記の構成によれば、吊りボルト17を本設キャツトウ
オーク5の吊り金具9の下端近傍部間に架設された横桟
16に取り付けであるため、屋根面と天井板7との間に
大きな空間を有する二重天井構造であるにもかかわらず
、吊りボルト17が短いもので済み、天井内の景観がシ
ンプルで、吊りボルト17が振動等による異音の発生原
因にならず、室内の音響効果を損なうことがない。
According to the above configuration, since the hanging bolts 17 are attached to the horizontal beams 16 installed between the lower ends of the hanging fittings 9 of the permanent catwalk 5, there is a large space between the roof surface and the ceiling plate 7. Despite having a double ceiling structure with without damaging it.

第5図は本発明の別実施例を示す。この実施例は、予め
、地上で、梁鉄骨3a、 3bに、屋根パネル取付は用
のブラケット8と、天井裏に据え付けられる本設キャツ
トウオーク5および当該本設キャツトウオーク5を吊り
下げ支持するための複数対の吊り金具9と、該吊り金具
9の上側部分間に架設された内部仮設足場4とを取り付
けておき、この梁鉄骨3a、 3bをクレーン等で吊り
上げて鉄骨建て方を行い、しかる後、クレーン等で吊り
上げた屋根パネル6を前記内部仮設足場4からの作業に
よって前記ブラケット8に取り付けるようにした点に特
徴がある。その他の構成は先の実施例と同しである。こ
の実施例は、屋根と天井との間隔が比較的狭く且つ天井
高さが均一な場合に特に有効である。
FIG. 5 shows another embodiment of the invention. In this embodiment, on the ground, a bracket 8 for attaching a roof panel, a permanent catwalk 5 to be installed in the ceiling, and a structure for suspending and supporting the permanent catwalk 5 are attached to the beam steel frames 3a and 3b in advance. A plurality of pairs of hanging fittings 9 and an internal temporary scaffolding 4 constructed between the upper parts of the hanging fittings 9 are attached, and the beam steel frames 3a and 3b are lifted with a crane or the like to construct the steel frame. The roof panel 6 is then lifted up by a crane or the like and attached to the bracket 8 by work from the internal temporary scaffolding 4. The other configurations are the same as in the previous embodiment. This embodiment is particularly effective when the distance between the roof and the ceiling is relatively narrow and the ceiling height is uniform.

〔発明の効果〕〔Effect of the invention〕

本発明は、上述した構成よりなるから、次の効果を奏し
得るのである。
Since the present invention has the above-described configuration, it can achieve the following effects.

地上で梁鉄骨に内部仮設足場を先付けしであるので、梁
鉄骨をクレーン等で吊り上げて鉄骨建て方を行うことに
よって、内部仮設足場が完了することになり、鉄骨建て
古詩点で簡便な作業足場(こう鋲足場)が得られ、鉄骨
建て古詩の安全性を向上することができる。
Since the internal temporary scaffolding is attached to the steel beam on the ground in advance, the internal temporary scaffolding is completed by lifting the steel beam with a crane or the like and erecting the steel frame. (tacked scaffolding) can be obtained, and the safety of steel-framed ancient poems can be improved.

鉄骨建て方を行うことによって、内部仮設足場が完了す
るので、鉄骨建て方の完了後、直ちに、屋根パネルの取
付は工程に移行でき、工期を短縮することができる。
By performing the steel frame construction, the internal temporary scaffolding is completed, so the roof panel installation process can be started immediately after the steel frame construction is completed, thereby shortening the construction period.

請求項(2)や請求項(3)によれば、上記の効果に加
えて、本設キャツトウオークを吊り下げ支持するための
吊り金具が内部仮設足場を梁鉄骨に取り付けるための部
材として利用されるので、仮設材を少なくして、仮設作
業の省力化とコストダウンとを図り得る効果がある。
According to claims (2) and (3), in addition to the above-mentioned effects, the hanging fittings for suspending and supporting the permanent catwalk are used as members for attaching the internal temporary scaffolding to the beam steel frame. As a result, the amount of temporary construction materials can be reduced, resulting in labor savings and cost reductions in temporary construction work.

殊に、請求項(4)によれば、屋根パネル取付は用のブ
ラケットが本設キャツトウオークの吊り下げ部材に利用
され、より一層の省力化とコストダウンが可能である。
In particular, according to claim (4), a bracket for mounting the roof panel is used as a hanging member for the catwalk, thereby making it possible to further save labor and reduce costs.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は屋根の施工方法を示す全体概略図、第2図は要
部の斜視図、第3図は施工途中における要部の縦断面図
、第4図は施工された屋根の構造を示す要部の縦断面図
、第5図は本発明の別の実施例を示す要部の縦断面図で
ある。 3a、3b・・・梁鉄骨、4・・・内部仮設足場、5・
・・本設キャツトウオーク、6・・・屋根パネル、8・
・・ブラケット、9・・・吊り金具、9a・・・上側部
分、9b・・・下側部分。
Figure 1 is an overall schematic diagram showing the roof construction method, Figure 2 is a perspective view of the main parts, Figure 3 is a vertical sectional view of the main parts during construction, and Figure 4 shows the structure of the constructed roof. FIG. 5 is a vertical cross-sectional view of the main part showing another embodiment of the present invention. 3a, 3b...beam steel frame, 4...internal temporary scaffolding, 5.
・・Permanent catwalk, 6・Roof panel, 8・
... Bracket, 9... Hanging fitting, 9a... Upper part, 9b... Lower part.

Claims (4)

【特許請求の範囲】[Claims] (1)地上で、梁鉄骨に、屋根パネル取付け用のブラケ
ットと、内部仮設足場とを取り付けておき、この梁鉄骨
をクレーン等で吊り上げて鉄骨建て方を行い、しかる後
、クレーン等で吊り上げた屋根パネルを前記内部仮設足
場からの作業によって前記ブラケットに取り付けるよう
にしたことを特徴とする屋根の施工方法。
(1) Brackets for attaching roof panels and internal temporary scaffolding were attached to the steel beam on the ground, and the steel beam was hoisted with a crane to construct the steel frame. After that, the steel beam was lifted with a crane, etc. A method for constructing a roof, characterized in that the roof panel is attached to the bracket by work from the internal temporary scaffolding.
(2)地上で、梁鉄骨に、屋根パネル取付け用のブラケ
ットと、天井裏に据え付けられる本設キャットウオーク
を吊り下げ支持するための複数対の吊り金具の上側部分
と、該上側部分間に架設された内部仮設足場とを取り付
けておき、この梁鉄骨をクレーン等で吊り上げて鉄骨建
て方を行い、しかる後、本設キャットウオークおよび吊
り金具の下側部分をクレーン等で吊り上げて、当該下側
部分を前記内部仮設足場からの作業によって前記上側部
分に連結すると共に、クレーン等で吊り上げた屋根パネ
ルを前記内部仮設足場からの作業によって前記ブラケッ
トに取り付けるようにしたことを特徴とする屋根の施工
方法。
(2) On the ground, install brackets for attaching roof panels to the beam steel frame, and the upper part of multiple pairs of hanging metal fittings for suspending and supporting the permanent catwalk installed in the ceiling, and between the upper parts. The steel beams are then lifted with a crane, etc. to construct the steel frame.Then, the lower part of the main catwalk and the lifting fittings are lifted with a crane, etc., and the lower part of the A method for constructing a roof, characterized in that the roof panel is connected to the upper part by working from the internal temporary scaffolding, and the roof panel lifted by a crane or the like is attached to the bracket by working from the internal temporary scaffolding. .
(3)地上で、梁鉄骨に、屋根パネル取付け用のブラケ
ットと、天井裏に据え付けられる本設キャットウオーク
および当該本設キャットウオークを吊り下げ支持するた
めの複数対の吊り金具と、該吊り金具の上側部分間に架
設された内部仮設足場とを取り付けておき、この梁鉄骨
をクレーン等で吊り上げて鉄骨建て方を行い、しかる後
、クレーン等で吊り上げた屋根パネルを前記内部仮設足
場からの作業によって前記ブラケットに取り付けるよう
にしたことを特徴とする屋根の施工方法。
(3) On the ground, a bracket for attaching the roof panel to the beam steel frame, a permanent catwalk installed in the ceiling, multiple pairs of hanging metal fittings for suspending and supporting the permanent catwalk, and the hanging metal fittings. An internal temporary scaffold constructed between the upper parts is attached, and the beam steel frame is hoisted by a crane or the like to construct the steel frame. After that, the roof panels lifted by a crane or the like are worked from the internal temporary scaffolding. A method for constructing a roof, characterized in that the roof is attached to the bracket by:
(4)前記吊り金具の上側部分が前記ブラケットの両端
から垂下されていることを特徴とする請求項(2)又は
(3)記載の屋根の施工方法。
(4) The roof construction method according to claim 2 or 3, wherein the upper portion of the hanging fitting is suspended from both ends of the bracket.
JP1120103A 1989-05-12 1989-05-12 Roof construction method Expired - Fee Related JP2808448B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1120103A JP2808448B2 (en) 1989-05-12 1989-05-12 Roof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1120103A JP2808448B2 (en) 1989-05-12 1989-05-12 Roof construction method

Publications (2)

Publication Number Publication Date
JPH02300455A true JPH02300455A (en) 1990-12-12
JP2808448B2 JP2808448B2 (en) 1998-10-08

Family

ID=14777998

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1120103A Expired - Fee Related JP2808448B2 (en) 1989-05-12 1989-05-12 Roof construction method

Country Status (1)

Country Link
JP (1) JP2808448B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60223550A (en) * 1984-04-21 1985-11-08 鹿島建設株式会社 Construction of roof truss
JPS62161568A (en) * 1986-01-13 1987-07-17 Oki Electric Ind Co Ltd Control system of multihead printer

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60223550A (en) * 1984-04-21 1985-11-08 鹿島建設株式会社 Construction of roof truss
JPS62161568A (en) * 1986-01-13 1987-07-17 Oki Electric Ind Co Ltd Control system of multihead printer

Also Published As

Publication number Publication date
JP2808448B2 (en) 1998-10-08

Similar Documents

Publication Publication Date Title
US20050066609A1 (en) Preassembled roof and floor deck panel system
JP6667940B2 (en) Exterior wall panel and column layout structure of exterior wall and layout construction method
JP6970610B2 (en) Building construction method
JP7397723B2 (en) Building trunk structure
JPH02300455A (en) Construction method of roof
JPH09317185A (en) Construction method of housing
JP2557161B2 (en) Roof unit with parapet
JPH08239928A (en) Non-scaffolding contruction method for exterior wall material
JP4018000B2 (en) Construction method of unit type building
JP4541837B2 (en) Curtain wall structure by ALC plate with steel frame and its construction method
JP2867172B2 (en) Mounting structure of folded plate to beam steel frame
JPH07145651A (en) Roof construction in unit building and roof construction method
JPS6137426B2 (en)
JP3039613U (en) Mounting bracket
JPH028025Y2 (en)
JPH0358415B2 (en)
JPH0512402Y2 (en)
JPH03212548A (en) Constructing method of preliminariry assembled floor having equipment
JPH0326827Y2 (en)
JPH08253969A (en) Unit building and method of constructing elevator
JPH084154A (en) Wall panel
JPH0813678A (en) Roof panel and unit building
JPH10292528A (en) Wall structure of building and erection method thereof
JPH05331955A (en) Ceiling frame and ceiling panel
JPH05187068A (en) Construction method of building