|
US5991732A
(en)
*
|
1989-02-15 |
1999-11-23 |
Moslares; Andres Monedero |
Strategical-tactical logistic system
|
|
US5367677A
(en)
*
|
1990-05-11 |
1994-11-22 |
Thinking Machines Corporation |
System for iterated generation from an array of records of a posting file with row segments based on column entry value ranges
|
|
US5235508A
(en)
*
|
1990-05-31 |
1993-08-10 |
At&T Bell Laboratories |
Automated resource allocation cutting stock arrangement using random cut patterns
|
|
US5289370A
(en)
*
|
1991-05-31 |
1994-02-22 |
At&T Bell Laboratories |
Automated resource allocation method employing a learning arrangement
|
|
US5291397A
(en)
*
|
1991-12-20 |
1994-03-01 |
Powell Roger A |
Method for resource allocation and project control for the production of a product
|
|
US5586021A
(en)
*
|
1992-03-24 |
1996-12-17 |
Texas Instruments Incorporated |
Method and system for production planning
|
|
US5303170A
(en)
*
|
1992-04-03 |
1994-04-12 |
International Business Machines Corporation |
System and method for process modelling and project planning
|
|
US5287194A
(en)
*
|
1992-11-25 |
1994-02-15 |
Xerox Corporation |
Distributed printing
|
|
WO1994020918A1
(en)
*
|
1993-03-11 |
1994-09-15 |
Fibercraft/Descon Engineering, Inc. |
Design and engineering project management system
|
|
US5365425A
(en)
*
|
1993-04-22 |
1994-11-15 |
The United States Of America As Represented By The Secretary Of The Air Force |
Method and system for measuring management effectiveness
|
|
US5619695A
(en)
*
|
1994-02-03 |
1997-04-08 |
Lockheed Martin Corporation |
Method and apparatus for scheduling resources
|
|
US6801820B1
(en)
|
1994-05-27 |
2004-10-05 |
Lilly Software Associates, Inc. |
Method and apparatus for scheduling work orders in a manufacturing process
|
|
US7647241B1
(en)
*
|
1994-05-27 |
2010-01-12 |
Infor Global Solutions (Veenendaal) B.V |
Computer program product for determining and reducing customer service impact
|
|
US5492632A
(en)
*
|
1994-09-23 |
1996-02-20 |
Motorola, Inc. |
Method and system for monitoring and controlling a filtration process
|
|
US5649113A
(en)
*
|
1994-10-12 |
1997-07-15 |
U S West Technologies, Inc. |
Method and system for translating an optimization problem for use in efficient resource allocation
|
|
US5884276A
(en)
*
|
1994-10-12 |
1999-03-16 |
U S West, Inc. |
System for translating an optimization problem for use in efficient resource allocation
|
|
US5845258A
(en)
*
|
1995-06-16 |
1998-12-01 |
I2 Technologies, Inc. |
Strategy driven planning system and method of operation
|
|
US5765137A
(en)
*
|
1996-03-04 |
1998-06-09 |
Massachusetts Institute Of Technology |
Computer system and computer-implemented process for correlating product requirements to manufacturing cost
|
|
US5826238A
(en)
*
|
1996-04-02 |
1998-10-20 |
Taiwan Semiconductor Manufacturing |
Daily target generation and machine allocation with priority
|
|
US5889673A
(en)
*
|
1996-12-27 |
1999-03-30 |
Vanguard International Semiconductor Corporation |
Manufacturing method and system for dynamic dispatching of integrated circuit wafer lots
|
|
US6216108B1
(en)
*
|
1997-08-11 |
2001-04-10 |
Levander Mark R. |
Service business management system
|
|
US6073055A
(en)
*
|
1997-11-10 |
2000-06-06 |
Basf Corporation |
Computerized virtual paint manufacturing and application system
|
|
US6195590B1
(en)
*
|
1998-02-11 |
2001-02-27 |
Roger A. Powell |
System for control and resource allocation for the manufacture of a product
|
|
JPH11232324A
(ja)
*
|
1998-02-16 |
1999-08-27 |
Nec Yamagata Ltd |
負荷区分型生産管理方式および生産管理方法
|
|
GB2342194A
(en)
*
|
1998-09-28 |
2000-04-05 |
Kpmg Management Consulting |
Monitoring and controlling a process
|
|
SE512843C2
(sv)
*
|
1998-11-02 |
2000-05-22 |
Ericsson Telefon Ab L M |
Lastreglering i ett databehandlingssystem m.h.a. prioritetsnivåbaserad hierarki av buffertar
|
|
US6366915B1
(en)
*
|
1998-11-04 |
2002-04-02 |
Micron Technology, Inc. |
Method and system for efficiently retrieving information from multiple databases
|
|
US6167320A
(en)
*
|
1999-03-03 |
2000-12-26 |
Powell; Roger A. |
System for control and resource allocation for the manufacturing of a product
|
|
US6415195B1
(en)
|
1999-04-02 |
2002-07-02 |
American Standard Inc. |
Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
|
|
US6415194B1
(en)
|
1999-04-02 |
2002-07-02 |
American Standard Inc. |
Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
|
|
US6393332B1
(en)
|
1999-04-02 |
2002-05-21 |
American Standard Inc. |
Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
|
|
US6397118B1
(en)
|
1999-04-02 |
2002-05-28 |
American Standard Inc. |
Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand
|
|
US6681218B1
(en)
*
|
1999-11-04 |
2004-01-20 |
International Business Machines Corporation |
System for managing RDBM fragmentations
|
|
KR100311051B1
(ko)
*
|
1999-12-18 |
2001-11-03 |
윤종용 |
설비효율 최적화방법 및 이를 위한 설비효율 분석장치
|
|
US7373310B1
(en)
*
|
2000-04-06 |
2008-05-13 |
International Business Machines Corporation |
Workflow system matrix organization search engine
|
|
US7117161B2
(en)
|
2000-08-21 |
2006-10-03 |
Bruce Elisa M |
Decision dynamics
|
|
US7349863B1
(en)
*
|
2001-06-14 |
2008-03-25 |
Massachusetts Institute Of Technology |
Dynamic planning method and system
|
|
US7415393B1
(en)
|
2001-06-14 |
2008-08-19 |
Massachusetts Institute Of Technology |
Reliability buffering technique applied to a project planning model
|
|
DE10328758A1
(de)
*
|
2003-06-25 |
2005-01-27 |
M&F Maschinen- Und Fertigungsanlagen-Optimierung Josef Nagel |
Datenerfassungs- und Verarbeitungssystem für die Kontrolle von Fertigungsprozessen
|
|
US7689490B2
(en)
*
|
2004-05-28 |
2010-03-30 |
Morgan Stanley |
Matching resources of a securities research department to accounts of the department
|
|
US7769654B1
(en)
|
2004-05-28 |
2010-08-03 |
Morgan Stanley |
Systems and methods for determining fair value prices for equity research
|
|
US7734517B2
(en)
*
|
2004-05-28 |
2010-06-08 |
Morgan Stanley |
Systems and method for determining the cost of a securities research department to service a client of the department
|
|
US7752103B2
(en)
|
2004-09-10 |
2010-07-06 |
Morgan Stanley |
Systems and methods for auctioning access to securities research resources
|
|
US7953652B1
(en)
|
2006-06-12 |
2011-05-31 |
Morgan Stanley |
Profit model for non-execution services
|
|
US8266289B2
(en)
*
|
2009-04-23 |
2012-09-11 |
Microsoft Corporation |
Concurrent data processing in a distributed system
|
|
JP5884515B2
(ja)
*
|
2012-01-27 |
2016-03-15 |
富士通株式会社 |
図表生成プログラム、図表生成方法及び図表生成装置
|
|
JP6313671B2
(ja)
|
2014-06-23 |
2018-04-18 |
株式会社Screenホールディングス |
基板処理装置のためのスケジュール作成方法および基板処理装置
|
|
US11393050B2
(en)
*
|
2015-12-22 |
2022-07-19 |
Hitachi, Ltd. |
Resource accommodation device, schedule management device, and resource accommodation system
|
|
JP6573693B2
(ja)
*
|
2018-03-23 |
2019-09-11 |
株式会社Screenホールディングス |
基板処理装置のためのスケジュール作成方法および基板処理装置
|