JPH02252809A - Steel-made temporary flood gate - Google Patents

Steel-made temporary flood gate

Info

Publication number
JPH02252809A
JPH02252809A JP7544489A JP7544489A JPH02252809A JP H02252809 A JPH02252809 A JP H02252809A JP 7544489 A JP7544489 A JP 7544489A JP 7544489 A JP7544489 A JP 7544489A JP H02252809 A JPH02252809 A JP H02252809A
Authority
JP
Japan
Prior art keywords
vertical
tidal
embankment
vertical communication
plural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7544489A
Other languages
Japanese (ja)
Inventor
Yoshimasa Kawakita
川北 義正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP7544489A priority Critical patent/JPH02252809A/en
Publication of JPH02252809A publication Critical patent/JPH02252809A/en
Pending legal-status Critical Current

Links

Landscapes

  • Barrages (AREA)
  • Revetment (AREA)

Abstract

PURPOSE:To enable tide stopping safely, surely, and in a short time by blocking a space between plural strut members, erected on a horizontal part structure body in which plural vertical communication holes are longitudinally and laterally arranged, by means of partition plates, and blocking upper end openings of the vertical communication holes with cover bodies. CONSTITUTION:Plural strut members 8 and 8 having a left and right pair of vertical grooves are standingly provided on a longitudinal center axis of a horizontal bottom part structure body in which plural vertical communication holes are longitudinally and latitudinally arranged. And a partition plate 4 is inserted from the upper part between vertical groove materials to block between them, and also upper end opening of the vertical communication hole is airtightly blocked with a cover plate 21. And a steel-made temporary flood gate 2 is towed with the upper end opening of the vertical communication hole airtightly blocked with the plate 21 and installed in a mount 1, and then filling stones 12 are charged in vertical communication holes and on openings of them. Moreover the partition plate 4 is lowered in a vertical groove between the strut members 8 and 8 at the time of the last tide stopping, and blocking is made in a short time.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、鋼製仮水門に関する。[Detailed description of the invention] [Industrial application field] The present invention relates to a steel temporary sluice gate.

〔従来の技術〕[Conventional technology]

干拓事業では、第6因子面図に示すように、湾口を締切
って湾内に干拓地を造成するために、第7図斜視図に示
すように長さ数kmに及ぶ潮受堤を構築する。
In the reclamation project, a tidal embankment several kilometers long is constructed as shown in the perspective view of Figure 7 in order to close off the bay mouth and create reclaimed land within the bay, as shown in the factor 6 map.

ところで、潮受堤の構築の際、石積みにより潮受堤が完
成してゆく過程で、その内外に水位差が生じ、築堤の低
いところでは、数Loomにわたって、高位水面から低
位水面へ向かって潮流が発生し、折角石積みされた荒止
堤の部分の結石が流される。
By the way, during the construction of the tidal embankment, as the tidal embankment is completed by masonry, a difference in water level occurs between the inside and outside of the tidal embankment, and in the lower part of the embankment, tidal currents occur over several looms from the higher water level to the lower water level. However, the stones that had been piled up on the rough breakwater were washed away.

そこで、荒止堤における石積みによる潮止工事を短期間
に行うために、第8図断面図に示すように、予め鋼製型
枠15を大型海上クレーン等で設置し、この上面に石運
1般用のトロッコ18用レール16を布設し、陸地側に
トラックよりトロッコ18への積替基地20を作る等の
大掛りな工事を行っている。
Therefore, in order to carry out the tide-blocking work using stone masonry on the rough breakwater in a short period of time, a steel formwork 15 is installed in advance using a large marine crane, etc. Large-scale construction work is being carried out, including laying rails 16 for general use trolleys 18 and creating a transshipment base 20 from trucks to trolleys 18 on the land side.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかしながら、このような手段では、工事費が増大する
とともに、工期が長くなる。
However, such measures increase construction costs and lengthen the construction period.

本発明はこのような事情に鑑みて提案されたもので、□
大規模な積替基地やトロッコ、レール等の構築、海上ク
レーン等の使用を行わずに安全確実かつ短時間に潮止め
ができる経済的な鋼製仮水門を提供することを目的とす
る。
The present invention was proposed in view of these circumstances.
The purpose of the present invention is to provide an economical steel temporary sluice gate that can safely and reliably stop the tide in a short time without constructing large-scale transshipment bases, trolleys, rails, etc., or using marine cranes.

〔課題を解決するための手段〕[Means to solve the problem]

そのために本発明は、干拓における潮受堤の潮止めに設
置され、同潮受堤の完成により同潮受堤中に埋没される
仮水門において、偏平水平長方枠形の注排水可能な箱体
よりなり複数の竪通孔が縦横に配設された水平底部構造
体と、上記水平底部構造体の縦中心線上に等間隔で複数
本立設されそれぞれ対向面に互いに対向して開く堅調が
凹設された複数の支柱部材と、上記水平底部構造体の上
面に配設され上記複数の竪通孔の上端開口を着脱可能に
気密に閉塞する蓋板と、上記支柱部材の対向する堅調に
両端が挿入され上記隣り合う両支柱部材間に上方から挿
入されて上記両支柱部材間の部分を閉塞する複数の長方
形仕切板とを具えたことを特徴とする。
To this end, the present invention has been developed to provide a temporary sluice gate that is installed at the tidal stop of a tidal embankment during reclamation and is buried in the tidal embankment upon completion of the tidal embankment, and is constructed of a box body in the form of a flat horizontal rectangular frame that can be used for pouring and draining water. A horizontal bottom structure in which a plurality of vertical holes are arranged vertically and horizontally, and a plurality of vertical holes are erected at equal intervals on the vertical center line of the horizontal bottom structure, and each of the holes is recessed and opens facing each other on the opposite surface. A plurality of support members, a cover plate disposed on the upper surface of the horizontal bottom structure and removably and airtightly closing the upper end openings of the plurality of vertical holes, both ends of which are firmly inserted into opposing ends of the support support members; The present invention is characterized in that it includes a plurality of rectangular partition plates inserted from above between the two adjacent pillar members to close off the portion between the two pillar members.

〔作用〕[Effect]

このような構成によれば、下記作用が行われる。 According to such a configuration, the following effects are performed.

造船工場にてあらかじめ作られた倒立T字状断面を有す
る鋼製仮水門の水平底部構造体の竪通孔をそれぞれ蓋板
で閉塞したのち、通、L 宜バラスト水を入れて界面上に浮上し、これを現場に曳
行する。
After each vertical hole in the horizontal bottom structure of a steel temporary water gate with an inverted T-shaped cross section, which was prefabricated at a shipbuilding factory, was closed with a cover plate, ballast water was poured into the holes and floated above the interface. and tow it to the site.

現場では海上クレーン等を使用して、蓋板を外したのち
、バラストを充水してこれらの水平底部構造体を1列に
海底のマウンド上に沈設したのち、その竪通孔に石を詰
めてマウンド上に固定する。
At the site, a marine crane or the like was used to remove the cover plate, fill it with ballast, and sink these horizontal bottom structures in a single line onto a mound on the seabed, and then fill the vertical holes with stones. and secure it on the mound.

こうして潮止部における水平底部構造体の構築工事が終
わったならば、隣り合う両支柱部材間の部分を仕切板を
挿入することにより閉塞して、−挙に潮止めを行ったの
ち、仮水門の部分をすべて埋めて、潮受堤を完成する。
Once the construction work of the horizontal bottom structure at the tide stop is completed, the part between the two adjacent support columns is closed off by inserting a partition plate, and the tide is stopped, and then the temporary water gate is closed. Complete the tidal embankment by filling in all parts.

ここで、蓋板は仕切板として利用することもで−きる。Here, the lid plate can also be used as a partition plate.

〔実施例〕〔Example〕

本発明の一実施例を図面について説明すると、第1図は
その全体斜視図、第2図は第1図の仮水門を潮止部に通
用した全体平面図、第3図、第4図はそれぞれ第2図の
III−III。
An embodiment of the present invention will be explained with reference to the drawings. Fig. 1 is an overall perspective view, Fig. 2 is an overall plan view of the temporary sluice gate shown in Fig. III-III in FIG. 2, respectively.

IV−IVに沿った横断面図、第5図は第1図の仮水門
の施工要領を示す同じく斜視図である。
FIG. 5 is a cross-sectional view taken along IV-IV, and a perspective view showing the procedure for constructing the temporary sluice gate in FIG. 1.

上図において、lは湾口海底地盤10上に構築されたマ
ウンド、2は本発明にかかる鋼製仮水門で、それぞれ倒
立T字状断面を有する単位水門を複数縦列的に接続して
なる。各単位水門は縦板、横板及び補強材等よりなり、
平面形状が日宇状で適宜高さの水平長方形偏平枠体と、
この枠体の両長辺の央部にそれぞれ等間隔で立設され開
口部が互いに対向する左右1対の堅調を有する支柱部材
8.8よりなり、長方形枠体の前後の長方形開口部の上
端開口はそれぞれボルト22を介して蓋板21で気密に
閉塞可能であり、また左右1対の堅調材間の部分には仕
切板4が落とし込まれるようになっている。
In the above figure, l is a mound constructed on the seabed ground 10 at the mouth of the bay, and 2 is a steel temporary water gate according to the present invention, which is made up of a plurality of unit water gates each having an inverted T-shaped cross section connected in tandem. Each unit water gate consists of vertical plates, horizontal plates, reinforcing materials, etc.
A horizontal rectangular flat frame body with a diagonal planar shape and an appropriate height;
It consists of a pair of right and left rigid support members 8.8 that are erected at equal intervals in the center of both long sides of this frame, and whose openings face each other, and the upper ends of the front and rear rectangular openings of the rectangular frame. Each of the openings can be hermetically closed with a cover plate 21 via bolts 22, and a partition plate 4 can be dropped into the portion between the pair of left and right stiffeners.

5.5は湾口の両岸、6はマウンド1上の荒止堤9上に
構築された潮受堤、7は両岸5゜5からそれぞれ延びる
潮受堤6.6の対向端により形成される潮止部で、この
部分の構築に本発明による1llil仮水門が使用され
る。
5.5 is the tide on both banks of the bay mouth, 6 is the tidal levee built on the rough breakwater 9 on the mound 1, and 7 is the tidal levee formed by the opposite ends of the tidal levees 6.6 extending from both banks 5°5. At the stop, a 1llil false sluice according to the invention is used to construct this section.

12は単位水門の長方形枠体内に詰込まれる中結石、1
3.14はそれぞれ湾外、湾内の高潮時海面、1!i水
池水面である。
12 is a medium stone packed into the rectangular frame of the unit sluice; 1
3.14 is the sea level at high tide outside the bay and inside the bay, 1! i It is the water surface of the pond.

本発明を通用して湾内を干拓するには、まず、第2図に
示す両岸5.5に接する部分E。
In order to reclaim the inside of the bay using the present invention, first, the portion E touching both banks 5.5 shown in FIG.

Eを、第4図に示すように、公知の構築要領で、海底地
511O上のマウンドlに荒止堤9を構築し、さらに荒
止堤9の上に潮受堤6を構築してゆ(。
As shown in FIG. 4, a rough breakwater 9 is constructed on the mound l on the seabed 511O, and a tidal breakwater 6 is further constructed on top of the rough breakwater 9, as shown in FIG. .

こうしてE、 2部の築堤工事完了後、F。In this way, E, after the completion of the second part of the embankment construction, F.

G部はそれぞれ海底地盤10上にマウンド1を築き、こ
の上に第3図に示すように、鋼製仮水門2を据付ける。
In each section G, a mound 1 is built on the seabed ground 10, and a steel temporary water gate 2 is installed on top of this as shown in Fig. 3.

その際、鋼製仮水門は蓋板21でその竪通孔上端開口を
気密閉塞するとともに、適宜のバラストをつけて海面を
曳航して現場へ運ぶことができる。
At that time, the steel temporary sluice gate can be airtightly closed off at the upper end opening of the vertical hole with the cover plate 21, and can be towed on the sea surface with appropriate ballast and transported to the site.

現場では、第5図に示すように、海上クレーンを使って
これを第3図に示すように、マウンドlに据付けたのち
ダンプ艇を使ってその竪通孔及びその開口部上に中結石
12を詰めるとともに磐石する。
At the site, as shown in Fig. 5, a marine crane was used to install it on the mound l as shown in Fig. 3, and a dump boat was used to dump the medium stone 12 onto the vertical hole and its opening. It will be solidified and solidified.

最後の潮止めに当たっては、支柱部材8゜8間の空所を
その堅調に仕切板4を落とし込むことにより、短時間に
閉塞する。
For the final tide stop, the space between the support members 8.8 is closed in a short time by firmly dropping the partition plate 4 into the space.

〔発明の効果〕〔Effect of the invention〕

このような鋼製仮水門によれば、下記の効果が奏せられ
る。
According to such a steel temporary water gate, the following effects can be achieved.

(1)  鋼製であるから長大で浮力をもった構造体を
造船所で完成品として作り、そのまま現地へ曳航、据付
できるので、能率の悪い現地工事を極力少なくできるこ
とで、コストダウンに寄与できる。
(1) Since it is made of steel, a long, buoyant structure can be manufactured as a complete product at a shipyard, then towed to the site and installed as is, which can help reduce costs by minimizing inefficient on-site construction work. .

(2)仮水門の仕切板が鋼製であるので、順次閉鎖して
行って水門開口面積が少なくなり、潮流速が速くなって
も、従来工法のように石の流出がないので、短時間に一
斉に潮止めするための大掛りなトロッコやレール及びト
ランクからのトロッコへの積替基地などが不要となる。
(2) Since the temporary sluice gate partition plates are made of steel, the opening area of the sluice gates is reduced by closing them one after another, and even if the tidal current speed increases, there is no outflow of stones unlike with conventional construction methods, so it can be closed for a short period of time. This eliminates the need for large-scale trolleys, rails, and transshipment bases from trunks to trolleys to stop the tide all at once.

なお、仕切板は蓋板を利用することもできる。Note that a lid plate can also be used as the partition plate.

(3)鋼製仮水門が完成品なので、現地工事期間が短か
く、また大掛りな装置や基地が不要のため、大幅なコス
トダウンが図れる。
(3) Since the steel temporary water gate is a finished product, the on-site construction period is short, and large-scale equipment and bases are not required, resulting in significant cost reductions.

要するに本発明によれば、干拓における潮受堤の潮止め
に設置され、同潮受堤の完成により同潮受堤中に埋没さ
れる仮水門において、偏平水平長方枠形の注排水可能な
箱体よりなり複数の竪通孔が縦横に配設された水平底部
構造体と、上記水平底部構造体の縦中心線上に等間隔で
複数本立設されそれぞれ対向面に互いに対向して開く堅
調が凹設された複数の支柱部材と、上記水平底部構造体
の上面に配設され上記複数の竪通孔の上端開口を着膜可
能に気密に閉塞する蓋板と、上記支柱部材の対向する堅
調に両端が挿入され上記隣り合う両支柱部材間に上方か
ら挿入されて上記両支柱部材間の部分を閉塞する複数の
長方形仕切板とを具えたことにより、大規模な積替基地
やトロッコ、レール等の構築、海上クレーン等の使用を
行わずに安全確実かつ短時間に潮止めができる経済的な
鋼製仮水門を得るから、本発明は産業上極めて有益なも
のである。
In short, according to the present invention, in a temporary sluice gate that is installed at the tide stop of a tidal embankment during reclamation and is buried in the tidal embankment when the tidal embankment is completed, a box body in the form of a flat horizontal rectangular frame that can be used for pouring and draining water is used. A horizontal bottom structure in which a plurality of vertical holes are arranged vertically and horizontally, and a plurality of vertical holes arranged at equal intervals on the vertical center line of the horizontal bottom structure, each of which is recessed and opened facing each other on the opposite surface. a plurality of pillar members, a cover plate disposed on the upper surface of the horizontal bottom structure and airtightly closing the upper end openings of the plurality of vertical holes in a film-formable manner; A large-scale transshipment base, trolley, rail, etc. can be constructed by including a plurality of rectangular partition plates that are inserted between the two adjacent support members from above to close the area between the two support support members. The present invention is industrially extremely useful because it provides an economical steel temporary sluice gate that can safely and reliably stop the tide in a short time without using a marine crane or the like.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の一実施例を示す斜視図、第2図は第1
図の仮水門を潮止堤に通用した全体平面図、第3図、第
4図はそれぞれ第2図のIII−III、 IV−[V
に沿った横断面図、第5図は第1図の仮水門の施工要領
を示す同じく斜視図である。 第6図は湾の干拓地を示す平面図、第7図は第6図の潮
受堤及び排水口を示す斜視図、第8図は第7図の潮止堤
を仕切る要領を示す断面図である。 l・・・マウンド、2・・・鋼製仮水門、3・・・支柱
間距離、4・・・仕切板、5・・・両岸、6・・・潮受
堤、7・・・排水口、8・・・支柱部材、9・・・荒止
堤、lO・・・海底地盤、12・・・中結石、13・・
・高潮時海面、14・・・調水池水面、21・・・蓋板
、22・・・ボルト。 代理人 弁理士 塚 本 正 文 第 図 第 図 第3 図 第4図 /j
FIG. 1 is a perspective view showing one embodiment of the present invention, and FIG. 2 is a perspective view showing one embodiment of the present invention.
The overall plan view of the temporary sluice gate shown in Figure 3 and Figure 4 are shown as III-III and IV-[V in Figure 2, respectively.
FIG. 5 is a perspective view showing the procedure for constructing the temporary water gate shown in FIG. 1. Figure 6 is a plan view showing the reclaimed land in the bay, Figure 7 is a perspective view showing the tidal embankment and drainage outlet in Figure 6, and Figure 8 is a sectional view showing how to partition the tidal embankment in Figure 7. be. l...Mound, 2...Steel temporary sluice gate, 3...Distance between supports, 4...Partition plate, 5...Both banks, 6...Tide embankment, 7...Drainage port , 8... Support member, 9... Rough breakwater, lO... Seabed ground, 12... Medium stone, 13...
・Sea level at high tide, 14... Reservoir water level, 21... Cover plate, 22... Bolt. Agent Patent Attorney Masa Tsukamoto Figure Figure 3 Figure 4/j

Claims (1)

【特許請求の範囲】 干拓における潮受堤の潮止めに設置され、 同潮受堤の完成により同潮受堤中に埋没される仮水門に
おいて、偏平水平長方枠形の注排水可能な箱体よりなり
複数の竪通孔が縦横に配設された水平底部構造体と、上
記水平底部構造体の縦中心線上に等間隔で複数本立設さ
れそれぞれ対向面に互いに対向して開く竪溝が凹設され
た複数の支柱部材と、上記水平底部構造体の上面に配設
され上記複数の竪通孔の上端開口を着脱可能に気密に閉
塞する蓋板と、上記支柱部材の対向する竪溝に両端が挿
入され上記隣り合う両支柱部材間に上方から挿入されて
上記両支柱部材間の部分を閉塞する複数の長方形仕切板
とを具えたことを特徴とする鋼製仮水門。
[Scope of Claims] A temporary sluice gate installed at the tide stop of a tidal embankment in reclamation and buried in the tidal embankment upon completion of the tidal embankment, consisting of a box body in the shape of a flat horizontal rectangular frame capable of pouring and draining water. A horizontal bottom structure in which a plurality of vertical holes are arranged vertically and horizontally, and a plurality of vertical grooves that are erected at equal intervals on the vertical center line of the horizontal bottom structure and open facing each other on opposing surfaces are recessed. a plurality of support members, a cover plate disposed on the upper surface of the horizontal bottom structure and removably closing the upper end openings of the plurality of vertical holes in an airtight manner; A steel temporary sluice gate comprising a plurality of rectangular partition plates inserted from above between the two adjacent support members to close off the portion between the two support support members.
JP7544489A 1989-03-28 1989-03-28 Steel-made temporary flood gate Pending JPH02252809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7544489A JPH02252809A (en) 1989-03-28 1989-03-28 Steel-made temporary flood gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7544489A JPH02252809A (en) 1989-03-28 1989-03-28 Steel-made temporary flood gate

Publications (1)

Publication Number Publication Date
JPH02252809A true JPH02252809A (en) 1990-10-11

Family

ID=13576429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7544489A Pending JPH02252809A (en) 1989-03-28 1989-03-28 Steel-made temporary flood gate

Country Status (1)

Country Link
JP (1) JPH02252809A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100674354B1 (en) * 2006-10-14 2007-02-02 (주)정도엔지니어링 Dike structure for overflowing protection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100674354B1 (en) * 2006-10-14 2007-02-02 (주)정도엔지니어링 Dike structure for overflowing protection

Similar Documents

Publication Publication Date Title
US3640075A (en) Method of installing breakwater caissons
CN109736260B (en) U-shaped wharf and construction and installation method
CN212103878U (en) Breakwater component and breakwater structure thereof
US4503649A (en) Modular block structures for breakwaters, harbor dams and the like
US4080916A (en) Maritime platform assemblies
JP3054851B2 (en) Temporary closing method and steel sheet pile for the method
JPH02252809A (en) Steel-made temporary flood gate
US20080219772A1 (en) Berm System
KR100253849B1 (en) Block mat of revetment and construction method
CN106351173A (en) Water-permeable breakwater structure
CN208472649U (en) A kind of Gravity Type Casisson Berth structure setting friction pile in foundation
CN110939100A (en) Breakwater component and application thereof
CN214993498U (en) River course barricade
RU2040632C1 (en) Enclosure
CN110004875B (en) Multifunctional type bottom frame retaining wall embankment structure
JPS63181804A (en) Breakwater and its construction and concrete caisson therefor
CN214657059U (en) Soil retaining enclosure framework for cover-excavation method
JP2519299B2 (en) Underwater civil engineering structure and its construction method
CN211849594U (en) Three-purpose underwater construction system of diversion cofferdam construction platform
JPH02108711A (en) Partitioning block, block structure, execution of simplified breakwater and quay using same
JPH067045Y2 (en) Structure of dam
JPH0296013A (en) Beam block with wing and construction of breakwater structure therewith
JPH0711656A (en) Erection of artificial island
JP3301967B2 (en) Shade concrete block
JP2000144674A (en) Built-up wave-suppressing caisson and its construction method