JPH0224412A - Forming method of tamping sand pile with larger diameter and device thereof - Google Patents

Forming method of tamping sand pile with larger diameter and device thereof

Info

Publication number
JPH0224412A
JPH0224412A JP17346488A JP17346488A JPH0224412A JP H0224412 A JPH0224412 A JP H0224412A JP 17346488 A JP17346488 A JP 17346488A JP 17346488 A JP17346488 A JP 17346488A JP H0224412 A JPH0224412 A JP H0224412A
Authority
JP
Japan
Prior art keywords
sand
cylindrical body
aggregate
tube
outer tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17346488A
Other languages
Japanese (ja)
Inventor
Hiroshi Wada
浩 和田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP17346488A priority Critical patent/JPH0224412A/en
Publication of JPH0224412A publication Critical patent/JPH0224412A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To strengthen a poor subsoil easily by constraining the sides of sand and aggregate into the poor subsoil by a strong and flexible fiber-cylindrical body and forming a sand pile into the poor in an open state to the lower end thereof. CONSTITUTION:A sand pile placing device consists of a double tube formed in such a way that an internal tube 2 is inserted and fixed to the inside of an external tube 1, a hydraulic machine is fixed to the upper end of the internal tube and, at the same time, a shoe 14 capable of opening and closing is provided to the tip of the external tube. A folded flexible fiber-cylindrical body is set to a ring 12 to fix in place of the internal tube 2, closing the shoe 14 of the external tube 1, and the placing machine is force fitted into a subsoil. After that, sand and aggregate are thrown from a throwing port through the internal tube by passing through the folded flexible fiber-cylindrical body, opening the shoe 12, and the external tube 1 is pulled up to form a sand column into the subsoil.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は軟弱な地盤の改良方法、及び装置に関するも
のである。さらに詳述すれば、この発明は、i径の大き
い締め固められた砂又は骨材を側面の全体又は一部を柔
軟な繊維筒状体で拘束し、繊維部材を界してtth盤中
に接するごとく造成せられた砂杭に関する造成方法及び
装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method and apparatus for improving soft ground. More specifically, this invention binds compacted sand or aggregate with a large i diameter with a flexible fibrous cylindrical body on the whole or part of the side surface, bounds the fibrous members, and inserts the compacted sand or aggregate into a tth board. This invention relates to a construction method and device for sand piles constructed so that they are adjacent to each other.

(従来の技術) 軟弱地盤中に透水性の砂柱又は砂杭を造成して軟弱地盤
に含まれている水分を追い出し、軟弱地盤の強化するこ
とは、サンドドレーン工法として既に知られている。し
かし地盤中に砂柱を裸のまま造成したのでは地盤の変動
とともに砂柱が変形し場合によっては砂柱が途中で切断
し、そのため砂柱が途中で水分の抽出能力を失い、所期
の地盤強化を達成し得ないことがある。そこで砂柱を裸
のまま地盤中に立設しないで砂柱を透水性のある繊維チ
ューブで全体を包囲し拘束した状態で地盤中に立設する
ことが行なわれた。この場合、繊維チューブを地盤中に
立設するのに色々な方法が採用された。
(Prior Art) The construction of permeable sand pillars or sand piles in soft ground to drive out moisture contained in the soft ground and strengthen the soft ground is already known as the sand drain method. However, if sand pillars are created in the ground without being exposed, they will deform as the ground moves, and in some cases, the sand pillars will break midway, causing the sand pillars to lose their ability to extract water midway through the process. Ground reinforcement may not be achieved. Therefore, instead of standing the sand pillar bare in the ground, the sand pillar was surrounded and restrained with a water-permeable fiber tube and then erected in the ground. In this case, various methods were used to erect the fiber tubes into the ground.

例えば持分47−38092号公報では先づ鋼管を土中
に打ち込み9次いで鋼管内に繊維製袋体を挿入し次に袋
体の中に砂を投入し、その後鋼管を引き抜くと言う方法
を提案している。また先に本発明者が提案した特公昭4
8−19166公報では先づ折り畳んだ袋体を鋼管内に
入れ、後鋼管を土中え挿入し9次いで砂及び骨材を袋体
内に流人し°、その後振動棒体で拡大する方法を提案し
た。
For example, Publication No. 47-38092 proposes a method in which a steel pipe is first driven into the soil, a fiber bag is then inserted into the steel pipe, sand is poured into the bag, and the steel pipe is then pulled out. ing. In addition, the present inventor proposed the
Publication No. 8-19166 proposes a method in which a folded bag is first placed in a steel pipe, then the steel pipe is inserted into the soil, sand and aggregate are flowed into the bag, and then the bag is expanded using a vibrating rod. did.

これらの方法はこの時代の傾向として軟弱地盤中に繊維
部材を使用する場合は砂及び骨材全体を拘束し下端をは
必ず閉じて袋体とした。この事は砂、又は骨材の飛散す
ることを防ぐことがドレーン効゛A 果の低下させない最適の方法と考えてきた。
These methods followed the trend of this era when using fiber members in soft ground, restricting the entire sand and aggregate and making sure to close the bottom end to form a bag. For this reason, it has been considered that preventing sand or aggregate from scattering is the best way to prevent the drain effect from decreasing.

本発明者はむしろ繊維部材の先端を積極的に開放し開放
された下方は砂及び骨材は裸のまま地盤中に接しかt圧
密拡大した強固な砂柱を作ることを提案した。この様に
裸のまま圧密拡大された砂及び骨材がドレーン効果の低
下来すことのないことを色々な実験で確認した。上述し
て来た各工法の教えるように下端は必ず袋体で拘束する
と言う考えとは異なった考えになって来た。又特公昭5
0−22803公報の教える方法、では砂杭造成用は中
空管を内管とし、その外側に上方より吊り下げる外管と
から成り、中空管とは連結固定することなく自由に上下
出来る外側の管とで打設機を構成したものであり、その
内管の上端え振動機を固定し締め固め用の作用を行う様
にしており。
Rather, the present inventor proposed that the tip of the fiber member be actively opened, and that the sand and aggregate in the open lower part remain bare and in contact with the ground, thereby creating a strong sand column that is consolidated and expanded. It has been confirmed through various experiments that the sand and aggregate, which are compacted and expanded while being bare, do not cause a decrease in the drainage effect. The idea has become different from the idea that the bottom end must always be restrained with a bag body as taught in the above-mentioned construction methods. Mata Tokko Sho 5
According to the method taught in Publication No. 0-22803, sand pile construction consists of an inner hollow tube and an outer tube suspended from above, and the hollow tube is an outer tube that can be moved up and down freely without being connected and fixed. This machine consists of a pipe and a vibrator is fixed at the upper end of the inner pipe to perform compaction.

これと遊離した外管との間に金属製ネット又は剛性のあ
る合成繊維のネットを挿入した後締め固め用内管内に砂
又は骨材を投入し流下させ、これと同時に金属性ネット
を共に流下させ、所定の深度に達した後、締め固め用内
管を作動せしめその先端部で砂及び骨材を締め固めると
同時に金属ネット及び剛性ネットの弾性の限界範囲まで
拡大させるか(して金属ネット及び剛性ネットを界にし
て砂又は骨材が地盤に接する様にする工法である。
After inserting a metal net or a rigid synthetic fiber net between this and the free outer pipe, sand or aggregate is poured into the inner compaction pipe and allowed to flow down, and at the same time, the metal net is flowed down as well. After reaching a predetermined depth, the compaction inner pipe is operated to compact the sand and aggregate at its tip, and at the same time expand the elasticity of the metal net and the rigid net to the limits of their elasticity. This is a construction method in which sand or aggregate is brought into contact with the ground using a rigid net as a boundary.

これに対して本発明では折り畳んだ柔軟な繊維筒状体を
油圧圧縮板の外側と外管内側の間を通過させ内管の適所
に固定する様にしたもので、外管内管は一体として作動
しかつ締め固めには油圧締め固め板で締め固めを行う構
造であるから、上記昭50−22803公報の教える方
法及び装置とは構造的に異なる。又砂及び骨材を拘束す
る部材に於いて、昭50−22803公報では金属ネッ
ト又は剛性のある合成繊維ネットを用いるに対し。
In contrast, in the present invention, a folded flexible fibrous cylindrical body is passed between the outside of the hydraulic compression plate and the inside of the outer tube and fixed at a proper position in the inner tube, so that the outer tube and the inner tube operate as one unit. Moreover, since the compaction is performed using a hydraulic compaction plate, it is structurally different from the method and apparatus taught in the above-mentioned Publication No. 50-22803. Furthermore, as for the member for restraining the sand and aggregates, the 1980-22803 publication uses a metal net or a rigid synthetic fiber net.

本発明では折り畳んだ柔軟な繊維を使用する点に於いて
も異なる。又その締め固める方法について前行の差異を
次に示す、昭50−22803公報は図−6のA図に示
すごとく打設用内管の動きは先づ所定深度より2M〜3
M引き上げて砂及び骨材と金属ネットを地盤中に流入埋
設した後、再びIM〜2阿打ち下げ締め固め拡大せしめ
る。この動作を繰り返し行い杭柱を造成して行く方法に
対し9本発明では図−Bに示す如く外管及び内管は一体
となり一ヒ方に引き上げるのみで、2M〜3Mの引き上
げ−られた時点で引き上げを止めるか或いは引き上げ速
度を落とす、この2M〜3M引き上げる間に砂及び骨材
とこれを拘束した柔軟な折り畳んだ繊維部材は地盤中に
流下埋設される。これを圧縮板で圧入させ締め固め拡大
せしめ地盤内で直径大なる砂柱を造成する。再度2M〜
3M外管内管を引き上げ、引き上げを止めて圧縮板も共
に上昇しかつロットの収縮に伴い圧縮板は元の位置即ち
外管下端まで引き上げられ再度油圧により下方え圧入し
する様に作動させ、この作業を繰り返しつつ砂柱を造成
するものである。故に図−A。
The present invention also differs in that folded flexible fibers are used. In addition, the difference between the previous article and the compaction method is as follows: Publication No. 50-22803 states that as shown in Figure 6A, the movement of the inner pouring pipe is first 2M to 3M from a predetermined depth.
After raising the M and burying sand, aggregate and metal net into the ground, the IM was again lowered to 2 A and compacted and expanded. In contrast to the method of repeating this operation to construct a pile pillar, in the present invention, the outer pipe and inner pipe are integrated and only pulled up in one direction as shown in Figure B, and when the pipe is pulled up 2M to 3M. During this 2M to 3M lifting process, the sand and aggregate and the flexible folded fiber members restraining them flow down and are buried in the ground. This is pressed in with a compression plate, compacted and expanded to create a sand pillar with a large diameter within the ground. 2M again
The 3M outer tube and inner tube are pulled up, the pulling is stopped, and the compression plate also rises together with it.As the lot contracts, the compression plate is pulled up to its original position, that is, the lower end of the outer tube, and is operated so as to be press-fitted downward again by hydraulic pressure. Sand pillars are created by repeating the work. Therefore, Figure-A.

図−Bとの間に打設方法に差胃が明白であり特公昭50
−22803の教える方法ではそのまま施Tすることは
不可能であることを明白に示したグラフである。又地盤
状況では外管内管の引き上げを2M〜3M地点で止める
ことな(引き上げのみの動作で連続施工することもある
There is an obvious difference in the pouring method between Fig.
This is a graph that clearly shows that it is impossible to directly apply the method taught by -22803. Also, depending on the ground conditions, the lifting of the outer and inner pipes should not be stopped at the 2M to 3M point (sometimes construction is carried out continuously with only the lifting operation).

(発明が解決しようとする問題点) この発明は軟弱地盤中に強靭で柔軟なm線部状体で砂及
び骨材の側面を拘束し上端を開放する状態で地盤中に圧
密拡大させる砂杭造成方法及び装置にして、軟弱地盤の
強化することを容易、かつ敏速することを目的とするも
のである。
(Problems to be Solved by the Invention) This invention is a sand pile that is compacted and expanded into soft ground by restraining the side surfaces of sand and aggregate with a strong and flexible m-wire member and leaving the upper end open. The object of the present invention is to provide a method and device for strengthening soft ground easily and quickly.

(問題を解決するための手段) この発明者は、軟弱地盤中に柔軟な繊維筒状体の内に砂
及び骨材を入れ上、下端開放した形状として、砂及び骨
材を圧縮板により圧密拡大しつつ。
(Means for solving the problem) The inventor put sand and aggregate into a flexible fibrous cylindrical body in soft ground, made the top open at the bottom, and compacted the sand and aggregate with a compression plate. While expanding.

砂及び骨材の一部は繊1#筒状体の下端より流下して圧
密拡大され1強固な締め固められた砂柱を形成すること
により一部ドレーン効果を増進することを確認した又拘
束した柔軟な繊維部材を折り畳んだ形で鋼管内に挿入し
2次に砂及び骨材を筒状体内に流入し、投設機全体を引
き上げ地盤中に折り畳んだ筒状体と砂骨材が自由に流下
放出した。
It was confirmed that some of the sand and aggregate flowed down from the lower end of the cylindrical body and expanded through compaction, forming a strong compacted sand column, which partially enhanced the drainage effect. The folded flexible fiber member is folded and inserted into a steel pipe, and the sand and aggregate are then flowed into the cylindrical body, and the entire casting machine is pulled up into the ground to release the folded cylindrical body and sand aggregate. It was released downstream.

と同時に圧縮板の作用により折り畳んだ繊維部材は砂及
び骨材の拡大されるに伴い繊維部材の折り畳んだ部分が
開き拡大され地盤中に打設機外管の直径の2倍程度まで
拡大圧密され、結果的に直径人なる側面を繊維部材で拘
束された強固に締め固めた砂柱を容易に地盤中に造成す
る方法を探究した。
At the same time, the folded fiber member is expanded by the action of the compression plate as the sand and aggregate are expanded, and the folded part of the fiber member is expanded and expanded into the ground to about twice the diameter of the outer pipe of the casting machine. As a result, we explored a method to easily create firmly compacted sand pillars in the ground, with their diametrical sides restrained by fiber members.

り本発明の打設機の装置は内管、外管とからなる二重管
構造とし、内管は外管に比し短くシ、内管ト部に油圧器
を装置しこれを内管及び外管に固定させる。又油圧器か
ら下方えロットを延ばしその長さは外管先端付近に位1
させ、かつその先端に開閉自由な圧縮板を設ける。挿入
される柔軟な繊維筒状体は折り畳んだ状態で上丁開放さ
れた形でその上端をワイヤーで引き上げ内管の適所え固
定する。その後打設機全体を所定の深度まで打ち込み3
次に外管投入口より砂及び骨材を投入し内管を通り確実
に筒状体内部え流下して行き、外管先端部に達した後打
設機を2−〜3M引き上げ、折畳んだ筒状体とその内部
にある砂及び骨材をIt!!盤巾え流下埋設すると同時
圧縮板が下方え圧入し砂及び骨材と折り畳んだ筒状体を
圧縮拡大し直径大する砂柱を造成することが容易に出来
ることを確認した。この発明はこの様な知見と確認とに
基づいて完成されたものである。
Therefore, the casting machine device of the present invention has a double-tube structure consisting of an inner tube and an outer tube, and the inner tube is shorter than the outer tube. Fix it to the outer tube. Also, extend the downward elongate from the hydraulic device and its length should be approximately 1 inch near the tip of the outer pipe.
and a compression plate that can be freely opened and closed is provided at its tip. The flexible fibrous cylindrical body to be inserted is folded and opened, and its upper end is pulled up with a wire and fixed in place in the inner tube. Then, drive the entire casting machine to the specified depth 3
Next, sand and aggregate are introduced from the outer tube input port and flowed down through the inner tube into the cylindrical body. After reaching the tip of the outer tube, the pouring machine is pulled up 2-3 meters and folded. It! The cylindrical body and the sand and aggregate inside it! ! It was confirmed that when the board was buried under the flow, a compression board was pressed downward at the same time, compressing and expanding the cylindrical body folded with sand and aggregate to easily create a sand column with a larger diameter. This invention was completed based on such knowledge and confirmation.

9この出願は2つの発明を含んでいる。その1つは方法
の発明であり、他は装置の発明である。
9 This application contains two inventions. One is the invention of a method and the other is an invention of an apparatus.

方法の発明は、外管内に内管を挿入固定し、内管上端に
油圧圧縮機を装置し、内管及び外管に固定し、外管は造
成すべき砂杭の長さ分だけ長<シ。
The invention of the method involves inserting and fixing an inner pipe into the outer pipe, installing a hydraulic compressor at the upper end of the inner pipe, fixing it to the inner pipe and the outer pipe, and making the outer pipe as long as the length of the sand pile to be constructed. Sh.

その先端に開閉可能なシュウを設け、内管は外管に比し
短くする。又油圧圧縮機より圧縮用ロットを延ばしその
長さは外管の先端付近まで長くしロット先端には圧縮板
を設ける。
A shoe that can be opened and closed is provided at the tip, and the inner tube is shorter than the outer tube. Further, the compression rod is extended from the hydraulic compressor and its length is extended to near the tip of the outer tube, and a compression plate is provided at the tip of the lot.

この圧縮板は開閉自由な構造とする。これらが−体とな
った打設機を使用し施Tするもので、折り畳んだ繊維筒
状体は外管下端開口部より挿入し外管と圧縮板との間を
通りワイヤーでひきあげる内部 管の適所で固定し1次に外管のシュウを閉じ側をドにし
て打設機全体を地盤中に打ち込む。打込装置としては外
管−F部に振動機又は圧入機を取りつけこの力で打ち込
む様にし、所定の深度まで打込み終わると2次に外管他
端にある砂投入口より砂及び骨材を投入するがこの際砂
及び骨材は内管を通り筒状体内を通過して外管先端に達
し漸次筒状体を下方より砂及び骨材で充填され、充填し
終わると外管のシュウを開き内管に固定されている筒状
体の固定箇所を解き、打設機を2M〜3h引き上げる。
This compression plate has a structure that allows it to be opened and closed freely. The folded fibrous cylindrical body is inserted into the lower end opening of the outer tube, passed between the outer tube and the compression plate, and pulled up with a wire to form the inner tube. After fixing it in place, close the shoe of the outer tube and drive the entire casting machine into the ground. As a driving device, a vibrator or a press-fitting machine is attached to the F section of the outer tube, and this force is used to drive the material.When the driving is completed to a specified depth, the sand and aggregate are then poured into the sand input port at the other end of the outer tube. At this time, the sand and aggregate pass through the inner tube and into the cylindrical body, reach the tip of the outer tube, and gradually fill the cylindrical body with sand and aggregate from below. When the filling is finished, the outer tube is closed. Undo the fixed parts of the cylindrical body fixed to the open inner tube and raise the casting machine for 2M to 3h.

砂及び骨材とこれを拘束している折り畳んだ繊維筒状体
を、地盤中に流下埋設されると同時圧縮板を下方え圧縮
させ、砂及び骨材と81束した筒状体を地盤中に拡大圧
密される1次に圧縮機を圧入した長さ分だけ引き1−げ
、再度打設機をiイ同と同程度に1一方え引き上げ、引
きにげた長さ分だけ再度圧縮板下方え圧し下げ、砂及び
骨材と拘束する筒状体を圧縮拡大する。この工程を繰り
返し所定の深度上り地盤表面まで強靭な筒状体で倒面を
拘束された直径大なる砂柱を地盤中に埋設する改良方法
に関するものである。
When the sand and aggregate and the folded fibrous cylindrical body restraining them are buried in the ground, the compression plate is moved downward and compressed, and the 81 bundled cylindrical body with sand and aggregate is buried in the ground. The first compressor to be expanded and consolidated is pulled out by the length of the press-in, then the driving machine is pulled up again to the same extent as in A, and the compression board is lowered again by the pulled-out length. The pressure is lowered and the cylindrical body that binds the sand and aggregate is compressed and expanded. The present invention relates to an improved method of burying a large-diameter sand pillar in the ground, whose downside is restrained by a strong cylindrical body, by repeating this process to a predetermined depth up to the ground surface.

又装置に関する発明は外管内に内管を挿入固定し1次に
内管上部に油圧圧縮機を装備し、これを内管上部と外管
内側に強固に固定し、これより下方えロットを延ばしそ
の長さは外管先端部まで達する様にし、ロット先端部に
開閉自由な圧縮板を取りつけ、この圧縮板により、砂及
び骨材を圧縮する様に工夫したもので、ロットと圧縮板
の延びる長さはIM〜2−程度とされる。又外管下端に
開閉自由なシュウを設は打ち込み時は閉じ、引き上げ時
に開放する様にしておく、外管の長さは砂杭の造成出来
だけの長さとし、内管上部の適所に砂及び骨材の投入口
を設ける。投入口は内管と外管の間を管で結び外管の外
側に投入口を設ける。
Another invention related to a device is to insert and fix an inner pipe into an outer pipe, and then equip the upper part of the inner pipe with a hydraulic compressor, which is firmly fixed to the upper part of the inner pipe and the inside of the outer pipe, and from which the downward rotation is extended. The length is such that it reaches the tip of the outer tube, and a compression plate that can be opened and closed is attached to the tip of the lot, and this compression plate is designed to compress sand and aggregate. The length is about IM to 2-. In addition, a shoe that can be opened and closed at the lower end of the outer pipe is set so that it is closed when driving and opened when pulling up.The length of the outer pipe is as long as the sand pile can be made, and the upper part of the inner pipe is filled with sand and sand. Provide an input port for aggregate. The input port is provided on the outside of the outer tube by connecting the inner tube and the outer tube with a tube.

内管は外管に比し短<シ、外管の上端外側えワイヤー巻
き上げ装置を設け、そのワイヤーの長さは外管下端まで
延び、その先端で上下開放し折り畳んだ柔軟な繊維筒状
体上端を挟持固定させ、上方え引き上げる。Sき上げの
際外管の内側と圧縮板の外側との間を通過し内管の適所
の固定具まで巻き上げ固定させ“る、柔軟な折り畳んだ
筒状体の長さは砂杭造成する長さと同長とされるが、地
盤に応じ筒状体の長さを途中までとし、途中に宙吊りに
した状態で造成する場合もある。この場合砂及び骨材は
途中まで筒状体で拘束され、それ以下は裸のまま地盤に
接する形状となるが、地盤の状態に応じ採用し施工する
。打設に際しては先ず折り畳んだ柔軟な繊維筒状体を巻
き上げ内管適所え固定し2次いズ外管下端のシュウをと
閉じ、閉じた側を下にして所定の深度まで打ち込み1次
いで外管の砂投入口より砂及び骨材を内管を通り流下さ
せる。この際内管より流下した砂及び骨材は筒状体の内
を通過し外管下端に到する。その後打設機を上方え引き
上げると砂及び骨材と側面を拘束した折り畳んだ筒状体
は地盤中に流下埋設される。
The inner tube is shorter than the outer tube, and a wire winding device is installed on the outside of the upper end of the outer tube, and the length of the wire extends to the lower end of the outer tube, and at its tip, the top and bottom are opened and folded into a flexible fibrous cylindrical body. Clamp and secure the upper end and pull upward. During hoisting, the length of the flexible folded cylindrical body that passes between the inside of the outer pipe and the outside of the compression plate, and is rolled up and fixed to the fixing device at the appropriate location on the inner pipe, is the length of the sand pile construction. However, depending on the ground, the length of the cylindrical body may be limited to the middle, and it may be constructed with the cylindrical body suspended in the middle.In this case, the sand and aggregate are restrained halfway by the cylindrical body. Below that, the shape will be bare and in contact with the ground, but it will be adopted depending on the ground condition.When pouring, first roll up the folded flexible fibrous cylindrical body and fix it in place in the inner pipe, and then Close the shoe at the lower end of the outer tube, place the closed side down, and drive to a predetermined depth.1.Next, sand and aggregate are allowed to flow down through the inner tube from the sand inlet of the outer tube.At this time, the sand and aggregate flowing down from the inner tube are The sand and aggregate pass through the inside of the cylindrical body and reach the lower end of the outer pipe.Then, when the casting machine is raised upwards, the sand, aggregate, and the folded cylindrical body with the sides restrained flow down and are buried in the ground. .

この引き上げ長さを2M〜3M とし、引き上げ終ると
同時に圧縮板が油圧圧力によりさげ、地盤中に流下埋設
されている砂及び骨材とこれを拘束する折り畳んだ筒状
体を圧縮拡大し地盤中に側面を拘束した直径大なる締め
固められ圧密された砂杭が地盤中に造成されるごとき装
置である。
The lifting length is 2M to 3M, and at the same time as the lifting is finished, the compression plate is lowered by hydraulic pressure, compressing and expanding the sand and aggregate buried in the ground and the folded cylindrical body that restrains them. This is a device in which compacted and consolidated sand piles of large diameter are constructed in the ground with their sides restrained.

(実施例) これら2つの発明のうちでは先ず装置の発明を図面に基
づいて説明する。第1図は、この発明の全体図、第2図
は内管の適所で固定させる折り畳んだ柔軟な繊維筒状体
の固定具との関係図、及び上方え筒状体を巻き上げるワ
イヤー状態図と外管の位置関係一部切欠断面図、第3図
は外管のシュウ駅間き地盤中に折り畳んだ柔軟な繊維筒
状体が開き砂及び骨材が圧縮板の圧力により下方及び側
方に拡大され圧密拡大されて行く部分図、第4図は外管
シュウが開きロットが下方え圧入して、その先端にある
圧縮板がまさに開こうとする状態で。
(Example) Of these two inventions, first the invention of the device will be explained based on the drawings. Fig. 1 is an overall view of the present invention, Fig. 2 is a diagram showing the relationship between the folded flexible cylindrical body and the fixing device for fixing it in place in the inner tube, and a diagram of the state of the wire for winding up the cylindrical body from above. Figure 3 is a partially cutaway cross-sectional view of the positional relationship of the outer pipe.The flexible fibrous cylindrical body folded into the ground between the outer pipe stations opens and sand and aggregate are pushed downward and to the sides by the pressure of the compression plate. Figure 4 shows a partial view of the tube being expanded and compressed and expanded, with the outer tube shoe opening and the rod being press-fitted downward, and the compression plate at its tip about to open.

外管と圧縮板のみの関係図、第5図は折り畳んだ柔軟な
繊維筒状体の見取図、第6図は打設モノグラフでA図は
特公昭50−22803の打設要領図でB図は本発明打
設造成工程の要領図でこれは打設方法による差異を明白
にする両者比較グラフ第1図において(1)は外管、(
2)は内管(3)は柔軟な折り畳んだ筒状体、(4)は
開閉自由にした外管先端に取りつけられる閉塞具(シュ
ウ)(5)は、シュウを開閉自由にする蝶番い(6)は
圧縮板、(7)は油圧機に連結されているロット(8)
は油圧機本体、(9)は砂及び骨材の投入口で外管を通
過し内管と連結されている(10)内管に圧縮空気を送
風する際投入口を閉筒状体上部人ワイヤーで巻き上げる
時のリング及びリングが内管の適所に固定されている状
態図。
A diagram of the relationship between the outer tube and the compression plate only, Figure 5 is a sketch of the folded flexible fibrous cylindrical body, Figure 6 is a pouring monograph, Figure A is a pouring procedure diagram from the Japanese Patent Publication Publication No. 1983-22803, and Figure B is a diagram of the pouring procedure. 1 is a schematic diagram of the pouring and forming process of the present invention. This is a comparison graph that clarifies the differences depending on the pouring method. In Figure 1, (1) is the outer pipe, (
2) is an inner tube (3) that is a flexible folded cylindrical body, and (4) is an obturator (shu) that is attached to the tip of the outer tube that can be opened and closed freely.(5) is a hinge that allows the shoe to be opened and closed freely. 6) is a compression plate, and (7) is a lot (8) connected to a hydraulic machine.
(9) is the input port for sand and aggregate, which passes through the outer pipe and is connected to the inner pipe. (10) The input port is closed when blowing compressed air into the inner pipe. A state diagram showing the ring and the ring being fixed in place on the inner tube when winding up with a wire.

(13)油送管、(14)外管下端部(15)巻上げ用
ワイヤー(16) a!き上げ用モーター(17)内管
適所に折り畳んだ柔軟な筒状体の上端リングを固定する
工具、(18)圧縮空気送風口を示す。
(13) Oil pipe, (14) Lower end of outer pipe (15) Winding wire (16) a! A lifting motor (17), a tool for fixing the upper end ring of the folded flexible cylindrical body in place in the inner tube, and (18) a compressed air outlet are shown.

此の発明に係る装具は、外管(1)の内に内管(2)を
挿入固定した二重管から成り、内管上端に油圧機を固定
する。内管(2)の長さは外管(1)の3分の1以内程
度に短<シ、外管(2)は改良する長さ分だけ長くシ、
先端に(14)の開閉自由なシュウを設ける。打設機が
地−Fにある時に折り畳んだ柔軟な繊維筒状体をリング
(12)にセットし5部分図第2図に示す如くワイヤー
(15)で上方え巻き上げる9巻き上げに当たっては(
16)の巻き上げ用モーターを駆動させる折り畳んだ柔
軟繊維筒状体を巻き」:げる場合は筒状体上端をリング
(12)に固定し、先ず外管下端開口部より挿入し、外
管の内側圧縮板の間を通過させ内管適所え固定する。固
定する場合の固定具の動力は電気的或いは機械的な力を
使用すればよい。
The equipment according to the present invention consists of a double tube in which an inner tube (2) is inserted and fixed into an outer tube (1), and a hydraulic machine is fixed at the upper end of the inner tube. The length of the inner tube (2) is shortened to within one third of the length of the outer tube (1), and the outer tube (2) is lengthened by the length to be improved.
A shoe (14) that can be freely opened and closed is provided at the tip. When the pouring machine is on the ground - F, the folded flexible fibrous cylindrical body is set in the ring (12) and rolled upward with the wire (15) as shown in the 5-part diagram in Figure 2.
16) When rolling the folded flexible fiber cylindrical body that drives the winding motor, fix the upper end of the cylindrical body to the ring (12), insert it from the lower end opening of the outer tube, and then Pass it between the inner compression plates and fix the inner tube in place. Electrical or mechanical power may be used to power the fixture for fixing.

例を挙げて説明すると、先ず折り畳んだ柔軟な繊維筒状
体を外管の下端間大口より上方えワイヤーで巻き上げ内
管の適所え固定する9次いで外管先端のシュウを閉じ、
閉じた側を下にして打設機全体を振動機又は圧入機で地
盤中に圧入し、計両深度に達した後、圧入を止め投入口
より砂骨材を投入するが砂、骨材は内管を通り次いで折
り畳んだ柔軟な繊維筒状体内を通過しさらに一部は外管
先端部に達する。しかる後外管のシュウを開き外管°を
引き上げるが、その長さは2−〜3Mとされその長さ分
だけ砂及び、骨材と折り畳んだ柔軟な繊維筒状体は地盤
中に流下埋設される。この引きにげと同時にロット(7
)と圧縮板(6)は下側え圧入する動きを起こし、地盤
中に流下埋設されている砂及び骨材と柔軟な折り畳んだ
繊維筒状体はこの圧縮力により圧密拡大し地盤中に直径
大なる砂柱を形成する。この場合外管の動きは」二方え
引きLげら−れるのみの動きである。
To explain with an example, first, the folded flexible fibrous cylindrical body is wound upward from the large opening between the lower ends of the outer tube with a wire and fixed in place on the inner tube.Next, the shoe at the tip of the outer tube is closed.
Press the entire casting machine into the ground with the closed side facing down using a vibrator or a press-in machine. After reaching the total depth, stop the press-in and input sand aggregate from the input port, but the sand and aggregate do not It passes through the inner tube, then through the folded flexible fibrous cylindrical body, and a portion reaches the tip of the outer tube. After that, the shoe of the outer tube is opened and the outer tube is pulled up, and the length of the outer tube is 2 to 3 meters, and the flexible fibrous cylindrical body folded with sand and aggregate for that length is buried in the ground. be done. Lot (7) at the same time as this pull
) and the compression plate (6) cause a downward press-fitting movement, and the sand and aggregate buried in the ground and the flexible folded fibrous cylinder are compacted and expanded by this compression force, and the diameter is expanded into the ground. Forms a large pillar of sand. In this case, the movement of the outer tube is only that of being pulled in two directions.

゛さらに本発明の説明を続けると、打設機を211I3
阿引き上げた後圧縮板がド方にIM〜2−下がりF方部
分を圧縮圧入した後再び引き上げられ外管の下端の位置
に達した後再度打設機全体を2M〜3M引き上げ、再度
圧縮板を、下方え圧入して行く、この様な工程を繰り返
し地盤中に直径大なる側面全部又は一部を拘束され締め
固められた砂柱が漸次上方に向は造成されて行く造成方
法である。さらに!′#綱に説明を追加すると打設機が
2M〜3M引き上げられ−μ停止される時間は圧縮板が
砂及び骨材と折り畳んだ柔軟な筒状体が拡大圧密し終わ
るに充分な時間、2分〜3分間の間である。この2分〜
3分は各種実施例より確認された時間である0次に拡大
が完了すると同時に再度打設機を上方え引き上けるそれ
に合わせ圧縮板も再度延びた分だけ引き戻される。此の
様に圧縮板を上下し砂及び骨材を締め固める新規的考え
に基づき発明されたものである。さらに打設機上部の形
状を説明すると外管の直径401〜50cmの鋼管強固
に固定一体化させ2その直径は30C11〜401とし
、ストローブは2−〜3Mの延びを有する強力な圧力を
有するものを使用し2 これに連結し下方外管の先端ま
で延びるロートは鋼棒としI’!fiは10cm〜15
cmの強固なものを用いる。内管の投入口は直径201
程度とし2201程度の鋼管を流入鋼管とし外管を抜け
、外管他端のホッパーに連結される。ホッパーは501
以上の四角な繭とし、砂投入口を形成する。又リーダー
にと)って1ニド出来る移動用砂噛を使用し砂杭の直径
拡大に伴いその不足分をたえず補充する役目をする。
゛Continuing the explanation of the present invention, the pouring machine is 211I3.
After pulling up the A, the compression plate goes down IM ~ 2- and press-fits the F side part, then it is pulled up again and reaches the lower end of the outer tube, then the entire casting machine is pulled up again by 2M ~ 3M, and the compression plate is pressed again. This is a construction method in which sand is pressed downward into the ground, and this process is repeated to gradually create a compacted sand column in the ground, with all or part of the sides of the large diameter restrained and compacted. moreover! '# Adding an explanation to the rope, the time the casting machine is raised 2M to 3M and stopped is enough time for the compression plate to expand and consolidate the flexible cylindrical body folded with sand and aggregate. The duration is between 3 minutes and 3 minutes. These 2 minutes~
3 minutes is the time confirmed from various examples.At the same time as the zero-order expansion is completed, the casting machine is pulled upward again, and the compression plate is also pulled back by the length of the extension. It was invented based on the novel idea of compacting sand and aggregate by moving the compression plate up and down in this way. Furthermore, to explain the shape of the upper part of the pouring machine, the outer tube is a steel tube with a diameter of 401 to 50 cm, which is firmly fixed and integrated.2 The diameter is 30C11 to 401, and the strobe has a strong pressure with an extension of 2 to 3M. 2 The funnel connected to this and extending to the tip of the lower outer tube is a steel rod I'! fi is 10cm~15
Use a strong one. The input port of the inner tube has a diameter of 201 mm.
A steel pipe with a grade of about 2201 is used as an inflow steel pipe, passes through the outer pipe, and is connected to a hopper at the other end of the outer pipe. Hopper is 501
Make a square cocoon and form a sand inlet. Also, a portable sand pile with a capacity of 1 day is used by the leader, which serves to constantly replenish the shortage as the diameter of the sand pile increases.

例えば外管に充填された1回目の砂量は打設機が5M〜
6M引き上げられた時、当然砂量不足となる。この場合
この移動用向により上方ホッパー口より不足量を補充し
施工する様にする。
For example, the amount of sand filled in the outer tube for the first time is 5M~
Naturally, when it was raised 6M, there would be a shortage of sand. In this case, by using this moving direction, the insufficient amount is replenished from the upper hopper mouth and construction is carried out.

砂及び骨材はホッパー口より内管流入口を通り。Sand and aggregate pass through the inner pipe inlet from the hopper mouth.

内管を流下し筒状体内に充填されて行く、この内管投入
口は油圧機下端より201〜30cmの位置にもうけら
れる。さらに折り畳んだ柔軟繊維筒状体の固定取りつけ
位置は内管の投入口より下側5C11〜IOa++の所
にもうける0以上のごとき打設機F部構造により投設施
工が可能となる。
This inner pipe inlet, through which the liquid flows down the inner pipe and fills the cylindrical body, is provided at a position 201 to 30 cm from the lower end of the hydraulic machine. Furthermore, the fixed mounting position of the folded flexible fiber cylindrical body can be cast by a structure of the F part of the casting machine such as 0 or more, which is provided below the input port of the inner tube at 5C11 to IOa++.

柔軟な繊維筒状体の部材は強靭な繊維1例えばナイロン
、ポリプロピレン、ポリエステル等の合成繊維で作られ
粗目の布状で上下解放された筒状体として使用する。筒
状体の長さは外管先端まで長いものであっても良(、又
それより短いものでもよい、短いものは外管内側の途中
で宙吊りの状態で使用される。上述したごとき装置父方
法にょリ、早くかつ確実に計画された直径を有する砂柱
を地盤中の所定の深度まで造成出来る新規性のある締め
固め方法であり従来の締め固め砂杭のように砂量を計i
i!量より多く使用することなく、計画以内で砂杭を完
成出来る経済性をも加味されたも第1図は全体図、第2
図は折り畳んだ繊維筒状体の固定装置と巻き上げ用ワイ
ヤーと内管及び外管の関係図、第3図は圧縮板により圧
縮された折り畳まれた柔軟な繊維筒状体と砂、骨材、が
圧縮拡大されて行く状態図、第4図は圧縮板が下方え圧
入され、圧縮板がまさに開こうとする状態と外管との関
係図、第5図は筒状体の折り畳んだ形状同第6IAは特
公昭50−22803号と本発明の比較モノグラフ。
The flexible fibrous cylindrical member is made of strong fibers 1, such as synthetic fibers such as nylon, polypropylene, polyester, etc., and is used as a coarse cloth-like cylindrical body whose top and bottom are open. The length of the cylindrical body may be long up to the tip of the outer tube (or may be shorter than that; a short one is used suspended midway inside the outer tube. This is a novel compaction method that can quickly and reliably create sand pillars with a planned diameter to a predetermined depth in the ground.
i! The economic efficiency of completing the sand pile within the plan without using more than the quantity was taken into account.
The figure shows the relationship between the fixing device for the folded fiber tube, the winding wire, and the inner and outer tubes. Figure 4 is a diagram showing the state in which the compression plate is being compressed and expanded, and Figure 4 is a diagram showing the relationship between the compression plate being press-fitted downward and the compression plate about to open, and the outer tube. Figure 5 is the same as the folded shape of the cylindrical body. No. 6IA is a comparative monograph between Japanese Patent Publication No. 50-22803 and the present invention.

’illΔ “4 −1  錦i1   (41) (A 田) 吟 呵 (カラ 1目ン'illΔ “4 -1 Nishiki i1 (41) (A field) Gin 呵 (Kara 1st eye

Claims (1)

【特許請求の範囲】 1、柔軟な繊維筒状体の上端、下端を開放した形状とし
、その直径を小さく折り畳み、或いは部分的に縫合せた
ものを所定の深さ迄地盤中に圧入又は打ち込み、次いで
該筒状体内を砂又は骨材で充填すると同時に圧縮機によ
り圧縮拡大し、筒状体の折り畳んだ部分は自然に押し拡
げられかつ充填した砂及び骨材は圧密拡大される。結果
的に直径大なる柱状基礎杭を土中に残置埋設する様にし
た事を特色とする直径大なる締め固め砂杭造成工法。 2、打設機は外管と内管とから成り、外管上端に振動機
を装置し、内管上部に圧縮機を装置しこれに連結するロ
ットが下方に延び、その先端には開閉自由な圧縮板を設
け、折り畳むか一部縫合された柔軟な繊維筒状体の上端
をワイヤーで結束し上方え引き上げ内管の適所の固定装
置え固定し、外管先端には開閉自由な閉塞具を設け、閉
じた側を下にして地中に貫入し、所定の深度に達した後
外管外側の投入口より砂及び骨材を投入する、砂及び骨
材は内管を通り筒状体内に流下し筒状体を充填する、次
に打設機全体を引き上げ閉塞具を開くと、同時に柔軟な
繊維筒状体の固定箇所を解き、次に圧縮機を下方え作動
させ外管下端より流下し地盤中に埋設された柔軟な繊維
筒状体と、これを充填した砂及び骨材を圧縮板で拡大圧
密する装置。
[Claims] 1. A flexible fibrous cylindrical body with its upper and lower ends open, folded to a smaller diameter, or partially sewn together, and then press-fitted or driven into the ground to a predetermined depth. Next, the cylindrical body is filled with sand or aggregate and at the same time compressed and expanded by a compressor, the folded portion of the cylindrical body is naturally expanded and the filled sand and aggregate are compressed and expanded. This is a compacted sand pile construction method with a large diameter, which is characterized by the fact that columnar foundation piles with a large diameter are left buried in the soil. 2. The pouring machine consists of an outer tube and an inner tube. A vibrator is installed at the upper end of the outer tube, a compressor is installed at the upper end of the inner tube, and a rod connected to this extends downward, with a rod at its tip that can be opened and closed freely. The upper end of the flexible fibrous tube, which is folded or partially sutured, is tied with a wire, pulled upwards, and fixed to the fixing device in the appropriate position of the inner tube, and an obturator that can be freely opened and closed is placed at the tip of the outer tube. Penetrate into the ground with the closed side facing down, and after reaching a predetermined depth, sand and aggregate are introduced from the input port on the outside of the outer tube.The sand and aggregate pass through the inner tube and enter the cylindrical body. Then, the entire pouring machine is pulled up to open the obturator, and at the same time, the flexible fiber cylinder is released from the fixing point, and then the compressor is operated downwards to fill the outer pipe from the bottom end. A device that expands and compacts a flexible fibrous cylindrical body that has flowed down and is buried in the ground, and the sand and aggregate that fills it with a compression plate.
JP17346488A 1988-07-12 1988-07-12 Forming method of tamping sand pile with larger diameter and device thereof Pending JPH0224412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17346488A JPH0224412A (en) 1988-07-12 1988-07-12 Forming method of tamping sand pile with larger diameter and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17346488A JPH0224412A (en) 1988-07-12 1988-07-12 Forming method of tamping sand pile with larger diameter and device thereof

Publications (1)

Publication Number Publication Date
JPH0224412A true JPH0224412A (en) 1990-01-26

Family

ID=15960960

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17346488A Pending JPH0224412A (en) 1988-07-12 1988-07-12 Forming method of tamping sand pile with larger diameter and device thereof

Country Status (1)

Country Link
JP (1) JPH0224412A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018076663A (en) * 2016-11-07 2018-05-17 株式会社不動テトラ Hollow pipe for constructing displacement reduction type compacted sand pile and construction method of compacted sand pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018076663A (en) * 2016-11-07 2018-05-17 株式会社不動テトラ Hollow pipe for constructing displacement reduction type compacted sand pile and construction method of compacted sand pile

Similar Documents

Publication Publication Date Title
CN108442365B (en) Anti-blocking reinforced permeable pile and construction method
CN102828498B (en) Method for constructing gravel pile of hoop of immersed tube for reinforcing soft foundation
JP4499001B2 (en) Filling reinforcement method and filling
CN107059854A (en) It is a kind of new prefabricated drainage tubular pile and its construction method to be prepared
CN105735253B (en) A kind of construction method of enlarged footing resistance to compression uplift pile
CN112359815A (en) Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof
CN105133567B (en) Capsule type hydraulic vibration excitation device and method for treating saturated soil foundation through capsule type hydraulic vibration excitation device
JPH0224412A (en) Forming method of tamping sand pile with larger diameter and device thereof
CN1215776A (en) Method for construction of cast-in-place concrete anchor pile
DE10025966C2 (en) Support tube columns
CN111945703B (en) Drainage structure for foundation stabilization and drainage method thereof
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
JPS61134425A (en) Method of forming foundation pile
CN1142344C (en) Grouting equipment and pile making process of pump-grouting concrete
CN205576917U (en) Vibration sleeve pipe
RU2817367C1 (en) Continuous hollow die for installation of cast-in-place piles by indentation method and method of cast-in-place pile installation by means of continuous hollow die for cast-in-place piles by indentation
KR20010044812A (en) Net bag type fiber-concrete pile and construction method thereof
RU16001U1 (en) DEVICE FOR ESTABLISHING A PACKED PILES
CN209397585U (en) A kind of reinforced soft soil ground compacting pile construction device
KR960003748B1 (en) Working method of concrete pile or sand pile for a soft-soil foundation
JPH1129930A (en) Reinforced filling method
JPS5812913Y2 (en) Reinforcement device for the ground under the tip of the pile foundation
JPS6044450B2 (en) Deep compaction method
RU2599159C1 (en) Foundation and method of its construction
CN113737771A (en) Pipe jacking well opening soil body reinforcing process for soft soil foundation