KR20010044812A KR1020010016036A KR20010016036A KR20010044812A KR 20010044812 A KR20010044812 A KR 20010044812A KR 1020010016036 A KR1020010016036 A KR 1020010016036A KR 20010016036 A KR20010016036 A KR 20010016036A KR 20010044812 A KR20010044812 A KR 20010044812A
Authority
KR
South Korea
Prior art keywords
concrete
fiber concrete
mesh cloth
vertical hole
fiber
Prior art date
Application number
KR1020010016036A
Other languages
Korean (ko)
Inventor
임철웅
Original Assignee
임철웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임철웅 filed Critical 임철웅
Priority to KR1020010016036A priority Critical patent/KR20010044812A/en
Publication of KR20010044812A publication Critical patent/KR20010044812A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0085Geotextiles

Abstract

PURPOSE: A composite ground development method of a mesh cloth bag type fiber concrete pile for improvement of a poor ground is provided to prevent cement concrete forming a pile from scattering, to complete the construction work of monofilament or filament concrete piles simply and safely, and to enhance the strength of the poor ground by composite ground development by installing flexible piles harmonizing with the strength of the poor ground. CONSTITUTION: A composite ground development method of a mesh cloth bag type fiber concrete pile for the improvement of a poor ground comprises the steps of putting a steel pipe(2) into a vertical hole(1a) bored though a poor ground(1), taking out a reticular mesh cloth bag(4) rolled in a scroll type at the lower end of the steel pipe and putting in the steel pipe in the state of binding a heavy weight(10) to the lower end of the mesh cloth bag, cutting after installing the mesh cloth bag to be longer than the top end of the steel pipe, interposing a concrete injection pipe(6) to the lower end of the mesh cloth bag, then pulling out the concrete injection pipe, pouring a fiber concrete(6a) mixed with a cement concrete(5), a monofilament(7a) or filament in an optimum ratio to fill up to the top end of the mesh cloth bag, and pulling out the concrete injection pipe and the steel pipe from the vertical hole successively, so that the fiber concrete gets to be a filament concrete pile including a monofilament concrete pile in the state of covering the fiber concrete with the mesh cloth bag in the vertical hole.

Description

연약지반의 개량을 위한 망포자루형 섬유콘크리트말뚝의 복합지반조성 시공법 및 망포자루형 섬유콘크리트말뚝{NET BAG TYPE FIBER-CONCRETE PILE AND CONSTRUCTION METHOD THEREOF}Composite ground construction method and mesh bag pile fiber reinforced concrete pile for improvement of soft ground {NET BAG TYPE FIBER-CONCRETE PILE AND CONSTRUCTION METHOD THEREOF}

본 발명은 준설토 투기장의 연약지반이나 해안, 강변, 간석지(干潟地), 연못 또는 늪지대 등의 안정이 안된 점성토로 이루어진 연약지반에 도로나 단지 및 제방등의 구조물을 설치하기 위하여 시공하는 연약지반의 개량을 위한 망포자루형 섬유콘크리트 말뚝의 복합지반조성 시공법 및 망포자루형 섬유콘크리트말뚝에 관한 것으로,The present invention is a soft ground of the soft ground of the dredged soil, or a soft ground composed of unstable viscous soil such as coastal, riversides, tidal flats, ponds or swamps to install structures such as roads, complexes, and embankments. The present invention relates to a composite ground composite construction method of a mesh cloth fiber concrete pile and a mesh cloth fiber concrete pile for improvement,

시멘트콘크리트에 단섬유 또는 장섬유를 적정비율로 혼합하여 얻어지는 섬유콘크리트와 망포자루를 이용하여 연약지반의 디딤목이 되는 섬유콘크리트말뚝을 시공설치함으로써, 섬유콘크리트 말뚝과 기초 연약지반이 복합적 강도 지지력을 발휘하게 하여 연약지반의 견고성 및 구조물의 지지강도를 높일 수 있도록 제안 된 것이다.The fiber concrete pile and the basic soft ground exhibit composite strength support by constructing and installing fiber concrete piles, which are the stepping stones of soft ground, using fiber concrete and mesh cloth, which are obtained by mixing short fibers or long fibers at an appropriate ratio with cement concrete. It is proposed to increase the strength of the soft ground and the support strength of the structure.

종래에 일반적으로 연약지반은 연약지반을 형성하고 있는 점성토내에 수분이 다량으로 포화되어 자립의존도가 취약하여 지반이 불안정한 상태이므로 외압에 의한 지지력과 지반의 강도가 취약하여 구조물을 설치할 수가 없으며, 연약지반의 특성상 대량 압밀,침하현상이 장기간에 걸쳐서 계속적으로 진행하게 됨은 물론 구조물 등의 하중에 의한 지중의 전단 파괴로 인하여 시간의 흐름에 따라 연약지반상에 설치한 구조물의 피해를 적게 하기 위하여 시멘트콘크리트에 철근이나 철사를 심재로 하여 이미 제작된 철근콘크리트말뚝을 직접 박아 설치하였다.In general, the soft ground is saturated with a large amount of water in the viscous soil forming the soft ground, and the dependence of self-reliance is weak, and the ground is unstable. Therefore, the structure cannot be installed due to the weakness of external force and the strength of the ground. Due to the nature of mass consolidation and settlement, the concrete progresses over a long period of time, as well as to reduce the damage of structures installed on the soft ground over time due to the shear failure of the ground caused by the load of the structure. Reinforced concrete piles were built by directly installing reinforcement bars or wires.

이와 같은 종래의 철근콘크리트 말뚝은 별도로 제작하는 기간이 소요되고, 이미 제작된 철근콘크리트말뚝을 연약지반에 직접 박아 설치하는 경우는 말뚝의 타입심도가 깊은 굳은 지반까지 도달하도록 설치하여야 됨으로 설치비용이 높아지는 결점이 있었다.Such conventional reinforced concrete piles require a separate manufacturing period, and in case of directly installing reinforced concrete piles directly on the soft ground, the installation cost increases because the type of the pile must be installed to reach a deep solid ground. There was a flaw.

또한, 2000년 10월 31일자 특허출원 제64382호로 출원하여 제안된 시공법에 있어서는, 연약지반에 수직깊이로 뚫어 설치하는 수직홀의 내부에 강관통에 의하여 늘어 뜨려지게 설치한 망포자루의 내부로 단순히 시멘트콘크리트만을 직접 주입하는 시공법으로써, 시멘트콘크리트가 수직홀의 내부가 되는 망포자루의 내부로 정확하게 투입되어 필요 이상의 시멘트콘크리트가 손실되지 않는 이점은 있었으나 콘크리트말뚝이 휨응력이나 파열응력에 대해서는 저항능력이 부족한 등의 결점이 있었다.In addition, in the proposed construction method, filed with a patent application No. 64382 dated October 31, 2000, cement is simply inserted into the inside of a mansard bag installed by a steel pipe inside a vertical hole drilled vertically in a soft ground. As a construction method that directly injects concrete only, cement concrete is precisely injected into the inside of the netting bag which becomes the inside of the vertical hole, so that the cement concrete is not lost more than necessary, but the concrete pile lacks resistance to bending stress or rupture stress. There was this.

본 발명은 종래의 제반 결점을 해소하기 위하여 준설토 투기장의 연약지반이나, 해안, 강변 등의 안정이 안된 점성토로 이루어진 연약지반에 강관통과 콘크리트주입관 및 두루말이형의 망포자루와 시멘트콘크리트에 단섬유 또는 장섬유를 적정비율로 혼합하는 섬유콘크리트를 이용하여 수직홀의 내부에서 상기 섬유콘크리트가 망포자루에 둘러씌워진 상태로 충진되어 단섬유 또는 장섬유콘크리트말뚝이 되도록 시공 설치함으로서 말뚝을 형성하는 시멘트콘크리트의 양생물의 흐트러짐을 방지하면서 보다 유연성 있는 단섬유 또는 장섬유콘크리트말뚝의 시공작업을 간편하고 안전하게 완료할 수 있도록 하여 연약지반의 강도와 조화를 이루는 유연성 있는 말뚝을 설치하여 복합지반 조성에 의해 연약지반의 강도를 개량함을 목적으로 제안 된 것이다.The present invention is to overcome the shortcomings of conventional conventional dredged soil, soft ground consisting of unstable viscous soil, such as the shore, riverside, steel pipes and concrete injection pipe and rolled-shaped mesh cloth and cement concrete in short fibers or Filled with cement concrete to form a pile by installing the fiber concrete filled in a state surrounded by mesh cloth in the vertical hole by using fiber concrete for mixing the long fibers at an appropriate ratio to form short fibers or long fiber concrete piles. Strengthen the soft ground by installing a flexible pile that is in harmony with the strength of the soft ground by making it easier and safer to complete the construction of more flexible short or long fiber concrete piles while preventing the disturbance. Proposed for the purpose of improving .

도 1 은 본 발명의 연약지반의 개량을 위한 망포자루를 두루말이형으로 말아1 is a rolled up rolled manpobag for improvement of soft ground of the present invention

놓은 상태의 사시도Perspective view

도 2 은 본 발명의 시공상태를 보인 사시도2 is a perspective view showing a construction state of the present invention

도 3 은 본 발명의 망포자루를 강관통 내부로 삽입한 상태를 보인 단면도Figure 3 is a cross-sectional view showing a state inserted into the steel pipe of the mesh bag of the present invention

도 4 는 본 발명의 망포자루를 절단하여 콘크리트주입관을 주입한 상태를4 is a state in which the concrete injection pipe is injected by cutting the mesh bag of the present invention

보인 단면도Shown section

도 5 는 본 발명의 망포자루의 상단부를 절단하여 콘크리트주입관을 주입한5 is a concrete injection pipe is injected by cutting the upper end of the mesh bag of the present invention

상태를 보인 단면도Section showing the status

도 6 은 본 발명의 망포자루의 내부로 콘크리트 주입을 완료한 상태를 보인Figure 6 shows a state of completing the concrete injection into the inside of the mesh bag of the present invention

단면도Cross-section

도 7 은 본 발명의 수직홀에서 강관통을 빼내어 단섬유콘크리트말뚝으로7 is taken out of the steel pipe in the vertical hole of the present invention to short fiber concrete pile

시공이 완료된 상태의 단면도Sectional view of construction completed

도 8 은 본 발명의 수직홀에서 강관통을 빼내어 장섬유콘크리트말뚝으로8 is taken out of the steel pipe in the vertical hole of the present invention to the long fiber concrete pile

시공한 상태의 제1실시예의 단면도Cross section of the first embodiment in the construction state

도 9 은 본 발명의 시공이 완료된 단섬유 또는 장섬유콘크리트말뚝의 상부에9 is on the top of the short-fiber or long-fiber concrete piles of the construction of the present invention

구조물을 설치하여 보인 제2실시예의 단면도Cross section of the second embodiment shown by installing the structure

도 10 은 본 발명의 시공이 완료된 단섬유 또는 장섬유콘크리트말뚝의10 is the construction of the short fiber or long fiber concrete piles of the present invention completed

상부에 도로(아스팔트)를 설치하여 보인 제3실시예의 단면도Cross section of the third embodiment shown by installing a road (asphalt) on the top

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 연약지반 1a : 수직홀1: Soft ground 1a: Vertical hole

2 : 강관통 3 : 덮개판2: steel pipe 3: cover plate

3a : 경첩 4 : 망포자루3a: hinge 4: mesh cloth bag

5 : 시멘트콘크리트 6 : 콘크리트주입관5: cement concrete 6: concrete injection pipe

6a : 섬유콘크리트 7 : 단섬유콘크리트말뚝6a: fiber concrete 7: short fiber concrete pile

7a : 단섬유 8 : 장섬유콘크리트말뚝7a: short fiber 8: long fiber concrete pile

8a : 장섬유 10 : 중량체8a: long fiber 10: weight

100 : 기반 101 : 기초다짐층100: base 101: foundation plywood

102 : 구조물 103 : 배수로102 structure 103: drainage

104 : 경계석 105 : 도로(아스팔트)104: boundary stone 105: road (asphalt)

본 발명을 첨부된 도면에 의해 상세히 설명하면 다음과 같다.The present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명의 연약지반(1)의 개량을 위한 두루말이형 망포자루(4)의 사시도, 도 2 는 본 발명의 시공상태를 보인 사시도, 도 3 은 본 발명은 망포자루(4)를 강관통(2)의 내부로 넣어 늘어뜨려 놓은 상태를 보인 단면도, 도 4 는 본 발명의 망포자루(4)의 상단부를 절단하여 콘크리트주입관(6)을 끼워 넣어 설치된 상태를 보인 단면도, 도 5 는 본 발명의 망포자루(4)에 끼워 넣어 설치된 콘크리트주입관(6)으로 단섬유 또는 장섬유를 적정비율로 혼합한 섬유콘크리트(6a)를 주입한 상태를 보인 단면도, 도 6 은 본 발명의 망포자루(4)의 내부로 단섬유 또는 장섬유를 적정비율로 혼합한 섬유콘크리트(6a)의 주입을 완료한 상태를 보인 단면도, 도 7 은 본 발명의 수직홀(1a)에서 강관통(2)을 빼내어 단섬유콘크리트말뚝(7)이 완료된 상태의 단면도, 도 8 은 본 발명의 수직홀(1a)에서 강관통(2)을 빼내어 장섬유콘크리트말뚝(8)으로 시공한 상태의 제 1 실시예의 단면도, 도 9 내지 도 10 은 본 발명의 시공이 완료된 단섬유 또는 장섬유콘크리트말뚝(7)(8)의 상부에 시설물인 기반(100), 기초다짐층(101), 구조물(102), 배수로(103), 경계석(104), 도로(아스팔트)(105)를 설치하여 보인 제 2 내지 제 3 실시예의 단면이다.1 is a perspective view of a rolled-type mesh cloth bag 4 for the improvement of the soft ground 1 of the present invention, Figure 2 is a perspective view showing a construction state of the present invention, Figure 3 is a steel bag of the present invention Figure 4 is a cross-sectional view showing a state put down inside of the through (2), Figure 4 is a cross-sectional view showing a state installed by inserting the concrete injection pipe 6 by cutting the upper end of the mesh bag 4 of the present invention, Figure 5 6 is a cross-sectional view showing a state in which the fiber concrete 6a mixed with short fibers or long fibers at an appropriate ratio is injected into the concrete injection pipe 6 installed in the mesh bag 4 of the present invention, and FIG. 6 is a mesh cloth of the present invention. 7 is a cross-sectional view showing a state in which the injection of the fiber concrete 6a mixed with short fibers or long fibers at an appropriate ratio into the inside of the bag 4 is completed, and FIG. 7 is a steel pipe 2 in the vertical hole 1a of the present invention. 8 is a cross-sectional view of the state in which the short fiber concrete pile 7 is completed, and FIG. Sectional drawing of the 1st Example of the state which removed the steel pipe (2) from the straight hole (1a) and constructed it with the long fiber concrete pile 8, FIG. 9 thru | or FIG. 10 is the short fiber or the long fiber concrete pile of which the construction of this invention was completed ( 7) The second shown by installing the foundation 100, the foundation compaction 101, the structure 102, the drainage passage 103, the boundary stone 104, the road (asphalt) 105, which are facilities on top of the (8) To the third embodiment.

이와 같은 본 발명은 연약지반(1)의 지중으로 뚫어 시공하는 수직홀(1a)의 길이 깊이까지 박아 설치한 강관통(2)의 하단부에는 자중(自重) 및 토압에 의하여 개폐되는 덮개판(3)을 경첩(3a)으로 다소 경사지게 복착되도록 유착시킨 구조로 형성되었으며, 강관통(2)의 내부에는, 두루말이 형태로 감겨져 있는 망포자루(4)를 인출하며, 망포자루(4)의 내부로 중량체(10)를 내설하여 끝단부를 묶음시켜 강관통(2)의 길이 깊이로 끼워 넣어, 수직홀(1a)의 깊이 단부까지 끼워 들어가 늘어뜨려진 상태에서 강관통(2)의 상단부보다 길게 돌설된 상태로 망포자루(4)를 절단한 다음, 콘크리트주입관(6)을 망포자루(4)의 끝단부까지 끼워 넣은 상태에서 시멘트콘크리트(5)를 주입함과 동시에 별도로 준비한 단섬유(7a) 또는 장섬유(8a)를 통상의 분사장비(도시생략)로서 분사 주입시켜 시멘트콘크리트(5)와 단섬유(7a) 또는 장섬유(8a)를 적정비율로 혼합되는 섬유콘크리트(6a)로서 주입시켜 주면서 콘크리트주입관(6)을 빼내면서 망포자루(4)의 상단부까지 상기의 섬유콘크리트(6a)를 채운 다음, 콘크리트주입관(6)과 강관통(2)을 순차적으로 빼냄으로서 망포자루(4)의 내부에 채워진 상기의 섬유콘크리트(6a)가 수직홀(1a)의 내부에 곽 채워진 상태에서 수직홀(1a)의 내부에는 단섬유콘크리트말뚝(7) 또는 장섬유콘크리트말뚝(8)으로 응결(양생)되어 매설됨으로서, 본 발명의 시공작업이 완료된다.The present invention as described above is a cover plate 3 which is opened and closed by self-weight and earth pressure at the lower end of the steel pipe (2) installed by driving to the depth of the vertical hole (1a) to be drilled into the ground of the soft ground (1) ) Was formed in a structure in which the hinge (3a) is attached to be inclined somewhat inclined, the inside of the steel pipe (2), withdraw the mesh bag (4) wound in the form of a roll, the weight into the inside of the mesh bag (4) The body 10 is built up, the ends are bundled together, and inserted into the length depth of the steel pipe 2, and inserted into the depth end of the vertical hole 1a, and protruded longer than the upper end of the steel pipe 2 in the hanged state. After cutting the mesh bag 4 in a state, the concrete inlet pipe 6 is inserted into the end of the mesh bag 4 while the cement concrete 5 is injected, and the single fiber 7a prepared separately. Injection of long fiber 8a as a normal injection equipment (not shown) Cement concrete (5) and short fibers (7a) or long fibers (8a) as a fiber concrete (6a) to be mixed at an appropriate ratio while pulling out the concrete injection pipe (6) to the upper end of the mesh cloth (4) After filling the fiber concrete (6a), the fiber concrete (6a) filled in the inside of the mesh bag (4) by sequentially removing the concrete injection pipe (6) and the steel pipe (2) is a vertical hole (1a) In the filled state in the inside of the vertical hole (1a) inside the condensed (cured) in the short-fiber concrete pile (7) or long fiber concrete pile (8) is embedded, the construction work of the present invention is completed.

이와 같은 본 발명은 두루말이로 감겨져 있는 망포자루(4)와 강관통(2), 콘크리트주입관(6) 및 시멘트콘트리트(5)와 단섬유(7a) 또는 장섬유(8a)를 적정비율로 혼합하여 이루어지는 섬유콘크리트(6a)를 이용하여 연약지반(1)의 내부에 수직으로 매설되도록 시공 설치하는 시공법을 도 2 내지 도 8 에 의하여 상세히 설명하면 다음과 같다.In the present invention, the mesh wrapper (4) and the steel pipe (2), the concrete injection pipe (6) and the cement concrete (5) and short fibers (7a) or long fibers (8a) that are wound with a roll is mixed in an appropriate ratio The construction method for installing the construction so as to be vertically embedded in the interior of the soft ground (1) using the fiber concrete (6a) is described in detail with reference to Figs.

먼저 도 3 은 연약지반(1)의 증강을 위한 시공장소의 입지 조건에 따라 두루말이로 감겨져 있는 망포자루(4)의 하단부를 묶음시켜 중량체(10)를 삽입한 다음, 통상의 강관통(2)을 이용하여 연약지반(1)의 지중으로 뚫어 형성시킨 수직홀(1a)의 깊이까지 박아 설치한다. 이때 강관통(2)의 하단부에 경첩(3a)으로 유설한 덮개판 (3)은 지중압에 의하여 닫힌 상태가 된다.First, Figure 3 is inserted into the weight body 10 by tying the lower end of the mesh cloth wrapped around the roll 4 according to the location conditions of the city factory for the reinforcement of the soft ground (1), and then the ordinary steel pipe (2) Using) to drive to the depth of the vertical hole (1a) formed by drilling into the ground of the soft ground (1). At this time, the cover plate 3 placed on the lower end of the steel pipe 2 with the hinge 3a is in a closed state by underground pressure.

강관통(2)의 내부로는 상기 망포자루(4)를 끼워 넣어진 상태의 망포자루(4)가 중량체(10)의 자중에 의하여 강관통(2)의 하단부가 되는 덮개판(3)까지 늘어뜨려지도록 강관통(2)의 길이 깊이까지 설치된다. 이와 같은 상태에서 강관통(2)보다 높은 위치의 망포자루(4)를 절단한다.Inside the steel tube 2, the cover plate 3, in which the mesh bag 4 in the state where the mesh bag 4 is inserted, becomes a lower end of the steel tube 2 by the weight of the weight body 10. It is installed up to the length depth of the steel pipe 2 so that it may hang down. In such a state, the mesh bag 4 of a position higher than the steel pipe 2 is cut.

도 4 에서는, 강관통(2)보다 높은 위치로 돌출 되어진 망포자루(4)의 내부의 길이 깊이까지 콘크리트주입관(6)을 끼워 넣는다.In FIG. 4, the concrete injection pipe 6 is inserted to the length depth of the inside of the mesh bag 4 protruding to a position higher than the steel pipe 2.

도 5 에서는 망포자루(4)의 하단부부터 섬유콘크리트(6a)가 채우면서 망포자루 (4)의 상단부까지 채워지도록 주입하게 되는데, 이때 망포자루(4)에 채우는 섬유콘크리트(6a)는 시멘트콘크리트(5)와 단섬유(7a)를 적정비율로 혼합한 상태로서 주입한다.In FIG. 5, the fiber concrete 6a is filled from the lower end of the mesh bag 4 to be filled up to the upper end of the mesh bag 4, wherein the fiber concrete 6a filling the mesh bag 4 is cement concrete ( 5) and the short fibers 7a are injected as a mixture at an appropriate ratio.

도 6 에서는 콘크리트주입관(6)을 망포자루(4)로부터 완전히 탈이시키므로써 연약지반(1)의 지중에 형성시킨 수직홀(1a)의 내부는 망포자루(4)로 둘러 씌워진 단섬유콘크리트말뚝(7)이 강관통(2)에 의하여 형성된 상태가 된다.In FIG. 6, the inside of the vertical hole 1a formed in the ground of the soft ground 1 by completely removing the concrete injection pipe 6 from the mesh bag 4 is covered with short fiber concrete piles. (7) is in a state formed by the steel pipe (2).

도 7 에서는 수직홀(1a)에 박아 설치되어 있는 강관통(2)을 수직홀(1a)로부터 완전히 탈이시키므로서 수직홀(1a)의 내부는 시멘트콘크리트(5)와 단섬유가 적정비율로 혼합된 상태의 섬유콘크리트(6a)가 망포자루(4)에 둘러 씌워 수직홀(1a)에 충진된 상태로 응결(양생)됨과 동시에 수직홀(1a)의 둘레주벽과 일체화로 응결(양생)되면서 단섬유콘크리트말뚝(7)으로서의 기능을 발휘하게 됨으로서 본 발명의 시공설치가 완료된다.In FIG. 7, the cement concrete 5 and the short fibers have an appropriate ratio in the interior of the vertical hole 1a by completely removing the steel pipe 2 installed in the vertical hole 1a from the vertical hole 1a. While the fiber concrete 6a in the mixed state is enclosed in the mesh bag 4 and condensed (cured) in a state filled in the vertical hole 1a, it is condensed (cured) by being integrated with the peripheral wall of the vertical hole 1a. By exhibiting the function as the short fiber concrete pile 7, the construction installation of this invention is completed.

도 8 은 수직홀(1a)의 내부에 망포자루(4)에 채우는 섬유콘크리트(6a)를 시멘트콘크리트(5)와 장섬유(8a)를 적정비율로 혼합하여 수직홀(1a)의 내부에 장섬유콘크리트말뚝(8)으로서의 기능을 발휘하도록 하는 제1실시예를 보인 것이다.FIG. 8 shows that the cement concrete 5 and the long fiber 8a are mixed at a proper ratio with the fiber concrete 6a filling the mesh bag 4 inside the vertical hole 1a to form the inside of the vertical hole 1a. A first embodiment is shown in which a function as the fiber concrete pile 8 is exerted.

이와 같은 본 발명은 본 발명의 시공장소의 입지조건에 따라 적정간격마다 통상의 강관통(2)을 이용하여 연약지반(1)의 지중에 뚫어 설치하는 수직홀(1a)의 길이 깊이의 하단부까지 박아 넣은 상태에서 상기 강관통(2)의 내부인 길이 깊이까지 망포자루(4)를 늘어뜨러지도록 설치한 다음, 콘크리트주입관(6)에 의하여 단섬유 (7a) 또는 장섬유(8a)를 적정비율로 혼합시킨 섬유콘크리트(6a)의 주입을 완료한 후 상기 콘크리트주입관(6)과 강관통(2)을 수직홀(1a)에서 빼냄으로서 수직홀 (1a)의 내부는 망포자루(4)로 둘러씌워진 시멘트콘크리트(5)와 단섬유(7a) 또는 장섬유(8a)로 혼합되어 응결 결합되는 구조의 단섬유콘크리트말뚝(7)과 장섬유콘크리트말뚝 (8)으로서 상기 수직홀(1a)에 매설된 상태가 되도록 반복 연속하여 시공 설치함으로서 연약지반(1)의 내부에 망포자루형 단섬유콘크리트말뚝(7)과 장섬유쇼크리크말뚝(8)을 지그재그로 시공 설치함으로서 본 발명의 시공 설치를 완료하는 것이다.As described above, the present invention uses the conventional steel pipe (2) at appropriate intervals according to the location conditions of the factory of the present invention to the lower end of the length depth of the vertical hole (1a) to be installed in the ground of the soft ground (1) It is installed so that the mesh bag 4 hangs down to the length depth which is the inside of the steel pipe 2 in the inlaid state, and then the short fiber 7a or the long fiber 8a is titrated by the concrete injection pipe 6. After the completion of the injection of the fiber concrete (6a) mixed at a ratio, the concrete inlet pipe (6) and the steel pipe (2) is pulled out of the vertical hole (1a), the inside of the vertical hole (1a) is a mesh bag (4) The vertical holes (1a) as short fiber concrete piles (7) and long fiber concrete piles (8) having a structure in which the cement concrete (5) and short fibers (7a) or long fibers (8a) are enclosed and condensed and bonded together. Repeatedly and continuously installed so as to be buried in the network inside the soft ground (1) Bladder-like end to fiber by concrete pile 7 and the sheet construction installed for fiber leakage shock pile (8) in a zigzag pattern to complete the installation construction of the present invention.

이때, 시멘트콘크리트(5)와 단섬유(7a) 또는 장섬유(8a)를 적정비율은 연약지반(1)의 자립정도 및 입지조건에 따라 적절한 비율로 혼합하여 주입한다.At this time, the cement concrete (5) and short fibers (7a) or long fibers (8a) is injected in a suitable ratio in accordance with the appropriate ratio according to the degree of independence and location of the soft ground (1).

도 9 내지 도 10 은 단섬유콘크리트말뚝(7)이나 장섬유콘크리트말뚝(8)의 상부에 구조물(102)을 설치하여 보인 제 2 내지 제 3 실시예를 나타낸 것으로, 연약지반(1)에 시공된 단섬유 및 장섬유콘크리트말뚝(7)(8)의 상부로 기반(100) 공사를 한 후에, 상기 기반(100) 위로 기초다짐층(101)의 구조물(102), 배수로(103), 경계석(104), 도로(아스팔트)(105)를 설치하여 보인 것이다.9 to 10 show the second to third embodiments shown by installing the structure 102 on top of the short fiber concrete pile (7) or the long fiber concrete pile (8), the construction on the soft ground (1) After the construction of the foundation 100 to the upper part of the short fiber and long fiber concrete piles 7 and 8, the structure 102 of the foundation compaction layer 101, the drainage passage 103, and the boundary stone on the foundation 100. It is shown that 104 and the road (asphalt) 105 were provided.

상기 기반(100)상부로는 이미 시공 설치한 단섬유 및 장섬유콘크리트말뚝(7) (8)의 중압강도에 적절한 단지조성이나 제방의 구조물 및 도로 등을 설치하게 되는 것이다.The upper part of the base 100 is to install a suitable structure for the medium-pressure strength of the short-fiber and long-fiber concrete piles (7) (8) already installed and to install the structures and roads of the dike.

이와 같은 본 발명은 연약지반의 지중에 뚫어 시공하는 수직홀의 내부에 망포자루의 내부로 시멘트콘크리트와 단섬유 또는 장섬유를 적정비율로 혼합한 콘크리트를 필요한 양만을 간단한 작업으로 용이하게 주입하여 망포자루에 둘러씌워진 상태의 단섬유콘크리트말뚝 또는 장섬유콘크리트말뚝을 수직홀에 충진시켜 구축함으로서 망포자루에 둘러씌워진 상기 단섬유 또는 장섬유콘크리트말뚝의 내부에 시멘트콘크리트와 적정비율로 혼합되어 있는 강인한 인장력을 가지는 단섬유 또는 장섬유의인장력에 의하여 시멘트콘크리트의 응결(양생)상태에 있어서는,The present invention as described above is easy to inject only the required amount of concrete mixed with cement concrete and short fibers or long fibers into the inside of the vertical hole to be drilled in the ground of the soft ground in a simple operation by the simple operation By filling the short-fiber concrete pile or the long-fiber concrete pile covered in the vertical hole in the vertical hole, the tough tensile force mixed with cement concrete at an appropriate ratio is mixed inside the short-fiber or long-fiber concrete pile covered by the mesh cloth. In the state of condensation (cure) of cement concrete due to the pulling force of the short fibers or the long fibers,

연약지반의 강도가 극히 약한 경우에도 흐트러짐이 방지될 수 있으며, 단섬유 또는 장섬유큰크리트 말뚝은 휨능력이나 파열응력에 대해 유연성이 커서 연약지반과 강도면에서 조화를 이루어 복합지반을 조성할 수 있게 되어 지층의 연약부위만 보강하는 이점이 있으며, 견고한 내부지반의 갚이가지 관통하여 지지력을 얻는 기성제품에 의한 콘크리트 말뚝에 비해 경제성이 높은 이점이 있다.Even when the strength of the soft ground is extremely weak, it can be prevented from being disturbed. The short fiber or long fiber large concrete pile has a great flexibility in flexural capacity and rupture stress, so that the composite ground can be formed in harmony with the soft ground. There is an advantage of reinforcing only the soft parts of the strata, and has the advantage of high economic efficiency compared to the concrete piles by the ready-made products that get support through the repayment of solid internal ground.

Claims (3)

연약지반(1)의 지중으로 뚫어 시공하는 수직홀(1a)의 길이 깊이까지 박아 설치한 강관통(2)의 하단부에는 자중 및 토압에 의하여 개폐되는 덮개판(3)을 경첩(3a)으로 다소 경사지게 복착되도록 유착시켜 형성한 통상의 것에 있어서,To the lower end of the steel pipe (2) installed by drilling to the depth of the vertical hole (1a) drilled into the ground of the soft ground (1), the cover plate (3) opened and closed by self-weight and earth pressure is slightly hinged (3a) In the conventional one formed by coalescing so as to be inclined to be inclined, 강관통(2)의 내부에는 두루말이 형태로 감겨져 있는 망포자루(4)의 내부로 중량체(10)를 내설하여 끝단부를 묶음시켜 강관통(2)의 길이 깊이로 끼워 넣어, 수직홀(1a)의 깊이 단부까지 끼워 들어가 늘어뜨려진 상태에서 강관통(2)의 상단부보다 길게 돌설된 상태로 망포자루(4)를 절단한 다음, 콘크리트주입관(6)을 망포자루 (4)의 끝단까지 끼워 넣어 시멘트콘크리트(5)와 단섬유(7a) 또는 장섬유(8a)를 적정비율로 혼합시킨 섬유콘크리트(6a)를 주입함과 동시에 콘크리트주입관(6)을 빼내면서 망포자루(4) 내부에 상기 섬유콘크리트(6a)를 채운 다음, 콘크리트주입관(6)과 강관통 (2)을 순차적으로 빼내버림으로서 수직홀(1a)의 내부에는 섬유콘크리트 (6a)가 망포자루 (4)에 둘러씌워진 상태의 단섬유콘크리트말뚝(7)을 포함한 장섬유콘크리트말뚝(8)이 되도록 시공 설치함을 특징으로 하는 연약지반의 개량을 위한 망포자루형 섬유콘크리트 말뚝의 복합지반조성 시공법.Inside the steel pipe (2), the weight body (10) is built into the inside of the mesh cloth (4) in which a roll is wound in the form, bundles the ends, and is inserted into the length depth of the steel pipe (2), and the vertical hole (1a) In the state of being inserted into the end of the end of the line and hanged longer than the upper end of the steel tube (2) cut the mesh bag 4, and then insert the concrete injection pipe (6) to the end of the mesh bag (4) The fiber concrete 6a mixed with cement concrete 5 and short fibers 7a or long fibers 8a at an appropriate ratio. After filling the fiber concrete (6a), the concrete inlet pipe (6) and the steel pipe (2) is sequentially taken out to the inside of the vertical hole (1a), the fiber concrete (6a) is surrounded by the mesh bag (4) Construction to be long-fiber concrete pile (8) including short-fiber concrete pile (7) in the state Mangpo bladder-like composite ground construction method the composition of the fiber reinforced concrete piles for the improvement of soft ground, characterized in that the. 연약지반(1)의 지중으로 수직홀(1a)을 뚫어 시공하는 통상의 것에 있어서,In the ordinary thing which drills the vertical hole 1a in the ground of the soft ground 1, 수직홀(1a)의 내부에 길이 깊이로 늘어뜨려지도록 설치하는 두루말이형 망포자루(4)의 내부에 단섬유(7a)를 적정비율로 혼합한 섬유콘크리트(6a)를 충진함으로서 상기 섬유콘크리트(6a)가 수직홀(1a)의 내부에서 망포자루(4)에 둘러씌워진 구조로 응결되어 망포자루형 단섬유콘크리트말뚝(7)으로 형성되어 결합된 구성을 특징으로 한 연약지반의 개량을 위한 복합지반조성의 망포자루형 섬유콘크리트말뚝.The fiber concrete 6a is filled by filling the fiber concrete 6a in which the short fibers 7a are mixed at an appropriate ratio in the inside of the roll-shaped mesh cloth bag 4 installed so as to hang at a depth depth in the vertical hole 1a. ) Is condensed in a structure surrounded by the mesh cloth (4) in the interior of the vertical hole (1a) and formed into a mesh cloth type short fiber concrete pile (7), the composite ground for the improvement of the soft ground characterized by Manoposa type fiber concrete pile of composition. 제 2 항에 있어서,The method of claim 2, 망포자루(4)의 내부에 충진하는 섬유콘크리트(6a)는 장섬유(8a)를 적정비율로 혼합하여 충진함으로서 수직홀(1a)의 내부에서 망포자루형 장섬유콘크리트 말뚝(8)으로 형성되어 결합된 구성을 특징으로 한 연약지반의 개량을 위한 복합지반조성의 망포자루형 섬유콘크리트말뚝.The fiber concrete 6a filling the inside of the mesh bag 4 is formed as a mesh cloth type long fiber concrete pile 8 inside the vertical hole 1a by filling and filling the long fibers 8a at an appropriate ratio. Multi-layered composite mesh cloth fiber concrete pile for the improvement of soft ground characterized by combined construction.
KR1020010016036A 2001-03-27 2001-03-27 Net bag type fiber-concrete pile and construction method thereof KR20010044812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010016036A KR20010044812A (en) 2001-03-27 2001-03-27 Net bag type fiber-concrete pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010016036A KR20010044812A (en) 2001-03-27 2001-03-27 Net bag type fiber-concrete pile and construction method thereof

Publications (1)

Publication Number Publication Date
KR20010044812A true KR20010044812A (en) 2001-06-05

Family

ID=19707496

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010016036A KR20010044812A (en) 2001-03-27 2001-03-27 Net bag type fiber-concrete pile and construction method thereof

Country Status (1)

Country Link
KR (1) KR20010044812A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010079268A (en) * 2001-06-28 2001-08-22 임철웅 Fiber-concrete pile and construction method by using it
KR20010079163A (en) * 2001-06-19 2001-08-22 임철웅 Construction method of a composite ground using controlled modulus columns for the improvement of compressible soils
KR20030048922A (en) * 2001-12-13 2003-06-25 (주)상지메나드 Sand pile structure and construction method thereof
CN106968633A (en) * 2017-03-31 2017-07-21 中国矿业大学 A kind of mash gas pumping drilling hole sealing device and method for sealing
KR101871306B1 (en) * 2017-11-22 2018-06-26 주식회사 에이치비씨 Large diameter waterjet ground drilling machine and pile construction method using it

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3859798A (en) * 1973-05-22 1975-01-14 Chiyoda Chem Eng Construct Co Method of constructing a flexible sand in the soft ground
JPS6319324A (en) * 1986-07-11 1988-01-27 Asahi Chem Ind Co Ltd Cloth cylindrical body for packing hydraulic slurry and formation of pile therewith
JPS6433315A (en) * 1987-07-30 1989-02-03 Asahi Chemical Ind Formation of hardened column using cloth cylinder under ground
JPH01295912A (en) * 1987-11-16 1989-11-29 Asahi Chem Ind Co Ltd Cylindrical bag body, columnar hardened body using it, and its underground creating method
JPH02272113A (en) * 1989-04-12 1990-11-06 Sumitomo Cement Co Ltd Method of creating concrete pile body
JPH03166418A (en) * 1989-11-22 1991-07-18 Shimizu Corp Reinforcing member for field placing concrete pile
JPH05272134A (en) * 1992-03-24 1993-10-19 Ask Kenkyusho:Kk Cast-in-place concrete pile and formation thereof
US5593623A (en) * 1992-10-09 1997-01-14 Mohss; Anders Casting mould
JPH1025737A (en) * 1996-05-08 1998-01-27 Kajima Corp Method of cast-in-place pile construction just under existing foundation
JPH1150662A (en) * 1997-08-01 1999-02-23 Ohbayashi Corp Method for casting concrete in which long fiber is mixed
JP2000144726A (en) * 1998-11-05 2000-05-26 Taisei Corp Cast-in-place pile, underground wall and their constructing method
KR20010007973A (en) * 2000-10-31 2001-02-05 임철웅 Net bag type pile construction method of weak ground

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3859798A (en) * 1973-05-22 1975-01-14 Chiyoda Chem Eng Construct Co Method of constructing a flexible sand in the soft ground
JPS6319324A (en) * 1986-07-11 1988-01-27 Asahi Chem Ind Co Ltd Cloth cylindrical body for packing hydraulic slurry and formation of pile therewith
JPS6433315A (en) * 1987-07-30 1989-02-03 Asahi Chemical Ind Formation of hardened column using cloth cylinder under ground
JPH01295912A (en) * 1987-11-16 1989-11-29 Asahi Chem Ind Co Ltd Cylindrical bag body, columnar hardened body using it, and its underground creating method
JPH02272113A (en) * 1989-04-12 1990-11-06 Sumitomo Cement Co Ltd Method of creating concrete pile body
JPH03166418A (en) * 1989-11-22 1991-07-18 Shimizu Corp Reinforcing member for field placing concrete pile
JPH05272134A (en) * 1992-03-24 1993-10-19 Ask Kenkyusho:Kk Cast-in-place concrete pile and formation thereof
US5593623A (en) * 1992-10-09 1997-01-14 Mohss; Anders Casting mould
JPH1025737A (en) * 1996-05-08 1998-01-27 Kajima Corp Method of cast-in-place pile construction just under existing foundation
JPH1150662A (en) * 1997-08-01 1999-02-23 Ohbayashi Corp Method for casting concrete in which long fiber is mixed
JP2000144726A (en) * 1998-11-05 2000-05-26 Taisei Corp Cast-in-place pile, underground wall and their constructing method
KR20010007973A (en) * 2000-10-31 2001-02-05 임철웅 Net bag type pile construction method of weak ground

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010079163A (en) * 2001-06-19 2001-08-22 임철웅 Construction method of a composite ground using controlled modulus columns for the improvement of compressible soils
KR20010079268A (en) * 2001-06-28 2001-08-22 임철웅 Fiber-concrete pile and construction method by using it
KR20030048922A (en) * 2001-12-13 2003-06-25 (주)상지메나드 Sand pile structure and construction method thereof
CN106968633A (en) * 2017-03-31 2017-07-21 中国矿业大学 A kind of mash gas pumping drilling hole sealing device and method for sealing
CN106968633B (en) * 2017-03-31 2019-06-21 中国矿业大学 Gas extraction drilling and hole sealing device and hole sealing method
KR101871306B1 (en) * 2017-11-22 2018-06-26 주식회사 에이치비씨 Large diameter waterjet ground drilling machine and pile construction method using it

Similar Documents

Publication Publication Date Title
WO2020175844A1 (en) Construction method for underwater concrete block structure
KR20090093556A (en) Panel , Wall Structure with panels and Construction Method using the Same
KR100553478B1 (en) The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
KR100557010B1 (en) Earth anchor including a duplex grouting pipe and the earth anchor construction method using the same
KR102173079B1 (en) Composite phc pile for soil retaining wall
JP2007211408A (en) Seismic strengthening construction method for existing concrete bridge pier
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR20010044812A (en) Net bag type fiber-concrete pile and construction method thereof
JPH02232416A (en) Foundation pile structure
KR102247848B1 (en) Cast-in-place pile using Pressurized grouting and construction method
JP3385876B2 (en) Cast-in-place pile construction method just below the existing foundation
KR20050110996A (en) Reinforced geotextile mat and reinforcement of earth slopes and embankments using the same
JP3481508B2 (en) Stone masonry retaining wall reinforcement method
JP2651893B2 (en) Foundation pile structure
KR100711054B1 (en) A construction method of concrete retaining wall using anchor
RU2333318C1 (en) Method for reinforcing basement soil
KR100451429B1 (en) Combination system of block type reinforced retaining wall used waste concrete and waste limestone and constructing method thereof
KR101020217B1 (en) rock construction structure of using anchor and method thereof
KR20010007973A (en) Net bag type pile construction method of weak ground
KR200325653Y1 (en) Earth anchor including a duplex grouting pipe
KR20000041500A (en) Method of reinforcing earth using waste tire
JP3851581B2 (en) Ground strength reinforcement structure of the ground
CN220768043U (en) Stirring pile pressure type prestress steel strand anti-floating anchor rod
CN113463682B (en) Corrugated plate retaining wall structure and construction method thereof
JPH05132930A (en) Developing method of foundation pile with drain layer

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application