JPH02144475A - Method of mounting panel body and lifting guide jig - Google Patents

Method of mounting panel body and lifting guide jig

Info

Publication number
JPH02144475A
JPH02144475A JP63298052A JP29805288A JPH02144475A JP H02144475 A JPH02144475 A JP H02144475A JP 63298052 A JP63298052 A JP 63298052A JP 29805288 A JP29805288 A JP 29805288A JP H02144475 A JPH02144475 A JP H02144475A
Authority
JP
Japan
Prior art keywords
panel body
panel
guide jig
building
lifting guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP63298052A
Other languages
Japanese (ja)
Other versions
JPH0643755B2 (en
Inventor
Isamu Matsubara
勇 松原
Yoshihisa Sugitani
杉谷 由久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YKK Corp
Original Assignee
YKK Corp
Yoshida Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YKK Corp, Yoshida Kogyo KK filed Critical YKK Corp
Priority to JP63298052A priority Critical patent/JPH0643755B2/en
Priority to GB8926349A priority patent/GB2227005B/en
Priority to AU45644/89A priority patent/AU629874B2/en
Priority to BR898906219A priority patent/BR8906219A/en
Publication of JPH02144475A publication Critical patent/JPH02144475A/en
Priority to US07/774,726 priority patent/US5181825A/en
Publication of JPH0643755B2 publication Critical patent/JPH0643755B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/16Slings with load-engaging platforms or frameworks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Finishing Walls (AREA)

Abstract

PURPOSE:To simplify mounting work by mounting interlocking metal fittings respectively to the external wall of a construction and the rear of a panel body and, at the same time, lifting the panel body by a lifting guide jig rising and falling along a joint of an existing panel. CONSTITUTION:An upper horizontal lever and a lower horizontal lever are mounted to the external wall A of a building in correspondence with a panel body B. Hooks interlocking with the horizontal levers mounted to the external wall A are provided to the rear of the panel body B. The panel body B is lifted by a lifting guide jig 40 provided with a roller 53 rotating along a joint 29 of an existing panel having a panel body bearing 45. According to the constitution, the panel body B can be lifted without making transverse oscillation.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、パネル体を建物外壁に取付ける方法及びパネ
ル体を建物外壁に沿って吊り上げる際に用いる揚重ガイ
ド治具に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a method for attaching a panel body to an exterior wall of a building, and a lifting guide jig used when hoisting a panel body along the exterior wall of a building.

〔従来の技術〕[Conventional technology]

建物外壁が名目化して外観が見苦しくなった場合には、
その建物外壁にパネル体を新らたに取付けて外観を−新
し見栄えを良くしている。
When the exterior walls of a building become nominal and the exterior becomes unsightly,
New panels were installed on the exterior walls of the building to give it a new and better appearance.

このように、名目化した建物外壁にパネル体を新らたに
取付けるには、建物外壁に沿って足場を組み、その足場
に作業者が乗ってパネル体を建物外壁に取付けることが
一般的に行なわれている。
In this way, in order to newly attach a panel body to the nominal building exterior wall, it is generally necessary to set up scaffolding along the building exterior wall, and then a worker stands on the scaffolding and attaches the panel body to the building exterior wall. It is being done.

他方、ユニットカーテンウオールを構成するカーテンウ
オールユニットを建物躯体に取付ける方法としては、例
えば特開昭60−30743号公報に示す取付方法が知
られている。
On the other hand, as a method for attaching a curtain wall unit constituting a unit curtain wall to a building frame, for example, an attachment method disclosed in Japanese Patent Application Laid-Open No. 60-30743 is known.

すなわち、カーテンウオールユニットの縦部材にガイド
レールを形成し、建物躯体に取付けた既設カーテンウオ
ールユニットのガイドレールに沿ってガイド治具を昇降
自在とすると共に、このガイド治具にこれから取付ける
新設カーテンウオールユニットを連結し、新設カーテン
ウオールユニットをガイド治具を介して既設カーテンウ
オールユニットのガイドレールに沿フて上方に移動させ
て建物躯体に取付けるようにした取付方法である。
In other words, a guide rail is formed on the vertical member of the curtain wall unit, and a guide jig can be moved up and down along the guide rail of the existing curtain wall unit attached to the building frame. This is an installation method in which the units are connected and the newly installed curtain wall unit is moved upward along the guide rail of the existing curtain wall unit via a guide jig and then attached to the building frame.

〔発明が解決しようとする3題〕 足場を利用してパネル体を取付ける方法であると、足場
を組まなければならず、その作業が大変面倒であるばか
りか、作業者が足場から落下することもあって大変危険
である。
[Three problems to be solved by the invention] If the panel body is attached using scaffolding, the scaffolding must be erected, which is not only very troublesome, but also may cause the worker to fall from the scaffolding. It is also very dangerous.

他方、カーテンウオールユニットを建物躯体に取付ける
方法を利用してパネル体を建物外壁に取付ける場合には
、パネル体にガイドレールを形成せねばならず、パネル
体が特殊形状に限定されて平板状のパネル体を取付けで
きないばかりか、パネル体にガイドレールがあるために
外観が見栄え悪くなってしまう。
On the other hand, when attaching a panel body to the exterior wall of a building using the method of attaching a curtain wall unit to a building frame, a guide rail must be formed on the panel body, and the panel body is limited to a special shape and is not flat. Not only is it impossible to attach the panel body, but the appearance of the panel body becomes unsightly due to the presence of guide rails on the panel body.

そこで、本発明は前述の課題を解決できるようにしたパ
ネル体の取付方法及び揚重ガイド治具を提供することを
目的とする。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a method for mounting a panel body and a lifting guide jig that can solve the above-mentioned problems.

〔課題を解決するための手段及び作用〕隣接する既設の
パネル体間に形成される目地用空間に沿って昇降する揚
重ガイド治具によりパネル体を吊り上げるようにしたパ
ネル体の取付方法であり、これによってパネル体を特殊
形状とせずにパネル体を吊り上げできる。
[Means and effects for solving the problem] A method for installing a panel body in which the panel body is lifted by a lifting guide jig that moves up and down along the joint space formed between adjacent existing panel bodies. , This allows the panel body to be lifted without having to make the panel body into a special shape.

〔実 施 例〕〔Example〕

第2図に示すように、建物外9Aにはパネル体Bが上下
方向及び左右方向に間隔tを置いて連続して取付けであ
る。
As shown in FIG. 2, panel bodies B are continuously attached to the outside of the building 9A at intervals t in the vertical and horizontal directions.

すなわち、パネル体Bの背面上部両側に左右一対の上部
フック1,1が取着され、背面下部両側に左右一対の下
部フック2.2が取着されていると共に、建物外壁Aに
は取付用縦材3が左右のファスナー4.4を介して左右
に隣接するパネル体B、B間に跨って位置するように取
付けられ、この取付用縦材3には前記上部フック1と対
向する上部積杆5と下部フック2と対向する下部横杆6
がそれぞれ設けてあり、この上部横杆5に上部フック1
が係合し、下部横杆6に下部フプク2が係合してパネル
体Bを建物外!2Aに取付けている。
That is, a pair of left and right upper hooks 1, 1 are attached to both sides of the upper back of the panel body B, and a pair of left and right lower hooks 2.2 are attached to both sides of the lower back of the panel body B. The vertical member 3 is installed via left and right fasteners 4.4 so as to span between the left and right adjacent panel bodies B, and this installation vertical member 3 has an upper section facing the upper hook 1. A lower horizontal rod 6 facing the rod 5 and the lower hook 2
are provided respectively, and an upper hook 1 is attached to this upper horizontal rod 5.
engages, and the lower part 2 engages with the lower horizontal bar 6, moving the panel body B out of the building! It is installed at 2A.

次に各部の詳細を説明する。Next, details of each part will be explained.

前記パネル体Bはアルミ板等の板材10の左右両側を9
0度折曲して折曲片11を形成すると共に、その折曲片
11に左右一対のエツジ材12を取着してあり、このエ
ツジ材12は四条溝13を形成する本体14の一側に鉤
形の取付片15を一体形成し、かつ本体14の他側に鉤
形の支持片16を一体形成しであると共に、その本体1
4の底部に形成した孔17より、折曲片11の背面に固
着したスタッドボルト18を挿通し、ナツト19を螺合
してエツジ材12を折曲片11に取61.てある。
The panel body B has a plate material 10 such as an aluminum plate with both left and right sides 9
A bent piece 11 is formed by bending 0 degrees, and a pair of left and right edge members 12 are attached to the bent piece 11, and this edge member 12 is attached to one side of the main body 14 forming the four-striped groove 13. A hook-shaped mounting piece 15 is integrally formed on the main body 14, and a hook-shaped support piece 16 is integrally formed on the other side of the main body 14.
The stud bolt 18 fixed to the back surface of the bent piece 11 is inserted through the hole 17 formed at the bottom of the bent piece 11, and the nut 19 is screwed to attach the edge material 12 to the bent piece 11. There is.

前記上部フック1、下部フック2は下向凹部1a、2a
をHする板状となり、前記エツジ材12の本体14に、
凹条溝13に嵌挿したボルト20とナツト21で連結さ
れ、前記取付用縦材3は基板22と両側板23.23で
横断面コテ状となり、その両側片23に側方に開口した
凹陥溝24が上下方向に亘って形成されていると共に、
コーナ一部に略円形の縦孔25が形成され、建物外壁A
に固着したファスナー4の一側片4aに、凹陥溝24に
嵌合したボルト26とナツト27で連結しである。なお
、ファスナー4の一側片4aには前記ボルト26が挿通
する切欠溝28が室外側に開口17て形成され、ボルト
26を凹陥溝24内に上下方向よりスライドして取付け
た後に取イ4用シ材3を左右一対のファスナー4,4間
に跨って取付けできるようにしである。
The upper hook 1 and lower hook 2 have downward recesses 1a and 2a.
It becomes a plate shape with H, and the main body 14 of the edge material 12 has
The mounting vertical member 3 is connected by a bolt 20 and a nut 21 inserted into the groove 13, and has a trowel-shaped cross section with the base plate 22 and both side plates 23 and 23, and has a recess opened laterally in each side piece 23. A groove 24 is formed extending vertically, and
A substantially circular vertical hole 25 is formed in a part of the corner of the building outer wall A.
A bolt 26 and a nut 27 fitted in the recessed groove 24 are connected to one side piece 4a of the fastener 4 fixed to the holder. Note that a cutout groove 28 through which the bolt 26 is inserted is formed in one side piece 4a of the fastener 4 with an opening 17 on the outdoor side. The material 3 can be attached across a pair of left and right fasteners 4, 4.

前記」二部横杆5と下部横杆6は取付用縦材3の両側板
23.23に形成;、た凹陥溝24.24間に跨って横
架連結されている。
The two-part horizontal rod 5 and the lower horizontal rod 6 are formed on both side plates 23, 23 of the mounting vertical member 3;

そして、隣接するパネル体B、Bの折曲片11゜11は
間隙t8置いて相対向して、両者間に目地空間29を形
成していると共に、この目地空間29に目地用ガスケッ
ト30が嵌着しである。
The bent pieces 11° 11 of the adjacent panel bodies B, B face each other with a gap t8, forming a joint space 29 between them, and a joint gasket 30 is fitted into this joint space 29. It's a dress.

該目地用ガスケット30は複数の中空部31を有すると
共に、両側面には舌片32が一体形成され、室内側には
一対の係合突片33,33が一体形成してあり、その一
対の係合突片33゜33が前記エツジ材12の支持片1
6に係合するようにしである。
The joint gasket 30 has a plurality of hollow parts 31, tongue pieces 32 are integrally formed on both sides, and a pair of engaging protrusions 33, 33 are integrally formed on the indoor side. The engaging protrusion 33° 33 is the support piece 1 of the edge material 12.
6.

なお、第2図に示すように、上下・左右に隣接するパネ
ル体Bのクロス部において、縦方向、横方向の目地用ガ
スケット30は十文字状のクロス部目地用ガスケット3
4で連結しである。
As shown in FIG. 2, in the vertically and horizontally adjacent cross portions of the panel body B, the vertical and horizontal joint gaskets 30 are cross-shaped cross portion joint gaskets 3.
It is connected by 4.

次にパネル体の取付方法を工程順に説明する。Next, the method for attaching the panel body will be explained step by step.

第1、図(a)に示すように、建物外壁Aに左右一対の
ファスナー4を、所定の間隔を置いて上下方向にパネル
体Bの上下長さに応じた位置となるように作業者Cがゴ
ンドラDに乗って取付ける。
First, as shown in Figure (a), the worker C attaches a pair of left and right fasteners 4 to the outer wall A of the building at predetermined intervals in the vertical direction so that the positions correspond to the vertical length of the panel body B. will ride on Gondola D and install it.

なお、ゴンドラDは建物屋上Eに左右走行自在に設けた
ゴンドラ用ls8重機Fで昇降される。
The gondola D is raised and lowered by a gondola heavy machinery F installed on the roof E of the building so that it can run left and right.

第1図(b)に示すように、左右一対のファスナー4.
4間に取付用縦材3を前記ゴンドラDに乗った作業員C
により取付ける。
As shown in FIG. 1(b), a pair of left and right fasteners 4.
Worker C riding on the gondola D attaching the vertical member 3 for installation between 4 and 4.
Attach by.

なお、取付用縦材3は所定長さとなり、上下に隣接する
取付用縦材3,3は縦孔25間に亘つて連結用ビンを嵌
合して連結すると共に、取付用縦材3には上部横杆5、
下部横杆6が予じめ取付けである。
In addition, the vertical member 3 for mounting has a predetermined length, and the vertical members 3, 3 for mounting that are adjacent to each other vertically are connected by fitting a connecting bottle between the vertical holes 25, and the vertical member 3 for mounting is the upper horizontal rod 5,
The lower horizontal rod 6 is attached in advance.

このように、パネル体Bを支持する上部横杆5、下部横
杆6を建物外壁Aに直接取付けずに、ファスナー4を介
して建物外壁Aに取付けた取付用縦材3に取付けるので
、建物外壁Aに凹凸があっても上部、下部横杆5,6を
所定位置に正しく位置決めして取付けできる。
In this way, the upper horizontal beam 5 and the lower horizontal beam 6 that support the panel body B are not directly attached to the building outer wall A, but are attached to the mounting vertical members 3 attached to the building outer wall A via the fasteners 4. Even if the outer wall A has irregularities, the upper and lower cross bars 5 and 6 can be correctly positioned and installed at predetermined positions.

第3図、第4図に示すように上部フック1と下部フック
2を取付けたパネル体りを、第1図(c)に示すように
揚重ガイド治具40に保持し、その揚重ガイド治具40
を建物外壁Aに取付けである既設のパネル体B間の目地
用空間29をガイドとして吊り上げてパネル体Bを上方
に吊り上げる。
The panel body to which the upper hook 1 and lower hook 2 are attached as shown in FIGS. 3 and 4 is held in a lifting guide jig 40 as shown in FIG. 1(c), and the lifting guide Jig 40
is lifted up using the joint space 29 between the existing panel bodies B attached to the building outer wall A as a guide, and the panel body B is lifted upward.

前記揚重ガイド治具40は第5図に示すように、本体部
40aと左右一対のガイド部40b。
As shown in FIG. 5, the lifting guide jig 40 includes a main body portion 40a and a pair of left and right guide portions 40b.

40bより成り、本体部40aは左右の縦材41゜41
間に中間部横材42と下部横材43を横架連結すると共
に、支持横材44を中間部横材42と対向して設け、こ
の支持横材44と中間部横材42とでパネル体支持部4
5を形成すると共に、中間部横材42を支持している左
右の突出片46にブラケット47をそれぞれ設け、この
各ブラケット47に左右の押え材48を左右回動自在に
取付(jると共に、縦杆41の上部に出没自在に設けた
ロックビン49を押え材48のロック孔50に嵌合する
ことで押え材48をパネル体Bの左右側面B1に押しつ
けられる垂直な押え姿勢に保持できるようにし、そのロ
ックビン49を図示しないバネで突出付勢してロック孔
50に嵌合するように構成して本体部40aとなり、前
記左右のガイド部40bは縦材41の下部に固着した縦
板51に取付柱52を設け、この取付柱52に揚重ロー
ラ53とパイロットローラ54を設けであると共に、そ
の揚重ローラ53は第6図のように取付柱52の左右上
下にそれぞれ設けられ、その支軸53aは縦材41と直
交する水平で、その外周面にはゴム材が設けられてゴム
ローラとなり、前記パイロットローラ54は取付柱52
の後面上部、中間部、下部に後方に向けてそれぞれ取付
1jられ、その支軸54aは水平となっていると共に、
そのパイロットローラ54は前記目地用空間29内に臨
む外径で、外周面にはゴム材が設けられてゴムローラと
なり、かつ中間部のパイロットローラ54の外径に比べ
て上部、下部のパイロットローラ54の外径が若干小径
となって目地用空間29内に上下方向より挿入し易くな
っている。
40b, and the main body part 40a has left and right vertical members 41°41
The intermediate cross member 42 and the lower cross member 43 are horizontally connected between them, and a support cross member 44 is provided facing the intermediate cross member 42, and the support cross member 44 and the intermediate cross member 42 form a panel body. Support part 4
5, and brackets 47 are provided on the left and right protruding pieces 46 supporting the intermediate cross member 42, and left and right presser members 48 are attached to each bracket 47 so as to be rotatable left and right. By fitting the lock bin 49 provided on the upper part of the vertical rod 41 so as to be freely retractable into the lock hole 50 of the holding member 48, the holding member 48 can be held in a vertical holding position in which it is pressed against the left and right side surfaces B1 of the panel body B. The lock pin 49 is biased to protrude by a spring (not shown) and fitted into the lock hole 50 to form the main body part 40a, and the left and right guide parts 40b are attached to a vertical plate 51 fixed to the lower part of the vertical member 41. A mounting post 52 is provided, and a lifting roller 53 and a pilot roller 54 are provided on this mounting post 52.As shown in FIG. The shaft 53a is horizontal and perpendicular to the vertical member 41, and a rubber material is provided on its outer peripheral surface to form a rubber roller.The pilot roller 54 is attached to the mounting column 52.
They are attached to the upper, middle, and lower parts of the rear surface facing rearward, and their supporting shafts 54a are horizontal, and
The pilot roller 54 has an outer diameter facing into the joint space 29, and a rubber material is provided on the outer circumferential surface to serve as a rubber roller, and the pilot roller 54 at the upper and lower portions is compared to the outer diameter of the pilot roller 54 at the intermediate portion. has a slightly smaller outer diameter, making it easier to insert into the joint space 29 from above and below.

そして、パネル体Bの上部フック1.1がチェーン55
及びレバーチェーンブロック56を介して吊天秤57に
連結されていると共に、吊天秤57の左右と左右縦材4
1.44上部が揚重ガイド吊ロープ58で連結され、吊
天秤57が揚重ガイド治具用揚重機Gで昇降されるよう
にしであると共に、吊天秤57には一対のガイドローラ
59.59が設けである。
Then, the upper hook 1.1 of the panel body B is attached to the chain 55.
It is connected to the hanging balance 57 via the lever chain block 56, and the left and right sides of the hanging balance 57 and the left and right vertical members 4
1.44 The upper part is connected with a lifting guide hanging rope 58, and the hanging balance 57 is raised and lowered by a lifting machine G for lifting guide jig, and the hanging balance 57 is equipped with a pair of guide rollers 59.59. is the provision.

このようであるから、左右のロックピン49をロック孔
50より抜き出して左右の押え材48を側方に回動させ
、この状態でパネル体Bを中間部横杆42上に載置して
支持横杆44に当接し、左右の押え材48をパネル体B
の側面B。
Since this is the case, the left and right lock pins 49 are pulled out from the lock holes 50, the left and right pressers 48 are rotated laterally, and in this state, the panel body B is placed on the intermediate horizontal beam 42 and supported. Abuts against the horizontal rod 44, and presses the left and right presser members 48 against the panel body B.
Aspect B.

に押しつけてロックビン49をロック孔50に嵌合する
ことでパネル体Bを揚重ガイド治具40の本体部40a
に支持し、上部フック1を吊天秤57に連結し、パイロ
ットローラ54を目地用空間29内に挿入すると共に、
揚重ローラ53を既設のパネル体Bの表面に当接して揚
重ガイド治具40を、揚重ローラ53で室内外方向にガ
イドし、パイロットローラ54で左右方向にガイドして
左右に振れ動かないようにして吊り上げる。
By pressing the lock bin 49 into the lock hole 50, the panel body B is attached to the main body 40a of the lifting guide jig 40.
, connect the upper hook 1 to the hanging balance 57, insert the pilot roller 54 into the joint space 29,
The lifting roller 53 is brought into contact with the surface of the existing panel body B, the lifting roller 53 guides the lifting guide jig 40 indoors and outdoors, and the pilot roller 54 guides the lifting guide jig 40 in the left-right direction so that it swings left and right. Lift it up so that it is not bent.

そして、第1図(d)のようにパネル体Bが最上部の既
設のパネル体Bより上方位置まで吊り上げたら、そのパ
ネル体Bを揚重ガイド治具40より外して建物外壁A側
に引き寄せて第1図(e)のように上部フック1、下部
フック2を上部横杆5、下部横杆6に当接する。
Then, as shown in Fig. 1(d), when the panel body B is lifted to a position above the existing panel body B at the top, the panel body B is removed from the lifting guide jig 40 and pulled toward the outside wall A of the building. Then, as shown in FIG. 1(e), the upper hook 1 and the lower hook 2 are brought into contact with the upper horizontal rod 5 and the lower horizontal rod 6.

この状態でレバーチェーンブロック56によってチェー
ン55を繰り出してパネル体Bを下降させ、第1図(f
)のように上部フック1の下向凹部1aを上部横杆5に
嵌合すると共に、下部フック2の下向凹部2aを下部横
杆6に嵌合してパネル体Bを建物外壁Aに取付ける。
In this state, the chain 55 is let out by the lever chain block 56 to lower the panel body B, and as shown in FIG.
), the downward recess 1a of the upper hook 1 is fitted into the upper horizontal beam 5, and the downward recess 2a of the lower hook 2 is fitted into the lower horizontal rod 6 to attach the panel body B to the building outer wall A. .

以上の様に揚重ガイド治具40を既設のパネル体Bに沿
って吊り上げる際に、第7図のように揚重ローラ53、
パイロットローラ54がパネル体Bの表面に沿って転勤
するので、各ローラによってパネル体Bの表面を汚す恐
れがあるから、合成樹脂又はアルミ板によって鉤形に折
曲した養生シート60を板材10と折曲片11とに亘っ
て予じめ取付け、この養生シート60でパネル体B表面
の汚れを防止し、全てのパネル体Bを建物外壁Aに取付
は完了後に養生シート60を取り外して隣接するパネル
体B、B間の目地用空間29に目地用ガスケット30を
装着する。
When lifting the lifting guide jig 40 along the existing panel body B as described above, as shown in FIG.
Since the pilot rollers 54 move along the surface of the panel body B, there is a risk that the surface of the panel body B may be contaminated by each roller. The curing sheet 60 is installed in advance across the folded piece 11 to prevent the surface of the panel body B from getting dirty, and after the installation of all panel bodies B to the building exterior wall A is completed, the curing sheet 60 is removed and the adjacent panel body B is installed. A joint gasket 30 is attached to the joint space 29 between the panel bodies B and B.

第8図に示すように、一方のエツジ材12にのみ支持片
16を一体形成すると共に、その支持片16の係合突出
片16aを目地用空間29の左右方向中央に位置させ、
目地用ガスケット30の先端部に係合溝30aを形成し
て、その係合F30aを係合突出片16aに嵌合させて
目地用ガスケット30を装着しても良いし、第9図のよ
うに他方のエツジ材12の支持片16に凹溝16bを形
成すると共に、この凹溝16bにガスケット61を設け
、一方のエツジ材12の支持片16をガスケット61に
圧着して隣接するパネル体B、B間を目地用ガスケット
30と前記ガスケット61とで二重シールするようにし
ても良い。
As shown in FIG. 8, the support piece 16 is integrally formed only on one edge material 12, and the engaging protrusion piece 16a of the support piece 16 is positioned at the center of the joint space 29 in the left-right direction,
The joint gasket 30 may be attached by forming an engagement groove 30a at the tip of the joint gasket 30 and fitting the engagement groove F30a into the engagement protrusion 16a, or as shown in FIG. A concave groove 16b is formed in the support piece 16 of the other edge material 12, and a gasket 61 is provided in the concave groove 16b, and the support piece 16 of one edge material 12 is crimped to the gasket 61, so that the adjacent panel body B, The space between B may be double-sealed using the joint gasket 30 and the gasket 61.

また、第10図に示すように、パネル体Bの板材10の
端部10aをエツジ材12より側方に突出させると共に
、パイロットローラ54を小径部54bを有する形状と
し、その小径部54bを板材10の端部10aに当接し
て室内・外側方向に動かないように規制しても良い。
Further, as shown in FIG. 10, the end portion 10a of the plate material 10 of the panel body B is made to protrude laterally from the edge material 12, and the pilot roller 54 is shaped to have a small diameter portion 54b. It is also possible to restrict movement in the indoor/outward direction by coming into contact with the end portion 10a of 10.

〔発明の効果〕〔Effect of the invention〕

(1)既設のパネル体B間に形成した目地用空間29を
利用してパネル体Bを吊り上げるので、パネル体Bを特
殊形状とする必要がないと共に、表面を平坦面として外
観を見栄え良くできる。
(1) Since the joint spaces 29 formed between the existing panel bodies B are used to lift the panel bodies B, there is no need for the panel bodies B to have a special shape, and the surface can be made flat for a good appearance. .

また、パネル体Bに設けた上部フック1、下部フック2
を建物外壁Aに取付けた上部横杆5、下部横杆6に係合
してパネル体Bを建物外壁Aに取付けるので、パネル体
Bを簡単に建物外壁Aに取付けできる。
In addition, upper hook 1 and lower hook 2 provided on panel body B
Since the panel body B is attached to the building exterior wall A by engaging with the upper horizontal beam 5 and the lower horizontal beam 6 attached to the building exterior wall A, the panel body B can be easily attached to the building exterior wall A.

(2)目地用空間29内に臨むパイロットローラ54を
備えた左右一対のガイド部40b、40bをHするから
、パネル体を横振れせずに吊り上げできる。
(2) Since the pair of left and right guide portions 40b, 40b equipped with the pilot roller 54 facing into the joint space 29 are H, the panel body can be lifted without lateral wobbling.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図(a)〜Ct>は本発明の取付方法の一例を工程
順に示す説明図、第2図はパネル体取付状態の正面図、
第3図、第4図は第2図の■−■線、IV−rV線断面
図、第5図は揚重ガイド治具の斜視図、第6図はガイド
部の斜視図、第7図は揚重ガイド治具の吊り上げ状態の
横断面図、第8図、第9図は目地用ガスケットの他の装
着例を示す横断面図、第10図はパイロットローラの変
形例を示す横断面図である。 Aは建物外壁、Bはパネル体、1は上部フック、2は下
部フック、5は上部横杆、6は下部横杆、29は目地用
空間、40は揚重ガイド治具、53は揚重ローラ、54
はパイロットローラ。
FIGS. 1(a) to Ct> are explanatory diagrams showing an example of the mounting method of the present invention in the order of steps, FIG. 2 is a front view of the panel body attached,
Figures 3 and 4 are cross-sectional views taken along lines ■-■ and IV-rV in Figure 2, Figure 5 is a perspective view of the lifting guide jig, Figure 6 is a perspective view of the guide section, and Figure 7. is a cross-sectional view of the lifting guide jig in a lifted state; FIGS. 8 and 9 are cross-sectional views showing other examples of fitting the joint gasket; and FIG. 10 is a cross-sectional view showing a modified example of the pilot roller. It is. A is the outer wall of the building, B is the panel body, 1 is the upper hook, 2 is the lower hook, 5 is the upper cross beam, 6 is the lower cross beam, 29 is the joint space, 40 is the lifting guide jig, 53 is the lifting weight Laura, 54
is a pilot roller.

Claims (2)

【特許請求の範囲】[Claims] (1)建物外壁Aに上部横杆5と下部横杆6とを各パネ
ル体Bと対応してそれぞれ取付け、パネル体Bの背面に
上部横杆5と係合する上部フック1及び下部横杆6と係
合する下部フック2をそれぞれ取付けると共に、上部フ
ック1、下部フック2を上部横杆5、下部横杆6に係合
してパネル体Bを建物外壁Aに、下から順次上方に向け
て取付けるパネル体の取付方法であり、既設のパネル体
B間に形成された目地用空間29をガイドとして吊り上
げられる揚重ガイド治具40によってパネル体Bを上方
に吊り上げるようにしたことを特徴とするパネル体の取
付方法。
(1) Attach the upper horizontal beam 5 and the lower horizontal beam 6 to the outer wall A of the building in correspondence with each panel body B, and attach the upper hook 1 and the lower horizontal beam to the back of the panel body B to engage with the upper horizontal beam 5. 6, and engage the upper hook 1 and the lower hook 2 with the upper horizontal beam 5 and the lower horizontal beam 6, and direct the panel body B toward the outer wall A of the building sequentially upward from the bottom. This is a method for attaching a panel body to be mounted by using a lifting guide jig 40 that lifts the panel body B using the joint space 29 formed between the existing panel bodies B as a guide. How to install the panel body.
(2)パネル体支持部45を有する本体部40aに、パ
ネル体表面に沿って回転する揚重ローラ53と目地用空
間29内に臨むパイロットローラ54を備えた左右一対
のガイド部40b,40bを設けた揚重ガイド治具。
(2) A pair of left and right guide portions 40b, 40b each having a lifting roller 53 that rotates along the surface of the panel body and a pilot roller 54 facing into the joint space 29 are attached to the main body portion 40a having the panel body support portion 45. Lifting guide jig installed.
JP63298052A 1988-11-28 1988-11-28 Panel mounting method and lifting guide jig Expired - Lifetime JPH0643755B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP63298052A JPH0643755B2 (en) 1988-11-28 1988-11-28 Panel mounting method and lifting guide jig
GB8926349A GB2227005B (en) 1988-11-28 1989-11-22 Method and apparatus for lifting and guiding panel elements on building site
AU45644/89A AU629874B2 (en) 1988-11-28 1989-11-28 Method and apparatus for lifting and guiding panel elements on building site
BR898906219A BR8906219A (en) 1988-11-28 1989-11-28 METHOD AND APPARATUS FOR ICAR AND GUIDING PANEL ELEMENTS AT THE CONSTRUCTION SITE
US07/774,726 US5181825A (en) 1988-11-28 1991-10-07 Method for lifting and guiding elements on building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63298052A JPH0643755B2 (en) 1988-11-28 1988-11-28 Panel mounting method and lifting guide jig

Publications (2)

Publication Number Publication Date
JPH02144475A true JPH02144475A (en) 1990-06-04
JPH0643755B2 JPH0643755B2 (en) 1994-06-08

Family

ID=17854508

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63298052A Expired - Lifetime JPH0643755B2 (en) 1988-11-28 1988-11-28 Panel mounting method and lifting guide jig

Country Status (4)

Country Link
JP (1) JPH0643755B2 (en)
AU (1) AU629874B2 (en)
BR (1) BR8906219A (en)
GB (1) GB2227005B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101303148B1 (en) * 2012-04-12 2013-09-09 현대알루미늄(주) Construction method for curtain wall
CN106013819A (en) * 2016-07-19 2016-10-12 中建局集团建设发展有限公司 Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN108675116A (en) * 2018-07-24 2018-10-19 南京淮港建筑工程有限公司 The construction method of PC components

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4336142A1 (en) * 1993-10-22 1995-04-27 Pilz Technologie Gmbh Facade construction as well as work elevator and method for its assembly
FR2836680B1 (en) * 2002-03-01 2004-10-22 Pinguely Haulotte LIFT NACELLE AND METHOD FOR LAYING A PARTITION ELEMENT BY MEANS OF SUCH A NACELLE
CN110714554B (en) * 2019-10-21 2020-11-03 中大建设股份有限公司 Construction method for constructing inner partition wall by using light partition wall board
CN113445724B (en) * 2021-05-26 2023-01-24 奥新建设科技有限公司 Hanging basket device for building curtain wall construction
CN113389357B (en) * 2021-06-29 2022-05-10 山东中建八局投资建设有限公司 Parapet waterproof coating high-efficient round brush device for construction

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7512398U (en) * 1975-04-18 1976-02-12 I.C.B.N.V. Internationale Constructie Bedrijven, Heerlen (Niederlande) DEVICE FOR MOUNTING CURTAIN WALLS
JP2779099B2 (en) * 1992-07-16 1998-07-23 ハウス食品株式会社 Manufacturing method of retort food (2)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101303148B1 (en) * 2012-04-12 2013-09-09 현대알루미늄(주) Construction method for curtain wall
CN106013819A (en) * 2016-07-19 2016-10-12 中建局集团建设发展有限公司 Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN108675116A (en) * 2018-07-24 2018-10-19 南京淮港建筑工程有限公司 The construction method of PC components

Also Published As

Publication number Publication date
BR8906219A (en) 1990-06-26
GB2227005A (en) 1990-07-18
GB8926349D0 (en) 1990-01-10
JPH0643755B2 (en) 1994-06-08
AU4564489A (en) 1990-05-31
GB2227005B (en) 1993-01-06
AU629874B2 (en) 1992-10-15

Similar Documents

Publication Publication Date Title
US4665662A (en) Method and device for coating a frontage part, or building, with glass sheets
JPH02144475A (en) Method of mounting panel body and lifting guide jig
US5067300A (en) Method of attaching curtain wall units to a building skeleton framework
US5181825A (en) Method for lifting and guiding elements on building site
JP4834399B2 (en) Temporary suspension member for landing door device, landing door device using temporary suspension member, and landing door installation method
JP2010116756A (en) Curtain wall structure
WO2008077563A1 (en) Modular paneling system
JP2775620B2 (en) Curtain wall
JP2503750B2 (en) Elevator hall device
JPH0627705Y2 (en) Wall panel mounting structure
JP3029125U (en) Girder support device for building form panel
JPH0532577Y2 (en)
JPH0712541Y2 (en) Scaffolding equipment
JPH09156867A (en) Building-in jig for panel
JPH0421419Y2 (en)
JPH0540197Y2 (en)
JPH0721720Y2 (en) Jumping out hanger scaffolding
JPH05171867A (en) Window installation device for curtain wall
JPH0543127Y2 (en)
CN207003877U (en) A kind of indoor facade abnormity decorative aluminum plate mounting structure
JPH078697Y2 (en) Eaves girder makeup mounting structure
JPH0436347Y2 (en)
JPH0738511Y2 (en) Support fittings for roof panels and hut back wall panels
JPH0547214Y2 (en)
JPH04161662A (en) Hoisting transfer device for external wall material or the like