JPH0137529B2 - - Google Patents

Info

Publication number
JPH0137529B2
JPH0137529B2 JP27676684A JP27676684A JPH0137529B2 JP H0137529 B2 JPH0137529 B2 JP H0137529B2 JP 27676684 A JP27676684 A JP 27676684A JP 27676684 A JP27676684 A JP 27676684A JP H0137529 B2 JPH0137529 B2 JP H0137529B2
Authority
JP
Japan
Prior art keywords
concrete
curtain body
hollow ring
layer
cutting material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP27676684A
Other languages
Japanese (ja)
Other versions
JPS61155512A (en
Inventor
Eiji Matsui
Tadanori Date
Masaaki Kakurai
Junro Aida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP27676684A priority Critical patent/JPS61155512A/en
Publication of JPS61155512A publication Critical patent/JPS61155512A/en
Publication of JPH0137529B2 publication Critical patent/JPH0137529B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は場所打ち杭の負の摩擦力除去方法に
関する。
DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" This invention relates to a method for removing negative frictional force from cast-in-place piles.

「従来の技術」 埋立地等の軟弱地盤に構築される基礎杭には地
盤の圧密作用によつて地盤が沈下するのに伴なつ
て基礎杭を共に引き込もうとする負の摩擦力が作
用し建築物等の基礎に不測の沈下を生じ建築物等
に傾斜やひび割れ等を生じ、あるいは杭を破壊す
る原因となつている。
``Conventional technology'' Foundation piles constructed on soft ground such as reclaimed land are subject to a negative frictional force that tries to pull the foundation piles together as the ground sinks due to soil consolidation. It causes unexpected subsidence in the foundations of buildings, causing slopes and cracks in buildings, and causes the destruction of piles.

よつて、このような地盤沈下地帯では、基礎杭
と地層との間に何んらかの縁切り措置を施こすこ
とが必要であり、既製杭の場合では外套鋼管を付
けるか、杭にアスフアルト等の摩擦力切断材を塗
布しておいて打込むかされている。
Therefore, in such areas of ground subsidence, it is necessary to take some kind of edge cutting measures between the foundation piles and the strata. In the case of ready-made piles, it is necessary to attach a mantle steel pipe or cover the piles with asphalt, etc. A friction cutting material is applied and then hammered in.

しかし、場所打ち杭の場合には上述のように地
上で縁切り措置を施こすことは出来ないので、全
く相異なる手段がとられる。
However, in the case of cast-in-place piles, it is not possible to carry out edge cutting measures on the ground as described above, so a completely different method is taken.

例えば、特公昭58−58495号にあつては第2図
に示される如く、アスフアルト11等を付着した
複数の板12を鉄筋かご13の外周にワイヤ14
で取付けて掘削孔15に建込み、打設したコンク
リートの圧力によつて複数の板12を掘削孔15
の壁面に押しつけるようにしてコンクリート杭を
形成するとし、特願昭59−102736号にあつては、
コンクリート杭の施工手順および地盤沈下状態を
示す説明図の第3図a〜d並びに潤滑材を塗布し
た鋼管を嵌入したコンクリート杭の拡大切断平面
図である第4図に示される如く、地盤1中にコン
クリート杭2を打設しコンクリートが固結した
後、コンクリート杭2より大径で外周壁4に潤滑
材5を付着させた鋼管3を打設されたコンクリー
ト杭2に嵌入するようにし、さらに、特願昭59−
108544号にあつては、コンクリート杭の施工手順
および地盤沈下状態を示す説明図の第5図a〜e
並びに注入管付き鋼管を嵌入したコンクリート杭
の拡大切断平面図である第6図に示される如く、
地盤1′中にコンクリート杭2′を打設しコンクリ
ートが固結した後、コンクリート杭2′より大径
の注入管4′付き鋼管3′をコンクリート杭2′に
嵌入し、つぎに注入管4′の先端6′から潤滑材
7′を地盤1′中に注入しながら注入管4′付き鋼
管3′を引き上げてコンクリート杭2′の周囲に潤
滑材7′の浸透層8′を形成するようにしている。
For example, in the case of Japanese Patent Publication No. 58-58495, as shown in FIG.
The plurality of plates 12 are installed in the excavated hole 15 by the pressure of the poured concrete.
According to Japanese Patent Application No. 59-102736, the concrete pile is formed by pressing it against the wall of the building.
As shown in Figures 3 a to d, which are explanatory drawings showing the construction procedure of concrete piles and the state of ground subsidence, and Figure 4, which is an enlarged cutaway plan view of a concrete pile fitted with a steel pipe coated with a lubricant, After the concrete pile 2 is driven and the concrete hardens, a steel pipe 3 having a diameter larger than that of the concrete pile 2 and having a lubricant 5 attached to the outer peripheral wall 4 is fitted into the concrete pile 2 that has been driven. , special application 1987-
Regarding No. 108544, Figures 5 a to e of the explanatory diagram showing the concrete pile construction procedure and ground subsidence state
Also, as shown in Fig. 6, which is an enlarged cutaway plan view of a concrete pile into which a steel pipe with an injection pipe is fitted,
After the concrete pile 2' is driven into the ground 1' and the concrete hardens, a steel pipe 3' with an injection pipe 4' having a larger diameter than the concrete pile 2' is inserted into the concrete pile 2', and then the injection pipe 4 is inserted into the concrete pile 2'. While injecting the lubricant 7' into the ground 1' from the tip 6' of the lubricant 7', the steel pipe 3' with the injection pipe 4' is pulled up to form a permeation layer 8' of the lubricant 7' around the concrete pile 2'. I have to.

「発明が解決しようとする問題点」 しかるに第1の方法は摩擦力切断材を付着させ
た板体を鉄筋かごに移動可能に取付けるという複
雑な作業が必要であり、また当該板材も杭ととも
に埋殺すので多数の板体が必要であり、さらに板
体を鉄筋かごに取付けるので鉄筋かごの直径を従
来のものより小さくする必要がありそのため曲げ
やせん断に対して強度が不足するばかりでなく、
最も重要なことは板体と掘削孔の壁面との間にコ
ンクリートが侵入し摩擦力の切断を妨げるおそれ
がある。
``Problems to be Solved by the Invention'' However, the first method requires the complicated work of movably attaching the plate to which the friction cutting material is attached to the reinforcing bar cage, and the plate is also buried together with the pile. In addition, since the plates are attached to a rebar cage, the diameter of the rebar cage must be smaller than conventional ones, which not only lacks strength against bending and shearing.
The most important thing is that concrete may enter between the plate and the wall of the excavation hole, which may prevent the frictional force from being cut.

また第2の方法は外套管としての鋼管3をドロ
ツプハンマーまたはバイブロハンマー等を用いて
所定の深さまで嵌入させるようにするというので
あるから、この使い捨ての鋼管3は所定の強度を
有した高価なものを供さねばならない。
In addition, the second method is to insert the steel pipe 3 as the jacket pipe to a predetermined depth using a drop hammer or vibrohammer, so this disposable steel pipe 3 is an expensive one with a predetermined strength. must be provided.

さらに第3の方法は、鋼管3′に注入管4′の付
設という加工を要するという不利ばかりか、当該
注入管4′がウオータージエツトまたはバイブロ
ハンマー等を用いて所定の深さまで嵌入させる際
に大なる嵌入抵抗になるという難点がある。
Furthermore, the third method not only has the disadvantage of requiring processing to attach the injection pipe 4' to the steel pipe 3', but also has the disadvantage that the injection pipe 4' cannot be fitted to a predetermined depth using a water jet or a vibro hammer. There is a drawback that it causes a large insertion resistance.

尚、第2、第3の方法はいずれも場所打ち杭固
化をまつてからの施工であるので、工事工程の長
期化をもたらし、好ましくない。
Note that both the second and third methods are undesirable because they require construction after waiting for hardening of the cast-in-place piles, which prolongs the construction process.

「問題点を解決するための手段」、「作用」 本発明は叙上の事情に鑑みなされたもので、そ
の要旨とするところは、アスフアルト等の摩擦力
切断材を外周面に付着し、最下端部に浮き輪状の
中空リング部を設けた筒状の鉄板製カーテン体を
鉄筋かごの所定位置に紐止め等にてあらかじめ捲
着し、かかる鉄筋かごを掘削孔に建込んだ後、該
中空リング部に掘削用泥水等を注入充満させて膨
脹状態に保持させ、この状態下にてコンクリート
打設をとり行うと共に該掘削孔壁とカーテン体と
の空隙部には砂等の充填材を詰めるとして、圧密
沈下層に於いて外周面に摩擦力切断材付着層を同
時繞囲形成したところの場所打ち杭を提供すると
して、既述した従来手段の諸難点を全く解消した
点にある。
"Means for Solving Problems" and "Operation" The present invention was made in view of the above circumstances, and its gist is that a friction cutting material such as asphalt is attached to the outer peripheral surface, and the A cylindrical iron plate curtain body with a floating hollow ring section at the lower end is wrapped around a reinforcing bar cage at a predetermined position with strings, etc., and after the reinforcing bar cage is erected in the excavation hole, the hollow ring section is The ring part is injected and filled with drilling mud, etc. and kept in an expanded state, and under this condition, concrete is poured, and the gap between the wall of the excavation hole and the curtain body is filled with filler such as sand. The present invention provides a cast-in-place pile in which a friction force cutting material adhesion layer is simultaneously formed on the outer circumferential surface of the consolidation settlement layer, completely eliminating the problems of the conventional means described above.

「実施例」 以下、これを図に基づいて詳細に説明する。"Example" This will be explained in detail below based on the drawings.

第1図a,bは本発明の特徴である筒状の鉄板
製カーテン体16の説明図で、これは鉄板を長寸
筒状としたもので、その外周面にはアスフアルト
等の摩擦力切断材17が付着され、またその最下
端部には樹脂シート等よりなる浮き輪状の中空リ
ング部18が設けられており、当該中空リング部
18には注水用パイプ19が付設されている。カ
ーテン体16に供される鉄板は別段ケーシング鋼
管の如く土中に打ち込み貫入させる訳ではないの
で、コンクリート側圧に耐え得る強度を有してい
る安価なもので良い。
FIGS. 1a and 1b are explanatory diagrams of a cylindrical iron plate curtain body 16, which is a feature of the present invention. This is a long cylindrical iron plate, and its outer circumferential surface is coated with friction-cutting material such as asphalt. A material 17 is attached, and a floating ring-like hollow ring part 18 made of a resin sheet or the like is provided at the lowermost end thereof, and a water injection pipe 19 is attached to the hollow ring part 18. Since the steel plate provided for the curtain body 16 is not driven into the soil like the casing steel pipe, it may be an inexpensive one that has the strength to withstand concrete lateral pressure.

しかして、該注水用パイプ19より中空リング
部18内に水を注入充満させると膨脹し、剛性が
付与されてリング状に安定し、掘削孔内にあつて
は孔壁に強く押し付き、一種の堰となり、その上
方に摩擦力切断材17の輪状層が立上ることとな
る。
When water is injected into the hollow ring part 18 from the water injection pipe 19 and filled with water, it expands, imparts rigidity and becomes stable in a ring shape, and when inside an excavation hole, presses strongly against the hole wall. This becomes a weir, and a ring-shaped layer of the friction force cutting material 17 rises above it.

本発明はこれを建込み鉄筋かごの所定位置つま
り圧密沈下層に該当する部位にあらかじめ配し、
しかる後にコンクリート打設を行うことによつ
て、縁切り措置を同時に形成する場所打ち杭とせ
んとするものである。
The present invention places this in advance at a predetermined position of the built-in reinforcing bar cage, that is, at a location corresponding to the consolidation settlement layer,
By subsequently pouring concrete, the piles can be used as cast-in-place piles that simultaneously form edge cutting measures.

すなわち、第7図a〜cは本発明方法の施工手
順図、第8図a〜cは第7図a〜cに対応した鉄
板製カーテン体中途部(上)と中空リング部
(下)の平断面図で、紐止め20等の止め手段で
鉄板製カーテン体16を捲着させた鉄筋かご21
を掘削孔22内に建込む(a)。
That is, Figures 7a to 7c are construction procedure diagrams of the method of the present invention, and Figures 8a to 8c are diagrams of the middle part (top) of the iron plate curtain body and the hollow ring part (bottom) corresponding to Figures 7a to c. In a plan cross-sectional view, a reinforcing cage 21 is shown with a steel plate curtain body 16 wrapped around it using a fastening means such as a string fastener 20.
is built into the excavated hole 22 (a).

次いで、注水用パイプ19より中空リング部1
8内へ注水(掘削用泥水でよい)充満させて中空
リング部18を膨脹させると、剛性が付与されて
輪状に大径化する中空リング部18は掘削孔22
の壁面に押し付けられ、へばり付く形態となる
(b)。
Next, the hollow ring part 1 is inserted from the water injection pipe 19.
When the hollow ring part 18 is expanded by injecting water (may be mud water for drilling) into the inside of the hollow ring part 18, the hollow ring part 18, which is given rigidity and enlarged in diameter in a ring shape, is formed in the drilling hole 22.
It is pressed against the wall of the
(b).

しかして、後述のコンクリート打設によつても
鉄板製カーテン体16と掘削孔22壁面との間に
コンクリートが侵入することはない。
Therefore, concrete will not enter between the iron plate curtain body 16 and the wall surface of the excavation hole 22 even during concrete pouring, which will be described later.

注水用パイプ19に栓をする等の措置にて、中
空リング部18の膨脹保持をしておいてからコン
クリート23の打設をすると共に掘削孔22と鉄
板製カーテン体16の空隙部24に砂等の充填材
25を詰める(c)。
After the hollow ring part 18 is maintained in expansion by taking measures such as plugging the water injection pipe 19, concrete 23 is poured, and sand is poured into the excavation hole 22 and the gap 24 of the iron plate curtain body 16. (c).

結局、コンクリート23の個化による場所打ち
杭の完成と同時に圧密沈下層に該当する部位のコ
ンクリート23外周に摩擦力切断材17を有した
縁切り措置も完成する。
In the end, at the same time as the cast-in-place pile is completed by singulating the concrete 23, the edge cutting measures with the friction force cutting material 17 on the outer periphery of the concrete 23 in the area corresponding to the consolidation settlement layer are also completed.

尚、本発明方法では、鉄板製カーテン体16の
コンクリート側圧を受けた展張状態の平滑面(鉄
板故に)と摩擦力切断材17の層形態とが全く一
致することとなるので、最も望ましい平滑な縁切
り層形成が自動的になされるため、掘削孔22壁
面が平滑に仕上り難い地盤に適用されるを良しと
する。
In addition, in the method of the present invention, the smooth surface of the steel plate curtain body 16 in the expanded state under concrete side pressure (because of the steel plate) and the layer form of the friction force cutting material 17 completely match, so that the most desirable smooth surface can be obtained. Since the edge cutting layer is formed automatically, it is suitable for application to ground where the wall surface of the excavation hole 22 is difficult to finish smoothly.

また、鉄板製カーテン体16は既述より明らか
な如く、場所打ち杭の固化までの期間保もたれて
くれればよく、摩擦力除去層が形成されたならば
不要であり、耐久性もその範囲内でよいものであ
る。
Furthermore, as is clear from the above description, the iron plate curtain body 16 only needs to be maintained for a period of time until the cast-in-place pile hardens, and is unnecessary if a frictional force removal layer is formed, and its durability is within that range. That's good.

「発明の効果」 以上より明らかなる如く、本発明によるなら
ば、多数の分割体を鉄筋かごに取り付けねばなら
ぬ煩らわしさがなく、また、摩擦力切断を妨げる
こととなるコンクリートの摩擦力除去層外側への
侵入もない。
"Effects of the Invention" As is clear from the above, according to the present invention, there is no need to attach a large number of divided bodies to a reinforcing cage, and the frictional force of concrete that hinders frictional force cutting is eliminated. There is no invasion to the outside of the removal layer.

また、捨て材として高価なものを供することな
く、且つ、その設置に困難を伴なうこともない。
Further, there is no need to provide expensive materials as waste materials, and there is no difficulty in installing them.

さらには、コンクリート固化と同時に、つま
り、従来の場所打ち杭の完成と同時に摩擦力除去
層も出来るものであつて、何んら工期の遅延をも
たらすこともなく、実際上、極めて有意義であ
る。
Furthermore, the frictional force removal layer can be formed at the same time as the concrete solidifies, that is, at the same time as the conventional cast-in-place pile is completed, which does not cause any delay in the construction period and is extremely meaningful in practice.

【図面の簡単な説明】[Brief explanation of drawings]

第1図a,bは本発明が用いる筒状膜体の説明
としての全体俯瞰図、a図中b−b矢視平断面
図、第2図〜第4図並びに第5〜6図は夫々従来
手段の説明図、第7図a〜cは本発明方法の施工
手順図、第8図a〜cは第7図に対応して示す平
断面図である。 1,1′……地盤、2,2′……コンクリート
杭、3,3′……鋼管、4……外周壁、4′……注
入管、5……潤滑材、6′……先端、7′……潤滑
材、8′……浸透層、11……アスフアルト、1
2……板、13……鉄筋かご、14……ワイヤ、
15……掘削孔、16……鉄板製カーテン体、1
7……摩擦力切断材、18……中空リング部、1
9……注水用パイプ、20……紐止め、21……
鉄筋かご、22……掘削孔、23……コンクリー
ト、24……空隙部、25……充填材。
Figures 1a and 1b are overall bird's-eye views for explaining the cylindrical membrane used in the present invention, sectional views taken along the line bb in Figure a, Figures 2 to 4, and Figures 5 to 6, respectively. 7a to 7c are construction procedure diagrams of the method of the present invention, and FIGS. 8a to 8c are plan sectional views corresponding to FIG. 7. 1, 1'...Ground, 2, 2'...Concrete pile, 3, 3'...Steel pipe, 4...Outer wall, 4'...Injection pipe, 5...Lubricant, 6'...Tip, 7'...Lubricant, 8'...Penetration layer, 11...Asphalt, 1
2...Plate, 13...Rebar cage, 14...Wire,
15... Excavation hole, 16... Iron plate curtain body, 1
7...Friction force cutting material, 18...Hollow ring part, 1
9... Water injection pipe, 20... String stopper, 21...
Rebar cage, 22...Drilling hole, 23...Concrete, 24...Void, 25...Filling material.

Claims (1)

【特許請求の範囲】[Claims] 1 アスフアルト等の摩擦力切断材を外周面に付
着し、最下端部に浮き輪状の中空リング部を設け
た筒状の鉄板製カーテン体を鉄筋かごの所定位置
に紐止め等にてあらかじめ捲着し、かかる鉄筋か
ごを掘削孔に建込んだ後、該中空リング部に掘削
用泥水等を注入充満させて膨脹状態に保持させ、
この状態下にてコンクリート打設をとり行うと共
に該掘削孔壁とカーテン体との空隙部には砂等の
充填材を詰めるとして、圧密沈下層に於いて外周
面に摩擦力切断材付着層を同時繞囲形成するとし
たことを特徴とする場所打ち杭の負の摩擦力除去
方法。
1 A cylindrical iron plate curtain body with a friction cutting material such as asphalt attached to the outer circumferential surface and a floating ring-like hollow ring section at the bottom end is wrapped in advance with strings, etc. at a predetermined position on the reinforcing cage. After erecting such a reinforcing bar cage in an excavation hole, the hollow ring portion is filled with drilling mud or the like to maintain it in an expanded state;
Under this condition, concrete is poured, and the gap between the wall of the excavation hole and the curtain body is filled with filler such as sand, and a layer of friction cutting material is applied to the outer peripheral surface in the consolidation settlement layer. A method for removing negative frictional force from cast-in-place piles, characterized by simultaneous encircling formation.
JP27676684A 1984-12-27 1984-12-27 Removal of negative frictional force of in-site pile Granted JPS61155512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27676684A JPS61155512A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-site pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27676684A JPS61155512A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-site pile

Publications (2)

Publication Number Publication Date
JPS61155512A JPS61155512A (en) 1986-07-15
JPH0137529B2 true JPH0137529B2 (en) 1989-08-08

Family

ID=17574054

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27676684A Granted JPS61155512A (en) 1984-12-27 1984-12-27 Removal of negative frictional force of in-site pile

Country Status (1)

Country Link
JP (1) JPS61155512A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544532A (en) * 2016-01-20 2016-05-04 中铁二院工程集团有限责任公司 Negative frictional resistance reduction structure of collapsibility subgrade pile foundation

Also Published As

Publication number Publication date
JPS61155512A (en) 1986-07-15

Similar Documents

Publication Publication Date Title
JP4463140B2 (en) Seismic reinforcement method for masonry walls
JP2576932B2 (en) Construction method of independent mountain retaining wall
JP3534928B2 (en) Construction method of seismic isolation pit for existing building
JP2001329545A (en) Bridge pier foundation construction method and floor slab for bridge pier
JP2790038B2 (en) Reinforcement method of existing pile foundation building
JPH0137529B2 (en)
JP3749505B2 (en) Steel pipe pile and its construction method
JPH0133607B2 (en)
JPS63277319A (en) Setting of friction pile
JPH0137528B2 (en)
JPH0613770B2 (en) Method of constructing mountain retaining wall with parent pile
JPH029124B2 (en)
JPS60246918A (en) Method of removing negative friction force of cast-in-place concrete pile
JPS621930A (en) Foundation structure of underground structure
JPS59134228A (en) Integration work of pile or continuous wall and footing
JP2565452B2 (en) Construction method of self-supporting retaining wall
JP2555838B2 (en) Independent panel mountain retaining method
JPS5841227Y2 (en) Element for mountain retainer
JPH0324924B2 (en)
JP2005113672A (en) Pile extracting construction method and heterogeneous coating material of pile
JPS6138015A (en) Sheathing work
JPH04182509A (en) Land slide protection structure
JPS64530B2 (en)
JPH0510084A (en) Execution method of deeper depth man hole
JPH086337B2 (en) Foundation construction method and foundation pile