JPH01234657A - Opening and closing device for pressure container - Google Patents

Opening and closing device for pressure container

Info

Publication number
JPH01234657A
JPH01234657A JP5793188A JP5793188A JPH01234657A JP H01234657 A JPH01234657 A JP H01234657A JP 5793188 A JP5793188 A JP 5793188A JP 5793188 A JP5793188 A JP 5793188A JP H01234657 A JPH01234657 A JP H01234657A
Authority
JP
Japan
Prior art keywords
nut
stud
bolt
tensioner
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5793188A
Other languages
Japanese (ja)
Other versions
JP2640355B2 (en
Inventor
Koichi Matsumoto
耕一 松本
Kenji Okada
賢治 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Babcock Hitachi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock Hitachi KK filed Critical Babcock Hitachi KK
Priority to JP63057931A priority Critical patent/JP2640355B2/en
Publication of JPH01234657A publication Critical patent/JPH01234657A/en
Application granted granted Critical
Publication of JP2640355B2 publication Critical patent/JP2640355B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pressure Vessels And Lids Thereof (AREA)

Abstract

PURPOSE:To aim at shortening the working time by constituting an installation vehicle with a first carrier vehicle mounted thereon with a bolt cleaning device and a stud tensioner and a second carrier vehicle mounted thereon with a nut attaching and removing device, and by making the second carrier vehicle movable in a direction orthogonal to the direction of arrangement of bolts, relative to the first carrier vehicle. CONSTITUTION:A bolt cleaning device 14 and a stud tensioner 15 are attached to a first installation carrier vehicle 25 which can be centered by means of a motor 23 and which is mounted on a station 13 that can be driven along a ring-like guide rail 12 in the direction of arrangement of stud bolts 3-0-3-4. A second installation vehicle 26 mounted thereon with a nut attaching and removing device 16 and a motor 27 for moving nuts 4-0-4-4 toward a setting bed is arranged on the station 13 so as to be movable relative to and along the installation vehicle 25. Accordingly, the nut conveyance can be made by the nut attaching and removing device 16 alone while the nut fastening by the stud tensioner 15 and the nut conveyance can be simultaneously carried out, thereby it is possible to shorten the working time.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、例えば原子炉圧力容器の上蓋を開閉する圧力
容器の開閉装置に係り、特に圧力容器の上蓋をスタッド
ボルトとす・ントによって締め付ける圧力容器の開閉装
置に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] The present invention relates to a pressure vessel opening/closing device that opens and closes the top cover of a nuclear reactor pressure vessel, for example, and particularly relates to a pressure vessel opening/closing device that opens and closes the top cover of a reactor pressure vessel, and in particular, a device for tightening the top cover of a pressure vessel with stud bolts and bolts. This relates to an opening/closing device for a pressure vessel.

〔従来の技術〕[Conventional technology]

原子炉圧力容器は、第8図に示す如く圧力容器胴体1と
、この圧力容器胴体1に載置した密閉頭部である上蓋2
とを70〜80本のスタ・ンドボルト3、ナツト4によ
り締め付けて圧力容器胴体1と上蓋2を密閉する構成と
なっている。第9図は、第8図のB部を拡大した詳細図
である。スタ・ノドボルト3は、圧力容器胴体1の胴体
フランジ5Gこ形成した雌ネジ部6と螺合するスタ・ン
ドボルト3の下部ネジ部7により圧力容器胴体1と接続
してその上面より突出し、他方、上蓋フランジ8に形成
されたスタッドボルト3の上部ネジ部9の外径より径の
大きいボルト孔10を挿通して他端の上部ネジ部9が上
蓋フランジ8外に突出している。
As shown in FIG. 8, the reactor pressure vessel consists of a pressure vessel body 1 and an upper cover 2, which is a closed head placed on the pressure vessel body 1.
The structure is such that the pressure vessel body 1 and the upper lid 2 are sealed by tightening them with 70 to 80 stand bolts 3 and nuts 4. FIG. 9 is a detailed enlarged view of section B in FIG. 8. The star end bolt 3 is connected to the pressure vessel body 1 by a lower threaded portion 7 of the star end bolt 3 which is threadedly engaged with a female threaded portion 6 formed on the body flange 5G of the pressure vessel body 1, and protrudes from the upper surface thereof, and on the other hand, The stud bolt 3 is inserted through a bolt hole 10 having a diameter larger than the outer diameter of the upper threaded part 9 of the stud bolt 3 formed in the upper cover flange 8, and the upper threaded part 9 at the other end projects outside the upper cover flange 8.

このネジ部9に対しナツト4を螺合し、その締付力によ
りスタンドボルト3で上蓋2と圧力容器胴体1を強固に
接続している。このスタッドボルト3、ナツト4は上蓋
2および圧力容器胴体1の延焼方向に沿ってスタッドボ
ルト3の整数倍のピッチで円形状に配列されている。
A nut 4 is screwed into this threaded portion 9, and the tightening force of the nut 4 firmly connects the upper cover 2 and the pressure vessel body 1 with the stand bolt 3. The stud bolts 3 and nuts 4 are arranged in a circular shape along the fire spreading direction of the upper cover 2 and the pressure vessel body 1 at a pitch that is an integral multiple of the stud bolts 3.

そして原子炉はその安全性を確認するために年−同程度
、圧力容器本体1の上蓋2を取外して内部の検査(In
−3ervice In5pection  供用期間
中検査等)を行わなければならない。
In order to confirm the safety of the reactor, the upper cover 2 of the pressure vessel main body 1 was removed and the interior was inspected (internal inspection).
-3service inspection, etc. must be conducted during the service period.

その際にはスタッドボルト3の上部ネジ部9に発生した
付着物を取り除いて清掃し、スタッドボルト3のテンシ
ョニングを行い、しかる後にナツト4の回転、取外し作
業を行うために、第10図、第11図および第12図に
示す開閉装置が設けられている。開閉装置はボルト清掃
装置14、スタッドテンショナ15、ナツト着脱装置1
6を備えている。しかしながら、原子炉圧力容器の近傍
は、作業雰囲気の放射線量が比較的高いために作業者の
被曝の問題があることから遠隔操作による開閉装置によ
ってボルト清掃装置14による清掃作業、スタンドテン
ショナ15によるテンショニング作業、ナラ1〜着脱装
置16による着脱作業が行われている。
At that time, the upper threaded portion 9 of the stud bolt 3 is cleaned by removing any deposits, the stud bolt 3 is tensioned, and then the nut 4 is rotated and removed, as shown in FIG. A switching device shown in FIGS. 11 and 12 is provided. The opening/closing device includes a bolt cleaning device 14, a stud tensioner 15, and a nut attaching/detaching device 1.
It is equipped with 6. However, in the vicinity of the reactor pressure vessel, there is a problem of radiation exposure for workers due to the relatively high radiation level in the working atmosphere. installation work, and installation/detachment work using the Nara 1 to the installation/detachment device 16 are being performed.

以下、第10図、第11図および第12図を用いて開閉
装置の概略を説明する。第10図は開閉装置の正面図、
第11図は第10図の平面図、第12図は第10図の開
閉装置の要部拡大斜視図である。
Hereinafter, the outline of the opening/closing device will be explained using FIG. 10, FIG. 11, and FIG. 12. Figure 10 is a front view of the switchgear,
11 is a plan view of FIG. 10, and FIG. 12 is an enlarged perspective view of essential parts of the opening/closing device of FIG. 10.

第10図から第12図において、2は上蓋、3はスタッ
ドポルト、4はナツト、8は上蓋2の上蓋フランジであ
る。11は開閉装置全体を支持するための架台であり、
この架台11は上蓋2に固定される。12は架台11上
に設置されたガイドレールであり、13は駆動モーフA
19によりスタッドボルト3の配列方向に沿ってガイド
レール12上を作動するステーションである。このステ
ーション13には、搭載台車18を介してボルト清掃装
置14、スタッドテンショナ15、ナツト着脱装置16
が取付けられている。17はスタッドポルト3の位置検
出器である。20,21.22はそれぞれボルト清掃装
置14.スタッドテンショナ15.ナツト着脱装置16
に対する駆動モータB、駆動モータC1駆動モータDで
ある。23はスタッドポルト3とスタッドテンショナ1
5の芯ずれの修正およびナツト4を着脱時に搭載台車1
8をスタッドポルト3の配列方向に対して直角方向に動
作させるための駆動モータEである。
10 to 12, 2 is an upper lid, 3 is a stud port, 4 is a nut, and 8 is an upper lid flange of the upper lid 2. 11 is a frame for supporting the entire switchgear;
This pedestal 11 is fixed to the upper lid 2. 12 is a guide rail installed on the pedestal 11, and 13 is a drive morph A.
19 is a station that operates on the guide rail 12 along the arrangement direction of the stud bolts 3. This station 13 is equipped with a bolt cleaning device 14, a stud tensioner 15, and a nut attaching/detaching device 16 via a loading cart 18.
is installed. 17 is a position detector for the stud port 3. 20, 21 and 22 are bolt cleaning devices 14. Stud tensioner 15. Nut attachment/detachment device 16
drive motor B, drive motor C1 and drive motor D. 23 is stud port 3 and stud tensioner 1
Correcting the misalignment of 5 and mounting the nut 4 on the cart 1 when installing and removing it.
8 in a direction perpendicular to the arrangement direction of the stud ports 3.

24はナツト4をスタッドポルト3から脱した後保管す
るためのナツト置き台である。
Numeral 24 is a nut holder for storing the nut 4 after it has been removed from the stud port 3.

なお、第11図の装置においては、ボルト清掃装置14
、スタッドテンショナ15およびナツト着脱装置16を
取り付けたステーション13が円周方向に四つ配置した
状態を示している。
In addition, in the apparatus shown in FIG. 11, the bolt cleaning device 14
, a state in which four stations 13 to which stud tensioners 15 and nut attaching/detaching devices 16 are attached are arranged in the circumferential direction is shown.

第13図、第14図は第10図、第11図および第12
図の開閉装置を用いて、従来のスタッドポルト3の締め
作業およびナツト4の取外し作業を行うシーケンスを説
明するもので、第13図の縦欄はステップNo、 、横
棚はスタッドボルト3のNo、を示すが、説明の都合上
スタッドボルト3、スタッドボルト3−0.3−1.3
−2.3−3.3−4.3−5.3−6と呼び、それら
のスタッドボルトに対応するナツト4も4−0.4−1
.4−2.4−3.4−4.4−5.4−6と呼ぶ。ス
タッドボルト3−1〜3−6は第14図のスタッドポル
ト3−0〜3−6に一致している。 なお、第13図に
おけるAはスタンドボルト3の錆をボルト清掃装置14
で落とす清掃作業、Bは位置検出器17によるスタンド
ボルト3の位置検出、スタッドボルト3・とスタッドテ
ンショナ15の芯ずれ修正作業およびスタンドボルト3
のテンショニング作業、Cはナツト着脱装置16による
ナツト4の着脱作業およびDはスタッドポルト3から外
したナツト4を置き台24へ移動する搬送作業をそれぞ
れ示し、第13図の○印は位置検出器17によるスタッ
ドボルト3の位置検出、スタッドボルト3とスタッドテ
ンショナ15の芯ずれ修正作業のみを示す。
Figures 13 and 14 are similar to Figures 10, 11, and 12.
This is to explain the conventional sequence of tightening the stud port 3 and removing the nut 4 using the opening/closing device shown in the figure. , but for convenience of explanation, stud bolt 3 and stud bolt 3-0.3-1.3 are shown.
-2.3-3.3-4.3-5.3-6, and the nuts 4 corresponding to those stud bolts are also 4-0.4-1.
.. It is called 4-2.4-3.4-4.4-5.4-6. The stud bolts 3-1 to 3-6 correspond to the stud ports 3-0 to 3-6 in FIG. 14. In addition, A in FIG. 13 is a bolt cleaning device 14 that removes rust from the stand bolt 3.
B is the position detection of the stand bolt 3 by the position detector 17, the work of correcting the misalignment of the stud bolt 3 and the stud tensioner 15, and the stand bolt 3
C indicates the tensioning work of the nut 4, C indicates the attachment/detachment of the nut 4 using the nut attachment/detachment device 16, and D indicates the conveyance operation of moving the nut 4 removed from the stud port 3 to the stand 24. The ○ mark in FIG. 13 indicates the position detection. Only the position detection of the stud bolt 3 by the device 17 and the misalignment correction work between the stud bolt 3 and the stud tensioner 15 are shown.

なお、開閉装置は、第14図に矢印で示す如く時計方向
に移動するものであり、ステーション13の移動方向に
沿って、第10図〜第12図に示すように先頭にボルト
清掃装置14、中央にスタッドテンショナ15、後尾に
ナツト着脱装置16が位置している。また、第12図に
示すスタッドボルト3の同志のピッチは、ボルト清掃装
置14、スタッドテンショナ15およびナツト着脱装置
16のピッチと同一ピッチである。
The opening/closing device moves clockwise as shown by the arrow in FIG. 14, and along the moving direction of the station 13, the bolt cleaning device 14 is placed at the top as shown in FIGS. 10 to 12. A stud tensioner 15 is located in the center, and a nut attaching/detaching device 16 is located at the rear. Further, the pitch between the stud bolts 3 shown in FIG. 12 is the same as the pitch of the bolt cleaning device 14, the stud tensioner 15, and the nut attaching/detaching device 16.

第13図のステップN001からステップNo。Step No. from step N001 in FIG.

12までの作業を行うことによって、第14図のスタッ
ドボルト3−1から3−5までのスタッドボルト5本の
清掃作業A、スタッドボルト3−1から3−5までのス
タッドボルト5本のテンショニングB1スタッドボルト
3−1から3−5に螺合されたナツト4−1から4−5
までの5個のナツト取外し作業C、ナツト4−1から4
−5までのナツト搬送作業りが行われたことになり、ス
タッドボルト3−′oと3−6は位置検出Bのみに使わ
れる。
By performing the work up to 12, cleaning work A for the five stud bolts from stud bolts 3-1 to 3-5 in Figure 14, and cleaning work for the five stud bolts from stud bolts 3-1 to 3-5 are completed. Nuts 4-1 to 4-5 screwed onto B1 stud bolts 3-1 to 3-5
5 nuts removal work C, nuts 4-1 to 4
This means that the nut conveyance work up to -5 has been carried out, and stud bolts 3-'o and 3-6 are used only for position detection B.

このようにして第8図および第9図に示すスタッドボル
ト3からナツト4を取り除くことによって圧力容器胴体
1から上蓋2を取り外すことができる。
In this manner, the upper cover 2 can be removed from the pressure vessel body 1 by removing the nuts 4 from the stud bolts 3 shown in FIGS. 8 and 9.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

ところが、上記従来技術の開閉装置はボルト清掃装置1
4、スタッドテンショナ15、ナツト着脱装置16が同
じ一つの搭載台車18に設置されているため、駆動モー
タE23により、これらボルト清掃装置14、スタッド
テンショナ15、ナツト着脱装置16は同時に半径方向
に移動する構造はなっている。このため、ナツト着脱装
置16によりスタッドボルト3−1から外したナツト4
−1をナツト置き台24の位置に移動する搬送作業りを
行うためには、ナツト着脱装置16はもとよりボルト清
掃装置14およびスタッドテンショナ15もす・ン装置
き台24まで移動させる必要がある。
However, the above prior art switchgear has a bolt cleaning device 1.
4. Since the stud tensioner 15 and the nut attaching/detaching device 16 are installed on the same single mounting cart 18, the bolt cleaning device 14, stud tensioner 15, and nut attaching/detaching device 16 are simultaneously moved in the radial direction by the drive motor E23. The structure is. Therefore, the nut 4 removed from the stud bolt 3-1 by the nut attaching/detaching device 16
-1 to the position of the nut holder 24, it is necessary to move not only the nut attaching/detaching device 16 but also the bolt cleaning device 14 and stud tensioner 15 to the nut holder 24.

第13図に示すステップNo、3.5,7.9ではスタ
ッドテンショナ15におけるテンショニング作業Bの時
間が最も長いためにナツト着脱装置16によるスタッド
ボルト3からナツト4の取外し作業Cが終了しても、す
ぐにはナツト4の搬送作業りが行えずテンショニング作
業Bの終了を待っている状態となる。ボルト清掃作業A
およびテンショニング作業Bおよびナツト取外し作業C
が全て終了した後にナツト4の搬送作業を行わざるを得
ない。このためナツト搬送作業りにロスが生じ全体の作
業時間が長くなるという欠点があった。
In steps No. 3.5 and 7.9 shown in FIG. 13, since the tensioning work B in the stud tensioner 15 takes the longest time, the removing work C of the nut 4 from the stud bolt 3 by the nut attaching/detaching device 16 is completed. However, the nut 4 cannot be carried out immediately and is in a state of waiting for the tensioning work B to be completed. Bolt cleaning work A
and tensioning work B and nut removal work C
It is necessary to carry out the work of transporting the nut 4 after all the steps have been completed. For this reason, there is a disadvantage in that there is loss in the nut conveying operation and the overall working time is increased.

本発明の目的は、上記した従来技術の課題を解決し、上
蓋開閉作業の効率化および作業員の被曝低減を実現する
ことができる圧力容器の開閉装置を提供することにある
SUMMARY OF THE INVENTION An object of the present invention is to provide a pressure vessel opening/closing device that solves the above-mentioned problems of the prior art, improves the efficiency of the top cover opening/closing operation, and reduces radiation exposure to workers.

〔゛課題を解決するための手段〕[Means to solve problems]

上記目的は、搭載台車を、ナツト着脱装置を取り付けた
搭載台車とボルト清掃装置及びスタッドテンショナを取
付けた搭載台車とに分離し、ナツト着脱装置を取り付け
た搭載台車が、ボルト清掃装置とスタッドテンショナを
取り付けた搭載台車と歯車により係合した搭載台車を基
準にして移動するように構成することにより達成される
The above purpose is to separate the loading truck into a loading truck with a nut attaching/detaching device attached, and a loading truck with a bolt cleaning device and a stud tensioner attached, so that the loading truck with the nut attaching/detaching device can remove the bolt cleaning device and stud tensioner. This is achieved by configuring the system to move with reference to the attached mounting carriage and the mounting carriage engaged by gears.

〔作用〕[Effect]

ナツト着脱装置を取付けた搭載台車は、ボルト清掃装置
及びスタッドテンショナを取付けた搭載台車とは分離し
て動作するため、ナツトをナツト着脱装置でスタンドボ
ルトから外してナツト置き台へ移動する際にスタッドテ
ンショナまたはボルト清掃装置の作業が終了していなく
ても、ナツトをナツト着脱装置で吊り上げ、ナツト装置
き台へ移動することができ、第13図のステップNo、
4.6.8.10におけるナツト搬送作業りの作動時間
が短縮できる。
The mounting cart to which the nut attaching/detaching device is installed operates separately from the mounting cart to which the bolt cleaning device and stud tensioner are attached. Even if the work of the tensioner or bolt cleaning device is not completed, the nut can be lifted up by the nut attaching/detaching device and moved to the nut device stand, and step No.
4.6.8.10 The operation time for nut conveyance work can be shortened.

また、ナツト着脱装置を取り付けた搭載台車はボルト清
掃装置およびスタッドテンショナを取り付けた搭載台車
と歯車を介して接続しているため、搭載台車と同時に移
動させることもできる。したがって、ナツト着脱装置を
搭載した搭載台車と他の搭載台車を基準となる相対位置
に停止させることにより、スタッドテンショナを取り付
けた搭載台車芯ずれの修正動作を行わせることができ、
同時にナツト着脱装置のスタッドボルトとの芯合わせも
同時に行うことができる。
Further, since the mounting cart to which the nut attaching/detaching device is attached is connected to the mounting cart to which the bolt cleaning device and stud tensioner are attached via gears, it can be moved simultaneously with the mounting cart. Therefore, by stopping the loading truck equipped with the nut attaching/detaching device and other loading trucks at relative positions that serve as a reference, it is possible to correct the misalignment of the loading truck equipped with the stud tensioner.
At the same time, alignment of the nut attaching/detaching device with the stud bolt can be performed at the same time.

〔実施例〕〔Example〕

本発明の一実施例を第1図〜第4図を基に説明する。 An embodiment of the present invention will be described based on FIGS. 1 to 4.

第1図は本発明における上蓋開閉装置の一実施例を拡大
して示す斜視図、第2図及び第3図は本実施例の正面図
及び平面図である。
FIG. 1 is an enlarged perspective view showing an embodiment of the top lid opening/closing device according to the present invention, and FIGS. 2 and 3 are a front view and a plan view of the embodiment.

この開閉装置は第1図〜第3図に示すように圧力容器胴
体1の上蓋2に架台11によって固定された円環状のガ
イドレール12に沿ってスタッドボルト3−0〜3−4
の配列方向に駆動可能なステーション13が設置されて
いる。このステーション上に13スタッドポルト3−0
〜3−4との芯合わせの調整のための駆動モータE23
を有する搭載台車A25に取付けたボルト清掃装置14
およびスタンドテンショナ15、ナツト着脱作業時にナ
ツト4−0〜4−4をナツト置き台24まで移動するた
めの駆動モータF27を有する搭載台車B26に取付け
られたナツト着脱装置16で構成されている。
As shown in FIGS. 1 to 3, this opening/closing device is connected to stud bolts 3-0 to 3-3 along an annular guide rail 12 fixed to the upper lid 2 of the pressure vessel body 1 by a frame 11.
A station 13 is installed which can be driven in the arrangement direction. 13 studs Porto 3-0 on this station
~3-4 Drive motor E23 for center alignment adjustment
Bolt cleaning device 14 attached to a loading trolley A25 having
and a stand tensioner 15, and a nut attaching/detaching device 16 attached to a mounting cart B26 having a drive motor F27 for moving the nuts 4-0 to 4-4 to the nut holder 24 during nut attaching/detaching work.

また、第4図は第3図のA部拡大詳細図である。Moreover, FIG. 4 is an enlarged detailed view of part A in FIG. 3.

第4図に示すように、本実施例では、搭載台車B26を
移動させるだめの駆動モータF27は搭載台車B26に
取付けられており、この駆動モータF27には搭載台車
A25に設けられた歯車A28とかみ合う歯車B29が
設けられている。この搭載台車A25の歯車A2Bと搭
載台車B26の歯車B29の噛み合わせにより、搭載台
車B26は搭載台車A25の歯車A28に沿って相対的
な移動が可能な機構を有している。
As shown in FIG. 4, in this embodiment, a drive motor F27 for moving the loading truck B26 is attached to the loading truck B26, and this drive motor F27 has a gear A28 provided on the loading truck A25. A meshing gear B29 is provided. By meshing the gear A2B of the loading truck A25 and the gear B29 of the loading truck B26, the loading truck B26 has a mechanism that allows relative movement along the gear A28 of the loading truck A25.

なお、第1図にスタンドボルト3−0〜3−4のピッチ
とボルト清掃装置14、スタッドテンショナ15および
予め設定した基準の位置にあるナツト着脱装置16のピ
ッチは同一ピッチであり、スタンドボルト3とボルト清
掃装置14、スタッドテンショナ15およびナツト着脱
装置16の軸芯は、位置検出器17および駆動モータe
23によりスタッドテンショナ15の芯合わせを行うだ
けで一致する構造である。
In addition, in FIG. 1, the pitch of the stand bolts 3-0 to 3-4 and the pitch of the bolt cleaning device 14, stud tensioner 15, and nut attaching/detaching device 16 located at a preset reference position are the same pitch, and the pitch of the stand bolts 3-0 to 3-4 is the same. The axes of the bolt cleaning device 14, stud tensioner 15, and nut attaching/detaching device 16 are connected to the position detector 17 and the drive motor e.
23, the stud tensioner 15 is aligned by simply aligning the center of the stud tensioner 15.

以上のように構成した開閉装置によるスタッドボルト3
−0〜3−4の締め作業を行う場合のシーケンスを第6
図、第7図を基に以下に説明する。
Stud bolt 3 using the switchgear configured as above
-6th sequence when performing tightening work from 0 to 3-4
This will be explained below based on FIGS.

第6図のステップN011および2は従来技術の第13
図で説明した動作と同じであるので、ここでは省略する
Steps N011 and 2 in FIG. 6 are the 13th step of the prior art.
Since the operation is the same as that explained in the figure, it will be omitted here.

第6図のステップNO63への移行は第7図の矢印で示
す方向(左方向)へステーション13を移動させて第7
図のボルト3−2の位置をスタ・ンドテンショナ15の
位置検出器17で確認した後に第7図のボルト3−1に
螺合されたす・ント4−1はナツト着脱装置16によっ
てスタ・ンドボルト3−1から外される。同時に、スタ
ッドボルト3−2はスタッドテンショナ15によってす
・ント4−2が締められ、スタッドボルト3−3はボル
ト清掃装置置14で清掃される。従って、従来の開閉装
置ではステップ4でナツト4−1をす・ン装置き台24
に運搬するナツト運搬作業りを行うためにはナツト清掃
装置14によるボルト3−3の清掃作業A、スタッドテ
ンショナ16によるボルト3−2のテンショニング作業
Bの終了を待たなければならなかった。しかし、本発明
の実施例においては、ナツト着脱装置16のみでナツト
3の運搬作業りを行うことできるため、他のボルト清掃
装置14はボルト3−3の清掃作業Aを、スタッドテン
ショナ16はスタッドボルト3−2のテンショニング作
業Bと並行に行えるようにしたものである。
The transition to step NO63 in FIG. 6 is to move the station 13 in the direction shown by the arrow in FIG.
After confirming the position of the bolt 3-2 in the figure with the position detector 17 of the stand bolt tensioner 15, the bolt 4-1 screwed onto the bolt 3-1 in FIG. is removed from the head bolt 3-1. At the same time, the bolt 4-2 of the stud bolt 3-2 is tightened by the stud tensioner 15, and the stud bolt 3-3 is cleaned by the bolt cleaning device 14. Therefore, in the conventional switchgear, in step 4, the nut 4-1 is
In order to carry out the nut transportation work, it was necessary to wait until the nut cleaning device 14 completed the cleaning work A of the bolt 3-3 and the stud tensioner 16 completed the tensioning work B of the bolt 3-2. However, in the embodiment of the present invention, since the nut 3 can be transported only by the nut attaching/detaching device 16, the other bolt cleaning device 14 performs the cleaning work A of the bolt 3-3, and the stud tensioner 16 performs the cleaning work A of the bolt 3-3. This can be done in parallel with the tensioning work B of the bolt 3-2.

ステップN004では搭載台車B26のナツト着脱装置
16はボルト3−2、搭載台車A25のボルト清掃装置
14はボルト3−4およびスタ・ンドテンショナ15は
ボルト3−3のピッチ上になるように移動され、搭載台
車A25を基準位置に停止させ、搭載台車A25の駆動
モータE23を駆動させてスタンドテンショナ15でス
タ・ンドポルト3−3の芯合わせを行う。このとき、搭
載台車B26の歯車B29は搭載台車A25の歯車A2
8と係合しているため、ナツト着脱装置16もスタッド
ボルト3−2との芯合わせを同時に行うことができる。
In step N004, the nut attaching/detaching device 16 of the mounting cart B26 is moved to be on the pitch of the bolt 3-2, the bolt cleaning device 14 of the mounting cart A25 is moved to be on the pitch of the bolt 3-4, and the stand tensioner 15 is moved to be on the pitch of the bolt 3-3. , the mounting cart A25 is stopped at the reference position, the drive motor E23 of the mounting cart A25 is driven, and the stand tensioner 15 aligns the center of the stand and port 3-3. At this time, the gear B29 of the loading truck B26 is the gear A2 of the loading truck A25.
8, the nut attaching/detaching device 16 can also be aligned with the stud bolt 3-2 at the same time.

スタッドボルト3−3との芯ずれ修正後、ボルト清掃装
置14はポル)No、3−4へ、スタッドテンショナ1
5はボルト3−3へ、ナツト着脱装置16はボルト3−
2へそれぞれセットされ、同時にそれぞれの作業を行う
。ナツト着脱装置16でスタッドポルト3−2から外さ
れたナツト4−2は、ナツト着脱装置16で保持され、
駆動モータB20でナツト着脱装置16と一緒に吊り上
げられる。吊りあげられたナツト着脱装置16は駆動モ
ータF27を時計方向へ移動することによりナツト着脱
装置16のみがナツト置き台24の方向へ移動される。
After correcting the misalignment with the stud bolt 3-3, the bolt cleaning device 14 moves to Pol) No. 3-4 and the stud tensioner 1.
5 to the bolt 3-3, and the nut attaching/detaching device 16 to the bolt 3-3.
2 and perform their respective tasks at the same time. The nut 4-2 removed from the stud port 3-2 by the nut attaching/detaching device 16 is held by the nut attaching/detaching device 16,
It is lifted together with the nut attaching/detaching device 16 by the drive motor B20. The lifted nut attaching/detaching device 16 is moved toward the nut holder 24 by moving the drive motor F27 clockwise.

ナツト着脱装置゛16で吊り上げたナツト4−2をナツ
ト置き台24へ降ろし、駆動モータF27を逆回転させ
ることにより搭載台車B26を元の位置へ戻す。このと
き、ボルト清掃装置14およびスタッドテンショナ15
は搭載台車A25に取つけられているため移動すること
はなく、それぞれの清掃作業A、テンショニング作業B
を行う。
The nut 4-2 lifted by the nut attaching/detaching device 16 is lowered onto the nut holder 24, and the driving motor F27 is reversely rotated to return the mounting cart B26 to its original position. At this time, the bolt cleaning device 14 and the stud tensioner 15
is attached to the loading trolley A25, so it does not move, and is used for cleaning work A and tensioning work B.
I do.

このように、第6図のステップ5以陣ステツプ7までは
同一の動作を繰り返し行うことによってボルト3〜1か
ら3−5までのナツト取外し作業C、ボルト3−1から
3−5までのナツト締め作業B、ボルト3−1から3−
5までの清掃作業Aが行われる。
In this way, by repeating the same operations up to Step 7 in Figure 6, the nuts from bolts 3-1 to 3-5 can be removed C, and the nuts from bolts 3-1 to 3-5 can be removed. Tightening work B, bolts 3-1 to 3-
Cleaning work A up to 5 is performed.

第6図のステップ6においては第7図のボルト3−5の
ナツト締め作業Bとボルト3−4のナツト取外し作業C
とナツト運搬作業りが行われ、ステップN007ではボ
ルト3−6は位置検出作業Bにのみ使われ、ボルト3−
5のナツト取外し作業Cとナツト運搬作業りが終了する
In step 6 of Fig. 6, the nut tightening work B of bolt 3-5 and the nut removal work C of bolt 3-4 shown in Fig. 7 are performed.
and nut transportation work is performed, and in step N007, bolt 3-6 is used only for position detection work B, and bolt 3-6 is used only for position detection work B.
Nut removal work C and nut transportation work in step 5 are completed.

このように、本発明の実施例においては、搭載台車A2
5と搭載台車B26を分割し、搭載台車A25とB26
を歯車A2BとB29によって連結することによって、
ボルト清掃装置14でボルト清掃作業A1スタッドテン
ショナ15でテンショニング作業Bを行っている間に、
ナツト着脱装置16はナツトの取外し作業Cとナツト運
搬作業りを行うことによって、作業時間の短縮を図るこ
とができる。
In this way, in the embodiment of the present invention, the loading trolley A2
5 and loading trolley B26 are divided into loading trolleys A25 and B26.
By connecting with gears A2B and B29,
While the bolt cleaning device 14 is performing bolt cleaning work A1 and the stud tensioner 15 is performing tensioning work B,
The nut attaching/detaching device 16 can shorten the working time by performing the nut removing work C and the nut transporting work.

第5図は前述の開閉装置において、駆動モータF27を
搭載台車A25に取り付け、この駆動モータF27に設
けられた歯車A、29と搭載台車B26に取り付けられ
た歯車B2Bを介して、搭載台車B26を搭載台車A2
5に対し相対的な移動が可能な機構とした例を示してい
る。
FIG. 5 shows the aforementioned opening/closing device in which a drive motor F27 is attached to a mounting trolley A25, and a mounting trolley B26 is connected via gears A and 29 provided on the drive motor F27 and a gear B2B attached to a mounting trolley B26. Loading trolley A2
An example of a mechanism that can move relative to 5 is shown.

したがって、第4図の装置と第5図の装置の異なる点は
、歯車A29と歯車B2Bが逆に取り付けられている点
で異なるのみであり、他の説明は第4図のものと同一で
あるので説明は省略する。
Therefore, the only difference between the device in FIG. 4 and the device in FIG. 5 is that gear A29 and gear B2B are installed in reverse, and the other explanations are the same as in FIG. 4. Therefore, the explanation will be omitted.

以上本発明の実施例においては、ナツトの取イし作業C
を中心に説明したが、内部〜検査の終了後はナツトを締
め付ける作業を行うが、本実施例の開閉装置はナツトを
締め付ける作業にも使用できる。
In the above embodiments of the present invention, the nut removal work C
Although the explanation has focused on tightening nuts after the internal inspection is completed, the opening/closing device of this embodiment can also be used for tightening nuts.

〔発明の効果〕〔Effect of the invention〕

以上のように本発明によれば、従来、スタッドテンショ
ナによるナツト締め作業が終了しないと、ナツト着脱装
置で取外したナツトをナツト置き台へ運搬することがで
きなかったが、スタッドテンショナによるテンショニン
グ作業中であっても、ナツト着脱装置で外したナツトを
ナツト置き台へ運搬できるので、スタッドテンショナの
ナツト締め作業を行いながら、ナツト着脱装置によるナ
ツトの運搬作業が同時に行えるため、作業時間の短縮お
よびそれに伴う作業員の被曝線量の低下で図ることがで
きる。、
As described above, according to the present invention, the nut removed by the nut attaching/detaching device could not be transported to the nut holder until the nut tightening work by the stud tensioner was completed, but the tensioning work by the stud tensioner Even inside the nut, the nut removed by the nut attachment/detachment device can be transported to the nut holder, so while tightening the nut with the stud tensioner, the nut can be transported by the nut attachment/detachment device at the same time, reducing work time and This can be achieved by reducing the radiation exposure of workers. ,

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明になる開閉装置の一実施例を示す斜視図
、第2図は第1図の正面図、第3図は第1図の平面図、
第4図は第3図のA部拡大平面図、第5図は本発明の他
の実施例を示す要部拡大斜視図、第6図は本発明の開閉
における開閉作業のシーケンス作動図、第7図は第6図
のスタッドポルトの配列を示す図、第8図は圧力容器の
縦断面は第9図は第8図のB部の拡大断面図、第10図
は従来の開閉装置の正面図、第11図は第10図の平面
図、第12図は第10図の要部拡大斜視図、第13図は
第11図〜第12図に示す従来の開閉装置を用いた場合
の開閉作業のシーケンス作動図、第14図は第13図の
スタッドボルトの配列を示す図である。 1・・・・・・圧力容器胴体、2・・・・・・上蓋、3
・・・・・・スタッドボルト、4・・・・・・ナツト、
5・・・・・・胴体フランジ、6・・・・・・雌ネジ部
、7・・・・・・下部ネジ部、8・・・・・・上蓋フラ
ンジ、9・・・・・・上部ネジ部、10・・・・・・ボ
ルト7L。 11・・・・・・架台、12・・・・・・ガイドレール
、13・・・・・・ステーション、14・・・・・・ボ
ルト清掃装置、15・・・・・・スタッドテンショナ、
16・・・・・・ナツト着脱装置、17・・・・・・位
置検出器、19・・・・・・駆動モータA、20・・・
・・・駆動モータB、21・・・・・・駆動モータC1
22・・・・・・駆動モータC123・・・・・・駆動
モータE、24・・・・・・ナラ)?ffき台、25・
・・・・・搭載台車A、26・・・・・・搭載台車B、
27・・・・・・駆動モータF、28・・・・・・歯車
A、29・・・・・・歯車B。 代理人 弁理士 西 元 勝 − −19= ψ l 「O r+”+       <D −八1
FIG. 1 is a perspective view showing an embodiment of a switchgear according to the present invention, FIG. 2 is a front view of FIG. 1, and FIG. 3 is a plan view of FIG. 1.
FIG. 4 is an enlarged plan view of part A in FIG. 3, FIG. 5 is an enlarged perspective view of main parts showing another embodiment of the present invention, and FIG. Figure 7 is a diagram showing the arrangement of the stud ports in Figure 6, Figure 8 is a longitudinal section of the pressure vessel, Figure 9 is an enlarged sectional view of section B in Figure 8, and Figure 10 is a front view of the conventional switchgear. 11 is a plan view of FIG. 10, FIG. 12 is an enlarged perspective view of the main part of FIG. 10, and FIG. 13 is an opening/closing operation using the conventional opening/closing device shown in FIGS. The work sequence diagram, FIG. 14, is a diagram showing the arrangement of the stud bolts in FIG. 13. 1...Pressure vessel body, 2...Top lid, 3
...Stud bolt, 4...Nut,
5...Body flange, 6...Female threaded part, 7...Lower threaded part, 8...Top lid flange, 9...Top Threaded part, 10... Bolt 7L. 11... Frame, 12... Guide rail, 13... Station, 14... Bolt cleaning device, 15... Stud tensioner,
16... Nut attachment/detaching device, 17... Position detector, 19... Drive motor A, 20...
... Drive motor B, 21... Drive motor C1
22...Drive motor C123...Drive motor E, 24...Near)? ff stand, 25・
...Mounting trolley A, 26...Mounting trolley B,
27... Drive motor F, 28... Gear A, 29... Gear B. Agent Patent attorney Masaru Nishimoto − −19= ψ l “O r+”+ <D −81

Claims (2)

【特許請求の範囲】[Claims] (1)圧力容器胴体と上蓋とをスタッドボルト及びナッ
トで締め付けた圧力容器上に、スタッドボルトの配列方
向に沿って移動するステーションと、このステーション
ン上をスタッドボルトの配列方向と直交する方向に移動
可能に設置されると共にボルト清掃装置、スタッドテン
ショナ及びナット着脱装置を取り付けた搭載台車を設け
、スタッドボルトとナットの緩め、締め付け作業及びス
タッドボルトからナットの取り外し作業を行うものにお
いて、前記搭載台車をボルト清掃装置及びスタッドテン
ショナを取り付けた搭載台車Aとナット着脱装置を取り
付けた搭載台車Bとに分割すると共に搭載台車Bが搭載
台車Aを基準に前記スタッドボルトの配列方向と直交す
る方向に移動可能に設置したことを特徴とする圧力容器
の開閉装置。
(1) A station that moves along the direction in which the stud bolts are arranged on a pressure vessel in which the pressure vessel body and the top cover are tightened with stud bolts and nuts, and a station that moves on this station in a direction perpendicular to the direction in which the stud bolts are arranged. A mounting trolley that is movably installed and equipped with a bolt cleaning device, a stud tensioner, and a nut attaching/detaching device, and is used for loosening and tightening of stud bolts and nuts, and removing nuts from stud bolts, wherein said mounting trolley is divided into a mounting cart A to which a bolt cleaning device and a stud tensioner are attached and a mounting cart B to which a nut attaching/detaching device is attached, and the mounting cart B moves in a direction perpendicular to the arrangement direction of the stud bolts with reference to the mounting cart A. A pressure vessel opening/closing device characterized in that it can be installed.
(2)前記搭載台車Aと搭載台車Bが、互いに歯車に介
して係合されていることを特徴とする請求項(1)記載
の圧力容器の開閉装置。
(2) The opening/closing device for a pressure vessel according to claim (1), wherein the loading truck A and the loading truck B are engaged with each other via gears.
JP63057931A 1988-03-11 1988-03-11 Pressure vessel switchgear Expired - Fee Related JP2640355B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63057931A JP2640355B2 (en) 1988-03-11 1988-03-11 Pressure vessel switchgear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63057931A JP2640355B2 (en) 1988-03-11 1988-03-11 Pressure vessel switchgear

Publications (2)

Publication Number Publication Date
JPH01234657A true JPH01234657A (en) 1989-09-19
JP2640355B2 JP2640355B2 (en) 1997-08-13

Family

ID=13069759

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63057931A Expired - Fee Related JP2640355B2 (en) 1988-03-11 1988-03-11 Pressure vessel switchgear

Country Status (1)

Country Link
JP (1) JP2640355B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0674239U (en) * 1993-04-01 1994-10-21 北海道電力株式会社 Guide positioning device for bolt tightening device
JP2012057690A (en) * 2010-09-07 2012-03-22 Japan Steel Works Ltd:The Bolt tensioner and bolt tensioner adjusting device
JP2013022710A (en) * 2011-07-25 2013-02-04 Japan Steel Works Ltd:The Bolt tensioner
JP2014042946A (en) * 2012-08-24 2014-03-13 Japan Steel Works Ltd:The Bolt tensioner
JP2015505279A (en) * 2011-12-21 2015-02-19 ジョスト,ケネス Bolt tightening robot for wind turbine
CN110168667A (en) * 2016-12-30 2019-08-23 纽斯高动力有限责任公司 Bolt installation and clamping system
US11292094B2 (en) 2017-12-06 2022-04-05 Vestas Wind Systems A/S Automated tightening of bolts

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5997849A (en) * 1982-11-24 1984-06-05 バブコツク日立株式会社 Automatic nut detachable device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5997849A (en) * 1982-11-24 1984-06-05 バブコツク日立株式会社 Automatic nut detachable device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0674239U (en) * 1993-04-01 1994-10-21 北海道電力株式会社 Guide positioning device for bolt tightening device
JP2012057690A (en) * 2010-09-07 2012-03-22 Japan Steel Works Ltd:The Bolt tensioner and bolt tensioner adjusting device
JP2013022710A (en) * 2011-07-25 2013-02-04 Japan Steel Works Ltd:The Bolt tensioner
JP2015505279A (en) * 2011-12-21 2015-02-19 ジョスト,ケネス Bolt tightening robot for wind turbine
JP2014042946A (en) * 2012-08-24 2014-03-13 Japan Steel Works Ltd:The Bolt tensioner
CN110168667A (en) * 2016-12-30 2019-08-23 纽斯高动力有限责任公司 Bolt installation and clamping system
JP2020514702A (en) * 2016-12-30 2020-05-21 ニュースケール パワー エルエルシー Bolt installation and tensioning system
CN110168667B (en) * 2016-12-30 2024-05-24 纽斯高动力有限责任公司 Bolt mounting and tensioning system
US11292094B2 (en) 2017-12-06 2022-04-05 Vestas Wind Systems A/S Automated tightening of bolts

Also Published As

Publication number Publication date
JP2640355B2 (en) 1997-08-13

Similar Documents

Publication Publication Date Title
US6467675B1 (en) Vehicle body assembly apparatus and assembly method
US8338751B2 (en) Adjustable span ferris wheel positioner
CN108063277A (en) A kind of assembly line for power battery module assembly PACK assemblings
PT933161E (en) DEVICE FOR MOUNTING CAROUSES OF AUTOMOTIVE VEHICLES BY WELDING FOR POINTS
JPH04223825A (en) Apparatus and method for assemb- ling car body
JPH01234657A (en) Opening and closing device for pressure container
CN114054457A (en) Blade storage vehicle device
CN209334962U (en) Rotary eight axis of the double-station linkage robot welding jig of draught fan impeller
US20010050206A1 (en) Interchangeable nests for supporting components on a transport system
CN111037186B (en) Multi-vehicle-type flexible turntable switching system for welding and assembling body in white
DE29923946U1 (en) System for the flexible assembly of car bodies
JPH11219829A (en) Transformer
CN217263005U (en) Auxiliary maintenance tool used in pretreatment and pretreatment mechanism of air spring maintenance line
CN207682272U (en) The mounting tool of Automobile back row seat back framework
CN210338379U (en) Box body tightening machine
JP2863224B2 (en) Ring gear processing equipment
CN220244761U (en) Multi-machine-table feeding and discharging workstation for complex parts
JP2005289326A (en) Side panel assembling line
JPH03279115A (en) Work transfer equipment
JPS62155178A (en) Assembly device for body
JPS63169233A (en) Nut carrying device
JPH0651093A (en) Repelacing device for control rod driving mechanism
US8302288B2 (en) System and method for assembling a closure
JPH0431837B2 (en)
CN116621019A (en) Fixed lifting device for four-axis manipulator body

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees