JPH01131702A - Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block - Google Patents

Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block

Info

Publication number
JPH01131702A
JPH01131702A JP28778687A JP28778687A JPH01131702A JP H01131702 A JPH01131702 A JP H01131702A JP 28778687 A JP28778687 A JP 28778687A JP 28778687 A JP28778687 A JP 28778687A JP H01131702 A JPH01131702 A JP H01131702A
Authority
JP
Japan
Prior art keywords
foundation
construction
block
grade separation
separation bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28778687A
Other languages
Japanese (ja)
Inventor
Keisuke Yamakawa
山川 圭介
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP28778687A priority Critical patent/JPH01131702A/en
Publication of JPH01131702A publication Critical patent/JPH01131702A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

PURPOSE: To shorten construction term by assembling a block manufactured at a factory on a foundation pillar driven at a predetermined position, attaching it on a foundation ground, and then connecting the foundation pillar with the skeleton block to perform a foundation work and an incidental work. CONSTITUTION: Foundation pillars 2 are driven at positions where a three- dimensional crossing bridge is installed, and bridge blocks 3 manufactured at a factory are carried to construction site and are assembled. Grout is poured on a bottom face 5 to attach the block 3 with a foundation ground 10 adhesively. After that, the foundation pillars 2 and the skeleton blocks 3 are tightened by bolts, welding, etc., to perform a foundation work. Consequently, construction term for the three-dimensional crossing bridge can be shortened, and a period of traffic regulation can be shortened greatly.

Description

【発明の詳細な説明】 従来父差点に於ける立体化工事は長い渋滞と多くの日数
を要するのが欠点であった。本発明はこの様な欠点をな
くす為になされたものであり、それを図について説明す
れば、まず現場の地下埋設物を調査し障畜となりうる水
道管等をあらかじめ移設しておく。次にアスフアルト■
を規定寸法にめくり■の基礎杭を打設しておく・。次に
既に工場製産しであるブロック■を現場に搬入し、設計
図に従い設置・し組1立てる。このときボールド■にて
それぞれ連結しておく。組立が終ると1皮面(りにグラ
ウト注入しブロックと基礎地盤Oとの接着安定を、計る
。−ここから基礎工事に入る。これはあらかじめ打設し
てあった基礎杭・わと躯体ブロックとを接続する工事で
ある。躯体鉄務(鉄板)(りと基礎杭■の鉄fJ(鉄板
)■とを熔、接かボールド■で締結する。この作業はあ
らかじめあけそあるマンホール(りを作業員が出入して
行う。これで車輌を仮通行させても↓い。他の付帯工事
を行ない、この僑工事は完了となるっ この発明は、工期を大巾に短縮させる為になされたもの
であり、−役的なもので現場での作業は10日前後です
み、交通規制は1週間程度で解除できる見通しである。
DETAILED DESCRIPTION OF THE INVENTION Conventionally, three-dimensional construction work at intersection points has had the disadvantage of requiring long traffic jams and many days. The present invention has been made in order to eliminate such drawbacks, and to explain it with reference to the drawings, first, underground objects at the site are investigated and water pipes and the like that could be a nuisance are relocated in advance. Next, asphalt■
Turn it over to the specified dimensions and drive the foundation pile. Next, the blocks ■, which have already been produced in the factory, are delivered to the site, installed and assembled according to the blueprints. At this time, connect them with bold ■. Once the assembly is completed, grout is injected into the first surface to ensure a stable bond between the blocks and the foundation ground O. - Foundation work begins from here. This work is to connect the steel fJ (iron plate) of the frame structure (iron plate) and the foundation pile with welding, jointing, or bold ■.This work is done in advance by connecting the manhole This is done by workers entering and exiting.This allows vehicles to temporarily pass through.Other ancillary works are carried out, and this additional work is completed.This invention was made to greatly shorten the construction period. The work on the site will only take about 10 days, and traffic restrictions are expected to be lifted in about a week.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の縦断面図である。 ■はアスフアルト ■は基礎杭 ■は僑のブロック ■
はブロック連結ボルト (0はブロツク1よ面 ■は躯
体鉄板 ■は基礎′杭鉄板■は締結ボールド ■はマン
ホール 0は基礎°地盤
The drawing is a longitudinal sectional view of the invention. ■ is asphalt ■ is foundation pile ■ is overseas block ■
is the block connecting bolt (0 is the side from block 1 ■ is the steel frame plate ■ is the foundation' pile iron plate ■ is the fastening bold ■ is the manhole 0 is the foundation ° ground

Claims (2)

【特許請求の範囲】[Claims] (1)立体交差橋築造工事に於て先にする基礎工事を後
まわしにし、躯体設置後に基礎工事を完了させる工法
(1) A construction method in which the foundation work is postponed first in the construction of an overpass bridge, and the foundation work is completed after the frame is installed.
(2)本又で詳記した様に現場外で分解製造したブロッ
クを現場に搬入し、組立てる組立式立体交差橋
(2) As detailed in Honmata, blocks disassembled and manufactured off-site are brought to the site and assembled into a prefabricated overpass bridge.
JP28778687A 1987-11-13 1987-11-13 Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block Pending JPH01131702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28778687A JPH01131702A (en) 1987-11-13 1987-11-13 Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28778687A JPH01131702A (en) 1987-11-13 1987-11-13 Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block

Publications (1)

Publication Number Publication Date
JPH01131702A true JPH01131702A (en) 1989-05-24

Family

ID=17721723

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28778687A Pending JPH01131702A (en) 1987-11-13 1987-11-13 Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block

Country Status (1)

Country Link
JP (1) JPH01131702A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887603A (en) * 2016-05-11 2016-08-24 宁波市交通规划设计研究院有限公司 Method for controlling differential settlement of bridgehead roadbed
CN105970755A (en) * 2016-05-27 2016-09-28 宁波市交通规划设计研究院有限公司 Construction method for prevention and treatment for sidewise slippage of soft soil roadbed
CN106192650A (en) * 2016-07-27 2016-12-07 宁波市交通规划设计研究院有限公司 The operation highway bridgehead vehicle jump coordinating to control based on malformation disposes structure and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887603A (en) * 2016-05-11 2016-08-24 宁波市交通规划设计研究院有限公司 Method for controlling differential settlement of bridgehead roadbed
CN105887603B (en) * 2016-05-11 2018-06-19 宁波市交通规划设计研究院有限公司 A kind of method for controlling Bridgehead by Blastig differential settlement
CN105970755A (en) * 2016-05-27 2016-09-28 宁波市交通规划设计研究院有限公司 Construction method for prevention and treatment for sidewise slippage of soft soil roadbed
CN106192650A (en) * 2016-07-27 2016-12-07 宁波市交通规划设计研究院有限公司 The operation highway bridgehead vehicle jump coordinating to control based on malformation disposes structure and method
CN106192650B (en) * 2016-07-27 2018-05-15 宁波市交通规划设计研究院有限公司 Coordinate the operation highway bridgehead vehicle jump disposal structure and method of control based on malformation

Similar Documents

Publication Publication Date Title
JPH0821196A (en) Structure of floor system for segment type tunnel, and construction of segment type tunnel with precast floor system
JPH0393923A (en) Connection method of steel pillar of cast-in-place pile and connection structure
JPH01131702A (en) Method of construction completing foundation work after installation of body in construction of grade separation bridge and built-up type grade separation bridge divided into each block
JPH0790933A (en) Construction method of structure
RU2171330C1 (en) Arch-type deck bridge and method for its manufacture
JPS62244923A (en) Anchor bolt-driven precast concrete block and driving of anchor bolt
JP2620118B2 (en) Net formwork method for walls and floors
JPH0270850A (en) Pc coupled beam and execution of construction using same
JP2869764B2 (en) Reservoir construction method
JPS6195199A (en) Traverse structure under road foundation
JPH04315620A (en) Foundation structure for steel-framed building
JP2605563B2 (en) Basement structure of building
JPH0452815B2 (en)
JPH09328759A (en) Join method of column and pile
JP2699812B2 (en) Industrialized structure of middle- and high-rise houses
JP3065701B2 (en) Concrete beam and steel beam joining method
JP2540375B2 (en) Basic structure of building
JPH116162A (en) Construction method for reinforced concrete underground external wall
JP3005885B2 (en) How to build the foundation of a structure
JPH0667619U (en) Bearing wall assembly structure
SU897919A1 (en) Prefabricated ferroconcrete bridge pylon
JPH0466965B2 (en)
JP2967530B2 (en) Basement building construction method
JP2605484B2 (en) Steel construction method in building construction
JP2560912B2 (en) Column-beam joint structure and construction method