- Publication number
- JPH01102171A JPH01102171A JP25733287A JP25733287A JPH01102171A JP H01102171 A JPH01102171 A JP H01102171A JP 25733287 A JP25733287 A JP 25733287A JP 25733287 A JP25733287 A JP 25733287A JP H01102171 A JPH01102171 A JP H01102171A
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- concrete
- rising
- balcony
- rise
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000630 rising effect Effects 0.000 title claims description 26
- 238000000034 method Methods 0.000 title claims description 6
- 238000010276 construction Methods 0.000 title description 2
- 238000009415 formwork Methods 0.000 claims description 37
- 230000002787 reinforcement Effects 0.000 abstract description 12
- 230000003014 reinforcing effect Effects 0.000 abstract description 11
- 239000002184 metal Substances 0.000 abstract description 8
- 230000001681 protective effect Effects 0.000 abstract description 3
- 125000006850 spacer group Chemical group 0.000 abstract description 3
- 241000234435 Lilium Species 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 240000004670 Glycyrrhiza echinata Species 0.000 description 1
- 235000001453 Glycyrrhiza echinata Nutrition 0.000 description 1
- 235000006200 Glycyrrhiza glabra Nutrition 0.000 description 1
- 235000017382 Glycyrrhiza lepidota Nutrition 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229940010454 licorice Drugs 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Abstract
Description
【発明の詳細な説明】
イ0発明の目的
産業上の利用分野
本発明は、例えば、第4図に示すように、内部スラブ面
AとバルコニーBとが段差を有し、しかもその間にサツ
シュ下端等の立上り部Cを有する建物躯体をコンクリー
トで一体打ちする工法に関するものである。DETAILED DESCRIPTION OF THE INVENTION A. Object of the Invention Industrial Field of Application The present invention provides, for example, as shown in FIG. This relates to a construction method in which a building frame having a rising portion C such as a building frame is integrally poured with concrete.
従来の技術
従来、上記のような段差等のある躯体部分にコンクリー
トを打設する場合、第5図に示すように、梁鉄骨りや鉄
筋EにセパレーターFを溶接し、これに型枠Gをセット
して打設していた。Conventional technology Conventionally, when pouring concrete into a part of a building structure with steps such as those mentioned above, a separator F is welded to the beam steel frame or reinforcing bars E, and a formwork G is set to this, as shown in Figure 5. The concrete was being poured.
発明が解決しようとする問題点
しかしながら、上記従来方法では、鉄骨りや鉄筋Eの精
度やセパレーターFの取付は精度によって型枠Gのセッ
ト精度が左右され、不正確となるぽかりでなく、型枠の
解体が難しく、脱型後のコンクリート面の仕上げにも問
題があった。Problems to be Solved by the Invention However, in the above conventional method, the accuracy of setting the formwork G depends on the accuracy of the steel frame and reinforcing bars E, and the installation accuracy of the separator F. It was difficult to dismantle the concrete, and there were also problems with the finishing of the concrete surface after demolding.
本発明は、上記従来の問題点を解決するためになされた
もので、その目的とするところは、型枠のセットが正確
かつ容易で、仕上げに手間がかがらない段差床および立
上り部に於けるコンクリートの一体打ち工法を提供する
ことにある。The present invention was made in order to solve the above-mentioned conventional problems, and its purpose is to enable accurate and easy setting of formwork for stepped floors and rising parts that do not require much time and effort for finishing. The purpose of this project is to provide a concrete casting method that can be used in one piece.
ロ1発明の構成
問題点を解決するための手段
本発明の建物躯体の段差床および立上り部に於けるコン
クリートの一体打ち工法は、略コ字状に折曲げで水平受
部と長脚部と短脚部を形成した受金物を段差のある床に
差し渡して、上記長脚部の下端を低床側に設置せしめる
と共に、短脚部の下端を高床側に設置せしめ、上記水平
受部の長脚部側端部に水平方向に突設したセパレーター
に立上り型枠または段差型枠を取付けると共に、上記水
平受部に立上り型枠をセットし、両法部および立上り部
にコンクリートを同時に打設することを特徴とするもの
である。B1 Means for Solving the Constituent Problems of the Invention The method of integrally pouring concrete for stepped floors and rising parts of a building frame according to the present invention is to bend the concrete in a substantially U-shape to form a horizontal receiving part and a long leg part. The support with the short legs formed thereon is passed over a stepped floor, and the lower ends of the long legs are installed on the low floor side, and the lower ends of the short legs are installed on the high floor side, and the length of the horizontal support section is set. Attach a rising formwork or stepped formwork to the separator that protrudes horizontally from the side ends of the legs, set the rising formwork on the horizontal receiver, and pour concrete into both slopes and the rising part at the same time. It is characterized by this.
実施例
以下、本発明の一実施例について図面を参照しながら説
明する。EXAMPLE Hereinafter, an example of the present invention will be described with reference to the drawings.
第1図において、1は受金物であって、第2図に示すよ
うに鉄筋を略コ字状に折曲げて水平受部1aと長脚部1
bと短脚部1cが形成されでいる。In Fig. 1, reference numeral 1 denotes a metal receiving part, and as shown in Fig. 2, a reinforcing bar is bent into a substantially U-shape to form a horizontal receiving part 1a and a long leg part 1.
b and short leg portion 1c are formed.
上記水平受部1aの長脚部1b側端部には、セパレータ
ー2が水平方向に突設して溶接されている。A separator 2 is welded to the end of the long leg portion 1b of the horizontal receiving portion 1a so as to protrude in the horizontal direction.
3は端太型枠用骨であって、その−倒起立片3aには釘
打用穴があけられている。Reference numeral 3 denotes a frame for thick formwork, and holes for nailing are made in the upright pieces 3a thereof.
4は立上り部配筋用取付杆であって、上記セパレーター
2と端太型枠用骨3との間にほぼ垂直に植設されている
。本実施例では、上記取付杆4はセパレーター2の後部
を折曲げて一体的に形成しであるが、別体のものであっ
てもよい。Reference numeral 4 denotes a mounting rod for reinforcing the upright portion, which is installed almost perpendicularly between the separator 2 and the frame 3 for the end frame. In this embodiment, the mounting rod 4 is integrally formed by bending the rear part of the separator 2, but it may be formed separately.
5はカンザシ筋受であって、上記長脚部1bから側方に
突設されている。Reference numeral 5 denotes a licorice bar, which protrudes laterally from the long leg portion 1b.
上記長脚部1bの下jiilW1には、塩ビ保WI管6
が、また上記短脚部1cの下端部には、塩ビ製の止め金
物7が取付けられている。In the lower jiil W1 of the long leg portion 1b, there is a PVC preservation pipe 6.
However, a stopper 7 made of PVC is attached to the lower end of the short leg 1c.
上記受金物1は、第1図に示すように、建物の段差の低
いバルコニー側に長脚部1bが位置し、梁部分を越えて
水平受部1aを差し渡し、段差の高い室内スラブ側に短
脚部ICが位置するように配置されている。そして、上
記短脚部1Cの下端部の止め金物7をスラブ型枠8に釘
止めして固定する。As shown in Fig. 1, the above-mentioned bracket 1 has a long leg part 1b located on the balcony side with a low level difference in the building, a horizontal support part 1a across the beam part, and a short leg part 1b on the indoor slab side with a high level difference. It is arranged so that the leg IC is located therein. Then, the stopper 7 at the lower end of the short leg portion 1C is nailed to the slab formwork 8 and fixed.
長脚部1bの下端の保護管6は、バルコニー型枠9上に
設置して、受金物1の水平受部1aがほぼ水平になるよ
うにセットする。The protective tube 6 at the lower end of the long leg part 1b is installed on the balcony formwork 9, and set so that the horizontal receiving part 1a of the receiving metal part 1 is substantially horizontal.
次に、上記スラブ型枠8にスペーサーブロック10を配
置して、これと上記カンザシ筋受5との間にカンザシ筋
11を差し渡して、梁上端筋12を支持せしめる。尚、
梁筋は予め地組みしたプレハブ鉄筋であって、上記受金
物1をセットする前に、予め梁型枠内に落し込んでおい
て、上記のようにカンザシ筋11により所定高さ位置に
セットする。Next, a spacer block 10 is placed on the slab formwork 8, and a lily pad 11 is passed between this and the lily pad support 5 to support the beam upper end reinforcement 12. still,
The beam reinforcing bars are prefabricated reinforcing bars that have been pre-assembled in advance, and before setting the above-mentioned bracket 1, they are dropped into the beam formwork and set at a predetermined height position using the barb 11 as described above. .
続いて上記立上り部配筋用取付杆4に立上り部鉄筋13
を溶接して支持せしめる。Next, the rising part reinforcing bars 13 are attached to the mounting rod 4 for the rising part reinforcement.
Weld and support.
次に、上記セパレーター2に立上り型枠14を取付けて
、7オームタイ15により締付固定する。Next, the standing formwork 14 is attached to the separator 2 and fixed by tightening with 7-ohm ties 15.
該立上り型枠14の上端部は立上り部の上端面に一致さ
せ、下端面はバルコニー面に一致するようにセットする
。また、上記端太型枠用骨3には、端太型枠16をセッ
トして、釘止めする。該端太型枠16の上端部は立上り
部の上端面に、下端部はスラブ面に一致するようにセッ
トする。The upper end of the rising formwork 14 is set to match the upper end surface of the rising portion, and the lower end surface is set to match the balcony surface. Moreover, the thick-cut formwork 16 is set on the thick-cut form frame 3 and nailed thereto. The upper end of the end frame 16 is set so as to match the upper end surface of the rising portion, and the lower end thereof is set so as to match the slab surface.
更に、上記立上り型枠14と端太型枠16を頭継ぎ桟木
17により釘止めして連結する。Further, the upright formwork 14 and the end formwork 16 are connected by nailing them together using a head joint piece 17.
以上のようにして、型枠のセットが完了したら、上記ス
ラブ型枠8、梁型枠、バルコニー型枠9および立上り部
分にコンクリートを同時に打設して一体打ちする。When the formwork has been set in the manner described above, concrete is poured into the slab formwork 8, beam formwork, balcony formwork 9, and the rising portion at the same time and is poured in one piece.
第3図は室内スラブおよびバルコニーに半PC床を使用
した場合の実施例を示すものである。本実施例では、セ
パレーター2に段差型枠18を取付け、立上り部の側型
枠19および立上り鉄筋20は巾止め筋21に取付ける
ようになっている。FIG. 3 shows an example in which a semi-PC floor is used for an indoor slab and a balcony. In this embodiment, the step formwork 18 is attached to the separator 2, and the side formwork 19 and the rising reinforcing bars 20 of the rising portion are attached to the stop bars 21.
尚、本実施例では、梁筋12を直接受金物1の水平受部
1aに結束している。In this embodiment, the beam reinforcement 12 is directly tied to the horizontal receiving portion 1a of the receiving metal 1.
ハ0発明の効果
(1)高精度に形成した受金物を、スラブ型枠やバルコ
ニー型枠または半PC板に正確にセットすることができ
るので、立上り型枠や段差型枠が精度良くセットするこ
とができる。Effects of the invention (1) A highly precisely formed metal receiving object can be accurately set on a slab formwork, balcony formwork, or semi-PC board, so that rising formwork and stepped formwork can be set with high precision. be able to.
(2)スラブ、立上り部およびバルコニー等が同時打ち
であり、梁部分も通しで打設出来るため打継ぎ部分がな
く、漏水の心配がない。(2) The slab, rising section, balcony, etc. are cast at the same time, and the beams can also be cast through, so there are no joints and no worries about water leakage.
(3)大工の取付は作業が簡単である。(3) Installation by carpenters is easy.
(4)梁筋の力ンザシ筋受けとして利用できるため、梁
筋を正しい位置に配置することが出来る。(4) Since the beam reinforcement can be used as a force receiver, the beam reinforcement can be placed in the correct position.
(5)コンクリート打設時に立上り型枠の上部を通路と
して利用することが出来る。(5) The upper part of the rising formwork can be used as a passage during concrete pouring.
第1図は本発明方法の一実施例を説明する斜視図、第2
図は本発明方法に用いる受金物の斜視図、第3図は別の
実施例を説明する斜視図、第4図は建物内部とバルコニ
ーとに段差があり、立上り部を有する躯体の断面図、第
5図は従来方法を説明する断面図である。
1・・・受金物、1a・・・水平受部、1b・・・長脚
部、1c・・・短脚部、2・・・セパレーター、3・・
・端太型枠用受、3a・・・起立片、4・・・立上り部
配筋用取付杆、5・・・カンザシ筋受、6・・・保護管
、7・・・止め金物、8・・・スラブ型枠、9・・・バ
ルコニー型枠、10・・・スペーサーブロック、11・
・・カンザシ筋、12・・・梁上端筋、13・・・立上
り部鉄筋、14・・・立上り型枠、15・・・7オーム
タイ、16・・・端太型枠、17・・・頭継ぎ桟木、1
8・・・段差型枠、19・・・立上り部の側型枠、20
・・・立上り鉄筋、21・・・中止め筋。Fig. 1 is a perspective view illustrating an embodiment of the method of the present invention;
The figure is a perspective view of a receiving metal used in the method of the present invention, FIG. 3 is a perspective view illustrating another embodiment, and FIG. 4 is a cross-sectional view of a building frame with a raised part and a step between the inside of the building and the balcony. FIG. 5 is a sectional view illustrating a conventional method. DESCRIPTION OF SYMBOLS 1... Receptacle, 1a... Horizontal receiving part, 1b... Long leg part, 1c... Short leg part, 2... Separator, 3...
- Receiver for thick formwork, 3a... Standing piece, 4... Mounting rod for rising section reinforcement, 5... Kanzashiri bar receiver, 6... Protective pipe, 7... Stopper, 8 ... Slab formwork, 9... Balcony formwork, 10... Spacer block, 11.
... Kanzashi reinforcement, 12 ... Beam top end reinforcement, 13 ... Rising part reinforcing bar, 14 ... Rising formwork, 15 ... 7 ohm tie, 16 ... Thick formwork, 17 ... Head Joint crosspiece, 1
8... Step formwork, 19... Side formwork of rising part, 20
...Standing reinforcing bar, 21...Stopping bar.
Claims (1)
た受金物を段差のある床に差し渡して、上記長脚部の下
端を低床側に設置せしめると共に、短脚部の下端を高床
側に設置せしめ、上記水平受部の長脚部側端部に水平方
向に突設したセパレーターに立上り型枠または段差型枠
を取付けると共に、上記水平受部に立上り型枠をセット
し、両床部および立上り部にコンクリートを同時に打設
することを特徴とする建物躯体の段差床および立上り部
に於けるコンクリートの一体打ち工法。The receiving part, which is bent into a substantially U-shape to form a horizontal receiving part, a long leg part, and a short leg part, is passed over a stepped floor so that the lower end of the long leg part is installed on the lower floor side, and the short leg part is placed on the lower end of the long leg part. The lower end of the horizontal support part is installed on the raised floor side, and a rising formwork or step formwork is attached to the separator projecting horizontally at the end of the long leg part of the horizontal support part, and the rising formwork is attached to the horizontal support part. An integrated concrete pouring method for stepped floors and rising parts of a building frame, characterized by placing concrete in both floors and rising parts at the same time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25733287A JPH0645967B2 (en) | 1987-10-14 | 1987-10-14 | Concrete pouring method of concrete on step floor and rising part of building frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25733287A JPH0645967B2 (en) | 1987-10-14 | 1987-10-14 | Concrete pouring method of concrete on step floor and rising part of building frame |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01102171A true JPH01102171A (en) | 1989-04-19 |
JPH0645967B2 JPH0645967B2 (en) | 1994-06-15 |
Family
ID=17304890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25733287A Expired - Lifetime JPH0645967B2 (en) | 1987-10-14 | 1987-10-14 | Concrete pouring method of concrete on step floor and rising part of building frame |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0645967B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1143054B2 (en) † | 2000-04-04 | 2008-10-15 | Tsudakoma Kogyo Kabushiki Kaisha | Weft insert subnozzle |
CN112942815A (en) * | 2021-02-04 | 2021-06-11 | 广东省第五建筑工程有限公司 | Archaized building support beam and roof integrated pouring construction method |
-
1987
- 1987-10-14 JP JP25733287A patent/JPH0645967B2/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1143054B2 (en) † | 2000-04-04 | 2008-10-15 | Tsudakoma Kogyo Kabushiki Kaisha | Weft insert subnozzle |
CN112942815A (en) * | 2021-02-04 | 2021-06-11 | 广东省第五建筑工程有限公司 | Archaized building support beam and roof integrated pouring construction method |
CN112942815B (en) * | 2021-02-04 | 2022-04-22 | 广东省第五建筑工程有限公司 | Archaized building support beam and roof integrated pouring construction method |
Also Published As
Publication number | Publication date |
---|---|
JPH0645967B2 (en) | 1994-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20110128396A (en) | Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof | |
US8458973B1 (en) | Tie beam formation apparatus and method | |
JPH01102171A (en) | Method of integral placing construction of concrete in stepped floor and rising section of building body | |
JP2537330B2 (en) | Precast reinforced concrete columns | |
JP2690834B2 (en) | How to install the water stop plate | |
KR200196745Y1 (en) | A concrete wall construction for using reinforcement fixing pin | |
JP2864906B2 (en) | Precast wall joining method | |
JPS6351212B2 (en) | ||
JPH0572503B2 (en) | ||
JPH0637160Y2 (en) | Sleeve fixed hardware | |
JP2649205B2 (en) | Anchor bolt burying method | |
JPS6312987B2 (en) | ||
JPH076252Y2 (en) | Joint structure of PC beam and beam | |
JP2574630Y2 (en) | Half PC beam structure | |
JPH03281855A (en) | Floor framing construction for building | |
JPH0476117A (en) | Supporting device for anchor bolt | |
JPS5830459B2 (en) | Construction method of precast reinforced concrete structure | |
JPH0633119Y2 (en) | Floating formwork support | |
JP2759131B2 (en) | Foundation beam construction method for steel reinforced concrete columns | |
JPH0513789Y2 (en) | ||
JPS6137697Y2 (en) | ||
JPH0240823B2 (en) | KATAMOCHISURABUNIOKERUTESURITORITSUKEBUZAINOSETSUCHIHOHO | |
JPH0711202Y2 (en) | Joint structure of columns and beams in precast reinforced concrete structures | |
JPH0886013A (en) | Method of constructing balcony and precast concrete member for construction of balcony | |
JPH0558704U (en) | Precast reinforced concrete structure |