JP7908085B2 - Output estimation device, output estimation program, and output estimation method - Google Patents

Output estimation device, output estimation program, and output estimation method

Info

Publication number
JP7908085B2
JP7908085B2 JP2022107122A JP2022107122A JP7908085B2 JP 7908085 B2 JP7908085 B2 JP 7908085B2 JP 2022107122 A JP2022107122 A JP 2022107122A JP 2022107122 A JP2022107122 A JP 2022107122A JP 7908085 B2 JP7908085 B2 JP 7908085B2
Authority
JP
Japan
Prior art keywords
charge
battery
discharge
customer
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022107122A
Other languages
Japanese (ja)
Other versions
JP2024006333A (en
Inventor
勝弘 松田
和広 三澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tohoku Electric Power Co Inc
Original Assignee
Tohoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tohoku Electric Power Co Inc filed Critical Tohoku Electric Power Co Inc
Priority to JP2022107122A priority Critical patent/JP7908085B2/en
Publication of JP2024006333A publication Critical patent/JP2024006333A/en
Application granted granted Critical
Publication of JP7908085B2 publication Critical patent/JP7908085B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、出力推定装置、出力推定プログラム及び出力推定方法に関する。 This invention relates to an output estimation device, an output estimation program, and an output estimation method.

低炭素社会の実現やエネルギーの効率的な利用に向け、今後太陽光発電(PV:Photovoltaics)や蓄電池などのエネルギー機器を活用する需要家が増加していくことが想定される。各需要家の蓄電池による充放電が特定の時間帯に集中すると、その時間帯の電力需要が増大し、電力系統の負荷率が低下するおそれがある。電力系統の負荷率が低下した場合、電力系統の運用効率が低下してしまう。 To realize a low-carbon society and promote the efficient use of energy, it is anticipated that the number of consumers utilizing energy equipment such as solar power generation (PV: Photovoltaics) and battery storage will increase in the future. If the charging and discharging of batteries by individual consumers are concentrated during specific time periods, the electricity demand during those times may increase, potentially lowering the load factor of the power grid. A decrease in the load factor of the power grid would reduce the operational efficiency of the power grid.

このように、蓄電池充放電により、電力系統の需要変動が複雑化することが考えられる。このような電力系統の需要変動の複雑化により、これまで以上に需要変化率が高まることも想定される。需要変化率が拡大した場合、最低需要と最大需要との差が大きくなり、短時間で急速にその差を埋めなければならなくなり、電力系統の必要調整量が増大してしまう。さらに、電力系統の調整が追い付かなかった場合には、電力を供給できない事態に発展する可能性がある。 Thus, battery charging and discharging can complicate demand fluctuations in the power grid. This increased complexity could lead to a higher rate of demand change than before. If the rate of demand change expands, the difference between minimum and maximum demand will increase, requiring rapid adjustments in a short time, thus increasing the amount of adjustment needed by the power grid. Furthermore, if the power grid cannot keep up with the adjustments, it could lead to a situation where power cannot be supplied.

このような事態を回避するため、ヒートポンプ式給湯機や蓄電池などの需要家機器を用いて需要変化率を低減させるといった対策の検討が望まれている。需要家機器を用いた対策を考えた場合、需要家側資源を活用するアグリゲータと呼ばれる仲介業者や小売電気事業者が、系統運用者の需要調整に寄与することで対価を得るビジネスが成立すると期待される。 To avoid such situations, it is desirable to consider measures to reduce the rate of change in demand using consumer-side equipment such as heat pump water heaters and storage batteries. When considering measures using consumer-side equipment, it is expected that a business model could be established where intermediaries called aggregators, or retail electricity providers, who utilize consumer-side resources, earn compensation by contributing to the demand adjustment of grid operators.

需要家機器を用いた需要調整の1つの方法として、デマンドレスポンス(DR:Demand Response)を活用することが考えられる。デマンドレスポンスとは、経済メリットを提供することにより需要を調整する技術である。例えば、デマンドレスポンスの活用としては、需要家における蓄電池の充放電にインセンティブやペナルティを与えることで、需要家の蓄電池を制御するといった需要調整が考えられる。 One method of demand adjustment using customer-side equipment is to utilize Demand Response (DR). Demand response is a technology that adjusts demand by providing economic benefits. For example, one application of demand response could be to control customer battery usage by providing incentives or penalties for charging and discharging their batteries.

需要調整を適切に行うためには、蓄電池などの需要家機器の充放電を把握することが求められる。そこで、小売電気事業者やアグリゲータは、スマートメータと蓄電池との間にセンサを設置して蓄電池の充放電情報を取得し、センサから取得した蓄電池の充放電情報を用いてデマンドレスポンス指令を発して需要調整を行っている。 To properly adjust demand, it is necessary to understand the charging and discharging of customer equipment such as storage batteries. Therefore, retail electricity providers and aggregators install sensors between smart meters and storage batteries to acquire battery charging and discharging information, and use this information to issue demand response commands and adjust demand.

デマンドレスポンスを用いた需要調整の技術として、例えば、一日の充電量及び放電量を事前に得られる条件下で、各蓄電池に充電するための時間帯毎の総充電電力曲線を決定し、その曲線と鏡像関係にある曲線にしたがって電気料金を決定する従来技術がある。 As a demand response technique for adjusting demand, for example, there is a conventional technique that determines the total charging power curve for each time period for charging each battery, under conditions where the daily charging and discharging amounts are known in advance, and then determines electricity rates according to a curve that is a mirror image of that curve.

特開2015-014876号公報Japanese Patent Publication No. 2015-014876

しかしながら、従来の需要調整技術では、蓄電池の充放電量の情報を得るために新たなセンサの設置及びセンサから情報を得るための新たな通信設備の設置が必要であった。新たな通信設備を用いた情報収集ルートとは、送配電事業者とスマートメータとを結ぶAルート及び送配電事業者とアグリゲータなどとを結ぶCルート以外のルートである。このように新たな設備を設ける場合、個々の需要家における蓄電池の充放電量を得るためには、多くの作業が必要となり且つコストも高くなり、的確な需要調整の実現は困難であった。 However, conventional demand adjustment technologies required the installation of new sensors and communication equipment to obtain information on battery charge/discharge rates. The information collection routes using this new communication equipment were those other than Route A, which connects transmission and distribution companies to smart meters, and Route C, which connects transmission and distribution companies to aggregators, etc. When new equipment is installed in this way, obtaining battery charge/discharge rates for individual consumers requires a great deal of work and is costly, making accurate demand adjustment difficult.

開示の技術は、上記に鑑みてなされたものであって、簡易な構成で需要調整を的確に行う出力推定装置、出力推定プログラム及び出力推定方法を提供することを目的とする。 The disclosed technology was developed in view of the above, and aims to provide an output estimation device, output estimation program, and output estimation method that accurately adjust demand with a simple configuration.

本願の開示する出力推定装置、出力推定プログラム及び出力推定方法の一つの態様において、データ取得部は、複数の需要家の電力使用量を収集する。分類部は、前記電力使用量のうちの充放電装置を有さない非保有需要家の電力使用量を用いて前記需要家を分類するグループを生成する。グループ判定部は、前記充放電装置を保有する推定対象需要家の属性と近似する属性の非保有需要家が含まれるグループを、前記推定対象需要家が属するグループとして前記グループの中から選択する。推定部は、前記グループ判定部により選択されたグループに含まれる前記非保有需要家の電力使用量と前記推定対象需要家の電力使用量とを基に、前記推定対象需要家の前記充放電装置の充放電量を推定する。 In one embodiment of the output estimation device, output estimation program, and output estimation method disclosed in this application, a data acquisition unit collects the power consumption of a plurality of consumers. A classification unit generates groups of consumers by classifying them using the power consumption of consumers who do not possess a charge/discharge device from the power consumption. A group determination unit selects from the groups a group that includes consumers who do not possess a charge/discharge device and whose attributes are similar to those of the target consumer who possesses a charge/discharge device, and selects this group as the group to which the target consumer belongs . An estimation unit estimates the charge/discharge amount of the charge/discharge device of the target consumer based on the power consumption of the consumers who do not possess a charge/discharge device and the power consumption of the target consumer.

1つの側面では、本発明は、簡易な構成で需要調整を的確に行うことができる。 In one aspect, the present invention allows for accurate demand adjustment with a simple configuration.

図1は、需要家に対する電力管理システムの概略構成図である。Figure 1 is a schematic diagram of the power management system for consumers. 図2は、出力推定装置及びデマンドレスポンス生成装置のブロック図である。Figure 2 is a block diagram of the output estimation device and the demand response generation device. 図3は、正規化に用いるパラメータとして用いる値の組合せの一例を示す図である。Figure 3 shows an example of a combination of values used as parameters for normalization. 図4は、推定対象需要家の負荷カーブと平均負荷カーブとの関係を説明するための図である。Figure 4 illustrates the relationship between the load curve of the estimated target consumer and the average load curve. 図5は、推定対象需要家の出力推定処理の概要を表す図である。Figure 5 is a diagram illustrating the overview of the output estimation process for the target consumer. 図6は、アグリテータシステムによるデマンドレスポンス指令の生成処理のフローチャートである。Figure 6 is a flowchart of the process by which the aggregator system generates demand response commands. 図7は、出力推定装置による推定対象需要家の蓄電池の充放電量及び実負荷の推定処理のフローチャートである。Figure 7 is a flowchart showing the estimation process of the battery charge/discharge amount and actual load of the target consumer by the output estimation device. 図8は、出力推定装置のハードウェア構成図である。Figure 8 is a hardware configuration diagram of the output estimation device.

以下に、本願の開示する出力推定装置、出力推定プログラム及び出力推定方法の実施例を図面に基づいて詳細に説明する。なお、以下の実施例により本願の開示する出力推定装置、出力推定プログラム及び出力推定方法が限定されるものではない。 The following describes in detail, with reference to the drawings, embodiments of the output estimation device, output estimation program, and output estimation method disclosed in this application. However, the following embodiments do not limit the output estimation device, output estimation program, and output estimation method disclosed in this application.

図1は、需要家に対する電力管理システムの概略構成図である。電力管理システムは、需要家2の電力管理を行うアグリゲータシステム1及び送配電事業者システム3を有する。 Figure 1 is a schematic diagram of the power management system for consumers. The power management system includes an aggregator system 1 and a transmission and distribution operator system 3, which manage the power supply for consumer 2.

送配電事業者システム3は、発電所で発生した電気を需要家2が電気を使用する地点まで、送電線や配電線などにより送り届ける事業者が管理するシステムである。送配電事業者システム3は、各需要家2に設置されたスマートメータ22とネットワークで接続される。送配電事象者システム3は、スマートメータ22により計量された情報を受信する。この、スマートメータ22が計量した情報を送配電事象者システム3へ送るルートは、Aルートと呼ばれる。送配電事象者システム3は、各需要家2のスマートメータ22により計量された情報をアグリゲータシステム1へ送信する。 The power transmission and distribution system 3 is a system managed by the power company that delivers electricity generated at power plants to the point where consumers 2 use the electricity, via transmission and distribution lines. The power transmission and distribution system 3 is connected via a network to smart meters 22 installed at each consumer 2. The power transmission and distribution system 3 receives information measured by the smart meters 22. The route by which this information measured by the smart meters 22 is sent to the power transmission and distribution system 3 is called Route A. The power transmission and distribution system 3 transmits the information measured by the smart meters 22 at each consumer 2 to the aggregator system 1.

アグリゲータシステム1は、アグリゲータや小売電気事業者などが管理するシステムである。アグリゲータシステム1は、各需要家2のスマートメータ22により計量された情報を含むスマートメータデータを送配電事象者システム3から受信する。この、スマートメータ22が計量した情報をアグリゲータシステム1へ送配電事象者システム3を介して送るルートは、Cルートと呼ばれる。アグリゲータシステム1は、スマートメータ22にから送信されたスマートメータデータを用いて各需要家2に対して充電又は放電を指示する。例えば、アグリゲータシステム1は、需要家2が有する蓄電池23に対するデマンドレスポンス指令を発して、需要家2に蓄電池23の充放電を行わせる。本実施例では、アグリゲータシステム1は、蓄電池23などの充放電装置を有さない需要家2に設置されたスマートメータ22からの情報も収集する。 The aggregator system 1 is a system managed by aggregators and retail electricity providers. The aggregator system 1 receives smart meter data, including information measured by the smart meters 22 of each customer 2, from the power transmission and distribution system 3. The route by which this information measured by the smart meters 22 is sent to the aggregator system 1 via the power transmission and distribution system 3 is called the C route. The aggregator system 1 uses the smart meter data transmitted from the smart meters 22 to instruct each customer 2 to charge or discharge. For example, the aggregator system 1 issues a demand response command to the battery 23 owned by customer 2, causing customer 2 to charge or discharge the battery 23. In this embodiment, the aggregator system 1 also collects information from smart meters 22 installed at customer 2 that do not have charging/discharging devices such as batteries 23.

需要家2は、送配電事業者システム3から供給された電気を使用する企業や家庭である。需要家2は、例えば、需要家端末装置21及びスマートメータ22を有する。また、需要家2は、エアコン24やエコキュート(登録商標)といった電気給湯器25などの送配電事業者システム3から供給された電気を使用する負荷機器を有する。さらに、需要家2は、蓄電池23などの充放電装置を有してもよい。ここで、充放電装置は、太陽光発電システムなどの発電装置も含まれる。 Customer 2 is a company or household that uses electricity supplied from the power transmission and distribution system 3. Customer 2, for example, has a customer terminal device 21 and a smart meter 22. Customer 2 also has load equipment that uses electricity supplied from the power transmission and distribution system 3, such as an air conditioner 24 and an electric water heater 25 such as an EcoCute (registered trademark). Furthermore, Customer 2 may have a charging and discharging device such as a storage battery 23. Here, the charging and discharging device also includes power generation equipment such as a solar power generation system.

以下では、充放電装置として蓄電池23を例に説明する。ここで、図1では、蓄電池23を保有する需要家2を例に図示したが、需要家2は、蓄電池23を保有しなくてもよい。ただし、以下に説明するアグリゲータシステム1による電力管理は、蓄電池23を保有する需要家2が対象となる。ここでは、蓄電池23を保有する需要家2を蓄電池保有需要家と呼び、蓄電池23を保有しない需要家2を蓄電池非保有需要家と呼ぶ。 In the following explanation, we will use a battery 23 as an example of a charging and discharging device. While Figure 1 illustrates a customer 2 that owns a battery 23, customer 2 does not necessarily need to own a battery 23. However, the power management provided by the aggregator system 1 described below applies to customer 2 that owns a battery 23. Here, customer 2 that owns a battery 23 is referred to as a "battery-owning customer," and customer 2 that does not own a battery 23 is referred to as a "non-battery-owning customer."

スマートメータ22は、需要家2における所定期間毎の電力使用量を計量する。スマートメータ22は、エアコン24や電気給湯器25などの負荷機器により使用された電力量及び蓄電池23に充電された電力量を加算して、且つ、蓄電池23から放電された電力量を減算することで電力使用量を算出する。ただし、スマートメータ22は、需要家2における全体の電力使用量を計量するが、蓄電池23やエアコン24といった個々の機器を区別した電力使用量の計量は行わなくてよい。そして、スマートメータ22は、計量した電力使用量をスマートメータデータとして送配電事業者システム3へ送出する。 The smart meter 22 measures the amount of electricity used by customer 2 at predetermined intervals. The smart meter 22 calculates the total electricity usage by adding the amount of electricity used by load equipment such as the air conditioner 24 and electric water heater 25, and the amount of electricity charged to the battery 23, and then subtracting the amount of electricity discharged from the battery 23. However, while the smart meter 22 measures the total electricity usage at customer 2, it does not need to measure the electricity usage of individual devices such as the battery 23 and air conditioner 24 separately. The smart meter 22 then sends the measured electricity usage as smart meter data to the power transmission and distribution operator system 3.

需要家端末装置21は、需要家2が使用するパーソナルコンピュータなどの情報端末装置である。蓄電池保有需要家が有する需要家端末装置21は、アグリゲータシステム1から発せられたデマンドレスポンス指令を受信する。そして、需要家端末装置21は、デマンドレスポンス指令をモニタなどに表示させて、需要家2に提供する。需要家2は、デマンドレスポンス指令を基に蓄電池23の充放電を実行する。 The customer terminal device 21 is an information terminal device, such as a personal computer, used by customer 2. The customer terminal device 21 owned by the battery-owning customer receives the demand response command issued from the aggregator system 1. The customer terminal device 21 then displays the demand response command on a monitor or similar device and provides it to customer 2. Customer 2 then performs charging and discharging of the battery 23 based on the demand response command.

図2は、出力推定装置及びデマンドレスポンス生成装置のブロック図である。アグリゲータシステム1は、出力推定装置10及びデマンドレスポンス生成装置11を有する。 Figure 2 is a block diagram of the output estimation device and the demand response generation device. The aggregator system 1 includes the output estimation device 10 and the demand response generation device 11.

出力推定装置10は、蓄電池保有需要家が保有する蓄電池23の出力、すなわち蓄電池23の充放電量を推定する。また、出力推定装置10は、蓄電池保有需要家の実負荷を推定する。以下に、出力推定装置10の詳細について説明する。出力推定装置10は、図2に示すように、スマートメータデータ取得部101、分類部102、データ格納部103、需要家情報記憶部104、グループ判定部105及び推定部106を有する。 The output estimation device 10 estimates the output of the battery 23 owned by the battery-owning customer, i.e., the charge and discharge amount of the battery 23. The output estimation device 10 also estimates the actual load of the battery-owning customer. The details of the output estimation device 10 are described below. As shown in Figure 2, the output estimation device 10 includes a smart meter data acquisition unit 101, a classification unit 102, a data storage unit 103, a customer information storage unit 104, a group determination unit 105, and an estimation unit 106.

需要家情報記憶部104は、蓄電池保有需要家及び蓄電池非保有需要家のいずれも含む各需要家2のそれぞれの属性情報を記憶する。属性情報は、例えば、需要家2の家族人数や延床面積などの各需要家2の電力使用傾向を表すことが可能な情報である。また、需要家情報記憶部104は、需要家2が保有する蓄電池23のうち定格出力が分かっている蓄電池23についてはその定格出力も記憶する。需要家情報記憶部104は、アグリゲータシステム1の管理者から入力された情報を記憶しても良いし、送配電事業者システム3から送られてくる各需要家2の情報を記憶してもよい。 The customer information storage unit 104 stores attribute information for each customer 2, including both customers who own storage batteries and those who do not. Attribute information includes, for example, information that can represent the power usage trends of each customer 2, such as the number of family members and the total floor area of the customer 2. The customer information storage unit 104 also stores the rated output of storage batteries 23 owned by customer 2 for which the rated output is known. The customer information storage unit 104 may store information input from the administrator of the aggregator system 1, or it may store information for each customer 2 sent from the power transmission and distribution operator system 3.

スマートメータデータ取得部101は、各需要家2に配置されたスマートメータ22から出力されたスマートメータデータを、送配電事業者システム3を介してCルートで取得する。そして、スマートメータデータ取得部101は、各需要家2のスマートメータデータを蓄積して保持する。この際、スマートメータデータには、それぞれの需要家2が蓄電池保有需要家又は蓄電池非保有需要家のいずれであるかを示す情報が付加される。 The smart meter data acquisition unit 101 acquires smart meter data output from smart meters 22 installed at each customer 2 via the power transmission and distribution operator system 3 using route C. The smart meter data acquisition unit 101 then stores and retains the smart meter data for each customer 2. At this time, information indicating whether each customer 2 is a customer with a battery storage system or a customer without a battery storage system is added to the smart meter data.

分類部102は、スマートメータデータ取得部101が保持するスマートメータデータのうち蓄電池非保有需要家のスマートメータデータをスマートメータデータ取得部101から取得する。そして、分類部102は、スマートメータデータを時間毎に並べて1日の電力使用量の変化を表す負荷カーブを蓄電池非保有需要家毎に生成する。すなわち、負荷カーブは、1日の時間毎のスマートメータデータの集合である。 The classification unit 102 retrieves smart meter data for customers without battery storage systems from the smart meter data acquisition unit 101. The classification unit 102 then arranges the smart meter data hour by hour to generate a load curve representing the daily change in electricity usage for each customer without battery storage systems. In other words, the load curve is a collection of smart meter data for each hour of the day.

そして、分類部102は、負荷カーブを用いてクラスタリングを行い、予め決められた数のグループに蓄電池非保有需要家を分類する。例えば、分類部102は、負荷カーブの間の距離を用いてクラスタリングを行うことができる。これにより、負荷カーブの距離を基準として蓄電池非保有需要家を、例えば3つのグループといった予め決められた数のグループに分けることができる。すなわち、グループ毎に、負荷カーブが類似する蓄電値非保有需要家がまとまる。また、分類部102は、分類結果をフィードバックしてクラスタリングを繰り返して分類を行ってもよい。ここで、負荷カーブは、時刻毎の電力使用量の集合であり、属性が近似する各需要家2の電力使用量の変化は似ていると想定できる。すなわち、負荷カーブを用いて蓄電池非保有需要家を分類することで、属性が近似することを基準として、需要家2を決められた数のグループに分類することができるといえる。ここで、属性が近似するとは、例えば、以下のように表すことができる。各需要家2の家族人数の類似閾値を1人とする。また、各需要家の延床面積の類似閾値を10m2とする。この場合に、ある需要家2の家族人数をm(人)であり延床面積がn(m2)の場合、家族人数がm±1(人)且つ延床面積がn±10(m2)である需要家は、属性が近似する需要家2といえる。すなわち、家族人数及び延床面積について、各グループの平均からそのグループの中で最も外れた蓄電池非保有需要家との差を類似閾値とした場合に、平均からのそれぞれの類似閾値内に含まれる需要家2がそのグループに属性が近似するということができる。そして、分類部102は、分類した蓄電池非保有需要家の負荷カーブをグループ毎に分けて、蓄電池非保有需要家の識別情報と共にデータ格納部103に格納する。 The classification unit 102 then performs clustering using load curves to classify non-battery-owning consumers into a predetermined number of groups. For example, the classification unit 102 can perform clustering using the distance between load curves. This allows non-battery-owning consumers to be divided into a predetermined number of groups, such as three groups, based on the distance between load curves. In other words, each group consists of non-battery-owning consumers with similar load curves. The classification unit 102 may also repeat the clustering process by feeding back the classification results. Here, the load curve is a set of power consumption amounts for each time period, and it can be assumed that the changes in power consumption of each consumer 2 with similar attributes are similar. In other words, by classifying non-battery-owning consumers using load curves, it can be said that consumers 2 can be classified into a predetermined number of groups based on similar attributes. Here, similar attributes can be expressed, for example, as follows: The similarity threshold for the number of family members of each consumer 2 is set to 1 person. Also, the similarity threshold for the total floor area of each consumer is set to 10 m² . In this case, if a certain customer 2 has m family members and n total floor area ( m² ), then a customer with m ± 1 family members and n ± 10 total floor area ( m² ) can be said to be a customer 2 with similar attributes. That is, if the similarity threshold is set as the difference between the average of each group and the most outlier non-battery-owning customer in that group, then customers 2 that fall within each similarity threshold from the average can be said to have attributes similar to that group. The classification unit 102 then separates the load curves of the classified non-battery-owning customers by group and stores them in the data storage unit 103 along with the identification information of the non-battery-owning customers.

グループ判定部105は、出力推定の対象とする蓄電池保有需要家の情報を取得する。例えば、グループ判定部105は、入力装置を用いてアグリゲータシステム1の管理者から出力推定の対象とする蓄電池保有需要家の情報の入力を受けてもよい。他にも、グループ判定部105は、出力推定の対象とする複数の蓄電池保有需要家の情報を予め格納した外部のデータベースから出力推定の対象とする蓄電池保有需要家の情報を取得してもよい。以下では、出力推定の対象とする蓄電池保有需要家を「推定対象需要家」と呼ぶ。 The group determination unit 105 acquires information on battery-owning consumers to be targeted for output estimation. For example, the group determination unit 105 may receive input of information on battery-owning consumers to be targeted for output estimation from the administrator of the aggregator system 1 using an input device. Alternatively, the group determination unit 105 may acquire information on battery-owning consumers to be targeted for output estimation from an external database that pre-stores information on multiple battery-owning consumers to be targeted for output estimation. Hereinafter, battery-owning consumers targeted for output estimation will be referred to as "target consumers."

次に、グループ判定部105は、推定対象需要家の属性情報を需要家情報記憶部104から取得する。さらに、グループ判定部105は、データ格納部103に格納されたグループ毎に各グループに属する全ての蓄電池非保有需要家の属性情報を取得する。そして、グループ判定部105は、推定対象需要家の属性情報と各グループに属する蓄電池非保有需要家の属性情報とを比較して、推定対象需要家に属性情報が近似するグループを特定する。以下では、グループ判定部105により特定されたグループを「近似グループ」と呼ぶ。 Next, the group determination unit 105 obtains attribute information of the estimated target customer from the customer information storage unit 104. Furthermore, the group determination unit 105 obtains attribute information of all non-battery-owning customers belonging to each group stored in the data storage unit 103. Then, the group determination unit 105 compares the attribute information of the estimated target customer with the attribute information of the non-battery-owning customers belonging to each group to identify the group whose attribute information is similar to that of the estimated target customer. Hereafter, the group identified by the group determination unit 105 will be referred to as the "approximate group."

例えば、グループ判定部105は、負荷カーブを用いたクラスタリングにより生成されたグループのそれぞれについて、それぞれのグループに含まれる蓄電池非保有需要家の家族人数の平均及び延床面積の平均を算出する。そして、グループ判定部105は、推定対象需要家の家族人数と延床面積とに最も近い家族人数の平均及び延床面積の平均を有するグループを近似グループとして特定する。これにより、例えば、ある需要家2について、家族人数及び延床面積のそれぞれが平均からの類似閾値内に存在するグループを、その需要家2の近似グループとすることができる。 For example, the group determination unit 105 calculates the average number of family members and the average total floor area of non-battery-owning consumers included in each group generated by clustering using load curves. The group determination unit 105 then identifies the group with the closest average number of family members and average total floor area to the estimated target consumer as the approximate group. This allows, for example, a group whose number of family members and total floor area are within a similarity threshold from the average for a given consumer 2 to be designated as the approximate group for that consumer 2.

グループ判定部105は、近似グループの全ての蓄電池非保有需要家の負荷カーブをデータ格納部103から取得する。そして、グループ判定部105は、近似グループの蓄電池非保有需要家の時刻毎のスマートメータデータの平均値を近似グループの代表値として求めて、平均負荷カーブを生成する。 The group determination unit 105 obtains the load curves of all non-battery-owning consumers in the approximate group from the data storage unit 103. Then, the group determination unit 105 calculates the average value of the smart meter data for each time interval of the non-battery-owning consumers in the approximate group as a representative value for the approximate group, and generates an average load curve.

ここで、本実施例では、グループ判定部105は、近似グループの代表値を蓄電池非保有需要家のスマートメータデータの平均値としたが、近似グループにおける全体的なスマートメータデータの変化傾向を表す値であれば他の値を代表値として用いてもよい。例えば、グループ判定部105は、近似グループの蓄電池非保有需要家の中で、スマートメータデータが中央値に最も近い蓄電池非保有需要家のスマートメータデータを代表値としてもよい。 In this embodiment, the group determination unit 105 uses the average value of smart meter data from non-battery-owning consumers as the representative value for the approximate group. However, other values may be used as the representative value as long as they represent the overall trend of change in smart meter data within the approximate group. For example, the group determination unit 105 may use the smart meter data of the non-battery-owning consumer whose smart meter data is closest to the median value among the non-battery-owning consumers in the approximate group as the representative value.

次に、グループ判定部105は、推定対象需要家のスマートメータデータをスマートメータデータ取得部101から取得する。そして、グループ判定部105は、推定対象需要家の負荷カーブを生成する。その後、グループ判定部105は、推定対象需要家の負荷カーブ及び近似グループの平均負荷カーブを推定部106へ出力する。 Next, the group determination unit 105 acquires smart meter data for the estimated target customer from the smart meter data acquisition unit 101. Then, the group determination unit 105 generates a load curve for the estimated target customer. Afterward, the group determination unit 105 outputs the load curve for the estimated target customer and the average load curve for the approximate group to the estimation unit 106.

推定部106は、推定対象需要家の負荷カーブ及び近似グループの平均負荷カーブの入力をグループ判定部105から受ける。次に、推定部106は、推定対象需要家の1日の総負荷量が、平均負荷カーブの総負荷量と等しくなるように、平均負荷カーブに含まれるスマートメータデータを正規化する。 The estimation unit 106 receives the load curve of the target customer and the average load curve of the approximate group from the group determination unit 105. Next, the estimation unit 106 normalizes the smart meter data included in the average load curve so that the total daily load of the target customer is equal to the total load of the average load curve.

ここで、平均負荷カーブと推定対象需要家の負荷カーブにおけるベース負荷の割合が大きく異なる場合の正規化方法の一例について説明する。ここで、正規化前の平均負荷カーブに含まれるスマートメータデータをPc(t)とし、正規化後の平均負荷カーブに含まれるスマートメータデータをPc’(t)とする。また、推定対象需要家の負荷カーブに含まれるスマートメータデータをPx(t)とする。 Here, we will explain an example of a normalization method when the proportion of base load in the average load curve and the load curve of the estimated target consumer differs significantly. Here, let Pc(t) be the smart meter data included in the average load curve before normalization, and let Pc'(t) be the smart meter data included in the average load curve after normalization. Also, let Px(t) be the smart meter data included in the load curve of the estimated target consumer.

推定部106は、正規化後の平均負荷カーブに含まれるスマートメータデータであるPc’(t)を、正規化前の平均負荷カーブに含まれるスマートメータデータであるPc(t)、並びに、パラメータa及びbを用いて、Pc’(t)=aPc(t)+bとする。この場合、Pc’(t)は、a及びbが定数であれば、Pc(t)を拡大縮小及び移動させたものであり、このようにおくことでPc(t)が正規化されているといえる。 The estimation unit 106 calculates Pc'(t), which is the smart meter data included in the normalized average load curve, using Pc(t), which is the smart meter data included in the average load curve before normalization, and parameters a and b, as follows: Pc'(t) = aPc(t) + b. In this case, if a and b are constants, Pc'(t) is obtained by scaling and shifting Pc(t), and by doing so, Pc(t) can be said to be normalized.

図3は、正規化に用いるパラメータとして用いる値の組合せの一例を示す図である。例えば、a及びbは、図3における座標平面上の格子の交点の値とすることができる。図3の格子は、例えば、0.1刻み値のa及びbを表すとすることができる。さらに、この交点のいずれかが、a及びbの初期値として予め決められる。初期値は、例えば、(a,b)=(0,0)などとすることができる。 Figure 3 shows an example of a combination of values used as parameters for normalization. For example, a and b can be the values of the intersection points of a grid on the coordinate plane in Figure 3. The grid in Figure 3 can, for example, represent a and b with a step size of 0.1. Furthermore, one of these intersection points is predetermined as the initial values of a and b. The initial values can be, for example, (a, b) = (0, 0).

推定部106は、Pc’(t)にa及びbの初期値を代入して、Px(t)との差分の1日の積分値であるΣ(Px(t)-Pc’(t))を算出する。次に、推定部106は、a及びbの組合せの値を変えて、Σ(Px(t)-Pc’(t))を算出する。推定部106は、a及びbの組合せの値を変化させて、a及びbの組合せ毎のΣ(Px(t)-Pc’(t))を算出する。 The estimation unit 106 substitutes the initial values of a and b into Pc'(t) and calculates Σ(Px(t) - Pc'(t)), which is the daily integral of the difference with Px(t). Next, the estimation unit 106 changes the values of the combinations of a and b and calculates Σ(Px(t) - Pc'(t)). The estimation unit 106 changes the values of the combinations of a and b and calculates Σ(Px(t) - Pc'(t)) for each combination of a and b.

そして、推定部106は、Σ(Px(t)-Pc’(t))が最小となるa及びbの組合せを特定する。例えば、推定部106は、図3の点200におけるa及びbを、Σ(Px(t)-Pc’(t))が最小となるa及びbの組合せとして特定する。そして、推定部106は、Σ(Px(t)-Pc’(t))が最小となるa及びbの組合せで表されるPc’(t)=aPc(t)+bを正規化後の平均負荷カーブに含まれるスマートメータデータとする。 The estimation unit 106 then identifies the combination of a and b that minimizes Σ(Px(t) - Pc'(t)). For example, the estimation unit 106 identifies a and b at point 200 in Figure 3 as the combination of a and b that minimizes Σ(Px(t) - Pc'(t)). The estimation unit 106 then uses Pc'(t) = aPc(t) + b, represented by the combination of a and b that minimizes Σ(Px(t) - Pc'(t)), as the smart meter data included in the normalized average load curve.

ここでは、推定部106は、総当たり方式を用いて正規化を行ったが、これに限らず、二次計画問題などを解くなど他の手法を用いて正規化を行うことも可能である。 Here, the estimation unit 106 performed normalization using a brute-force method, but it is not limited to this; normalization can also be performed using other methods, such as solving a quadratic programming problem.

次に、推定部106は、需要家情報記憶部104に記憶された情報を確認して、推定対象需要家の蓄電池23の定格出力が既知か否かを判定する。 Next, the estimation unit 106 checks the information stored in the customer information storage unit 104 and determines whether the rated output of the battery 23 of the target customer is known or not.

推定対象需要家の蓄電池23の定格出力が既知である場合、推定部106は、推定対象需要家の蓄電池23の定格出力を需要家情報記憶部104から取得する。蓄電池23の定格出力には、充電量と放電量とが含まれる。ここで、蓄電池23の充電量の定格出力をP(充電)と表し、蓄電池23の放電量の定格出力をP(放電)と表す。 If the rated output of the battery 23 of the estimated target customer is known, the estimation unit 106 obtains the rated output of the battery 23 of the estimated target customer from the customer information storage unit 104. The rated output of the battery 23 includes both the charge amount and the discharge amount. Here, the rated output of the charge amount of the battery 23 is represented as P (charge), and the rated output of the discharge amount of the battery 23 is represented as P (discharge).

家族人数や延べ床面積が類似する需要家2同士は電気の使用方法は似ていると考えられる。そのため、推定対象需要家と近似グループに属する蓄電池非保有需要家との電気の使用方法は似ていると考えられる。このことから、推定対象需要家の電力使用量から蓄電池23の充放電量を除いた実負荷は、近似グループに属する蓄電池非保有需要家の電力使用量の平均に近似すると考えられる。そこで、推定対象需要家の実負荷が正規化後の平均負荷カーブに近似するという前提に立つことができ、この前提では、推定対象需要家のスマートメータデータから平均負荷カーブに含まれるスマートメータデータを減算した値であるPx(t)-Pc’(t)は、蓄電池23による充放電の値である。すなわち、この前提においては、蓄電池23の充電時には、Px(t)-Pc’(t)-P(充電)の値は0に近似し、蓄電池23の放電時にはPx(t)-Pc’(t)+P(放電)の値は0に近似する。 It is assumed that two consumers with similar family sizes and total floor area use electricity similarly. Therefore, it is assumed that the electricity usage of the estimated consumer and the non-battery-owning consumers belonging to the approximation group are similar. From this, it is assumed that the actual load obtained by subtracting the charge/discharge amount of battery 23 from the estimated consumer's electricity consumption approximates the average electricity consumption of non-battery-owning consumers belonging to the approximation group. Thus, we can assume that the estimated consumer's actual load approximates the normalized average load curve. Under this assumption, Px(t) - Pc'(t), which is the value obtained by subtracting the smart meter data included in the average load curve from the estimated consumer's smart meter data, represents the charge/discharge value of battery 23. That is, under this assumption, when battery 23 is charging, the value of Px(t) - Pc'(t) - P (charging) approximates 0, and when battery 23 is discharging, the value of Px(t) - Pc'(t) + P (discharging) approximates 0.

図4は、推定対象需要家の負荷カーブと平均負荷カーブとの関係を説明するための図である。図4のグラフ201は、推定対象需要家の負荷カーブから平均負荷カーブを減算したカーブを表す。また、グラフ202は、グラフ201のカーブの充電時間帯にP(充電)を減算し、放電時間帯にP(放電)を加算したカーブを表す。上述した前提では、グラフ201に示すようにPx(t)-Pc’(t)が蓄電池23の充電量の定格出力の2分の1より大きい場合を充電時間帯としてP(充電)を減算することで、グラフ202に示すようにPx(t)-Pc’(t)-P(充電)の値を0に近似させることができる。また、グラフ201に示すようにPx(t)-Pc’(t)が蓄電池23の放電量の定格出力の2分の1の符号を負にした値より小さい場合を放電時間帯としてP(放電)を加算することで、グラフ202に示すようにPx(t)-Pc’(t)+P(放電)の値を0に近似させることができる。すなわち、推定対象需要家の負荷カーブから平均負荷カーブを減算したカーブを、充放電を判定する閾値を基準として折り返えした場合に、元の部分と折り返した部分との幅が丁度重なるように閾値を決定することが好ましい。 Figure 4 is a diagram illustrating the relationship between the load curve of the estimated target consumer and the average load curve. Graph 201 in Figure 4 represents the curve obtained by subtracting the average load curve from the load curve of the estimated target consumer. Graph 202 represents the curve obtained by subtracting P (charging) from the charging time period and adding P (discharging) to the discharging time period of the curve in Graph 201. Under the above assumptions, as shown in Graph 201, by subtracting P (charging) when Px(t) - Pc'(t) is greater than half of the rated output of the battery 23's charge amount, the value of Px(t) - Pc'(t) - P(charging) can be approximated to 0, as shown in Graph 202. Furthermore, as shown in Graph 201, by adding P(discharge) when Px(t) - Pc'(t) is less than half the rated output of the battery 23's discharge amount (with the sign negative), the value of Px(t) - Pc'(t) + P(discharge) can be approximated to 0, as shown in Graph 202. In other words, it is preferable to determine the threshold such that when the curve obtained by subtracting the average load curve from the load curve of the estimated target consumer is folded back using the threshold for determining charge and discharge as a reference, the widths of the original part and the folded part overlap precisely.

そこで、推定部106は、時刻t毎にPx(t)-Pc’(t)を算出して、算出した値が蓄電池23の充電量の定格出力の2分の1より大きければ、その時刻tには蓄電池23が充電されていると仮定する。これは、上述したように、定格出力の2分の1で折り返すことで蓄電池23の充電量を除いた実負荷と平均負荷カーブの電力使用量との差が0に近付くことから、定格出力の2分の1を基準として充電を判定することが好ましいと考えられるためである。すなわち、推定部106は、Px(t)-Pc’(t)>P(充電)/2の場合、その時刻tには蓄電池23が充電されていると仮定する。そして、推定部106は、蓄電池23が充電されている時間帯における推定対象需要家の実負荷をPx(t)-P(充電)として算出する。 Therefore, the estimation unit 106 calculates Px(t) - Pc'(t) at each time t, and if the calculated value is greater than half of the rated output of the battery 23's charge, it assumes that the battery 23 is being charged at that time t. This is because, as described above, by folding back at half the rated output, the difference between the actual load (excluding the battery 23's charge) and the power consumption on the average load curve approaches zero, making it preferable to determine charging based on half the rated output. In other words, the estimation unit 106 assumes that the battery 23 is being charged at that time t if Px(t) - Pc'(t) > P(charge)/2. Then, the estimation unit 106 calculates the actual load of the target consumer during the time period when the battery 23 is being charged as Px(t) - P(charge).

また、推定部106は、時刻t毎にPx(t)-Pc’(t)を算出して、算出した値が蓄電池23の放電量の定格出力の2分の1の符号を負にした値より小さければ、その時刻tには蓄電池23が放電していると仮定する。これも、上述したように、定格出力の2分の1で折り返すことで蓄電池23の放電量を除いた実負荷と平均負荷カーブの電力使用量との差が0に近付くことから、定格出力の2分の1を基準として放電を判定することが好ましいと考えられるためである。すなわち、推定部106は、Px(t)-Pc’(t)<-P(放電)/2の場合、その時刻tには蓄電池23が放電していると仮定する。そして、推定部106は、蓄電池23が放電している時間帯における推定対象需要家の実負荷をPx(t)+P(放電)として算出する。 Furthermore, the estimation unit 106 calculates Px(t) - Pc'(t) at each time t, and if the calculated value is smaller than the negative sign of half the rated output of the battery 23's discharge amount, it is assumed that the battery 23 is discharging at that time t. This is because, as mentioned above, by folding back at half the rated output, the difference between the actual load (excluding the battery 23's discharge amount) and the power consumption on the average load curve approaches zero. Therefore, it is considered preferable to determine discharge based on half the rated output. That is, the estimation unit 106 assumes that the battery 23 is discharging at time t if Px(t) - Pc'(t) < -P(discharge)/2. Then, the estimation unit 106 calculates the actual load of the target consumer during the time period when the battery 23 is discharging as Px(t) + P(discharge).

一方、推定対象需要家の蓄電池23の定格出力が分かっていない場合、推定部106は、以下のような処理により、蓄電池23の定格出力、充放電時間帯及び推定対象需要家の実負荷の推定を行う。 On the other hand, if the rated output of the battery 23 of the estimated target customer is unknown, the estimation unit 106 estimates the rated output of the battery 23, the charging and discharging time period, and the actual load of the estimated target customer by performing the following process.

まず、推定部106は、蓄電池23の充電量の定格出力をP(充電α)として、P(充電α)を初期値に設定する。例えば、推定部106は、一般的な蓄電池の最も低い充電量の定格出力をP(充電α)の初期値とする。具体的には、推定部106は、P(充電α)の初期値を2kWなどとすることができる。 First, the estimation unit 106 sets the rated output of the battery 23's charge level as P(charge α) and sets P(charge α) as the initial value. For example, the estimation unit 106 uses the lowest rated output of a typical battery's charge level as the initial value of P(charge α). Specifically, the estimation unit 106 can set the initial value of P(charge α) to 2kW, for example.

そして、推定部106は、時刻t毎にPx(t)-Pc’(t)を算出して、算出した値がP(充電α)の2分の1より大きければ、その時刻tには蓄電池23が充電されていると仮定する。すなわち、推定部106は、Px(t)-Pc’(t)>P(充電α)/2の場合、その時刻tには蓄電池23が充電されていると仮定する。そして、推定部106は、蓄電池23が充電されている時間帯における推定対象需要家の実負荷をPx(t)-P(充電α)として算出する。 The estimation unit 106 then calculates Px(t) - Pc'(t) at each time t, and if the calculated value is greater than half of P(charge α), it assumes that the battery 23 is charged at that time t. That is, the estimation unit 106 assumes that the battery 23 is charged at that time t if Px(t) - Pc'(t) > P(charge α)/2. The estimation unit 106 then calculates the actual load of the target consumer during the time period when the battery 23 is charged as Px(t) - P(charge α).

次に、推定部106は、Px(t)-Pc’(t)>0となる時刻tを抽出し、抽出したtの集合をTとする。そして、推定部106は、Σt∈T(Px(t)-Pc(t)-P(充電α))を算出する。ここで、推定部106は、例えば、Px(t)-Pc’(t)>P(充電α)/3となる時刻tを抽出してΣt∈T(Px(t)-Pc(t)-P(充電α))を算出してもよい。 Next, the estimation unit 106 extracts time t such that Px(t) - Pc'(t) > 0, and the set of extracted t values is denoted as T. Then, the estimation unit 106 calculates Σ t ∈ T (Px(t) - Pc(t) - P(charge α)). Here, the estimation unit 106 may, for example, extract time t such that Px(t) - Pc'(t) > P(charge α)/3 and calculate Σ t ∈ T (Px(t) - Pc(t) - P(charge α)).

次に、推定部106は、P(充電α)を予め決められた1ステップ分変化させて、同様にPx(t)-P(充電α)を算出し、さらにΣt∈T(Px(t)-Pc’(t)-P(充電α))を算出する。例えば、推定部106は、0.1W刻みでP(充電α)を変化させる。そして、推定部106は、特定の上限値まで、P(充電α)を変化させていきながら、Px(t)-P(充電α)及びΣt∈T(Px(t)-Pc’(t)-P(充電α))の算出を繰り返す。例えば、推定部106は、一般的な蓄電池の最も高い充電量の定格出力をP(充電α)の上限値とする。具体的には、推定部106は、P(充電α)の上限値を5kWとすることができる。 Next, the estimation unit 106 changes P(charge α) by a predetermined step and similarly calculates Px(t) - P(charge α), and further calculates Σ t∈T (Px(t) - Pc'(t) - P(charge α)). For example, the estimation unit 106 changes P(charge α) in increments of 0.1W. Then, the estimation unit 106 repeats the calculation of Px(t) - P(charge α) and Σ t∈T (Px(t) - Pc'(t) - P(charge α)) while changing P(charge α) up to a specific upper limit. For example, the estimation unit 106 sets the upper limit of P(charge α) to the rated output of the highest charge amount of a typical storage battery. Specifically, the estimation unit 106 can set the upper limit of P(charge α) to 5kW.

次に、推定部106は、Σt∈T(Px(t)-Pc(t)-P(充電α))が最小となるP(充電α)の値を特定する。そして、推定部106は、特定したP(充電α)の値の場合のPx(t)-P(充電α)を充電時間帯における推定対象需要家の実負荷の推定値とする。これは、Σt∈T(Px(t)-Pc(t)-P(充電α))が最小となる場合に、蓄電池23の充電量を除いた実負荷と平均負荷カーブの電力使用量との差が最も0に近付くことから、このP(充電α)を基準として充電を判定することが好ましいと考えられるためである。 Next, the estimation unit 106 identifies the value of P(charge α) that minimizes Σ t∈T (Px(t) - Pc(t) - P(charge α)). Then, the estimation unit 106 uses Px(t) - P(charge α) for the identified value of P(charge α) as the estimated value of the actual load of the target consumer during the charging period. This is because when Σ t∈T (Px(t) - Pc(t) - P(charge α)) is minimized, the difference between the actual load excluding the charge amount of the storage battery 23 and the power consumption on the average load curve approaches zero, and therefore it is considered preferable to determine charging based on this P(charge α).

ここで、本実施例では、推定部106は、総当たり方式を用いてP(充電α)を決定したが、これに限らず、二次計画問題などを解くなど他の手法を用いてP(充電α)を決定することも可能である。 In this embodiment, the estimation unit 106 determined P (charge α) using a brute-force method. However, it is not limited to this method; it is also possible to determine P (charge α) using other methods, such as solving a quadratic programming problem.

次に、推定部106は、蓄電池23の放電量の定格出力をP(放電β)として初期値に設定する。例えば、推定部106は、一般的な蓄電池の最も低い放電量の定格出力をP(放電β)の初期値とする。 Next, the estimation unit 106 sets the rated output of the battery 23's discharge rate as the initial value P (discharge β). For example, the estimation unit 106 uses the lowest discharge rate rated output of a typical battery as the initial value for P (discharge β).

そして、推定部106は、時刻t毎にPx(t)-Pc’(t)を算出して、算出した値がP(放電β)の2分の1の符号を負にした値より小さければ、その時刻tには蓄電池23が放電していると仮定する。すなわち、推定部106は、Px(t)-Pc’(t)<-P(放電β)/2の場合、その時刻tには蓄電池23が放電していると仮定する。そして、推定部106は、蓄電池23が放電している時間帯における推定対象需要家の実負荷をPx(t)+P(放電β)として算出する。 The estimation unit 106 then calculates Px(t) - Pc'(t) at each time t, and if the calculated value is less than half of P(discharge β) with a negative sign, it assumes that the battery 23 is discharging at that time t. That is, the estimation unit 106 assumes that the battery 23 is discharging at that time t if Px(t) - Pc'(t) < -P(discharge β)/2. The estimation unit 106 then calculates the actual load of the target consumer during the time period when the battery 23 is discharging as Px(t) + P(discharge β).

次に、推定部106は、Px(t)-Pc’(t)<0となる時刻tを抽出し、抽出したtの集合をTとする。そして、推定部106は、Σt∈T(Px(t)-Pc(t)+P(放電β))を算出する。ここで、推定部106は、例えば、Px(t)-Pc’(t)<-P(放電β)/3となる時刻tを抽出してΣt∈T(Px(t)-Pc(t)+P(放電β))を算出してもよい。 Next, the estimation unit 106 extracts time t such that Px(t) - Pc'(t) < 0, and the set of extracted t values is denoted as T. Then, the estimation unit 106 calculates Σ t ∈ T (Px(t) - Pc(t) + P(discharge β)). Here, the estimation unit 106 may, for example, extract time t such that Px(t) - Pc'(t) < -P(discharge β)/3 and calculate Σ t ∈ T (Px(t) - Pc(t) + P(discharge β)).

次に、推定部106は、P(放電β)を変化させて、同様にPx(t)+P(放電β)を算出し、さらにΣt∈T(Px(t)-Pc(t)+P(放電β))を算出する。例えば、推定部106は、0.1W刻みでP(放電β)を変化させる。そして、推定部106は、特定の上限値まで、P(放電β)を変化させていきながら、Px(t)+P(放電β)及びΣt∈T(Px(t)-Pc(t)+P(放電β))の算出を繰り返す。例えば、推定部106は、一般的な蓄電池の最も高い放電量の定格出力をP(放電β)の上限値とする。 Next, the estimation unit 106 changes P(discharge β) and similarly calculates Px(t) + P(discharge β), and further calculates Σ t∈T (Px(t) - Pc(t) + P(discharge β)). For example, the estimation unit 106 changes P(discharge β) in increments of 0.1W. Then, the estimation unit 106 repeats the calculation of Px(t) + P(discharge β) and Σ t∈T (Px(t) - Pc(t) + P(discharge β)) while changing P(discharge β) up to a specific upper limit. For example, the estimation unit 106 uses the rated output of the highest discharge amount of a typical storage battery as the upper limit of P(discharge β).

次に、推定部106は、Σt∈T(Px(t)-Pc’(t)+P(放電β))が最小となるP(放電β)の値を特定する。そして、推定部106は、特定したP(放電β)の値の場合のPx(t)+P(放電β)を放電時間帯における推定対象需要家の実負荷の推定値とする。これは、Σt∈T(Px(t)-Pc’(t)+P(放電β))が最小となる場合に、蓄電池23の放電量を除いた実負荷と平均負荷カーブの電力使用量との差が最も0に近付くことから、このP(放電β)を基準として放電を判定することが好ましいと考えられるためである。 Next, the estimation unit 106 identifies the value of P(discharge β) that minimizes Σ t∈T (Px(t) - Pc'(t) + P(discharge β)). Then, the estimation unit 106 uses Px(t) + P(discharge β) for the identified value of P(discharge β) as the estimated value of the actual load of the target consumer during the discharge period. This is because when Σ t∈T (Px(t) - Pc'(t) + P(discharge β)) is minimized, the difference between the actual load excluding the discharge amount of the storage battery 23 and the power consumption on the average load curve approaches zero, and therefore it is considered preferable to determine the discharge based on this P(discharge β).

ここで、本実施例では、推定部106は、総当たり方式を用いてP(放電β)を決定したが、これに限らず、二次計画問題などを解くなど他の手法を用いてP(放電β)を決定することも可能である。 In this embodiment, the estimation unit 106 determined P (discharge β) using a brute-force method. However, it is not limited to this method; it is also possible to determine P (discharge β) using other methods, such as solving a quadratic programming problem.

その後、推定部106は、推定対象需要家の実負荷の推定値をデマンドレスポンス生成装置11へ送信する。また、推定部106は、推定した推定対象需要家の蓄電池23の充放電の時間帯の情報や蓄電池23の定格出力の推定値などもデマンドレスポンス生成装置11へ送信してもよい。 Subsequently, the estimation unit 106 transmits the estimated actual load of the estimated target customer to the demand response generation device 11. The estimation unit 106 may also transmit information regarding the charging and discharging time periods of the estimated target customer's battery 23, as well as the estimated rated output of the battery 23, to the demand response generation device 11.

デマンドレスポンス生成装置11は、送信部111及びデマンドレスポンス生成部112を有する。 The demand response generation device 11 includes a transmission unit 111 and a demand response generation unit 112.

デマンドレスポンス生成部112は、推定対象需要家の実負荷の推定値を出力推定装置10の推定部106から受信する。次に、デマンドレスポンス生成部112は、需要家2の全体の電力使用量の推移及び推定対象需要家の実負荷の推定値を基に、推定対象需要家に対するデマンドレスポンス指令を生成する。そして、デマンドレスポンス生成部112は、生成したデマンドレスポンス指令を送信部111へ出力する。 The demand response generation unit 112 receives the estimated actual load of the target customer from the estimation unit 106 of the output estimation device 10. Next, the demand response generation unit 112 generates a demand response command for the target customer based on the overall power consumption trend of customer 2 and the estimated actual load of the target customer. Then, the demand response generation unit 112 outputs the generated demand response command to the transmission unit 111.

送信部111は、推定対象需要家に対するデマンドレスポンス指令の入力をデマンドレスポンス生成部112から受ける。そして、送信部111は、取得した推定対象需要家に対するデマンドレスポンス指令を推定対象需要家の需要家端末装置21へ送信して、推定対象需要家に対してデマンドレスポンス指令を通知する。 The transmission unit 111 receives a demand response command input for the estimated target customer from the demand response generation unit 112. The transmission unit 111 then transmits the acquired demand response command to the estimated target customer's customer terminal device 21, notifying the estimated target customer of the demand response command.

図5は、推定対象需要家の出力推定処理の概要を表す図である。次に、図5を参照して、出力推定装置10による推定対象需要家の出力推定処理をまとめて説明する。 Figure 5 is a diagram illustrating the output estimation process for the target consumer. Next, referring to Figure 5, the output estimation process for the target consumer by the output estimation device 10 will be explained in detail.

分類部102は、蓄電池非保有需要家のスマートメータデータを、スマートメータデータ取得部101が収集したスマートメータデータの中から取得する(ステップS1)。 The classification unit 102 acquires smart meter data for customers who do not own storage batteries from the smart meter data collected by the smart meter data acquisition unit 101 (step S1).

次に、分類部102は、蓄電池非保有需要家のスマートメータデータを用いてクラスタリングを行い、負荷カーブが類似する蓄電値非保有需要家をそれぞれ集めて3つのA~Cグループを生成する。これにより、分類部102は、需要家2を属性別に3グループに分類した場合に相当するA~Cグループを生成する(ステップS2)。 Next, the classification unit 102 performs clustering using smart meter data from customers without battery storage systems, grouping customers without battery storage systems with similar load curves to generate three groups, A to C. This generates groups A to C, which correspond to the three groups that would result if customer 2 were classified into three groups based on its attributes (step S2).

次に、分類部102は、分類結果であるA~Cグループ毎にスマートメータデータをデータ格納部103に格納する(ステップS3)。 Next, the classification unit 102 stores the smart meter data in the data storage unit 103 for each of the classification results, A to C (step S3).

次に、グループ判定部105は、推定対象需要家のスマートメータデータをスマートメータデータ取得部101が収集したスマートメータデータの中から取得して、負荷カーブを生成する(ステップS4)。 Next, the group determination unit 105 acquires the smart meter data of the estimated target customer from the smart meter data acquisition unit 101 collected, and generates a load curve (step S4).

また、グループ判定部105は、推定対象需要家の属性情報及びデータ格納部103に格納されるA~Cグループのそれぞれに属する蓄電池非保有需要家の属性情報を需要家情報記憶部104から取得する。そして、グループ判定部105は、推定対象需要家の属性情報と属性情報が近似する近似グループをCグループと判定する。グループ判定部105は、Cグループの全ての蓄電池非保有需要家の負荷カーブをデータ格納部103から取得する。そして、グループ判定部105は、Cグループの蓄電池非保有需要家の負荷カーブの平均負荷カーブを算出する(ステップS5)。 Furthermore, the group determination unit 105 obtains attribute information of the estimated target customer and attribute information of non-battery-owning customers belonging to each of the A to C groups stored in the data storage unit 103 from the customer information storage unit 104. The group determination unit 105 then determines that the approximate group whose attribute information is similar to that of the estimated target customer is group C. The group determination unit 105 obtains the load curves of all non-battery-owning customers in group C from the data storage unit 103. Finally, the group determination unit 105 calculates the average load curve of the non-battery-owning customers in group C (step S5).

推定部106は、推定対象需要家の負荷カーブとCグループの平均負荷カーブとの差異から推定対象需要家における蓄電池23の充電時間帯及び放電時間帯を推定する。そして、推定部106は、推定対象需要家における蓄電池23の充放電量及び実負荷を推定する(ステップS6)。 The estimation unit 106 estimates the charging and discharging time periods of the battery 23 at the target customer based on the difference between the target customer's load curve and the average load curve of Group C. Then, the estimation unit 106 estimates the charge/discharge amount and actual load of the battery 23 at the target customer (step S6).

その後、推定部106は、推定結果である推定対象需要家における蓄電池23の充放電量及び実負荷をデマンドレスポンス生成装置11に送信する(ステップS7)。 Subsequently, the estimation unit 106 transmits the estimated charge/discharge amount and actual load of the battery 23 at the estimated target customer to the demand response generation device 11 (step S7).

図6は、アグリテータシステムによるデマンドレスポンス指令の生成処理のフローチャートである。次に、図6を参照して、アグリテータシステム1によるデマンドレスポンス指令の生成処理の流れを説明する。 Figure 6 is a flowchart of the demand response command generation process by the aggregator system. Next, referring to Figure 6, the flow of the demand response command generation process by the aggregator system 1 will be explained.

スマートメータデータ取得部101は、蓄電池保有需要家及び蓄電池非保有需要家の双方のスマートメータデータを収集する。分類部102は、蓄電池非保有需要家のスマートメータデータを、スマートメータデータ取得部101が収集したスマートメータデータの中から取得する(ステップS101)。 The smart meter data acquisition unit 101 collects smart meter data from both battery-owning and non-battery-owning customers. The classification unit 102 acquires smart meter data from non-battery-owning customers from the smart meter data collected by the smart meter data acquisition unit 101 (step S101).

次に、分類部102は、蓄電池非保有需要家のスマートメータデータを用いてクラスタリングを行いグループ化することで、需要家2を分類する(ステップS102)。分類部102は、分類結果であるグループ毎にスマートメータデータをデータ格納部103に格納する。 Next, the classification unit 102 classifies the customers 2 by clustering and grouping them using the smart meter data of customers who do not own battery storage systems (step S102). The classification unit 102 then stores the smart meter data for each group in the data storage unit 103.

グループ判定部105は、推定対象需要家のスマートメータデータをスマートメータデータ取得部101が収集したスマートメータデータの中から取得して負荷カーブを生成する(ステップS103)。 The group determination unit 105 acquires smart meter data for the estimated target customer from the smart meter data collected by the smart meter data acquisition unit 101 and generates a load curve (step S103).

また、グループ判定部105は、推定対象需要家の属性情報及びデータ格納部103に格納されるグループのそれぞれに属する蓄電池非保有需要家の属性情報を需要家情報記憶部104から取得する。そして、グループ判定部105は、推定対象需要家の属性情報と属性情報が近似する近似グループを特定する。次に、グループ判定部105は、近似グループの全ての蓄電池非保有需要家の負荷カーブをデータ格納部103から取得する。そして、グループ判定部105は、近似グループの蓄電池非保有需要家の負荷カーブの平均負荷カーブを算出する(ステップS104)。 Furthermore, the group determination unit 105 obtains attribute information of the estimated target consumers and attribute information of non-battery-owning consumers belonging to each group stored in the data storage unit 103 from the consumer information storage unit 104. The group determination unit 105 then identifies the approximate group whose attribute information is similar to that of the estimated target consumers. Next, the group determination unit 105 obtains the load curves of all non-battery-owning consumers in the approximate group from the data storage unit 103. Finally, the group determination unit 105 calculates the average load curve of the load curves of the non-battery-owning consumers in the approximate group (step S104).

推定部106は、推定対象需要家の負荷カーブと近似グループの平均負荷カーブとを用いて推定対象需要家における蓄電池23の充放電量及び実負荷を推定する(ステップS105)。 The estimation unit 106 estimates the charge/discharge amount and actual load of the battery 23 at the target customer using the load curve of the target customer and the average load curve of the approximation group (step S105).

その後、推定部106は、推定結果である推定対象需要家における蓄電池23の充放電量及び実負荷をデマンドレスポンス生成装置11に送信して通知する(ステップS106)。 Subsequently, the estimation unit 106 transmits the estimated charge/discharge amount of the battery 23 and the actual load at the estimated target customer to the demand response generation device 11 for notification (step S106).

デマンドレスポンス生成部112は、推定対象需要家の蓄電池23の充放電量及び実負荷の推定値を出力推定装置10の推定部106から受信する。次に、デマンドレスポンス生成部112は、需要家全体の電力使用量の推移、並びに、推定対象需要家の蓄電池23の充放電量及び実負荷の推定値を基に、推定対象需要家に対するデマンドレスポンスの内容を決定してデマンドレスポンス指令を生成する。そして、デマンドレスポンス生成部112は、生成したデマンドレスポンス指令を送信部111へ出力する。送信部111は、推定対象需要家に対するデマンドレスポンス指令の入力をデマンドレスポンス生成部112から受ける。そして、送信部111は、取得した推定対象需要家に対するデマンドレスポンス指令を推定対象需要家の需要家端末装置21へ送信して、推定対象需要家に対してデマンドレスポンスの内容を通知する(ステップS107)。 The demand response generation unit 112 receives the estimated charge/discharge amount of the battery 23 and the estimated actual load of the estimated target customer from the estimation unit 106 of the output estimation device 10. Next, the demand response generation unit 112 determines the content of the demand response for the estimated target customer and generates a demand response command based on the trend of the total power consumption of the customer, as well as the estimated charge/discharge amount of the battery 23 and the estimated actual load of the estimated target customer. The demand response generation unit 112 then outputs the generated demand response command to the transmission unit 111. The transmission unit 111 receives the input of the demand response command for the estimated target customer from the demand response generation unit 112. The transmission unit 111 then transmits the acquired demand response command for the estimated target customer to the customer terminal device 21 of the estimated target customer, notifying the estimated target customer of the content of the demand response (step S107).

図7は、出力推定装置による推定対象需要家の蓄電池の充放電量及び実負荷の推定処理のフローチャートである。次に、図7を参照して、出力推定装置10による推定対象需要家の蓄電池23の充放電量及び実負荷の推定処理の流れを説明する。図7のフローにおける各処理は、図6のフローにおけるステップS105で実行される処理の一例にあたる。 Figure 7 is a flowchart of the estimation process for the charge/discharge amount and actual load of the battery of the target customer by the output estimation device. Next, referring to Figure 7, the flow of the estimation process for the charge/discharge amount and actual load of the battery 23 of the target customer by the output estimation device 10 will be explained. Each process in the flow of Figure 7 corresponds to an example of the process executed in step S105 of the flow of Figure 6.

推定部106は、推定対象需要家の負荷カーブ及び近似グループの平均負荷カーブをグループ判定部105から取得する。次に、推定部106は、推定対象需要家の1日の総負荷量が、平均負荷カーブの総負荷量と等しくなるように、平均負荷カーブに含まれるスマートメータデータを正規化する(ステップS201)。 The estimation unit 106 obtains the load curve of the target customer and the average load curve of the approximate group from the group determination unit 105. Next, the estimation unit 106 normalizes the smart meter data included in the average load curve so that the total daily load of the target customer is equal to the total load of the average load curve (step S201).

次に、推定部106は、需要家情報記憶部104に記憶された情報を確認して、推定対象需要家の蓄電池23の定格出力の情報が存在するか否かを判定する(ステップS202)。 Next, the estimation unit 106 checks the information stored in the customer information storage unit 104 and determines whether or not information on the rated output of the battery 23 of the target customer exists (step S202).

推定対象需要家の蓄電池23の定格出力の情報が存在する場合(ステップS202:肯定)、推定部106は、推定対象需要家の蓄電池23の定格出力を需要家情報記憶部104から取得する。次に、推定部106は、Px(t)-Pc’(t)>P(充電)/2となる時間帯を蓄電池23の充電時間帯と仮定する。そして、推定部106は、蓄電池23の充電時間帯における推定対象需要家の実負荷をPx(t)-P(充電)として算出する(ステップS203)。 If information on the rated output of the battery 23 of the estimated target customer exists (step S202: affirmative), the estimation unit 106 obtains the rated output of the battery 23 of the estimated target customer from the customer information storage unit 104. Next, the estimation unit 106 assumes that the time period when Px(t) - Pc'(t) > P(charging)/2 is the charging time period for the battery 23. Then, the estimation unit 106 calculates the actual load of the estimated target customer during the battery 23 charging time as Px(t) - P(charging) (step S203).

また、推定部106は、Px(t)-Pc’(t)<-P(放電)/2となる時間帯を蓄電池23の放電時間帯と仮定する。そして、推定部106は、蓄電池23の放電時間帯における推定対象需要家の実負荷をPx(t)+P(放電)として算出する(ステップS204)。 Furthermore, the estimation unit 106 assumes that the time period when Px(t) - Pc'(t) < -P(discharge)/2 is the discharge period of the battery 23. Then, the estimation unit 106 calculates the actual load of the target consumer during the battery 23's discharge period as Px(t) + P(discharge) (step S204).

一方、推定対象需要家の蓄電池23の定格出力の情報が存在しない場合(ステップS202:否定)、推定部106は、蓄電池23の充電量P(充電α)を初期値に設定する(ステップS205)。 On the other hand, if information on the rated output of the battery 23 of the estimated target customer is unavailable (step S202: negative), the estimation unit 106 sets the charge amount P (charge α) of the battery 23 to an initial value (step S205).

次に、推定部106は、時刻t毎にPx(t)-Pc’(t)を算出して、Px(t)-Pc’(t)>0となる時刻tの範囲Tにおいて、Σt∈T(Px(t)-Pc’(t)-P(充電α))を算出する(ステップS206)。 Next, the estimation unit 106 calculates Px(t) - Pc'(t) at each time t, and calculates Σ t∈T (Px(t) - Pc'(t) - P(charge α)) in the range T of time t where Px(t) - Pc'(t) > 0 (step S206).

次に、推定部106は、P(充電α)が上限値か否かを判定する(ステップS207)。P(充電α)が上限値でない場合(ステップS207:否定)、推定部106は、P(充電α)を1ステップ上昇させる(ステップS208)。その後、推定部106は、ステップS206へ戻る。 Next, the estimation unit 106 determines whether P (charge α) is at its upper limit (step S207). If P (charge α) is not at its upper limit (step S207: negative), the estimation unit 106 increases P (charge α) by one step (step S208). After that, the estimation unit 106 returns to step S206.

これに対して、P(充電α)が上限値の場合(ステップS207:肯定)、推定部106は、Σt∈T(Px(t)-Pc’(t)-P(充電α))が最小となるP(充電α)の値を選択する(ステップS209)。 In contrast, if P(charge α) is at its upper limit (step S207: affirmative), the estimation unit 106 selects the value of P(charge α) that minimizes Σ t∈T (Px(t) - Pc'(t) - P(charge α)) (step S209).

そして、推定部106は、選択したP(充電α)の値について、Px(t)-Pc’(t)>P(充電α)/2の場合、その時刻tには蓄電池23が充電されていると仮定する。そして、推定部106は、蓄電池23の充電時間帯における推定対象需要家の実負荷をPx(t)-P(充電α)として算出する(ステップS210)。 The estimation unit 106 then assumes that the battery 23 is charged at time t if Px(t) - Pc'(t) > P(charge α)/2 for the selected value of P(charge α). The estimation unit 106 then calculates the actual load of the target consumer during the battery 23 charging period as Px(t) - P(charge α) (step S210).

次に、推定部106は、蓄電池23の放電量P(放電β)を初期値に設定する(ステップS211)。 Next, the estimation unit 106 sets the discharge amount P (discharge β) of the storage battery 23 to an initial value (step S211).

次に、推定部106は、Px(t)-Pc’(t)<0となる時刻tの範囲Tにおいて、Σt∈T(Px(t)-Pc’(t)+P(放電β))を算出する(ステップS212)。 Next, the estimation unit 106 calculates Σ t∈T (Px(t) - Pc'(t) + P(discharge β)) in the range T of time t where Px(t) - Pc'(t) < 0 (step S212).

次に、推定部106は、P(放電β)が上限値か否かを判定する(ステップS213)。P(放電β)が上限値でない場合(ステップS213:否定)、推定部106は、P(放電β)を1ステップ上昇させる(ステップS214)。その後、推定部106は、ステップS212へ戻る。 Next, the estimation unit 106 determines whether P (discharge β) is at its upper limit (step S213). If P (discharge β) is not at its upper limit (step S213: negative), the estimation unit 106 increases P (discharge β) by one step (step S214). After that, the estimation unit 106 returns to step S212.

これに対して、P(放電β)が上限値の場合(ステップS213:肯定)、推定部106は、Σt∈T(Px(t)-Pc’(t)+P(放電β))が最小となるP(放電β)の値を選択する(ステップS215)。 In contrast, if P(discharge β) is at its upper limit (step S213: affirmative), the estimation unit 106 selects the value of P(discharge β) that minimizes Σ t∈T (Px(t) - Pc'(t) + P(discharge β)) (step S215).

そして、推定部106は、選択したP(放電β)の値について、Px(t)-Pc’(t)<-P(放電β)/2の場合、その時刻tには蓄電池23が放電されていると仮定する。そして、推定部106は、蓄電池23の放電時間帯における推定対象需要家の実負荷をPx(t)+P(放電β)として算出する(ステップS216)。 The estimation unit 106 then assumes that, for the selected value of P(discharge β), if Px(t) - Pc'(t) < -P(discharge β)/2, the battery 23 is discharged at time t. The estimation unit 106 then calculates the actual load of the target consumer during the battery 23 discharge period as Px(t) + P(discharge β) (step S216).

以上に説明したように、本実施例に係る出力推定装置は、Cルートを介して得られる蓄電池非保有需要家のスマートメータデータを用いてクラスタリングを行い、需要家を属性に応じたグループに分類する。そして、出力推定装置は、推定対象需要家の属性に近似する属性を有する近似グループを特定し、その近似グループの平均負荷カーブと推定対象需要家の負荷カーブとの差分から推定対象需要家の蓄電池の充放電量及び実負荷を推定する。 As described above, the output estimation device according to this embodiment performs clustering using smart meter data of non-battery-owning consumers obtained via Route C, classifying consumers into groups according to their attributes. The output estimation device then identifies approximate groups with attributes similar to those of the target consumer, and estimates the battery charge/discharge amount and actual load of the target consumer from the difference between the average load curve of the approximate group and the load curve of the target consumer.

これにより、蓄電池などの電気供給機器の充放電量を計測するセンサや新たな通信経路を増やすことなく、推定対象需要家の蓄電池の充放電量及び実負荷を推定することができる。また、各需要家から収集可能なスマートメータデータを用いて推定を行うため、個々の需要家の蓄電池の充放電量及び実負荷を推定することが容易にできる。したがって、簡易な構成でコストを抑えつつ、的確な需要調整を行うことが可能となる。 This allows for the estimation of the battery charge/discharge amount and actual load of target customers without increasing the number of sensors or communication paths required to measure the charge/discharge amount of electrical supply equipment such as batteries. Furthermore, because the estimation is performed using smart meter data collectible from each customer, it is easy to estimate the battery charge/discharge amount and actual load of individual customers. Therefore, accurate demand adjustment becomes possible with a simple configuration while keeping costs down.

次に、実施例2について説明する。需要家1件あたりの負荷カーブは、毎日のように変化する。そのため、需要家1件ずつの1日のスマートメータデータを用いて推定を行った場合には推定精度が低下する恐れがある。そこで、本実施例に係る出力推定装置は、一定期間の平均値を用いて推定を行う。本実施例に係る出力推定装置1も、図2のブロック図で表される。以下の説明では、実施例1と同様の各部の動作については説明を省略する。 Next, we will describe Example 2. The load curve for each customer changes almost daily. Therefore, if estimation is performed using daily smart meter data for each individual customer, the estimation accuracy may decrease. Thus, the output estimation device in this example uses the average value over a certain period for estimation. The output estimation device 1 in this example is also represented by the block diagram in Figure 2. In the following description, the operation of each part, as in Example 1, will be omitted.

グループ判定部105は、推定対象需要家についての例えば1週間といった一定期間のスマートメータデータをスマートメータデータ取得部101から取得する。そして、グループ判定部105は、一定期間の各日の各時刻のスマートメータデータの平均を求めて、推定対象需要家の一定期間における平均の負荷カーブを生成する。 The group determination unit 105 acquires smart meter data for a certain period, such as one week, for the estimated target customer from the smart meter data acquisition unit 101. Then, the group determination unit 105 calculates the average of the smart meter data for each day and time within that period to generate an average load curve for the estimated target customer over that period.

推定部106は、推定対象需要家の一定期間における平均の負荷カーブと近似グループの平均負荷カーブとを用いて、推定対象需要家の蓄電池23の充電時間帯及び充電量、並びに、放電時間帯及び放電量を推定する。 The estimation unit 106 uses the average load curve of the target customer over a certain period and the average load curve of the approximate group to estimate the charging time period and charge amount, as well as the discharge time period and discharge amount, of the battery 23 of the target customer.

以上に説明したように、本実施例に係る出力推定装置は、一定期間のスマートメータデータの平均値を用いて推定対象需要家の負荷カーブを生成して充放電量や実負荷の推定処理を実行する。これにより、負荷カーブの日々の変化を吸収することができ、推定精度が向上し、より的確な需要調整を行うことが可能となる。 As described above, the output estimation device according to this embodiment generates a load curve for the target consumer using the average value of smart meter data over a certain period, and then performs estimation processing of charge/discharge amounts and actual load. This allows for absorption of daily changes in the load curve, improving estimation accuracy and enabling more precise demand adjustment.

次に、実施例3について説明する。本実施例に係る出力推定装置は、複数件の需要家のスマートメータデータの平均値を用いて推定を行う。本実施例に係る出力推定装置1も、図2のブロック図で表される。以下の説明では、実施例1と同様の各部の動作については説明を省略する。 Next, we will describe Example 3. The output estimation device in this example performs estimation using the average value of smart meter data from multiple customers. The output estimation device 1 in this example is also represented by the block diagram in Figure 2. In the following description, the operation of each part, as in Example 1, will be omitted.

グループ判定部105は、複数の他の蓄電池保有需要家のスマートメータデータをスマートメータデータ取得部101から取得する。そして、グループ判定部105は、複数の他の蓄電池保有需要家の属性情報を用いて、それぞれの近似グループを特定する。そして、グループ判定部105は、推定対象需要家と同じ近似グループに属する蓄電池保有需要家及び推定対象需要家の各日の各時刻のスマートメータデータの平均を求めて、推定対象需要家の負荷カーブを生成する。 The group determination unit 105 acquires smart meter data from multiple other battery-owning customers from the smart meter data acquisition unit 101. Then, using the attribute information of these multiple other battery-owning customers, the group determination unit 105 identifies their respective approximate groups. Finally, the group determination unit 105 calculates the average of the smart meter data for each day and time of the battery-owning customers and the target customer belonging to the same approximate group as the target customer, and generates a load curve for the target customer.

ここで、本実施例では、属性の類似により平均を算出するための蓄電池保有需要家を選択したが、推定対象需要家と負荷カーブが類似すると考えられる蓄電池保有需要家を選択できれば他の方法を用いることも可能である。例えば、グループ判定部105は、推定対象需要家を含む複数の蓄電池保有需要家のスマートメータデータを取得して、取得したスマートメータデータを用いてクラスタリングを行い、推定対象需要家と同じグループに分類された蓄電池保有需要家を選択してもよい。 In this embodiment, battery-owning consumers were selected to calculate the average based on attribute similarity. However, other methods can be used as long as battery-owning consumers with load curves similar to the estimated target consumer can be selected. For example, the group determination unit 105 may acquire smart meter data from multiple battery-owning consumers, including the estimated target consumer, perform clustering using the acquired smart meter data, and select battery-owning consumers classified into the same group as the estimated target consumer.

推定部106は、推定対象需要家の分類区分毎の平均の負荷カーブと近似グループの平均負荷カーブとを用いて、推定対象需要家の蓄電池23の充電時間帯及び充電量、並びに、放電時間帯及び放電量を推定する。 The estimation unit 106 uses the average load curve for each classification category of the target consumers and the average load curve for the approximate group to estimate the charging time period and charge amount, as well as the discharge time period and discharge amount, of the battery 23 of the target consumers.

以上に説明したように、本実施例に係る出力推定装置は、複数の推定対象需要家を属性で分類して、分類区分毎にスマートメータデータの平均値を用いて推定対象需要家の負荷カーブを生成して充放電量や実負荷の推定処理を実行する。これにより、負荷カーブの個々の需要家における変動を吸収することができ、推定精度が向上し、より的確な需要調整を行うことが可能となる。 As described above, the output estimation device according to this embodiment classifies multiple target consumers by attribute, generates a load curve for each target consumer using the average value of smart meter data for each classification category, and performs estimation processing of charge/discharge amounts and actual load. This allows for absorption of fluctuations in the load curve for individual consumers, improving estimation accuracy and enabling more precise demand adjustment.

ここで、以上の各実施例では、出力推定装置10とデマンドレスポンス生成装置11とを別の装置として説明したが、デマンドレスポンス生成装置11が有する機能を出力推定装置10に組み込んで1つの装置とすることも可能である。 In the embodiments described above, the output estimation device 10 and the demand response generation device 11 were described as separate devices. However, it is also possible to integrate the functions of the demand response generation device 11 into the output estimation device 10 to create a single device.

図8は、出力推定装置のハードウェア構成図である。以上の各実施例で説明した出力推定装置1は、例えば、図8に示すようなハードウェア構成を有する。すなわち、出力推定装置1は、CPU(Central Processing Unit)91、メモリ92、ハードディスク93及びネットワークインタフェース94を有する。CPU91は、バスを介してメモリ92、ハードディスク93及びネットワークインタフェース94と接続される。 Figure 8 is a hardware configuration diagram of the output estimation device. The output estimation device 1 described in each of the above embodiments has, for example, the hardware configuration shown in Figure 8. That is, the output estimation device 1 includes a CPU (Central Processing Unit) 91, memory 92, hard disk 93, and network interface 94. The CPU 91 is connected to the memory 92, hard disk 93, and network interface 94 via a bus.

ネットワークインタフェース94は、出力推定装置1と外部装置との通信インタフェースである。ネットワークインタフェース94は、例えば、送配電事業者システム3やデマンドレスポンス生成装置11とCPU91との間の通信を中継する。 The network interface 94 is a communication interface between the output estimation device 1 and external devices. For example, the network interface 94 relays communication between the power transmission and distribution operator system 3, the demand response generation device 11, and the CPU 91.

ハードディスク93は、補助記憶装置である。ハードディスク93は、データ格納部103及び需要家情報記憶部104の機能を実現することができる。また、ハードディスク93は、スマートメータデータ取得部101、分類部102、グループ判定部105及び推定部106の各部の機能を実現するためのプラグラムを含む各種プログラムを格納する。 The hard disk 93 is an auxiliary storage device. The hard disk 93 can implement the functions of the data storage unit 103 and the customer information storage unit 104. Furthermore, the hard disk 93 stores various programs, including programs for implementing the functions of the smart meter data acquisition unit 101, the classification unit 102, the group determination unit 105, and the estimation unit 106.

メモリ92は、主記憶装置である。メモリ92は、DRAM(Dynamic Random Access Memory)などを使用することができる。 Memory 92 is the main memory. Memory 92 can utilize DRAM (Dynamic Random Access Memory), etc.

CPU91は、ハードディスク93から各種プログラムを読み出してメモリ92に展開して実行する。これにより、CPU91は、スマートメータデータ取得部101、分類部102、グループ判定部105及び推定部106の機能を実現する。 The CPU 91 reads various programs from the hard disk 93, loads them into memory 92, and executes them. This allows the CPU 91 to implement the functions of the smart meter data acquisition unit 101, the classification unit 102, the group determination unit 105, and the estimation unit 106.

1 アグリゲータシステム
2 需要家
3 送配電事業者システム
21 需要家端末装置
22 スマートメータ
23 蓄電池
24 エアコン
25 電気給湯器
101 スマートメータデータ取得部
102 分類部
103 データ格納部
104 需要家情報記憶部
105 グループ判定部
106 推定部
1 Aggregator system 2 Consumer 3 Transmission and distribution operator system 21 Consumer terminal device 22 Smart meter 23 Storage battery 24 Air conditioner 25 Electric water heater 101 Smart meter data acquisition unit 102 Classification unit 103 Data storage unit 104 Consumer information storage unit 105 Group determination unit 106 Estimation unit

Claims (10)

複数の需要家の電力使用量を収集するデータ取得部と、
前記電力使用量のうちの充放電装置を有さない非保有需要家の電力使用量を用いて前記需要家を分類するグループを生成する分類部と、
前記充放電装置を保有する推定対象需要家の属性と近似する属性の非保有需要家が含まれるグループを、前記推定対象需要家が属するグループとして前記グループの中から選択するグループ判定部と、
前記グループ判定部により選択されたグループに含まれる前記非保有需要家の電力使用量と前記推定対象需要家の電力使用量とを基に、前記推定対象需要家の前記充放電装置の充放電量を推定する推定部と
を備えたことを特徴とする出力推定装置。
A data acquisition unit that collects electricity usage data from multiple customers,
A classification unit that generates groups for classifying consumers using the amount of electricity used by non-customers who do not own charging/discharging equipment from the amount of electricity used,
A group determination unit selects from the aforementioned groups a group that includes non-possessing consumers with attributes similar to those of the estimated target consumer who possesses the aforementioned charge/discharge device, as the group to which the estimated target consumer belongs .
An output estimation device characterized by comprising: an estimation unit that estimates the charge/discharge amount of the charge/discharge device of the estimated target customer based on the power consumption of the non-owner customers included in the group selected by the group determination unit and the power consumption of the estimated target customer.
前記グループ判定部は、選択したグループに含まれる前記非保有需要家の電力使用量の代表値を取得し、
前記推定部は、前記グループ判定部により算出された前記代表値と前記推定対象需要家の前記電力使用量の差分を基に、前記推定対象需要家の前記充放電装置の充放電量を推定することを特徴とする請求項1に記載の出力推定装置。
The group determination unit obtains a representative value of the electricity consumption of the non-owner consumers included in the selected group,
The output estimation device according to claim 1, characterized in that the estimation unit estimates the charge and discharge amount of the charge and discharge device of the estimated target customer based on the difference between the representative value calculated by the group determination unit and the power consumption of the estimated target customer.
前記推定部は、前記代表値と前記推定対象需要家の前記電力使用量の差分が前記充放電装置の定格出力の半分の値以上の場合に前記充放電装置が充放電を行っていると判定することを特徴とする請求項2に記載の出力推定装置。 The output estimation device according to claim 2, characterized in that the estimation unit determines that the charge/discharge device is performing a charge/discharge operation when the difference between the representative value and the estimated power consumption of the target consumer is equal to or greater than half the rated output of the charge/discharge device. 前記推定部は、前記代表値と前記推定対象需要家の前記電力使用量の差分を基に前記充放電装置の電池容量を算出し、前記代表値と前記推定対象需要家の前記電力使用量の差分が算出した前記電池容量の半分の値以上の場合に前記充放電装置が充放電を行っていると判定することを特徴とする請求項2に記載の出力推定装置。 The output estimation device according to claim 2, characterized in that the estimation unit calculates the battery capacity of the charge/discharge device based on the difference between the representative value and the power consumption of the estimated target consumer, and determines that the charge/discharge device is performing a charge/discharge operation when the difference between the representative value and the power consumption of the estimated target consumer is equal to or greater than half of the calculated battery capacity. 前記推定部は、前記推定対象需要家の前記電力使用量から前記充放電装置の充放電量を除いて前記推定対象需要家の実負荷を求めることを特徴とする請求項1に記載の出力推定装置。 The output estimation device according to claim 1, characterized in that the estimation unit determines the actual load of the target consumer by subtracting the charge/discharge amount of the charge/discharge device from the power consumption of the target consumer. 前記推定対象需要家の前記充放電装置の充放電量を基に、前記推定対象需要家に対するデマンドリクエスト指令を生成して前記推定対象需要家に通知するデマンドリクエスト通知部をさらに備えたことを特徴とする請求項1に記載の出力推定装置。 The output estimation device according to claim 1, further comprising a demand request notification unit that generates a demand request command for the estimated target customer based on the charge/discharge amount of the charge/discharge device of the estimated target customer and notifies the estimated target customer. 前記推定部は、前記推定対象需要家の一定期間における電力使用量の平均を前記推定対象需要家の電力使用量として用いることを特徴とする請求項1に記載の出力推定装置。 The output estimation device according to claim 1, characterized in that the estimation unit uses the average of the electricity consumption of the target consumer over a certain period as the electricity consumption of the target consumer. 前記推定部は、前記推定対象需要家を含む前記充放電装置を有する複数の保有需要家の電力使用量の平均を前記推定対象需要家の電力使用量として用いることを特徴とする請求項1に記載の出力推定装置。 The output estimation device according to claim 1, characterized in that the estimation unit uses the average of the power consumption of multiple customers having the charging/discharging device, including the target customer, as the power consumption of the target customer. 複数の需要家の電力使用量を収集し、
前記電力使用量のうちの充放電装置を有さない非保有需要家の電力使用量を用いて前記需要家を分類するグループを生成し、
前記充放電装置を保有する推定対象需要家の属性と近似する属性の非保有需要家が含まれるグループを、前記推定対象需要家が属するグループとして前記グループの中から選択し、選択したグループに含まれる前記非保有需要家の電力使用量と前記推定対象需要家の電力使用量とを基に、前記推定対象需要家の前記充放電装置の充放電量を推定する
処理をコンピュータに実行させることを特徴とする出力推定プログラム。
Collect electricity usage data from multiple customers,
Using the electricity consumption of non-ownership consumers who do not own charging/discharging equipment from the aforementioned electricity consumption, groups are generated to classify the consumers.
An output estimation program characterized by having a computer perform a process to estimate the charge/discharge amount of the charge/discharge device of the estimated target customer, based on the power consumption of the non-owning customers included in the selected group and the power consumption of the estimated target customer.
出力推定装置に、
複数の需要家の電力使用量を収集させ、
前記電力使用量のうちの充放電装置を有さない非保有需要家の電力使用量を用いて前記需要家を分類するグループを生成させ、
前記充放電装置を保有する推定対象需要家の属性と近似する属性の非保有需要家が含まれるグループを、前記推定対象需要家が属するグループとして前記グループの中から選択させ、選択したグループに含まれる前記非保有需要家の電力使用量と前記推定対象需要家の電力使用量とを基に、前記推定対象需要家の前記充放電装置の充放電量を推定させる
ことを特徴とする出力推定方法。
In the output estimation device,
Collect electricity usage data from multiple customers,
Using the electricity consumption of non-ownership consumers who do not own charging/discharging equipment from the aforementioned electricity consumption, groups are generated to classify the consumers.
An output estimation method characterized by selecting a group from among the groups to be the group to which the estimated target customer belongs, which includes non-owners with attributes similar to those of the estimated target customer who owns the charge/discharge device, and estimating the charge/discharge amount of the charge/discharge device of the estimated target customer based on the power consumption of the non-owners included in the selected group and the power consumption of the estimated target customer.
JP2022107122A 2022-07-01 2022-07-01 Output estimation device, output estimation program, and output estimation method Active JP7908085B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022107122A JP7908085B2 (en) 2022-07-01 2022-07-01 Output estimation device, output estimation program, and output estimation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022107122A JP7908085B2 (en) 2022-07-01 2022-07-01 Output estimation device, output estimation program, and output estimation method

Publications (2)

Publication Number Publication Date
JP2024006333A JP2024006333A (en) 2024-01-17
JP7908085B2 true JP7908085B2 (en) 2026-08-19

Family

ID=89540708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022107122A Active JP7908085B2 (en) 2022-07-01 2022-07-01 Output estimation device, output estimation program, and output estimation method

Country Status (1)

Country Link
JP (1) JP7908085B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015921A (en) 2006-07-07 2008-01-24 Mitsubishi Electric Corp Power load representative pattern creation device and power load representative pattern creation program
JP2013115927A (en) 2011-11-29 2013-06-10 Fujitsu Ltd Program, device, and method for power control support
JP2019023937A (en) 2014-03-07 2019-02-14 株式会社日立製作所 Data analysis system and method
JP2020191764A (en) 2019-05-24 2020-11-26 三菱電機株式会社 Photovoltaic power generation output estimation device, photovoltaic power generation output estimation method and photovoltaic power generation output estimation program
US20210406284A1 (en) 2020-06-24 2021-12-30 Xi'an Jiaotong University Method of power user classification based on distributed k-means, storage medium and classification device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008015921A (en) 2006-07-07 2008-01-24 Mitsubishi Electric Corp Power load representative pattern creation device and power load representative pattern creation program
JP2013115927A (en) 2011-11-29 2013-06-10 Fujitsu Ltd Program, device, and method for power control support
JP2019023937A (en) 2014-03-07 2019-02-14 株式会社日立製作所 Data analysis system and method
JP2020191764A (en) 2019-05-24 2020-11-26 三菱電機株式会社 Photovoltaic power generation output estimation device, photovoltaic power generation output estimation method and photovoltaic power generation output estimation program
US20210406284A1 (en) 2020-06-24 2021-12-30 Xi'an Jiaotong University Method of power user classification based on distributed k-means, storage medium and classification device

Also Published As

Publication number Publication date
JP2024006333A (en) 2024-01-17

Similar Documents

Publication Publication Date Title
Mutanen et al. Customer classification and load profiling method for distribution systems
Liu et al. Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization
Daly et al. RoCoF-constrained scheduling incorporating non-synchronous residential demand response
US20220077707A1 (en) Battery charge and discharge power control in a power grid
WO2012098729A1 (en) Power demand regulation apparatus, power regulation network system, and power regulation method
Georgilakis State-of-the-art of decision support systems for the choice of renewable energy sources for energy supply in isolated regions
Liu et al. Techno-economic feasibility assessment of grid-defection
KR102621374B1 (en) Management System and Method for Controlling Output of Power Generation
CN120165394B (en) Distributed power distribution optimization method and system based on virtual power plant
US20240280617A1 (en) Aggregator System
Lokesh et al. Optimal sizing of RES and BESS in networked microgrids based on proportional peer‐to‐peer and peer‐to‐grid energy trading
CN116703643A (en) Construction method of power resource aggregation equivalent model and power resource scheduling method
JP7319838B2 (en) Power management device and power management method
KR102977266B1 (en) Method for controlling conservation voltage reduction for energy saving in low voltage distributed network and apparatus thereof
JP6549896B2 (en) Electric power demand adjustment device, electric power demand adjustment method and electric power demand adjustment program
Arafat et al. Maximum reserved capacity of aggregated electric water heaters virtual battery for peak management
CN113746105B (en) Optimization control method, device, equipment and storage medium for power demand response
CN121529499A (en) A method, apparatus, equipment and storage medium for power distribution network zoning
Gong et al. A dynamic demand-side resource pool construction method to account for response characteristics
JP2024006333A (en) Output estimation device, output estimation program, and output estimation method
JP7908086B2 (en) Output estimation device, output estimation program, and output estimation method
CN117913915A (en) Source-load collaborative management system in smart active distribution network
Pandey et al. Droop parameter-based economic dispatch for islanded microgrid considering demand response
JP7876435B2 (en) Load control device, load control program, and load control method
Kamyar et al. Optimal thermostat programming and optimal electricity rates for customers with demand charges

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20260210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20260303

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20260424

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20260728

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20260806

R150 Certificate of patent or registration of utility model

Ref document number: 7908085

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150