JP7433118B2 - Construction method of wall unit and workbench - Google Patents

Construction method of wall unit and workbench Download PDF

Info

Publication number
JP7433118B2
JP7433118B2 JP2020065975A JP2020065975A JP7433118B2 JP 7433118 B2 JP7433118 B2 JP 7433118B2 JP 2020065975 A JP2020065975 A JP 2020065975A JP 2020065975 A JP2020065975 A JP 2020065975A JP 7433118 B2 JP7433118 B2 JP 7433118B2
Authority
JP
Japan
Prior art keywords
wall unit
steel material
vertical
pedestal
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020065975A
Other languages
Japanese (ja)
Other versions
JP2021161804A (en
Inventor
寛之 大島
耕栄 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2020065975A priority Critical patent/JP7433118B2/en
Publication of JP2021161804A publication Critical patent/JP2021161804A/en
Application granted granted Critical
Publication of JP7433118B2 publication Critical patent/JP7433118B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

特許法第30条第2項適用 令和2年3月2日 (仮称)横浜金沢物流センター新築計画工事 作業所(神奈川県横浜市金沢区幸浦1-3-3)Application of Article 30, Paragraph 2 of the Patent Act March 2, 2020 (tentative name) Yokohama Kanazawa Logistics Center new construction project work site (1-3-3 Yukiura, Kanazawa-ku, Yokohama, Kanagawa Prefecture)

本発明は、建物の外装パネルの下地となる壁面ユニットの施工方法及び該壁面ユニットを地組するための作業台に関する。 TECHNICAL FIELD The present invention relates to a method for constructing a wall unit as a base for an exterior panel of a building, and a workbench for assembling the wall unit.

建物の外壁の構造において、2枚の鋼板の間に断熱材を挟み込んで構成したサンドイッチパネルを外装パネルとして、縦胴縁に取り付けるものが知られている。
この構造を構築する際には、下地となる縦胴縁を予め建物躯体に固定して一体とし、その縦胴縁に外装パネルを固定することが一般的である。
BACKGROUND ART In the structure of the exterior wall of a building, it is known that a sandwich panel, which is constructed by sandwiching a heat insulating material between two steel plates, is attached to a vertical rim as an exterior panel.
When constructing this structure, it is common to fix the base vertical rim to the building frame in advance and integrate it, and then fix the exterior panels to the vertical rim.

外装パネルの下地となる縦胴縁は以下の手順により建て込み、建物躯体と一体とする。
(1)作業ヤード上でコンクリート止め鋼材と胴縁を仮組する。
(2)仮組したコンクリート止め鋼材と胴縁を吊り上げて建物躯体に建て込む。
(3)胴縁一本毎に建入精度を確認しながら調整して本締めを行う。
The vertical rim, which will serve as the base for the exterior panels, will be erected and integrated with the building frame using the following steps.
(1) Temporarily assemble the concrete retaining steel and the rim on the work yard.
(2) Lift up the temporarily assembled concrete retaining steel members and rim and erect them into the building frame.
(3) Make adjustments while checking the construction accuracy of each rim before final tightening.

この他、以下の特許文献のように、外壁材を地組によりユニット化して建て込む方法が知られている。 In addition, a method is known in which exterior wall materials are assembled into units using ground assembly, as described in the following patent documents.

特開2001-269826号公報Japanese Patent Application Publication No. 2001-269826 特開2017-155489号公報Japanese Patent Application Publication No. 2017-155489 特開昭62-025644号公報Japanese Unexamined Patent Publication No. 62-025644 特開2004-68523号公報Japanese Patent Application Publication No. 2004-68523 特開2001-317208号公報Japanese Patent Application Publication No. 2001-317208

従来の縦胴縁の建て込み方法には、以下のような問題点がある。
(a)胴縁を建物躯体に建て込んだ後、改めて一本毎に調整作業が必要なため、手間が掛かる。また、施工精度によっては調整が不可能な場合もある。
(b)建て込み時に胴縁の施工精度が保たれていないため、コンクリート止め鋼材と外装パネルとの間隔は均一とはならず、この間隔は外装パネルを施工した後でないと決まらない。このため地組の段階で層間ふさぎ材を取り付けることはできない。
(c)層間ふさぎ材は外装パネルを施工した後の施工となるため、各階の外周周りの作業は後回しとする必要がある。
The conventional method of building a vertical rim has the following problems.
(a) After the rim is installed on the building frame, adjustment work is required for each rim, which is time-consuming. Furthermore, adjustment may not be possible depending on the construction accuracy.
(b) Because the construction accuracy of the hull frame was not maintained during erection, the spacing between the concrete retaining steel and the exterior panels was not uniform, and this spacing could only be determined after the exterior panels were constructed. For this reason, it is not possible to install interstory covering materials during the foundation assembly stage.
(c) Since the interlayer sealing material will be installed after the exterior panels are installed, work around the outer periphery of each floor will need to be postponed.

また、特許文献のようにユニット化した外壁材を建て込む方法には、以下のような問題がある。
(d)外壁ユニットの施工精度を高めるためには、地組のための作業台(架台)の精度が高くなければならない。しかし、いずれの特許文献にも作業台の精度についての記載はない。
(e)特許文献1、2のように建て起こした状態で地組を行う場合、建て起こした状態の外装材を保持する下地枠の構築に手間がかかる。
(f)外装パネルは、上下・左右の外装パネル同士の嵌合部の形態から、施工の順序が決まっている。このため、外壁ユニットも建て込みの順序が決まってしまい、工事の進捗に合わせて一部分のみを先に施工する等、柔軟な施工を行うことができない。
Furthermore, the method of constructing unitized exterior wall materials as disclosed in the patent document has the following problems.
(d) In order to improve the construction accuracy of the exterior wall unit, the work platform (frame) for ground assembly must be highly accurate. However, none of the patent documents describes the accuracy of the workbench.
(e) When assembling the foundation in an erected state as in Patent Documents 1 and 2, it takes time and effort to construct a foundation frame to hold the exterior material in the erected state.
(f) The order of construction of the exterior panels is determined based on the form of the fitting portions between the upper and lower, left and right exterior panels. For this reason, the order in which the exterior wall units are to be built is determined, and flexible construction, such as constructing only a portion first in accordance with the progress of construction, is not possible.

本発明は、建て込み時の調整作業が不要な壁面ユニットの施工方法及び該壁面ユニットを地組するための作業台を提供することを目的とする。 An object of the present invention is to provide a method for constructing a wall unit that does not require adjustment work during erection, and a workbench for assembling the wall unit.

上記課題を解決するためになされた本願の第1発明は、コンクリート止め鋼材と、前記コンクリート止め鋼材に直交し、前記コンクリート止め鋼材に上端を連結する複数の縦胴縁と、複数の前記縦胴縁の下端に亘って配置し、複数の前記縦胴縁の下端を連結する脚部固定材と、からなり、建物の外装パネルの下地となる、壁面ユニットの施工方法であって、作業ヤードに配置した作業台の上面に、前記コンクリート止め鋼材、複数の前記縦胴縁、及び前記脚部固定材、を載置する工程と、載置した前記コンクリート止め鋼材と前記縦胴縁、及び前記縦胴縁と前記脚部固定材、をそれぞれ連結し、前記壁面ユニットを地組で構築する工程と、前記壁面ユニットの前記コンクリート止め鋼材に、ロックウールからなる層間ふさぎ材を固定する工程と、前記壁面ユニットのコンクリート止め鋼材に吊りボルトを取り付けて吊り上げ、吊り上げた前記壁面ユニットを建物躯体の所定の位置に建て込む工程と、からなることを特徴とする、壁面ユニットの施工方法を提供する。
本願の第2発明は、第1発明の壁面ユニットの施工方法において、前記コンクリート止め鋼材は、建て込み時に外装パネル側となる面の下端の長さ方向に亘って、層間をふさぐための鋼材を有することを特徴とする、壁面ユニットの施工方法を提供する。
本願の第3発明は、第1発明又は第2発明の壁面ユニットの施工方法で使用し、コンクリート止め鋼材、前記コンクリート止め鋼材に直交し、前記コンクリート止め鋼材に上端を連結する複数の縦胴縁、及び複数の前記縦胴縁の下端に亘って配置し、複数の前記縦胴縁の下端を連結する脚部固定材、からなり、建物の外装パネルの下地となる、壁面ユニットを地組するための作業台であって、作業ヤードの床面上に配置する架台と、前記作業ヤードの床面と、前記架台との間に設ける架台高調整具と、を有し、前記架台は、長尺の形鋼材であり、複数本の前記架台を所定の間隔をもって略平行に並列して構成することを特徴とする、作業台を提供する。
本願の第4発明は、第3発明の作業台において、並列した前記架台のうち、端部に位置する架台の上面に、所定の厚さ、所定の幅を有するスペーサーを設けることを特徴とする、作業台を提供する。

A first invention of the present application made in order to solve the above-mentioned problems includes a concrete fixing steel material, a plurality of vertical rims that are orthogonal to the concrete fixing steel material and whose upper ends are connected to the concrete fixing steel material, and a plurality of the vertical rims. A method for constructing a wall unit, which comprises a leg fixing member disposed over the lower end of the edge and connecting the lower ends of a plurality of vertical edges , and serves as a base for an exterior panel of a building, the method being applied to a work yard. a step of placing the concrete fixing steel material, a plurality of the vertical rims, and the leg fixing material on the upper surface of the placed workbench; a step of respectively connecting the rim and the leg fixing material and constructing the wall unit with ground assembly; a step of fixing an interlayer blocking material made of rock wool to the concrete fixing steel of the wall unit ; To provide a method for constructing a wall unit, comprising the steps of attaching a hanging bolt to a concrete-fixing steel material of the wall unit and lifting it up, and erecting the lifted wall unit at a predetermined position in a building frame .
A second invention of the present application is the method for constructing a wall unit of the first invention, in which the concrete retaining steel material is a steel material for closing the interlayers over the length direction of the lower end of the surface that will be the exterior panel side at the time of erection. A method for constructing a wall unit is provided.
A third invention of the present application is used in the method for constructing a wall unit of the first invention or the second invention, and includes a concrete fastening steel material, a plurality of vertical rims orthogonal to the concrete fastening steel material, and having upper ends connected to the concrete fastening steel material. , and a leg fixing member disposed across the lower ends of the plurality of vertical rims and connecting the lower ends of the plurality of vertical rims. The workbench includes a pedestal placed on the floor of a work yard, and a pedestal height adjuster provided between the floor of the work yard and the pedestal, the pedestal comprising: A workbench is provided, which is made of a long shaped steel material and is characterized in that a plurality of the pedestals are arranged in parallel with each other at a predetermined interval.
A fourth invention of the present application is characterized in that, in the workbench of the third invention, a spacer having a predetermined thickness and a predetermined width is provided on the upper surface of the mount located at an end of the parallel mounts. , provide a workbench.

本発明は、上記した課題を解決するための手段により、次のような効果を得ることができる。
(1)精度が高い壁面ユニットを地組して建て込むため、建て込み時に一本毎に建入れ精度を確認しながらの調整作業が不要となり、工期が短縮される。
(2)精度が高い壁面ユニットを建て込むため、予め層間ふさぎ材を壁面ユニットに取り付けておくことができる。これにより、外装パネルを取り付けた後に層間ふさぎ材を充填する作業がなくなり、各階の外周周りの作業を後回しにする必要がない。
(3)複数本の架台の高さをそれぞれの架台高調整具により調整することにより、複数の架台の上面を面一にできるため、精度の高い壁面ユニットを地組できる。
(4)作業台は、形鋼材からなる架台と、架台を支持する架台高調整具と、からなるため、容易に構築することができる。
(5)外装パネルは壁面ユニットを建て込んだ後に施工するため、壁面ユニットの建て込み順序が外装パネルの施工順序により決まることがなく、工事の進捗に合わせて一部分のみ壁面ユニットを先に建て込む等、柔軟な施工を行うことができる。
The present invention can obtain the following effects by means for solving the above problems.
(1) Since highly accurate wall units are assembled into the ground, there is no need to check the accuracy of each unit during construction and make adjustments, which shortens the construction period.
(2) In order to erect a wall unit with high precision, interlayer sealing material can be attached to the wall unit in advance. This eliminates the need to fill in interlayer sealing material after installing exterior panels, and there is no need to postpone work around the outer periphery of each floor.
(3) By adjusting the height of the plurality of pedestals using the respective pedestal height adjusters, the upper surfaces of the plurality of pedestals can be made flush, so that a highly accurate wall unit can be assembled into the ground.
(4) Since the workbench consists of a pedestal made of shaped steel and a pedestal height adjuster that supports the pedestal, it can be easily constructed.
(5) Since the exterior panels are constructed after the wall units have been erected, the order in which the wall units are erected is not determined by the construction order of the exterior panels, and only a portion of the wall units can be erected first according to the progress of construction. etc., allows for flexible construction.

本発明の壁面ユニットの施工方法における壁面ユニットの斜視図A perspective view of a wall unit in the wall unit construction method of the present invention 壁面ユニットの縦胴縁上部の拡大図Enlarged view of the upper part of the vertical rim of the wall unit 壁面ユニットの縦胴縁下部の拡大図Enlarged view of the lower part of the vertical rim of the wall unit 壁面ユニットの地組状態の説明図An explanatory diagram of the ground assembly state of the wall unit 本発明の作業台の斜視図A perspective view of the workbench of the present invention 本発明の壁面ユニットの施工方法の説明図(1)Explanatory diagram (1) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(2)Explanatory diagram (2) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(3)Explanatory diagram (3) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(4)Explanatory diagram (4) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(5)Explanatory diagram (5) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(6)Explanatory diagram (6) of the construction method of the wall unit of the present invention 架台とコンクリート止め鋼材の配置関係の説明図Explanatory diagram of the arrangement of the frame and concrete retaining steel 本発明の壁面ユニットの施工方法の説明図(7)Explanatory diagram (7) of the construction method of the wall unit of the present invention 本発明の壁面ユニットの施工方法の説明図(8)Explanatory diagram (8) of the construction method of the wall unit of the present invention

以下、本発明の実施の形態について説明する。なお、本説明における壁面ユニットの上下方向・高さ方向は、壁面ユニットを建物に建て込むときの方向を表し、表側・裏側はそれぞれ、建物に建て込んだ際の外装パネル側・建物躯体側を表す。 Embodiments of the present invention will be described below. In addition, the vertical direction and height direction of the wall unit in this explanation represent the direction when the wall unit is installed in a building, and the front and back sides respectively refer to the exterior panel side and building frame side when installed in the building. represent.

[実施例]
[1]壁面ユニット及び作業台
(1)壁面ユニットの構成
本発明の壁面ユニットの施工方法により施工を行う壁面ユニット1は、建物の外装パネルの下地となるものである。外装パネルは、2枚の鋼板の間に断熱材を挟み込んで構成したサンドイッチパネルが一般的である。
壁面ユニット1は、コンクリート止め鋼材2と、コンクリート止め鋼材2に直交して設ける複数の縦胴縁3と、からなる(図1)。そして、壁面ユニット1のコンクリート止め鋼材2のウェブの表面には層間ふさぎ材41をコンクリート止め鋼材2の長さ方向に亘って設ける(図2)。
また、縦胴縁3の下端には、複数の縦胴縁3に亘って脚部固定材5を設ける(図3)。
[Example]
[1] Wall unit and workbench (1) Structure of wall unit The wall unit 1 constructed by the wall unit construction method of the present invention serves as a base for an exterior panel of a building. The exterior panel is generally a sandwich panel constructed by sandwiching a heat insulating material between two steel plates.
The wall unit 1 consists of a concrete fixing steel member 2 and a plurality of vertical edges 3 provided orthogonally to the concrete fixing steel member 2 (FIG. 1). Then, an interlayer sealing material 41 is provided on the surface of the web of the concrete-fixing steel material 2 of the wall unit 1 over the length direction of the concrete-fixing steel material 2 (FIG. 2).
In addition, a leg fixing member 5 is provided at the lower end of the vertical furring 3 over a plurality of the vertical furrings 3 (FIG. 3).

(2)コンクリート止め鋼材
コンクリート止め鋼材2は、建物のコンクリート床スラブの端部を構成する鋼材であり、溝形鋼やアングル材、角材等からなる。
本実施例におけるコンクリート止め鋼材2は溝形鋼であり、建て込み時に外装パネル側となるウェブの表面を外装パネルを取り付ける側とし、建て込み時に下面となる下フランジにL字状の固定具21を、一辺を下フランジの長さ方向に沿って固定するとともに、下方に突設する他辺を縦胴縁3の幅だけ離隔して対向させたものを一組として、縦胴縁3の本数分設ける。
固定具21には、下方に突設して対向する他辺間に配置した縦胴縁3の上端を、ボルトを介して連結する。
(2) Concrete fixing steel material The concrete fixing steel material 2 is a steel material that constitutes the end of the concrete floor slab of a building, and is made of channel steel, angle material, square material, etc.
The concrete fixing steel material 2 in this embodiment is a channel steel, and the surface of the web that will be the exterior panel side during erection is the side to which the exterior panel is attached, and an L-shaped fixture 21 is attached to the lower flange, which will be the lower surface during erection. , one side is fixed along the length direction of the lower flange, and the other side protruding downward is placed opposite to each other with a distance of the width of the vertical flange 3 as a set, and the number of vertical flange 3 is determined. Provide a portion.
The upper end of the vertical furring 3, which projects downward and is arranged between the opposite sides, is connected to the fixture 21 via a bolt.

(3)縦胴縁
縦胴縁3は、外装パネルを固定する部材であり、例えば断面正方形状の鋼材からなる。
縦胴縁3は、外装パネル側の面がコンクリート止め鋼材2のウェブの表面よりも外装パネル側に所定の距離だけ突出している。この距離が、壁面ユニットを建物に建て込んだときの、コンクリート止め鋼材2の外面と外壁パネルの内面の距離である層間幅となる。
(3) Vertical furring rim The vertical furring 3 is a member for fixing the exterior panel, and is made of, for example, a steel material with a square cross section.
The surface of the vertical rim 3 on the exterior panel side protrudes by a predetermined distance from the surface of the web of the concrete fixing steel 2 toward the exterior panel. This distance becomes the interlayer width, which is the distance between the outer surface of the concrete fixing steel material 2 and the inner surface of the outer wall panel when the wall unit is built into a building.

(4)層間ふさぎ材
層間ふさぎ材41は、耐火材であるロックウールを成型したものであり、高さは50mm以上であり、コンクリート止め鋼材2のウェブの表面に固定する。
層間ふさぎ材41は、例えば建物の層間幅が20mmのときには厚さを25mmとし、厚さを建物の層間幅よりも厚くする。
(4) Interlayer Closure Material The interlayer closure material 41 is made of rock wool, which is a fireproof material, and has a height of 50 mm or more, and is fixed to the surface of the web of the concrete fixing steel material 2.
For example, when the interlayer width of the building is 20 mm, the interlayer closing material 41 has a thickness of 25 mm, which is thicker than the interlayer width of the building.

(5)層間ふさぎ鋼材
コンクリート止め鋼材2の表面には、層間ふさぎ鋼材42を設けてもよい。
層間ふさぎ鋼材42は、層間ふさぎ材41の下方であって、コンクリート止め鋼材2のウェブ表面の下端に沿って、工場又は現場で溶接等により固定する。固定具21がウェブ表面よりも前方に突出している場合には、固定具21にも同時に溶接等により固定する。
層間ふさぎ鋼材42は、層間幅よりもわずかに小さい例えばD16(最外径:18mm)の異形棒鋼とする。また、異形棒鋼に代えて、厚さが1.6mm以上の鋼板を用いてもよい。
(5) Interlayer blocking steel material An interlayer blocking steel material 42 may be provided on the surface of the concrete fixing steel material 2.
The interlayer closing steel material 42 is fixed below the interlayer closing material 41 and along the lower end of the web surface of the concrete fixing steel material 2 by welding or the like in a factory or on site. If the fixture 21 protrudes forward from the web surface, it is also fixed to the fixture 21 at the same time by welding or the like.
The interlayer baffle steel material 42 is a deformed steel bar, for example, D16 (outermost diameter: 18 mm), which is slightly smaller than the interlayer width. Further, instead of the deformed steel bar, a steel plate having a thickness of 1.6 mm or more may be used.

(6)脚部固定材
脚部固定材5は、L字状の鋼材からなり、一辺の内面を縦胴縁3の裏側表面に当接し、他辺の内面を縦胴縁3の下端に沿って配置する。他辺の内面には、コンクリート止め鋼材2に設けた固定具21と同様の固定具51を対称となるように設け、ボルトを介して縦胴縁3の下端を連結する。
(6) Leg fixing material The leg fixing material 5 is made of an L-shaped steel material, and the inner surface of one side is in contact with the back surface of the vertical rim 3, and the inner surface of the other side is attached along the lower end of the vertical rim 3. Place it. On the inner surface of the other side, a fixture 51 similar to the fixture 21 provided on the concrete fixing steel member 2 is provided symmetrically, and the lower end of the vertical flange 3 is connected via a bolt.

(7)作業台の構成
壁面ユニット1は、作業ヤードに設けた作業台7上で地組を行う(図4)。
作業台7は、作業ヤードの床面上に配置する架台71と、架台71を支持する架台高調整具72と、からなり、複数組の架台71及び架台高調整具72を所定の間隔をもって略平行に並列して構成する(図5)。
(7) Structure of workbench The wall unit 1 performs ground assembly on a workbench 7 provided in the work yard (FIG. 4).
The workbench 7 consists of a pedestal 71 placed on the floor of the work yard and a pedestal height adjuster 72 that supports the pedestal 71, and the plurality of sets of pedestals 71 and pedestal height adjusters 72 are arranged at predetermined intervals. They are arranged in parallel (Figure 5).

(8)架台
架台71は、上面が平らな長尺の形鋼材であり、例えば一方のフランジを床面上に略平行に配置したH形鋼からなる。
架台71は、複数本を所定の間隔をもって略平行に並列して配置する。
(8) Frame The pedestal 71 is a long steel section with a flat upper surface, and is made of, for example, an H-section steel with one flange arranged substantially parallel to the floor surface.
A plurality of pedestals 71 are arranged substantially parallel to each other at predetermined intervals.

(9)架台高調整具
架台高調整具72は、作業ヤードの床面と、架台71との間に設ける。
架台高調整具72は、例えばジャッキであり、架台71の下フランジを両側から支持し、架台71の長さ方向に、適宜所定の間隔で配置する。
一本の架台71に対して複数の架台高調整具72を設けることにより、容易に架台71の上面を水平面とすることができる。
また、複数本の架台71の高さをそれぞれの架台高調整具72により調整することにより、複数の架台71の上面を面一にできるため、精度の高い壁面ユニット1を地組できる。
(9) Frame height adjuster The pedestal height adjuster 72 is provided between the floor of the work yard and the pedestal 71.
The pedestal height adjuster 72 is, for example, a jack, supports the lower flange of the pedestal 71 from both sides, and is arranged at appropriate predetermined intervals in the length direction of the pedestal 71.
By providing a plurality of pedestal height adjusters 72 for one pedestal 71, the upper surface of the pedestal 71 can be easily made into a horizontal plane.
Further, by adjusting the height of the plurality of mounts 71 using the respective mount height adjusters 72, the upper surfaces of the plurality of mounts 71 can be made flush, so that the wall unit 1 can be assembled with high precision.

(10)スペーサー
並列した架台71のうち、一方の端部に位置する架台71の上面には、スペーサー73を設ける。
スペーサー73は厚さが層間幅と同一の矩形の鋼板であり、架台71の長さ方向に亘って所定の間隔で、並列する他の架台71と逆側の端部側に寄せて設ける。
スペーサー73の個数及び間隔は、上部に載置するコンクリート止め鋼材2を支持できる個数及び間隔とする。
(10) Spacer A spacer 73 is provided on the upper surface of the pedestal 71 located at one end of the pedestals 71 arranged in parallel.
The spacer 73 is a rectangular steel plate having the same thickness as the interlayer width, and is provided at a predetermined interval along the length of the pedestal 71 toward the opposite end of the pedestal 71 arranged in parallel.
The number and spacing of the spacers 73 are such that they can support the concrete fixing steel 2 placed on top.

[2]壁面ユニットの施工方法
次に、本発明の壁面ユニットの施工方法について説明する。
[2] Method of constructing a wall unit Next, a method of constructing a wall unit of the present invention will be described.

(1)作業台の構築
作業ヤード上の予め設定した位置に架台高調整具72を配置し、その上に架台71を配置する(図6)。作業ヤード上に鉄板を敷設し、その上に架台高調整具72を配置してもよい。
架台71は複数本を並列して配置するが、一方の端部の架台71は、上面にスペーサー73を設けたものとする。
そして、それぞれの架台71の上面のレベルを確認しながら架台高調整具72を操作し、全ての架台71の上面を水平かつ面一にすることで、水平面を有する作業台7となる。
作業台7は、架台高調整具72と架台71により構成するため、移設が容易であり、例えば作業ヤードの位置変更にも容易に対応することができる。
(1) Construction of a workbench The pedestal height adjuster 72 is placed at a preset position on the work yard, and the pedestal 71 is placed on top of it (FIG. 6). An iron plate may be laid on the work yard, and the pedestal height adjuster 72 may be placed on it.
A plurality of pedestals 71 are arranged in parallel, and the pedestal 71 at one end is provided with a spacer 73 on its upper surface.
Then, by operating the pedestal height adjuster 72 while checking the level of the top surface of each pedestal 71, and making the top surfaces of all the pedestals 71 horizontal and flush, the workbench 7 has a horizontal surface.
Since the workbench 7 is constituted by the pedestal height adjuster 72 and the pedestal 71, it can be easily relocated, and can easily accommodate changes in the location of the work yard, for example.

(2)コンクリート止め鋼材の載置
まず、作業台7上に、コンクリート止め鋼材2を載置する(図7)。
コンクリート止め鋼材2は端部の架台71上に載置するが、予め固定具21が固定されたウェブの下面が、他の並列する架台71側となるように、ウェブ表面を下面として架台71上に載置する。このとき、コンクリート止め鋼材2は、スペーサー73上に載置するが、ウェブの上端を、スペーサー73のある端部から突設して載置する。
また、層間ふさぎ鋼材42を有する場合も、層間ふさぎ鋼材42は層間幅よりも小さいため、スペーサー73によりかさ上げされた空間に納まり、架台71と干渉しない。
(2) Placing the concrete fixing steel material First, the concrete fixing steel material 2 is placed on the workbench 7 (FIG. 7).
The concrete fixing steel material 2 is placed on the pedestal 71 at the end, and the web surface is placed on the pedestal 71 with the web surface as the lower surface so that the bottom surface of the web to which the fixing tool 21 is fixed in advance is on the other parallel pedestal 71 side. Place it on. At this time, the concrete fixing steel material 2 is placed on the spacer 73 with the upper end of the web protruding from the end where the spacer 73 is located.
Further, even when the interlayer closing steel material 42 is provided, since the interlayer closing steel material 42 is smaller than the interlayer width, it fits into the space raised by the spacer 73 and does not interfere with the pedestal 71.

(3)縦胴縁、脚部固定材の載置
次に、縦胴縁3を作業台7上に載置する(図8)。縦胴縁3は、既に載置されたコンクリート止め鋼材2の固定具21に合わせて配置するため、容易に位置決めすることができる。このとき、コンクリート止め鋼材2は、厚さが層間幅と同一であるスペーサー73上に載置されているため、架台71の上面に配置する縦胴縁3とは、スペーサー73の厚さである層間幅分だけずれており、コンクリート止め鋼材2のウェブ表面から層間幅だけ突出した位置に、縦胴縁3を位置決めすることができる。
そして、配置した縦胴縁3の下端に沿って、脚部固定材5を載置する(図9)。脚部固定材5の固定具51を縦胴縁3に合わせて載置するため、容易に位置決めすることができる。
(3) Placing the vertical trunk rim and leg fixing material Next, the vertical trunk rim 3 is placed on the workbench 7 (FIG. 8). The vertical flange 3 can be easily positioned because it is arranged in accordance with the fixture 21 of the concrete fixing steel material 2 that has already been placed. At this time, since the concrete fixing steel material 2 is placed on the spacer 73 whose thickness is the same as the interlayer width, the vertical rim 3 disposed on the top surface of the pedestal 71 has the same thickness as the spacer 73. The vertical furring 3 can be positioned at a position that is shifted by the interlayer width and protrudes from the web surface of the concrete fixing steel material 2 by the interlayer width.
Then, the leg fixing material 5 is placed along the lower end of the arranged vertical trunk rim 3 (FIG. 9). Since the fixing tool 51 of the leg fixing member 5 is placed in alignment with the vertical torso 3, it can be easily positioned.

(4)本締め
そして、コンクリート止め鋼材2と縦胴縁3を連結するボルト、及び縦胴縁3と脚部固定材5を連結するボルトを本締めし、コンクリート止め鋼材2、縦胴縁3、脚部固定材5を一体とする(図10)。
作業台7はそれぞれの架台71の高さ及び水平を架台高調整具72により調整されており、水平かつ面一となっている。よって、作業台7上で一体とするコンクリート止め鋼材2、縦胴縁3、脚部固定材5からなる壁面ユニット1は、建て込み時に調整が不要な、精度の高い状態で地組できる。
(4) Final tightening Then, the bolts connecting the concrete fixing steel 2 and the vertical rim 3 and the bolts connecting the vertical rim 3 and the leg fixing members 5 are fully tightened, and the concrete fixing steel 2 and the vertical rim 3 are fully tightened. , the leg fixing member 5 is integrated (FIG. 10).
The height and horizontality of each pedestal 71 of the workbench 7 are adjusted by a pedestal height adjuster 72, so that the workbench 7 is horizontal and flush. Therefore, the wall unit 1 consisting of the concrete retaining steel 2, the vertical rim 3, and the leg fixing members 5, which are integrated on the workbench 7, can be assembled into the ground with high precision without the need for adjustment during erection.

(5)層間ふさぎ材の取付
層間ふさぎ材41を、コンクリート止め鋼材2のウェブ表面に取り付ける(図11)。
コンクリート止め鋼材2のウェブ表面のうち、層間ふさぎ材41を固定する部分は、架台71から突出しているため、壁面ユニット1が作業台7上に置かれた状態であっても、容易に取り付けることができる。
本実施例においては、層間ふさぎ材41を本締め後に行っているが、本締め前に行ってもよいし、本締めと同時進行で行ってもよい。
(5) Attaching the interlayer sealing material The interlayer sealing material 41 is attached to the web surface of the concrete fixing steel material 2 (FIG. 11).
Since the part of the web surface of the concrete fixing steel material 2 to which the interlayer sealing material 41 is fixed protrudes from the frame 71, it can be easily attached even when the wall unit 1 is placed on the workbench 7. I can do it.
In this embodiment, the interlayer sealing material 41 is applied after the final tightening, but it may be performed before the final tightening or simultaneously with the final tightening.

(5.1)架台とコンクリート止め鋼材の配置関係
層間ふさぎ材41は、架台71から突出したコンクリート止め鋼材2の表面に固定する。
このため、架台71からのコンクリート止め鋼材2の突出長さHが、層間ふさぎ材41の高さH41よりも長くするのが好適である(図12)。
コンクリート止め鋼材2は、架台71のスペーサー73上に載置する。
コンクリート止め鋼材2の高さをH2、層間ふさぎ材41の高さをH41、層間ふさぎ鋼材42の高さをH42、スペーサー73の幅をH73、層間ふさぎ鋼材42とスペーサー73との間隔をdとしたときに、
-H41-H42>H73+d
となるように、スペーサー73の幅H73と、層間ふさぎ鋼材42の架台71上での配置位置を決めることにより、架台71からのコンクリート止め鋼材2の突出長さHが、層間ふさぎ材41の高さH41よりも長くすることができる。
(5.1) Arrangement relationship between pedestal and concrete fixing steel The interlayer blocking material 41 is fixed to the surface of the concrete fixing steel 2 protruding from the pedestal 71.
For this reason, it is preferable that the protrusion length H P of the concrete fixing steel member 2 from the pedestal 71 is longer than the height H 41 of the interlayer covering material 41 (FIG. 12).
The concrete fixing steel material 2 is placed on the spacer 73 of the frame 71.
The height of the concrete fixing steel material 2 is H2, the height of the interlayer blocking material 41 is H41 , the height of the interlayer blocking steel material 42 is H42 , the width of the spacer 73 is H73 , the distance between the interlayer blocking steel material 42 and the spacer 73. When is d,
H 2 -H 41 -H 42 >H 73 +d
By determining the width H 73 of the spacer 73 and the placement position of the interlayer closing steel material 42 on the pedestal 71 so that can be made longer than the height H41.

(6)壁面ユニットの建て込み
壁面ユニット1のコンクリート止め鋼材2に吊りボルトを取り付けて(図13)、クレーン等により吊り上げる。
壁面ユニット1は外装パネルが取り付けられていないため重量が軽く、吊り上げ時の変形がなく、地組時の精度が保たれる。
そして、吊り上げた壁面ユニット1を建物躯体の所定の位置に建て込む。
精度の高い壁面ユニット1をそのまま建て込むことができるため、建て込み時に一本毎に建入れ精度を確認しながらの調整作業が不要となり、工期が短縮される。
(6) Erecting the wall unit Attach hanging bolts to the concrete fixing steel 2 of the wall unit 1 (Figure 13) and lift it up using a crane or the like.
Since the wall unit 1 is not attached with an exterior panel, it is light in weight, does not deform when lifted, and maintains accuracy during assembly.
Then, the lifted wall unit 1 is installed in a predetermined position of the building frame.
Since the highly accurate wall unit 1 can be erected as is, there is no need for adjustment work while checking the erecting accuracy for each unit during erecting, and the construction period is shortened.

(7)壁面構造の構築
建て込んだ壁面ユニット1の表面に外装パネル8を配置して、壁面構造を構築する(図14)。
壁面ユニット1に予め取り付けた層間ふさぎ材41は、外装パネル8によって押しつぶされて、層間を塞いだ状態で収まる。
建て込んだ壁面ユニット1の精度が高いため、常に層間幅Wが一定であり、予め取り付けた層間ふさぎ材41でも、層間を塞ぐことができる。
また、外装パネル8を取り付けた後に層間ふさぎ材41を充填する作業がないため、各階の外周周りの作業を後回しにする必要がない。
外装パネル8は、壁面ユニット1を建て込んだ後に施工するため、壁面ユニット1の建て込み順序が外装パネル8の施工順序により決まることがなく、工事の進捗に合わせて一部分のみ壁面ユニット1を先に建て込む等、柔軟な施工を行うことができる。
層間ふさぎ材41の下部には層間ふさぎ鋼材42が位置するため、層間ふさぎ鋼材42は、層間ふさぎ材41が地震時に落下するのを防止する。
(7) Construction of wall structure The exterior panel 8 is placed on the surface of the built-in wall unit 1 to construct the wall structure (FIG. 14).
The interlayer sealing material 41 attached to the wall unit 1 in advance is crushed by the exterior panel 8 and fits in a state where the interlayer is closed.
Since the built-in wall unit 1 has high precision, the interlayer width W is always constant, and even the interlayer closing material 41 installed in advance can close the interlayer.
Further, since there is no work to fill the interlayer sealing material 41 after the exterior panel 8 is attached, there is no need to postpone work around the outer periphery of each floor.
Since the exterior panels 8 are constructed after the wall units 1 are built, the order in which the wall units 1 are constructed is not determined by the construction order of the exterior panels 8, and only some parts of the wall units 1 are installed first depending on the progress of the construction. Flexible construction can be carried out, such as building in
Since the interstory covering steel material 42 is located below the interstory covering material 41, the interstory covering steel material 42 prevents the interstory covering material 41 from falling during an earthquake.

1 壁面ユニット
2 コンクリート止め鋼材、21 固定具
3 縦胴縁
41 層間ふさぎ材、42 層間ふさぎ鋼材
5 脚部固定材、51 固定具
6 吊りボルト
7 作業台、71 架台、72 架台高調整具
8 外装パネル
9 床スラブ
1 Wall unit 2 Concrete fixing steel material, 21 Fixing device 3 Vertical rim 41 Interlayer blocking material, 42 Interlayer blocking steel material 5 Leg fixing material, 51 Fixing device 6 Hanging bolt 7 Work platform, 71 Frame, 72 Frame height adjustment tool 8 Exterior Panel 9 Floor slab

Claims (4)

コンクリート止め鋼材と、前記コンクリート止め鋼材に直交し、前記コンクリート止め鋼材に上端を連結する複数の縦胴縁と、複数の前記縦胴縁の下端に亘って配置し、複数の前記縦胴縁の下端を連結する脚部固定材と、からなり、建物の外装パネルの下地となる、壁面ユニットの施工方法であって、
作業ヤードに配置した作業台の上面に、前記コンクリート止め鋼材、複数の前記縦胴縁、及び前記脚部固定材、を載置する工程と、
載置した前記コンクリート止め鋼材と前記縦胴縁、及び前記縦胴縁と前記脚部固定材、をそれぞれ連結し、前記壁面ユニットを地組で構築する工程と、
前記壁面ユニットの前記コンクリート止め鋼材に、ロックウールからなる層間ふさぎ材を固定する工程と、
前記壁面ユニットのコンクリート止め鋼材に吊りボルトを取り付けて吊り上げ、吊り上げた前記壁面ユニットを建物躯体の所定の位置に建て込む工程と、からなることを特徴とする、
壁面ユニットの施工方法。
a concrete retaining steel material, a plurality of vertical furrows perpendicular to the concrete retaining steel materials and having upper ends connected to the concrete retaining steel materials, and a plurality of vertical furrows disposed across the lower ends of the plurality of vertical furrows, A method for constructing a wall unit, which is comprised of a leg fixing material that connects the lower end, and serves as a base for an exterior panel of a building ,
placing the concrete retaining steel material, the plurality of vertical rims, and the leg fixing material on the top surface of a workbench placed in a work yard;
Connecting the placed concrete retaining steel material and the vertical rim, and the vertical rim and the leg fixing material, respectively, and constructing the wall unit using ground assembly;
fixing an interlayer sealing material made of rock wool to the concrete fixing steel material of the wall unit;
The method is characterized by comprising the steps of attaching hanging bolts to the concrete fixing steel of the wall unit, lifting it up, and erecting the lifted wall unit at a predetermined position in the building frame .
Construction method of wall unit.
請求項1に記載の壁面ユニットの施工方法において、
前記コンクリート止め鋼材は、建て込み時に前記外装パネル側となる面の下端の長さ方向に亘って、層間をふさぐための鋼材を有することを特徴とする、
壁面ユニットの施工方法。
The method for constructing a wall unit according to claim 1,
The concrete retaining steel material is characterized in that it has a steel material for closing the interlayers over the length direction of the lower end of the surface that will be on the exterior panel side during erection.
Construction method of wall unit.
請求項1又は2に記載の壁面ユニットの施工方法で使用し、コンクリート止め鋼材、前記コンクリート止め鋼材に直交し、前記コンクリート止め鋼材に上端を連結する複数の縦胴縁、及び複数の前記縦胴縁の下端に亘って配置し、複数の前記縦胴縁の下端を連結する脚部固定材、からなり、建物の外装パネルの下地となる、壁面ユニットを地組するための作業台であって、
作業ヤードの床面上に配置する架台と、
前記作業ヤードの床面上に配置し、前記架台を支持する架台高調整具と、を有し、
前記架台は、長尺の形鋼材であり、
複数本の前記架台を所定の間隔をもって略平行に並列して構成することを特徴とする、
作業台。
Used in the method for constructing a wall unit according to claim 1 or 2, a concrete retaining steel material, a plurality of vertical rims that are orthogonal to the concrete retaining steel material and whose upper ends are connected to the concrete retaining steel materials, and a plurality of the vertical members. A workbench for assembling a wall unit, which serves as a base for an exterior panel of a building, and comprises a leg fixing member disposed over the lower end of the rim and connecting the lower ends of a plurality of vertical rims. hand,
a pedestal placed on the floor of the work yard;
a pedestal height adjuster disposed on the floor of the work yard and supporting the pedestal;
The pedestal is a long shaped steel material,
A plurality of the mounts are arranged in parallel with each other at predetermined intervals,
Workbench.
請求項3に記載の作業台において、
並列した前記架台のうち、端部に位置する架台の上面に、所定の厚さ、所定の幅を有するスペーサーを設けることを特徴とする、
作業台。
The workbench according to claim 3,
A spacer having a predetermined thickness and a predetermined width is provided on the upper surface of the mount located at the end of the mounts arranged in parallel.
Workbench.
JP2020065975A 2020-04-01 2020-04-01 Construction method of wall unit and workbench Active JP7433118B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020065975A JP7433118B2 (en) 2020-04-01 2020-04-01 Construction method of wall unit and workbench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020065975A JP7433118B2 (en) 2020-04-01 2020-04-01 Construction method of wall unit and workbench

Publications (2)

Publication Number Publication Date
JP2021161804A JP2021161804A (en) 2021-10-11
JP7433118B2 true JP7433118B2 (en) 2024-02-19

Family

ID=78002855

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020065975A Active JP7433118B2 (en) 2020-04-01 2020-04-01 Construction method of wall unit and workbench

Country Status (1)

Country Link
JP (1) JP7433118B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010059741A (en) 2008-09-05 2010-03-18 Taisei Corp Interlayer blocking member
JP2016094788A (en) 2014-11-17 2016-05-26 株式会社フジタ Outer wall panel/column layout structure and layout construction method
JP2017155489A (en) 2016-03-02 2017-09-07 大和ハウス工業株式会社 Basic assembly stand of outer wall panel and construction method of outer wall surface material
JP2017155490A (en) 2016-03-02 2017-09-07 大和ハウス工業株式会社 Outer wall panel and water cutoff structure of outer wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010059741A (en) 2008-09-05 2010-03-18 Taisei Corp Interlayer blocking member
JP2016094788A (en) 2014-11-17 2016-05-26 株式会社フジタ Outer wall panel/column layout structure and layout construction method
JP2017155489A (en) 2016-03-02 2017-09-07 大和ハウス工業株式会社 Basic assembly stand of outer wall panel and construction method of outer wall surface material
JP2017155490A (en) 2016-03-02 2017-09-07 大和ハウス工業株式会社 Outer wall panel and water cutoff structure of outer wall

Also Published As

Publication number Publication date
JP2021161804A (en) 2021-10-11

Similar Documents

Publication Publication Date Title
US5063718A (en) Curtain wall for a building
US20070266659A1 (en) Perimeter foundation panel, and method of use
US9745711B2 (en) Prefabricated wall system and method
US7975443B2 (en) Precast prestress raised access floor construction
JP5512112B2 (en) Construction method of floor structure and unit type building
JP7433118B2 (en) Construction method of wall unit and workbench
JP3762689B2 (en) Connection structure of wall frame panel and floor slab foundation
JP2006509127A (en) Vertical alignment and leveling of modular building units
JPH1061181A (en) Panel support tool
JP6755102B2 (en) Construction method of the outer wall panel base and outer wall material
JP2876182B2 (en) Joint foundation for temporary shutter
KR102471233B1 (en) Seismic access floor
JP7365518B1 (en) Panel support material and formwork structure using it
KR102256173B1 (en) Seismic and Thermal Reinforcing Structure and Construction Method Thereof
JP5465607B2 (en) Foundation construction method
JPH09125567A (en) Wall panel and its installation structure
JPH0762881A (en) Shop assembly jig for frame structure and shop assembly method of frame structure
JP7040755B2 (en) Outer wall structure
JP2557161B2 (en) Roof unit with parapet
JP2016169471A (en) Floor structure of building, and construction method of building
JP2513365Y2 (en) Exterior wall structure of a house
JPS607405Y2 (en) basic structure
JP2022056731A (en) Pile base structure
JP2023048692A (en) Rectangular frame member for wall substrate
JP2021031861A (en) Unit building

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20200410

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230919

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230920

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240123

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240206

R150 Certificate of patent or registration of utility model

Ref document number: 7433118

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150