JP7419431B2 - How to install flange reinforcement - Google Patents

How to install flange reinforcement Download PDF

Info

Publication number
JP7419431B2
JP7419431B2 JP2022073077A JP2022073077A JP7419431B2 JP 7419431 B2 JP7419431 B2 JP 7419431B2 JP 2022073077 A JP2022073077 A JP 2022073077A JP 2022073077 A JP2022073077 A JP 2022073077A JP 7419431 B2 JP7419431 B2 JP 7419431B2
Authority
JP
Japan
Prior art keywords
flange
tool
clamping member
nut
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022073077A
Other languages
Japanese (ja)
Other versions
JP2022103207A (en
Inventor
洋一郎 星野
卓也 東海林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cosmo Koki Co Ltd
Original Assignee
Cosmo Koki Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cosmo Koki Co Ltd filed Critical Cosmo Koki Co Ltd
Priority to JP2022073077A priority Critical patent/JP7419431B2/en
Publication of JP2022103207A publication Critical patent/JP2022103207A/en
Application granted granted Critical
Publication of JP7419431B2 publication Critical patent/JP7419431B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、弁室等の狭隘な空間内に設置されている管路構成部材のフランジと接続部材のフランジとのフランジ接合部を、上下方向から挟持して補強するフランジ補強具の装着方法及びそれに用いる装着工具に関する。 The present invention provides a method for attaching a flange reinforcing tool that clamps and reinforces a flange joint between a flange of a conduit component and a flange of a connecting member installed in a narrow space such as a valve chamber from above and below. The present invention relates to a mounting tool used therefor.

例えば特許文献1に開示されているように、接続部材である弁装置の上下両端のフランジに、それぞれ管路構成部材である流体管及び消火栓のフランジを接合したものがある。このようにフランジ同士を接合する場合、経年劣化等による腐食や不等沈下、または地震等の外力などが加わると、フランジの接合部分から流体管内の流体が外部に漏出するおそれがある。 For example, as disclosed in Patent Document 1, there is a device in which flanges of a fluid pipe and a fire hydrant, which are conduit constituent members, are respectively joined to flanges at both upper and lower ends of a valve device, which is a connecting member. When flanges are joined together in this manner, there is a risk that the fluid in the fluid pipe may leak to the outside from the joined portion of the flanges if corrosion or uneven settlement due to aging deterioration or the like or external force such as an earthquake is applied.

そこで、特許文献1に記載されているように、フランジ接合部を上下方向から挟持して補強し、流体の漏出を未然に防止するためのフランジ補強具が開発されている。 Therefore, as described in Patent Document 1, a flange reinforcing tool has been developed that clamps and reinforces the flange joint from above and below to prevent fluid leakage.

特開2016-180452号公報(第4頁、第1図)JP 2016-180452 (Page 4, Figure 1)

特許文献1に記載されているフランジ補強具は、一端を支点として開閉可能な上下1対の挟持部材により、管路構成部材である流体管と消火栓の両フランジの接合部を上下方向から挟持し、上下の挟持部材同士をボルトとナットにより連結することにより、フランジ接合部を上下から補強するものであるが、フランジ補強具を装着する際に、次のような課題がある。 The flange reinforcement device described in Patent Document 1 uses a pair of upper and lower clamping members that can be opened and closed with one end as a fulcrum to clamp the joint between the flanges of a fluid pipe and a fire hydrant, which are conduit constituent members, from above and below. The flange joint is reinforced from above and below by connecting the upper and lower clamping members with bolts and nuts, but the following problems arise when installing the flange reinforcing tool.

すなわち、流体管の殆どは地中に埋設されているため、それに接続される弁装置や消火栓も地表からやや深い位置においてフランジ接合される場合が多い。また弁装置や消火栓は、狭隘な弁筺や弁室内に配置されることが多いため、フランジ接合部の周囲に十分な作業スペースを確保することができず、作業者が弁室内で作業するのは困難である。このため、フランジ補強具の装着に熟練を要したり、フランジ接合部へのフランジ補強具の装着作業に時間がかかり過ぎて、作業能率が低下するという問題がある。また、弁室を一旦壊したり、取外したりしてフランジ補強具の装着作業を行ってから、再度弁室を構築する場合もあるが、作業コスト、時間、労力を非常に費やすことになるという問題がある。 That is, since most of the fluid pipes are buried underground, the valve devices and fire hydrants connected thereto are often flanged at a position somewhat deep from the ground surface. In addition, because valve devices and fire hydrants are often placed inside narrow valve cases or valve chambers, it is not possible to secure sufficient work space around the flange joints, making it difficult for workers to work inside the valve chamber. It is difficult. For this reason, there are problems in that skill is required to attach the flange reinforcing tool, and it takes too much time to attach the flange reinforcing tool to the flange joint, resulting in a decrease in work efficiency. In addition, there are cases where the valve chamber is destroyed or removed and a flange reinforcing tool is installed, and then the valve chamber is rebuilt, which requires a large amount of work cost, time, and effort. There is.

本発明は、上記問題点に鑑みてなされたもので、フランジ接合部の周囲に十分な作業スペースが確保されていなくても、フランジ接合部にフランジ補強具を上方から容易に装着でき、作業能率を向上させうるようにしたフランジ補強具の装着方法及びそれに用いる装着工具を提供することを目的としている。 The present invention has been made in view of the above problems, and even if sufficient work space is not secured around the flange joint, a flange reinforcing tool can be easily attached to the flange joint from above, increasing work efficiency. It is an object of the present invention to provide a method for installing a flange reinforcing device and a tool for installing it that can improve the performance of the flange reinforcing device.

上記課題を解決するために、本発明のフランジ補強具の装着方法は、
上下両端にフランジを有する接続部材の両フランジにそれぞれ接合される管路構成部材の下方のフランジ接合部に外嵌される1対の分割体からなる下部挟持部材と、前記管路構成部材の上方のフランジ接合部に外嵌される1対の分割体からなる上部挟持部材と、前記下部挟持部材及び前記上部挟持部材同士を連結する連結ボルト及びナットと、から少なくとも構成されフランジ接合を補強するフランジ補強具の装着方法であって、
前記下部挟持部材における前記1対の分割体の一方の端部同士を、両分割体が開閉可能なようにボルトとナットにより予め仮連結した状態で、前記1対の分割体を上下方向を向く1対の吊支工具により支持する第1の工程と、
前記吊支工具により支持された前記1対の分割体の仮連結部を支点として開いた状態で前記下方のフランジ接合部の側方まで移動させ、前記両分割体を閉じることにより、前記下方のフランジ接合部の外径部に前記下部挟持部材を側方から嵌合して仮置きする第2の工程と、
前記1対の分割体の他方の端部同士を連結するボルトとナットを締結工具の下端部の支持部により上下対向状に支持し、前記締結工具を移動させて前記ボルトとナットにより前記1対の分割体の他方の端部を連結する第3の工程と、
前記1対の分割体の前記一方の端部同士を仮連結したボルトとナット及び前記1対の分割体の他方の端部同士を連結したボルトとナットを、供回りを防止しながら前記締結工具により上方から緊締し、前記下方のフランジ接合部に前記下部挟持部材を装着する第4の工程と、を少なくとも備えることを特徴としている。
この特徴によれば、第1ないし第4の工程を実施することにより、フランジ補強具を構成する下部挟持部材を、接続部材の下端のフランジと管路構成部材のフランジとのフランジ接合部に、上方から容易に装着してフランジ接合部を上下方向から補強する部材を装着することができる。従って、例えば狭隘な空間内に管路構成部材及び接続部材が設置され、それらのフランジ接合部の周囲に大きな作業スペースが確保されていなくても、弁室を壊したり、取外したりせずに、フランジ補強具の装着作業を効率よく行うことができ、作業能率が向上する。
In order to solve the above problems, the flange reinforcement mounting method of the present invention includes:
A lower holding member consisting of a pair of split bodies fitted onto the lower flange joint portion of a conduit constituent member which is joined to both flanges of a connecting member having flanges at both upper and lower ends, and an upper part of the conduit constituent member. A flange for reinforcing the flange joint, the flange comprising at least an upper clamping member consisting of a pair of split bodies fitted externally to the flange joint of the flange, and a connecting bolt and nut connecting the lower clamping member and the upper clamping member to each other. A method for attaching a reinforcing device,
One ends of the pair of divided bodies in the lower holding member are temporarily connected in advance with bolts and nuts so that both divided bodies can be opened and closed, and the pair of divided bodies are oriented in the vertical direction. A first step of supporting with a pair of hanging support tools;
By using the tentative connection part of the pair of divided bodies supported by the hanging support tool as a fulcrum and moving it in an open state to the side of the lower flange joint part, and closing both of the divided bodies, the lower part is suspended. a second step of fitting and temporarily placing the lower holding member on the outer diameter portion of the flange joint from the side;
A bolt and a nut connecting the other ends of the pair of split bodies are supported in a vertically opposed manner by a support portion at the lower end of a fastening tool, and the fastening tool is moved to connect the bolt and nut to each other. a third step of connecting the other end of the divided body;
The fastening tool connects the bolt and nut temporarily connecting the one ends of the pair of divided bodies and the bolt and nut connecting the other ends of the pair of divided bodies while preventing co-rotation. The present invention is characterized in that it includes at least a fourth step of tightening the lower clamping member from above and attaching the lower clamping member to the lower flange joint.
According to this feature, by carrying out the first to fourth steps, the lower clamping member constituting the flange reinforcing tool is attached to the flange joint between the flange at the lower end of the connecting member and the flange of the conduit constituting member. A member that can be easily installed from above and reinforces the flange joint from above and below can be installed. Therefore, for example, even if the pipe constituting members and connecting members are installed in a narrow space and a large working space is not secured around their flange joints, the valve chamber can be easily removed without destroying or removing it. The work of installing the flange reinforcing tool can be done efficiently, improving work efficiency.

前記第1の工程において、前記分割体の外径部に形成された切欠部に前記吊支工具の下端部を嵌合させた状態で、前記分割体の上下両面を吊支工具の支持部材により挟持して支持することを特徴としている。
この特徴によれば、1対の分割体を2つの吊支工具により支持して容易に開閉したり、下方へ移動させたりすることができる。
In the first step, with the lower end of the suspension tool fitted into the notch formed on the outer diameter of the divided body, the upper and lower surfaces of the divided body are held by the support members of the suspension tool. It is characterized by being held and supported.
According to this feature, the pair of divided bodies can be supported by two hanging tools and can be easily opened/closed or moved downward.

前記第1ないし第4の工程と同じ手順により、前記上部挟持部材を前記上方のフランジ接合部に装着した後、前記上下の分割体の外径部にそれぞれ形成された切欠部同士が上下に整合するように周方向に位置決めする第5の工程を更に備えることを特徴としている。
この特徴によれば、上下の分割体を周方向に位置決めして切欠部同士を整合させることで、これらの切欠部に架けて連結ボルトを正確に取付けることができる。
After the upper holding member is attached to the upper flange joint by the same procedure as the first to fourth steps, the notches formed in the outer diameter portions of the upper and lower divided bodies are vertically aligned with each other. The present invention is characterized by further comprising a fifth step of positioning in the circumferential direction so as to.
According to this feature, by positioning the upper and lower divided bodies in the circumferential direction and aligning the notches with each other, it is possible to accurately attach the connecting bolt across these notches.

前記第5の工程において、前記上下の分割体の前記切欠部にロッドを上方から挿入して位置決めすることを特徴としている。
この特徴によれば、ロッドを切欠部に上方から挿入するだけで、上下の分割体の切欠部同士を容易に整合させることができる。
In the fifth step, a rod is inserted into the notch of the upper and lower divided bodies from above and positioned.
According to this feature, the notches of the upper and lower divided bodies can be easily aligned by simply inserting the rod into the notch from above.

前記上部挟持部材及び前記下部挟持部材同士を連結する前記連結ボルト及びナットを締結工具の下端部の保持部により上下対向状に保持する第6の工程と、
前記締結工具を移動させて、それに保持された連結ボルトを、前記上下の分割体の前記切欠部に側方から嵌合し、前記連結ボルトとナットとの供回りを防止しながら前記締結工具により上方から緊締し、前記上部挟持部材と下部挟持部材同士とを連結する第7の工程と、を更に備えることを特徴としている。
この特徴によれば、上部挟持部材及び前記下部挟持部材同士を連結する連結ボルト及びナットを上方から緊締することで、フランジ補強具を、接続部材の上下両端のフランジと管路構成部材の上下のフランジとのフランジ接合部に、上方から容易に装着してフランジ接合部を上下方向から補強することができる。
a sixth step of holding the connection bolt and nut that connect the upper clamping member and the lower clamping member in a vertically opposed manner by a holding part at the lower end of the fastening tool;
The fastening tool is moved to fit the connecting bolt held therein into the notch of the upper and lower divided bodies from the side, and the fastening tool is used to prevent the connecting bolt and nut from rotating together. The present invention is characterized in that it further includes a seventh step of tightening from above and connecting the upper clamping member and the lower clamping member to each other.
According to this feature, by tightening the connecting bolts and nuts connecting the upper clamping member and the lower clamping member from above, the flange reinforcing device can be attached to the flanges at both the upper and lower ends of the connecting member and the upper and lower ends of the conduit component. It can be easily attached to the flange joint from above to reinforce the flange joint from above and below.

前記フランジ補強具の装着方法に用いる装着工具であって、
先端部が前記分割体の前記切欠部に側方から嵌合可能な上下方向に配設されるロッド部材と、
前記ロッド部材の先端部に設けられ、該ロッド部材の先端部を前記切欠部に嵌合した状態で前記分割体の上下両面を挟んで支持可能な1対の支持部材と、から構成された吊支工具を備えることを特徴としている。
この特徴によれば、1対の分割体を2つの吊支工具を用いて支持して容易に開閉したり、下方に移動させたりすることができる。また、上下方向に長い吊支工具を狭隘な空間内に上方から挿入して、両分割体をフランジ接合部に容易に装着することができる。
An installation tool used in the method for installing the flange reinforcing device, comprising:
a rod member disposed in the vertical direction, the tip of which can fit into the notch of the divided body from the side;
a pair of support members provided at the tip of the rod member and capable of supporting both upper and lower surfaces of the divided body in a state where the tip of the rod member is fitted into the notch; It is characterized by being equipped with supporting tools.
According to this feature, the pair of divided bodies can be supported using two hanging tools and can be easily opened/closed or moved downward. Further, by inserting a vertically long hanging support tool into a narrow space from above, both divided bodies can be easily attached to the flange joint.

前記フランジ補強具の装着方法に用いる装着工具であって、
上下方向に配設される第1ロッド部材と、
前記第1ロッド部材の下端部に取付けられ、上面に、ボルトの頭部とナットとのいずれか一方を回り止めして保持可能な下向き凹部を有する第1のボルトナット保持部材と、
前記第1ロッド部材に取付けられた上下複数のロッド連結部材と、
前記各ロッド連結部材に上下方向に移動可能かつ回転可能に支持された、前記第1ロッド部材と略平行をなす第2ロッド部材と、
前記第2ロッド部材の下端部に取付けられ、下面に、前記ボルトの頭部とナットとのいずれか他方を回り止めして保持可能な、前記下向き凹部と対向する上向き凹部を有する第2のボルトナット保持部材と、
前記第2ロッド部材の上端部に設けられた操作ハンドルと、から構成された締結工具を備えることを特徴としている。
この特徴によれば、第1ロッド部材の第1のボルトナット保持部材と第2のロッド部材の第2のボルトナット保持部材により、ボルトとナットを対向状に保持して分割体に簡単に取付けることができ、その後連続して、第2のロッド部材の第2のボルトナット保持部材によりボルトとナットを緊締することができる。また、上下方向に長い締結工具を狭隘な空間内に上方から挿入して、ボルトとナットの取付けや緊締作業を容易に行うことができる。
An installation tool used in the method for installing the flange reinforcing device, comprising:
a first rod member disposed in the vertical direction;
a first bolt-nut holding member that is attached to the lower end of the first rod member and has a downward recess on the upper surface that can hold either the head of the bolt or the nut while preventing rotation;
a plurality of upper and lower rod connecting members attached to the first rod member;
a second rod member substantially parallel to the first rod member, which is vertically movable and rotatably supported by each of the rod connecting members;
a second bolt that is attached to the lower end of the second rod member and has an upward recess opposite to the downward recess on the lower surface thereof, which is capable of holding the other of the bolt head and the nut in a rotation-stopping manner; a nut holding member;
The present invention is characterized in that it includes a fastening tool comprising: an operation handle provided at the upper end of the second rod member; and a fastening tool.
According to this feature, the bolt and nut are held in opposition by the first bolt and nut holding member of the first rod member and the second bolt and nut holding member of the second rod member, and are easily attached to the divided body. After that, the bolt and nut can be continuously tightened by the second bolt and nut holding member of the second rod member. Further, by inserting a vertically long fastening tool into a narrow space from above, it is possible to easily perform bolt and nut installation and tightening operations.

前記第1ロッド部材は、前記連結ボルトの軸部を側方から挿脱可能に保持する軸部保持部材を有することを特徴としている。
この特徴によれば、第1または第2のボルトナット保持部材に保持されたボルトが倒れるのが防止されるので、ボルトの軸部が長くても、分割体の切欠部に側方から容易に嵌合することができる。
The first rod member is characterized in that it has a shaft holding member that holds the shaft of the connection bolt so that it can be inserted and removed from the side.
According to this feature, the bolt held by the first or second bolt/nut holding member is prevented from falling down, so even if the shaft of the bolt is long, the notch of the split body can be easily accessed from the side. Can be fitted.

また、上記課題を解決するために、本発明のフランジ補強具の装着方法は、
管路構成部材のフランジとそれに接合される接続部材のフランジとを、上下1対の挟持部材の挟持部により上下方向から挟んで補強するフランジ補強具の装着方法であって、
前記上下1対の挟持部材同士を、上下方向に相対移動可能なように上下方向からボルトとナットにより仮連結する第1の工程と、
前記仮連結された上下の挟持部材を上下方向を向く吊支工具の下端部により保持して吊支する第2の工程と、
前記吊支工具により吊支された前記上下の挟持部材を前記上下のフランジ接合部の側方まで移動させ、前記上下の挟持部を前記上下のフランジの外径部に側方から挟入する第3の工程と、
前記仮連結したボルトとナットを供回りを防止しながら締結工具により上方から緊締し、前記上下のフランジ接合部を前記上下の挟持部により挟持する第4の工程と、を備えることを特徴としている。
この特徴によれば、第1ないし第4の工程を実施することにより、上下1対の挟持部材からなるフランジ補強具を、管路構成部材と接続部材とのフランジ接合部に、上方から容易に装着してフランジ接合部を上下方向から補強することができる。従って、例えば狭隘な空間内に管路構成部材及び接続部材が設置され、それらのフランジ接合部の周囲に大きな作業スペースが確保されていなくても、弁室を壊したり、取外したりせずに、フランジ補強具の装着作業を効率よく行うことができ、作業能率が向上する。
In addition, in order to solve the above problems, the method for installing a flange reinforcing device of the present invention includes:
A method for attaching a flange reinforcing device for reinforcing a flange of a pipe constituting member and a flange of a connecting member joined thereto by sandwiching them from above and below between a pair of pinching members of a pair of upper and lower pinching members, the method comprising:
a first step of temporarily connecting the pair of upper and lower holding members with bolts and nuts from above and below so that they can move relative to each other in the above and below directions;
a second step of holding and suspending the temporarily connected upper and lower clamping members by a lower end of a suspension support tool facing in the vertical direction;
moving the upper and lower clamping members suspended by the suspension support tool to the sides of the upper and lower flange joints, and inserting the upper and lower clamping parts into the outer diameter portions of the upper and lower flanges from the side; Step 3 and
A fourth step of tightening the temporarily connected bolt and nut from above using a fastening tool while preventing them from rotating together, and clamping the upper and lower flange joints with the upper and lower clamping parts. .
According to this feature, by carrying out the first to fourth steps, the flange reinforcing tool consisting of a pair of upper and lower holding members can be easily attached to the flange joint between the conduit component and the connecting member from above. When installed, the flange joint can be reinforced from above and below. Therefore, for example, even if the pipe constituting members and connecting members are installed in a narrow space and a large working space is not secured around their flange joints, the valve chamber can be easily removed without destroying or removing it. The work of installing the flange reinforcing tool can be done efficiently, improving work efficiency.

前記フランジ補強具の装着方法に用いる装着工具であって、
上下方向に配設されるロッド部材と、前記ロッド部材の下端部に取付けられ、前記上下の挟持部材における挟持部と反対側の側端部を側方から挟んで支持可能な上下1対の支持部材と、から構成された吊支工具を備えることを特徴としている。
この特徴によれば、フランジ補強具が装着されるフランジ接合部の周囲に大きなスペースがなくても、上下方向に長い吊支工具の下端部に取り付けられた上下1対の支持部材により挟持部材を保持して、上下のフランジ接合部に側方から容易に装着することができる。
An installation tool used in the method for installing the flange reinforcing device, comprising:
a rod member disposed in the vertical direction; and a pair of upper and lower supports that are attached to the lower end of the rod member and can support the side ends of the upper and lower clamping members opposite to the clamping parts by laterally sandwiching them. The present invention is characterized by comprising a hanging support tool composed of a member and a suspension support tool.
According to this feature, even if there is not a large space around the flange joint where the flange reinforcing tool is attached, the clamping member can be held by the pair of upper and lower support members attached to the lower end of the vertically long hanging support tool. It can be held and easily attached from the side to the upper and lower flange joints.

前記フランジ補強具の装着方法に用いる装着工具であって、
上下方向に配設されるロッド部材と、前記ロッド部材の下端部に取付けられ、上下1対の挟持部材を仮連結するボルトの頭部またはナットに上方から回り止めして嵌合可能なソケットと、前記ロッド部材の上端部に設けられた操作ハンドルと、から構成された締結工具を備えることを特徴としている。
この特徴によれば、フランジ補強具が装着されるフランジ接合部の周囲に大きなスペースがなくても、上下方向に長い締結工具を狭隘な空間内に上方から挿入して、下端部に取り付けたソケットにより、ボルトまたはナットを上方から容易に締め付けることができる。
An installation tool used in the method for installing the flange reinforcing device, comprising:
a rod member disposed in the vertical direction; a socket that is attached to the lower end of the rod member and that can be fitted from above to the head or nut of a bolt that temporarily connects a pair of upper and lower holding members; , an operation handle provided at the upper end of the rod member, and a fastening tool.
According to this feature, even if there is not a large space around the flange joint where the flange reinforcing tool is attached, a vertically long fastening tool can be inserted from above into the narrow space and the socket attached to the lower end can be used. This allows bolts or nuts to be easily tightened from above.

前記フランジ補強具の装着方法に用いる装着工具であって、
前記吊支工具のロッド部材と前記締結工具のロッド部材とを、それぞれのロッド部材が並行をなすように、かつ前記吊支工具に対し前記締結工具が上下方向に移動可能なように、上下複数のロッド連結部材により連結することにより、前記吊支工具と前記締結工具とが一体化されていることを特徴としている。
この特徴によれば、吊支工具と締結工具とが一体化された装着工具を用いることにより、吊支工具による上下1対の挟持部材の保持及び下方への移動作業と、締結工具によるボルトとナットの締付け作業とを、工具を取り替えることなく連続的に行うことができ、作業能率が向上する。
An installation tool used in the method for installing the flange reinforcing device, comprising:
The rod member of the hanging support tool and the rod member of the fastening tool are arranged in a plurality of upper and lower positions so that the rod members are parallel to each other and the fastening tool is movable in the vertical direction with respect to the hanging support tool. The suspension tool and the fastening tool are integrated by being connected by a rod connecting member.
According to this feature, by using a mounting tool in which a hanging support tool and a fastening tool are integrated, the lifting support tool can hold and move a pair of upper and lower clamping members downward, and the fastening tool can perform bolt and Nut tightening work can be performed continuously without changing tools, improving work efficiency.

(a)は、実施例1のフランジ補強具の装着方法及び装着工具により、補修弁と消火栓及び分岐首部とにフランジ補強具を装着した状態の側面図、(b)は、フランジ補強具の装着対象となる補修弁と消火栓及び分岐首部とを示す側面図である。(a) is a side view of the flange reinforcing device installed on the repair valve, fire hydrant, and branch neck using the flange reinforcing device installation method and installation tool of Example 1, and (b) is a side view of the flange reinforcing device installed. It is a side view showing a target repair valve, a fire hydrant, and a branch neck. フランジ補強具全体の斜視図である。FIG. 3 is a perspective view of the entire flange reinforcing device. (a)は上部挟持部材を構成する分割体の平面図、(b)は同じく左側面図、(c)は同じく右側面図、(d)は同じく正面図、(e)は同じく下面図、(f)は下部挟持部材を構成する分割体の要部の下面図である。(a) is a plan view of the divided body constituting the upper holding member, (b) is a left side view, (c) is a right side view, (d) is a front view, (e) is a bottom view, (f) is a bottom view of the main part of the divided body constituting the lower clamping member. (a)は、第1の吊支工具の側面図、(b)は、同じく、第2の吊支工具の側面図である。(a) is a side view of the first suspension support tool, and (b) is a side view of the second suspension support tool. (a)は、第1の締結工具の側面図、(b)は、同じく、第2の締結工具の側面図である。(a) is a side view of the first fastening tool, and (b) is a side view of the second fastening tool. 図4のA-A断面図である。5 is a sectional view taken along line AA in FIG. 4. FIG. 図5(b)のB-B断面図である。FIG. 5B is a sectional view taken along line BB in FIG. 5(b). 第1の工程を示し、下部挟持部材の分割体を第1の吊支工具により吊支して開いた状態の平面図である。It is a top view which shows the 1st process, and the state which the divided body of a lower clamping member is suspended by the 1st suspension support tool, and opened. 図8のC-C断面図である。9 is a sectional view taken along line CC in FIG. 8. FIG. 第2の工程を示し、下部挟持部材の分割体を第1の吊支工具により開いた状態で下部のフランジ接合部まで移動した後閉じ、下部挟持部材を下部のフランジ接合部に仮置きした状態の側面図である。The second step is shown, in which the divided body of the lower clamping member is moved to the lower flange joint in an open state by the first hanging support tool, and then closed, and the lower clamping member is temporarily placed at the lower flange joint. FIG. 第3の工程を示し、第1の締結工具によりボルトとナットを保持し、分割体の他方の端部を仮連結した状態の側面図である。It is a side view which shows the 3rd process, and the bolt and nut are held by the 1st fastening tool, and the other end of the split body is temporarily connected. 第4の工程を示し、第1の締結工具により分割体の両端部を連結するボルトとナットを緊締した状態の側面図である。It is a side view which shows the 4th process, and the state where the bolt and nut which connect the both ends of a split body are tightened by the 1st fastening tool. 同じく平面図である。It is also a plan view. 上部挟持部材の分割体を1対の第2の吊支工具により吊支して開いた状態の平面図である。FIG. 7 is a plan view of the divided body of the upper clamping member in an open state suspended by a pair of second suspension tools. 図14のD-D断面図である。15 is a sectional view taken along line DD in FIG. 14. FIG. 第5の工程を示し、第2の吊支工具を用いて上下の挟持部材同士を位置決めした状態の側面図である。It is a side view which shows the 5th process, and the state where the upper and lower clamping members were positioned using the 2nd hanging support tool. 第6の工程を示し、第2の締結工具により連結ボルトとナットを保持した状態の側面図である。It is a side view which shows the 6th process, and the state where the connection bolt and nut are held by the 2nd fastening tool. 第7の工程を示し、第2の締結工具により保持した連結ボルトとナットを、上下の挟持部材の切欠部に側方から嵌合する状態の平面図である。It is a top view which shows the 7th process, and the state where the connection bolt and nut held by the 2nd fastening tool are fitted into the notch part of the upper and lower clamping members from the side. 第2の締結工具により連結ボルトとナットを緊締し、フランジ接合部に上下の挟持部材の装着した状態の側面図である。FIG. 6 is a side view of a state in which the connecting bolt and nut are tightened using a second fastening tool, and upper and lower clamping members are attached to the flange joint. 実施例2のフランジ補強具の装着方法及び装着工具により、フランジ接合部にフランジ補強具を装着した状態の側面図である。FIG. 7 is a side view of the flange reinforcing device mounted on the flange joint by the flange reinforcing tool mounting method and mounting tool of Example 2; (a)は上部の挟持部材の側面図、(b)は同じく平面図、(c)は同じくE-E断面図、(d)は下部の挟持部材の側面図、(e)は同じく平面図、(f)は同じくF-F断面図、(g)は上下の挟持部材を連結した状態の断面図である。(a) is a side view of the upper clamping member, (b) is a plan view, (c) is a sectional view taken along EE, (d) is a side view of the lower clamping member, and (e) is a plan view. , (f) are FF sectional views, and (g) is a sectional view showing the upper and lower holding members connected. 吊支工具と締結工具からなる装着工具の側面図である。It is a side view of the installation tool which consists of a suspension tool and a fastening tool. 図22のG-G断面図である。23 is a sectional view taken along line GG in FIG. 22. FIG. 図22のH-H断面図である。23 is a sectional view taken along line HH in FIG. 22. FIG. 実施例2のフランジ補強具の装着方法の第1ないし第4の工程、及び吊支工具と締結工具からなる装着工具を用いて、上下の挟持部材からなるフランジ補強具をフランジ接合部に装着した状態の側面図である。Using the first to fourth steps of the flange reinforcing tool mounting method of Example 2 and the mounting tool consisting of a suspension tool and a fastening tool, a flange reinforcing tool consisting of upper and lower clamping members was attached to the flange joint. It is a side view of a state. 弁室内の埋設物を掘削するための掘削工具を示した側面図である。FIG. 3 is a side view showing an excavation tool for excavating a buried object in the valve chamber.

本発明に係るフランジ補強具の装着方法及びそれに用いる装着工具を実施するための形態を実施例に基づいて以下に説明する。 DESCRIPTION OF THE PREFERRED EMBODIMENTS A method for mounting a flange reinforcing tool and a mounting tool used therein according to the present invention will be described below based on examples.

実施例1に係るフランジ補強具の装着方法及びそれに用いる装着工具について、図1~図19及び図26を参照して説明する。先ず図1に示すように、管路構成部材である流体管3の分岐首部3bの上端に設けられた略水平の分岐部フランジ3cには、接続部材である補修弁4の下端の略水平をなすフランジ4cが接続され、補修弁4の上端の略水平をなすフランジ4dには、管路構成部材である消火栓2の下端の略水平をなすフランジ2dが接続され、流体管3の分岐部フランジ3cと消火栓2のフランジ2dとがフランジ補強具10によって結合、補強されている。流体管3の分岐首部3b、補修弁4及び消火栓2は、狭隘な弁室20(図10参照)の空間内に設置されている。なお、フランジ3cとフランジ4c同士及びフランジ2dとフランジ4d同士は、それぞれ複数のボルトとナットにより連結されているが、本実施例では、便宜上ボルトとナットは省略してある。 A method for installing a flange reinforcing tool according to Example 1 and a mounting tool used therein will be described with reference to FIGS. 1 to 19 and FIG. 26. First, as shown in FIG. 1, a substantially horizontal branch flange 3c provided at the upper end of the branch neck 3b of the fluid pipe 3, which is a pipe constituting member, has a substantially horizontal lower end of a repair valve 4, which is a connecting member. A substantially horizontal flange 4c at the upper end of the repair valve 4 is connected to a substantially horizontal flange 4d at the lower end of the fire hydrant 2, which is a pipe constituting member, and a branch flange of the fluid pipe 3. 3c and the flange 2d of the fire hydrant 2 are connected and reinforced by a flange reinforcing tool 10. The branch neck 3b of the fluid pipe 3, the repair valve 4, and the fire hydrant 2 are installed in a narrow valve chamber 20 (see FIG. 10). Although the flanges 3c and 4c and the flanges 2d and 4d are connected by a plurality of bolts and nuts, the bolts and nuts are omitted for convenience in this embodiment.

ここで、流体管3は、既設流体管あるいは新設流体管であってもよく、地中に埋設されるダクタイル鋳鉄製であり、断面視略円形状に形成され、内周面がモルタル層で被覆されている。尚、本発明に係る流体管は、その他鋳鉄、鋼等の金属製、あるいはコンクリート製、塩化ビニール、ポリエチレン若しくはポリオレフィン製等であってもよい。更に尚、流体管の内周面はモルタル層に限らず、例えばエポキシ樹脂等により被覆されてもよく、若しくは適宜の材料を粉体塗装により流体管の内周面に被覆してもよい。また、本実施例では流体管内の流体は上水であるが、本実施例の上水に限らず、例えば工業用水や農業用水、下水等の他、ガスやガスと液体との気液混合体であっても構わない。 Here, the fluid pipe 3 may be an existing fluid pipe or a newly installed fluid pipe, and is made of ductile cast iron that is buried underground, has a substantially circular cross-sectional shape, and has an inner circumferential surface covered with a mortar layer. has been done. The fluid pipe according to the present invention may be made of other metals such as cast iron or steel, concrete, vinyl chloride, polyethylene, or polyolefin. Furthermore, the inner circumferential surface of the fluid tube is not limited to the mortar layer, and may be coated with, for example, an epoxy resin or the like, or an appropriate material may be coated on the inner circumferential surface of the fluid tube by powder coating. In addition, although the fluid in the fluid pipe is clean water in this embodiment, it is not limited to the clean water in this embodiment, and can also be, for example, industrial water, agricultural water, sewage, etc., as well as gas or a gas-liquid mixture of gas and liquid. It doesn't matter.

図1(a)及び図2に示すように、本発明の方法の実施に用いられるフランジ補強具10は、消火栓2のフランジ2dを管路軸方向である上下方向に挟持する上部挟持部材11と、流体管3の分岐部フランジ3cを上下方向に挟持する下部挟持部材14と、上部挟持部材11と下部挟持部材14を連結する連結部材17と、後述する分割体12,12’を一体に結合して環状の上部挟持部材11及び下部挟持部材14を構成する結合部材18と、から主に構成されている。連結部材17は、上下方向を向く長寸の連結ボルト17aとそれに螺合されるナット17bにより構成され、結合部材18は、上下方向を向く短寸のボルト18aとそれに螺合されるナット18bにより構成されている。 As shown in FIGS. 1(a) and 2, the flange reinforcing device 10 used to implement the method of the present invention includes an upper clamping member 11 that clamps the flange 2d of the fire hydrant 2 in the vertical direction, which is the axial direction of the pipe. , a lower clamping member 14 that vertically clamps the branch flange 3c of the fluid pipe 3, a connecting member 17 that connects the upper clamping member 11 and the lower clamping member 14, and the later-described divided bodies 12 and 12' are integrally connected. It is mainly composed of a coupling member 18 that constitutes an annular upper clamping member 11 and a lower clamping member 14. The connecting member 17 is made up of a long connecting bolt 17a facing in the vertical direction and a nut 17b screwed onto it, and the connecting member 18 is made up of a short bolt 18a facing in the vertical direction and a nut 18b screwed into it. It is configured.

以下、上部挟持部材11及び下部挟持部材14について説明する。尚、下部挟持部材14は、基本的に上部挟持部材11と同一構造をなし、上下反転された状態で取り付けられるものであるので、上部挟持部材11についてのみ詳細に説明する。 The upper clamping member 11 and the lower clamping member 14 will be explained below. Note that the lower clamping member 14 basically has the same structure as the upper clamping member 11 and is attached in an upside-down state, so only the upper clamping member 11 will be described in detail.

図2に示すように、上部挟持部材11は、周方向に2分割された分割体12,12’からなり、両分割体12,12’は結合部材18であるボルト18aとナット18b(図1(a)参照)により結合されることで、環状に構成される。 As shown in FIG. 2, the upper clamping member 11 is composed of divided bodies 12, 12' divided into two in the circumferential direction, and both divided bodies 12, 12' are a bolt 18a and a nut 18b (FIG. (See (a)) to form a cyclic structure.

図2及び図3に示されるように、一方の分割体12は、径方向内側を向くように周方向の2箇所に形成された挟持部12a,12a’と、該挟持部12a,12a’に対応する周方向位置で径方向外側を向くように周方向の2箇所に形成された、上面が挟持部12a,12a’の上面より低い段差面をなす挟持鍔部12c,12c’と、一方の挟持部12aの基部と他方の挟持部12a’の基部とを連結する連結アーム部12bと、一方の挟持部12aの基部から他方の挟持部12a’とは反対方向に延びるアーム部12dと、を備えている。尚、分割体12には、挟持部12a及び挟持鍔部12cが1つまたは3つ以上の複数ずつ設けられていてもよい。 As shown in FIGS. 2 and 3, one of the divided bodies 12 has clamping parts 12a and 12a' formed at two locations in the circumferential direction so as to face inward in the radial direction, and clamping parts 12a and 12a'. Clamping flanges 12c, 12c' are formed at two locations in the circumferential direction so as to face radially outward at corresponding circumferential positions, and have stepped surfaces whose upper surfaces are lower than the upper surfaces of the clamping parts 12a, 12a'; A connecting arm part 12b that connects the base of the clamping part 12a and the base of the other clamping part 12a', and an arm part 12d extending from the base of one clamping part 12a in the opposite direction to the other clamping part 12a'. We are prepared. Note that the divided body 12 may be provided with one or more than two clamping parts 12a and clamping collar parts 12c.

挟持部12a,12a’は、挟持部12aの基部の上端縁から径方向内側に突出する2つの突状部12e,12eから構成されている。また、一方の挟持部12aの基部の下端縁には、径方向内側に突出する突状部12j,12jが形成されている。また、挟持鍔部12c,12c’は、挟持部12a,12a’の基部から外径側に突出しており、該挟持鍔部12c,12c’には、連結ボルト17aの軸部を外径側から嵌合可能な、外径方向から内径方向に向けて切り欠かれた切欠部12fが形成されている。挟持鍔部12c,12c’において切欠部12fを構成する壁部12k,12kの外端縁には、連結ボルト17aの頭部またはナット17bの外径方向への移動を防止するための上方に突出する凸部12mがそれぞれ設けられている。 The clamping parts 12a, 12a' are composed of two projecting parts 12e, 12e that protrude radially inward from the upper end edge of the base of the clamping part 12a. Moreover, protrusions 12j, 12j that protrude inward in the radial direction are formed on the lower end edge of the base of one of the holding parts 12a. Furthermore, the clamping collars 12c, 12c' protrude outward from the bases of the clamping parts 12a, 12a', and the shafts of the connecting bolts 17a are attached to the clamping collars 12c, 12c' from the outer diameter side. A fittable notch 12f is formed that is cut out from the outer diameter direction toward the inner diameter direction. The outer edges of the walls 12k, 12k forming the notch 12f in the clamping flanges 12c, 12c' are provided with an upwardly protruding portion to prevent the head of the connecting bolt 17a or the nut 17b from moving in the outer radial direction. A convex portion 12m is provided respectively.

また、連結アーム部12bは、一方の挟持部12aの基部の下端部と、他方の挟持部12a’の基部の下端部とを連結するように略円弧状に形成されている。また、アーム部12dは、一方の挟持部12aの基部の上端部から略水平方向に、連結アーム部12bと同心且つ同径の略円弧状に形成されている。また、アーム部12dの端部には、アーム部12dの下端部から周方向に突出する結合部12gが形成されており、結合部12gには、上下方向に貫通する貫通孔12hが形成されている。また、他方の挟持部12a’の基部の端部には、他方の挟持部12a’の基部の上端部から周方向に突出する結合部12pが形成されており、結合部12pには、上下方向に貫通する貫通孔12qが形成されている。すなわち、結合部12pは、挟持鍔部12c’の近傍に設けられている。 Further, the connecting arm portion 12b is formed in a substantially arc shape so as to connect the lower end of the base of one clamping portion 12a and the lower end of the base of the other clamping portion 12a'. Further, the arm portion 12d is formed in a substantially arc shape extending from the upper end of the base of one of the clamping portions 12a in a substantially horizontal direction and having the same diameter and concentricity as the connecting arm portion 12b. Furthermore, a coupling part 12g that protrudes in the circumferential direction from the lower end of the arm part 12d is formed at the end of the arm part 12d, and a through hole 12h that penetrates in the vertical direction is formed in the coupling part 12g. There is. Further, a coupling part 12p that protrudes in the circumferential direction from the upper end of the base of the other clamping part 12a' is formed at the end of the base of the other clamping part 12a'. A through hole 12q passing through is formed. That is, the coupling portion 12p is provided near the clamping collar portion 12c'.

また、他方の分割体12’は、分割体12と同一構成となっている。特に図2に示されるように、これら分割体12,12’を結合する際には、分割体12の結合部12gと分割体12’の結合部12pとを上下に重ねた状態で、貫通孔12h,12qの上方からボルト18aを挿入し下方からナット18bを緊締する。同様に、分割体12の結合部12pと分割体12’の結合部12gとを上下に重ねた状態で、貫通孔12h,12qの上方からボルト18aを挿入し下方からナット18bを緊締する。このとき、分割体12の結合部12pは分割体12’の結合部12gよりも上方(管路軸方向外側)に位置しており、分割体12’の結合部12pは分割体12の結合部12gよりも上方(管路軸方向外側)に位置している。ここで、ボルト18aを下方から挿入し、上方からナット18bを緊締してもよい。 Further, the other divided body 12' has the same configuration as the divided body 12. In particular, as shown in FIG. 2, when joining these divided bodies 12 and 12', the through hole is Insert the bolt 18a from above 12h and 12q and tighten the nut 18b from below. Similarly, with the connecting portion 12p of the divided body 12 and the connecting portion 12g of the divided body 12' stacked vertically, the bolt 18a is inserted from above the through holes 12h and 12q, and the nut 18b is tightened from below. At this time, the joint 12p of the divided body 12 is located above (outside in the pipe axis direction) the joint 12g of the divided body 12', and the joint 12p of the divided body 12' is located at the joint 12g of the divided body 12. 12g (outside in the axial direction of the pipe). Here, the bolt 18a may be inserted from below and the nut 18b may be tightened from above.

これら分割体12,12’が結合されることにより、上方から見て環状を成す上部挟持部材11が構成される。尚、分割体12,12’の各挟持部12a,12a’の基部、各連結アーム部12b及び各アーム部12dは、上部挟持部材11を環状に構成する本体部であり、分割体12,12’の各結合部12g,12pは、周方向に延びる前記本体部の延長線上に設けられている。なお、下部挟持部材14は、基本的に上部挟持部材11と同一構造をなし、上下反転させて装着されるものであるので、その詳細な説明は省略する。ただし、図3(f)に示すように、下部挟持部材14における切欠部12fが形成されている挟持鍔部12cの下面には、連結ボルト17aの頭部17cが下方から嵌合されて回り止めされる回り止め用凹部12nが形成されており、この点が上部挟持部材11と異なっている。
下部挟持部材14は、上記のように結合した分割体12,12’を上下反転した状態で、連結ボルト17aとナット17bにより上部挟持部材11と連結される。
By combining these divided bodies 12 and 12', the upper clamping member 11 having an annular shape when viewed from above is constructed. The base of each clamping part 12a, 12a' of the divided bodies 12, 12', each connecting arm part 12b, and each arm part 12d are main bodies forming the upper clamping member 11 in an annular shape. The coupling portions 12g and 12p are provided on an extension line of the main body extending in the circumferential direction. Note that the lower clamping member 14 basically has the same structure as the upper clamping member 11 and is installed upside down, so a detailed explanation thereof will be omitted. However, as shown in FIG. 3(f), the head 17c of the connecting bolt 17a is fitted from below to the lower surface of the clamping flange 12c in which the notch 12f of the lower clamping member 14 is formed to prevent rotation. This is different from the upper holding member 11 in that a rotation preventing recess 12n is formed therein.
The lower clamping member 14 is connected to the upper clamping member 11 by a connecting bolt 17a and a nut 17b with the divided bodies 12, 12' connected as described above upside down.

次に、前述したフランジ接合部にフランジ補強具10を装着する方法及びそれに用いる工具の実施例1について説明する。なお、本実施例では、流体管3の分岐首部3b、補修弁4、消火栓2を囲繞する平面視略長方形状の比較的狭隘な弁室20の空間内でフランジ補強具10を装着する形態について説明する。 Next, a first embodiment of a method for attaching the flange reinforcing tool 10 to the above-mentioned flange joint and a tool used therein will be described. In this embodiment, the flange reinforcing device 10 is attached within the relatively narrow space of the valve chamber 20 that is approximately rectangular in plan view and surrounds the branch neck portion 3b of the fluid pipe 3, the repair valve 4, and the fire hydrant 2. explain.

まず、図4ないし図7を参照して装着工具について説明する。 First, the installation tool will be explained with reference to FIGS. 4 to 7.

図4(a)は、下部挟持部材14を吊支する第1の吊支工具30、図4(b)は、上部挟持部材11を吊支する第2の吊支工具40を示す。ここで本願において「吊支」とは、吊り下げた状態で支えることを意味する。第1の吊支工具30は、上下方向の長さが弁室20の深さよりも所定寸法長く形成されたロッド部材30aと、その下端部に固着され、下部挟持部材14の挟持鍔部12c、12c’の下面に形成された回り止め用凹部12n(図3(f)参照)に嵌合されてその下面を支持する六角ナット状の下部支持部材30bと、この下部支持部材30bの上方のロッド部材30aに上下方向及び回転方向に移動可能に嵌合され、下部挟持部材14の分割体12,12’における中間部の挟持鍔部12c,12c’の上面の段差面に上方から嵌合されて、凸部12mにより外径方向への移動が規制される平板状の上部支持部材30cとにより構成されている。上部支持部材30cの平面形状は、図6に示すように、ほぼ横長の長方形をなしている。 4A shows a first suspension tool 30 that suspends the lower clamping member 14, and FIG. 4B shows a second suspension tool 40 that suspends the upper clamping member 11. Here, in the present application, "suspension" means supporting in a suspended state. The first hanging support tool 30 includes a rod member 30a whose length in the vertical direction is longer than the depth of the valve chamber 20 by a predetermined dimension, a clamping collar 12c of the lower clamping member 14 fixed to the lower end of the rod member 30a, A hexagonal nut-shaped lower support member 30b that is fitted into the anti-rotation recess 12n (see FIG. 3(f)) formed on the lower surface of 12c' and supports the lower surface, and a rod above the lower support member 30b. It is fitted to the member 30a so as to be movable in the vertical direction and rotational direction, and is fitted from above to the stepped surface of the upper surface of the middle portion of the clamping flange portions 12c, 12c' of the divided bodies 12, 12' of the lower clamping member 14. , and a flat upper support member 30c whose movement in the outer radial direction is restricted by the convex portion 12m. The planar shape of the upper support member 30c is approximately a horizontally long rectangle, as shown in FIG.

第2の吊支工具40は、第1の吊支工具30のロッド部材30aとほぼ同じ長さの上下方向のロッド部材40aと、このロッド部材40aの下端よりも若干上方に固着され、上部挟持部材11の分割体12,12’における中間部の挟持鍔部12c,12c’の下面の段差面を下方から支持し、凸部12mによって外径方向への移動が規制される下部支持部材40bと、下部支持部材40bよりも上方のロッド部材40aに上下方向及び回転方向に移動可能に嵌合され、分割体12,12’における中間部の挟持鍔部12c,12c’の上面の段差面に上方から嵌合されて、凸部12mにより外径方向への移動が規制される平板状の上部支持部材40cとにより構成されている。 The second suspension support tool 40 has a vertical rod member 40a having approximately the same length as the rod member 30a of the first suspension support tool 30, and is fixed slightly above the lower end of this rod member 40a, and is secured to an upper part clamping member. A lower support member 40b supports from below the stepped surface of the lower surface of the intermediate clamping flange portions 12c and 12c' of the divided bodies 12 and 12' of the member 11, and whose movement in the outer radial direction is restricted by the convex portion 12m. , is fitted to the rod member 40a above the lower support member 40b so as to be movable in the vertical and rotational directions, and is fitted upwardly into the stepped surface of the upper surface of the intermediate clamping collar portions 12c, 12c' of the divided bodies 12, 12'. The flat upper support member 40c is fitted with the upper support member 40c, and movement in the outer radial direction is restricted by the convex portion 12m.

下部支持部材40bと上部支持部材40cの平面形状は、第1の吊支工具30の上部支持部材30cと略同形をなしている。なお、第2の吊支工具40は、上部挟持部材11と下部挟持部材14との分割体12,12’に形成された切欠部12f同士を上下に整合させるための位置決め工具も兼ねており、ロッド部材40aにおける下部支持部材40bより下方に突出する部分が、下部挟持部材14の切欠部12fに上方から挿入される位置決め部40dとして使用される。また、第1及び第2の吊支工具30、40のロッド部材30a、40aの直径は、分割体12,12’に形成された切欠部12fの開口幅よりも僅かに小とされている。なお、下部支持部材40bの段差面と嵌め合わせるような構造にして、下部支持部材40bも位置決めのために用いてもよい。 The planar shapes of the lower support member 40b and the upper support member 40c are substantially the same as the upper support member 30c of the first suspension tool 30. In addition, the second suspension support tool 40 also serves as a positioning tool for vertically aligning the notches 12f formed in the divided bodies 12, 12' of the upper clamping member 11 and the lower clamping member 14, A portion of the rod member 40a that protrudes downward from the lower support member 40b is used as a positioning portion 40d that is inserted into the notch 12f of the lower clamping member 14 from above. Further, the diameters of the rod members 30a, 40a of the first and second suspension tools 30, 40 are slightly smaller than the opening width of the notch 12f formed in the divided bodies 12, 12'. Note that the lower support member 40b may also be used for positioning by having a structure that fits into the stepped surface of the lower support member 40b.

図5(a)は、分割体12,12’の端部同士を連結するボルト18aとナット18bを締め付けるための第1の締結工具50、図5(b)は、上部挟持部材11と下部挟持部材14を連結する連結ボルト17aとナット17bを締め付けるための第2の締結工具60を示す。なお、第1の締結工具50及び第2の締結工具60は、それぞれ、分割体12,12’の一方の端部同士を連結するボルト18aとナット18b、及び上部挟持部材11と下部挟持部材14とを連結する連結ボルト17aとナット17bを保持してフランジ補強具10に取付けるボルトナット取付具も兼ねている。 FIG. 5(a) shows a first fastening tool 50 for tightening the bolt 18a and nut 18b connecting the ends of the divided bodies 12, 12', and FIG. 5(b) shows the upper clamping member 11 and the lower clamping tool 50. A second fastening tool 60 for tightening the connecting bolt 17a and nut 17b connecting the members 14 is shown. Note that the first fastening tool 50 and the second fastening tool 60 each include a bolt 18a and a nut 18b that connect one end of the divided bodies 12 and 12', and an upper clamping member 11 and a lower clamping member 14. It also serves as a bolt/nut fitting that holds the connecting bolt 17a and nut 17b that connect the two and attaches it to the flange reinforcing tool 10.

第1の締結工具50は、上下方向の長さが弁室20の深さよりも所定寸法長く形成された第1ロッド部材50aと、その下端に側方を向くように略水平に取付けられ、上面に、ナット18bまたはボルト18aの頭部を回り止めして保持可能な、上方に開口する下向き凹部50bを有する第1のボルトナット保持部材50cと、第1ロッド部材50aに第1のボルトナット保持部材50cと同方向を向くように略水平に取付けられた上下複数のロッド連結部材50dと、各ロッド連結部材50dの先端部に上下方向に移動可能かつ回転可能に支持された、第1ロッド部材50aと略平行かつそれよりも長寸をなす第2ロッド部材50eと、第2ロッド部材50eの下端に取付けられ、下面に、ボルト18aの頭部またはナット18bを回り止めして保持可能な、前記下向き凹部50bと対向する上向き凹部50fを有する第2のボルトナット保持部材50gと、第2ロッド部材50eの上端部に取付けられた操作ハンドル50hとにより構成されている。なお、上向き凹部50fは、その内側壁に略水平方向に図示しないスプリングプランジャが設けられ、それによりボルト18aの頭部またはナット18bが保持されて脱落しないように設定されている。なお、必ずしもスプリングプランジャが設けられるものに限られず、例えば凹部50fの穴寸法をボルト18aの頭部またはナット18bと略同じくして摩擦力によって脱落しないように設定してもよいし、あるいは上向き凹部50fの奥面にマグネット等を設けて、磁性を有するボルト18aの頭部またはナット18bが簡単に落下するのを防止するようにしてもよい。 The first fastening tool 50 includes a first rod member 50a whose length in the vertical direction is longer than the depth of the valve chamber 20 by a predetermined dimension, and is attached substantially horizontally to the lower end of the first rod member 50a so as to face sideways. A first bolt-nut holding member 50c having an upwardly-opening downward recess 50b capable of holding the head of the nut 18b or bolt 18a while preventing rotation, and a first bolt-nut holding member 50c on the first rod member 50a. A plurality of upper and lower rod connecting members 50d are mounted substantially horizontally so as to face in the same direction as the member 50c, and a first rod member is vertically movable and rotatably supported at the tip of each rod connecting member 50d. A second rod member 50e that is substantially parallel to and longer than 50a, and a second rod member 50e that is attached to the lower end of the second rod member 50e and that can hold the head of the bolt 18a or the nut 18b on the lower surface while preventing rotation. It is composed of a second bolt/nut holding member 50g having an upward recess 50f facing the downward recess 50b, and an operating handle 50h attached to the upper end of the second rod member 50e. A spring plunger (not shown) is provided on the inner wall of the upward recessed portion 50f in a substantially horizontal direction, so that the head of the bolt 18a or the nut 18b is held and prevented from falling off. Note that the spring plunger is not necessarily provided; for example, the hole size of the recessed portion 50f may be set to be approximately the same as the head of the bolt 18a or the nut 18b so that it will not fall off due to frictional force, or the recessed portion 50f may be provided with a spring plunger. A magnet or the like may be provided on the inner surface of 50f to prevent the magnetic head of the bolt 18a or the nut 18b from easily falling.

最下方のロッド連結部材50dは、第1ロッド部材50aに上下方向に移動可能に取付けられ、この最下方のロッド連結部材50dとその上方のロッド連結部材50dとの間の第1ロッド部材50aには、圧縮コイルばね50jが外嵌されている。第2ロッド部材50eの下端部には、最下方のロッド連結部材50dの下面に当接して抜け止めされる抜止め部材50kが固着されている。第1ロッド部材50aを下方に移動させるか、または第2ロッド部材50eを上方に移動させると、圧縮コイルばね50jが圧縮されて、弾性復元方向に付勢されるようになっている。なお、圧縮コイルばね50jは省略してもよい。 The lowermost rod connecting member 50d is attached to the first rod member 50a so as to be movable in the vertical direction, and the lowermost rod connecting member 50d is attached to the first rod member 50a between the lowermost rod connecting member 50d and the upper rod connecting member 50d. A compression coil spring 50j is fitted onto the outside. A retaining member 50k that comes into contact with the lower surface of the lowermost rod connecting member 50d to prevent it from coming off is fixed to the lower end of the second rod member 50e. When the first rod member 50a is moved downward or the second rod member 50e is moved upward, the compression coil spring 50j is compressed and biased in the direction of elastic recovery. Note that the compression coil spring 50j may be omitted.

第2の締結工具60は、基本的に上記第1の締結工具50と同一構成をなし、第1ロッド部材60aと、下向き凹部60bを有する第1のボルトナット保持部材60cと、上下複数のロッド連結部材60dと、各ロッド連結部材60dに上下方向に移動可能かつ回転可能に支持された、第1ロッド部材60aと略平行をなす第2ロッド部材60eと、下面に下向き凹部60bと対向する上向き凹部60fを有する第2のボルトナット保持部材60gと、第2ロッド部材60eの上端部に取付けられた操作ハンドル60hと、第2ロッド部材60eに嵌合された抜止め部材60kとにより構成されている。 The second fastening tool 60 basically has the same configuration as the first fastening tool 50, and includes a first rod member 60a, a first bolt/nut holding member 60c having a downward recess 60b, and a plurality of upper and lower rods. a connecting member 60d, a second rod member 60e that is vertically movable and rotatably supported by each rod connecting member 60d and substantially parallel to the first rod member 60a; It is composed of a second bolt/nut holding member 60g having a recessed portion 60f, an operating handle 60h attached to the upper end of the second rod member 60e, and a retaining member 60k fitted to the second rod member 60e. There is.

第1のボルトナット保持部材60cの下向き凹部60bには、上部挟持部材11と下部挟持部材14とを連結する連結ボルト17aの頭部17cまたはナット17bが回り止めして嵌合される。また、第2のボルトナット保持部材60gの上向き凹部60fには、上部挟持部材11と下部挟持部材14とを連結するナット17bまたは連結ボルト17aの頭部17cが回り止めして嵌合される。なお、上向き凹部60fは、その内側壁に略水平方向に図示しないスプリングプランジャが設けられ、それによりナット17bまたは連結ボルト17aの頭部17cが保持されて脱落しないように設定されている。なお、必ずしもスプリングプランジャが設けられるものに限られず、例えば凹部60fの穴寸法をナット17bまたは連結ボルト17aの頭部17cと略同じくして摩擦力によって脱落しないように設定してもよいし、あるいは上向き凹部60fの奥面にマグネット等を設けて、磁性を有するナット17bまたは連結ボルト17aの頭部17cが簡単に落下するのを防止するようにしてもよい。第1ロッド部材60aの下端部には、図7に示すように、連結ボルト17aの軸部17dの上下方向の中間部を保持可能な側方及び上下両方向に開口する平面視外向きU字状の保持溝60mを有する軸部保持部材60nが取付けられている。なお、連結ボルト17aが比較的短寸の場合には、軸部保持部材60nは省略することもある。 A head 17c of a connecting bolt 17a or a nut 17b that connects the upper clamping member 11 and the lower clamping member 14 is fitted into the downward recess 60b of the first bolt/nut holding member 60c so as not to rotate. Further, a nut 17b or a head 17c of a connecting bolt 17a that connects the upper clamping member 11 and the lower clamping member 14 is fitted into the upwardly directed recess 60f of the second bolt-nut holding member 60g so as to prevent rotation. A spring plunger (not shown) is provided on the inner wall of the upward recessed portion 60f in a substantially horizontal direction so that the nut 17b or the head 17c of the connecting bolt 17a is held and prevented from falling off. Note that the spring plunger is not necessarily provided, and for example, the hole size of the recess 60f may be set to be approximately the same as the head 17c of the nut 17b or the connecting bolt 17a so that it will not fall off due to frictional force, or A magnet or the like may be provided on the inner surface of the upward concave portion 60f to prevent the magnetic nut 17b or the head 17c of the connecting bolt 17a from easily falling. As shown in FIG. 7, the lower end of the first rod member 60a has an outward U-shaped opening in plan view that can hold the vertically intermediate portion of the shaft portion 17d of the connecting bolt 17a. A shaft holding member 60n having a holding groove 60m is attached. Note that if the connecting bolt 17a is relatively short, the shaft holding member 60n may be omitted.

次に、図8ないし図13を参照して、まずフランジ補強具10の下部挟持部材14を装着する手順について説明する。装着する前に、弁室20の上面を閉塞している蓋体(図示略)を取り外し、弁室20の上面を解放する。また、流体管3の分岐首部3bの分岐部フランジ3cと補修弁4の下端のフランジ4cとの接合部が、地中に埋設されている場合には、その周囲を掘削して露出させる。掘削工具として、上記した工具に近似した長尺のロッド部材により構成した工具を採用してもよく、例えば図26に示される掘削工具80は、一対のロッド部材81,82を互いに平行に配設し、これらの軸方向に相対移動可能に構成されており、一方のロッド部材81の下端にリンク部材83を介しバケット84の基端部84aを回動可能に枢支するとともに、他方のロッド部材82の下端にバケット84の上端部84bを回動可能に枢支して取付けられている。このようにすることで、これらのロッド部材81,82を軸方向に相対移動させ、バケット84を回動操作させることで、弁室20内に埋設された土砂等の埋設物Gの掘削作業を上方から行うことができる。なお、掘削作業は、フランジ補強具10を取付可能とするため、少なくとも流体管3の分岐部フランジ3cの下方の分岐首部3bが露出するまで行われると好ましい。 Next, with reference to FIGS. 8 to 13, the procedure for attaching the lower clamping member 14 of the flange reinforcing device 10 will be described. Before installation, the lid (not shown) closing the upper surface of the valve chamber 20 is removed to open the upper surface of the valve chamber 20. Furthermore, if the joint between the branch flange 3c of the branch neck 3b of the fluid pipe 3 and the flange 4c at the lower end of the repair valve 4 is buried underground, the area around it is excavated to expose it. As the excavation tool, a tool composed of a long rod member similar to the above-mentioned tool may be employed. For example, an excavation tool 80 shown in FIG. 26 has a pair of rod members 81 and 82 arranged parallel to each other. The proximal end portion 84a of the bucket 84 is rotatably supported at the lower end of one rod member 81 via a link member 83, and the other rod member 81 is configured to be movable relative to each other in the axial direction. The upper end portion 84b of the bucket 84 is rotatably supported and attached to the lower end of the bucket 82. By doing this, by relatively moving these rod members 81 and 82 in the axial direction and rotating the bucket 84, excavation work for buried objects G such as earth and sand buried in the valve chamber 20 can be carried out. This can be done from above. Note that the excavation work is preferably performed until at least the lower branch neck 3b of the branch flange 3c of the fluid pipe 3 is exposed, so that the flange reinforcing tool 10 can be attached.

まず、下部挟持部材14を装着する前の工程において、下部挟持部材14を構成する分割体12,12’における一方の端部の結合部12p、12g同士を、上方から挿入したボルト18aとナット18bにより緩く仮連結する。分割体12,12’の他方の端部の結合部12p、12gは、仮連結部を支点として開閉しうるように連結しないで開放しておく(図8参照)。 First, in a process before attaching the lower clamping member 14, the bolt 18a and nut 18b are inserted from above to connect the connecting parts 12p and 12g at one end of the divided bodies 12 and 12' constituting the lower clamping member 14. Temporarily connect it loosely. The connecting parts 12p and 12g at the other ends of the divided bodies 12 and 12' are left open without being connected so that they can be opened and closed using the temporary connecting part as a fulcrum (see FIG. 8).

次に、第1の工程において、図8及び図9に示すように、両分割体12,12’の中間部の切欠部12fに前述した1対の第1の吊支工具30、30のロッド部材30aの下端部を外径側から嵌合し、下部支持部材30bを、挟持鍔部12c,12c’の下面に形成された回り止め用凹部12nに嵌合するとともに、上部支持部材30cを、分割体12,12’の挟持鍔部12c,12c’の上面の段差面に上方から嵌合し、両分割体12,12’を1対の第1の吊支工具30、30により吊支する。 Next, in the first step, as shown in FIG. 8 and FIG. The lower end of the member 30a is fitted from the outer diameter side, the lower support member 30b is fitted into the anti-rotation recess 12n formed on the lower surface of the clamping collars 12c, 12c', and the upper support member 30c is fitted. The clamping flanges 12c, 12c' of the divided bodies 12, 12' are fitted from above into the stepped surfaces of the upper surfaces, and both the divided bodies 12, 12' are suspended by a pair of first suspension tools 30, 30. .

次いで、第2の工程において、図8に示すように、第1の吊支工具30、30により吊支された両分割体12,12’を仮連結部を支点として開いた状態で、図10に示すように、各第1の吊支工具30のロッド部材30aを把持しながら、両分割体12,12’を、流体管3の分岐部フランジ3cと補修弁4の下端のフランジ4cとの接合部近傍まで下降させた後、両分割体12,12’を閉じて分岐部フランジ3cと補修弁4の下端のフランジ4cとの外径部に側方から嵌合して仮置きする。この際、両分割体12,12’の突状部12j,12jが補修弁4のフランジ4cの上面に当接した状態で仮置きされる。両分割体12,12’を仮連結部を支点として開いた状態で下方に移動させうるので、弁室20内の幅寸が小さくても、消火栓2や補修弁4に干渉するのを回避して下方に移動させることができる。 Next, in the second step, as shown in FIG. 8, both the divided bodies 12, 12' suspended by the first suspension tools 30, 30 are opened with the temporary connection part as a fulcrum, and then As shown in FIG. 3, while gripping the rod member 30a of each first suspension tool 30, connect the two divided bodies 12, 12' between the branch flange 3c of the fluid pipe 3 and the flange 4c at the lower end of the repair valve 4. After being lowered to the vicinity of the joint, both the divided bodies 12, 12' are closed and fitted from the side to the outer diameter portions of the branch flange 3c and the flange 4c at the lower end of the repair valve 4, and temporarily placed. At this time, the protrusions 12j, 12j of both the divided bodies 12, 12' are temporarily placed in contact with the upper surface of the flange 4c of the repair valve 4. Since both the divided bodies 12, 12' can be moved downward in an open state using the temporary connection part as a fulcrum, interference with the fire hydrant 2 and the repair valve 4 can be avoided even if the width inside the valve chamber 20 is small. can be moved downward.

次いで、第3の工程において、図11に示すように、前述した第1の締結工具50の第2のボルトナット保持部材50gの上向き凹部50fにより、両分割体12,12’の他方の端部同士を連結するボルト18aの頭部を保持するとともに、第1の締結工具50の第1のボルトナット保持部材50cの下向き凹部50bにより、ボルト18aに螺合されるナット18bを嵌合して保持する。その後、第1の締結工具50を把持して下方に移動させ、ボルト18aを両分割体12,12’の他方の端部の貫通孔12h,12qに上方より挿入し、保持されたナット18bをボルト18aの下端部に螺合させて、両分割体12,12’の他方の端部同士を仮連結する。なお、この第3の工程においては、上記とは反対に、ボルト18aの頭部を下向き凹部50bにより、ナット18bを上向き凹部50fにより、それぞれ保持してもよい。 Next, in the third step, as shown in FIG. 11, the other end of both the divided bodies 12, 12' is The head of the bolt 18a that connects the bolts 18a is held, and the nut 18b screwed onto the bolt 18a is fitted and held by the downward recess 50b of the first bolt-nut holding member 50c of the first fastening tool 50. do. Thereafter, the first fastening tool 50 is gripped and moved downward, the bolt 18a is inserted from above into the through holes 12h and 12q at the other end of both the divided bodies 12 and 12', and the held nut 18b is inserted. It is screwed into the lower end of the bolt 18a to temporarily connect the other ends of both the divided bodies 12, 12'. In this third step, contrary to the above, the head of the bolt 18a may be held by the downward recess 50b, and the nut 18b may be held by the upward recess 50f.

次いで、第4の工程において、図12及び図13に示すように、第1の締結工具50を用いて、すなわち、第1のボルトナット保持部材50cの下向き凹部50bをナット18bに、第2のボルトナット保持部材50gの上向き凹部50fをボルト18aの頭部にそれぞれ嵌合した状態で、第2ロッド部材50eの上端の操作ハンドル50hを回転操作し、それぞれ、両分割体12,12’の両端部を連結しているボルト18aとナット18bとを緊締する。この際、ナット18bは、第1のボルトナット保持部材50cの上向き凹部50bに嵌合されて供回りが防止されているので、容易に緊締することができる。また、一対の第1の吊支工具30、30で下部挟持部材14の周方向の回転を抑えて、容易に緊締することができる。なお、緊締するためにトルクレンチを用いてもよい。この第4の工程により、下部挟持部材14が分岐部フランジ3cと補修弁4の下端のフランジ4cとの接合部に、周方向に回動可能に仮装着される。 Next, in the fourth step, as shown in FIGS. 12 and 13, using the first fastening tool 50, the downward recess 50b of the first bolt-nut holding member 50c is inserted into the nut 18b. With the upward concave portions 50f of the bolt/nut holding member 50g fitted into the heads of the bolts 18a, the operation handle 50h at the upper end of the second rod member 50e is rotated, and both ends of the two divided bodies 12, 12' are rotated. Tighten the bolt 18a and nut 18b connecting the parts. At this time, the nut 18b is fitted into the upwardly directed recess 50b of the first bolt/nut holding member 50c to prevent co-rotation, so that it can be easily tightened. Moreover, the rotation of the lower clamping member 14 in the circumferential direction can be suppressed by the pair of first suspension tools 30, 30, and the lower clamping member 14 can be easily tightened. Note that a torque wrench may be used for tightening. Through this fourth step, the lower clamping member 14 is temporarily attached to the joint between the branch flange 3c and the flange 4c at the lower end of the repair valve 4 so as to be rotatable in the circumferential direction.

このように、第1ないし第4の工程を実施することにより、フランジ補強具10を構成する下部挟持部材14を、分岐部フランジ3cと補修弁4の下端のフランジ4cとのフランジ接合部に、上方から容易に装着してフランジ接合部を上下方向から補強する部材を装着することができる。従って、本実施例1のように、狭隘な弁室20の空間内に消火栓2及び補修弁4が設置され、それらのフランジ接合部の周囲に大きな作業スペースが確保されていなくても、フランジ補強具10の装着作業を効率よく行うことができ、作業能率が向上する。 In this manner, by carrying out the first to fourth steps, the lower clamping member 14 constituting the flange reinforcing tool 10 is attached to the flange joint between the branch flange 3c and the flange 4c at the lower end of the repair valve 4. A member that can be easily installed from above and reinforces the flange joint from above and below can be installed. Therefore, as in the first embodiment, even if the fire hydrant 2 and the repair valve 4 are installed in the narrow space of the valve chamber 20 and a large work space is not secured around their flange joints, the flange reinforcement The attachment work of the tool 10 can be performed efficiently, and work efficiency is improved.

下部挟持部材14を分岐部フランジ3cと補修弁4の下端のフランジ4cとの接合部に仮装着した後、補修弁4の上端のフランジ4dと消火栓2のフランジ2dとの接合部に上部挟持部材11を構成する両分割体12,12’が装着される。この場合、上部挟持部材11の両分割体12,12’を吊支するのに前述した第2の吊支工具40を使用する以外は、下部挟持部材14における第1ないし第4の工程と同じ手順で装着されるため、その詳細な工程の説明は省略する。 After temporarily attaching the lower clamping member 14 to the joint between the branch flange 3c and the flange 4c at the lower end of the repair valve 4, the upper clamping member is attached to the joint between the flange 4d at the upper end of the repair valve 4 and the flange 2d of the fire hydrant 2. Both divided bodies 12, 12' forming part 11 are attached. In this case, the steps are the same as the first to fourth steps for the lower clamping member 14, except that the second suspension tool 40 described above is used to suspend both the divided bodies 12, 12' of the upper clamping member 11. Since it is attached in a step-by-step manner, a detailed explanation of the process will be omitted.

上部挟持部材11の両分割体12,12’を吊支する場合は、図14及び図15に示すように、第2の吊支工具40のロッド部材40aを、上部挟持部材11の両分割体12,12’の中間部の切欠部12fに外径側から嵌合するとともに、両分割体12,12’における中間部の挟持鍔部12c,12c’の下面と上面の段差面を、下部支持部材40bと上部支持部材40cにより挟持して支持する。この際、ロッド部材40aに上下方向に移動可能に嵌合されている上部支持部材40cを一端上方に移動させてから下方に移動させればよい。また、下部支持部材40bと上部支持部材40cは、凸部12mにより外径方向への移動を規制されているので、図14に示すように、両分割体12,12’を1対の第2の吊支工具40、40により開く場合に、ロッド部材40aが切欠部12fより離脱するおそれはない。 When suspending both the divided bodies 12 and 12' of the upper clamping member 11, as shown in FIGS. 14 and 15, the rod member 40a of the second suspension support tool 40 is 12, 12' is fitted into the notch 12f at the intermediate part from the outer diameter side, and the stepped surface between the lower and upper surfaces of the clamping flange 12c, 12c' at the intermediate part of both the divided bodies 12, 12' is supported by the lower part. It is held and supported by the member 40b and the upper support member 40c. At this time, the upper support member 40c, which is fitted to the rod member 40a so as to be movable in the vertical direction, may be moved upward at one end and then moved downward. Further, since the lower support member 40b and the upper support member 40c are restricted from moving in the outer radial direction by the convex portion 12m, as shown in FIG. When opening with the suspension support tools 40, 40, there is no risk that the rod member 40a will come off from the notch 12f.

上部挟持部材11を補修弁4の上端のフランジ4dと消火栓2のフランジ2dとの接合部に装着した後の第5の工程において、図16に示すように、1対の第2の吊支工具40、40を上部挟持部材11の分割体12,12’に取付けた状態のまま、第2の吊支工具40、40のロッド部材40a、40aを下方に移動させ、それらの下端部の位置決め部40dを下部挟持部材14の分割体12,12’の切欠部12fに上方から挿入する。これにより、上部挟持部材11と下部挟持部材14の分割体12,12’の切欠部12f同士が位置決めされて上下に整合する。なお、第2の吊支工具40のロッド部材40aを下方に移動させると、上部支持部材40cは上方に移動するので、位置決め部40dは下部挟持部材14の切欠部12fに支障なく挿入される。 In the fifth step after the upper holding member 11 is attached to the joint between the flange 4d at the upper end of the repair valve 4 and the flange 2d of the fire hydrant 2, as shown in FIG. 16, a pair of second suspension tools are attached. 40, 40 are attached to the divided bodies 12, 12' of the upper holding member 11, the rod members 40a, 40a of the second hanging support tools 40, 40 are moved downward, and the positioning portions of their lower ends are moved downward. 40d is inserted into the notch 12f of the divided bodies 12, 12' of the lower holding member 14 from above. As a result, the notches 12f of the divided bodies 12, 12' of the upper clamping member 11 and the lower clamping member 14 are positioned and vertically aligned. Note that when the rod member 40a of the second hanging support tool 40 is moved downward, the upper support member 40c is moved upward, so that the positioning portion 40d can be inserted into the cutout portion 12f of the lower clamping member 14 without any problem.

このように、上部挟持部材11と下部挟持部材14の分割体12,12’を周方向に位置決めして切欠部12f同士を整合させることで、これらの切欠部12fに架けて連結ボルト17aを正確に取付けることができる。 In this way, by positioning the divided bodies 12, 12' of the upper clamping member 11 and the lower clamping member 14 in the circumferential direction and aligning the notches 12f, it is possible to accurately tighten the connecting bolt 17a across these notches 12f. Can be installed on.

次いで、第6の工程において、図17に示すように、第2の締結工具60の第1のボルトナット保持部材60cの下向き凹部60bに、上部挟持部材11と下部挟持部材14における上下の分割体12,12’同士を連結する上下方向の連結ボルト17aの頭部17cを嵌合して保持するとともに、連結ボルト17aの軸部17dの中間部を、第2の締結工具60の軸部保持部材60nの保持溝60m(図7参照)により保持する。また同時に、第2の締結工具60の第2のボルトナット保持部材60gの上向き凹部60fに、連結ボルト17aに螺合されるナット17bを嵌合し、連結ボルト17aと同軸をなして対向するように保持する。なお、この作業は地表で行われる。この第6の工程においては、上記とは反対に、連結ボルト17aの頭部17cを上向き凹部60fにより、ナット17bを下向き凹部60bにより、それぞれ保持してもよい。 Next, in the sixth step, as shown in FIG. The head 17c of the vertical connecting bolt 17a connecting the connecting bolts 12 and 12' is fitted and held, and the intermediate part of the shaft 17d of the connecting bolt 17a is held by the shaft holding member of the second fastening tool 60. It is held by a 60n holding groove 60m (see FIG. 7). At the same time, the nut 17b that is screwed onto the connecting bolt 17a is fitted into the upward recess 60f of the second bolt/nut holding member 60g of the second fastening tool 60, so that the nut 17b is coaxially opposed to the connecting bolt 17a. to hold. Note that this work will be performed on the ground surface. In this sixth step, contrary to the above, the head 17c of the connecting bolt 17a may be held by the upward recess 60f, and the nut 17b may be held by the downward recess 60b.

次いで、連結ボルト17aとナット17bを保持した状態の第2の締結工具60を把持して、連結ボルト17aを、図17に示すように上部挟持部材11と下部挟持部材14と近接する側方まで下方に移動させた後、第7の工程において、図18に示すように、第2の締結工具60により保持された連結ボルト17aの軸部17dを、上部挟持部材11と下部挟持部材14の分割体12,12’の切欠部12fに、外径側である側方から嵌合する。この際、連結ボルト17aの軸部17dは軸部保持部材60nにより保持されているので、連結ボルト17aが倒れるおそれはない。また、上下の切欠部12fは、第2の吊支工具40、40により上下に位置決めされて整合して周方向の回転を抑えているので、軸部17dを上下の切欠部12fに容易に嵌合することができる。 Next, grasp the second fastening tool 60 holding the connecting bolt 17a and nut 17b, and pull the connecting bolt 17a to the side adjacent to the upper clamping member 11 and the lower clamping member 14, as shown in FIG. After moving it downward, in a seventh step, as shown in FIG. It fits into the notch 12f of the body 12, 12' from the side, which is the outer diameter side. At this time, since the shaft portion 17d of the connecting bolt 17a is held by the shaft portion holding member 60n, there is no risk of the connecting bolt 17a falling down. Further, the upper and lower notches 12f are vertically positioned and aligned by the second suspension tools 40, 40 to suppress rotation in the circumferential direction, so that the shaft portion 17d can be easily fitted into the upper and lower notches 12f. can be matched.

軸部17dを上下の切欠部12fに嵌合した後、第2の締結工具60の第2ロッド部材60eの操作ハンドル60hを回転操作して、第2のボルトナット保持部材60gに保持されたナット17bを連結ボルト17aの上部に螺合し、上下の分割体12,12’同士を仮連結する。なお、上下の分割体12,12’の切欠部12fは周方向に4箇所形成されているので、この作業は、第2の吊支工具40を必要に応じて取外しながら繰り返し行われる。例えば、2箇所の連結ボルト17a及びナット17bの連結後に第2の吊支工具40を取外せばよい。ただし、切欠部12fは周方向に4箇所形成されているものに限られない。 After fitting the shaft portion 17d into the upper and lower notches 12f, the operation handle 60h of the second rod member 60e of the second fastening tool 60 is rotated to remove the nut held by the second bolt-nut holding member 60g. 17b is screwed onto the upper part of the connecting bolt 17a to temporarily connect the upper and lower divided bodies 12, 12'. Note that, since the cutout portions 12f of the upper and lower divided bodies 12, 12' are formed at four locations in the circumferential direction, this operation is repeatedly performed while removing the second hanging support tool 40 as necessary. For example, the second hanging support tool 40 may be removed after connecting the two connecting bolts 17a and nuts 17b. However, the notch portions 12f are not limited to being formed at four locations in the circumferential direction.

最後に、4個のナット17bを第2の締結工具60の第2のボルトナット保持部材60gにより順次締め付ければ、図19に示すように、フランジ補強具10の装着は完了し、上部挟持部材11と下部挟持部材14とにより、消火栓2のフランジ2dと流体管3の分岐部フランジ3cとが上下両方向から挟持され、補修弁4のフランジ4c,4dと、消火栓2のフランジ2d及び流体管3の分岐部フランジ3cとのフランジ接合部が補強される。なお、ナット17bを第2の締結工具60を用いて締め付ける代わりに、上下方向に長い締付け専用の工具を使用して締付けてもよい。いずれの工具を使用してナット17bを締め付ける場合でも、連結ボルト17aの頭部17cは、下部挟持部材14の挟持鍔部12c,12c’の下面に形成された回り止め用凹部12n(図3(f)参照)に嵌合されて供回りが防止されているので、ナット17bを上方から容易に締め付けることができる。なお、締め付けるためにトルクレンチを用いてもよい。 Finally, if the four nuts 17b are sequentially tightened by the second bolt/nut holding member 60g of the second fastening tool 60, the installation of the flange reinforcing tool 10 is completed and the upper clamping member is tightened, as shown in FIG. 11 and the lower clamping member 14, the flange 2d of the fire hydrant 2 and the branch flange 3c of the fluid pipe 3 are clamped from both upper and lower directions, and the flanges 4c, 4d of the repair valve 4, the flange 2d of the fire hydrant 2, and the fluid pipe 3 The flange joint with the branch flange 3c is reinforced. Note that instead of tightening the nut 17b using the second fastening tool 60, a vertically long dedicated tightening tool may be used to tighten the nut 17b. No matter which tool is used to tighten the nut 17b, the head 17c of the connecting bolt 17a is attached to the anti-rotation recess 12n (see FIG. (see f)) to prevent co-rotation, the nut 17b can be easily tightened from above. Note that a torque wrench may be used for tightening.

以上説明したように、実施例1のフランジ補強具の装着方法によれば、前述した第1ないし第7の工程を実施することにより、外周面に連結ボルト17aの軸部17dを外径側から嵌合可能な切欠部12fが形成された分割体12,12’を有し、この分割体12,12’の周方向の端部同士をボルト18aとナット18bにより連結して環状に形成される上部挟持部材11と下部挟持部材14からなるフランジ補強具10を、上部挟持部材11及び下部挟持部材14同士を連結する連結ボルト17a及びナット17bを上方から緊締することで、補修弁4の上下のフランジ4c,4dと、消火栓2のフランジ2d及び流体管3の分岐部フランジ3cとのフランジ接合部に、弁室20内で、弁室20の上方の地表から容易に装着することができる。従って、弁室20の内部空間が狭く、消火栓2や補修弁4の周囲に大きな作業スペースが確保されていなくても、フランジ補強具10の装着作業を効率よく行うことができ、作業能率が向上する。 As explained above, according to the method for attaching the flange reinforcing device of the first embodiment, by performing the first to seventh steps described above, the shaft portion 17d of the connecting bolt 17a is attached to the outer peripheral surface from the outer diameter side. It has divided bodies 12, 12' in which fittable notches 12f are formed, and the ends of the divided bodies 12, 12' in the circumferential direction are connected to each other by bolts 18a and nuts 18b to form an annular shape. The upper and lower parts of the repair valve 4 are tightened by tightening the connecting bolts 17a and nuts 17b that connect the upper and lower clamping members 11 and 14 together from above. It can be easily attached to the flange joint between the flanges 4c and 4d, the flange 2d of the fire hydrant 2, and the branch flange 3c of the fluid pipe 3 within the valve chamber 20 from above the valve chamber 20. Therefore, even if the internal space of the valve chamber 20 is narrow and a large work space is not secured around the fire hydrant 2 or the repair valve 4, the work of installing the flange reinforcing device 10 can be carried out efficiently, improving work efficiency. do.

また、実施例1の第1の吊支工具30、位置決め工具を兼ねる第2の吊支工具40、第1の締結工具50及び第2の締結工具60は、いずれも上下方向に長いロッド状をなしているので、弁室20の内部空間が狭く、消火栓2や補修弁4の周囲に大きなスペースがなくても、それらの工具を弁室20内に上方から挿入して、フランジ補強具10をフランジ接合部に容易に装着することができる。 In addition, the first suspension tool 30, the second suspension tool 40 that also serves as a positioning tool, the first fastening tool 50, and the second fastening tool 60 of the first embodiment all have a rod shape that is long in the vertical direction. Therefore, even if the internal space of the valve chamber 20 is narrow and there is no large space around the fire hydrant 2 or repair valve 4, these tools can be inserted into the valve chamber 20 from above and the flange reinforcing device 10 can be installed. Can be easily attached to flange joints.

実施例2に係るフランジ補強具の装着方法及びそれに用いる装着工具について、図20~図25を参照して説明する。なお、上記した実施例1と同様の構成については、実施例1と同じ符号を付して重複する説明を省略する。この実施例2では、流体管3の分岐部フランジ3cと補修弁4の下端のフランジ4cとの接合部に、実施例1とは異なるフランジ補強具70を装着する。 A method for installing a flange reinforcing tool and a mounting tool used therein according to the second embodiment will be described with reference to FIGS. 20 to 25. Note that configurations similar to those of the first embodiment described above are given the same reference numerals as those of the first embodiment, and redundant explanations will be omitted. In this second embodiment, a flange reinforcing tool 70 different from that in the first embodiment is attached to the joint between the branch flange 3c of the fluid pipe 3 and the flange 4c at the lower end of the repair valve 4.

実施例2の方法に用いられるフランジ補強具70は、図21(a)~図21(c)に示す上部の挟持部材71と、図21(d)~図21(f)に示す下部の挟持部材72とからなり、1対のフランジ補強具70が分岐部フランジ3cとフランジ4cとの接合部に装着される。上部の挟持部材71は、上面が上壁部71aにより閉塞され、内部に下方に開口する円形の嵌合孔71bを有する本体部71cと、本体部71cの上部の外周面に一体的に連設された外向きの挟持部71dとを備え、上壁部71aの中央部には、後述する連結ボルト73の軸部73aが挿通される貫通孔71eが形成されている。また、嵌合孔71bの内面には、上下方向を向くとともに、挟持部71dの突出方向と反対方向に凹入する嵌合溝71fが形成されている。さらに、挟持部71dと反対側の本体部71cの上面には、後述する吊支工具76の保持部材76cにより保持される上向き突部71gが突設されている。挟持部71dの略水平をなす下面は、滑り止めのために凹凸面とされている。 The flange reinforcing tool 70 used in the method of Example 2 includes an upper clamping member 71 shown in FIGS. 21(a) to 21(c) and a lower clamping member 71 shown in FIGS. 21(d) to 21(f). A pair of flange reinforcing tools 70 are attached to the joint between the branch flange 3c and the flange 4c. The upper holding member 71 is integrally connected to a main body part 71c whose upper surface is closed by an upper wall part 71a and has a circular fitting hole 71b that opens downward inside, and an outer peripheral surface of the upper part of the main body part 71c. A through hole 71e, through which a shaft 73a of a connecting bolt 73 (described later) is inserted, is formed in the center of the upper wall 71a. Furthermore, a fitting groove 71f is formed on the inner surface of the fitting hole 71b, which faces in the vertical direction and is recessed in a direction opposite to the protruding direction of the holding portion 71d. Furthermore, an upward protrusion 71g that is held by a holding member 76c of a hanging support tool 76, which will be described later, is provided on the upper surface of the main body 71c on the opposite side to the holding part 71d. The substantially horizontal lower surface of the holding portion 71d is made into an uneven surface to prevent slipping.

下部の挟持部材72は、上部の挟持部材71の嵌合孔71b内に嵌合される本体部72aと、本体部72aの下端部に外向きに突設された、上部の挟持部材71の挟持部71dと対をなす挟持部72bとを備え、本体部72aには、後述する連結ボルト73の軸部が挿通される上下方向の貫通孔72cが形成されている。貫通孔72cの下部は、連結ボルト73の頭部または後述するナット74が嵌合されて回り止めされる六角孔72dとされている。挟持部72bと反対側の本体部72aの側面には、上部の挟持部材71の嵌合溝71fに嵌合される上下方向の突条72eが形成されている。挟持部72bの略水平をなす上面は、滑り止めのために凹凸面とされている。 The lower clamping member 72 includes a main body part 72a that is fitted into the fitting hole 71b of the upper clamping member 71, and a main body part 72a that protrudes outward from the lower end of the main body part 72a. The body portion 72a includes a holding portion 72b paired with a portion 71d, and a vertical through hole 72c through which a shaft portion of a connecting bolt 73 (described later) is inserted is formed in the main body portion 72a. The lower part of the through hole 72c is a hexagonal hole 72d into which a head of a connecting bolt 73 or a nut 74 (described later) is fitted to prevent rotation. A vertical protrusion 72e that is fitted into the fitting groove 71f of the upper holding member 71 is formed on the side surface of the main body part 72a opposite to the holding part 72b. The substantially horizontal upper surface of the holding portion 72b is made into an uneven surface to prevent slipping.

図21(g)に示すように、上部の挟持部材71と下部の挟持部材72は、連結ボルト73とナット74により連結された状態で使用される。すなわち、上部の挟持部材71の嵌合孔71bに、下部の挟持部材72を、上部の挟持部材71の嵌合溝71fに下部の挟持部材72の突条72eを嵌合させながら下方より嵌合した後、両貫通孔71e、72cに下方より挿入した連結ボルト73の上端部にナット74を螺合させると、上部の挟持部材71と下部の挟持部材72とが連結される。連結後においては、上部の挟持部材71の嵌合溝71fに下部の挟持部材72の突条72eが嵌合されているので、それらの相対回動は防止され、挟持部71d、72b同士が上下に対向した状態に維持される。なお、連結ボルト73を上方から挿入し、下端部にナット74を螺合させてもよい。 As shown in FIG. 21(g), the upper clamping member 71 and the lower clamping member 72 are used in a state where they are connected by a connecting bolt 73 and a nut 74. That is, the lower clamping member 72 is fitted into the fitting hole 71b of the upper clamping member 71 from below while the protrusion 72e of the lower clamping member 72 is fitted into the fitting groove 71f of the upper clamping member 71. After that, when the nut 74 is screwed onto the upper end of the connecting bolt 73 inserted into both the through holes 71e and 72c from below, the upper clamping member 71 and the lower clamping member 72 are connected. After the connection, since the protrusion 72e of the lower clamping member 72 is fitted into the fitting groove 71f of the upper clamping member 71, their relative rotation is prevented, and the clamping parts 71d and 72b are vertically aligned with each other. is maintained facing the Note that the connecting bolt 73 may be inserted from above and the nut 74 may be screwed onto the lower end.

次に、図22ないし図24を参照して実施例2の装着方法に用いる装着工具について説明する。この装着工具75は、フランジ補強具70を吊支する吊支工具76と、ナット74または連結ボルト73を締め付ける締結工具77とを一体化したものである。吊支工具76は、上下方向に長いロッド部材76aと、その下端部に側方に突出させて取り付けられた、上部の挟持部材71の下端を支持する略水平の支持部材76bと、支持部材76bの若干上方のロッド部材76aに取り付けられた、上部の挟持部材71を保持する保持部材76cとからなっている。 Next, a mounting tool used in the mounting method of the second embodiment will be described with reference to FIGS. 22 to 24. This installation tool 75 is a tool that integrates a suspension tool 76 for suspending the flange reinforcing tool 70 and a fastening tool 77 for tightening the nut 74 or the connecting bolt 73. The hanging support tool 76 includes a rod member 76a that is long in the vertical direction, a substantially horizontal support member 76b that is attached to the lower end of the rod member 76a so as to protrude laterally and supports the lower end of the upper clamping member 71, and a support member 76b. It consists of a holding member 76c that holds the upper clamping member 71 and is attached to a rod member 76a slightly above the holding member 76a.

図23に示すように、支持部材76bには、下部の挟持部材72の本体部72aに側方から嵌合される平面視半円形の凹部76dが形成され、この凹部76dを本体部72aに側方から嵌合した状態で、上部の挟持部材71の下端面が保持部材76cの上面により支持される(図25参照)。保持部材76cは、支持部材76b方向に突出する互いに略平行な1対の保持片76e、76eを有し、この両保持片76eにより、上部の挟持部材71の本体部71cに設けられた上向き突部71gが両側から保持されるようになっている(図25参照)。 As shown in FIG. 23, the support member 76b is formed with a recess 76d that is semicircular in plan view and is fitted from the side into the main body 72a of the lower clamping member 72. In the fitted state from both sides, the lower end surface of the upper holding member 71 is supported by the upper surface of the holding member 76c (see FIG. 25). The holding member 76c has a pair of holding pieces 76e, 76e that are substantially parallel to each other and protrude in the direction of the supporting member 76b. The portion 71g is held from both sides (see FIG. 25).

締結工具77は、上下方向に長いロッド部材77aと、その下端部に固定され、下面に上向きの六角穴77bが形成されたソケット77cと、ロッド部材77aの上端部に取り付けられた操作ハンドル77dとからなっている。締結工具77のロッド部材77aは、吊支工具76のロッド部材76aに取り付けられた上下複数の連結部材78により、上下方向に移動可能及び回転可能かつロッド部材76aと略平行をなすように保持されている。また、ロッド部材77aには、連結部材78から抜け外れないように、抜止め部材79が取り付けられている。 The fastening tool 77 includes a vertically long rod member 77a, a socket 77c fixed to the lower end thereof and having an upward hexagonal hole 77b formed in the lower surface, and an operating handle 77d attached to the upper end of the rod member 77a. It consists of The rod member 77a of the fastening tool 77 is held so as to be movable and rotatable in the vertical direction and substantially parallel to the rod member 76a by a plurality of upper and lower connecting members 78 attached to the rod member 76a of the suspension support tool 76. ing. Further, a retaining member 79 is attached to the rod member 77a so that the rod member 77a does not come off from the connecting member 78.

次に、図25を参照して、フランジ補強具70を装着する手順について説明する。まず、第1の工程において、上部の挟持部材71と下部の挟持部材72とを、連結ボルト73とナット74により仮連結する。この際、ナット74を緩めて、上部の挟持部材71の挟持部71dと下部の挟持部材72の挟持部72bが、装着されるフランジ3cとフランジ4cに嵌合可能な状態にしておく。 Next, with reference to FIG. 25, a procedure for mounting the flange reinforcing tool 70 will be described. First, in a first step, the upper clamping member 71 and the lower clamping member 72 are temporarily connected using a connecting bolt 73 and a nut 74 . At this time, the nut 74 is loosened so that the clamping part 71d of the upper clamping member 71 and the clamping part 72b of the lower clamping member 72 can fit into the attached flanges 3c and 4c.

次いで、第2の工程において、吊支工具76の支持部材76bの上面により、上部の挟持部材71における挟持部71dと反対側の下端面を支持するとともに、保持部材76cの1対の保持片76eにより、上部の挟持部材71の上向き突部71gを挟持して保持し、上下の挟持部材71、72を吊支工具71により吊支する。 Next, in a second step, the upper surface of the support member 76b of the hanging support tool 76 supports the lower end surface of the upper clamping member 71 on the side opposite to the clamping part 71d, and also supports the pair of holding pieces 76e of the holding member 76c. As a result, the upward protrusion 71g of the upper clamping member 71 is clamped and held, and the upper and lower clamping members 71 and 72 are suspended by the suspension support tool 71.

次いで、第3の工程において、装着工具75を把持して吊支工具71を下方に移動させ、吊支された上部の挟持部材71の挟持部71dと下部の挟持部材72の挟持部72bをフランジ3cとフランジ4cの外径部に側方から挟入する。 Next, in the third step, the mounting tool 75 is gripped and the hanging support tool 71 is moved downward, and the clamping part 71d of the suspended upper clamping member 71 and the clamping part 72b of the lower clamping member 72 are connected to the flange. 3c and the outer diameter portion of the flange 4c from the side.

次いで、第4の工程において、締結工具77を下方に移動させて、下端部のソケット77cによりナット74を締め付ける。この際、連結ボルト73の頭部は、下部の挟持部材72の下部の六角孔72d内において回り止めされているので、上方からナット74を容易に締め付けることができる。なお、この第4の工程においては、吊支工具76と別体をなす上下方向に長い専用の締結工具を使用して、ナット74を締め付けてもよく、締め付けるためにトルクレンチを用いてもよい。前記第1ないし第4の工程を繰り返し、反対側のフランジ3cとフランジ4cの外径部を別の上部の挟持部材71の挟持部71dと下部の挟持部材72の挟持部72bにより挟持すると、フランジ3cとフランジ4cの180°対向する外径部が1対のフランジ補強具70、70により上下方向から強く挟持されて補強される(図20参照)。 Next, in a fourth step, the fastening tool 77 is moved downward to tighten the nut 74 using the socket 77c at the lower end. At this time, since the head of the connecting bolt 73 is prevented from rotating within the hexagonal hole 72d in the lower part of the lower clamping member 72, the nut 74 can be easily tightened from above. In addition, in this fourth step, the nut 74 may be tightened using a dedicated fastening tool that is separate from the suspension tool 76 and is long in the vertical direction, or a torque wrench may be used for tightening. . When the first to fourth steps are repeated and the outer diameter parts of the flanges 3c and 4c on the opposite side are held between the holding part 71d of another upper holding member 71 and the holding part 72b of the lower holding member 72, the flange The outer diameter portions of the flange 3c and the flange 4c, which face each other at 180°, are strongly clamped and reinforced from above and below by a pair of flange reinforcing tools 70, 70 (see FIG. 20).

以上説明したように、実施例2のフランジ補強具の装着方法によれば、前記第1ないし第4の工程を実施することにより、上下に対をなす上部の挟持部材71と下部の挟持部材72とからなるフランジ補強具70を、流体管3の分岐部フランジ3cと補修弁4の下部のフランジ4cとに、弁室20の上方の地表から容易に装着して、フランジ接合部を弁室20内で上下方向から補強することができる。従って、前記実施例1の装着方法と同様に、弁室20の内部空間が狭く、消火栓2や補修弁4の周囲に大きな作業スペースが確保されていなくても、フランジ補強具70の装着作業を効率よく行うことができ、作業能率が向上する。また、実施例2の吊支工具76及び締結工具77は、実施例1の装着工具と同様に、上下方向に長いロッド状をなしているので、弁室20の内部空間が狭く、消火栓2や補修弁4の周囲に大きなスペースがなくても、それらの工具を弁室20内に上方から挿入して、フランジ補強具70をフランジ接合部に容易に装着することができる。更に、挟持部材72の下面は外径側に向けて上方に延びるテーパ部72fが形成されており、このようにすることで、流体管3の分岐首部3bの側方にて受口部を構成する大径部3fとの取り合いが容易である。 As explained above, according to the method for attaching a flange reinforcing tool of the second embodiment, by performing the first to fourth steps, the upper clamping member 71 and the lower clamping member 72 forming a vertical pair A flange reinforcing tool 70 consisting of the above is easily attached to the branch flange 3c of the fluid pipe 3 and the lower flange 4c of the repair valve 4 from the ground surface above the valve chamber 20, and the flange joint portion is attached to the valve chamber 20. It can be reinforced from above and below. Therefore, similarly to the mounting method of the first embodiment, even if the internal space of the valve chamber 20 is narrow and a large working space is not secured around the fire hydrant 2 or the repair valve 4, the mounting work of the flange reinforcing device 70 can be carried out. It can be done efficiently and work efficiency is improved. In addition, since the hanging support tool 76 and the fastening tool 77 of the second embodiment have a vertically long rod shape like the installation tool of the first embodiment, the internal space of the valve chamber 20 is narrow, and the fire hydrant 2 and Even if there is not a large space around the repair valve 4, the tools can be inserted into the valve chamber 20 from above and the flange reinforcing tool 70 can be easily attached to the flange joint. Further, the lower surface of the holding member 72 is formed with a tapered portion 72f that extends upward toward the outer diameter side, and by doing so, a socket portion is formed on the side of the branch neck portion 3b of the fluid pipe 3. It is easy to engage with the large diameter portion 3f.

以上、本発明を実施例1及び実施例2に基づいて説明したが、具体的な構成はこれらの実施例に限定されるものではなく、発明の要旨を逸脱しない範囲内で、次のような種々の変形や変更があっても、本発明に含まれる。 Although the present invention has been described above based on Examples 1 and 2, the specific configuration is not limited to these Examples, and the following modifications may be made without departing from the gist of the invention. Even if there are various modifications and changes, they are included in the present invention.

例えば、前記実施例1では、補修弁4を接続部材としてその上下のフランジ4c、4dと、管路構成部材である消火栓2のフランジ2d及び流体管3の分岐部フランジ3cとのフランジ接合部に、フランジ補強具10を装着する例を説明し、また前記実施例2では、流体管3の分岐部フランジ3cと補修弁4の下部のフランジ4cにフランジ補強具70を装着する例を説明したが、接続部材は補修弁4に限らず、上下両端にフランジを有するバタフライ弁、切換弁、ボールバルブ等であってもよく、それらの上部にフランジ接合される部材については特に限定されるものではない。また、接続部材が消火栓や空気弁等であり、分岐部フランジ3cにフランジ接続されている場合に本発明を適用してもよい。 For example, in the first embodiment, the repair valve 4 is used as a connecting member and the upper and lower flanges 4c, 4d are connected to the flange joints between the flange 2d of the fire hydrant 2 and the branch flange 3c of the fluid pipe 3, which are pipe constituting members. , an example was explained in which the flange reinforcing device 10 was attached, and in the second embodiment, an example was explained in which the flange reinforcing device 70 was attached to the branch flange 3c of the fluid pipe 3 and the lower flange 4c of the repair valve 4. The connecting member is not limited to the repair valve 4, but may also be a butterfly valve, a switching valve, a ball valve, etc., which have flanges on both the upper and lower ends, and there are no particular limitations on the member that is flanged to the upper part of these valves. . Further, the present invention may be applied when the connecting member is a fire hydrant, an air valve, etc., and is flange-connected to the branch flange 3c.

また、前記実施例2では、流体管3の分岐部フランジ3cと補修弁4の下部のフランジ4cにフランジ補強具70を装着する例を説明したが、補修弁4の上部のフランジ4dと消火栓2のフランジ2dにフランジ補強具70を装着する場合にも、本発明を適用しうることは勿論である。 In the second embodiment, the flange reinforcement 70 is attached to the branch flange 3c of the fluid pipe 3 and the lower flange 4c of the repair valve 4. Of course, the present invention can also be applied to the case where the flange reinforcing tool 70 is attached to the flange 2d.

また、前記実施例1では、下部挟持部材14と上部挟持部材11とを連結部材17によって連結する例を説明したが、上部挟持部材11や連結部材17を用いずともよく、例えば、管路構成部材のフランジとそれに接合される接続部材のフランジとのフランジ接合部に、フランジ補強具として下部挟持部材14のみを、吊支工具や締結工具を用いて装着するような場合にも本発明を適用できる。この場合、分割体12の突状部12eと突状部12jとの隙間をフランジ接合部の厚さよりも僅かに大きくし、例えば上方向からボルトや止めネジでフランジ接合部を挟み込むようにするとよい。 Further, in the first embodiment, an example was explained in which the lower clamping member 14 and the upper clamping member 11 are connected by the connecting member 17, but the upper clamping member 11 and the connecting member 17 may not be used. The present invention is also applicable to cases where only the lower clamping member 14 is attached as a flange reinforcing tool to a flange joint between a flange of a member and a flange of a connecting member joined thereto using a hanging support tool or a fastening tool. can. In this case, it is preferable to make the gap between the protruding part 12e and the protruding part 12j of the divided body 12 slightly larger than the thickness of the flange joint, and to sandwich the flange joint from above with bolts or set screws, for example. .

2 消火栓(管路構成部材)
2d フランジ
3 流体管(管路構成部材)
3b 分岐首部
3c 分岐部フランジ
4 補修弁(接続部材)
4c,4d フランジ
10 フランジ補強具
11 上部挟持部材
12,12’ 分割体
12a,12a’ 挟持部
12b 連結アーム部
12c,12c’ 挟持鍔部
12d アーム部
12e 突状部
12f 切欠部
12g 結合部
12j 突状部
12m 凸部
12n 回り止め用凹部
12p 結合部
14 下部挟持部材
17 連結部材
17a 連結ボルト
17b ナット
17c 頭部
17d 軸部
18 結合部材
18a ボルト
18b ナット
20 弁室
30 第1の吊支工具
40 第2の吊支工具
30a、40a ロッド部材(ロッド)
30b、40b 下部支持部材
30c、40c 上部支持部材
40d 位置決め部
50 第1の締結工具
60 第2の締結工具
50a、60a 第1ロッド部材
50b、60b 下向き凹部
50c、60c 第1のボルトナット保持部材
50d、60d ロッド連結部材
50e、60e 第2ロッド部材
50f、60f 上向き凹部
50g、60g 第2のボルトナット保持部材
50h、60h 操作ハンドル
50j 圧縮コイルばね
50k、60k 抜止め部材
60m 保持溝
60n 軸部保持部材
70 フランジ補強具
71 上部の挟持部材
71a 上壁部
71b 嵌合孔
71c 本体部
71d 挟持部
71e 貫通孔
71f 嵌合溝
71g 上向き突部
72 下部の挟持部材
72a 本体部
72b 挟持部
72c 貫通孔
72d 六角孔
72e 突条
73 連結ボルト
74 ナット
75 装着工具
76 吊支工具
76a ロッド部材
76b 支持部材
76c 保持部材(支持部材)
76d 凹部
76e 保持片
77 締結工具
77a ロッド部材
77b 六角穴
77c ソケット
77d 操作ハンドル
78 連結部材
79 抜止め部材
80 掘削工具
81,82 ロッド部材
83 リンク部材
84 バケット
2 Fire hydrant (pipeline component)
2d Flange 3 Fluid pipe (pipe line component)
3b Branch neck 3c Branch flange 4 Repair valve (connection member)
4c, 4d Flange 10 Flange reinforcement 11 Upper clamping member 12, 12' Divided body 12a, 12a' Clamping part 12b Connecting arm part 12c, 12c' Clamping collar part 12d Arm part 12e Projection part 12f Notch part 12g Joint part 12j Projection Shaped portion 12m Convex portion 12n Detent recess 12p Connecting portion 14 Lower clamping member 17 Connecting member 17a Connecting bolt 17b Nut 17c Head 17d Shaft portion 18 Connecting member 18a Bolt 18b Nut 20 Valve chamber 30 First suspension tool 40 2. Hanging support tool 30a, 40a Rod member (rod)
30b, 40b Lower support members 30c, 40c Upper support member 40d Positioning portion 50 First fastening tool 60 Second fastening tool 50a, 60a First rod members 50b, 60b Downward recesses 50c, 60c First bolt/nut holding member 50d , 60d Rod connecting members 50e, 60e Second rod members 50f, 60f Upward recesses 50g, 60g Second bolt/nut holding members 50h, 60h Operation handle 50j Compression coil springs 50k, 60k Retaining member 60m Holding groove 60n Shaft holding member 70 Flange reinforcing tool 71 Upper clamping member 71a Upper wall part 71b Fitting hole 71c Main body part 71d Clamping part
71e Through hole 71f Fitting groove 71g Upward protrusion 72 Lower clamping member 72a Main body part 72b Clamping part 72c Through hole 72d Hexagonal hole 72e Projection 73 Connection bolt 74 Nut 75 Mounting tool 76 Hanging support tool 76a Rod member 76b Support member
76c Holding member (supporting member)
76d Recess 76e Holding piece 77 Fastening tool 77a Rod member 77b Hexagonal hole
77c Socket 77d Operating handle 78 Connecting member 79 Retaining member 80 Excavation tools 81, 82 Rod member 83 Link member 84 Bucket

Claims (2)

接続部材である弁の上下両端のフランジに、前記弁の上下両端を挟んでそれぞれ接合される管路構成部材の下方のフランジ接合部に外嵌される下部挟持部材と、前記管路構成部材の上方のフランジ接合部に外嵌される上部挟持部材と、前記下部挟持部材及び前記上部挟持部材同士を連結する連結ボルト及びナットと、から少なくとも構成されフランジ接合を補強するフランジ補強具の装着方法であって、
吊支工具により、前記下部挟持部材を前記管路構成部材の前記下方のフランジ接合部の外径部に側方から嵌合して、前記下部挟持部材の突状部を前記弁の下端のフランジの上面に当接した状態で、該下部挟持部材を仮置きするとともに、前記上部挟持部材を前記管路構成部材の前記上方のフランジ接合部の外径部に側方から嵌合して、該上部挟持部材を仮置きする工程と、
前記連結ボルト及びナットを、供回りを防止しながら締結工具により上方から緊締し、前記下方のフランジ接合部に前記下部挟持部材を装着するとともに、前記上方のフランジ接合部に前記上部挟持部材を装着する工程と、を少なくとも備えることを特徴とするフランジ補強具の装着方法。
A lower clamping member is fitted onto flanges at both upper and lower ends of the connecting member of the valve, and a lower clamping member is fitted onto the lower flange joint portion of the pipe line forming member which is joined across both the upper and lower ends of the valve, respectively; A method for attaching a flange reinforcing tool for reinforcing a flange joint, which comprises at least an upper clamping member that is fitted onto an upper flange joint, and a connecting bolt and nut that connect the lower clamping member and the upper clamping member to each other. There it is,
Using a suspension tool, the lower clamping member is fitted from the side to the outer diameter portion of the lower flange joint of the conduit constituting member , and the protruding part of the lower clamping member is attached to the flange at the lower end of the valve. Temporarily place the lower clamping member in contact with the upper surface, and fit the upper clamping member from the side to the outer diameter portion of the upper flange joint of the conduit constituting member . a step of temporarily placing the upper holding member ;
Tighten the connecting bolt and nut from above using a fastening tool while preventing rotation, and attach the lower clamping member to the lower flange joint, and attach the upper clamping member to the upper flange joint. A method for attaching a flange reinforcing tool, comprising at least the step of:
管路構成部材のフランジとそれに接合される接続部材のフランジとを、上下1対の挟持部材の挟持部により上下方向から挟んで補強するフランジ補強具の装着方法であって、
上下方向に相対移動可能なように上下方向からボルトとナットにより仮連結された前記上下の挟持部材を、前記仮連結の部分を支点に開いた状態で吊支工具により前記上下のフランジの外径部に側方から挟入し、前記上下の挟持部材を閉じる工程と、
前記仮連結したボルトとナット、及び、前記上下の挟持部材の閉じた部分を連結する連結ボルトとナットを、それぞれ供回りを防止しながら締結工具により上方から緊締し、前記上下のフランジ接合部を前記上下の挟持部により挟持する工程と、を備えることを特徴とするフランジ補強具の装着方法。
A method for attaching a flange reinforcing device for reinforcing a flange of a pipe constituting member and a flange of a connecting member joined thereto by sandwiching them from above and below between a pair of pinching members of a pair of upper and lower pinching members, the method comprising:
The upper and lower clamping members, which are temporarily connected by bolts and nuts from above and below so that they can move relative to each other in the vertical direction, are opened using the temporarily connected portion as a fulcrum, and the outer diameter of the upper and lower flanges is adjusted using a hanging support tool. and closing the upper and lower clamping members;
The temporarily connected bolts and nuts and the connecting bolts and nuts connecting the closed parts of the upper and lower holding members are each tightened from above using a fastening tool while preventing rotation, and the upper and lower flange joints are tightened. A method for installing a flange reinforcing tool, comprising the step of holding the upper and lower holding parts.
JP2022073077A 2018-04-24 2022-04-27 How to install flange reinforcement Active JP7419431B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022073077A JP7419431B2 (en) 2018-04-24 2022-04-27 How to install flange reinforcement

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018083311A JP7068020B2 (en) 2018-04-24 2018-04-24 How to install the flange reinforcement
JP2022073077A JP7419431B2 (en) 2018-04-24 2022-04-27 How to install flange reinforcement

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2018083311A Division JP7068020B2 (en) 2018-04-24 2018-04-24 How to install the flange reinforcement

Publications (2)

Publication Number Publication Date
JP2022103207A JP2022103207A (en) 2022-07-07
JP7419431B2 true JP7419431B2 (en) 2024-01-22

Family

ID=68389716

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2018083311A Active JP7068020B2 (en) 2018-04-24 2018-04-24 How to install the flange reinforcement
JP2022073077A Active JP7419431B2 (en) 2018-04-24 2022-04-27 How to install flange reinforcement

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2018083311A Active JP7068020B2 (en) 2018-04-24 2018-04-24 How to install the flange reinforcement

Country Status (1)

Country Link
JP (2) JP7068020B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7330061B2 (en) * 2019-10-21 2023-08-21 コスモ工機株式会社 Flange stiffener

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004025367A (en) 2002-06-26 2004-01-29 Nippon Soda Co Ltd Screwing tool for flange
JP2014062613A (en) 2012-09-21 2014-04-10 Kyowa Kogyo Kk Coupling structure of equipment for water service
JP2015108402A (en) 2013-12-04 2015-06-11 岡山市 Flange joint part reinforcing fixture
JP2016125599A (en) 2015-01-05 2016-07-11 岡山市 Reinforcement jig of joint part
JP2017145885A (en) 2016-02-17 2017-08-24 岡山市 Reinforcement jig for junction and reinforcement structure for junction
JP2019032002A (en) 2017-08-04 2019-02-28 株式会社水道技術開発機構 Fixing jig of valve case split portion and its mounting method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4620732A (en) * 1985-11-14 1986-11-04 The United States Of America As Represented By The Secretary Of The Air Force Bolt frame construction
JP2546383Y2 (en) * 1991-07-03 1997-08-27 株式会社クボタ Auxiliary tools for fire hydrants
JPH061811U (en) * 1992-06-16 1994-01-14 株式会社ビーシー製作所 Clamp device
JPH0612891U (en) * 1992-07-20 1994-02-18 カシオ計算機株式会社 Pipe fixing structure for semiconductor manufacturing equipment
JP6508997B2 (en) * 2015-03-24 2019-05-08 コスモ工機株式会社 Flange reinforcement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004025367A (en) 2002-06-26 2004-01-29 Nippon Soda Co Ltd Screwing tool for flange
JP2014062613A (en) 2012-09-21 2014-04-10 Kyowa Kogyo Kk Coupling structure of equipment for water service
JP2015108402A (en) 2013-12-04 2015-06-11 岡山市 Flange joint part reinforcing fixture
JP2016125599A (en) 2015-01-05 2016-07-11 岡山市 Reinforcement jig of joint part
JP2017145885A (en) 2016-02-17 2017-08-24 岡山市 Reinforcement jig for junction and reinforcement structure for junction
JP2019032002A (en) 2017-08-04 2019-02-28 株式会社水道技術開発機構 Fixing jig of valve case split portion and its mounting method

Also Published As

Publication number Publication date
JP7068020B2 (en) 2022-05-16
JP2022103207A (en) 2022-07-07
JP2019190560A (en) 2019-10-31

Similar Documents

Publication Publication Date Title
JP7419431B2 (en) How to install flange reinforcement
JP6474579B2 (en) Valve device
US7784835B1 (en) Pipe connecting member
US20200331130A1 (en) Hammer for installing a gasket into a joint between two pipes
JP6426892B2 (en) Valve body removing device and valve body removing method
JP6526447B2 (en) Valve body removal device
JPH08121641A (en) Underground buried pipe shut-off valve opening/closing device
JP6369678B2 (en) Tube unit
JP6970587B2 (en) Flange reinforcement
JP7061157B2 (en) How to remove the valve body
JP6587919B2 (en) Closure device, and method for removing pipe connecting member using the closure device
JP6588613B2 (en) Valve body removal device and valve body removal method
JP6721619B2 (en) Valve body removing device and valve body removing method
JP6764986B2 (en) Valve body removal device and valve body removal method
JP7330061B2 (en) Flange stiffener
JP2022030443A (en) Pipe cutting method and device of the same
JP6942840B2 (en) Valve device
JP6691468B2 (en) Connection member removal method
JP6280893B2 (en) Valve body removal device and valve body removal method
JP4169359B2 (en) Omnidirectional branch joint for steel pipes
JP6937221B2 (en) Flow control device
JP2021011883A (en) Repair device
JP5747068B2 (en) Valve body removal device and valve body removal method
JP2022023939A (en) Flange reinforcing tool
JP2019190582A (en) Fluid equipment installation method and fluid equipment used in the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220427

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230418

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230801

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231023

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20231031

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240110

R150 Certificate of patent or registration of utility model

Ref document number: 7419431

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150