JP7397817B2 - Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program - Google Patents

Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program Download PDF

Info

Publication number
JP7397817B2
JP7397817B2 JP2021013440A JP2021013440A JP7397817B2 JP 7397817 B2 JP7397817 B2 JP 7397817B2 JP 2021013440 A JP2021013440 A JP 2021013440A JP 2021013440 A JP2021013440 A JP 2021013440A JP 7397817 B2 JP7397817 B2 JP 7397817B2
Authority
JP
Japan
Prior art keywords
contract
amount
data
loss
budget
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021013440A
Other languages
Japanese (ja)
Other versions
JP2022116992A (en
Inventor
遼 三島
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2021013440A priority Critical patent/JP7397817B2/en
Publication of JP2022116992A publication Critical patent/JP2022116992A/en
Application granted granted Critical
Publication of JP7397817B2 publication Critical patent/JP7397817B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、損失引当金算出装置、損失引当金算出方法および損失引当金算出プログラムに関する。 The present invention relates to a loss allowance calculation device, a loss allowance calculation method, and a loss allowance calculation program.

特許文献1には、工事進行基準会計の実施のために計算する工事進捗度の信頼性を評価する方法が開示されている(特許文献1の0001段落参照)。 Patent Document 1 discloses a method for evaluating the reliability of construction progress calculated for implementation of percentage-of-completion accounting (see paragraph 0001 of Patent Document 1).

特開2012-98849号公報Japanese Patent Application Publication No. 2012-98849

上記特許文献1に記載のような工事やIT(Information Technology)の分野においては、将来発生すると見込まれる損失を引当金として計上することがある。このような引当金のことを損失引当金という。 In the fields of construction and IT (Information Technology) as described in Patent Document 1, losses that are expected to occur in the future may be recorded as a reserve. Such reserves are called loss reserves.

ここで、従来においては、契約毎の損失引当金の計算は、担当者が手計算により行っていたため、計算ミスのリスクがあり、また、作業負荷も大きかった。 Here, in the past, the loss allowance for each contract was calculated manually by a person in charge, so there was a risk of calculation errors and the workload was heavy.

本発明は、上記問題点に鑑みてなされたものであって、契約毎の損失引当金を自動で算出することができる損失引当金算出装置、損失引当金算出方法および損失引当金算出プログラムを提供することを目的とする。 The present invention has been made in view of the above problems, and provides a loss allowance calculation device, a loss allowance calculation method, and a loss allowance calculation program that can automatically calculate the loss allowance for each contract. The purpose is to

上述した課題を解決し、目的を達成するために、本発明に係る損失引当金算出装置は、制御部および記憶部を備え、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出装置であって、前記記憶部には、契約識別データと前記案件の契約金額とを含む契約データと、前記契約識別データと前記案件の予算金額とを含む予算データと、前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、が格納されており、前記制御部が、前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値と、に基づいて前記損失引当金を算出する算出手段を備えること、を特徴とする。 In order to solve the above-mentioned problems and achieve the purpose, a loss allowance calculation device according to the present invention includes a control unit and a storage unit, and calculates a loss allowance which is a reserve for losses expected to occur in the future for a certain case. The storage unit includes contract data including contract identification data and a contract amount of the project, and budget data including the contract identification data and the budget amount of the project. , percentage-of-completion sales data that includes the contract identification data and a percentage-of-completion sales cumulative amount that is the cumulative amount of sales based on the percentage-of-completion method for the project, and the contract identification data and the cumulative amount of costs incurred for the project. and cost summary data including a certain cumulative cost amount, and the control unit subtracts the budget amount in the budget data from the contract amount in the contract data for each contract identification data. and a value obtained by subtracting the cumulative cost amount in the cost summary data from the cumulative sales amount in the percentage-of-completion sales data. Features.

また、本発明に係る損失引当金算出装置は、前記制御部が、前記減じた値同士の和が負の値となった前記契約識別データで特定される契約を、前記損失引当金が発生する契約として特定してオペレータに通知する通知手段を更に備えること、を特徴とする。 Further, in the loss allowance calculation device according to the present invention, the control unit may cause the loss allowance to be generated for a contract specified by the contract identification data in which the sum of the reduced values is a negative value. The present invention is characterized by further comprising a notification means for identifying the contract and notifying the operator.

また、本発明に係る損失引当金算出装置は、前記算出手段が、前記原価集計データ中の前記原価累計金額を前記予算データ中の前記予算金額で除することにより前記案件の進捗率を算出し、更に、前記契約データ中の前記契約金額に当該算出した進捗率を乗じることにより前記進行基準売上累計金額を算出すること、を特徴とする。 Further, in the loss allowance calculation device according to the present invention, the calculation means calculates the progress rate of the project by dividing the cumulative cost amount in the cost summary data by the budget amount in the budget data. The method is further characterized in that the cumulative sales amount based on the percentage of progress is calculated by multiplying the contract amount in the contract data by the calculated progress rate.

また、本発明に係る損失引当金算出装置は、前記制御部が、前記損失引当金が発生する場合、前記算出手段で算出した前記損失引当金を含む仕訳を生成する仕訳生成手段を更に備え、当該仕訳は、前記損失引当金の発生月に生成される前記損失引当金の計上用の仕訳である計上用仕訳および前記発生月の翌月に生成される前記損失引当金の振り戻し用の仕訳である振戻用仕訳であること、を特徴とする。 Further, the loss allowance calculation device according to the present invention further includes a journal entry generating means for the control unit to generate a journal entry including the loss allowance calculated by the calculation means when the loss allowance is generated, The relevant journal entries are an accounting journal, which is a journal entry for recording the loss allowance, generated in the month in which the loss allowance occurs, and a journal entry for reversal of the loss allowance, which is generated in the month following the month in which the loss allowance occurs. It is characterized by being a certain reversal journal entry.

また、本発明に係る損失引当金算出装置は、前記案件が、工事案件であり、前記損失引当金が、工事損失引当金であること、を特徴とする。 Further, the loss allowance calculation device according to the present invention is characterized in that the case is a construction project, and the loss allowance is a construction loss allowance.

また、本発明に係る損失引当金算出方法は、制御部および記憶部を備える情報処理装置で実行される、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出方法であって、前記記憶部には、契約識別データと前記案件の契約金額とを含む契約データと、前記契約識別データと前記案件の予算金額とを含む予算データと、前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、が格納されており、前記制御部で実行される、前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値と、に基づいて前記損失引当金を算出する算出ステップを含むこと、を特徴とする。 Further, a loss reserve calculation method according to the present invention is a method for calculating a loss reserve, which is a reserve for losses expected to occur in the future for a certain project, which is executed by an information processing device including a control unit and a storage unit. The storage unit includes contract data including contract identification data and a contract amount of the project, budget data including the contract identification data and a budget amount of the project, and percentage-based sales data that includes data and a percentage-of-completion sales cumulative amount that is the cumulative amount of sales based on the percentage-of-completion method for the project, and the contract identification data and a cumulative cost amount that is the cumulative amount of costs incurred for the project. and a value obtained by subtracting the budget amount in the budget data from the contract amount in the contract data for each of the contract identification data, which is executed by the control unit. , comprising a calculation step of calculating the loss allowance based on a value obtained by subtracting the cumulative cost amount in the cost summary data from the cumulative sales amount in the percentage-of-completion sales data. do.

また、本発明に係る損失引当金算出プログラムは、制御部および記憶部を備える情報処理装置に実行させるための、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出プログラムであって、前記記憶部には、契約識別データと前記案件の契約金額とを含む契約データと、前記契約識別データと前記案件の予算金額とを含む予算データと、前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、が格納されており、前記制御部に実行させるための、前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値と、に基づいて前記損失引当金を算出する算出ステップを含むこと、を特徴とする。 Further, the loss reserve calculation program according to the present invention calculates a loss reserve, which is a reserve for losses expected to occur in the future for a certain case, to be executed by an information processing device including a control unit and a storage unit. The loss allowance calculation program includes contract data including contract identification data and a contract amount of the project, budget data including the contract identification data and the budget amount of the project, and the contract data. Percentage-based sales data that includes identification data and a cumulative percentage-of-completion sales amount that is the cumulative amount of sales based on the percentage-of-completion method for the project, and cumulative cost amount that is the cumulative amount of the cost amount that has been generated for the contract identification data and the project. and cost summary data including, for each contract identification data to be executed by the control unit, the budget amount in the budget data is subtracted from the contract amount in the contract data. and a calculation step of calculating the loss allowance based on the value obtained by subtracting the cumulative cost amount in the cost summary data from the cumulative sales amount in the percentage-of-completion sales data. Features.

本発明によれば、契約毎の損失引当金を自動で算出することができるという効果を奏する。 According to the present invention, it is possible to automatically calculate the loss allowance for each contract.

図1は、損失引当金算出装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of a loss allowance calculation device. 図2は、1カ月目における処理フローの一例を示す図である。FIG. 2 is a diagram showing an example of a processing flow in the first month. 図3は、2カ月目における処理フローの一例を示す図である。FIG. 3 is a diagram showing an example of the processing flow in the second month. 図4は、1カ月目に登録される契約データの一例を示す図である。FIG. 4 is a diagram showing an example of contract data registered in the first month. 図5は、1カ月目に登録される予算データおよび予算履歴データの一例を示す図である。FIG. 5 is a diagram showing an example of budget data and budget history data registered in the first month. 図6は、1カ月目に登録される原価データおよび原価集計データの一例を示す図である。FIG. 6 is a diagram showing an example of cost data and cost total data registered in the first month. 図7は、1カ月目に登録される進捗率データおよび進行基準売上データの一例を示す図である。FIG. 7 is a diagram showing an example of progress rate data and progress-based sales data registered in the first month. 図8は、2カ月目に登録される予算データおよび予算履歴データの一例を示す図である。FIG. 8 is a diagram showing an example of budget data and budget history data registered in the second month. 図9は、2カ月目に登録される原価データおよび原価集計データの一例を示す図である。FIG. 9 is a diagram showing an example of cost data and cost total data registered in the second month. 図10は、2カ月目に登録される進捗率データおよび進行基準売上データの一例を示す図である。FIG. 10 is a diagram showing an example of progress rate data and progress-based sales data registered in the second month. 図11は、2カ月目に登録される損失引当金データの一例を示す図である。FIG. 11 is a diagram showing an example of loss allowance data registered in the second month. 図12は、工事損失引当金の計上用仕訳の一例を示す図である。FIG. 12 is a diagram showing an example of a journal entry for recording construction loss allowance. 図13は、科目設定マスタの一例を示す図である。FIG. 13 is a diagram showing an example of a subject setting master. 図14は、工事損失引当金の振戻用仕訳の一例を示す図である。FIG. 14 is a diagram showing an example of a journal entry for reversing construction loss reserves.

以下に、本発明に係る損失引当金算出装置、損失引当金算出方法および損失引当金算出プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態により本発明が限定されるものではない。 DESCRIPTION OF EMBODIMENTS Below, embodiments of a loss allowance calculation device, a loss allowance calculation method, and a loss allowance calculation program according to the present invention will be described in detail based on the drawings. Note that the present invention is not limited to this embodiment.

[1.概要]
工事を行う際には、工事損失が発生することがある。前記工事損失とは、工事契約について、工事原価総額が工事収益総額を超過する可能性が高く、かつ、その金額を合理的に見積もることができる場合において、前記超過すると見込まれる額のことである。
[1. overview]
When carrying out construction work, construction losses may occur. The above-mentioned construction loss refers to the amount that is expected to exceed the total construction cost in a construction contract when there is a high probability that the total construction cost will exceed the total construction revenue and that amount can be reasonably estimated. .

また、前記工事損失が発生する場合には、工事損失引当金を計上する必要がある。前記工事損失引当金とは、前記工事損失から、前記工事契約に関してすでに計上された損益の額を控除した残額について計上される引当金のことである。前記工事損失引当金は、工事進行基準において、工事原価総額が合理的に見積もりできている場合に採用することができる。 Additionally, if the aforementioned construction losses occur, it is necessary to record a provision for construction losses. The provision for construction losses is a provision that is recorded for the remaining amount after deducting the amount of profit and loss already recorded regarding the construction contract from the construction loss. The provision for construction losses can be adopted when the total cost of construction can be reasonably estimated using the percentage-of-completion method.

ここで、従来においては、前記工事損失引当金は、担当者が手動で計算して求めていたため、金額の誤入力や計算ミス等のリスクの問題があった。また、従来においては、前記工事損失引当金を計上すべき工事(工事契約)の把握は、担当者が人為的判断により行っていたため、把握に手間がかかるという問題もあった。そして、従来においては、前記工事損失引当金が発生した場合の仕訳の計上も、担当者が手動で行ったため、仕訳計上の手間や計上ミス等の問題もあった。 Here, in the past, the construction loss reserve was calculated manually by a person in charge, and there was a risk of erroneous input of the amount or calculation error. In addition, in the past, the person in charge had to manually determine which construction works (construction contracts) should be accounted for for construction losses, so there was a problem in that it was time-consuming. Conventionally, the journal entry when the construction loss reserve was generated was also manually recorded by the person in charge, which caused problems such as the hassle of recording the journal entry and recording errors.

そこで、本実施形態においては、例えば、前記工事損失引当金を自動で算出できるようにした。また、本実施形態においては、例えば、工事進行基準の契約について、システムで保持している予算データ、原価データおよび進行基準売上データ等から、前記工事損失引当金を計上すべき工事(工事契約)を自動判断できるようにした。そして、本実施形態においては、例えば、前記工事損失引当金を計上すべき工事(工事契約)に対して工事損失引当金計上仕訳を自動で計上できるようにした。以下、具体的な構成および動作について説明する。 Therefore, in this embodiment, for example, the construction loss reserve can be automatically calculated. In addition, in this embodiment, for example, regarding a contract based on the percentage-of-completion method, based on budget data, cost data, percentage-of-completion sales data, etc. held in the system, construction work (construction contract) for which the provision for construction loss should be recorded. can be automatically determined. In the present embodiment, for example, a journal entry for recording construction loss reserves can be automatically recorded for the construction work (construction contract) for which the construction loss reserve should be recorded. The specific configuration and operation will be described below.

[2.構成]
本実施形態に係る損失引当金算出装置100の構成の一例について、図1を参照して説明する。図1は、損失引当金算出装置100の構成の一例を示すブロック図である。
[2. composition]
An example of the configuration of the loss allowance calculation device 100 according to the present embodiment will be described with reference to FIG. 1. FIG. 1 is a block diagram showing an example of the configuration of a loss allowance calculation device 100.

損失引当金算出装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、損失引当金算出装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The loss allowance calculation device 100 is a commercially available desktop personal computer. Note that the loss allowance calculation device 100 is not limited to stationary information processing devices such as desktop personal computers, but can also be used with commercially available notebook personal computers, PDAs (Personal Digital Assistants), smartphones, tablet personal computers, etc. It may also be a portable information processing device.

損失引当金算出装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。損失引当金算出装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The loss allowance calculation device 100 includes a control section 102, a communication interface section 104, a storage section 106, and an input/output interface section 108. Each unit included in the loss allowance calculation device 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、損失引当金算出装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、損失引当金算出装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、後述する各種マスタ等のデータは、例えばサーバ200に格納されてもよい。 The communication interface unit 104 communicatively connects the loss allowance calculation device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via a communication line. Here, the network 300 has a function of connecting the loss allowance calculation device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that data such as various masters, which will be described later, may be stored in the server 200, for example.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface unit 108 . As the output device 114, in addition to a monitor (including a home television), a speaker or a printer can be used. As the input device 112, in addition to a keyboard, a mouse, and a microphone, a monitor that cooperates with the mouse to realize a pointing device function can be used. Note that in the following description, the output device 114 may be referred to as a monitor 114, and the input device 112 may be referred to as a keyboard 112 or a mouse 112.

記憶部106には、各種のデータベース、テーブルおよびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for giving instructions to a CPU (Central Processing Unit) to perform various processes in cooperation with an OS (Operating System). As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, etc. can be used.

記憶部106は、例えば、契約データ106aと、予算データ106bと、予算履歴データ106cと、原価データ106dと、原価集計データ106eと、進捗率データ106fと、進行基準売上データ106gと、損失引当金データ106hと、科目設定マスタ106iと、を備えている。 The storage unit 106 stores, for example, contract data 106a, budget data 106b, budget history data 106c, cost data 106d, cost total data 106e, progress rate data 106f, percentage-of-completion sales data 106g, and loss allowance. It includes data 106h and subject setting master 106i.

本実施形態に係る損失引当金算出装置100によれば、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出することができる。本実施形態に係る損失引当金算出装置100は、工事やIT等の様々な分野において使用することが可能であるが、工事の分野を例にとると、前記案件は工事案件であり、前記損失引当金は前記工事損失引当金である。 According to the loss allowance calculation device 100 according to the present embodiment, it is possible to calculate a loss allowance, which is an allowance for losses that are expected to occur in the future for a certain case. The loss allowance calculation device 100 according to the present embodiment can be used in various fields such as construction and IT. Taking the field of construction as an example, the project is a construction project, and the loss allowance calculation device 100 can be used in various fields such as construction and IT. The reserve is the construction loss reserve mentioned above.

契約データ106aは、図4に示すように、例えば、プロジェクト識別データ(PJ番号)と、契約識別データ(契約番号)と、契約行番号と、売上基準と、前記案件の契約金額と、等を含む。 As shown in FIG. 4, the contract data 106a includes, for example, project identification data (PJ number), contract identification data (contract number), contract line number, sales standards, contract amount of the project, etc. include.

予算データ106bは、図5および図8に示すように、例えば、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、登録日と、前記案件の予算金額と、等を含む。予算データ106bには、最新の情報が上書きされるため、過去の予算情報は次段落で説明する予算履歴データ106cから参照することができる。 As shown in FIGS. 5 and 8, the budget data 106b includes, for example, the project identification data (PJ number), the contract identification data (contract number), the contract line number, the registration date, and the project identification data. Including budget amount, etc. Since the budget data 106b is overwritten with the latest information, past budget information can be referenced from the budget history data 106c described in the next paragraph.

予算履歴データ106cは、予算データ106bの修正を行った場合において、修正前および修正後の予算情報を履歴として残すためのデータである。予算履歴データ106cは、図5および図8に示すように、例えば、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、新規、修正前または修正後の処理区分と、前記登録日と、前記案件の予算金額と、等を含む。 The budget history data 106c is data for keeping the budget information before and after the modification as a history when the budget data 106b is modified. As shown in FIGS. 5 and 8, the budget history data 106c includes, for example, the project identification data (PJ number), the contract identification data (contract number), the contract line number, new, unrevised, or modified data. It includes the following processing classification, the registration date, the budget amount of the project, etc.

原価データ106dは、当月に実際に発生した原価金額を管理するためのデータである。原価データ106dは、図6および図9に示すように、例えば、伝票番号と、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、当月に実際に発生した原価金額と、等を含む。 The cost data 106d is data for managing the amount of costs actually incurred in the current month. As shown in FIGS. 6 and 9, the cost data 106d includes, for example, the document number, the project identification data (PJ number), the contract identification data (contract number), the contract line number, and the actual including the cost amount incurred, etc.

原価集計データ106eは、当月に実際に発生した前記原価金額の累計金額である原価累計金額を管理するためのデータである。原価集計データ106eは、図6および図9に示すように、例えば、伝票番号と、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、会計年月と、当月に実際に発生した前記原価金額と、当該原価金額の累計金額である原価累計金額と、等を含む。 The cost total data 106e is data for managing the cumulative cost amount, which is the cumulative amount of the cost amount actually generated in the current month. As shown in FIGS. 6 and 9, the cost summary data 106e includes, for example, the document number, the project identification data (PJ number), the contract identification data (contract number), the contract line number, and the accounting year. It includes the month, the cost amount actually incurred in the current month, and the cumulative cost amount which is the cumulative amount of the cost amount.

進捗率データ106fは、図7および図10に示すように、例えば、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、会計基準と、前記案件の進捗率と、等を含む。 As shown in FIGS. 7 and 10, the progress rate data 106f includes, for example, the project identification data (PJ number), the contract identification data (contract number), the contract line number, the accounting standard, and the project. progress rate, etc.

進行基準売上データ106gは、図7および図10に示すように、例えば、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、会計年月と、当月の進行基準による売上金額(進行基準売上金額・・・A)と、前月以前の進行基準による売上金額の累計金額(前月以前進行基準売上累計金額・・・B)と、等を含む。進行基準売上データ106gは、図示していないが、進行基準による売上金額の累計金額である進行基準売上累計金額も更に含む。当該進行基準売上累計金額は、AとBの和となる。 As shown in FIGS. 7 and 10, the percentage-of-completion sales data 106g includes, for example, the project identification data (PJ number), the contract identification data (contract number), the contract line number, the fiscal year and month, It includes the current month's sales amount based on the percentage-of-completion method (completion-based sales amount...A), the cumulative amount of sales based on the percentage-based percentage for the previous month (cumulative percentage-based sales amount before the previous month...B), and so on. Although not shown, the percentage-based sales data 106g further includes a percentage-based cumulative sales amount, which is a cumulative amount of sales based on percentage-based sales. The relevant percentage-of-completion cumulative sales amount is the sum of A and B.

損失引当金データ106hは、発生する前記損失引当金を管理するためのデータであり、仕訳生成の基となるデータでもある。損失引当金データ106hは、図11に示すように、例えば、前記プロジェクト識別データ(PJ番号)と、前記契約識別データ(契約番号)と、前記契約行番号と、会計年月と、前記損失引当金(損失引当金額)と、等を含む。 The loss allowance data 106h is data for managing the generated loss allowance, and is also data that is the basis for creating journal entries. As shown in FIG. 11, the loss allowance data 106h includes, for example, the project identification data (PJ number), the contract identification data (contract number), the contract line number, the fiscal year and month, and the loss allowance. (loss allowance amount), etc.

科目設定マスタ106iは、前記損失引当金を含む仕訳に用いる勘定科目を管理するためのマスタである。科目設定マスタ106iは、図13に示すように、例えば、科目設定区分と、総勘定科目コードと、補助科目コードと、補助内訳科目コードと、等を含む。図13に示す科目設定マスタ106iの例では、前記科目設定区分=60に工事損失引当金科目が設定されており、前記科目設定区分=61に工事損失引当金繰入科目が設定されている。 The item setting master 106i is a master for managing account items used for journal entries including the loss allowance. As shown in FIG. 13, the subject setting master 106i includes, for example, subject setting classifications, general account subject codes, auxiliary subject codes, auxiliary breakdown subject codes, and the like. In the example of the item setting master 106i shown in FIG. 13, a construction loss reserve item is set in the item setting classification=60, and a construction loss provision provision item is set in the item setting classification=61.

制御部102は、損失引当金算出装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。 The control unit 102 is a CPU or the like that centrally controls the loss allowance calculation device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs specifying various processing procedures, required data, etc., and performs various information processing based on these stored programs. Execute.

制御部102は、機能概念的に、例えば、(1)前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値と、に基づいて前記損失引当金を算出する算出手段としての算出部102aと、(2)前記減じた値同士の和が負の値となった前記契約識別データで特定される契約を、前記損失引当金が発生する契約として特定してオペレータに通知する通知手段としての通知部102bと、(3)前記損失引当金が発生する場合、前記算出手段で算出した前記損失引当金を含む仕訳を生成する仕訳生成手段としての仕訳生成部102cと、を備えている。 Functionally, the control unit 102 conceptually includes, for example, (1) for each contract identification data, a value obtained by subtracting the budget amount in the budget data from the contract amount in the contract data, and the percentage-of-completion sales data; (2) a calculation unit 102a as a calculation means that calculates the loss allowance based on a value obtained by subtracting the cumulative cost amount in the cost summary data from the cumulative sales amount on the percentage-of-completion basis; (3) a notification unit 102b as a notification means for identifying a contract specified by the contract identification data in which the sum of values is a negative value as a contract in which the loss allowance is generated and notifying the operator; When the loss allowance is generated, a journal generation unit 102c is provided as a journal generation means for generating a journal entry including the loss allowance calculated by the calculation means.

算出部102aは、前記契約識別データ毎に、契約データ106a中の前記契約金額から予算データ106b中の前記予算金額を減じた値と、進行基準売上データ106g中の前記進行基準売上累計金額から原価集計データ106e中の前記原価累計金額を減じた値と、に基づいて前記損失引当金を算出する。当該減じた値同士の和が正の値または0となった場合、前記損失引当金が発生しないこととなる。当該減じた値同士の和が負の値となった場合、前記損失引当金が発生することとなり、当該負の値の絶対値が前記損失引当金となる。 The calculation unit 102a calculates, for each of the contract identification data, a value obtained by subtracting the budget amount in the budget data 106b from the contract amount in the contract data 106a, and a cost price from the cumulative sales amount on the percentage-of-completion basis in the percentage-of-completion sales data 106g. The loss allowance is calculated based on the value obtained by subtracting the cumulative cost amount in the aggregated data 106e. If the sum of the reduced values becomes a positive value or 0, the loss allowance will not be generated. When the sum of the subtracted values becomes a negative value, the loss allowance is generated, and the absolute value of the negative value becomes the loss allowance.

算出部102aは、前記進行基準売上累計金額を以下のようにして算出できる。すなわち、算出部102aは、原価集計データ106e中の前記原価累計金額を予算データ106bの前記予算金額で除することにより前記案件の進捗率を算出し、更に、契約データ106a中の前記契約金額に当該算出した進捗率を乗じることにより前記進行基準売上累計金額を算出する。 The calculation unit 102a can calculate the percentage-based cumulative sales amount as follows. That is, the calculation unit 102a calculates the progress rate of the project by dividing the cumulative cost amount in the cost summary data 106e by the budget amount in the budget data 106b, and further calculates the progress rate of the project by dividing the cumulative cost amount in the cost summary data 106e by the contract amount in the contract data 106a. The cumulative sales amount based on the percentage of progress is calculated by multiplying the calculated progress rate.

通知部102bは、前記減じた値同士の和が負の値となった前記契約識別データで特定される契約を、前記損失引当金が発生する契約として特定してオペレータに通知する。 The notification unit 102b specifies a contract specified by the contract identification data in which the sum of the subtracted values becomes a negative value as a contract in which the loss allowance is generated, and notifies the operator of the contract.

仕訳生成部102cは、前記損失引当金が発生する場合、算出部102aで算出した前記損失引当金を含む仕訳を生成する。当該仕訳は、前記損失引当金の発生月に生成される前記損失引当金の計上用の仕訳である計上用仕訳および前記発生月の翌月に生成される前記損失引当金の振り戻し用の仕訳である振戻用仕訳である。 When the loss allowance is generated, the journal generation unit 102c generates a journal including the loss allowance calculated by the calculation unit 102a. The relevant journal entries are an accounting journal, which is a journal entry for recording the loss allowance, generated in the month in which the loss allowance occurs, and a journal entry for reversal of the loss allowance, which is generated in the month following the month in which the loss allowance occurs. This is a journal entry for reversal.

[3.処理の概要]
本項目では、本実施形態に係る処理の概要を説明する。
[3. Processing overview]
In this section, an overview of the processing according to this embodiment will be explained.

[3-1.機能概要]
本実施形態においては、例えば、工事進行基準の契約について、工事進行基準売上計算の要素および計算結果として登録されている金額を用いて、前記工事損失引当金の計上対象となる工事を決定し、また、前記工事損失引当金に関する仕訳を計上することができる。前記要素とは、例えば、契約金額、予算金額および原価累計金額である。前記計算結果とは、例えば、進行基準売上金額である。
[3-1. Functional overview]
In this embodiment, for example, for a contract based on the percentage-of-completion method, using the elements of the percentage-of-completion sales calculation and the amount registered as the calculation result, determine the construction subject to the recording of the construction loss reserve, Further, a journal entry regarding the construction loss reserve can be recorded. The elements are, for example, a contract amount, a budget amount, and a total cost amount. The calculation result is, for example, a percentage-based sales amount.

前記工事損失引当金は、例えば、「(契約金額-予算金額)+(進行基準売上累計金額-原価累計金額)」という計算式により算出することができる。また、当該計算式による計算結果が負の値(<0)である工事が、前記工事損失引当金が発生する工事ということとなる。 The construction loss reserve can be calculated, for example, using the formula: "(contract amount - budget amount) + (accumulated percentage-of-completion sales amount - cumulative cost amount)". Further, construction work for which the calculation result using the calculation formula is a negative value (<0) is considered to be construction work for which the construction loss reserve is generated.

[3-2.処理フロー]
本実施形態においては、例えば、図2および図3に示す処理フローに従って、処理が進行する。例えば、1カ月目と2カ月目において、どのように処理が進行するかを説明する。
[3-2. Processing flow]
In this embodiment, the process proceeds according to the process flows shown in FIGS. 2 and 3, for example. For example, how the process progresses in the first and second months will be explained.

1カ月目の処理フローを、図2を用いて本段落において説明する。まず、「契約入力」において、工事契約の受注金額が指定されて登録される。次に、「売上基準登録」において、工事契約の売上基準が進行基準に変更される。次に、「予算入力」において、工事契約に対して、予算金額が入力される。次に、「原価入力」において、工事契約に対して、原価が紐付けされる。次に、「進捗率計算処理」が行われる。次に、「進行基準売上計算処理」が行われる。最後に、「仕訳連携」において、前記工事損失引当金が発生していた場合、前記工事損失引当金の仕訳が計上される。 The processing flow for the first month will be explained in this paragraph using FIG. First, in "contract input", the order amount of the construction contract is specified and registered. Next, in "Sales Standard Registration", the sales standard of the construction contract is changed to the percentage of completion. Next, in "Budget Input", a budget amount is input for the construction contract. Next, in "Cost Input", the cost is linked to the construction contract. Next, a "progress rate calculation process" is performed. Next, a "completion-based sales calculation process" is performed. Finally, in "journal coordination", if the construction loss reserve has occurred, the journal entry for the construction loss reserve is recorded.

2カ月目の処理フローを、図3を用いて本段落において説明する。まず、「予算入力」において、工事契約に対して、予算金額が修正される。次に、「原価入力」において、工事契約に対して、原価が紐付けされる。次に、「進捗率計算処理」が行われる。次に、「進行基準売上計算処理」が行われる。最後に、「仕訳連携」において、前記工事損失引当金が発生していた場合、前記工事損失引当金の仕訳が計上される。 The processing flow for the second month will be explained in this paragraph using FIG. First, in "budget input", the budget amount is corrected for the construction contract. Next, in "Cost Input", the cost is linked to the construction contract. Next, a "progress rate calculation process" is performed. Next, a "completion-based sales calculation process" is performed. Finally, in "journal coordination", if the construction loss reserve has occurred, the journal entry for the construction loss reserve is recorded.

[4.処理の具体例]
本項目では、本実施形態に係る処理の具体例を説明する。本項目では、1カ月目(2020/04)および2カ月目(2020/05)における、前記工事損失引当金が発生するか否かの判断の処理について説明する。また、本項目では、算出した前記工事損失引当金に基づく仕訳の生成についても説明する。
[4. Specific example of processing]
In this item, a specific example of processing according to this embodiment will be described. In this item, we will explain the process for determining whether or not the construction loss reserve will be generated in the first month (2020/04) and second month (2020/05). This item also describes the generation of journal entries based on the calculated construction loss allowance.

[4-1.1カ月目における、前記工事損失引当金が発生するか否かの判断]
本項目では、1カ月目(2020/04)における、前記工事損失引当金が発生するか否かの判断の処理について、図4~図7を用いて説明する。
[4-1. Determining whether or not the above-mentioned allowance for construction losses will be generated in the first month]
In this item, the process of determining whether or not the construction loss reserve will be generated in the first month (2020/04) will be explained using FIGS. 4 to 7.

(1)契約入力
まず、図4に示すように、契約データ106aが登録される。本例では、図4に示すように、契約番号PJJUC00001についての契約金額として1,000,000円が登録され、契約番号PJJUC00002についての契約金額として2,000,000円が登録されている。
(1) Contract Input First, as shown in FIG. 4, contract data 106a is registered. In this example, as shown in FIG. 4, 1,000,000 yen is registered as the contract amount for contract number PJJUC00001, and 2,000,000 yen is registered as the contract amount for contract number PJJUC00002.

(2)予算入力
次に、図5に示すように、予算データ106bが登録される。本例では、図5に示すように、契約番号PJJUC00001についての予算金額として900,000円が登録され、契約番号PJJUC00002についての予算金額として1,800,000円が登録されている。また、併せて、図5に示すように、予算履歴データ106cが生成される。
(2) Budget Input Next, as shown in FIG. 5, budget data 106b is registered. In this example, as shown in FIG. 5, 900,000 yen is registered as the budget amount for contract number PJJUC00001, and 1,800,000 yen is registered as the budget amount for contract number PJJUC00002. Additionally, as shown in FIG. 5, budget history data 106c is generated.

(3)原価入力
次に、図6に示すように、2020/04に発生した原価金額が入力されることにより、原価データ106dが登録される。本例では、図6に示すように、契約番号PJJUC00001についての原価金額として90,000円が登録され、契約番号PJJUC00002についての原価金額として360,000円が登録されている。
(3) Cost input Next, as shown in FIG. 6, the cost data 106d is registered by inputting the cost amount generated in 2020/04. In this example, as shown in FIG. 6, 90,000 yen is registered as the cost amount for contract number PJJUC00001, and 360,000 yen is registered as the cost amount for contract number PJJUC00002.

また、併せて、図6に示すように、原価集計データ106eが生成される。原価集計データ106eは、処理時点までの前記入力された原価金額を集計したデータであるが、2020/04時点では、2020/04に入力された原価金額が存在しないため、図6に示すように、原価集計データ106e中の原価累計金額(原価金額)は、原価データ106d中の原価金額と同じとなる。 Additionally, as shown in FIG. 6, cost summary data 106e is generated. The cost summary data 106e is data that has been compiled from the input cost amounts up to the time of processing, but as of 2020/04, there is no cost amount input in 2020/04, so as shown in FIG. , the cumulative cost amount (cost amount) in the cost summary data 106e is the same as the cost amount in the cost data 106d.

(4)進捗率計算処理
次に、算出部102aは、「原価集計データ106e中の原価累計金額(原価金額)÷予算データ106b中の予算金額×100」という計算式により、契約別の進捗率を算出する。
(4) Progress rate calculation process Next, the calculation unit 102a calculates the progress rate for each contract using the calculation formula "total cost amount (cost amount) in the cost summary data 106e ÷ budget amount in the budget data 106b x 100". Calculate.

具体的には、契約番号PJJUC00001については、原価累計金額(原価金額)は(3)で説明したように90,000円であり、予算金額は(2)で説明したように900,000円である。このため、算出部102aは、契約番号PJJUC00001についての進捗率を、90,000円÷900,000円×100=10%と算出する。 Specifically, for contract number PJJUC00001, the cumulative cost amount (cost amount) is 90,000 yen, as explained in (3), and the budget amount is 900,000 yen, as explained in (2). Therefore, the calculation unit 102a calculates the progress rate for contract number PJJUC00001 as 90,000 yen÷900,000 yen×100=10%.

また、契約番号PJJUC00002については、原価累計金額(原価金額)は(3)で説明したように360,000円であり、予算金額は(2)で説明したように1,800,000円である。このため、算出部102aは、契約番号PJJUC00002についての進捗率を、360,000円÷1,800,000円×100=20%と算出する。 Furthermore, for contract number PJJUC00002, the cumulative cost amount (cost amount) is 360,000 yen as explained in (3), and the budget amount is 1,800,000 yen as explained in (2). Therefore, the calculation unit 102a calculates the progress rate for contract number PJJUC00002 as 360,000 yen÷1,800,000 yen×100=20%.

そして、図7に示すように、本項目で説明した算出結果を含む進捗率データ106fが登録される。 Then, as shown in FIG. 7, progress rate data 106f including the calculation results described in this item is registered.

(5)進行基準売上計算処理
次に、算出部102aは、「契約データ106a中の契約金額×進捗率-前月以前進行基準売上累計金額」という計算式により、契約別の1カ月目(2020/04)の進行基準売上金額を算出する。
(5) Completion-based sales calculation process Next, the calculation unit 102a calculates the first month of each contract (2020/ 04) Calculate the percentage-based sales amount.

具体的には、契約番号PJJUC00001については、契約金額は(1)で説明したように1,000,000円であり、進捗率は(4)で説明したように10%であり、前月以前進行基準売上累計金額は0円である。このため、算出部102aは、契約番号PJJUC00001についての1カ月目(2020/04)の進行基準売上金額を、1,000,000円×10%-0円=100,000円と算出する。これにより、契約番号PJJUC00001についての進行基準売上累計金額0円が、「前月以前進行基準売上累計金額0円+1カ月目(2020/04)の進行基準売上金額100,000円」という計算式により、100,000円に更新される。 Specifically, for contract number PJJUC00001, the contract amount is 1,000,000 yen as explained in (1), the progress rate is 10% as explained in (4), and the cumulative percentage-of-completion sales amount for the previous month is 0 yen. Therefore, the calculation unit 102a calculates the percentage-of-completion sales amount for the first month (2020/04) for contract number PJJUC00001 as 1,000,000 yen x 10% - 0 yen = 100,000 yen. As a result, the cumulative percentage-based sales amount of 0 yen for contract number PJJUC00001 will be reduced to 100,000 yen using the formula: "Cumulative percentage-based sales amount from the previous month 0 yen + 1st month (2020/04) percentage-based sales amount 100,000 yen" will be updated.

また、契約番号PJJUC00002については、契約金額は(1)で説明したように2,000,000円であり、進捗率は(4)で説明したように20%であり、前月以前進行基準売上累計金額は0円である。このため、算出部102aは、契約番号PJJUC00002についての1カ月目(2020/04)の進行基準売上金額を、2,000,000円×20%-0円=400,000円と算出する。これにより、契約番号PJJUC00002についての進行基準売上累計金額0円が、「前月以前進行基準売上累計金額0円+1カ月目(2020/04)の進行基準売上金額400,000円」という計算式により、400,000円に更新される。 Furthermore, regarding contract number PJJUC00002, the contract amount is 2,000,000 yen as explained in (1), the progress rate is 20% as explained in (4), and the cumulative percentage-of-completion sales amount for the previous month is 0 yen. It is. Therefore, the calculation unit 102a calculates the percentage-of-completion sales amount for the first month (2020/04) for contract number PJJUC00002 as 2,000,000 yen x 20% - 0 yen = 400,000 yen. As a result, the cumulative percentage-based sales amount of 0 yen for contract number PJJUC00002 will be reduced to 400,000 yen using the formula: "Cumulative percentage-based sales amount from the previous month 0 yen + 1st month (2020/04) percentage-based sales amount 400,000 yen" will be updated.

そして、図7に示すように、本項目で説明した算出結果を含む進行基準売上データ106gが登録される。なお、図7の進行基準売上データ106gにおいて示す「進行基準売上金額」とは、本項目で算出した1カ月目(2020/04)の進行基準売上金額を意味している。 Then, as shown in FIG. 7, percentage-of-completion sales data 106g including the calculation results described in this section is registered. Note that the "completion-based sales amount" shown in the percentage-of-completion sales data 106g in FIG. 7 means the percentage-of-completion sales amount for the first month (2020/04) calculated in this item.

(6)損失引当金判断処理
最後に、算出部102aは、1カ月目についての損失引当金判断をするために、「(契約データ106a中の契約金額-予算データ106b中の予算金額)+(進行基準売上データ106g中の進行基準売上累計金額+原価集計データ106e中の原価累計金額)」という計算式による計算を行う。
(6) Loss reserve determination process Finally, in order to determine the loss reserve for the first month, the calculation unit 102a calculates the following: (contract amount in contract data 106a - budget amount in budget data 106b) + ( Calculation is performed using the following formula: ``Accumulated amount of percentage-based sales in the percentage-of-completion sales data 106g+cumulative amount of costs in the total cost data 106e.''

具体的には、契約番号PJJUC00001については、契約金額は(1)で説明したように1,000,000円であり、予算金額は(2)で説明したように900,000円であり、進行基準売上累計金額は(5)で説明したように100,000円であり、原価累計金額は(3)で説明したように90,000円である。このため、算出部102aは、契約番号PJJUC00001について、1カ月目(2020/04)の時点では、「(1,000,000円-900,000円)+(100,000円-90,000円)」=110,000円を算出する。当該算出結果が負の値でない場合、前記工事損失引当金は発生しないこととなる。つまり、1カ月目(2020/04)の時点では、契約番号PJJUC00001については、前記工事損失引当金は発生しない。 Specifically, for contract number PJJUC00001, the contract amount is 1,000,000 yen as explained in (1), the budget amount is 900,000 yen as explained in (2), and the cumulative percentage-of-completion sales amount is ( As explained in 5), it is 100,000 yen, and the cumulative cost amount is 90,000 yen, as explained in (3). Therefore, for the contract number PJJUC00001, the calculation unit 102a calculates "(1,000,000 yen - 900,000 yen) + (100,000 yen - 90,000 yen)" = 110,000 yen as of the first month (2020/04). If the calculation result is not a negative value, the above-mentioned allowance for construction losses will not be generated. In other words, as of the first month (2020/04), the above-mentioned provision for construction losses will not be generated for contract number PJJUC00001.

また、契約番号PJJUC00002については、契約金額は(1)で説明したように2,000,000円であり、予算金額は(2)で説明したように1,800,000円であり、進行基準売上累計金額は(5)で説明したように400,000円であり、原価累計金額は(3)で説明したように360,000円である。このため、算出部102aは、契約番号PJJUC00002について、1カ月目(2020/04)の時点では、「(2,000,000円-1,800,000円)+(400,000円-360,000円)」=240,000円を算出する。当該算出結果が負の値でない場合、前記工事損失引当金は発生しないこととなる。つまり、1カ月目(2020/04)の時点では、契約番号PJJUC00002についても、前記工事損失引当金は発生しない。 Regarding contract number PJJUC00002, the contract amount is 2,000,000 yen as explained in (1), the budget amount is 1,800,000 yen as explained in (2), and the cumulative percentage-of-completion sales amount is (5). As explained, it is 400,000 yen, and the cumulative cost amount is 360,000 yen, as explained in (3). Therefore, for contract number PJJUC00002, the calculation unit 102a calculates "(2,000,000 yen - 1,800,000 yen) + (400,000 yen - 360,000 yen)" = 240,000 yen as of the first month (2020/04). If the calculation result is not a negative value, the above-mentioned allowance for construction losses will not be generated. In other words, as of the first month (2020/04), the aforementioned provision for construction losses will not be generated for contract number PJJUC00002.

[4-2.2カ月目における、前記工事損失引当金が発生するか否かの判断]
本項目では、2カ月目(2020/05)における、前記工事損失引当金が発生するか否かの判断の処理について、図8~図11を用いて説明する。
[4-2. Determination of whether or not the above-mentioned provision for construction losses will be generated in the second month]
In this item, the process of determining whether or not the construction loss reserve will be generated in the second month (2020/05) will be explained using FIGS. 8 to 11.

(1)契約入力
契約入力は、1カ月目に既に行われているため、2カ月目には行われない。
(1) Contract entry Contract entry has already been done in the first month, so it will not be done in the second month.

(2)予算入力
まず、図8に示すように、予算データ106bの内容が変更される。本例では、図8に示すように、契約番号PJJUC00001についての予算金額が、900,000円から1,100,000円に変更され、一方で、契約番号PJJUC00002についての予算金額は、1,800,000円から変更されない。
(2) Budget input First, as shown in FIG. 8, the contents of the budget data 106b are changed. In this example, as shown in FIG. 8, the budget amount for contract number PJJUC00001 is changed from 900,000 yen to 1,100,000 yen, while the budget amount for contract number PJJUC00002 is unchanged from 1,800,000 yen.

また、併せて、図8に示すように、1カ月目および2カ月目の予算データ106bの内容を含む予算履歴データ106cが生成される。予算データ106bは修正を行うと上書きされるため、過去月の予算の参照は、予算履歴データ106cから行うことができる。 Additionally, as shown in FIG. 8, budget history data 106c including the contents of the budget data 106b for the first month and the second month is generated. Since the budget data 106b is overwritten if it is modified, past months' budgets can be referenced from the budget history data 106c.

(3)原価入力
次に、図9に示すように、2020/05に発生した原価金額が入力されることにより、原価データ106dが登録される。本例では、図9に示すように、契約番号PJJUC00001についての原価金額として240,000円が登録され、契約番号PJJUC00002についての原価金額として360,000円が登録されている。
(3) Cost input Next, as shown in FIG. 9, the cost data 106d is registered by inputting the cost amount generated in 2020/05. In this example, as shown in FIG. 9, 240,000 yen is registered as the cost amount for contract number PJJUC00001, and 360,000 yen is registered as the cost amount for contract number PJJUC00002.

また、併せて、図9に示すように、原価集計データ106eが生成される。原価集計データ106eは、処理時点までの前記入力された原価金額を集計したデータである。契約番号PJJUC00001については、[4-1]の(3)で説明した2020/04の原価金額90,000円および前段落で説明した2020/05の原価金額240,000円の累計金額である330,000円が原価累計金額となる。契約番号PJJUC00002については、[4-1]の(3)で説明した2020/04の原価金額360,000円および前段落で説明した2020/05の原価金額360,000円の累計金額である720,000円が原価累計金額となる。 Additionally, as shown in FIG. 9, cost summary data 106e is generated. The cost total data 106e is data that totals the inputted cost amounts up to the time of processing. For contract number PJJUC00001, the cumulative cost is 330,000 yen, which is the cumulative amount of the 2020/04 cost amount of 90,000 yen explained in (3) of [4-1] and the 2020/05 cost amount of 240,000 yen explained in the previous paragraph. amount. For contract number PJJUC00002, the cumulative cost is 720,000 yen, which is the cumulative amount of the 2020/04 cost amount of 360,000 yen explained in (3) of [4-1] and the 2020/05 cost amount of 360,000 yen explained in the previous paragraph. amount.

(4)進捗率計算処理
次に、算出部102aは、「原価集計データ106e中の原価累計金額÷予算データ106b中の予算金額×100」という計算式により、契約別の進捗率を算出する。
(4) Progress Rate Calculation Process Next, the calculation unit 102a calculates the progress rate for each contract using the following formula: "Cumulative cost amount in the cost total data 106e÷Budget amount in the budget data 106b×100."

具体的には、契約番号PJJUC00001については、原価累計金額(原価金額)は(3)で説明したように330,000円であり、予算金額は(2)で説明したように変更後の1,100,000円である。このため、算出部102aは、契約番号PJJUC00001についての進捗率を、330,000円÷1,100,000円×100=30%と算出する。 Specifically, for contract number PJJUC00001, the cumulative cost amount (cost amount) is 330,000 yen as explained in (3), and the budget amount is 1,100,000 yen after the change as explained in (2). . Therefore, the calculation unit 102a calculates the progress rate for contract number PJJUC00001 as 330,000 yen/1,100,000 yen×100=30%.

また、契約番号PJJUC00002については、原価累計金額(原価金額)は(3)で説明したように720,000円であり、予算金額は(2)で説明したように変更されていないので1,800,000円である。このため、算出部102aは、契約番号PJJUC00002についての進捗率を、720,000円÷1,800,000円×100=40%と算出する。 Regarding contract number PJJUC00002, the cumulative cost amount (cost amount) is 720,000 yen as explained in (3), and the budget amount is 1,800,000 yen because it has not been changed as explained in (2). Therefore, the calculation unit 102a calculates the progress rate for contract number PJJUC00002 as 720,000 yen÷1,800,000 yen×100=40%.

そして、図10に示すように、本項目で説明した算出結果を含む進捗率データ106fが登録される。 Then, as shown in FIG. 10, progress rate data 106f including the calculation results described in this item is registered.

(5)進行基準売上計算処理
次に、算出部102aは、「契約データ106a中の契約金額×進捗率-前月以前進行基準売上累計金額」という計算式により、契約別の2カ月目(2020/05)の進行基準売上金額を算出する。
(5) Completion-based sales calculation process Next, the calculation unit 102a calculates the second month (2020/ 05) Calculate the percentage-of-completion sales amount.

具体的には、契約番号PJJUC00001については、契約金額は(1)で説明したように変更されていないので1,000,000円であり、進捗率は(4)で説明したように30%であり、前月以前進行基準売上累計金額は[4-1]の(5)で説明したように100,000円である。このため、算出部102aは、契約番号PJJUC00001についての2カ月目(2020/05)の進行基準売上金額を、1,000,000円×30%-100,000円=200,000円と算出する。これにより、契約番号PJJUC00001についての進行基準売上累計金額100,000円が、「前月以前進行基準売上累計金額100,000円+2カ月目(2020/05)の進行基準売上金額200,000円」という計算式により、300,000円に更新される。 Specifically, for contract number PJJUC00001, the contract amount has not been changed as explained in (1), so it is 1,000,000 yen, and the progress rate is 30% as explained in (4), and the amount is 1,000,000 yen as explained in (4). The cumulative sales amount on a percentage-of-completion basis is 100,000 yen, as explained in (5) of [4-1]. Therefore, the calculation unit 102a calculates the percentage-of-completion sales amount for the second month (2020/05) for contract number PJJUC00001 as 1,000,000 yen x 30% - 100,000 yen = 200,000 yen. As a result, the cumulative percentage-based sales amount of 100,000 yen for contract number PJJUC00001 will be reduced to 300,000 yen using the formula: "Cumulative percentage-based sales amount from the previous month 100,000 yen + 2nd month (2020/05) percentage-based sales amount 200,000 yen" will be updated.

また、契約番号PJJUC00002については、契約金額は(1)で説明したように変更されていないので2,000,000円であり、進捗率は(4)で説明したように40%であり、前月以前進行基準売上累計金額は[4-1]の(5)で説明したように400,000円である。このため、算出部102aは、契約番号PJJUC00002についての2カ月目(2020/05)の進行基準売上金額を、2,000,000円×40%-400,000円=400,000円と算出する。これにより、契約番号PJJUC00002についての進行基準売上累計金額400,000円が、「前月以前進行基準売上累計金額400,000円+2カ月目(2020/05)の進行基準売上金額400,000円」という計算式により、800,000円に更新される。 In addition, regarding contract number PJJUC00002, the contract amount is 2,000,000 yen because it has not been changed as explained in (1), the progress rate is 40% as explained in (4), and the percentage of progress sales from the previous month is 2,000,000 yen. The cumulative amount is 400,000 yen as explained in (5) of [4-1]. Therefore, the calculation unit 102a calculates the percentage-of-completion sales amount for the second month (2020/05) for contract number PJJUC00002 as 2,000,000 yen x 40% - 400,000 yen = 400,000 yen. As a result, the cumulative percentage-based sales amount of 400,000 yen for contract number PJJUC00002 will be reduced to 800,000 yen using the formula: "Cumulative percentage-based sales amount from the previous month 400,000 yen + 2nd month (2020/05) percentage-based sales amount 400,000 yen" will be updated.

そして、図10に示すように、本項目で説明した算出結果を含む進行基準売上データ106gが登録される。なお、図10の進行基準売上データ106gにおいて示す「進行基準売上金額」とは、本項目で算出した2カ月目(2020/05)の進行基準売上金額を意味している。 Then, as shown in FIG. 10, percentage-of-completion sales data 106g including the calculation results described in this section is registered. Note that the "completion-based sales amount" shown in the percentage-of-completion sales data 106g in FIG. 10 means the percentage-of-completion sales amount for the second month (2020/05) calculated in this item.

(6)損失引当金判断処理
最後に、算出部102aは、2カ月目についての損失引当金判断をするために、「(契約データ106a中の契約金額-予算データ106b中の予算金額)+(進行基準売上データ106g中の進行基準売上累計金額+原価集計データ106e中の原価累計金額)」という計算式による計算を行う。
(6) Loss reserve determination process Finally, in order to determine the loss reserve for the second month, the calculation unit 102a calculates the following: (contract amount in contract data 106a - budget amount in budget data 106b) + ( Calculation is performed using the following formula: ``Accumulated amount of percentage-based sales in the percentage-of-completion sales data 106g+cumulative amount of costs in the total cost data 106e.''

具体的には、契約番号PJJUC00001については、契約金額は(1)で説明したように1,000,000円であり、予算金額は(2)で説明したように変更後の1,100,000円であり、進行基準売上累計金額は(5)で説明したように300,000円であり、原価累計金額は(3)で説明したように330,000円である。このため、算出部102aは、契約番号PJJUC00001について、2カ月目(2020/04)の時点では、「(1,000,000円-1,100,000円)+(300,000円-330,000円)」=-130,000円を算出する。当該算出結果が負の値である場合、前記工事損失引当金が発生することとなる。つまり、2カ月目(2020/05)の時点では、契約番号PJJUC00001については、前記工事損失引当金は130,000円発生する。 Specifically, for contract number PJJUC00001, the contract amount is 1,000,000 yen as explained in (1), the budget amount is 1,100,000 yen after the change as explained in (2), and the cumulative percentage-of-completion sales The amount is 300,000 yen as explained in (5), and the cumulative cost amount is 330,000 yen as explained in (3). Therefore, for contract number PJJUC00001, the calculation unit 102a calculates "(1,000,000 yen - 1,100,000 yen) + (300,000 yen - 330,000 yen)" = -130,000 yen as of the second month (2020/04). If the calculation result is a negative value, the above-mentioned allowance for construction losses will be generated. In other words, as of the second month (2020/05), for contract number PJJUC00001, the construction loss reserve will be 130,000 yen.

通知部102bは、前記工事損失引当金が発生した契約番号PJJUC00001の契約をオペレータに通知する。これにより、オペレータは、前記工事損失引当金を計上すべき契約を効率的かつ正確に把握することができる。 The notification unit 102b notifies the operator of the contract with contract number PJJUC00001 in which the construction loss allowance has occurred. Thereby, the operator can efficiently and accurately grasp the contracts for which the construction loss allowance should be recorded.

また、契約番号PJJUC00002については、契約金額は(1)で説明したように2,000,000円であり、予算金額は(2)で説明したように変更されていないので1,800,000円であり、進行基準売上累計金額は(5)で説明したように800,000円であり、原価累計金額は(3)で説明したように720,000円である。このため、算出部102aは、契約番号PJJUC00002について、2カ月目(2020/05)の時点では、「(2,000,000円-1,800,000円)+(800,000円-720,000円)」=280,000円を算出する。当該算出結果が負の値でない場合、前記工事損失引当金は発生しないこととなる。つまり、2カ月目(2020/05)の時点では、契約番号PJJUC00002については、前記工事損失引当金は発生しない。 Also, regarding contract number PJJUC00002, the contract amount is 2,000,000 yen as explained in (1), the budget amount is 1,800,000 yen because it has not been changed as explained in (2), and the cumulative percentage-of-completion sales amount is 2,000,000 yen. As explained in (5), it is 800,000 yen, and the cumulative cost amount is 720,000 yen, as explained in (3). Therefore, for contract number PJJUC00002, the calculation unit 102a calculates "(2,000,000 yen - 1,800,000 yen) + (800,000 yen - 720,000 yen)" = 280,000 yen as of the second month (2020/05). If the calculation result is not a negative value, the above-mentioned allowance for construction losses will not be generated. In other words, as of the second month (2020/05), the above-mentioned provision for construction losses will not be generated for contract number PJJUC00002.

(7)損失引当金データ生成処理
最後に、図11に示すように、(6)で前記工事損失引当金が発生する契約番号PJJUC00001についての損失引当金データ106hが生成される。図11の損失引当金データ106hにおいて、1行目のレコード(損失引当金額130,000円を有するレコード)は、当月(2020/04)の前記工事損失引当金計上用のデータであり、2行目のレコード(損失引当金額-130,000円を有するレコード)は、翌月(2020/05)の前記工事損失引当金振り戻し用のデータである。当該生成された損失引当金データ106hは、以下の[4-3]で説明する仕訳の生成に用いられる。
(7) Loss allowance data generation process Finally, as shown in FIG. 11, loss allowance data 106h for the contract number PJJUC00001 in which the construction loss allowance occurs is generated in (6). In the loss reserve data 106h in Figure 11, the record in the first line (record with a loss reserve amount of 130,000 yen) is the data for recording the construction loss reserve for the current month (2020/04), and the second line is The record (record with loss allowance amount - 130,000 yen) is data for reversing the construction loss allowance for the next month (2020/05). The generated loss allowance data 106h is used to generate journal entries described in [4-3] below.

[4-3.仕訳の生成]
本項目では、[4-2]の(6)前記工事損失引当金が発生する契約番号PJJUC00001についての仕訳の生成について説明する。仕訳生成部102cは、[4-2]の(7)で生成した損失引当金データ106hおよび図13に示す科目設定マスタ106iに基づいて、仕訳を生成する。
[4-3. Generation of journal]
This item explains the generation of journal entry for contract number PJJUC00001 in which the construction loss reserve is generated in [4-2] (6). The journal generation unit 102c generates a journal based on the loss allowance data 106h generated in (7) of [4-2] and the item setting master 106i shown in FIG. 13.

具体的には、仕訳生成部102cは、契約番号PJJUC00001についての工事損失引当金発生月(2020/05)の仕訳として、図12に示す計上用仕訳を生成する。また、仕訳生成部102cは、契約番号PJJUC00001についての工事損失引当金発生翌月(2020/06)の仕訳として、図14に示す振戻用仕訳を生成する。なお、振戻用仕訳の勘定科目は、発生月の計上用仕訳同様の設定である。 Specifically, the journal generation unit 102c generates the accounting journal shown in FIG. 12 as the journal for the month in which the construction loss allowance occurred (2020/05) for contract number PJJUC00001. In addition, the journal generation unit 102c generates a reversal journal shown in FIG. 14 as a journal for the month following the occurrence of the construction loss allowance for contract number PJJUC00001 (2020/06). Note that the account entries for the reversal journal are set in the same way as the accounting journal for the month of occurrence.

このように、前記工事損失引当金が発生した月の月末の仕訳連携処理のタイミングで、当月で前記工事損失引当金を計上し、翌月で振り戻し仕訳を計上する。これにより、発生した前記工事損失引当金を累積して積み上げるのではなく、毎月同じロジックで計算し計上を行うことが可能となる。 In this way, at the timing of the journal linkage processing at the end of the month in which the provision for construction loss occurred, the provision for construction loss is recorded in the current month, and the reversal journal entry is recorded in the following month. As a result, instead of accumulating the allowance for construction losses that have occurred, it becomes possible to calculate and record the same logic every month.

[5.本実施形態のまとめ]
本実施形態に係る損失引当金算出装置100によれば、[4-1]および[4-2]で説明したように、契約毎の前記損失引当金を自動で算出することができる。
[5. Summary of this embodiment]
According to the loss allowance calculation device 100 according to the present embodiment, as explained in [4-1] and [4-2], the loss allowance for each contract can be automatically calculated.

また、本実施形態に係る損失引当金算出装置100によれば、[4-2]の(6)で説明したように、通知部102bを備えることにより、前記損失引当金が発生した契約を把握することができる。 Further, according to the loss allowance calculation device 100 according to the present embodiment, as explained in (6) of [4-2], by providing the notification unit 102b, the contract in which the loss allowance has occurred can be grasped. can do.

そして、本実施形態に係る損失引当金算出装置100によれば、[4-3]で説明したように、前記工事損失引当金が発生した契約についての仕訳を自動で生成することができる。 According to the loss allowance calculation device 100 according to the present embodiment, as explained in [4-3], it is possible to automatically generate a journal entry for the contract in which the construction loss allowance has occurred.

[6.国連が主導する持続可能な開発目標(SDGs)への貢献]
本実施形態により、業務効率化や企業の適切な経営判断を推進することに寄与することができるので、SDGsの目標8及び9に貢献することが可能となる。
[6. Contribution to the Sustainable Development Goals (SDGs) led by the United Nations]
This embodiment can contribute to improving business efficiency and promoting appropriate business decisions of companies, and thus can contribute to Goals 8 and 9 of the SDGs.

また、本実施形態により、廃棄ロス削減や、ペーパレス・電子化を推進することに寄与することができるので、SDGsの目標12、13及び15に貢献することが可能となる。 Furthermore, this embodiment can contribute to reducing waste loss and promoting paperless and electronic systems, making it possible to contribute to Goals 12, 13, and 15 of the SDGs.

また、本実施形態により、統制、ガバナンス強化に寄与することができるので、SDGsの目標16に貢献することが可能となる。 Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[7.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[7. Other embodiments]
In addition to the embodiments described above, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all of the processes described as being performed manually can be performed manually. Alternatively, some of the steps can be performed automatically using known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, information including processing procedures, control procedures, specific names, parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings are included. It can be changed arbitrarily.

また、損失引当金算出装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Further, regarding the loss allowance calculation device 100, each illustrated component is functionally conceptual, and does not necessarily need to be physically configured as illustrated.

例えば、損失引当金算出装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて損失引当金算出装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions provided by the loss allowance calculation device 100, especially each processing function performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU. Alternatively, it may be realized as hardware using wired logic. Note that the program is recorded on a non-temporary computer-readable recording medium that includes programmed instructions for causing an information processing device to execute the processing described in this embodiment. It is mechanically read by the calculation device 100. That is, a storage unit such as a ROM or an HDD (Hard Disk Drive) stores a computer program that cooperates with an OS to give instructions to a CPU and perform various processes. This computer program is executed by being loaded into the RAM, and constitutes a control unit in cooperation with the CPU.

また、このコンピュータプログラムは、損失引当金算出装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 Further, this computer program may be stored in an application program server connected to the loss allowance calculation device 100 via any network, and all or part of it may be downloaded as necessary. It is possible.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, a program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EE. PROM (registration Trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk) ), DVD (Digital Versatile Disk), Blu-ray (registered trademark) Disc, etc. shall include any “portable physical medium”.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Further, a "program" is a data processing method written in any language or writing method, and does not matter in the form of source code or binary code. Note that a "program" is not necessarily limited to a unitary structure, but may be distributed as multiple modules or libraries, or may work together with separate programs such as an OS to achieve its functions. Including things. Note that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the embodiments, and the installation procedure after reading.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 The various databases stored in the storage unit are storage devices such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and are used for various processing and website provision. Stores programs, tables, databases, web page files, etc.

また、損失引当金算出装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、損失引当金算出装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the loss allowance calculation device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. Further, the loss allowance calculation device 100 may be realized by installing software (including a program, data, etc.) that makes the device realize the processing described in this embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of dispersion and integration of devices is not limited to what is shown in the diagram, and all or part of them can be functionally or physically divided into arbitrary units according to various additions or functional loads. It can be configured in a distributed/integrated manner. That is, the embodiments described above may be implemented in any combination, or the embodiments may be implemented selectively.

本発明は、例えば、建設工事業界およびIT業界等において有用である。 The present invention is useful, for example, in the construction industry, the IT industry, and the like.

100 損失引当金算出装置
102 制御部
102a 算出部
102b 通知部
102c 仕訳生成部
104 通信インターフェース部
106 記憶部
106a 契約データ
106b 予算データ
106c 予算履歴データ
106d 原価データ
106e 原価集計データ
106f 進捗率データ
106g 進行基準売上データ
106h 損失引当金データ
106i 科目設定マスタ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Loss allowance calculation device 102 Control unit
102a Calculation section
102b Notification section
102c Journal generation unit 104 Communication interface unit 106 Storage unit
106a Contract data
106b Budget data
106c Budget history data
106d Cost data
106e Cost summary data
106f Progress rate data
106g percentage-of-completion sales data
106h Loss allowance data
106i Subject setting master 108 Input/output interface section 112 Input device 114 Output device 200 Server 300 Network

Claims (7)

制御部および記憶部を備え、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出装置であって、
前記記憶部には、
契約識別データと前記案件の契約金額とを含む契約データと、
前記契約識別データと前記案件の予算金額とを含む予算データと、
前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、
前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、
が格納されており、
前記制御部は、
前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値との和を算出し、
当該和が負の値でない場合は、その契約識別データの契約は損失引当金が発生しない契約であるとし、
当該和が負の値である場合は、その契約識別データの契約は損失引当金が発生する契約であるとし、当該和の絶対値を損失引当金として算出する算出手段
を備えること、
を特徴とする損失引当金算出装置。
A loss allowance calculation device, comprising a control unit and a storage unit, and calculating a loss allowance, which is a reserve for losses expected to occur in the future for a certain case,
In the storage unit,
contract data including contract identification data and a contract amount for the project;
budget data including the contract identification data and the budget amount of the project;
percentage-of-completion sales data that includes the contract identification data and a cumulative percentage-of-completion sales amount that is a cumulative amount of sales based on the percentage-of-completion method for the project;
cost summary data including the contract identification data and a cumulative cost amount that is a cumulative amount of costs incurred for the project;
is stored,
The control unit includes:
For each contract identification data, a value obtained by subtracting the budget amount in the budget data from the contract amount in the contract data, and a value obtained by subtracting the budget amount in the budget data from the cumulative sales amount in the percentage-of-completion sales data in the cost summary data. Calculate the sum with the value obtained by subtracting the cumulative cost amount,
If the sum is not a negative value, it is assumed that the contract with the contract identification data is a contract that does not generate loss reserves,
If the sum is a negative value, the contract with the contract identification data is considered to be a contract that generates a loss allowance, and a calculation means is provided to calculate the absolute value of the sum as a loss allowance;
A loss reserve calculation device featuring:
前記制御部は、
前記算出手段によって損失引当金が発生する契約であるとされた契約を、オペレータに通知する通知手段
を更に備えること、
を特徴とする請求項1に記載の損失引当金算出装置。
The control unit includes:
further comprising a notification means for notifying an operator of a contract determined by the calculation means to be a contract in which a loss allowance is generated;
2. The loss allowance calculation device according to claim 1.
前記算出手段は、
前記原価集計データ中の前記原価累計金額を前記予算データ中の前記予算金額で除することにより前記案件の進捗率を算出し、更に、前記契約データ中の前記契約金額に当該算出した進捗率を乗じることにより前記進行基準売上累計金額を算出すること、
を特徴とする請求項1または2に記載の損失引当金算出装置。
The calculation means is
Calculate the progress rate of the project by dividing the cumulative cost amount in the cost summary data by the budget amount in the budget data, and further add the calculated progress rate to the contract amount in the contract data. Calculating the cumulative sales amount based on percentage of progress by multiplying the amount;
The loss allowance calculation device according to claim 1 or 2, characterized in that:
前記制御部は、
前記損失引当金が発生する場合、前記算出手段で算出した前記損失引当金を含む仕訳を生成する仕訳生成手段を更に備え、
当該仕訳は、前記損失引当金の発生月に生成される前記損失引当金の計上用の仕訳である計上用仕訳および前記発生月の翌月に生成される前記損失引当金の振り戻し用の仕訳である振戻用仕訳であること、
を特徴とする請求項1から3のいずれか一つに記載の損失引当金算出装置。
The control unit includes:
Further comprising a journal entry generation means for generating a journal entry including the loss allowance calculated by the calculation means when the loss allowance is generated;
The relevant journal entries are an accounting journal, which is a journal entry for recording the loss allowance, generated in the month in which the loss allowance occurs, and a journal entry for reversal of the loss allowance, which is generated in the month following the month in which the loss allowance occurs. It is a certain reversal journal entry,
The loss allowance calculation device according to any one of claims 1 to 3, characterized in that:
前記案件が、工事案件であり、
前記損失引当金が、工事損失引当金であること、
を特徴とする請求項1から4のいずれか一つに記載の損失引当金算出装置。
The said project is a construction project,
The loss allowance is a construction loss allowance;
The loss allowance calculation device according to any one of claims 1 to 4.
制御部および記憶部を備える情報処理装置で実行される、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出方法であって、
前記記憶部には、
契約識別データと前記案件の契約金額とを含む契約データと、
前記契約識別データと前記案件の予算金額とを含む予算データと、
前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、
前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、
が格納されており、
前記制御部で実行される、
前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値との和を算出し、
当該和が負の値でない場合は、その契約識別データの契約は損失引当金が発生しない契約であるとし、
当該和が負の値である場合は、その契約識別データの契約は損失引当金が発生する契約であるとし、当該和の絶対値を損失引当金として算出する算出ステップ
を含むこと、
を特徴とする損失引当金算出方法。
A loss reserve calculation method for calculating a loss reserve, which is a reserve for losses expected to occur in the future for a certain case, executed by an information processing device including a control unit and a storage unit, the method comprising:
In the storage unit,
contract data including contract identification data and a contract amount for the project;
budget data including the contract identification data and the budget amount of the project;
percentage-of-completion sales data that includes the contract identification data and a cumulative percentage-of-completion sales amount that is a cumulative amount of sales based on the percentage-of-completion method for the project;
cost summary data including the contract identification data and a cumulative cost amount that is a cumulative amount of costs incurred for the project;
is stored,
executed by the control unit,
For each contract identification data, a value obtained by subtracting the budget amount in the budget data from the contract amount in the contract data, and a value obtained by subtracting the budget amount in the budget data from the cumulative sales amount in the percentage-of-completion sales data in the cost summary data. Calculate the sum with the value obtained by subtracting the cumulative cost amount,
If the sum is not a negative value, it is assumed that the contract with the contract identification data is a contract that does not generate loss reserves,
If the sum is a negative value, the contract with the contract identification data is considered to be a contract that generates a loss allowance, and includes a calculation step of calculating the absolute value of the sum as a loss allowance;
A loss reserve calculation method characterized by:
制御部および記憶部を備える情報処理装置に実行させるための、ある案件について将来発生すると見込まれる損失についての引当金である損失引当金を算出する損失引当金算出プログラムであって、
前記記憶部には、
契約識別データと前記案件の契約金額とを含む契約データと、
前記契約識別データと前記案件の予算金額とを含む予算データと、
前記契約識別データと前記案件の進行基準による売上金額の累計金額である進行基準売上累計金額とを含む進行基準売上データと、
前記契約識別データと前記案件について発生した原価金額の累計金額である原価累計金額とを含む原価集計データと、
が格納されており、
前記制御部に実行させるための、
前記契約識別データ毎に、前記契約データ中の前記契約金額から前記予算データ中の前記予算金額を減じた値と、前記進行基準売上データ中の前記進行基準売上累計金額から前記原価集計データ中の前記原価累計金額を減じた値との和を算出し、
当該和が負の値でない場合は、その契約識別データの契約は損失引当金が発生しない契約であるとし、
当該和が負の値である場合は、その契約識別データの契約は損失引当金が発生する契約であるとし、当該和の絶対値を損失引当金として算出する算出ステップ
を含むこと、
を特徴とする損失引当金算出プログラム。
A loss reserve calculation program for calculating a loss reserve, which is a reserve for losses expected to occur in the future for a certain project, to be executed by an information processing device including a control unit and a storage unit, the program comprising:
In the storage unit,
contract data including contract identification data and a contract amount for the project;
budget data including the contract identification data and the budget amount of the project;
percentage-of-completion sales data that includes the contract identification data and a cumulative percentage-of-completion sales amount that is a cumulative amount of sales based on the percentage-of-completion method for the project;
cost summary data including the contract identification data and a cumulative cost amount that is a cumulative amount of costs incurred for the project;
is stored,
for the control unit to execute,
For each contract identification data, a value obtained by subtracting the budget amount in the budget data from the contract amount in the contract data, and a value obtained by subtracting the budget amount in the budget data from the cumulative sales amount in the percentage-of-completion sales data in the cost summary data. Calculate the sum with the value obtained by subtracting the cumulative cost amount,
If the sum is not a negative value, it is assumed that the contract with the contract identification data is a contract that does not generate loss reserves,
If the sum is a negative value, the contract with the contract identification data is considered to be a contract that generates a loss allowance, and includes a calculation step of calculating the absolute value of the sum as a loss allowance;
A loss allowance calculation program featuring:
JP2021013440A 2021-01-29 2021-01-29 Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program Active JP7397817B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021013440A JP7397817B2 (en) 2021-01-29 2021-01-29 Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021013440A JP7397817B2 (en) 2021-01-29 2021-01-29 Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program

Publications (2)

Publication Number Publication Date
JP2022116992A JP2022116992A (en) 2022-08-10
JP7397817B2 true JP7397817B2 (en) 2023-12-13

Family

ID=82749799

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021013440A Active JP7397817B2 (en) 2021-01-29 2021-01-29 Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program

Country Status (1)

Country Link
JP (1) JP7397817B2 (en)

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
会計全書 平成29年度,2017年07月10日,p.680-687,ISBN : 978-4-502-89002-4
工事契約会計,建設産業経理研究所,2008年06月30日,p.85-117,ISBN : 978-4-433-35978-2
業種別会計実務ガイドブック,初版第1刷,税務研究会出版局,2011年03月15日,p.945-952,ISBN : 978-4-7931-1887-6

Also Published As

Publication number Publication date
JP2022116992A (en) 2022-08-10

Similar Documents

Publication Publication Date Title
JP2022182779A (en) Information processing device, information processing method, and program
JP2017168087A (en) Expense journalizing automatic generation device, expense journalizing automatic generation method, and expense journalizing automatic generation program
JP7397817B2 (en) Loss allowance calculation device, loss allowance calculation method, and loss allowance calculation program
JP2023099782A (en) Information generation apparatus, information generation program, and information generation method
JP2018109869A (en) Amount calculation apparatus, amount calculation method and amount calculation program
JP7104520B2 (en) Withholding tax-related business support equipment, withholding tax-related business support methods, and withholding tax-related business support programs
JP7505998B2 (en) Budget data generation device, budget data generation method, and budget data generation program
JP7308338B1 (en) Business support device, business support method, and business support program
JP7462500B2 (en) Project management device, project management method, and project management program
JP7280931B2 (en) Information processing device, information processing method, and information processing program
JP2019016234A (en) Sales management device, sales management method, and sales management program
JP2022183878A (en) Budget prime cost unit price calculation device, budget prime cost unit price calculation method and budget prime cost unit price calculation program
JP7290963B2 (en) Money totaling device, money totaling method and money totaling program
JP7377229B2 (en) Cost allocation devices, cost allocation methods and cost allocation programs
JP7470000B2 (en) Profit and Loss Management Simulation Device, Profit and Loss Management Simulation Method, and Profit and Loss Management Simulation Program
JP7312137B2 (en) Manufacturing control device, manufacturing control method, and manufacturing control program
JP7300431B2 (en) Productivity Index Calculation Device, Productivity Index Calculation Method, and Productivity Index Calculation Program
JP7356389B2 (en) Inventory evaluation execution device, inventory evaluation execution method, and inventory evaluation execution program
JP7389722B2 (en) Overhead cost management device, overhead cost management method, and indirect cost management program
JP7384706B2 (en) Excess amount reflection device, excess amount reflection method, and excess amount reflection program
JP2022039638A (en) Business support device, business support program, and business support method
JP2022155473A (en) Dwelling Unit Sales Management Device, Dwelling Unit Sales Management Method, and Dwelling Unit Sales Management Program
JP6947507B2 (en) Profit management equipment, profit management methods, and profit management programs
JP2023061277A (en) Discount management device, discount management method, and discount management program
JP2023142003A (en) Cost transfer device, cost transfer method, and cost transfer program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230518

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20230525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230801

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230921

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20231107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20231201

R150 Certificate of patent or registration of utility model

Ref document number: 7397817

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150