JP7306816B2 - Scaffold board connector and scaffold board connection structure - Google Patents

Scaffold board connector and scaffold board connection structure Download PDF

Info

Publication number
JP7306816B2
JP7306816B2 JP2018221010A JP2018221010A JP7306816B2 JP 7306816 B2 JP7306816 B2 JP 7306816B2 JP 2018221010 A JP2018221010 A JP 2018221010A JP 2018221010 A JP2018221010 A JP 2018221010A JP 7306816 B2 JP7306816 B2 JP 7306816B2
Authority
JP
Japan
Prior art keywords
scaffolding
board
boards
footboard
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018221010A
Other languages
Japanese (ja)
Other versions
JP2020084594A (en
Inventor
篤 岩下
隆正 福田
英明 足立
修一 金田
淳 秦野
敦 谷口
正勝 関山
正弘 徳永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Nikken Lease Kogyo Co Ltd
Nikken Build Co Ltd
Original Assignee
Taisei Corp
Nikken Lease Kogyo Co Ltd
Nikken Build Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Nikken Lease Kogyo Co Ltd, Nikken Build Co Ltd filed Critical Taisei Corp
Priority to JP2018221010A priority Critical patent/JP7306816B2/en
Publication of JP2020084594A publication Critical patent/JP2020084594A/en
Application granted granted Critical
Publication of JP7306816B2 publication Critical patent/JP7306816B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Description

本発明は、足場板用連結具および足場板の連結構造に関する。 TECHNICAL FIELD The present invention relates to a scaffolding board connector and a scaffolding board connection structure.

シールドトンネルの施工現場では、複数の足場板を連結することで、作業足場を形成している。シールドトンネルの施工現場において二枚の足場板を連結するときには、枕木やブラケットの上方に設置するため、足場板の上方から作業できることが必要となる。また、二枚の足場板を連結部において確実に固定する必要がある。さらに、測量や作業内容に応じて、連続した複数の足場板から中間の一枚のみを撤去できる必要がある。 At the shield tunnel construction site, a working scaffold is formed by connecting a plurality of scaffolding boards. When connecting two scaffolding boards at a construction site of a shield tunnel, it is necessary to be able to work from above the scaffolding boards because the scaffolding boards are installed above sleepers and brackets. In addition, it is necessary to securely fix the two scaffolding boards at the joint. Furthermore, it is necessary to be able to remove only one intermediate scaffolding board from a plurality of continuous scaffolding boards according to surveying and work contents.

そして、二枚の足場板の連結構造としては、角筒状の連結具に両足場板の端部を差し込み、連結具の網目に上方から差し込んだピンを足場板の穴部に差し込むことで、連結具を両足場板に固定しているものがある(例えば、特許文献1参照)。 Then, as a connection structure of two scaffolding boards, the ends of both scaffolding boards are inserted into a rectangular tube-shaped connector, and a pin inserted into the mesh of the connector from above is inserted into the hole of the scaffolding board. There is a method in which a coupler is fixed to both scaffolding boards (see Patent Document 1, for example).

特開2011-169012号公報JP 2011-169012 A

二枚の足場板を連結したときに、その連結部が平坦であることが好ましいが、前記した従来の連結構造では、連結部の全幅に亘って、足場板と連結具との間に段差が形成されるという問題がある。 When two scaffolding boards are connected, it is preferable that the connecting part is flat. There is a problem of formation.

本発明は、前記した問題を解決し、二枚の足場板を上方から容易かつ確実に連結できるとともに、連続した複数の足場板から中間の一枚のみを撤去することができ、さらに、二枚の足場板を略平坦に連結できる足場板用連結具および足場板の連結構造を提供することを課題とする。 The present invention solves the above-described problems, can easily and reliably connect two scaffolding boards from above, can remove only one intermediate scaffolding board from a plurality of continuous scaffolding boards, and furthermore, can remove two scaffolding boards. It is an object of the present invention to provide a connector for scaffolding boards and a scaffolding board connection structure capable of connecting two scaffolding boards in a substantially flat manner.

前記課題を解決するため、第一の発明は、二枚の足場板を連結するための足場板用連結具である。前記足場板用連結具は、前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられる接続部材と、前記両足場板の上面にそれぞれ配置される二つの取付具と、前記取付具の貫通穴に挿通される取付ねじと、を備えている。前記接続部材の上面には、前記取付ねじが螺合される二つのねじ穴が形成されている。一方の前記ねじ穴を一方の前記足場板の開口部の直下に配置したときに、他方の前記ねじ穴が他方の前記足場板の開口部の直下に配置されるように、前記両ねじ穴の間隔が設定されている。前記取付具を前記足場板の上面に配置したときに、前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれるように構成されている。前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、前記接続部材の側部には、上方に向けて延びている縦部が形成されている。前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置されている。前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されている。 In order to solve the above-mentioned problems, the first invention is a scaffolding board connector for connecting two scaffolding boards. The scaffolding board connector includes a connection member assembled to the lower surface side of the scaffolding boards in a slidable state in the connecting direction of the scaffolding boards, and two attachments respectively arranged on the upper surfaces of the scaffolding boards. and a mounting screw inserted through the through-hole of the mounting device. Two screw holes into which the mounting screws are screwed are formed in the upper surface of the connecting member. Both screw holes are arranged so that when one of the screw holes is arranged directly under the opening of one of the scaffolding boards, the other of the screw holes is arranged directly under the opening of the other scaffolding board. intervals are set. When the mounting fixture is placed on the upper surface of the scaffolding board, the protrusion formed on the upper surface of the scaffolding board is configured to be fitted into the fitting hole of the mounting fixture. The scaffolding board includes a flat plate-like footboard, a side board hanging vertically from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board. A longitudinal portion extending upward is formed on the side of the . A side portion of the connecting member is positioned between the footboard and the bottom board of the scaffold plank. The height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower plate of the scaffolding board.

前記課題を解決するため、第二の発明は、二枚の足場板を足場板用連結具を用いて連結する足場板の連結構造である。前記足場板用連結具は、前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられた接続部材と、前記両足場板の上面にそれぞれ配置された二つの取付具と、前記取付具の貫通穴に挿通された取付ねじと、を備えている。前記接続部材の上面には、二つのねじ穴が形成されている。一方の前記ねじ穴は、一方の前記足場板の開口部の直下に配置されるとともに、他方の前記ねじ穴は、他方の前記足場板の開口部の直下に配置されている。前記取付ねじは、前記足場板の前記開口部を通じて、前記接続部材の前記ねじ穴に螺合されている。前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれている。前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、前記接続部材の側部には、上方に向けて延びている縦部が形成されている。前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置されている。前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されている。 In order to solve the above-mentioned problems, the second invention is a scaffolding board connection structure for connecting two scaffolding boards using a scaffolding board connector. The scaffolding board connector includes a connecting member assembled to the lower surface side of the scaffolding boards in a slidable state in the connecting direction of the scaffolding boards, and two pieces respectively arranged on the upper surfaces of the scaffolding boards. A mounting fixture and a mounting screw inserted through a through hole of the mounting fixture are provided. Two screw holes are formed in the upper surface of the connecting member. One of the screw holes is located directly under the opening of one of the scaffolding boards, and the other of the screw holes is located directly under the opening of the other scaffolding board. The mounting screw is screwed into the threaded hole of the connecting member through the opening of the scaffolding board. A protrusion formed on the upper surface of the scaffolding board is fitted into the fitting hole of the fixture. The scaffolding board includes a flat plate-like footboard, a side board hanging vertically from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board. A longitudinal portion extending upward is formed on the side of the . A side portion of the connecting member is positioned between the footboard and the bottom board of the scaffold plank. The height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower plate of the scaffolding board.

前記課題を解決するため、第三の発明は、二枚の足場板を連結するための足場板用連結具である。前記足場板用連結具は、前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられる接続部材と、前記両足場板の上面に配置される取付具と、前記取付具の貫通穴に挿通される取付ねじと、を備えている。前記接続部材の上面には、ねじ穴が形成されており、前記取付ねじは、前記足場板の開口部を通じて、前記ねじ穴に螺合される。前記取付具を前記足場板の上面に配置したときに、前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれるように構成されている。前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、前記接続部材の側部には、上方に向けて延びている縦部が形成されている。前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置されている。前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されている。 In order to solve the above-mentioned problems, the third invention is a scaffolding board connector for connecting two scaffolding boards. The scaffolding board connector includes a connecting member assembled to the lower surface side of the scaffolding boards in a slidable state in the connecting direction of the scaffolding boards, and a mounting fixture arranged on the upper surface of the scaffolding boards; and a mounting screw that is inserted through the through hole of the mounting fixture. A threaded hole is formed in the upper surface of the connecting member, and the mounting screw is screwed into the threaded hole through the opening of the scaffolding board. When the mounting fixture is placed on the upper surface of the scaffolding board, the protrusion formed on the upper surface of the scaffolding board is configured to be fitted into the fitting hole of the mounting fixture. The scaffolding board includes a flat plate-like footboard, a side board hanging vertically from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board. A longitudinal portion extending upward is formed on the side of the . A side portion of the connecting member is positioned between the footboard and the bottom board of the scaffold plank. The height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower plate of the scaffolding board.

第一の発明、第二の発明および第三の発明では、接続部材を二枚の足場板の下面側に跨って配置し、取付具および取付ねじによって接続部材を両足場板に固定することで、両足場板を上方から容易かつ確実に連結できる。そして、接続部材が二枚の足場板に跨って配置されているため、足場板が連結部において上下方向に動くのを防ぐことができる。
また、第一の発明、第二の発明および第三の発明では、取付具および取付ねじを接続部材から取り外し、接続部材を片方の足場板側にスライドさせることで、両足場板を容易に分離できる。これにより、連続した複数の足場板から中間の一枚のみを撤去できる。
In the first, second, and third inventions, the connection member is arranged across the lower surfaces of the two scaffolding boards, and the connection member is fixed to both scaffolding boards by means of fixtures and mounting screws. , both scaffolding boards can be easily and reliably connected from above. Further, since the connection member is arranged across the two scaffolding boards, it is possible to prevent the scaffolding boards from moving in the vertical direction at the connecting portion.
In addition, in the first, second and third inventions, both scaffolding boards can be easily separated by removing the fixture and the mounting screw from the connecting member and sliding the connecting member toward one of the scaffolding boards. can. As a result, only one intermediate scaffolding board can be removed from a plurality of continuous scaffolding boards.

第一の発明、第二の発明および第三の発明では、足場板の上面に配置する取付具を小さくできるため、両足場板を略平坦に連結できる。これにより、作業者が作業足場を通行するときの安全性を高めることができる。 In the first, second, and third inventions, the fittings to be arranged on the upper surfaces of the scaffolding boards can be made smaller, so that both scaffolding boards can be connected substantially flat. As a result, it is possible to enhance the safety of workers when they pass through the working scaffold.

前記した足場板用連結具において、前記接続部材の上面に差込穴を形成し、前記ねじ穴を前記足場板の前記開口部の直下に配置したときに、前記差込穴が前記足場板の前記開口部の直下に配置されるように、前記ねじ穴と前記差込穴との位置関係を設定することが好ましい。 In the scaffolding board connector described above, an insertion hole is formed in the upper surface of the connecting member, and when the screw hole is arranged directly below the opening of the scaffolding board, the insertion hole is positioned in the scaffolding board. It is preferable to set the positional relationship between the screw hole and the insertion hole so that the screw hole and the insertion hole are arranged directly under the opening.

この構成では、棒状の工具の先端部を足場板の上方から開口部を通じて接続部材の差込穴に差し込み、工具によって接続部材を押し出すことで、接続部材を足場板に対して容易にスライドさせることができる。 In this configuration, the tip of the rod-shaped tool is inserted into the insertion hole of the connecting member through the opening from above the scaffolding board, and the connecting member is pushed out by the tool, so that the connecting member can be easily slid on the scaffolding board. can be done.

前記足場板が、前記開口部が形成された踏み板と、前記踏み板の両側縁部から垂れ下がった左右の側板と、を備え、前記接続部材を前記両側板の間に配置する場合がある。この場合には、前記接続部材の左右方向の幅を前記両側板の内面の間隔よりも小さくして、足場板の側板の内面と接続部材の側面との間に隙間を形成することが好ましい。 The scaffolding board may include a footboard with the opening formed thereon and left and right side boards hanging from both side edges of the footboard, and the connection member may be arranged between the side boards. In this case, it is preferable to form a gap between the inner surface of the side plate of the scaffold board and the side surface of the connecting member by making the lateral width of the connecting member smaller than the interval between the inner surfaces of the side plates.

この構成では、接続部材に対して足場板を横方向に傾けることができるため、二枚の足場板を屈曲させて連結できる。これにより、複数の足場板を湾曲させて連結できる。 With this configuration, the scaffolding boards can be laterally tilted with respect to the connecting member, so that the two scaffolding boards can be bent and connected. Thereby, a plurality of scaffolding boards can be curved and connected.

本発明では、二枚の足場板を上方から容易かつ確実に連結できるとともに、連続した複数の足場板から中間の一枚のみを撤去することができ、さらに、両足場板を略平坦に連結して、作業足場の安全性を高めることができる。 In the present invention, two scaffolding boards can be easily and reliably connected from above, only one intermediate scaffolding board can be removed from a plurality of continuous scaffolding boards, and both scaffolding boards can be connected substantially flat. can increase the safety of the working scaffold.

本発明の実施形態に係る連結構造を示した斜視図である。It is the perspective view which showed the connection structure which concerns on embodiment of this invention. 本発明の実施形態に係る連結構造を示した分解斜視図である。1 is an exploded perspective view showing a connecting structure according to an embodiment of the present invention; FIG. 本発明の実施形態に係る連結構造を示した平面図である。It is the top view which showed the connection structure which concerns on embodiment of this invention. 本発明の実施形態に係る連結構造を示した図で、図3のIV-IV断面図である。FIG. 4 is a cross-sectional view taken along line IV-IV of FIG. 3, showing a connection structure according to an embodiment of the present invention. 本発明の実施形態に係る連結構造を示した図で、図3のV-V断面図である。FIG. 4 is a cross-sectional view taken along the line VV of FIG. 3, showing the connection structure according to the embodiment of the present invention. 本発明の実施形態に係る連結構造において、二枚の足場板を屈曲させた状態を示した平面図である。FIG. 4 is a plan view showing a state in which two scaffolding boards are bent in the connection structure according to the embodiment of the present invention; 本発明の実施形態に係る足場板用連結具の変形例を示した平面図である。FIG. 4 is a plan view showing a modification of the scaffolding board connector according to the embodiment of the present invention.

本発明の実施形態について、適宜図面を参照しながら詳細に説明する。
本実施形態では、図1に示すように、シールドトンネルの施工現場において、複数の足場板50をトンネルの長手方向に連結して作業足場を形成するときに、二枚の足場板50,50を連結するための足場板用連結具1および連結構造2について説明する。
Embodiments of the present invention will be described in detail with reference to the drawings as appropriate.
In this embodiment, as shown in FIG. 1, when a work scaffold is formed by connecting a plurality of scaffolding boards 50 in the longitudinal direction of the tunnel at a construction site of a shield tunnel, two scaffolding boards 50, 50 are used. The scaffold board coupler 1 and the coupling structure 2 for coupling will be described.

足場板50は、鋼製であり、図2に示すように、平板状の踏み板51と、踏み板51の左右の両縁部から垂直に垂れ下がった左右の側板52,52と、両側板52,52の下縁部から左右方向の内側に突出した左右の下板53,53と、を備えている。 The scaffold board 50 is made of steel, and as shown in FIG. and left and right lower plates 53, 53 protruding inward in the left-right direction from the lower edge of the housing.

踏み板51には、複数の開口部54が貫通している。開口部54は、左右方向に延びている長孔である。各開口部54は、所定の間隔で前後方向に並べられている。隣り合う開口部54,54の間には、左右方向に延びている仕切り部55が形成されている。つまり、開口部54と仕切り部55とが前後方向に交互に並設されている。各開口部54は、足場板50の軽量化、採光および水捌けを目的として設けられている。
なお、踏み板51の前縁部には、開口部54の後半分が形成され、踏み板51の後縁部には、開口部54の前半分が形成されている。
A plurality of openings 54 pass through the footboard 51 . The opening 54 is an elongated hole extending in the left-right direction. The openings 54 are arranged in the front-rear direction at predetermined intervals. A partition portion 55 extending in the left-right direction is formed between the adjacent openings 54 , 54 . That is, the openings 54 and the partitions 55 are alternately arranged in the front-rear direction. Each opening 54 is provided for the purpose of reducing the weight of the scaffolding board 50, letting in light, and draining water.
A rear half of the opening 54 is formed at the front edge of the footboard 51 , and a front half of the opening 54 is formed at the rear edge of the footboard 51 .

仕切り部55の上面には、複数の突出部56が形成されている。突出部56は、円形に突出した部位であり、作業者が足場板50を歩くときの滑り止めとなる。 A plurality of projecting portions 56 are formed on the upper surface of the partition portion 55 . The protruding part 56 is a part protruding in a circular shape, and serves as a non-slip when the worker walks on the scaffolding board 50 .

本実施形態では、図3に示すように、二枚の足場板50,50が前後方向に並べて配置されている。前側の足場板50の後端部と、後側の足場板50の前端部とは僅かに間隔を空けて突き合わされている。
前側の足場板50の後縁部に形成された開口部54の前半分と、後側の足場板50の前縁部に形成された開口部54の後半分とが連結されることで、一つの開口部54が形成されている。
In this embodiment, as shown in FIG. 3, two scaffolding boards 50, 50 are arranged side by side in the front-rear direction. The rear end of the scaffolding board 50 on the front side and the front end of the scaffolding board 50 on the rear side are abutted with a slight gap therebetween.
The front half of the opening 54 formed at the rear edge of the scaffolding board 50 on the front side and the rear half of the opening 54 formed at the front edge of the scaffolding board 50 on the rear side are connected to each other. Two openings 54 are formed.

足場板用連結具1は、図2に示すように、二枚の足場板50,50を連結するための鋼製の部材である。足場板用連結具1は、接続部材10と、二つの取付具20,20と、二本の取付ねじ30,30と、を備えている。 The scaffolding board connector 1 is a steel member for connecting two scaffolding boards 50, 50, as shown in FIG. A scaffolding board connector 1 includes a connection member 10, two attachments 20, 20, and two attachment screws 30, 30. - 特許庁

接続部材10は、四角形の平板部11と、平板部11の左右の側縁部に連設された左右の側部12,12と、が形成されている。
平板部11の前半分は、図5に示すように、前側の足場板50の踏み板51の下面側に配置されている。また、平板部11の後半分は、後側の足場板50の踏み板51の下面側に配置されている。
The connecting member 10 is formed with a rectangular flat plate portion 11 and left and right side portions 12 , 12 connected to left and right side edge portions of the flat plate portion 11 .
As shown in FIG. 5, the front half of the flat plate portion 11 is arranged on the lower surface side of the footboard 51 of the front scaffolding board 50 . In addition, the rear half of the flat plate portion 11 is arranged on the lower surface side of the footboard 51 of the scaffolding board 50 on the rear side.

接続部材10の側部12は、図4に示すように、平板部11の側縁部に連設された折り曲げ部である。側部12は、平板部11の側縁部から斜め下方に傾斜した傾斜部と、傾斜部の外縁部から外側に向けて延びている下横部と、下横部の外縁部から上方に向けて延びている縦部と、縦部の上縁部から内側に向けて延びている上横部とが形成されている。側部12は、軸断面がC形状となるように折り曲げられている。このように、接続部材10に折り曲げ加工された左右の側部12,12を設けることで、接続部材10の曲げ強度を高めている。 As shown in FIG. 4, the side portion 12 of the connecting member 10 is a bent portion connected to the side edge portion of the flat plate portion 11 . The side portion 12 includes an inclined portion inclined obliquely downward from the side edge portion of the flat plate portion 11, a lower horizontal portion extending outward from the outer edge of the inclined portion, and an upper horizontal portion extending upward from the outer edge of the lower horizontal portion. A vertical portion extending inwardly from the vertical portion and an upper lateral portion extending inwardly from the upper edge of the vertical portion are formed. The side portion 12 is bent to have a C-shaped axial cross-section. By providing the connecting member 10 with the bent left and right side portions 12, 12 in this manner, the bending strength of the connecting member 10 is increased.

左側の側部12は、足場板50の踏み板51と左側の下板53との間に配置されている。また、右側の側部12は、足場板50の踏み板51と右側の下板53との間に配置されている。 The left side 12 is arranged between the footboard 51 of the scaffolding board 50 and the left lower board 53 . The right side portion 12 is arranged between the footboard 51 of the scaffold board 50 and the right lower board 53 .

接続部材10の左右方向の幅は、足場板50の左右の側板52,52の内面の間隔よりも僅かに小さく形成されている。したがって、足場板50の側板52の内面と、接続部材10の側部12の側面との間には隙間が形成されている。
また、接続部材10の側部12の高さは、足場板50の踏み板51の下面と下板53の上面との間隔よりも僅かに小さく形成されている。
The width of the connection member 10 in the left-right direction is formed slightly smaller than the interval between the inner surfaces of the left and right side plates 52 , 52 of the scaffolding board 50 . Therefore, a gap is formed between the inner surface of the side plate 52 of the scaffolding board 50 and the side surface of the side portion 12 of the connecting member 10 .
The height of the side portion 12 of the connecting member 10 is slightly smaller than the distance between the lower surface of the footboard 51 and the upper surface of the lower plate 53 of the scaffolding board 50 .

平板部11の上面には、図2に示すように、前後二つのねじ穴15,15が開口している。ねじ穴15は、平板部11を貫通しており、内周面にねじ溝が形成されている。なお、ねじ穴15は、平板部11に貫通穴を形成し、その貫通穴に連通するように、平板部11の下面にナットなどの雌ねじ部材を接合することで形成してもよい。
ねじ穴15は、平板部11の左右方向の中央部に形成されている。また、図3に示すように、前側のねじ穴15を前側の足場板50の開口部54の直下に配置したときに、後側のねじ穴15が後側の足場板50の開口部54の直下に配置されるように、両ねじ穴15,15の前後方向の間隔が設定されている。
As shown in FIG. 2, two front and rear screw holes 15, 15 are opened in the upper surface of the flat plate portion 11. As shown in FIG. The screw hole 15 penetrates the flat plate portion 11 and has a thread groove formed on the inner peripheral surface thereof. The screw hole 15 may be formed by forming a through hole in the flat plate portion 11 and joining a female screw member such as a nut to the lower surface of the flat plate portion 11 so as to communicate with the through hole.
The screw hole 15 is formed in the central portion of the flat plate portion 11 in the left-right direction. Also, as shown in FIG. 3, when the front screw holes 15 are arranged directly below the openings 54 of the front scaffolding board 50, the rear screw holes 15 are located at the openings 54 of the rear scaffolding board 50. The distance between the two screw holes 15, 15 in the front-rear direction is set so that they are arranged directly below.

平板部11の上面には、図2に示すように、複数の差込穴16が開口している。差込穴16は平板部11を貫通している。本実施形態では、平板部11に五つの差込穴16が形成されている。
平板部11の中央部に形成された差込穴16は、図3に示すように、両足場板50,50の間に形成された開口部54の直下に配置されている。
ねじ穴15と中央の差込穴16との位置関係は、ねじ穴15を足場板50のいずれかの開口部54の直下に配置したときに、中央の差込穴16が足場板50の他の開口部54の直下に配置されるように設定されている。
A plurality of insertion holes 16 are opened in the upper surface of the flat plate portion 11, as shown in FIG. The insertion hole 16 penetrates the flat plate portion 11 . In this embodiment, five insertion holes 16 are formed in the flat plate portion 11 .
The insertion hole 16 formed in the central portion of the flat plate portion 11 is arranged directly below the opening 54 formed between the two scaffolding boards 50, 50, as shown in FIG.
The positional relationship between the screw hole 15 and the central insertion hole 16 is such that when the screw hole 15 is arranged immediately below one of the openings 54 of the scaffolding board 50, the central insertion hole 16 is positioned on the other side of the scaffolding board 50. It is set to be arranged directly below the opening 54 of the .

中央の差込穴16の前後には、差込穴16が二つずつ配置されている。前側の二つの差込穴16,16は、平板部11の左右方向の中央部を挟んで左右対象の位置に配置されている。また、前側の二つの差込穴16,16と、後側の二つの差込穴16,16とは、平板部11の前後方向の中央部を挟んで前後対象の位置に配置されている。 Two insertion holes 16 are arranged before and after the center insertion hole 16. - 特許庁The two insertion holes 16, 16 on the front side are arranged symmetrically with respect to the central portion of the flat plate portion 11 in the left-right direction. Also, the two insertion holes 16, 16 on the front side and the two insertion holes 16, 16 on the rear side are arranged at front-rear symmetrical positions with the central portion of the flat plate portion 11 interposed therebetween.

五つの差込穴16の位置関係は、中央の差込穴16を開口部54の直下に配置したときに、前側の両差込穴16,16および後側の両差込穴16,16が、足場板50の仕切り部55の直下に配置されるように設定されている。 The positional relationship of the five insertion holes 16 is such that when the central insertion hole 16 is arranged directly below the opening 54, the front insertion holes 16, 16 and the rear insertion holes 16, 16 are , is set to be arranged directly below the partition portion 55 of the scaffolding board 50. As shown in FIG.

取付具20は、図1に示すように、足場板50の踏み板51の上面に重ねられる板状の部材である。取付具20は、隣り合う二本の仕切り部55,55に跨って配置されている。取付具20の前縁部および後縁部は、下方に向けて折り曲げられており、開口部54に入り込んでいる。
取付具20は、踏み板51の左右方向の中央部に配置されている。取付具20の左右方向の幅は、足場板50の左右方向の幅に比べて非常に小さく形成されている。
As shown in FIG. 1, the fixture 20 is a plate-like member that is placed on top of the footboard 51 of the scaffold board 50 . The fixture 20 is arranged across two adjacent partitions 55 , 55 . The leading and trailing edges of fixture 20 are bent downwardly into opening 54 .
The fixture 20 is arranged in the center of the footboard 51 in the left-right direction. The width of the fixture 20 in the left-right direction is formed to be much smaller than the width of the scaffolding board 50 in the left-right direction.

取付具20には、図5に示すように、足場板50の突出部56が嵌め込まれる嵌合穴21が貫通している。本実施形態の取付具20には、図1に示すように、前側の仕切り部55の二つの突出部56,56が嵌め込まれる二つの嵌合穴21,21と、後側の仕切り部55の二つの突出部56,56が嵌め込まれる二つの嵌合穴21,21とが形成されている。 As shown in FIG. 5 , fitting holes 21 in which projecting portions 56 of scaffolding boards 50 are fitted penetrate through the fittings 20 . As shown in FIG. 1, the fixture 20 of the present embodiment has two fitting holes 21, 21 into which the two protruding portions 56, 56 of the partition portion 55 on the front side are fitted, and the partition portion 55 on the rear side. Two fitting holes 21, 21 into which the two protrusions 56, 56 are fitted are formed.

取付具20の中央部には、下方に向けて窪んだ窪み部22が形成されている。窪み部22は、図5に示すように、足場板50の開口部54に入り込んでおり、隣り合う二本の仕切り部55,55の間に挟まれている。窪み部22の中央部には、図2に示すように、貫通穴23が形成されている。 A recessed portion 22 recessed downward is formed in the central portion of the fixture 20 . As shown in FIG. 5, the recess 22 is inserted into the opening 54 of the scaffolding board 50 and is sandwiched between two adjacent partitions 55,55. A through hole 23 is formed in the central portion of the recessed portion 22, as shown in FIG.

図5に示すように、取付具20の嵌合穴21に突出部56が嵌め込まれるとともに、窪み部22が開口部54に入り込むことで、取付具20が踏み板51の上面に位置決めされている。 As shown in FIG. 5 , the fitting 20 is positioned on the upper surface of the footboard 51 by fitting the protrusion 56 into the fitting hole 21 of the fitting 20 and inserting the recessed portion 22 into the opening 54 .

取付具20の嵌合穴21に突出部56が入り込むことで、取付具20は突出部56の上端部よりも低い位置に配置されることになる。つまり、取付具20は、踏み板51の上面に形成された滑り止め用の各突出部56よりも低い位置に配置されている。 By inserting the protrusion 56 into the fitting hole 21 of the fixture 20 , the fixture 20 is arranged at a position lower than the upper end of the protrusion 56 . That is, the fixture 20 is arranged at a position lower than the anti-slip protrusions 56 formed on the upper surface of the footboard 51 .

取付ねじ30は、ねじ溝が形成された軸部31と、軸部31よりも拡径された頭部32と、を有する公知の雄ねじ部材である。
取付ねじ30の軸部31は、取付具20の貫通穴23(図2参照)に上方から挿通されている。取付ねじ30の頭部32は、窪み部22の上面に係合されている。頭部32は、取付具20の窪み部22内に収容されており、取付具20の上面よりも低い位置に配置されている。
The mounting screw 30 is a known male screw member having a shaft portion 31 formed with a thread groove and a head portion 32 having a larger diameter than the shaft portion 31 .
A shaft portion 31 of the mounting screw 30 is inserted through the through hole 23 (see FIG. 2) of the mounting fixture 20 from above. A head 32 of the mounting screw 30 is engaged with the upper surface of the recess 22 . The head 32 is housed in the recessed portion 22 of the fixture 20 and is positioned below the upper surface of the fixture 20 .

取付ねじ30の軸部31は、図2に示すように、踏み板51の開口部54を通じて、接続部材10のねじ穴15に螺合されている。これにより、図5に示すように、踏み板51の二本の仕切り部55,55が取付具20と接続部材10との間に挟まれており、取付具20および接続部材10が足場板50に固定されている。 The shaft portion 31 of the mounting screw 30 is screwed into the threaded hole 15 of the connecting member 10 through the opening 54 of the footboard 51, as shown in FIG. Thereby, as shown in FIG. Fixed.

次に、本実施形態の足場板用連結具1を用いて二枚の足場板50,50を連結する手順について説明する。
まず、図2に示す後側の足場板50の前方に接続部材10を配置し、接続部材10を後方に移動させて、接続部材10を踏み板51の下面側に移動させる。このとき、接続部材10の左右の側部12,12は、踏み板51と下板53との間に挿入する。これにより、接続部材10の両側部12,12が足場板50に支持され、接続部材10は、足場板50の長手方向(前後方向)にスライド可能となる。そして、接続部材10全体を後側の足場板50の踏み板51の下面側に配置する。
Next, a procedure for connecting two scaffolding boards 50, 50 using the scaffolding board connector 1 of the present embodiment will be described.
First, the connecting member 10 is arranged in front of the rear scaffolding board 50 shown in FIG. At this time, the left and right side portions 12 , 12 of the connecting member 10 are inserted between the footboard 51 and the lower plate 53 . As a result, both sides 12, 12 of the connecting member 10 are supported by the scaffolding board 50, and the connecting member 10 is slidable in the longitudinal direction (front-rear direction) of the scaffolding board 50. As shown in FIG. Then, the entire connecting member 10 is arranged on the lower surface side of the footboard 51 of the scaffolding board 50 on the rear side.

続いて、図3に示すように、後側の足場板50の前側に足場板50を配置し、前側の足場板50の後端部と後側の足場板50の前端部とを突き合わせる。
その後、接続部材10を前方にスライドさせ、接続部材10の前半分を前側の足場板50の踏み板51の下面側に配置し、接続部材10の後半分を後側の足場板50の踏み板51の下面側に配置する。
Subsequently, as shown in FIG. 3, the scaffolding board 50 is placed in front of the rear scaffolding board 50, and the rear end of the front scaffolding board 50 and the front end of the rear scaffolding board 50 are butted against each other.
After that, the connection member 10 is slid forward, the front half of the connection member 10 is arranged on the lower surface side of the footboard 51 of the front scaffold board 50, and the rear half of the connection member 10 is arranged on the footboard 51 of the rear scaffold board 50. Place on the bottom side.

接続部材10をスライドさせるときには、棒状の工具の先端部を足場板50の上方から開口部54を通じて接続部材10の中央の差込穴16に差し込む。そして、工具によって接続部材10を押し出すことで、接続部材10を足場板50に対してスライドさせることができる。
このとき、開口部54に露出していた差込穴16が移動して仕切り部55の下方に隠れると、他の差込穴16が開口部54に露出するため、順次に異なる差込穴16を利用して接続部材10をスライドさせることができる。
When sliding the connecting member 10 , the tip of a rod-shaped tool is inserted from above the scaffolding board 50 through the opening 54 into the insertion hole 16 in the center of the connecting member 10 . By pushing out the connection member 10 with a tool, the connection member 10 can be slid with respect to the scaffolding board 50 .
At this time, if the insertion hole 16 exposed in the opening 54 moves and is hidden under the partition 55, other insertion holes 16 are exposed in the opening 54, so that different insertion holes 16 are inserted in sequence. can be used to slide the connection member 10 .

接続部材10の前後のねじ穴15,15が前後の足場板50,50の開口部54,54の直下に配置されるように、両足場板50,50に対して接続部材10を配置する。
そして、図5に示すように、前後の足場板50,50の踏み板51,51の上面にそれぞれ取付具20,20を載置する。
The connecting member 10 is positioned with respect to both scaffolding boards 50,50 such that the front and rear screw holes 15,15 of the connecting member 10 are positioned directly below the openings 54,54 of the front and rear scaffolding boards 50,50.
Then, as shown in FIG. 5, the fixtures 20, 20 are placed on the upper surfaces of the footboards 51, 51 of the front and rear scaffolding boards 50, 50, respectively.

その後、図2に示すように、取付具20の貫通穴23に上方から取付ねじ30を挿通し、取付ねじ30を接続部材10のねじ穴15に螺合させることで、図1に示すように、接続部材10を二枚の足場板50,50に固定する。これにより、本実施形態の足場板用連結具1を用いて二枚の足場板50,50を連結した連結構造2が形成される。 Thereafter, as shown in FIG. 2, the mounting screw 30 is inserted through the through hole 23 of the mounting fixture 20 from above, and the mounting screw 30 is screwed into the threaded hole 15 of the connecting member 10, thereby forming the mounting screw 30 as shown in FIG. , the connection member 10 is fixed to the two scaffolding boards 50, 50; As a result, a connecting structure 2 in which two scaffolding boards 50, 50 are connected using the scaffolding board connector 1 of the present embodiment is formed.

また、二枚の足場板50,50を分離させる場合には、前後の足場板50,50から取付ねじ30および取付具20を取り外す。そして、接続部材10を前方または後方にスライドさせ、接続部材10全体を片方の足場板50の踏み板51の下面側に移動させる。これにより、図2に示すように、二つの足場板50,50が分離した状態となる。
なお、接続部材10をスライドさせるときには、二枚の足場板50,50を連結するときと同様に、棒状の工具を差込穴16に差し込んで接続部材10を押し出す。
Moreover, when separating the two scaffolding boards 50, 50, the mounting screws 30 and the mounting fixtures 20 are removed from the front and rear scaffolding boards 50, 50. As shown in FIG. Then, the connecting member 10 is slid forward or backward to move the entire connecting member 10 to the lower surface side of the footboard 51 of one of the scaffolding boards 50 . As a result, the two scaffolding boards 50, 50 are separated as shown in FIG.
When the connecting member 10 is slid, the connecting member 10 is pushed out by inserting a rod-shaped tool into the insertion hole 16 in the same manner as when connecting the two scaffolding boards 50 , 50 .

以上のような本実施形態の足場板用連結具1および連結構造2では、図5に示すように、接続部材10が二枚の足場板50,50の下面側に跨って配置されている。そして、取付具20および取付ねじ30によって両足場板50,50に接続部材10に固定することで、両足場板50,50を上方から容易かつ確実に連結できる。そして、接続部材10が二枚の足場板50,50に跨って配置されているため、足場板50が連結部において上下方向に動くのを防ぐことができる。
また、取付具20および取付ねじ30を接続部材10から取り外し、接続部材10を片方の足場板50側にスライドさせることで、両足場板50,50を容易に分離できる。これにより、連続した複数の足場板50から中間の一枚のみを撤去できる。
In the scaffolding board connector 1 and the connecting structure 2 of the present embodiment as described above, the connecting member 10 is arranged across the lower surfaces of the two scaffolding boards 50, 50 as shown in FIG. By fixing both scaffolding boards 50 and 50 to the connecting member 10 with the fittings 20 and the mounting screws 30, the two scaffolding boards 50 and 50 can be easily and reliably connected from above. Since the connecting member 10 is arranged across the two scaffolding boards 50, 50, the scaffolding board 50 can be prevented from moving vertically at the joint.
Further, by removing the fixture 20 and the mounting screw 30 from the connection member 10 and sliding the connection member 10 toward one of the scaffolding boards 50, the two scaffolding boards 50, 50 can be easily separated. As a result, only one intermediate scaffolding board 50 can be removed from a plurality of continuous scaffolding boards 50.例文帳に追加

本実施形態の足場板用連結具1および連結構造2では、足場板50の平板部11の上面に配置された取付具20が小さいため、両足場板50,50を略平坦に連結できる。これにより、作業者が作業足場を通行するときの安全性を高めることができる。 In the scaffolding board connecting device 1 and the connecting structure 2 of the present embodiment, since the fixture 20 arranged on the upper surface of the flat plate portion 11 of the scaffolding board 50 is small, both scaffolding boards 50, 50 can be connected substantially flat. As a result, it is possible to enhance the safety of workers when they pass through the working scaffold.

本実施形態の足場板用連結具1および連結構造2では、図3に示すように、棒状の工具の先端部を足場板50の上方から開口部54を通じて接続部材10の差込穴16に差し込むことができる。そして、図6に示すように、工具によって接続部材10を押し出すことで、接続部材10を足場板50に対して容易にスライドさせることができる。 In the scaffolding board connector 1 and the connecting structure 2 of this embodiment, as shown in FIG. be able to. Then, as shown in FIG. 6, the connection member 10 can be easily slid with respect to the scaffolding board 50 by pushing out the connection member 10 with a tool.

本実施形態の接続部材10には、中央の差込穴16と、中央の差込穴16に対して前後左右に配置された四つの差込穴16とが形成されている。このように、複数の差込穴16を一方向に並べることなく分散させることで、接続部材10の強度低下を抑えている。 The connection member 10 of the present embodiment is formed with a central insertion hole 16 and four insertion holes 16 arranged in front, rear, left, and right of the central insertion hole 16 . In this way, by dispersing the plurality of insertion holes 16 without arranging them in one direction, a decrease in the strength of the connection member 10 is suppressed.

本実施形態の足場板用連結具1および連結構造2では、図3に示すように、足場板50の側板52の内面と、接続部材10の側部12の側面との間に隙間が形成されている。したがって、図6に示すように、接続部材10に対して両足場板50,50を左右方向に傾けることができるため、両足場板50,50を屈曲させて連結できる。これにより、複数の足場板50を湾曲させて連結できるため、湾曲している作業現場に合わせて、作業足場を湾曲させることができる。 In the scaffolding board coupler 1 and the connection structure 2 of this embodiment, as shown in FIG. ing. Therefore, as shown in FIG. 6, both scaffolding boards 50, 50 can be tilted in the left-right direction with respect to the connecting member 10, so that both scaffolding boards 50, 50 can be bent and connected. Thereby, since a plurality of scaffolding boards 50 can be curved and connected, the work scaffolding can be curved according to the curved work site.

以上、本発明の実施形態について説明したが、本発明は前記実施形態に限定されることなく、その趣旨を逸脱しない範囲で適宜に変更が可能である。
本実施形態の接続部材10では、図4に示すように、平板部11の左右に上向きに折り曲げた側部12,12が形成されているが、本発明の参考例としては、側部12の形状は限定されるものではなく、例えば、下向きに折り曲げてもよい。更には、接続部材10に折り曲げた側部を設けることなく、接続部材10全体を平坦に形成してもよい。
Although the embodiments of the present invention have been described above, the present invention is not limited to the above embodiments and can be appropriately modified without departing from the scope of the invention.
In the connection member 10 of the present embodiment, as shown in FIG. 4, the side portions 12, 12 are formed by bending upward on the left and right sides of the flat plate portion 11. However, as a reference example of the present invention, the side portion 12 The shape is not limited, and for example, it may be bent downward. Furthermore, the connecting member 10 as a whole may be formed flat without providing the connecting member 10 with a bent side portion.

本実施形態の接続部材10には、図2に示すように、五つの差込穴16が形成されているが、差込穴16の数は限定されるものではない。なお、接続部材10に差込穴16を設けなくてもよい。
本実施形態の接続部材10には、二つのねじ穴15,15が形成されているが、ねじ穴15の数は限定されるものではなく、例えば、三つ以上のねじ穴15を形成し、三つの取付具20を設けてもよい。
As shown in FIG. 2, five insertion holes 16 are formed in the connection member 10 of this embodiment, but the number of insertion holes 16 is not limited. Note that the connection member 10 may not have the insertion hole 16 .
Two screw holes 15, 15 are formed in the connecting member 10 of the present embodiment, but the number of the screw holes 15 is not limited. Three fittings 20 may be provided.

本実施形態の取付具20には、足場板50の突出部56が嵌め込まれる四つの嵌合穴21が形成されているが、嵌合穴21の数は限定されるものではない。なお、本発明の参考例としては、取付具20に嵌合穴21を設けなくてもよい。 The fixture 20 of this embodiment is formed with four fitting holes 21 into which the projections 56 of the scaffolding board 50 are fitted, but the number of fitting holes 21 is not limited. In addition, as a reference example of the present invention, the fitting hole 21 may not be provided in the fixture 20 .

本実施形態の足場板用連結具1では、接続部材10に二つのねじ穴15,15を形成し、二つの取付具20,20を前後の足場板50,50の上面にそれぞれ配置している。しかしながら、図7に示す足場板用連結具1Aのように、接続部材10に一つねじ穴15を形成し、一つの取付具20を前後の足場板50,50の仕切り部55,55の上面に跨って配置してもよい。そして、取付ねじ30を両足場板50,50の間の開口部54を通じて、ねじ穴15に螺合させることで、両足場板50,50を連結できる。 In the scaffolding board coupler 1 of this embodiment, two screw holes 15, 15 are formed in the connecting member 10, and two mounting fixtures 20, 20 are arranged on the upper surfaces of the front and rear scaffolding boards 50, 50, respectively. . However, like the scaffolding board connector 1A shown in FIG. may be placed across the By screwing the mounting screws 30 into the screw holes 15 through the openings 54 between the scaffolding boards 50, 50, the scaffolding boards 50, 50 can be connected.

本発明の足場板用連結具および連結構造を適用可能な足場板は限定されるものではなく、足場板の下面側に接続部材をスライド可能に取り付けることができるのであれば、各種公知の足場板に本発明の足場板用連結具および連結構造を適用可能である。 The scaffolding board to which the connector for scaffolding board and the connection structure of the present invention can be applied is not limited, and various known scaffolding boards can be used as long as the connection member can be slidably attached to the lower surface side of the scaffolding board. The connector for scaffolding boards and the connection structure of the present invention can be applied to.

1 足場板用連結具
2 連結構造
10 接続部材
11 平板部
12 側部
15 ねじ穴
16 差込穴
20 取付具
21 嵌合穴
22 窪み部
23 貫通穴
30 取付ねじ
31 軸部
32 頭部
50 足場板
51 踏み板
52 側板
53 下板
54 開口部
55 仕切り部
56 突出部
Reference Signs List 1 scaffold board connector 2 connection structure 10 connection member 11 flat plate portion 12 side portion 15 screw hole 16 insertion hole 20 fixture 21 fitting hole 22 recess 23 through hole 30 mounting screw 31 shaft portion 32 head 50 scaffold board 51 footboard 52 side plate 53 lower plate 54 opening 55 partition 56 protrusion

Claims (5)

二枚の足場板を連結するための足場板用連結具であって、
前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられる接続部材と、
前記両足場板の上面にそれぞれ配置される二つの取付具と、
前記取付具の貫通穴に挿通される取付ねじと、を備え、
前記接続部材の上面には、前記取付ねじが螺合される二つのねじ穴が形成され、
一方の前記ねじ穴を一方の前記足場板の開口部の直下に配置したときに、他方の前記ねじ穴が他方の前記足場板の開口部の直下に配置されるように、前記両ねじ穴の間隔が設定されており、
前記取付具を前記足場板の上面に配置したときに、前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれており、
前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、
前記接続部材の側部には、上方に向けて延びている縦部が形成されており、
前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置され、
前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されていることを特徴とする足場板用連結具。
A scaffolding board connector for connecting two scaffolding boards,
a connection member assembled to the lower surface side of both scaffolding boards in a slidable state in the connection direction of both scaffolding boards;
two fixtures respectively arranged on the upper surfaces of the scaffolding boards;
and a mounting screw inserted through the through hole of the mounting fixture,
Two threaded holes into which the mounting screws are screwed are formed on the upper surface of the connecting member,
Both screw holes are arranged so that when one of the screw holes is arranged directly under the opening of one of the scaffolding boards, the other of the screw holes is arranged directly under the opening of the other scaffolding board. interval is set
When the mounting fixture is placed on the upper surface of the scaffolding board, a protruding portion formed on the upper surface of the scaffolding board is fitted into the fitting hole of the mounting fixture,
The scaffolding board includes a flat footboard, a side board vertically hanging from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board,
A vertical portion extending upward is formed on a side portion of the connection member,
a side portion of the connecting member is disposed between the footboard and the lower board of the scaffolding plank;
A connector for a scaffolding board, wherein the height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower board of the scaffolding board.
二枚の足場板を連結するための足場板用連結具であって、
前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられる接続部材と、
前記両足場板の上面に配置される取付具と、
前記取付具の貫通穴に挿通される取付ねじと、を備え、
前記接続部材の上面には、ねじ穴が形成されており、
前記取付ねじは、前記足場板の開口部を通じて、前記ねじ穴に螺合され、
前記取付具を前記足場板の上面に配置したときに、前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれており、
前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、
前記接続部材の側部には、上方に向けて延びている縦部が形成されており、
前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置され、
前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されていることを特徴とする足場板用連結具。
A scaffolding board connector for connecting two scaffolding boards,
a connection member assembled to the lower surface side of both scaffolding boards in a slidable state in the connection direction of both scaffolding boards;
a fixture disposed on the upper surface of both scaffolding boards;
and a mounting screw inserted through the through hole of the mounting fixture,
A threaded hole is formed in the upper surface of the connection member,
the mounting screw is screwed into the screw hole through the opening of the scaffolding board;
When the mounting fixture is placed on the upper surface of the scaffolding board, a protruding portion formed on the upper surface of the scaffolding board is fitted into the fitting hole of the mounting fixture,
The scaffolding board includes a flat footboard, a side board vertically hanging from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board,
A vertical portion extending upward is formed on a side portion of the connection member,
a side portion of the connecting member is disposed between the footboard and the lower board of the scaffolding plank;
A connector for a scaffolding board, wherein the height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower board of the scaffolding board.
請求項1または請求項2に記載の足場板用連結具であって、
前記接続部材の上面には差込穴が形成されており、
前記ねじ穴を前記足場板の前記開口部の直下に配置したときに、前記差込穴が前記足場板の前記開口部の直下に配置されるように、前記ねじ穴と前記差込穴との位置関係が設定されていることを特徴とする足場板用連結具。
The scaffolding board connector according to claim 1 or 2,
An insertion hole is formed in the upper surface of the connection member,
The screw hole and the insertion hole are arranged so that when the screw hole is arranged directly below the opening of the scaffolding board, the insertion hole is arranged directly below the opening of the scaffolding board. A connector for a scaffolding board, characterized in that a positional relationship is set.
請求項1から請求項3のいずれか一項に記載の足場板用連結具であって、
前記足場板は、
前記開口部が形成された前記踏み板と、
前記踏み板の両側縁部から垂れ下がった左右の前記側板と、を備え、
前記接続部材は、前記両側板の間に配置され、
前記接続部材の左右方向の幅は、前記両側板の内面の間隔よりも小さいことを特徴とする足場板用連結具。
The scaffolding board connector according to any one of claims 1 to 3,
The scaffold planks are
the footboard in which the opening is formed;
and the left and right side plates hanging from both side edges of the footboard,
The connection member is arranged between the side plates,
A connector for a scaffold board, wherein the lateral width of the connecting member is smaller than the interval between the inner surfaces of the side plates.
二枚の足場板を足場板用連結具を用いて連結する足場板の連結構造であって、
前記足場板用連結具は、
前記両足場板の連結方向にスライド可能な状態で、前記両足場板の下面側に組み付けられた接続部材と、
前記両足場板の上面にそれぞれ配置された二つの取付具と、
前記取付具の貫通穴に挿通された取付ねじと、を備え、
前記接続部材の上面には、二つのねじ穴が形成され、
一方の前記ねじ穴は、一方の前記足場板の開口部の直下に配置されるとともに、
他方の前記ねじ穴は、他方の前記足場板の開口部の直下に配置されており、
前記取付ねじは、前記足場板の前記開口部を通じて、前記接続部材の前記ねじ穴に螺合され、
前記足場板の上面に形成された突出部が、前記取付具の嵌合穴に嵌め込まれており、
前記足場板には、平板状の踏み板と、前記踏み板の側縁部から垂直に垂れ下がった側板と、前記側板の下縁部から内側に突出した下板と、が形成されるとともに、
前記接続部材の側部には、上方に向けて延びている縦部が形成されており、
前記接続部材の側部は、前記足場板の前記踏み板と前記下板との間に配置され、
前記接続部材の側部の高さは、前記足場板の前記踏み板の下面と前記下板の上面との間隔よりも小さく形成されていることを特徴とする足場板の連結構造。
A scaffolding board connection structure for connecting two scaffolding boards using a scaffolding board connector,
The scaffolding board connector includes:
a connection member assembled to the lower surface side of both scaffolding boards in a slidable state in the connection direction of both scaffolding boards;
two fixtures respectively arranged on the upper surfaces of the scaffolding boards;
and a mounting screw inserted through the through hole of the mounting fixture,
Two screw holes are formed in the upper surface of the connecting member,
One of the screw holes is arranged directly below the opening of one of the scaffolding boards,
the other screw hole is positioned directly below the opening of the other scaffolding plank;
the mounting screw is screwed into the threaded hole of the connection member through the opening of the scaffolding board;
A protrusion formed on the upper surface of the scaffolding board is fitted into the fitting hole of the fixture,
The scaffolding board includes a flat footboard, a side board vertically hanging from the side edge of the footboard, and a lower board protruding inward from the lower edge of the side board,
A vertical portion extending upward is formed on a side portion of the connection member,
a side portion of the connecting member is disposed between the footboard and the lower board of the scaffolding plank;
A connecting structure of scaffolding boards, wherein the height of the side portion of the connecting member is formed to be smaller than the distance between the lower surface of the footboard and the upper surface of the lower board of the scaffolding board.
JP2018221010A 2018-11-27 2018-11-27 Scaffold board connector and scaffold board connection structure Active JP7306816B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018221010A JP7306816B2 (en) 2018-11-27 2018-11-27 Scaffold board connector and scaffold board connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018221010A JP7306816B2 (en) 2018-11-27 2018-11-27 Scaffold board connector and scaffold board connection structure

Publications (2)

Publication Number Publication Date
JP2020084594A JP2020084594A (en) 2020-06-04
JP7306816B2 true JP7306816B2 (en) 2023-07-11

Family

ID=70909817

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018221010A Active JP7306816B2 (en) 2018-11-27 2018-11-27 Scaffold board connector and scaffold board connection structure

Country Status (1)

Country Link
JP (1) JP7306816B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP1556224S (en) 2016-03-28 2016-08-15
JP1556223S (en) 2016-03-28 2016-08-15
JP2019094634A (en) 2017-11-20 2019-06-20 Jfe機材フォーミング株式会社 Connector for scaffold plate material and connection structure of scaffold plate material with use of connector metal fitting

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0253415U (en) * 1988-10-12 1990-04-18
JPH0748875Y2 (en) * 1990-06-19 1995-11-08 日鐵建材工業株式会社 Steel scaffold board connection structure
JPH0821025A (en) * 1994-07-05 1996-01-23 Nippon Steel Metal Prod Co Ltd Floor plate structure
JPH10273972A (en) * 1997-03-31 1998-10-13 Sumitomo Kinzoku Kenzai Kk Steel floor board and joint fixture for steel floor board

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP1556224S (en) 2016-03-28 2016-08-15
JP1556223S (en) 2016-03-28 2016-08-15
JP2019094634A (en) 2017-11-20 2019-06-20 Jfe機材フォーミング株式会社 Connector for scaffold plate material and connection structure of scaffold plate material with use of connector metal fitting

Also Published As

Publication number Publication date
JP2020084594A (en) 2020-06-04

Similar Documents

Publication Publication Date Title
US9038343B2 (en) Device for connecting two prefabricated construction elements together
KR102575473B1 (en) Cable tray junction and splice plate coupling system
KR101954359B1 (en) Cable tray
KR101794532B1 (en) connector for flooring wood deck
KR101442195B1 (en) Deck plate assembly for passageway and footbridge
JP7306816B2 (en) Scaffold board connector and scaffold board connection structure
KR200424942Y1 (en) A mounting structure for frame of bed
KR101275503B1 (en) Deck joint
KR101607113B1 (en) Structure and apparatus for connecting cable tray
JP2008045398A (en) Shut off plate for closing space
KR20180002100U (en) Fixing structure of deck
KR200474132Y1 (en) Connectinng apparatus for mesh type cable tray
JP6021831B2 (en) Sasara girder positioning joint structure
KR101973798B1 (en) Toe Board for Scaffolding
JP2005194805A (en) Floor plate connecting fitting, floor plate connecting method, and floor structure
JP2012041802A (en) Scaffold board for attic
JP2005344371A (en) Floor structure and terrace deck
KR20150040747A (en) Cable tray assebled by connecting cable tray unit
JP7510179B2 (en) Scaffolding panel connecting member and scaffolding
JP4310740B2 (en) Floor board connecting bracket and floor structure using the same
JP7340651B2 (en) Connecting parts for stairs
KR200477314Y1 (en) Footboard and connection structure of the same
JP6347483B2 (en) Floor board fixture
JP2010159573A (en) Running board for scaffolding
JP7233818B2 (en) Connection structure of beams in suspended ceiling and connection method thereof

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20181212

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20181212

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7426

Effective date: 20190109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20190109

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211122

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220921

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221004

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230110

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230213

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230629

R150 Certificate of patent or registration of utility model

Ref document number: 7306816

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150