JP7297493B2 - Claims management device, claims management method, and claims management program - Google Patents

Claims management device, claims management method, and claims management program Download PDF

Info

Publication number
JP7297493B2
JP7297493B2 JP2019061242A JP2019061242A JP7297493B2 JP 7297493 B2 JP7297493 B2 JP 7297493B2 JP 2019061242 A JP2019061242 A JP 2019061242A JP 2019061242 A JP2019061242 A JP 2019061242A JP 7297493 B2 JP7297493 B2 JP 7297493B2
Authority
JP
Japan
Prior art keywords
equipment
loss
charge
master
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019061242A
Other languages
Japanese (ja)
Other versions
JP2020160935A (en
Inventor
弘樹 村野
祐治 大隈
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Priority to JP2019061242A priority Critical patent/JP7297493B2/en
Publication of JP2020160935A publication Critical patent/JP2020160935A/en
Priority to JP2023090058A priority patent/JP2023110005A/en
Application granted granted Critical
Publication of JP7297493B2 publication Critical patent/JP7297493B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、損料管理装置、損料管理方法、および、損料管理プログラムに関する。 The present invention relates to a loss management device, a loss management method, and a loss management program.

特許文献1には、機械の損料を工期1ヶ月のまとまった単位で算出し、1日当たりの損料に換算することで、日割のコスト評価を可能とする構成が開示されている。 Patent Literature 1 discloses a configuration that enables cost evaluation on a daily basis by calculating loss charges for a machine in units of one month of construction period and converting them into loss charges per day.

特開2003-138874号公報JP 2003-138874 A

しかしながら、上記特許文献1記載の発明においては、1日あたりの損料単価を設定し、機材の現場への搬入から搬出までの期間において、各日までに生じた損料を算出することができなかったという課題があった。 However, in the invention described in Patent Document 1, it was not possible to set the unit cost of damages per day and calculate the damages incurred up to each day during the period from carrying in the equipment to the site until carrying out. There was a problem.

本発明は、上記問題点に鑑みてなされたものであって、機材の搬入出の情報をもとに日次で損料を自動計算することが可能になることで、精緻な原価を迅速に把握することが可能となるため、業務負荷の軽減および効率化を実現することができる損料管理装置、損料管理方法、および、損料管理プログラムを提供することを目的とする。 The present invention has been made in view of the above-mentioned problems, and it is possible to quickly grasp the precise cost by making it possible to automatically calculate the loss fee on a daily basis based on the information on the carrying in and out of the equipment. Therefore, it is an object of the present invention to provide a loss management device, a loss management method, and a loss management program that can reduce the work load and improve efficiency.

上述した課題を解決し、目的を達成するために、本発明に係る損料管理装置は、記憶部と制御部とを備えた損料管理装置であって、前記記憶部は、各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、施工期間中の損料計算対象時間および/または損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、を備え、前記制御部は、前記機材の搬入出に関する機材受払データを取得する機材受払取得手段と、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中の所定時点迄に生じた前記機材の損料を含む機材損料データを取得する機材損料取得手段と、を備えたことを特徴とする。 In order to solve the above-described problems and achieve the object, a loss management device according to the present invention includes a storage unit and a control unit, wherein the storage unit stores a loss unit price for each piece of equipment. equipment storage means for storing the set equipment master; and calendar storage means for storing the calendar master in which the time for loss calculation and/or the date for loss calculation during the construction period are set, wherein the control unit stores the equipment equipment receipt/payment acquisition means for acquiring equipment receipt/payment data relating to carrying-in/out of the equipment; and an equipment damage charge acquiring means for acquiring equipment damage charge data including the equipment loss data.

また、本発明に係る損料管理装置において、前記制御部は、前記機材損料データに基づいて、損料仕訳データを作成する仕訳作成手段、を更に備えたことを特徴とする。 Further, in the loss management apparatus according to the present invention, the control unit further comprises journal creation means for creating loss charge journal data based on the equipment loss data.

また、本発明に係る損料管理装置において、前記機材損料取得手段は、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の工事現場への搬入時点から前記所定時点迄に生じた前記機材の損料を含む前記機材損料データを取得することを特徴とする。 Further, in the damages management apparatus according to the present invention, the equipment damages acquisition means is configured to determine the time point at which the equipment is delivered to the construction site during the construction period based on the equipment master, the calendar master, and the equipment receipt/payment data. and acquiring the equipment damage data including the equipment damages incurred up to the predetermined point in time.

また、本発明に係る損料管理装置において、前記機材損料取得手段は、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の直前の搬出場所からの搬出時点から前記所定時点迄に生じた前記機材の損料を含む前記機材損料データを取得することを特徴とする。 Further, in the damages management apparatus according to the present invention, the equipment damages acquisition means calculates the amount of the equipment from the last unloading place during the construction period based on the equipment master, the calendar master, and the equipment receipt/payment data. It is characterized in that the equipment damage data including the equipment damages incurred from the time of unloading to the predetermined time is acquired.

また、本発明に係る損料管理装置において、前記損料単価は、1時間当たりの単価、および/または、1日当たりの単価であることを特徴とする。 Further, in the loss charge management apparatus according to the present invention, the loss charge unit price is a unit price per hour and/or a unit price per day.

また、本発明に係る損料管理装置において、前記機材損料取得手段は、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の搬入日から所定日迄の前記損料計算対象日の日数と、当該機材の1日当たりの前記損料単価とを乗じた値を当該機材の前記損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする。 Further, in the damages management apparatus according to the present invention, the equipments damages acquisition means obtains the damages from the delivery date of the equipment during the construction period to a predetermined date based on the equipment master, the calendar master, and the equipment receipt/payment data. multiplied by the number of days for which the loss fee is calculated and the unit price of the loss fee per day of the equipment is acquired as the loss fee of the equipment, and the equipment loss data including the loss fee is acquired. .

また、本発明に係る損料管理装置において、前記機材損料取得手段は、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の搬入時点から前記所定時点迄の前記損料計算対象時間の時間数と、当該機材の1時間当たりの前記損料単価とを乗じた値を当該機材の前記損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする。 Further, in the damages management apparatus according to the present invention, the equipment damages acquisition means obtains, based on the equipment master, the calendar master, and the equipment receipt/payment data, Obtain the value obtained by multiplying the number of hours for which the loss fee is calculated up to the time of loss by the unit price of the loss fee per hour of the equipment as the loss fee of the equipment, and acquire the equipment loss fee data including the loss fee. Characterized by

また、本発明に係る損料管理装置において、前記制御部は、前記施工期間中に工事中止期間が生じた場合、当該工事中止期間に対応する前記損料計算対象時間および/または前記損料計算対象日が損料計算対象外となるように前記カレンダマスタの更新を実行する更新手段、を更に備えたことを特徴とする。 Further, in the loss management device according to the present invention, if a construction suspension period occurs during the construction period, the control unit determines whether the loss calculation target time and/or the loss calculation target date corresponding to the construction suspension period is The present invention is characterized by further comprising update means for updating the calendar master so as not to be subject to loss calculation.

また、本発明に係る損料管理装置において、前記更新手段は、更に、更新を実行した前記カレンダマスタに基づいて、前記機材受払データに、前記工事中止期間に対応する調整日数、および/または、前記工事中止期間に対応する調整時間数を追加する更新を実行することを特徴とする。 Further, in the loss management device according to the present invention, the updating means further adds the adjustment days corresponding to the construction suspension period and/or the It is characterized by executing an update that adds the number of adjustment hours corresponding to the construction suspension period.

また、本発明に係る損料管理装置において、前記制御部は、前記機材損料データに基づいて、所定期間における工事毎の損料を含む原価データを作成する原価作成手段、を更に備えたことを特徴とする。 Further, in the loss management device according to the present invention, the control unit further comprises cost creation means for creating cost data including loss charges for each construction work in a predetermined period based on the equipment loss data. do.

また、本発明に係る損料管理装置において、前記仕訳作成手段は、前記機材損料データに基づいて、工事毎の前記損料仕訳データを作成することを特徴とする。 Further, in the loss management apparatus according to the present invention, the journal creation means creates the loss charge journal data for each construction work based on the equipment loss charge data.

また、本発明に係る損料管理装置において、前記仕訳作成手段は、期末に到達した場合、前記機材損料データに基づいて、当期の前記損料仕訳データを作成することを特徴とする。 In the loss management apparatus according to the present invention, the journal creation means creates the loss journal data for the current term based on the equipment loss data when the end of the term is reached.

また、本発明に係る損料管理装置において、前記損料仕訳データは、借方の勘定科目が未成工事支出金、且つ、貸方の勘定科目が間接機械賃借料であることを特徴とする。 In the loss management apparatus according to the present invention, the loss journal data is characterized in that the debit account item is uncompleted construction expenditure and the credit account item is indirect machine rent.

また、本発明に係る損料管理方法は、記憶部と制御部とを備えた損料管理装置に実行させるための損料管理方法であって、前記記憶部は、各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、施工期間中の損料計算対象時間および/または損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、を備え、前記制御部で実行させる、前記機材の搬入出に関する機材受払データを取得する機材受払取得ステップと、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中の所定時点迄に生じた前記機材の損料を含む機材損料データを取得する機材損料取得ステップと、を含むことを特徴とする。 Further, a loss management method according to the present invention is a loss management method to be executed by a loss management device having a storage unit and a control unit, wherein the storage unit stores an equipment master in which a loss unit price for each piece of equipment is set. and a calendar storage means for storing a calendar master in which the time and/or day for loss calculation during the construction period are set, and the carrying-in of the equipment is executed by the control unit. an equipment receipt/payment acquisition step of acquiring equipment receipt/payment data related to delivery; and based on the equipment master, the calendar master, and the equipment receipt/payment data, the equipment including losses incurred up to a predetermined time during the construction period. and an equipment loss data acquisition step of acquiring loss data.

また、本発明に係る損料管理プログラムは、記憶部と制御部とを備えた損料管理装置に実行させるための損料管理プログラムであって、前記記憶部は、各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、施工期間中の損料計算対象時間および/または損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、を備え、前記制御部において、前記機材の搬入出に関する機材受払データを取得する機材受払取得ステップと、前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中の所定時点迄に生じた前記機材の損料を含む機材損料データを取得する機材損料取得ステップと、を実行させることを特徴とする。 Further, a loss management program according to the present invention is a loss management program to be executed by a loss management device having a storage unit and a control unit, wherein the storage unit stores an equipment master in which a loss unit price for each piece of equipment is set. and calendar storage means for storing a calendar master in which the time and/or day for loss calculation during the construction period is set, and the control unit controls the carrying-in/out of the an equipment receipt/payment acquisition step of acquiring equipment receipt/payment data; and equipment loss/damage data including loss/damage of the equipment up to a predetermined point in time during the construction period based on the equipment master, the calendar master, and the equipment receipt/payment data. and an equipment loss fee acquisition step of acquiring the

本発明によれば、機材の入出庫データをもとに損料を自動計算し、その計算結果から仕訳を自動作成することが可能になることで、業務負荷の軽減および効率化を実現することができるという効果を奏する。また、本発明によれば、日次で処理を行うことで精緻な原価金額を迅速に把握することが可能となるという効果を奏する。 According to the present invention, it is possible to automatically calculate the loss fee based on the incoming/outgoing data of the equipment, and automatically create the journal entry from the calculation result, thereby reducing the work load and improving efficiency. It has the effect of being able to In addition, according to the present invention, it is possible to quickly grasp the precise cost amount by performing the processing on a daily basis.

図1は、本実施形態における損料管理装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of the loss management device in this embodiment. 図2は、本実施形態における機材マスタの一例を示す図である。FIG. 2 is a diagram showing an example of the equipment master in this embodiment. 図3は、本実施形態におけるカレンダマスタの一例を示す図である。FIG. 3 is a diagram showing an example of a calendar master in this embodiment. 図4は、本実施形態における損料管理装置の処理の一例を示すフローチャートである。FIG. 4 is a flowchart showing an example of processing of the loss management device in this embodiment. 図5は、本実施形態における損料管理処理の一例を示すフロー図である。FIG. 5 is a flowchart showing an example of loss management processing in this embodiment. 図6は、本実施形態における損料管理処理の一例を示すフロー図である。FIG. 6 is a flowchart showing an example of loss management processing in this embodiment. 図7は、本実施形態における損料管理処理の一例を示すフロー図である。FIG. 7 is a flowchart showing an example of loss management processing in this embodiment. 図8は、本実施形態における損料管理処理の一例を示すフロー図である。FIG. 8 is a flowchart showing an example of loss management processing in this embodiment.

本発明の実施形態を図面に基づいて詳細に説明する。なお、本発明は本実施形態により限定されるものではない。 An embodiment of the present invention will be described in detail based on the drawings. In addition, this invention is not limited by this embodiment.

[1.概要]
まず、本発明の概要について説明する。
[1. overview]
First, the outline of the present invention will be explained.

建設業界では、建設機材を使用した際に損料を計上している。ここで、損料とは、償却費、維持修理費および/または管理費等のトータルでかかるライフサイクルコストを1日当たりの金額に換算して出される経費であり、例えば、損料単価3万円の機材を工事Aで3日、および、工事Bで2日使用した場合、工事Aの損料は、9万円(=3万円*3日)となり、工事Bの損料は、6万円(=3万円*2日)となる。 In the construction industry, losses are recorded when construction equipment is used. Here, the loss is an expense calculated by converting the total life cycle cost such as depreciation cost, maintenance and repair cost and/or management cost into an amount per day. is used for 3 days for construction A and 2 days for construction B, the loss for construction A is 90,000 yen (= 30,000 yen * 3 days), and the loss for construction B is 60,000 yen (= 3 10,000 yen *2 days).

従来、どの機材をどの工事で使用しているかといった入出庫データは、管理できていたが、その日数から損料を計算し、計算結果から経費の仕訳の入力することは、別途行っていたため、非効率であった。また、従来、損料の計算処理および仕訳の入力は、月末にまとめて処理を行うことが多く、日次での発生原価の金額を捉えることができなかった。 In the past, it was possible to manage incoming and outgoing data such as which equipment was used for which construction, but it was necessary to calculate the loss fee from the number of days and enter the journal entry of expenses from the calculation results separately. It was efficient. Also, conventionally, loss calculation processing and journal entries were often processed collectively at the end of the month, and it was not possible to grasp the amount of incurred costs on a daily basis.

そこで、本実施形態においては、日次での損料計算処理を可能とすることで、タイムリーに原価発生を把握できる仕組みを提供している。 Therefore, in the present embodiment, by enabling daily loss calculation processing, a mechanism is provided in which cost occurrence can be grasped in a timely manner.

[2.構成]
本実施形態に係る損料管理装置100の構成の一例について、図1から図3を参照して説明する。図1は、本実施形態における損料管理装置100の構成の一例を示すブロック図である。
[2. composition]
An example of the configuration of the loss management device 100 according to this embodiment will be described with reference to FIGS. 1 to 3. FIG. FIG. 1 is a block diagram showing an example of the configuration of the loss management device 100 in this embodiment.

図1に示すように、損料管理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、損料管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 As shown in FIG. 1, the loss management system 100 is a commercially available desktop personal computer. Note that the loss management device 100 is not limited to a stationary information processing device such as a desktop personal computer, and may be a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smart phone, a portable type such as a tablet personal computer. It may be an information processing device.

損料管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。損料管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The loss management device 100 includes a control section 102 , a communication interface section 104 , a storage section 106 and an input/output interface section 108 . Each unit included in the loss management apparatus 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、損料管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、損料管理装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。 The communication interface unit 104 communicably connects the loss management apparatus 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the loss management apparatus 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

記憶部106には、各種のデータベース、テーブル、およびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。記憶部106は、機材マスタ106aと、カレンダマスタ106bと、仕訳ファイル106cとを備えている。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for performing various processes by giving commands to a CPU (Central Processing Unit) in cooperation with an OS (Operating System). As the storage unit 106, for example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used. The storage unit 106 includes an equipment master 106a, a calendar master 106b, and a journal file 106c.

機材マスタ106aは、各機材に対する損料単価を設定したマスタである。ここで、損料単価は、1時間当たりの単価、および/または、1日当たりの単価等であってもよい。また、機材は、建設機材等であってもよい。また、機材マスタ106aは、機材コード(CD)、および/または、機材名等の機材識別子が設定されていてもよい。 The equipment master 106a is a master in which the loss unit price for each equipment is set. Here, the loss charge unit price may be a unit price per hour and/or a unit price per day. Also, the equipment may be construction equipment or the like. Further, the equipment master 106a may be set with equipment codes (CD) and/or equipment identifiers such as equipment names.

ここで、図2を参照して、本実施形態における機材マスタ106aの一例について説明する。図2は、本実施形態における機材マスタ106aの一例を示す図である。 Here, an example of the equipment master 106a in this embodiment will be described with reference to FIG. FIG. 2 is a diagram showing an example of the equipment master 106a in this embodiment.

図2に示すように、本実施形態における機材マスタ106aには、機材コード、機材名、および、損料単価が設定されており、機材毎に損料の単価が設定されている。 As shown in FIG. 2, in the equipment master 106a in this embodiment, the equipment code, the equipment name, and the loss unit price are set, and the loss unit price is set for each equipment.

図1に戻り、カレンダマスタ106bは、施工期間中の損料計算対象時間および/または損料計算対象日を設定したマスタである。ここで、カレンダマスタ106bは、施工期間中の日付、施工期間中の各日が損料計算対象であるか否かを示す損料計算対象識別子、および/または、施工期間中の各日における工事予定時間等が設定されていてもよい。 Returning to FIG. 1, the calendar master 106b is a master in which the hours for loss calculation and/or the days for loss calculation during the construction period are set. Here, the calendar master 106b stores a date during the construction period, a charge calculation object identifier indicating whether or not each day during the construction period is subject to loss calculation, and/or the scheduled construction time for each day during the construction period. etc. may be set.

ここで、図3を参照して、本実施形態におけるカレンダマスタ106bの一例について説明する。図3は、本実施形態におけるカレンダマスタ106bの一例を示す図である。 Here, an example of the calendar master 106b in this embodiment will be described with reference to FIG. FIG. 3 is a diagram showing an example of the calendar master 106b in this embodiment.

図3に示すように、本実施形態におけるカレンダマスタ106bには、施工期間中の日付、および、損料計算対象コードが設定されており、工事を行わない休日等が損料計算対象外として設定されている。 As shown in FIG. 3, in the calendar master 106b in this embodiment, dates during the construction period and codes for loss calculation are set. there is

図1に戻り、仕訳ファイル106cは、仕訳データを記憶する。ここで、仕訳ファイル106cは、施工期間中の所定時点迄に生じた機材の損料を含む機材損料データ、所定期間における工事毎の損料を含む原価データ、および/または、機材の工事現場における搬入出に関する機材受払データ等を記憶していてもよい。また、仕訳データは、損料仕訳データ等であってもよい。ここで、損料仕訳データは、借方の勘定科目が未成工事支出金、且つ、貸方の勘定科目が間接機械賃借料であってもよい。また、機材受払データは、機材識別子、搬出日付、搬出場所識別子、搬入日付、搬入場所識別子、工事中止期間に対応する調整日数、および/または、工事中止期間に対応する調整時間数等を含んでいてもよい。また、機材損料データは、機材識別子、搬出日付、搬出場所識別子、搬入日付、搬入場所識別子、機材の損料、機材の損料単価、機材の損料計算対象日の日数(使用日数)、機材の損料計算対象時間の時間数(使用時間数)、および/または、工事識別子等を含んでいてもよい。また、原価データは、工事識別子、会計日付、原価科目区分、および/または、原価等を含んでいてもよい。 Returning to FIG. 1, the journal file 106c stores journal data. Here, the journal file 106c contains equipment damage data including equipment damages incurred up to a predetermined point in the construction period, cost data including damages for each construction work in a predetermined period, and/or equipment carrying in and out at the construction site. Equipment receipt/payment data, etc. related to Also, the journal data may be loss journal data or the like. Here, the loss journal data may have uncompleted construction expenditure as a debit account item and indirect machine rent as a credit account item. In addition, the equipment receipt/payment data includes the equipment identifier, carry-out date, carry-out location identifier, carry-in date, carry-in location identifier, adjustment days corresponding to the construction suspension period, and/or adjustment hours corresponding to the construction suspension period. You can In addition, equipment loss data includes equipment identifier, carry-out date, carry-out location identifier, carry-in date, carry-in location identifier, equipment loss fee, equipment loss unit price, number of days for equipment loss calculation target date (days of use), equipment loss calculation The number of hours of the target time (the number of hours of use) and/or a construction identifier may be included. The cost data may also include construction identifiers, accounting dates, cost category categories, and/or costs.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(タッチパネルを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、およびマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114またはプリンタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface section 108 . The output device 114 can be a monitor (including a touch panel), a speaker, or a printer. The input device 112 can be a keyboard, a mouse, a microphone, or a monitor that cooperates with the mouse to provide a pointing device function. Note that, hereinafter, the output device 114 may be referred to as the monitor 114 or the printer 114 and the input device 112 may be referred to as the keyboard 112 or the mouse 112 .

制御部102は、損料管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、機材受払取得部102aと、機材損料取得部102bと、原価作成部102cと、更新部102dと、仕訳作成部102eとを備えている。 The control unit 102 is a CPU or the like that comprehensively controls the loss management apparatus 100 . The control unit 102 has an internal memory for storing a control program such as an OS, a program defining various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Execute. The control unit 102 functionally and conceptually includes an equipment receipt/payment acquisition unit 102a, an equipment loss charge acquisition unit 102b, a cost creation unit 102c, an update unit 102d, and a journal creation unit 102e.

機材受払取得部102aは、機材の搬入出に関する機材受払データを取得する。ここで、機材受払取得部102aは、機材受払データを仕訳ファイル106cに格納してもよい。 The equipment receipt/payment acquisition unit 102a acquires equipment receipt/payment data related to carry-in/out of equipment. Here, the equipment receipt/payment acquisition unit 102a may store the equipment receipt/payment data in the journal file 106c.

機材損料取得部102bは、機材の損料を含む機材損料データを取得する。ここで、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、施工期間中の所定時点迄に生じた機材の損料を含む機材損料データを取得してもよい。また、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、施工期間中における機材の工事現場への搬入時点から所定時点迄に生じた機材の損料を含む機材損料データを取得してもよい。また、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、施工期間中における機材の直前の搬出場所からの搬出時点から所定時点迄に生じた機材の損料を含む機材損料データを取得してもよい。また、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、施工期間中における機材の搬入日から所定日迄の損料計算対象日の日数と、当該機材の1日当たりの損料単価とを乗じた値を当該機材の損料として取得し、当該損料を含む機材損料データを取得してもよい。また、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、施工期間中における機材の搬入時点から所定時点迄の損料計算対象時間の時間数と、当該機材の1時間当たりの損料単価とを乗じた値を当該機材の損料として取得し、当該損料を含む機材損料データを取得してもよい。また、機材損料取得部102bは、機材損料データを仕訳ファイル106cに格納してもよい。 The equipment loss charge acquisition unit 102b acquires equipment loss data including loss charges of equipment. Here, based on the equipment master 106a, the calendar master 106b, and the equipment payment/receipt data, the equipment loss/damage acquisition unit 102b may acquire equipment loss/damage data including the equipment loss incurred up to a predetermined point in time during the construction period. good. In addition, the equipment damages acquisition unit 102b includes equipment damages incurred from the time the equipment is delivered to the construction site during the construction period until a predetermined time based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data. Equipment loss data may be obtained. Based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data, the equipment damages acquisition unit 102b collects equipment damages that occurred during the construction period from the time the equipment was unloaded from the immediately preceding unloading location to a predetermined time. You may acquire equipment loss data including Further, based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data, the equipment loss fee acquisition unit 102b determines the number of days for which the equipment damage is calculated from the delivery date of the equipment to a predetermined date during the construction period, A value obtained by multiplying the loss charge unit price per day may be acquired as the loss charge for the equipment, and equipment loss charge data including the loss charge may be acquired. In addition, based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data, the equipment loss calculation unit 102b determines the number of hours for which damages are calculated during the construction period from the time the equipment is brought in to a predetermined time, A value obtained by multiplying by the loss charge unit price per hour may be acquired as the loss charge for the equipment, and equipment loss charge data including the loss charge may be acquired. Further, the equipment damage charge acquisition unit 102b may store the equipment damage data in the journal file 106c.

原価作成部102cは、機材損料データに基づいて、所定期間における工事毎の損料を含む原価データを作成する。ここで、原価作成部102cは、原価データを仕訳ファイル106cに格納してもよい。また、所定期間は、1週、1月、2月、半年、または、1年等であってもよい。 The cost creation unit 102c creates cost data including loss charges for each construction work in a predetermined period based on the equipment loss charge data. Here, the cost creation unit 102c may store the cost data in the journal file 106c. Also, the predetermined period may be one week, one month, two months, half a year, one year, or the like.

更新部102dは、施工期間中に工事中止期間が生じた場合、当該工事中止期間に対応する損料計算対象時間および/または損料計算対象日が損料計算対象外となるようにカレンダマスタ106bの更新を実行する。ここで、更新部102dは、更新を実行したカレンダマスタ106bに基づいて、機材受払データに、工事中止期間に対応する調整日数、および/または、工事中止期間に対応する調整時間数を追加する更新を実行してもよい。 If a construction suspension period occurs during the construction period, the update unit 102d updates the calendar master 106b so that the loss calculation target hours and/or loss calculation days corresponding to the construction suspension period are not subject to loss calculation. Execute. Here, the updating unit 102d updates the equipment receipt/payment data by adding the adjusted number of days corresponding to the construction suspension period and/or the adjustment number of hours corresponding to the construction suspension period, based on the calendar master 106b that executed the update. may be executed.

仕訳作成部102eは、仕訳データを作成する。ここで、仕訳作成部102eは、機材損料データまたは原価データに基づいて、損料仕訳データを作成してもよい。また、仕訳作成部102eは、機材損料データまたは原価データに基づいて、工事毎の損料仕訳データを作成してもよい。また、仕訳作成部102eは、期末に到達した場合、機材損料データまたは原価データに基づいて、当期の損料仕訳データを作成してもよい。ここで、期末は、週末、月末、月度末、四半期末、半期末、年末、または、年度末であってもよい。また、仕訳作成部102eは、仕訳データを仕訳ファイル106cに格納してもよい。 The journal creation unit 102e creates journal data. Here, the journal creation unit 102e may create loss journal data based on equipment loss data or cost data. Further, the journal creation unit 102e may create loss journal data for each construction based on equipment loss data or cost data. Further, when the end of the term is reached, the journal creation unit 102e may create loss journal data for the current period based on equipment loss data or cost data. Here, the term end may be a weekend, the end of the month, the end of the month, the end of the quarter, the end of the half term, the end of the year, or the end of the year. Further, the journalizing section 102e may store the journalizing data in the journalizing file 106c.

[3.具体例]
本実施形態の具体例について、図4から図8を参照して説明する。
[3. Concrete example]
A specific example of this embodiment will be described with reference to FIGS. 4 to 8. FIG.

[損料管理処理]
ここで、図4から図8を参照して、本実施形態における損料管理処理の一例について説明する。図4は、本実施形態における損料管理装置100の処理の一例を示すフローチャートである。
[Loss management processing]
Here, an example of loss management processing in this embodiment will be described with reference to FIGS. 4 to 8. FIG. FIG. 4 is a flowchart showing an example of processing of the loss management device 100 in this embodiment.

図4に示すように、機材受払取得部102aは、ユーザにより入力装置112を介して施工期間中における工事現場での機材の搬入出データが入力された場合、搬入出データに基づいて、当該機材受払データを取得し、当該機材受払データを仕訳ファイル106cに格納する(ステップSA-1)。 As shown in FIG. 4 , when the user inputs, via the input device 112, the data on carrying in/out of the equipment at the construction site during the construction period, the equipment receipt/payment acquiring unit 102a acquires the equipment based on the carrying in/out data. Receipt/payment data is acquired, and the equipment receipt/payment data is stored in the journal file 106c (step SA-1).

そして、機材損料取得部102bは、機材マスタ106a、カレンダマスタ106b、および、機材受払データに基づいて、当期の施工期間中における機材の搬入日または期首から、搬出日または本日迄の損料計算対象日の日数と、当該機材の1日当たりの損料単価とを乗じた値を当該機材の損料として取得し、当該損料を含む機材損料データを取得し、当該機材損料データを仕訳ファイル106cに格納する(ステップSA-2)。 Then, based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data, the equipment loss fee acquisition unit 102b calculates the damage fee calculation target dates from the equipment delivery date or the beginning of the term to the removal date or today during the current construction period. multiplied by the number of days and the unit price per day of the equipment is acquired as the loss charge for the equipment, the equipment loss data including the loss charge is acquired, and the equipment loss data is stored in the journalizing file 106c (step SA-2).

そして、原価作成部102cは、機材損料データに基づいて、当期における工事毎の損料を含む原価データを作成し、当該原価データを仕訳ファイル106cに格納する(ステップSA-3)。 Based on the equipment loss data, the cost creation unit 102c creates cost data including loss charges for each construction work in the current period, and stores the cost data in the journal file 106c (step SA-3).

そして、更新部102dは、期末が到来したか否かを判定する(ステップSA-4)。 The update unit 102d then determines whether or not the end of the term has arrived (step SA-4).

そして、更新部102dは、期末が到来していないと判定した場合(ステップSA-4:No)、入力装置112を介して搬入出データが入力されるまで待機して、処理をステップSA-1に移行させる。 Then, if the update unit 102d determines that the end of the term has not arrived (step SA-4: No), it waits until the carry-in/out data is input via the input device 112, and the process proceeds to step SA-1. move to

一方、更新部102dは、期末が到来したと判定した場合(ステップSA-4:Yes)、処理をステップSA-5に移行させる。 On the other hand, when the update unit 102d determines that the end of the term has arrived (step SA-4: Yes), the process proceeds to step SA-5.

そして、更新部102dは、当期の施工期間中に工事中止期間が生じていたか否かを判定する(ステップSA-5)。 Then, the update unit 102d determines whether or not there was a construction suspension period during the current construction period (Step SA-5).

そして、更新部102dは、当期の施工期間中に工事中止期間が生じていないと判定した場合(ステップSA-5:No)、処理をステップSA-9に移行させる。 When the updating unit 102d determines that there is no construction suspension period during the current construction period (step SA-5: No), the update unit 102d shifts the process to step SA-9.

一方、更新部102dは、当期の施工期間中に工事中止期間が生じていたと判定した場合(ステップSA-5:Yes)、処理をステップSA-6に移行させる。 On the other hand, if the updating unit 102d determines that the construction work suspension period has occurred during the current construction period (step SA-5: Yes), the update unit 102d shifts the process to step SA-6.

そして、更新部102dは、当期の施工期間中に生じた工事中止期間に対応する損料計算対象日を損料計算対象外となるようにカレンダマスタ106bの更新を実行し、更新を実行した当該カレンダマスタ106bに基づいて、機材受払データに、工事中止期間に対応する調整日数、および/または、工事中止期間に対応する調整時間数を追加する更新を実行する(ステップSA-6)。 Then, the updating unit 102d updates the calendar master 106b so that the loss calculation target date corresponding to the construction suspension period that occurred during the current construction period is excluded from loss calculation, and updates the calendar master 106b that has executed the update. 106b, update is performed to add the adjusted number of days corresponding to the construction suspension period and/or the adjustment number of hours corresponding to the construction suspension period to the equipment receipt/payment data (Step SA-6).

そして、機材損料取得部102bは、機材マスタ106a、更新部102dにより更新されたカレンダマスタ106b、および、更新部102dにより更新された機材受払データに基づいて、当期の施工期間中における機材の搬入日または期首から、搬出日または本日迄の損料計算対象日の日数と、当該機材の1日当たりの損料単価とを乗じた値を当該機材の損料として取得し、当該損料を含む機材損料データを取得し、当該機材損料データを仕訳ファイル106cに格納する(ステップSA-7)。 Then, based on the equipment master 106a, the calendar master 106b updated by the updating unit 102d, and the equipment receipt/payment data updated by the updating unit 102d, the equipment loss acquisition unit 102b determines the delivery date of the equipment during the current construction period. Or, from the beginning of the term, multiply the number of days for which damage charges are calculated from the date of delivery or today by the unit price per day for the equipment, and acquire the equipment damage charge data including the damage charges. , the equipment loss data is stored in the journal file 106c (step SA-7).

そして、原価作成部102cは、機材損料データに基づいて、当期における工事毎の損料を含む原価データを作成し、当該原価データを仕訳ファイル106cに格納する(ステップSA-8)。 Based on the equipment loss data, the cost creation unit 102c creates cost data including loss charges for each construction work in the current term, and stores the cost data in the journalizing file 106c (step SA-8).

そして、仕訳作成部102eは、原価データに基づいて、借方の勘定科目が未成工事支出金、且つ、貸方の勘定科目が間接機械賃借料である、当期の工事毎の損料仕訳データを作成し(ステップSA-9)、処理を終了する。 Then, based on the cost data, the journal creation unit 102e creates loss journal data for each construction work in the current term, in which the debit account item is uncompleted construction expenditure and the credit account item is indirect machine rent ( Step SA-9), the process ends.

ここで、図2、図3、および、図5から図8を参照して、本実施形態における損料管理処理の具体例について説明する。図5から図8は、本実施形態における損料管理処理の一例を示すフロー図である。 Here, a specific example of loss management processing in this embodiment will be described with reference to FIGS. 2, 3, and 5 to 8. FIG. 5 to 8 are flow diagrams showing an example of loss management processing in this embodiment.

図5に示すように、本実施形態においては、2018年12月1日に、機材センタからK001:クレーン、および、K002:ボーリングマシンが工事Aに出庫され、ユーザによる出庫データ入力により機材受払データが取得される(ステップSB-1)。ここで、当タイミングにおいては、機材が工事現場に到着していないため、損料は発生しない。 As shown in FIG. 5, in this embodiment, on December 1, 2018, K001: Crane and K002: Boring machine were delivered from the equipment center to Construction A, and the delivery data input by the user resulted in the receipt and payment data of the equipment. is acquired (step SB-1). Here, at this timing, the equipment has not arrived at the construction site, so no loss is incurred.

そして、図5に示すように、本実施形態においては、2018年12月3日に、K001:クレーンおよびK002:ボーリングマシンが工事Aの現場へ到着して使用開始され、ユーザによる入庫データ入力により機材受払データが取得され、機材マスタ106a、カレンダマスタ106b、および、当該機材受払データに基づいて、機材損料データ、および、原価データが取得される(ステップSB-2)。 Then, as shown in FIG. 5, in this embodiment, on December 3, 2018, K001: Crane and K002: Boring machine arrived at the site of construction A and started to be used. Equipment receipt/payment data is obtained, and equipment loss data and cost data are obtained based on the equipment master 106a, calendar master 106b, and the equipment receipt/payment data (step SB-2).

そして、図6に示すように、本実施形態においては、2018年12月6日に、K001:クレーンが工事Aの現場から工事Bの現場へ出庫され、ユーザによる出庫データ入力により機材受払データが取得され、機材マスタ106a、カレンダマスタ106b、および、当該機材受払データに基づいて、機材損料データ、および、原価データが取得される(ステップSB-3)。このように、本実施形態においては、出庫日当日は損料計算対象日の日数としてカウントされない。 Then, as shown in FIG. 6, in this embodiment, on December 6, 2018, K001: Crane is delivered from the site of construction A to the site of construction B, and the delivery data is input by the user, and the equipment receipt and payment data is obtained. Based on the acquired equipment master 106a, calendar master 106b, and the relevant equipment receipt/payment data, equipment loss data and cost data are acquired (step SB-3). Thus, in this embodiment, the day of delivery is not counted as the number of days subject to loss calculation.

そして、図6に示すように、本実施形態においては、2018年12月8日に、K001:クレーンが工事Bの現場へ到着して使用開始され、ユーザによる入庫データ入力により機材受払データが取得され、機材マスタ106a、カレンダマスタ106b、および、当該機材受払データに基づいて、機材損料データ、および、原価データが取得される(ステップSB-4)。 Then, as shown in FIG. 6, in this embodiment, on December 8, 2018, K001: Crane arrived at the site of construction B and started to be used, and the user entered the receipt data to acquire the equipment receipt/payment data. Then, based on the equipment master 106a, the calendar master 106b, and the equipment receipt/payment data, the equipment loss data and cost data are acquired (step SB-4).

そして、図7に示すように、本実施形態においては、2018年12月12日に、K001:クレーンが工事Bの現場から機材センタへ返却され、K002:ボーリングマシンが工事Aの現場から機材センタへ返却され、ユーザによる出庫データ入力により機材受払データが取得され、機材マスタ106a、カレンダマスタ106b、および、当該機材受払データに基づいて、機材損料データ、および、原価データが取得される(ステップSB-5)。 Then, as shown in FIG. 7, in this embodiment, on December 12, 2018, K001: the crane was returned from the construction B site to the equipment center, and K002: the boring machine was returned from the construction A site to the equipment center. , and the user inputs delivery data to acquire equipment receipt/payment data, and based on the equipment master 106a, calendar master 106b, and the equipment receipt/payment data, equipment loss data and cost data are obtained (step SB -5).

そして、図7に示すように、本実施形態においては、2018年12月15日に、K001:クレーン、および、K002:ボーリングマシンが機材センタへ到着して入庫され、ユーザによる入庫データ入力により機材受払データが取得され、機材マスタ106a、カレンダマスタ106b、および、当該機材受払データに基づいて、機材損料データ、および、原価データが取得される(ステップSB-6)。 Then, as shown in FIG. 7, in this embodiment, on December 15, 2018, K001: Crane and K002: Boring machine arrived at the equipment center and were stored. Receipt/payment data is acquired, and equipment loss data and cost data are acquired based on the equipment master 106a, calendar master 106b, and the equipment receipt/payment data (step SB-6).

そして、図8に示すように、本実施形態においては、2018年12月度において、機材が工事の現場にはあるが、自然災害(例えば、台風)等の要因により工事が止まっていた期間を使用日数から調整するために、ユーザによる損料調整入力により工事Aの2日分(2018年12月9日から2018年12月10日)を損料計算対象外とし調整する(ステップSB-7)。このように、本実施形態においては、図3に示すように、カレンダマスタ106bにおいて、2018年12月9日から2018年12月10日迄が損料計算対象外を設定することで、当該期間を、損料計算対象日の日数としてカウントされないようにしている。 As shown in FIG. 8, in this embodiment, in December 2018, the equipment is at the construction site, but the construction is stopped due to factors such as natural disasters (for example, typhoons). In order to adjust from the number of days, two days' worth of construction work A (December 9, 2018 to December 10, 2018) are excluded from the calculation of loss charges by the user's charge adjustment input (step SB-7). Thus, in the present embodiment, as shown in FIG. 3, the period from December 9, 2018 to December 10, 2018 is set to be excluded from loss calculation in the calendar master 106b. , so that it is not counted as the number of days for loss calculation days.

そして、図8に示すように、本実施形態においては、2018年12月度末において、借方の勘定科目が未成工事支出金、且つ、貸方の勘定科目が間接機械賃借料である、12月度の工事Aおよび工事Bの損料仕訳データを作成する(ステップSB-8)。 As shown in FIG. 8, in the present embodiment, at the end of December 2018, the debit account item is uncompleted construction expenditure, and the credit account item is indirect machine rent. Create loss journal entry data for A and construction B (step SB-8).

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
The present invention may be implemented in various different embodiments other than the embodiments described above within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being automatically performed can be manually performed, or all of the processes described as being manually performed Alternatively, some can be done automatically by known methods.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, unless otherwise specified, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings can be changed arbitrarily.

また、損料管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Also, with respect to the loss management device 100, each component shown in the figure is functionally conceptual, and does not necessarily need to be physically configured as shown in the figure.

例えば、損料管理装置100が備える処理機能、特に制御部102にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて損料管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions of the loss management device 100, particularly the processing functions performed by the control unit 102, are implemented in whole or in part by a CPU and a program interpreted and executed by the CPU. Alternatively, it may be implemented as hardware using wired logic. The program is recorded on a non-temporary computer-readable recording medium containing programmed instructions for causing the information processing device to execute the processing described in this embodiment, and if necessary, the loss management device 100 mechanically read. That is, a storage unit such as a ROM or HDD (Hard Disk Drive) stores a computer program for giving commands to the CPU in cooperation with the OS to perform various processes. This computer program is executed by being loaded into the RAM and constitutes a control section in cooperation with the CPU.

また、このコンピュータプログラムは、損料管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 In addition, this computer program may be stored in an application program server connected to the loss management apparatus 100 via any network, and it is possible to download all or part of it as necessary. be.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) DiSB等の任意の「可搬用の物理媒体」を含むものとする。 Also, the program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the term "recording medium" refers to memory cards, USB (Universal Serial Bus) memories, SD (Secure Digital) cards, flexible disks, magneto-optical disks, ROMs, EPROMs (Erasable Programmable Read Only Memory), EEPROMs (registered trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk), DVD (Digital Versatile Disk), and Blu-ray (registered trademark) DiSB, etc. shall include any "portable physical medium".

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、本実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 A "program" is a data processing method written in any language or writing method, regardless of the format such as source code or binary code. In addition, the "program" is not necessarily limited to a single structure, but is distributed as a plurality of modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. It should be noted that well-known configurations and procedures can be used for the specific configuration and reading procedure for reading the recording medium in each device shown in the present embodiment, the installation procedure after reading, and the like.

記憶部106に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 The various databases and the like stored in the storage unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks. programs, tables, databases, and files for web pages.

また、損料管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、損料管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the loss management apparatus 100 may be configured as an information processing apparatus such as a known personal computer or workstation, or may be configured as the information processing apparatus to which any peripheral device is connected. Further, the loss management apparatus 100 may be realized by installing software (including programs, data, etc.) that causes the apparatus to realize the processing described in the present embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution and integration of devices is not limited to the one shown in the figure, and all or part of them can be functionally or physically arranged in arbitrary units according to various additions or functional loads. It can be distributed and integrated. In other words, the embodiments described above may be arbitrarily combined and implemented, or the embodiments may be implemented selectively.

本発明は、損料計算を行う機材を使用する建設業・工事業等の業界において有用である。 INDUSTRIAL APPLICABILITY The present invention is useful in industries such as the construction industry and engineering industry that use equipment for calculating damages.

100 損料管理装置
102 制御部
102a 機材受払取得部
102b 機材損料取得部
102c 原価作成部
102d 更新部
102e 仕訳作成部
104 通信インターフェース部
106 記憶部
106a 機材マスタ
106b カレンダマスタ
106c 仕訳ファイル
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 loss management device 102 control unit 102a equipment receipt and payment acquisition unit 102b equipment loss acquisition unit 102c cost creation unit 102d update unit 102e journal creation unit 104 communication interface unit 106 storage unit 106a equipment master 106b calendar master 106c journal file 108 input/output interface unit 112 Input device 114 Output device 200 Server 300 Network

Claims (13)

記憶部と制御部とを備えた損料管理装置であって、
前記記憶部は、
各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、
施工期間中の損料計算対象時間および損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、
を備え、
前記制御部は、
前記機材の搬入出時点を設定した機材受払データを取得する機材受払取得手段と、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の前記搬入出時点もしくは期首から前記搬入出時点もしくは本日迄の、前記損料計算対象日の日数と当該機材の1日当たりの前記損料単価とを乗じた値、または、前記損料計算対象時間の時間数と当該機材の1時間当たりの前記損料単価とを乗じた値を前記機材の損料として取得し、当該損料を含む機材損料データを取得する機材損料取得手段と、
を備えたことを特徴とする損料管理装置。
A loss management device comprising a storage unit and a control unit,
The storage unit
Equipment storage means for storing an equipment master in which a loss unit price for each equipment is set;
a calendar storage means for storing a calendar master in which the time for loss calculation and the date for loss calculation during the construction period are set;
with
The control unit
equipment receipt/payment acquisition means for acquiring equipment receipt/payment data in which the equipment delivery/removal time points are set ;
Based on the equipment master, the calendar master, and the equipment receipt/payment data, the number of days on which damages are to be calculated from the time of carrying in/out of the equipment during the construction period or the beginning of the period to the time of carrying in/out or today, and A value obtained by multiplying the loss charge unit price per day of the equipment, or a value obtained by multiplying the number of hours of the loss charge calculation target time and the loss charge unit price per hour of the equipment as the loss charge for the equipment , Equipment damage charge acquisition means for acquiring equipment damage charge data including the damage charge;
A loss management device characterized by comprising:
前記制御部は、
前記機材損料データに基づいて、借方の勘定科目が未成工事支出金、且つ、貸方の勘定科目が間接機械賃借料である損料仕訳データを作成する仕訳作成手段、
を更に備えたことを特徴とする請求項1に記載の損料管理装置。
The control unit
Journal creation means for creating loss journal data in which the debit account item is uncompleted construction expenditure and the credit account item is indirect machine rent, based on the equipment loss data;
2. The loss management device according to claim 1, further comprising: a.
前記機材損料取得手段は、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の工事現場への搬入時点から前記搬入出時点もしくは前記本日迄の、前記損料計算対象日の日数と当該機材の1日当たりの前記損料単価とを乗じた値、または、前記損料計算対象時間の時間数と当該機材の1時間当たりの前記損料単価とを乗じた値を前記機材の損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする請求項1または2に記載の損料管理装置。
The equipment damage fee acquisition means includes:
Based on the equipment master, the calendar master, and the equipment receipt/payment data , the number of days on which the damages are to be calculated from the time the equipment is brought into the construction site during the construction period until the time of carry-in/out or the current day. and the unit price per day of the equipment concerned, or the value obtained by multiplying the number of hours of the time subject to the calculation of the loss fee and the unit price per hour of the equipment concerned, will be acquired as the loss fee for the equipment . 3. The equipment loss management apparatus according to claim 1, wherein the equipment damage charge data including the loss charge is obtained.
前記機材損料取得手段は、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の直前の搬出場所からの搬出時点から前記搬入出時点もしくは前記本日迄の、前記損料計算対象日の日数と当該機材の1日当たりの前記損料単価とを乗じた値、または、前記損料計算対象時間の時間数と当該機材の1時間当たりの前記損料単価とを乗じた値を前記機材の損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする請求項1または2に記載の損料管理装置。
The equipment damage fee acquisition means includes:
Based on the equipment master, the calendar master, and the equipment receipt/payment data , the loss calculation date from the time of unloading of the equipment from the immediately preceding unloading location during the construction period to the time of carrying in/out or the current day. The value obtained by multiplying the number of days of the above by the loss unit price per day of the equipment, or the value obtained by multiplying the number of hours for which the loss fee is calculated and the loss unit price per hour of the equipment, shall be the loss fee for the equipment . 3. The equipment damage management apparatus according to claim 1 , wherein the equipment damage charge data including the damage charge is acquired.
前記損料単価は、
1時間当たりの単価、および/または、1日当たりの単価であることを特徴とする請求項1から4のいずれか一つに記載の損料管理装置。
The loss unit price is
5. The loss management device according to any one of claims 1 to 4, characterized in that it is a unit price per hour and/or a unit price per day.
前記機材損料取得手段は、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の搬入日から前記搬入出時点もしくは前記本日迄の前記損料計算対象日の日数と、当該機材の1日当たりの前記損料単価とを乗じた値を当該機材の前記損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする請求項1または2に記載の損料管理装置。
The equipment damage fee acquisition means includes:
Based on the equipment master, the calendar master, and the equipment receipt/payment data, the number of days of the loss calculation target date from the date of delivery of the equipment during the construction period to the time of delivery or the current day , and the number of days of the equipment 3. The loss management device according to claim 1, wherein a value obtained by multiplying the loss charge unit price per day is acquired as the loss charge for the equipment, and the equipment loss charge data including the loss charge is acquired.
前記機材損料取得手段は、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の搬入時点から前記搬入出時点もしくは前記本日迄の前記損料計算対象時間の時間数と、当該機材の1時間当たりの前記損料単価とを乗じた値を当該機材の前記損料として取得し、当該損料を含む前記機材損料データを取得することを特徴とする請求項1または2に記載の損料管理装置。
The equipment damage fee acquisition means includes:
Based on the equipment master, the calendar master, and the equipment receipt/payment data, the number of hours of the loss calculation target time from the time of carrying in the equipment during the construction period to the time of carrying in and out or until the current day , and the equipment 3. The loss charge management device according to claim 1 or 2, wherein a value obtained by multiplying the loss charge unit price per hour is acquired as the loss charge for the equipment, and the equipment loss charge data including the loss charge is acquired. .
前記制御部は、
前記施工期間中に工事中止期間が生じた場合、当該工事中止期間に対応する前記損料計算対象時間および/または前記損料計算対象日が損料計算対象外となるように前記カレンダマスタの更新を実行する更新手段、
を更に備えたことを特徴とする請求項1から7のいずれか一つに記載の損料管理装置。
The control unit
If a construction suspension period occurs during the construction period, the calendar master is updated so that the loss calculation target time and/or the loss calculation target date corresponding to the construction suspension period are not subject to loss calculation. update means,
The loss management device according to any one of claims 1 to 7, further comprising:
前記更新手段は、
更に、更新を実行した前記カレンダマスタに基づいて、前記機材受払データに、前記工事中止期間に対応する調整日数、および/または、前記工事中止期間に対応する調整時間数を追加する更新を実行することを特徴とする請求項8に記載の損料管理装置。
The updating means is
Furthermore, based on the updated calendar master, update is performed to add the number of adjustment days corresponding to the construction suspension period and/or the number of adjustment hours corresponding to the construction suspension period to the equipment receipt and payment data. The loss management device according to claim 8, characterized in that:
前記仕訳作成手段は、
前記機材損料データに基づいて、工事毎の前記損料仕訳データを作成することを特徴とする請求項2に記載の損料管理装置。
The journal creation means is
3. The loss management apparatus according to claim 2, wherein the loss journal data for each construction work is created based on the equipment loss data.
前記仕訳作成手段は、
期末に到達した場合、前記機材損料データに基づいて、当期の前記損料仕訳データを作成することを特徴とする請求項2に記載の損料管理装置。
The journal creation means is
3. The loss management apparatus according to claim 2, wherein when the end of the term is reached, the loss journal data for the current term is created based on the equipment loss data.
記憶部と制御部とを備えた損料管理装置に実行させるための損料管理方法であって、
前記記憶部は、
各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、
施工期間中の損料計算対象時間および損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、
を備え、
前記制御部で実行さる、
前記機材の搬入出時点を設定した機材受払データを取得する機材受払取得ステップと、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の前記搬入出時点もしくは期首から前記搬入出時点もしくは本日迄の、前記損料計算対象日の日数と当該機材の1日当たりの前記損料単価とを乗じた値、または、前記損料計算対象時間の時間数と当該機材の1時間当たりの前記損料単価とを乗じた値を前記機材の損料として取得し、当該損料を含む機材損料データを取得する機材損料取得ステップと、
を含むことを特徴とする損料管理方法。
A loss management method to be executed by a loss management device comprising a storage unit and a control unit,
The storage unit
Equipment storage means for storing an equipment master in which a loss unit price for each equipment is set;
a calendar storage means for storing a calendar master in which the time for loss calculation and the date for loss calculation during the construction period are set;
with
executed by the control unit;
an equipment receipt/payment acquiring step of acquiring equipment receipt/payment data in which the equipment delivery/receipt time points are set ;
Based on the equipment master, the calendar master, and the equipment receipt/payment data, the number of days on which damages are to be calculated from the time of carrying in/out of the equipment during the construction period or the beginning of the period to the time of carrying in/out or today, and A value obtained by multiplying the loss charge unit price per day of the equipment, or a value obtained by multiplying the number of hours of the loss charge calculation target time and the loss charge unit price per hour of the equipment as the loss charge for the equipment , an equipment damage charge acquisition step for acquiring equipment damage data including the damage charge;
A loss management method, comprising:
記憶部と制御部とを備えた損料管理装置に実行させるための損料管理プログラムであって、
前記記憶部は、
各機材に対する損料単価を設定した機材マスタを記憶する機材記憶手段と、
施工期間中の損料計算対象時間および損料計算対象日を設定したカレンダマスタを記憶するカレンダ記憶手段と、
を備え、
前記制御部において、
前記機材の搬入出時点を設定した機材受払データを取得する機材受払取得ステップと、
前記機材マスタ、前記カレンダマスタ、および、前記機材受払データに基づいて、前記施工期間中における前記機材の前記搬入出時点もしくは期首から前記搬入出時点もしくは本日迄の、前記損料計算対象日の日数と当該機材の1日当たりの前記損料単価とを乗じた値、または、前記損料計算対象時間の時間数と当該機材の1時間当たりの前記損料単価とを乗じた値を前記機材の損料として取得し、当該損料を含む機材損料データを取得する機材損料取得ステップと、
を実行させるための損料管理プログラム。
A loss management program to be executed by a loss management device comprising a storage unit and a control unit,
The storage unit
Equipment storage means for storing an equipment master in which a loss unit price for each equipment is set;
a calendar storage means for storing a calendar master in which the time for loss calculation and the date for loss calculation during the construction period are set;
with
In the control unit,
an equipment receipt/payment acquiring step of acquiring equipment receipt/payment data in which the equipment delivery/receipt time points are set ;
Based on the equipment master, the calendar master, and the equipment receipt/payment data, the number of days on which damages are to be calculated from the time of carrying in/out of the equipment during the construction period or the beginning of the period to the time of carrying in/out or today, and A value obtained by multiplying the loss charge unit price per day of the equipment, or a value obtained by multiplying the number of hours of the loss charge calculation target time and the loss charge unit price per hour of the equipment as the loss charge for the equipment , an equipment damage charge acquisition step for acquiring equipment damage data including the damage charge;
Loss and loss management program for executing
JP2019061242A 2019-03-27 2019-03-27 Claims management device, claims management method, and claims management program Active JP7297493B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2019061242A JP7297493B2 (en) 2019-03-27 2019-03-27 Claims management device, claims management method, and claims management program
JP2023090058A JP2023110005A (en) 2019-03-27 2023-05-31 Rent management device, rent management method, and rent management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019061242A JP7297493B2 (en) 2019-03-27 2019-03-27 Claims management device, claims management method, and claims management program

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2023090058A Division JP2023110005A (en) 2019-03-27 2023-05-31 Rent management device, rent management method, and rent management program

Publications (2)

Publication Number Publication Date
JP2020160935A JP2020160935A (en) 2020-10-01
JP7297493B2 true JP7297493B2 (en) 2023-06-26

Family

ID=72643544

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019061242A Active JP7297493B2 (en) 2019-03-27 2019-03-27 Claims management device, claims management method, and claims management program
JP2023090058A Pending JP2023110005A (en) 2019-03-27 2023-05-31 Rent management device, rent management method, and rent management program

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2023090058A Pending JP2023110005A (en) 2019-03-27 2023-05-31 Rent management device, rent management method, and rent management program

Country Status (1)

Country Link
JP (2) JP7297493B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7534981B2 (en) 2021-02-25 2024-08-15 株式会社オービック Hibernation setting management device, hibernation setting management method, and hibernation setting management program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006268717A (en) 2005-03-25 2006-10-05 Chugoku Electric Power Co Inc:The Civil engineering cost integration system
JP2007034347A (en) 2005-07-22 2007-02-08 Chugoku Electric Power Co Inc:The Tunnel construction cost integration system
JP2007310621A (en) 2006-05-18 2007-11-29 Hitachi Constr Mach Co Ltd Tool for supporting aggregate reproduction system construction and device for supporting aggregate reproduction system construction
JP2014026394A (en) 2012-07-25 2014-02-06 Kibi Syst Kk Integration system and program
JP2018206007A (en) 2017-06-02 2018-12-27 株式会社オービック Shared expense prorating device, shared expense prorating method, and shared expense prorating program

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04337864A (en) * 1991-05-14 1992-11-25 P C Ee Kk Accounts processor for construction business
JP2786086B2 (en) * 1993-09-02 1998-08-13 日本電気株式会社 Direct construction cost calculator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006268717A (en) 2005-03-25 2006-10-05 Chugoku Electric Power Co Inc:The Civil engineering cost integration system
JP2007034347A (en) 2005-07-22 2007-02-08 Chugoku Electric Power Co Inc:The Tunnel construction cost integration system
JP2007310621A (en) 2006-05-18 2007-11-29 Hitachi Constr Mach Co Ltd Tool for supporting aggregate reproduction system construction and device for supporting aggregate reproduction system construction
JP2014026394A (en) 2012-07-25 2014-02-06 Kibi Syst Kk Integration system and program
JP2018206007A (en) 2017-06-02 2018-12-27 株式会社オービック Shared expense prorating device, shared expense prorating method, and shared expense prorating program

Also Published As

Publication number Publication date
JP2023110005A (en) 2023-08-08
JP2020160935A (en) 2020-10-01

Similar Documents

Publication Publication Date Title
JP2023110005A (en) Rent management device, rent management method, and rent management program
JP2021119512A (en) Project accounting management device, project accounting management method, and project accounting management program
JP2022097622A (en) Information processing device, information processing method and information processing program
JP2018055265A (en) Expense calculation device, expense calculation method and expense calculation program
JP7060951B2 (en) Rebate management device, rebate management method, and rebate management program
JP6827837B2 (en) Project-specific credit management device, project-specific credit management method, and project-specific credit management program
JP2018005519A (en) Accounting processing device, accounting processing method, and accounting processing program
JP7474041B2 (en) Accrued expense transfer device, incurred expense transfer method, and incurred expense transfer program
JP7406361B2 (en) Planned progress rate calculation device, planned progress rate calculation method, and planned progress rate calculation program
JP2022073189A (en) Contract management work support device, contract management work support program, and contract management work support method
JP7530329B2 (en) Workers' Accident Insurance Premium Management Device, Workers' Accident Insurance Premium Management Method, and Workers' Accident Insurance Premium Management Program
JP7557495B2 (en) Workers' Accident Insurance Renewal Device, Workers' Accident Insurance Renewal Method, and Workers' Accident Insurance Renewal Program
JP2019016234A (en) Sales management device, sales management method, and sales management program
JP7064381B2 (en) Miscalculation confirmation business support device, miscalculation confirmation business support method and miscalculation confirmation business support program
JP7499112B2 (en) Sales recording device, sales recording method, and sales recording program
JP7412315B2 (en) Cost accounting device, cost accounting method, and cost accounting program
JP7250979B2 (en) Accounting error confirmation work support device, account error confirmation work support method, and account error confirmation work support program
JP7373460B2 (en) Credit management device, credit management method, and credit management program
JP7335220B2 (en) Purchase order issuance management device, purchase order issuance management method, and purchase order issuance management program
JP2021157331A (en) Past fiscal year retrospective device, past fiscal year retrospective method, and past fiscal year retrospective program
JP7198126B2 (en) Accrued revenue journal entry device, accrued revenue journal entry method, and accrued revenue journal entry program
JP7299681B2 (en) Contract-type receivables settlement processing device, contract-type receivables settlement processing method, and contract-type receivables settlement processing program
JP6983647B2 (en) Personnel cost management device, personnel cost management method, and labor cost management program
JP2022129995A (en) Suspension setting management device, suspension setting management method, and suspension setting management program
JP2023014893A (en) Interest rate at offset management device, interest rate at offset management method, and interest rate at offset management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221213

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230516

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230614

R150 Certificate of patent or registration of utility model

Ref document number: 7297493

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150