JP7206694B2 - Information processing device and information processing program - Google Patents

Information processing device and information processing program Download PDF

Info

Publication number
JP7206694B2
JP7206694B2 JP2018158040A JP2018158040A JP7206694B2 JP 7206694 B2 JP7206694 B2 JP 7206694B2 JP 2018158040 A JP2018158040 A JP 2018158040A JP 2018158040 A JP2018158040 A JP 2018158040A JP 7206694 B2 JP7206694 B2 JP 7206694B2
Authority
JP
Japan
Prior art keywords
project
risk
progress
determined
user group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018158040A
Other languages
Japanese (ja)
Other versions
JP2020034963A (en
Inventor
建一郎 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Business Innovation Corp
Original Assignee
Fuji Xerox Co Ltd
Fujifilm Business Innovation Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Xerox Co Ltd, Fujifilm Business Innovation Corp filed Critical Fuji Xerox Co Ltd
Priority to JP2018158040A priority Critical patent/JP7206694B2/en
Publication of JP2020034963A publication Critical patent/JP2020034963A/en
Application granted granted Critical
Publication of JP7206694B2 publication Critical patent/JP7206694B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、情報処理装置及び情報処理プログラムに関する。 The present invention relates to an information processing device and an information processing program.

特許文献1には、プロジェクト関係者間のコミュニケーションに関連するプロジェクトリスクの予測を支援することを課題とし、プロジェクト関係者の端末、サーバーがネットワーク上に存在し、サーバーは、発信者識別子と発信日時とを含む情報がメッセージ毎に格納されるコミュニケーション情報蓄積部、演算処理部を有し、演算処理部は、いずれかの端末がメッセージを発信すると、そのメッセージに関するコミュニケーション情報をコミュニケーション情報蓄積部に格納し、また、コミュニケーション情報蓄積部の蓄積情報に基づき、プロジェクト関係者毎に、プロジェクト関係者のメッセージ送信回数を時系列に表す解析情報を出力することが開示されている。 In Patent Document 1, the task is to support the prediction of project risks related to communication between project stakeholders, and the terminals and servers of the project stakeholders are present on the network, and the server has a caller identifier and the date and time of the call. is stored for each message, and the arithmetic processing unit stores communication information related to the message in the communication information storage unit when any terminal transmits a message. Further, it is disclosed that analysis information representing the number of message transmissions by project participants in chronological order is output for each project participant based on the accumulated information in the communication information accumulation unit.

特許文献2には、プロジェクト関係者間のコミュニケーションに関連するプロジェクトリスクの予測を支援することを課題とし、サーバーは、発信者識別子と発信日時と受信者識別子と受信日とを含む情報がメッセージ毎に格納されるコミュニケーション情報蓄積部、演算処理部を有し、演算処理部は、いずれかの端末がメッセージを発信すると、そのメッセージに関するコミュニケーション情報をコミュニケーション情報蓄積部に格納し、また、コミュニケーション情報蓄積部の蓄積情報に基づき、プロジェクト関係者毎に、プロジェクト関係者のメッセージ送信回数を時系列に表す解析情報を出力することが開示されている。 In Patent Document 2, the task is to support prediction of project risks related to communication between project stakeholders, and the server stores information including the sender identifier, the date and time of transmission, the recipient identifier, and the date of reception for each message. When any terminal transmits a message, the arithmetic processing unit stores the communication information related to the message in the communication information storage unit, and the communication information storage unit It is disclosed that analysis information representing the number of message transmissions of project stakeholders in chronological order is output for each project stakeholder based on the accumulated information of the department.

特許文献3には、予め決められたテキストの表現と意図との関係に基づいて、プロジェクトに関連するテキスト文に含まれる発言の意図を判定する意図判定手段と、予め決められたテキスト表現とトピックとの関係に基づいて、前記テキスト文に含まれる発言のトピックを判定するトピック判定手段と、複数の発言の意図及びトピックの出現パターンからなるリスク文抽出条件が記憶された抽出条件記憶手段と、前記意図判定手段により判定された意図及び前記トピック判定手段により判定されたトピックと、前記抽出条件記憶手段に記憶されているリスク文抽出条件とを照合し、前記リスク文抽出条件に合致する意図及びトピックに対応する発言をリスク発言として特定する発言特定手段とを有することが開示されている。 Patent Document 3 discloses intention determination means for determining the intention of utterances contained in text sentences related to a project based on the relationship between predetermined text expressions and intentions; extraction condition storage means for storing a risk sentence extraction condition consisting of a plurality of utterance intentions and topic appearance patterns; The intention determined by the intention determination means and the topic determined by the topic determination means are collated with the risk sentence extraction conditions stored in the extraction condition storage means, and the intention and topic matching the risk sentence extraction conditions are compared. utterance identification means for identifying utterances corresponding to the topic as risk utterances.

特許文献4には、発言内容の類似度を指標として話題の分布を分析し、特定の話題の変遷を追跡することを課題とし、発言内容分析部は発言を分析してその内容に関するユーザープロファイル(グラフ)を構築し、タスク構造解析部はタスクの登録されているユーザー情報に基づいて各ユーザーのタスクリストを生成し、プロファイル類似度判定部はユーザー間のプロファイル(発言内容)の類似度を計算し、距離計算部は、タスクマップを参照して辿る最短ルートのタスク距離を算出し、類似度集計部は距離毎の類似度(類似発言ユーザー数や平均値)の分布を集計して、分析結果出力部はこれを出力することが開示されている。 In Patent Document 4, the distribution of topics is analyzed using the degree of similarity of utterance content as an index, and the task is to track the transition of a specific topic. graph), the task structure analysis unit generates a task list for each user based on the user information registered for the task, and the profile similarity determination unit calculates the similarity of profiles (contents of remarks) between users. Then, the distance calculation unit calculates the task distance of the shortest route followed by referring to the task map, and the similarity aggregation unit aggregates the distribution of similarity for each distance (number of users with similar comments and average values) and analyzes It is disclosed that the result output unit outputs this.

特開2004-054606号公報JP 2004-054606 A 特開2004-127140号公報Japanese Patent Application Laid-Open No. 2004-127140 特許第5212604号公報Japanese Patent No. 5212604 特開2007-072549号公報JP 2007-072549 A

複数のユーザーで構成されるユーザー群が参加するプロジェクトの進捗において、リスクが発生することがある。特に、プロジェクトに関わるコミュニケーションと、そのプロジェクトの進捗において、その兆候が現れる。また、他のプロジェクトにおいては、同じリスクを解決している場合がある。しかし、その知見を生かすことは困難である。
本発明は、コミュニケーション情報と進捗情報から、プロジェクトの進捗におけるリスクを判定し、コラボレーション相手の候補として他のプロジェクトを通知することができる情報処理装置及び情報処理プログラムを提供することを目的としている。
Risks may arise in the progress of a project involving a group of users consisting of multiple users. In particular, the symptoms appear in the communication related to the project and the progress of the project. Other projects may have resolved the same risks. However, it is difficult to make use of the knowledge.
SUMMARY OF THE INVENTION It is an object of the present invention to provide an information processing apparatus and an information processing program capable of judging risks in the progress of a project from communication information and progress information and notifying other projects as collaboration partner candidates.

かかる目的を達成するための本発明の要旨とするところは、次の各項の発明に存する。なお、以下の「請求項」とあるのは、出願当初の請求項である。
請求項1の発明は、複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段を有する情報処理装置である。
The gist of the present invention for achieving this object lies in the following inventions. The "claims" below are the claims as originally filed.
According to the invention of claim 1, in a first project in which a first user group consisting of a plurality of users participates, communication information related to the first project and progress information indicating the progress of the first project. a determination means for determining whether or not there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means; and the determination means that there is a risk. if determined, at least one or more users of said first group of users collaborate on a second project in which a second group of users different from at least one of said first group of users participates It is an information processing apparatus having notification means for notifying as a partner candidate.

請求項2の発明は、前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段をさらに有し、前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択する、請求項1に記載の情報処理装置である。 The invention according to claim 2 further comprises a second acquiring means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the other project. 2. The information processing apparatus according to claim 1, wherein said notification means selects said second project from said communication information and said progress information acquired by said second acquisition means.

請求項3の発明は、前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、請求項2に記載の情報処理装置である。 In the invention according to claim 3, the determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means, and the notification means 3. The information processing apparatus according to claim 2, wherein in the items determined to have risk in said first project, another project determined to have no risk is selected as said second project.

請求項4の発明は、前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、過去にリスク有りと判定され、現在はリスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、請求項3に記載の情報処理装置である。 In the invention according to claim 4, the notification means, in the item judged to have a risk of the first project, sends another project judged to have a risk in the past and judged to have no risk at present to the second project. 4. The information processing apparatus according to claim 3, which is selected as a project of.

請求項5の発明は、前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、請求項2に記載の情報処理装置である。 In the invention of claim 5, the determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means, and the notification means 3. The information processing apparatus according to claim 2, wherein another project determined to have a risk in an item different from the item determined to have a risk in the first project is selected as the second project. .

請求項6の発明は、前記通知手段は、前記第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、請求項5に記載の情報処理装置である。 According to the invention of claim 6, the notification means selects, as the second project, another project judged to have risk among the items judged to have no risk of the first project. It is an information processing apparatus described.

請求項7の発明は、コンピュータを、複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段として機能させるための情報処理プログラムである。 According to the seventh aspect of the invention, there is provided a computer which, in a first project in which a first user group consisting of a plurality of users participates, displays communication information related to the first project and the progress of the first project. acquisition means for acquiring progress information indicated by the progress information; determination means for determining whether or not there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means; is determined to be present, a second user group in which at least one or more different users of the first user group participate in at least one or more users of the first user group This is an information processing program for functioning as notification means for notifying a project as a collaboration partner candidate.

請求項1の情報処理装置によれば、コミュニケーション情報と進捗情報から、プロジェクトの進捗におけるリスクを判定し、コラボレーション相手の候補として他のプロジェクトを通知することができる。 According to the information processing apparatus of claim 1, risks in the progress of a project can be determined from communication information and progress information, and other projects can be notified as collaboration partner candidates.

請求項2の情報処理装置によれば、他のプロジェクトのコミュニケーション情報と進捗情報から、コラボレーション相手の候補を選択することができる。 According to the information processing apparatus of claim 2, collaboration partner candidates can be selected from communication information and progress information of other projects.

請求項3の情報処理装置によれば、第1のプロジェクトのリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトをコラボレーション相手の候補として選択することができる。 According to the information processing apparatus of claim 3, in the item judged to be risky in the first project, another project judged to be risk-free can be selected as a candidate for a collaboration partner.

請求項4の情報処理装置によれば、第1のプロジェクトのリスク有りと判定された項目において、過去にリスク有りと判定されたが、現在はリスク無しと判定された他のプロジェクトをコラボレーション相手の候補として選択することができる。 According to the information processing apparatus of claim 4, in the item judged to be at risk of the first project, another project that was judged to be at risk in the past, but is currently judged to be at no risk, is a collaboration partner. Can be selected as a candidate.

請求項5の情報処理装置によれば、第1のプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトをコラボレーション相手の候補として選択することができる。 According to the information processing apparatus of claim 5, it is possible to select, as a collaboration partner candidate, another project determined to be at risk for an item different from the item determined to be at risk for the first project.

請求項6の情報処理装置によれば、第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトをコラボレーション相手の候補として選択することができる。 According to the information processing apparatus of claim 6, in the item judged to have no risk of the first project, another project judged to have a risk can be selected as a collaboration partner candidate.

請求項7の情報処理プログラムによれば、コミュニケーション情報と進捗情報から、プロジェクトの進捗におけるリスクを判定し、コラボレーション相手の候補として他のプロジェクトを通知することができる。 According to the information processing program of claim 7, risks in project progress can be determined from communication information and progress information, and other projects can be notified as collaboration partner candidates.

本実施の形態の構成例についての概念的なモジュール構成図である。2 is a conceptual module configuration diagram of a configuration example of the present embodiment; FIG. 本実施の形態を利用したシステム構成例を示す説明図である。1 is an explanatory diagram showing a system configuration example using this embodiment; FIG. 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; スキル情報テーブルのデータ構造例を示す説明図である。FIG. 4 is an explanatory diagram showing an example data structure of a skill information table; 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; 本実施の形態による処理例を示す説明図である。FIG. 4 is an explanatory diagram showing an example of processing according to the present embodiment; プロジェクト管理テーブルのデータ構造例を示す説明図である。FIG. 4 is an explanatory diagram showing an example data structure of a project management table; 本実施の形態による処理例を示すフローチャートである。6 is a flow chart showing an example of processing according to the present embodiment; プロジェクト管理テーブルのデータ構造例を示す説明図である。FIG. 4 is an explanatory diagram showing an example data structure of a project management table; 本実施の形態を実現するコンピュータのハードウェア構成例を示すブロック図である。1 is a block diagram showing a hardware configuration example of a computer that implements the embodiment; FIG.

以下、図面に基づき本発明を実現するにあたっての好適な一実施の形態の例を説明する。
図1は、本実施の形態の構成例についての概念的なモジュール構成図を示している。
なお、モジュールとは、一般的に論理的に分離可能なソフトウェア(コンピュータ・プログラム)、ハードウェア等の部品を指す。したがって、本実施の形態におけるモジュールはコンピュータ・プログラムにおけるモジュールのことだけでなく、ハードウェア構成におけるモジュールも指す。それゆえ、本実施の形態は、それらのモジュールとして機能させるためのコンピュータ・プログラム(コンピュータにそれぞれの手順を実行させるためのプログラム、コンピュータをそれぞれの手段として機能させるためのプログラム、コンピュータにそれぞれの機能を実現させるためのプログラム)、システム及び方法の説明をも兼ねている。ただし、説明の都合上、「記憶する」、「記憶させる」、これらと同等の文言を用いるが、これらの文言は、実施の形態がコンピュータ・プログラムの場合は、記憶装置に記憶させる、又は記憶装置に記憶させるように制御するという意味である。また、モジュールは機能に一対一に対応していてもよいが、実装においては、1モジュールを1プログラムで構成してもよいし、複数モジュールを1プログラムで構成してもよく、逆に1モジュールを複数プログラムで構成してもよい。また、複数モジュールは1コンピュータによって実行されてもよいし、分散又は並列環境におけるコンピュータによって1モジュールが複数コンピュータで実行されてもよい。なお、1つのモジュールに他のモジュールが含まれていてもよい。また、以下、「接続」とは物理的な接続の他、論理的な接続(データの授受、指示、データ間の参照関係、ログイン等)の場合にも用いる。「予め定められた」とは、対象としている処理の前に定まっていることをいい、本実施の形態による処理が始まる前はもちろんのこと、本実施の形態による処理が始まった後であっても、対象としている処理の前であれば、そのときの状況・状態にしたがって、又はそれまでの状況・状態にしたがって定まることの意を含めて用いる。「予め定められた値」が複数ある場合は、それぞれ異なった値であってもよいし、2以上の値(もちろんのことながら、全ての値も含む)が同じであってもよい。また、「Aである場合、Bをする」という記載は、「Aであるか否かを判断し、Aであると判断した場合はBをする」の意味で用いる。ただし、Aであるか否かの判断が不要である場合を除く。また、「A、B、C」等のように事物を列挙した場合は、断りがない限り例示列挙であり、その1つのみを選んでいる場合(例えば、Aのみ)を含む。
また、システム又は装置とは、複数のコンピュータ、ハードウェア、装置等がネットワーク(一対一対応の通信接続を含む)等の通信手段で接続されて構成されるほか、1つのコンピュータ、ハードウェア、装置等によって実現される場合も含まれる。「装置」と「システム」とは、互いに同義の用語として用いる。もちろんのことながら、「システム」には、人為的な取り決めである社会的な「仕組み」(社会システム)にすぎないものは含まない。
また、各モジュールによる処理毎に又はモジュール内で複数の処理を行う場合はその処理毎に、対象となる情報を記憶装置から読み込み、その処理を行った後に、処理結果を記憶装置に書き出すものである。したがって、処理前の記憶装置からの読み込み、処理後の記憶装置への書き出しについては、説明を省略する場合がある。なお、ここでの記憶装置としては、ハードディスク、RAM(Random Access Memory)、外部記憶媒体、通信回線を介した記憶装置、CPU(Central Processing Unit)内のレジスタ等を含んでいてもよい。
An example of a preferred embodiment for realizing the present invention will be described below with reference to the drawings.
FIG. 1 shows a conceptual module configuration diagram of a configuration example of this embodiment.
A module generally refers to a component such as software (computer program) or hardware that can be logically separated. Therefore, modules in this embodiment refer not only to modules in a computer program, but also to modules in a hardware configuration. Therefore, the present embodiment provides a computer program for functioning as those modules (a program for causing the computer to execute each procedure, a program for causing the computer to function as each means, a program for causing the computer to function as each function). It also serves as an explanation of the program, system and method for realizing However, for the convenience of explanation, the terms "stored", "stored", and equivalent terms are used, but when the embodiment is a computer program, these terms are stored in a storage device or stored in a storage device. It means to control to store in the device. Also, modules may correspond to functions one-to-one. may consist of multiple programs. Also, multiple modules may be executed by one computer, and one module may be executed by multiple computers by computers in a distributed or parallel environment. Note that one module may include other modules. Further, hereinafter, "connection" is used not only for physical connection but also for logical connection (data transfer, instruction, reference relationship between data, login, etc.). The term "predetermined" means that it is determined before the target process, and not only before the process according to the present embodiment starts, but also after the process according to the present embodiment starts. Also, if it is before the target process, it is used including the meaning that it is determined according to the situation/state at that time or according to the situation/state up to that time. When there are a plurality of "predetermined values", they may be different values, or two or more values (including, of course, all values) may be the same. Also, the description "if A, do B" is used in the sense of "judge whether it is A, and if it is judged to be A, do B". However, this excludes the case where it is not necessary to judge whether or not it is A. In addition, when things are listed like "A, B, C", etc., unless otherwise specified, it is an exemplary list, and includes cases where only one of them is selected (for example, only A).
In addition, a system or device is configured by connecting a plurality of computers, hardware, devices, etc. by communication means such as a network (including one-to-one correspondence communication connection), or a single computer, hardware, device The case where it is realized by etc. is also included. The terms "apparatus" and "system" are used interchangeably. Of course, "system" does not include what is merely a social "mechanism" (social system) that is an artificial arrangement.
In addition, for each process performed by each module or for each process when multiple processes are performed within a module, the target information is read from the storage device, and after the processing is performed, the processing result is written to the storage device. be. Therefore, the description of reading from the storage device before processing and writing to the storage device after processing may be omitted. The storage device here may include a hard disk, a RAM (Random Access Memory), an external storage medium, a storage device via a communication line, a register in a CPU (Central Processing Unit), and the like.

本実施の形態である情報処理装置100は、プロジェクトの進捗管理を行うものであって、図1の例に示すように、取得(A)モジュール105、取得(B)モジュール110、リスク判定モジュール115、通知モジュール120を有している。
ここでのプロジェクトとは、複数のユーザーによって構成される集団によって、特定の期限(以下、納期ともいう)までに何らかの目標を達成するための業務のことをいう。例えば、新しい商品を開発するための商品開発プロジェクト等がある。そして、プロジェクトには、活動フェーズがあり、例えば、企画、設計、開発、テスト、保守等の活動フェーズがある。
The information processing apparatus 100 according to the present embodiment manages the progress of a project, and as shown in the example of FIG. , a notification module 120 .
Here, a project is defined as a task for achieving some goal by a specific deadline (hereinafter also referred to as delivery date) by a group of users. For example, there are product development projects for developing new products. A project has activity phases, such as planning, design, development, testing, and maintenance.

取得(A)モジュール105は、リスク判定モジュール115、プロジェクト(A)管理装置150Aと接続されている。取得(A)モジュール105は、プロジェクト(A)管理装置150Aから、複数のユーザーで構成される第1のユーザー群が参加するプロジェクト(A)において、そのプロジェクト(A)に関わるコミュニケーション情報と、そのプロジェクト(A)の進捗を示す進捗情報を取得する。
「コミュニケーション情報」として、例えば、コミュニケーションが行われた日時(年、月、日、時、分、秒、秒以下、又はこれらの組み合わせであってもよい)、そのコミュニケーションを行ったユーザー、そのコミュニケーションの内容等があり、具体的には、そのプロジェクトにおいて参加者であるユーザー間でやり取りされた、メール、投稿、メッセージ、文書等の閲覧、プロジェクト管理装置への報告(例えば、進捗、不具合発見率等の登録)等がある。
「進捗情報」として、そのプロジェクトにおける活動フェーズが含まれる。例えば、そのプロジェクトにおけるTODO等での着手日時、期限、進捗状況等がある。
Acquisition (A) module 105 is connected to risk determination module 115 and project (A) management device 150A. Acquisition (A) module 105 obtains, from project (A) management apparatus 150A, communication information related to project (A) in which a first user group consisting of a plurality of users participates, and communication information related to the project (A). Acquire progress information indicating the progress of project (A).
As "communication information", for example, the date and time when communication was performed (year, month, day, hour, minute, second, less than a second, or a combination thereof), the user who performed the communication, the communication Specifically, viewing emails, posts, messages, documents, etc. exchanged between users who are participants in the project, reporting to the project management device (e.g., progress, defect discovery rate etc.) etc.
"Progress information" includes activity phases in the project. For example, there are the start date, time limit, progress status, etc. of the TODO in the project.

取得(B)モジュール110は、リスク判定モジュール115、プロジェクト(B)管理装置150B、プロジェクト(C)管理装置150Cと接続されている。取得(B)モジュール110は、プロジェクト(B)管理装置150B、プロジェクト(C)管理装置150C等から、プロジェクト(A)以外の他のプロジェクトにおいて、他のプロジェクトに関わるコミュニケーション情報と、他のプロジェクトの進捗を示す進捗情報を取得する。 Acquisition (B) module 110 is connected to risk determination module 115, project (B) management device 150B, and project (C) management device 150C. Acquisition (B) module 110 acquires communication information related to other projects other than project (A) from project (B) management device 150B, project (C) management device 150C, etc. Get progress information indicating progress.

リスク判定モジュール115は、取得(A)モジュール105、取得(B)モジュール110、通知モジュール120と接続されている。リスク判定モジュール115は、取得(A)モジュール105によって取得されたコミュニケーション情報と進捗情報から、プロジェクト(A)の進捗におけるリスクの有無の判定を行う。つまり、リスク判定モジュール115は、リスクの顕在化の判定を行う。この判定は、例えば、定期的に実施する。具体的には、活動フェーズ毎に用意されたルール(規則)にしたがって、リスク有無の判定を行ってもよい。ルールについては、図2の例に示す顕在化ルールとして後述する。
また、リスク判定モジュール115は、取得(B)モジュール110によって取得されたコミュニケーション情報と進捗情報から、他のプロジェクトの進捗におけるリスクの有無の判定を行うようにしてもよい。
The risk determination module 115 is connected to the acquisition (A) module 105 , the acquisition (B) module 110 and the notification module 120 . The risk determination module 115 determines whether there is a risk in the progress of the project (A) from the communication information and progress information acquired by the acquisition (A) module 105 . In other words, the risk determination module 115 determines the actualization of the risk. This determination is performed periodically, for example. Specifically, the presence or absence of risk may be determined according to rules prepared for each activity phase. The rule will be described later as a manifestation rule shown in the example of FIG.
Also, the risk determination module 115 may determine the presence or absence of risks in the progress of other projects from the communication information and progress information acquired by the acquisition (B) module 110 .

提案処理モジュール125は、提案対象プロジェクトの検索を行う。つまり、提案処理モジュール125は、リスク判定モジュール115によってリスクが有りと判定された場合に、第1のユーザー群の少なくとも1人以上のユーザーに対して、その第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する他のプロジェクト(例えば、プロジェクト(B)、プロジェクト(C)等)をコラボレーション相手の候補として選択する。
1人のユーザーが複数のプロジェクトに参加することがあり得る。したがって、プロジェクト(A)と他のプロジェクトの両方に参加しているユーザーもあり得る。ただし、他のプロジェクトに参加しているが、プロジェクト(A)に参加していないユーザーもあり得て、そのユーザーがプロジェクト(A)におけるリスクを解決する可能性もある。そこで、「コラボレーション相手の候補となる他のプロジェクト」は、「第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加するプロジェクト」である。もちろんのことながら、プロジェクト(A)に参加しているユーザーと他のプロジェクトに参加しているユーザーが1人もいない場合(プロジェクト(A)と他のプロジェクトとで重複しているユーザーがいない場合、プロジェクト(A)に参加しているユーザーと他のプロジェクトに参加しているユーザーが全て異なる場合)も含む。この場合、プロジェクト(A)では所有していないノウハウを他のプロジェクトが有している可能性が高いので、コラボレーション相手として適している場合がある。
The proposal processing module 125 searches for proposed projects. In other words, when the risk determination module 115 determines that there is a risk, the proposal processing module 125, for at least one user in the first user group, at least one user in the first user group other projects (for example, project (B), project (C), etc.) in which a second group of users different from each other participate are selected as collaboration partner candidates.
A single user can participate in multiple projects. Therefore, there may be a user participating in both project (A) and another project. However, there may be users who participate in other projects but do not participate in project (A), and there is a possibility that those users will resolve risks in project (A). Therefore, "other projects that are candidates for collaboration partners" are "projects in which a second group of users, at least one of whom is different from the first group of users, participates." Of course, if there are no users participating in project (A) and no users participating in other projects (if there are no duplicate users in project (A) and other projects) , when users participating in project (A) and users participating in other projects are all different). In this case, since there is a high possibility that other projects have know-how that project (A) does not possess, they may be suitable as collaboration partners.

また、提案処理モジュール125は、取得(B)モジュール110によって取得されたコミュニケーション情報と進捗情報から、コラボレーション相手の候補となるプロジェクトを選択する。
そして、提案処理モジュール125は、プロジェクト(A)のリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトをコラボレーション相手の候補であるプロジェクトとして選択するようにしてもよい。ここで「項目」には、リスク判定モジュール115がリスクの判定に用いたルールを含めてもよい。つまり、プロジェクト(A)ではルールXによってリスク有りと判定されたが、プロジェクト(B)ではルールXによってリスク無しと判定された場合が該当することになる。なお、他のプロジェクトについては、現在においてリスク無しと判定されていればよく、過去においてリスク有りと判定されていてもよい。
さらに、具体的には、提案処理モジュール125は、プロジェクト(A)のリスク有りと判定された項目において、過去にリスク有りと判定され、現在はリスク無しと判定された他のプロジェクトをコラボレーション相手の候補となるプロジェクトとして選択するようにしてもよい。ここで選択されたプロジェクトは、同じ項目で発生したリスクを解決したことになるので、プロジェクト(A)に対してリスク解決の知見を有していることになる。
より具体的には、提案処理モジュール125は、プロジェクト(A)のリスクが発生した活動フェーズと同じ活動フェーズで、プロジェクト(A)のリスクと同様のリスクが発生した他のプロジェクトをコラボレーション相手の候補であるプロジェクトとして提案するようにしてもよい。これによって、プロジェクト(A)は、他のプロジェクトにおける知見を活用して、低工数でよりよい解決が図れるようになる。なお、コラボレーション相手の候補となるプロジェクトの選択処理として、同じ活動フェーズで、プロジェクト(A)のリスクと同様のリスクが顕在化した他のプロジェクトを選択することの他に、以下に示すような選択処理としてもよい。
The proposal processing module 125 also selects a project as a collaboration partner candidate from the communication information and progress information acquired by the acquisition (B) module 110 .
Then, the proposal processing module 125 may select other projects that have been determined to have no risk in the items determined to have risk in project (A) as projects that are candidates for collaboration partners. Here, the “items” may include rules used by the risk determination module 115 for risk determination. In other words, the project (A) is judged to have a risk according to the rule X, but the project (B) is judged to have no risk according to the rule X. Note that other projects may be judged to have no risk at present, or may have been judged to have risk in the past.
Furthermore, specifically, the proposal processing module 125 selects other projects that have been determined to be at risk in the past and are currently determined to be at no risk in the project (A) that have been determined to be at risk. It may be selected as a candidate project. Since the project selected here has solved the risk generated in the same item, it means that the project (A) has the knowledge of risk solution.
More specifically, the proposal processing module 125 selects other projects in which risks similar to those of project (A) occur in the same activity phase as the activity phase in which the risks of project (A) occur as candidates for collaboration partners. may be proposed as a project. As a result, project (A) can utilize the knowledge of other projects to achieve better solutions with less man-hours. As a process for selecting projects that are candidates for collaboration partners, in addition to selecting other projects in the same activity phase in which risks similar to those of project (A) have materialized, the following selections are made: It may be processed.

また、提案処理モジュール125は、リスク判定モジュール115によってプロジェクト(A)のリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトをコラボレーション相手の候補であるプロジェクトとして選択するようにしてもよい。これによって、プロジェクト(A)とは異なる側面を有しているプロジェクトとして選択することができるようになる。なお、さらに、プロジェクト(A)のリスク有りと判定された項目と同じ項目ではリスク無しと判定された他のプロジェクトであることが好ましい。
そして、提案処理モジュール125は、リスク判定モジュール115によって第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトをコラボレーション相手の候補であるプロジェクトとして選択するようにしてもよい。
In addition, the proposal processing module 125 selects other projects judged to have risks in items different from the items judged to have risks for the project (A) by the risk judgment module 115 as projects that are candidates for collaboration partners. You may make it This makes it possible to select a project that has aspects different from project (A). Furthermore, it is preferable that the other project is judged to have no risk for the same item as the item judged to have risk for project (A).
Then, the proposal processing module 125 selects other projects judged to have risks among the items judged to have no risks in the first project by the risk judgment module 115 as projects that are candidates for collaboration partners. good too.

通知モジュール120は、提案処理モジュール125を有しており、リスク判定モジュール115、プロジェクト(A)担当ユーザー端末170Aと接続されている。通知モジュール120は、リスク判定モジュール115によってプロジェクト(A)にリスクが有りと判定された場合に、第1のユーザー群の少なくとも1人以上のユーザー(プロジェクト(A)担当ユーザー端末170A又はプロジェクト(A)担当ユーザー端末170Aの利用者であるユーザー)に対して、提案処理モジュール125によって選択されたプロジェクトをコラボレーション相手の候補として通知する。ここで通知として、例えば、電子メール、チャット、電子掲示板、ソーシャルメディアを用いた通知、プッシュ通知、自動音声応答による電話発信等があり、電話発信として、例えば、Lync(登録商標)等を用いて行えばよい。 The notification module 120 has a proposal processing module 125 and is connected to the risk determination module 115 and the project (A) user terminal 170A. When the risk determination module 115 determines that there is a risk in the project (A), the notification module 120 sends at least one or more users of the first user group (the user terminal 170A in charge of the project (A) or the project (A) ) the user who is the user of the user terminal 170A in charge) is notified of the project selected by the proposal processing module 125 as a collaboration partner candidate. Here, the notification includes, for example, e-mail, chat, electronic bulletin board, notification using social media, push notification, and telephone call by automatic voice response. Do it.

プロジェクト(A)管理装置150Aは、プロジェクト(A)活動情報記憶モジュール155Aを有しており、情報処理装置100の取得(A)モジュール105と接続されている。プロジェクト(A)管理装置150Aは、プロジェクト(A)の活動情報を記憶している。活動情報として、少なくとも、コミュニケーション情報と進捗情報スケジュールを含み、その他に、課題、成果物等を記憶していてもよい。
プロジェクト(B)管理装置150Bは、プロジェクト(B)活動情報記憶モジュール155Bを有しており、情報処理装置100の取得(B)モジュール110と接続されている。プロジェクト(B)管理装置150Bは、プロジェクト(B)の活動情報を記憶している。
プロジェクト(C)管理装置150Cは、プロジェクト(C)活動情報記憶モジュール155Cを有しており、情報処理装置100の取得(B)モジュール110と接続されている。プロジェクト(C)管理装置150Cは、プロジェクト(C)の活動情報を記憶している。
なお、プロジェクト(A)以外の他のプロジェクトとして、プロジェクト(B)、プロジェクト(C)を例示しているが、3つ以上のプロジェクトであってもよいし、1つのプロジェクトであってもよい。
The project (A) management device 150A has a project (A) activity information storage module 155A and is connected to the acquisition (A) module 105 of the information processing device 100 . The project (A) management device 150A stores activity information of project (A). The activity information includes at least communication information and progress information schedule, and may also store assignments, deliverables, and the like.
The project (B) management device 150B has a project (B) activity information storage module 155B and is connected to the acquisition (B) module 110 of the information processing device 100 . The project (B) management device 150B stores activity information of the project (B).
The project (C) management device 150C has a project (C) activity information storage module 155C and is connected to the acquisition (B) module 110 of the information processing device 100 . The project (C) management device 150C stores project (C) activity information.
Although project (B) and project (C) are illustrated as projects other than project (A), there may be three or more projects, or one project.

プロジェクト(A)担当ユーザー端末170Aは、情報処理装置100の通知モジュール120と接続されている。プロジェクト(A)担当ユーザー端末170Aは、プロジェクト(A)に参画しているユーザー(例えば、プロジェクト(A)のリーダー等)によって用いられており、通信機能を有している。例えば、PC(Personal Computer、ノートPC、タブレット型端末等であってもよい)、携帯端末(スマートフォンを含む携帯電話等)、ウェアラブル端末(リストバンド型(腕輪型)、腕時計型、頭に装着するメガネ型)等が該当する。 Project (A) user terminal 170A is connected to notification module 120 of information processing apparatus 100 . The project (A) user terminal 170A is used by a user participating in the project (A) (for example, the leader of the project (A)) and has a communication function. For example, PC (Personal Computer, notebook PC, tablet terminal, etc.), mobile terminal (mobile phone including smartphone, etc.), wearable terminal (wristband type (bracelet type), wristwatch type, worn on the head Glasses type), etc.

図2は、本実施の形態を利用したシステム構成例を示す説明図である。
情報処理装置100、プロジェクト(A)管理装置150A、プロジェクト(B)管理装置150B、プロジェクト(C)管理装置150C、全プロジェクト管理装置250、ユーザー端末270A、ユーザー端末270B、ユーザー端末270C、ユーザー端末270D、ユーザー端末270E、ユーザー端末270F、ユーザー端末270G、ユーザー端末270H、ユーザー端末270I、ユーザー端末270J、ユーザー端末270Kは、通信回線290を介してそれぞれ接続されている。通信回線290は、無線、有線、これらの組み合わせであってもよく、例えば、通信インフラとしてのインターネット、イントラネット等であってもよい。また、情報処理装置100、プロジェクト管理装置150、全プロジェクト管理装置250による機能は、クラウドサービスとして実現してもよい。
FIG. 2 is an explanatory diagram showing a system configuration example using this embodiment.
Information processing device 100, project (A) management device 150A, project (B) management device 150B, project (C) management device 150C, all project management device 250, user terminal 270A, user terminal 270B, user terminal 270C, user terminal 270D , a user terminal 270E, a user terminal 270F, a user terminal 270G, a user terminal 270H, a user terminal 270I, a user terminal 270J, and a user terminal 270K are connected via a communication line 290, respectively. The communication line 290 may be wireless, wired, or a combination thereof, and may be, for example, the Internet, an intranet, etc. as a communication infrastructure. Also, the functions of the information processing device 100, the project management device 150, and the all project management device 250 may be implemented as a cloud service.

全プロジェクト管理装置250は、プロジェクトフェーズ情報記憶モジュール255、リスク顕在化ルール記憶モジュール260、顕在化リスク一覧記憶モジュール265を有している。全プロジェクト管理装置250は、各プロジェクトの定義処理と管理を行う。
プロジェクトフェーズ情報記憶モジュール255は、各プロジェクトのプロジェクト情報(プロジェクトを構成する情報)、活動フェーズ情報(各プロジェクトが取り得る活動フェーズに関する情報)を記憶している。各プロジェクトのリーダーがプロジェクト情報、活動フェーズ情報を入力する。
リスク顕在化ルール記憶モジュール260は、各プロジェクトのリスクの顕在化ルールを記憶している。例えば、リスク判定モジュール115は、リスク顕在化ルール記憶モジュール260に記憶されている顕在化ルールにしたがって、リスクを判定している。各プロジェクトのリーダーが顕在化ルールを入力する。
顕在化ルールとして、例えば、活動フェーズに対応して、コミュニケーション情報で定義されており、具体的には、以下のものがある。
(1)企画フェーズ
(a)コミュニケーションに参加していいない(発言のない)メンバーがxx割合以上存在する。
(b)発言に対する返信率がxx%よりも低い。又は、返信までのタイムラグがxx時間より大きい。
(2)設計フェーズ
(a)決定事項(成果物)に対し閲覧していないメンバーがxx割合以上存在する。
(b)設計フェーズ終了後に成果物が修正される回数がxx回よりも多い。
(3)開発フェーズ
(a)スケジュール通りに着手、完了できていない。
(b)アクション事項に人員をアサインできていない。
(4)テストフェーズ
(a)不具合発見率に減少傾向がない。
(5)保守フェーズ
(a)問い合わせに対する平均回答時間がxx以上である。
(b)不具合報告数がxx回よりも多い。
The total project management device 250 has a project phase information storage module 255 , a risk manifestation rule storage module 260 and a manifested risk list storage module 265 . The all project management device 250 performs definition processing and management of each project.
The project phase information storage module 255 stores project information of each project (information constituting a project) and activity phase information (information on activity phases that each project can take). The leader of each project inputs project information and activity phase information.
The risk manifestation rule storage module 260 stores risk manifestation rules for each project. For example, the risk determination module 115 determines risks according to the manifestation rules stored in the risk manifestation rule storage module 260 . The leader of each project enters the manifestation rules.
As manifestation rules, for example, corresponding to activity phases, defined in communication information, specifically, there are the following.
(1) Planning phase (a) More than xx percentage of members do not participate in communication (do not speak).
(b) The reply rate to comments is lower than xx%. Alternatively, the time lag until a reply is longer than xx hours.
(2) Design phase (a) There are more than xx percentages of members who have not viewed the decisions (deliverables).
(b) The number of times the deliverable is modified after the design phase ends is greater than xx times.
(3) Development phase (a) Not started and completed on schedule.
(b) Failure to assign personnel to action items.
(4) Test phase (a) There is no downward trend in the defect discovery rate.
(5) Maintenance Phase (a) The average response time to inquiries is xx or longer.
(b) The number of defect reports is greater than xx times.

顕在化リスク一覧記憶モジュール265は、各プロジェクトの顕在化リスクの一覧を記憶している。リスク判定モジュール115によって判定された結果を記憶している。過去のプロジェクト(納期が過ぎたプロジェクト)、現在のプロジェクトにおけるリスクを記憶している。取得(B)モジュール110は、他のプロジェクトにおけるリスクを顕在化リスク一覧記憶モジュール265から取得するようにしてもよい。その場合、リスク判定モジュール115による他のプロジェクトの進捗におけるリスクの有無の判定処理は不要となる。 The materialized risk list storage module 265 stores a list of materialized risks for each project. It stores the results determined by the risk determination module 115 . Memorize risks in past projects (projects past due) and current projects. The acquisition (B) module 110 may acquire risks in other projects from the actualized risk list storage module 265 . In that case, the risk determination module 115 does not need to determine the presence or absence of risks in the progress of other projects.

プロジェクト(A)210Aには、プロジェクト(A)リーダー272A、プロジェクトメンバー272B、プロジェクトメンバー272C、プロジェクトメンバー272Dが参加している。
プロジェクト(B)210Bには、プロジェクトメンバー272D、プロジェクトメンバー272E、プロジェクト(B)リーダー272F、プロジェクトメンバー272G、プロジェクトメンバー272Hが参加している。
プロジェクト(C)210Cには、プロジェクトメンバー272H、プロジェクト(C)リーダー272I、プロジェクトメンバー272J、プロジェクトメンバー272Kが参加している。
なお、プロジェクトメンバー272Dは、プロジェクト(A)210Aとプロジェクト(B)210Bの両方に参加しており、プロジェクトメンバー272Hは、プロジェクト(B)210Bとプロジェクト(C)210Cの両方に参加している。このように、各プロジェクトには、複数人のユーザーが参加しており、また、一人のユーザーが複数のプロジェクトに参加してもよい。
A project (A) leader 272A, a project member 272B, a project member 272C, and a project member 272D participate in the project (A) 210A.
A project member 272D, a project member 272E, a project (B) leader 272F, a project member 272G, and a project member 272H participate in the project (B) 210B.
A project member 272H, a project (C) leader 272I, a project member 272J, and a project member 272K participate in the project (C) 210C.
Project member 272D participates in both project (A) 210A and project (B) 210B, and project member 272H participates in both project (B) 210B and project (C) 210C. Thus, multiple users participate in each project, and one user may participate in multiple projects.

この例では、複数のユーザーで構成される第1のユーザー群が参加するプロジェクト(A)210Aと、第1のユーザー群とは別のユーザーで構成される第2のユーザー群とが参加するプロジェクト(B)210B等がある。
例えば、プロジェクト(A)210Aにおいて、プロジェクト210Aのコミュニケーション情報と進捗情報からリスクが発生したことを検知した場合、コラボレーション相手の候補となるプロジェクトを特定する。ここで検知は、潜在リスクを検知(顕在化)することとなる。
また、コラボレーション相手の候補となるプロジェクトは、そのリスクに対し協力して解決、低減させることのできるプロジェクトである。情報処理装置100は、両プロジェクトに対しコラボレーションを提案する。情報処理装置100は、異なる側面を持つプロジェクトを提案することで、新たなアイディア、打開策の創発を目指すものである。
In this example, a project (A) 210A in which a first user group consisting of a plurality of users participates, and a project in which a second user group consisting of users different from the first user group participates. (B) 210B and the like.
For example, in the project (A) 210A, when it is detected that a risk has occurred from the communication information and progress information of the project 210A, projects that are candidates for collaboration partners are specified. Here, detection means detecting (manifesting) potential risks.
Projects that are candidates for collaboration partners are projects that can cooperate to solve and reduce the risks. The information processing apparatus 100 proposes collaboration for both projects. The information processing apparatus 100 aims to create new ideas and breakthroughs by proposing projects with different aspects.

図3は、本実施の形態による処理例を示すフローチャートである。
ステップS302からステップS306までの処理は、プロジェクトの定義作業に該当する。また、ステップS308からステップS314までの処理は、コラボレーション相手となるプロジェクトの提案処理である。
FIG. 3 is a flowchart showing an example of processing according to this embodiment.
The processing from step S302 to step S306 corresponds to project definition work. Processing from step S308 to step S314 is processing for proposing a project to be a collaboration partner.

ステップS302では、リーダーがプロジェクト情報を入力する。
ステップS304では、リーダーがフェーズを選択する。
ステップS306では、リーダーがリスクの顕在化ルールの選択、追加、編集、削除等を行う。例えば、リスクの顕在化ルールは、全プロジェクトで共有されており、フェーズの入力のみでリスクの顕在化ルールも指定されるようにしてもよい。また、リーダーがプロジェクト毎に顕在化ルールを選択してもよい。なお、ステップS306の処理は任意としてもよい。
In step S302, the leader inputs project information.
At step S304, the leader selects a phase.
In step S306, the leader selects, adds, edits, and deletes the risk manifestation rule. For example, the risk manifestation rule may be shared by all projects, and the risk manifestation rule may be specified only by inputting the phase. Also, the leader may select the manifestation rule for each project. Note that the processing of step S306 may be optional.

ステップS308では、プロジェクトのメンバーによるウェブシステム等の活用を検知することで、スケジュール、進捗、課題、コミュニケーション内容、成果物といった活動情報を蓄える。例えば、ここでウェブシステムは、プロジェクト管理を行うシステムであって、そのプロジェクト管理用のWebページでの操作をログ情報として検出、蓄積するようにしてもよい。 In step S308, activity information such as schedules, progress, issues, communication content, and deliverables is stored by detecting utilization of the web system or the like by project members. For example, the web system here is a system for managing a project, and may detect and accumulate operations on a web page for project management as log information.

ステップS310では、現在のフェーズに応じて、リスクの顕在化ルールの判定を行い、「リスク有り」の場合はステップS312へ進み、「リスクなし」の場合は処理を終了する(ステップS399)。
例えば、テストフェーズであれば、顕在化ルール:「不具合発見率に減少傾向がない」の判定を行う。ここで、不具合発見率として、(不具合数/テスト数)を用いてもよい。例えば、テストフェーズ移行直後と現在(テストフェーズ中)とで、不具合発見率の減少率を求める。そして、テスト完了までにクライテリアの達成ができるか推定する。この推定として、予め定められた計算式に適用して、テスト完了までにクライテリアを達成できるか否かを判定してもよい。計算式として、過去の統計値を用いて定めたものであってもよいし、テストフェーズ移行直後と現在の不具合発見率で定まる一次式としてもよい。
また、既に顕在化したリスクに対しても、顕在化ルールの判定を行い、改善がみられるかモニタリングする。改善した場合、潜在化リスクから除外する。悪化した場合、ステップS312で用いる閾値を下げて、さらなる改善を提案するようにしてもよい。
In step S310, the risk manifestation rule is determined according to the current phase, and if "risk exists", the process proceeds to step S312, and if "no risk", the process ends (step S399).
For example, if it is a test phase, the actualization rule: "There is no decreasing trend in the defect discovery rate" is determined. Here, (number of defects/number of tests) may be used as the defect discovery rate. For example, the rate of decrease in defect discovery rate is obtained between immediately after the shift to the test phase and now (during the test phase). Then, it is estimated whether the criteria can be achieved by the end of the test. As this estimation, a predetermined formula may be applied to determine whether or not the criteria can be achieved by the time the test is completed. The calculation formula may be determined using past statistical values, or may be a linear formula determined by the defect discovery rate immediately after the shift to the test phase and at the current time.
Also, for risks that have already materialized, we will judge the actualization rules and monitor whether improvements can be seen. If it improves, remove it from latent risk. If worse, the threshold used in step S312 may be lowered to suggest further improvement.

ステップS312では、同一の顕在化リスクを持つ(又は、過去に持っていた)他のプロジェクトのうち、提案スコアが閾値以上であるか否かを判断し、「閾値以上である」である場合はステップS314へ進み、「閾値以上ではない」の場合は処理を終了する(ステップS399)。なお、同一の顕在化リスクとは、同じフェーズであって同じ規則を適用した場合にリスク有りと判定された場合が該当する。
ステップS314では、対象プロジェクトに対して、前ステップの他のプロジェクトをコラボレーションプロジェクトとして提案する。例えば、両方のプロジェクトのリーダーに通知するようにしてもよい。また、他のプロジェクトが活動中である場合、プロジェクト双方向の提案スコアを合計し、合計値が高くなる他のプロジェクトを選択することによって、お互いに恩恵にあずかれるプロジェクトをより高く評価するようにしてもよい。
In step S312, it is determined whether or not the proposal score of other projects with the same actualized risk (or had in the past) is equal to or higher than the threshold. The process proceeds to step S314, and if "not equal to or greater than the threshold", the process ends (step S399). The same actualized risk corresponds to the case where it is determined that there is a risk when the same rule is applied in the same phase.
In step S314, another project in the previous step is proposed as a collaboration project to the target project. For example, the leaders of both projects may be notified. Also, if other projects are active, add up the two-way proposal scores and select the other project with the highest total value, so that projects that benefit from each other are evaluated more highly. good too.

図4は、本実施の形態による処理例を示すフローチャートである。図3の例に示したフローチャートのステップS312の具体的処理例を示すものである。つまり、提案スコアを異なるスキル数としたものである。
ステップS402では、対象プロジェクトのスキル情報テーブルを取得する。例えば、スキル情報テーブル500を取得する。図5は、スキル情報テーブル500のデータ構造例を示す説明図である。図5(a)は、対象としているプロジェクト(A)におけるスキル情報テーブル500Aのデータ構造例を示す説明図である。スキル情報テーブル500Aは、スキル欄510A、スキル評価値欄520Aを有している。スキル欄510Aは、スキルを記憶している。スキル評価値欄520Aは、そのスキルにおける評価値(プロジェクト(A)に参加しているユーザーのスキル評価値の平均値等)を記憶している。
FIG. 4 is a flowchart showing an example of processing according to this embodiment. This shows a specific example of processing in step S312 of the flowchart shown in the example of FIG. That is, the proposal score is the number of different skills.
In step S402, the skill information table of the target project is acquired. For example, the skill information table 500 is acquired. FIG. 5 is an explanatory diagram showing an example data structure of the skill information table 500. As shown in FIG. FIG. 5(a) is an explanatory diagram showing an example data structure of the skill information table 500A in the target project (A). The skill information table 500A has a skill column 510A and a skill evaluation value column 520A. The skill column 510A stores skills. The skill evaluation value column 520A stores the evaluation value of the skill (average value of skill evaluation values of users participating in project (A), etc.).

ステップS404では、他のプロジェクトのスキル情報テーブルを取得する。例えば、他のプロジェクトのスキル情報テーブルとして、図5(b)の例に示すようにプロジェクト(B)におけるスキル情報テーブル500B、図5(c)の例に示すようにプロジェクト(C)におけるスキル情報テーブル500Cがある。スキル情報テーブル500B、スキル情報テーブル500Cは、スキル情報テーブル500Aと同等のデータ構造である。
なお、ここでの「他のプロジェクト」として、対象としているプロジェクトと同一の顕在化リスクを有していたが、その顕在化リスクを解決した他のプロジェクトとしてもよい。
また、「他のプロジェクト」として、対象としているプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトとしてもよい。さらに、対象としているプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトとしてもよい。つまり、異なるリスクが発生した場合であって、お互いにそのノウハウを共有することで、双方でリスクの解決を図ることができるようになる。例えば、同一フェーズに対する活動傾向が異なることによって、発生するリスクが異なることがある。具体的には、設計フェーズにおいて、コミュニケーションが活発であるが成果物の量が少ないプロジェクト(プロジェクト(A))と、それとは逆の傾向にあるプロジェクト(プロジェクト(B))では異なるリスクが存在する可能性が高く、お互いにそのノウハウを共有することで双方の潜在リスクの解決が見込まれる。プロジェクト(A)では、「決定事項やその背景が見つからない」、「説明や情報展開のために多くの工数がかかる」ことによってリスクが発生しているが、プロジェクト(B)では、「売りとなる機能がない」、「販売が思わしくない」ことによってリスクが発生している場合、リスクが発生していない項目ではノウハウを提供できることになり、双方にメリットがある(いわゆるウィン-ウィンの関係)。
In step S404, skill information tables of other projects are acquired. For example, as skill information tables for other projects, skill information table 500B for project (B) as shown in the example of FIG. 5B and skill information table 500B for project (C) as shown in the example of FIG. There is a table 500C. The skill information table 500B and the skill information table 500C have the same data structure as the skill information table 500A.
The "other project" here has the same materialized risk as the target project, but may be another project that has resolved the materialized risk.
Further, the "other project" may be another project that is determined to have a risk in an item different from the item determined to have a risk in the target project. Furthermore, among the items determined to be risk-free in the target project, other projects determined to have risk may be used. In other words, even if a different risk arises, by sharing the know-how with each other, both parties will be able to resolve the risk. For example, different activity trends for the same phase may result in different risks. Specifically, in the design phase, there are different risks between a project with active communication but a small amount of deliverables (project (A)) and a project with the opposite trend (project (B)). The possibility is high, and by sharing the know-how with each other, it is expected that the latent risks on both sides will be resolved. In project (A), risks arise due to "cannot find decisions and their backgrounds" and "many man-hours are required for explanations and information deployment", but in project (B), "sales and If there is a risk due to "there is no function that can be used" or "sales are unsatisfactory", know-how can be provided for items that do not have a risk, which is advantageous for both parties (so-called win-win relationship) .

ステップS406では、両者間で異なるスキル項目の数を算出する。つまり、対象としているプロジェクト(A)とは異なるスキルを保有しているプロジェクトを選択するためである。図5の例では、スキル情報テーブル500Bは4行目の「C♯」が異なっているので「1」であり、スキル情報テーブル500Cは1行目の「顧客志向」と2行目の「提案能力」が異なっているので「2」である。 In step S406, the number of skill items that differ between the two is calculated. In other words, this is to select a project having skills different from those of the target project (A). In the example of FIG. 5, the skill information table 500B has "1" because "C#" on the fourth line is different, and the skill information table 500C has "customer orientation" on the first line and "proposal" on the second line. "Ability" is different, so it is "2".

ステップS408では、「異なるスキル項目数≧閾値A」であるか否かを判断し、「異なるスキル項目数≧閾値A」の場合はステップS410へ進み、それ以外の場合はステップS412へ進む。例えば、閾値Aを「2」とした場合は、前述の例では、スキル情報テーブル500CがステップS408の条件を満たしていることになる。つまり、プロジェクト(C)の方が提案スコアが高い。この場合、保有するスキルの異なるプロジェクトがコラボレーション相手となるプロジェクトとして有効であるとしており、異なる視点の意見がでることで、打開策につながるからである。
ステップS410では、コラボレーションプロジェクトリストに含める。前述の例では、プロジェクト(C)がコラボレーションプロジェクトリストに入れられることになる。
ステップS412では、比較するプロジェクトがあるか否かを判断し、ある場合はステップS404へ戻り、それ以外の場合は処理を終了する(ステップS499)。
In step S408, it is determined whether or not "the number of different skill items≧threshold A", and if "the number of different skill items≧threshold A", the process proceeds to step S410; otherwise, the process proceeds to step S412. For example, when the threshold A is set to "2", the skill information table 500C satisfies the condition of step S408 in the above example. That is, project (C) has a higher proposal score. In this case, it is said that projects with different skills possessed are effective as projects to be collaboration partners, and opinions from different viewpoints lead to breakthrough measures.
In step S410, it is included in the collaboration project list. In the example above, project (C) would be placed in the collaboration projects list.
In step S412, it is determined whether or not there is a project to be compared, and if there is, the process returns to step S404, otherwise the process ends (step S499).

図6は、本実施の形態による処理例を示すフローチャートである。図3の例に示したフローチャートのステップS312の具体的処理例を示すものである。つまり、図4の例に示したフローチャートの別の処理例を示すものである。ステップS606、ステップS608以外の処理は、図4の例に示したフローチャートと同等の処理である。
ステップS602では、対象プロジェクトのスキル情報テーブルを取得する。
ステップS604では、他のプロジェクトのスキル情報テーブルを取得する。
FIG. 6 is a flowchart showing an example of processing according to this embodiment. This shows a specific example of processing in step S312 of the flowchart shown in the example of FIG. That is, it shows another processing example of the flowchart shown in the example of FIG. Processes other than steps S606 and S608 are the same as those in the flowchart shown in the example of FIG.
In step S602, the skill information table of the target project is obtained.
In step S604, skill information tables of other projects are obtained.

ステップS606では、両者間で同じスキル項目であって、対象プロジェクトの方がスキル評価値が高いスキル項目数を算出する。この算出したスキル項目数を、図4の例での提案スコアとしている。
ステップS608では、「前ステップで算出したスキル項目数≧閾値B」であるか否かを判断し、「前ステップで算出したスキル項目数≧閾値B」の場合はステップS610へ進み、それ以外の場合はステップS612へ進む。
In step S606, the number of skill items that are the same between the two and have a higher skill evaluation value in the target project is calculated. The calculated number of skill items is used as the proposal score in the example of FIG.
In step S608, it is determined whether or not "the number of skill items calculated in the previous step≧threshold B". If so, the process proceeds to step S612.

ステップS610では、コラボレーションプロジェクトリストに含める。つまり、スキル評価値が低いにもかかわらず、リスクを解決したプロジェクトであるので、リスクを解決するためのノウハウを有している可能性が高いためである。
ステップS612では、比較するプロジェクトがあるか否かを判断し、ある場合はステップS604へ戻り、それ以外の場合は処理を終了する(ステップS699)。
In step S610, it is included in the collaboration project list. In other words, although the skill evaluation value is low, the risk has been resolved in the project, so there is a high possibility that the project has the know-how to resolve the risk.
In step S612, it is determined whether or not there is a project to be compared, and if there is, the process returns to step S604, otherwise the process ends (step S699).

図7は、本実施の形態による処理例を示すフローチャートである。図3の例に示したフローチャートのステップS312の具体的処理例を示すものである。つまり、図4の例に示したフローチャートの別の処理例を示すものである。ステップS706、ステップS708以外の処理は、図4の例に示したフローチャートと同等の処理である。
ステップS702では、対象プロジェクトのスキル情報テーブルを取得する。
ステップS704では、他のプロジェクトのスキル情報テーブルを取得する。
FIG. 7 is a flowchart showing an example of processing according to this embodiment. This shows a specific example of processing in step S312 of the flowchart shown in the example of FIG. That is, it shows another processing example of the flowchart shown in the example of FIG. Processes other than steps S706 and S708 are the same as those in the flowchart shown in the example of FIG.
In step S702, the skill information table of the target project is obtained.
In step S704, skill information tables of other projects are obtained.

ステップS706では、両者間で同じスキル項目であって、(対象プロジェクトの方がスキル評価値が高いスキル項目数)/(対象プロジェクトの方がスキル評価値が低いスキル項目数)の値を算出する。この算出した値を、図4の例での提案スコアとしている。
ステップS708では、「前ステップで算出した比率≧閾値C」であるか否かを判断し、「前ステップで算出した比率≧閾値C」の場合はステップS710へ進み、それ以外の場合はステップS712へ進む。
In step S706, the value of (the number of skill items with a higher skill evaluation value in the target project)/(the number of skill items with a lower skill evaluation value in the target project) for the same skill items between the two is calculated. . This calculated value is used as the proposal score in the example of FIG.
In step S708, it is determined whether or not "the ratio calculated in the previous step≧threshold C". If "the ratio calculated in the previous step≧threshold C", the process proceeds to step S710; otherwise, step S712. proceed to

ステップS710では、コラボレーションプロジェクトリストに含める。
ステップS712では、比較するプロジェクトがあるか否かを判断し、ある場合はステップS704へ戻り、それ以外の場合は処理を終了する(ステップS799)。
In step S710, it is included in the collaboration project list.
In step S712, it is determined whether or not there is a project to be compared, and if there is, the process returns to step S704, otherwise the process ends (step S799).

図8は、本実施の形態による処理例を示すフローチャートである。図3の例に示したフローチャートのステップS312の具体的処理例を示すものである。
ステップS802では、対象プロジェクトのリスクを抽出する。
ステップS804では、納期に目標を達成できた他のプロジェクトの過去のリスクを抽出する。
なお、ここでの「他のプロジェクト」として、対象としているプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトとしてもよい。さらに、対象としているプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトとしてもよい。つまり、異なるリスクが発生した場合であって、お互いにそのノウハウを共有することで、双方でリスクの解決を図ることができるようになる。図4の例に示したフローチャート内のステップS404と同様の理由である。
FIG. 8 is a flowchart showing an example of processing according to this embodiment. This shows a specific example of processing in step S312 of the flowchart shown in the example of FIG.
In step S802, the risks of the target project are extracted.
In step S804, past risks of other projects that have achieved their targets on time are extracted.
It should be noted that the "other project" here may be another project determined to have a risk in an item different from the item determined to have a risk in the target project. Furthermore, among the items determined to be risk-free in the target project, other projects determined to have risk may be used. In other words, even if a different risk arises, by sharing the know-how with each other, both parties will be able to resolve the risk. The reason is the same as step S404 in the flowchart shown in the example of FIG.

ステップS806では、対象プロジェクトと同じリスクを抽出できたか否かを判断し、抽出できた場合はステップS808へ進み、それ以外の場合はステップS812へ進む。
ステップS808では、リスク発生は、スケジュール上、同じ時期であるか否かを判断し、同じ時期の場合はステップS810へ進み、それ以外の場合はステップS812へ進む。ここで「同じ時期」として、単にフェーズが同じであることとしてもよいし、フェーズが同じであって、さらに、そのフェーズ内での経過割合(具体的には、そのフェーズ内での経過日数/そのフェーズの期間)が類似していることとしてもよい。なお、ここでの類似とは、両者の経過割合の差が予め定められた値以内であることである。
In step S806, it is determined whether or not the same risks as those of the target project have been extracted. If the risks have been extracted, the process proceeds to step S808;
In step S808, it is determined whether or not the risks occurred at the same time in terms of schedule. Here, "at the same time" may simply mean that the phase is the same, or that the phase is the same and the rate of progress within that phase (specifically, the number of days elapsed within that phase/ duration of the phase) may be similar. Note that the similarity here means that the difference between the two progress rates is within a predetermined value.

ステップS810では、コラボレーションプロジェクトリストに含める。
ステップS812では、比較するプロジェクトがあるか否かを判断し、ある場合はステップS804へ戻り、それ以外の場合は処理を終了する(ステップS899)。
In step S810, it is included in the collaboration project list.
In step S812, it is determined whether or not there is a project to be compared, and if there is, the process returns to step S804, otherwise the process ends (step S899).

図9は、本実施の形態による処理例を示す説明図である。
図9(a)の例に示す不具合発見率グラフ900Aは、対象としているプロジェクト(A)の時間経過と不具合発見率の関係を示したグラフである。
不具合発見率推移910Aから、納期930Aまでに不具合発見率が十分に低下しない可能性が高いので、現在920Aの時点で、リスク有りと判定されたものである。
なお、リスク有りか否かは、予測目標達成日数に対し閾値を設定することで判定し、以下の算出式を用いる。
不具合発見率=不具合数/テストケース数
不具合発見率の平均削減ポイント=(現在の不具合発見率-目標とする不具合発見率)/経過日数
予測目標達成日数=経過日数+(現在の不具合発見率-目標とする不具合発見率)/不具合発見率の平均削減ポイント
そして、「予測目標達成日数が納期930Aを超える」場合がリスク有りと判定する。
また、不具合発見率が安定するまでの期間は、リスクの顕在化の判定処理は行わないようにしてもよい。例えば、3か月かかるテストに対して初日の計測結果で提案するのではなく、2週間、1か月程度猶予期間を設けるようにすればよい。
FIG. 9 is an explanatory diagram showing an example of processing according to this embodiment.
A defect discovery rate graph 900A shown in the example of FIG. 9A is a graph showing the relationship between the elapsed time and the defect discovery rate of the target project (A).
From the defect discovery rate transition 910A, there is a high possibility that the defect discovery rate will not sufficiently decrease by the delivery date 930A.
Whether or not there is a risk is determined by setting a threshold for the number of days to achieve the predicted target, and the following calculation formula is used.
Defect discovery rate = number of defects / number of test cases Average reduction points for defect discovery rate = (current defect discovery rate - target defect discovery rate) / number of days elapsed Predicted target achievement days = number of elapsed days + (current defect discovery rate - target defect discovery rate)/average reduction point of defect discovery rate Then, it is determined that there is a risk when "the estimated number of days to achieve the target exceeds the delivery date of 930A".
In addition, the risk manifestation determination process may not be performed until the failure discovery rate stabilizes. For example, instead of making a proposal based on the measurement results on the first day for a test that takes three months, a grace period of two weeks or one month should be provided.

図9(b)の例に示す不具合発見率グラフ900Bはプロジェクト(B)におけるものであり、図9(c)の例に示す不具合発見率グラフ900Cはプロジェクト(C)におけるものである。
プロジェクト(C)の方がプロジェクト(B)よりも提案スコアが高くなるようにする。つまり、顕在化したリスクに対し、適切に対応できたと推測でき、解決のためのノウハウ提供が期待できるからである。
提案スコアが閾値以上であるものを提案してもよい。さらに、提案スコアが最も高いプロジェクトを提案するようにしてもよい。
提案スコアは、リスクが顕在化から納期までの「不具合発見率の平均削減ポイント」を用いて求める。以下の算出式を用いる。
不具合発見率の平均削減ポイント=(リスク顕在化時の不具合発見率-納期時の不具合発見率)/リスク顕在化から納期までの経過日数
ただし、以下の条件を満たすプロジェクトのみに限定する。
・納期に目標を達成できている。
・リスクの顕在化が発生している。
A fault discovery rate graph 900B shown in the example of FIG. 9B is for project (B), and a fault discovery rate graph 900C shown in the example of FIG. 9C is for project (C).
Project (C) should have a higher proposal score than project (B). In other words, it can be inferred that an appropriate response has been made to the actualized risk, and the provision of know-how for solving the problem can be expected.
Those with proposal scores equal to or greater than a threshold may be proposed. Furthermore, the project with the highest proposal score may be proposed.
The proposal score is obtained by using the "average reduction point of defect discovery rate" from the time the risk becomes apparent to the delivery date. The following calculation formula is used.
Average reduction points for defect discovery rate = (Defect discovery rate at risk manifestation - Defect discovery rate at time of delivery) / Elapsed days from risk manifestation to delivery date However, this is limited to projects that satisfy the following conditions.
- Achieving the target on time.
・Risks have materialized.

図8の例に示したフローチャートの処理を行うために、プロジェクト管理テーブル1000を用いるようにしてもよい。
図10は、プロジェクト管理テーブル1000のデータ構造例を示す説明図である。プロジェクト管理テーブル1000は、プロジェクトID欄1010、スケジュール欄1020、目標欄1030、目標達成フラグ1040、リスク種別欄1050、リスク発生日時欄1060、リスク要因項目欄1070を有しており、スケジュール欄1020は、開始日時欄1022、納期日時1024を有しており、リスク要因項目欄1070は、不具合発見率欄1072等を有している。プロジェクトID欄1010は、本実施の形態において、プロジェクトを一意に識別するための情報(プロジェクトID:IDentification)を記憶している。スケジュール欄1020は、そのプロジェクトのスケジュールを記憶している。開始日時欄1022は、そのプロジェクトの開始日時を記憶している。納期日時1024は、そのプロジェクトの納期日時を記憶している。なお、開始日時欄1022、納期日時1024は、活動フェーズ毎に用意されていてもよい。目標欄1030は、目標を記憶している。例えば、納期までに完了していること等がある。目標達成フラグ1040は、目標を達成したか否かを示す情報(フラグ)を記憶している。リスク種別欄1050は、そのプロジェクトで発生したリスク種別(そのリスクを判定したルールとしてもよい)を記憶している。リスク発生日時欄1060は、そのリスクの発生日時を記憶している。リスク要因項目欄1070は、そのリスク要因項目を記憶している。不具合発見率欄1072は、不具合発見率を記憶している。
The project management table 1000 may be used to perform the processing of the flowchart shown in the example of FIG.
FIG. 10 is an explanatory diagram showing an example data structure of the project management table 1000. As shown in FIG. The project management table 1000 has a project ID column 1010, a schedule column 1020, a goal column 1030, a goal achievement flag 1040, a risk type column 1050, a risk occurrence date and time column 1060, and a risk factor item column 1070. The schedule column 1020 is . The project ID column 1010 stores information (project ID: IDentification) for uniquely identifying a project in this embodiment. The schedule column 1020 stores the schedule of the project. The start date and time column 1022 stores the start date and time of the project. The delivery date and time 1024 stores the delivery date and time of the project. Note that the start date/time column 1022 and the delivery date/time 1024 may be prepared for each activity phase. The goal column 1030 stores goals. For example, it may be completed by the delivery date. The goal achievement flag 1040 stores information (flag) indicating whether or not the goal has been achieved. The risk type column 1050 stores the type of risk that occurred in the project (which may be the rule that determined the risk). The risk occurrence date and time column 1060 stores the date and time of occurrence of the risk. The risk factor item column 1070 stores the risk factor item. The defect discovery rate column 1072 stores the defect discovery rate.

図11は、本実施の形態による処理例を示すフローチャートである。図3の例に示したフローチャートのステップS314の具体的処理例を示すものである。つまり、提案するプロジェクト内のメンバーの誰を紹介するかを決定するアルゴリズム例である。
ステップS1102では、対象プロジェクトのメンバーを抽出する。例えば、プロジェクト管理テーブル1200から抽出する。図12は、プロジェクト管理テーブル1200のデータ構造例を示す説明図である。プロジェクト管理テーブル1200は、ユーザーID欄1210、プロジェクト数欄1220、プロジェクトID欄1230、役職欄1240、担当フェーズ欄1250を有している。ユーザーID欄1210は、本実施の形態において、ユーザーを一意に識別するための情報(ユーザーID)を記憶している。プロジェクト数欄1220は、そのユーザーが参加しているプロジェクト数を記憶している。プロジェクト数欄1220内の数だけ、その後にプロジェクトID欄1230と役職欄1240の組み合わせが続く。プロジェクトID欄1230は、プロジェクトIDを記憶している。役職欄1240は、プロジェクトにおいて、そのユーザーが有しているリーダー、一般メンバー等のプロジェクト内の役割(役職)を記憶している。担当フェーズ欄1250は、そのユーザーが担当しているフェーズを記憶している。
FIG. 11 is a flowchart showing an example of processing according to this embodiment. This shows a specific example of processing in step S314 of the flowchart shown in the example of FIG. In other words, it is an example of an algorithm for determining which of the members in the proposed project to introduce.
In step S1102, members of the target project are extracted. For example, extract from the project management table 1200 . FIG. 12 is an explanatory diagram showing an example data structure of the project management table 1200. As shown in FIG. The project management table 1200 has a user ID column 1210, a number of projects column 1220, a project ID column 1230, a position column 1240, and a phase column 1250 in charge. The user ID column 1210 stores information (user ID) for uniquely identifying the user in this embodiment. The number of projects column 1220 stores the number of projects in which the user participates. A combination of project ID field 1230 and job title field 1240 follows as many as the number in project number field 1220 . The project ID column 1230 stores project IDs. The post column 1240 stores roles (posts) within the project, such as leaders, general members, etc., held by the user in the project. The assigned phase column 1250 stores the phase assigned to the user.

ステップS1104では、提案するプロジェクトのメンバーを抽出する。同様に、プロジェクト管理テーブル1200から抽出すればよい。
ステップS1106では、対象プロジェクトのメンバーと、提案するプロジェクトのメンバーとに、同じメンバーがいるか否かを判断し、いる場合はステップS1108へ進み、それ以外の場合はステップS1110へ進む。
ステップS1108では、対象プロジェクトのリスクに関わっているか否かを判断し、関わっている場合はステップS1110へ進み、それ以外の場合はステップS1112へ進む。具体的には、プロジェクト管理テーブル1200の担当フェーズ欄1250を参照し、リスクが発生している(発生した)フェーズに該当するか否かで判断できる。
ステップS1110では、提案するプロジェクトのリーダーを紹介する。
ステップS1112では、そのメンバー(ステップS1106で同じメンバーと判断されたメンバー)を紹介する。
In step S1104, members of the proposed project are extracted. Similarly, it can be extracted from the project management table 1200 .
In step S1106, it is determined whether or not the members of the target project and the members of the project to be proposed are the same members.
In step S1108, it is determined whether or not the risk of the target project is involved, and if so, the process proceeds to step S1110, otherwise the process proceeds to step S1112. Specifically, it can be determined by referring to the assigned phase column 1250 of the project management table 1200 and determining whether or not it corresponds to a phase in which a risk has occurred (occurred).
In step S1110, the leader of the proposed project is introduced.
At step S1112, the member (the member determined to be the same member at step S1106) is introduced.

なお、プロジェクト双方向の提案スコアを合計して、合計値が高くなる他のプロジェクトを選択する場合の他のプロジェクトの提案スコアを算出するには、前述した提案スコアの算出におけるプロジェクトの関係を逆にすればよい。つまり、「対象とするプロジェクト」を「他のプロジェクト」として、「他のプロジェクト」を「対象とするプロジェクト」として提案スコアを算出すればよい。 Note that in order to calculate the proposal score of the other project when summing the proposal scores for both directions of the project and selecting the other project with the higher total value, the relationship of the projects in the above calculation of the proposal score is reversed. should be In other words, the proposal score can be calculated with the "target project" as the "other project" and the "other project" as the "target project".

なお、本実施の形態としてのプログラムが実行されるコンピュータのハードウェア構成は、図13に例示するように、一般的なコンピュータであり、具体的にはパーソナルコンピュータ、サーバーとなり得るコンピュータ等である。つまり、具体例として、処理部(演算部)としてCPU1301を用い、記憶装置としてRAM1302、ROM1303、HD1304を用いている。HD1304として、例えば、ハードディスク、フラッシュ・メモリであるSSD(Solid State Drive)等を用いてもよい。取得(A)モジュール105、取得(B)モジュール110、リスク判定モジュール115、通知モジュール120、提案処理モジュール125等のプログラムを実行するCPU1301と、そのプログラムやデータを記憶するRAM1302と、本コンピュータを起動するためのプログラム等が格納されているROM1303と、スキル情報テーブル500、プロジェクト管理テーブル1000、プロジェクト管理テーブル1200等を記憶する補助記憶装置であるHD1304と、キーボード、マウス、タッチスクリーン、マイク、カメラ(視線検知カメラ等を含む)等に対する利用者の操作(動作、音声、視線等を含む)に基づいてデータを受け付ける受付装置1306と、CRT、液晶ディスプレイ、スピーカー等の出力装置1305と、ネットワークインタフェースカード等の通信ネットワークと接続するための通信回線インタフェース1307、そして、それらをつないでデータのやり取りをするためのバス1308により構成されている。これらのコンピュータが複数台互いにネットワークによって接続されていてもよい。 As shown in FIG. 13, the hardware configuration of the computer on which the program according to the present embodiment is executed is a general computer, specifically a personal computer, a computer that can serve as a server, and the like. That is, as a specific example, a CPU 1301 is used as a processing unit (calculating unit), and a RAM 1302, ROM 1303, and HD 1304 are used as storage devices. As the HD 1304, for example, a hard disk, an SSD (Solid State Drive) which is a flash memory, or the like may be used. A CPU 1301 that executes programs such as the acquisition (A) module 105, the acquisition (B) module 110, the risk determination module 115, the notification module 120, the proposal processing module 125, etc., the RAM 1302 that stores the programs and data, and the computer is started. A ROM 1303 storing programs and the like for doing so, an HD 1304 serving as an auxiliary storage device for storing the skill information table 500, the project management table 1000, the project management table 1200, etc., a keyboard, a mouse, a touch screen, a microphone, a camera ( a receiving device 1306 that receives data based on user's operation (including motion, voice, line of sight, etc.), an output device 1305 such as a CRT, a liquid crystal display, a speaker, etc., and a network interface card. and a bus 1308 for connecting them to exchange data. A plurality of these computers may be connected to each other via a network.

前述の実施の形態のうち、コンピュータ・プログラムによるものについては、本ハードウェア構成のシステムにソフトウェアであるコンピュータ・プログラムを読み込ませ、ソフトウェアとハードウェア資源とが協働して、前述の実施の形態が実現される。
なお、図13に示すハードウェア構成は、1つの構成例を示すものであり、本実施の形態は、図13に示す構成に限らず、本実施の形態において説明したモジュールを実行可能な構成であればよい。例えば、一部のモジュールを専用のハードウェア(例えば特定用途向け集積回路(Application Specific Integrated Circuit:ASIC)等)で構成してもよく、一部のモジュールは外部のシステム内にあり通信回線で接続している形態でもよく、さらに図13に示すシステムが複数互いに通信回線によって接続されていて互いに協調動作するようにしてもよい。また、特に、パーソナルコンピュータの他、携帯情報通信機器(携帯電話、スマートフォン、モバイル機器、ウェアラブルコンピュータ等を含む)、情報家電、ロボット、複写機、ファックス、スキャナ、プリンタ、複合機(スキャナ、プリンタ、複写機、ファックス等のいずれか2つ以上の機能を有している画像処理装置)などに組み込まれていてもよい。
Of the above-described embodiments, with respect to the computer program, a computer program, which is software, is loaded into the system of this hardware configuration, and the software and hardware resources cooperate to perform the above-described embodiment. is realized.
Note that the hardware configuration shown in FIG. 13 shows one configuration example, and the present embodiment is not limited to the configuration shown in FIG. I wish I had. For example, some modules may be configured with dedicated hardware (for example, Application Specific Integrated Circuit: ASIC), etc., and some modules are in an external system and connected via a communication line. Further, a plurality of systems shown in FIG. 13 may be connected to each other by communication lines so as to cooperate with each other. In addition to personal computers, mobile information communication devices (including mobile phones, smartphones, mobile devices, wearable computers, etc.), information appliances, robots, copiers, faxes, scanners, printers, multifunction devices (scanners, printers, It may be incorporated in an image processing apparatus having two or more functions such as a copier, a facsimile machine, or the like.

なお、説明したプログラムについては、記録媒体に格納して提供してもよく、また、そのプログラムを通信手段によって提供してもよい。その場合、例えば、前記説明したプログラムについて、「プログラムを記録したコンピュータ読み取り可能な記録媒体」の発明として捉えてもよい。
「プログラムを記録したコンピュータ読み取り可能な記録媒体」とは、プログラムのインストール、実行、プログラムの流通等のために用いられる、プログラムが記録されたコンピュータで読み取り可能な記録媒体をいう。
なお、記録媒体としては、例えば、デジタル・バーサタイル・ディスク(DVD)であって、DVDフォーラムで策定された規格である「DVD-R、DVD-RW、DVD-RAM等」、DVD+RWで策定された規格である「DVD+R、DVD+RW等」、コンパクトディスク(CD)であって、読出し専用メモリ(CD-ROM)、CDレコーダブル(CD-R)、CDリライタブル(CD-RW)等、ブルーレイ・ディスク(Blu-ray(登録商標) Disc)、光磁気ディスク(MO)、フレキシブルディスク(FD)、磁気テープ、ハードディスク、読出し専用メモリ(ROM)、電気的消去及び書換可能な読出し専用メモリ(EEPROM(登録商標))、フラッシュ・メモリ、ランダム・アクセス・メモリ(RAM)、SD(Secure Digital)メモリーカード等が含まれる。
そして、前記のプログラムの全体又はその一部は、前記記録媒体に記録して保存や流通等させてもよい。また、通信によって、例えば、ローカル・エリア・ネットワーク(LAN)、メトロポリタン・エリア・ネットワーク(MAN)、ワイド・エリア・ネットワーク(WAN)、インターネット、イントラネット、エクストラネット等に用いられる有線ネットワーク、又は無線通信ネットワーク、さらにこれらの組み合わせ等の伝送媒体を用いて伝送させてもよく、また、搬送波に乗せて搬送させてもよい。
さらに、前記のプログラムは、他のプログラムの一部分若しくは全部であってもよく、又は別個のプログラムと共に記録媒体に記録されていてもよい。また、複数の記録媒体に分割して記録されていてもよい。また、圧縮や暗号化等、復元可能であればどのような態様で記録されていてもよい。
The program described above may be stored in a recording medium and provided, or the program may be provided by communication means. In that case, for example, the program described above may be regarded as an invention of "a computer-readable recording medium on which the program is recorded."
"Program-recorded computer-readable recording medium" refers to a computer-readable recording medium recording a program, which is used for program installation, execution, program distribution, and the like.
As a recording medium, for example, a digital versatile disc (DVD), which is a standard established by the DVD Forum, "DVD-R, DVD-RW, DVD-RAM, etc." Standard "DVD + R, DVD + RW, etc.", compact disc (CD), read-only memory (CD-ROM), CD recordable (CD-R), CD rewritable (CD-RW), Blu-ray disc ( Blu-ray (registered trademark) Disc), magneto-optical disk (MO), flexible disk (FD), magnetic tape, hard disk, read-only memory (ROM), electrically erasable and rewritable read-only memory (EEPROM (registered trademark) )), flash memory, random access memory (RAM), SD (Secure Digital) memory card, and the like.
Then, the whole or part of the program may be recorded on the recording medium and stored or distributed. Also, by communication, for example, a wired network used for a local area network (LAN), a metropolitan area network (MAN), a wide area network (WAN), the Internet, an intranet, an extranet, etc., or a wireless communication. It may be transmitted using a transmission medium such as a network or a combination thereof, or may be carried on a carrier wave.
Furthermore, the program may be part or all of another program, or may be recorded on a recording medium together with a separate program. Moreover, it may be divided and recorded on a plurality of recording media. Also, it may be recorded in any form, such as compression or encryption, as long as it can be restored.

100…情報処理装置
105…取得(A)モジュール
110…取得(B)モジュール
115…リスク判定モジュール
120…通知モジュール
125…提案処理モジュール
150…プロジェクト管理装置
155…プロジェクト活動情報記憶モジュール
170A…プロジェクト(A)担当ユーザー端末
210…プロジェクト
250…全プロジェクト管理装置
255…プロジェクトフェーズ情報記憶モジュール
260…リスク顕在化ルール記憶モジュール
265…顕在化リスク一覧記憶モジュール
270…ユーザー端末
290…通信回線
100... Information processing device 105... Acquisition (A) module 110... Acquisition (B) module 115... Risk determination module 120... Notification module 125... Proposal processing module 150... Project management device 155... Project activity information storage module 170A... Project (A) ) Responsible user terminal 210 Project 250 Management device for all projects 255 Project phase information storage module 260 Risk manifestation rule storage module 265 Risk manifestation list storage module 270 User terminal 290 Communication line

Claims (12)

複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
を有し、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理装置。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
has
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project that is determined to be risk-free among the items determined to be risky in the first project.
Information processing equipment.
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、過去にリスク有りと判定され、現在はリスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
請求項に記載の情報処理装置。
The notification means selects, as the second project, another project that has been determined to have a risk in the past and is currently determined to have no risk in the items that have been determined to have a risk in the first project.
The information processing device according to claim 1 .
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
を有し、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、過去にリスク有りと判定され、現在はリスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
を有する情報処理装置。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
has
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project that has been determined to have a risk in the past and is currently determined to have no risk in the items that have been determined to have a risk in the first project.
Information processing device having
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
請求項に記載の情報処理装置。
The notification means selects, as the second project, another project that is determined to be risk-free among the items determined to be risky in the first project.
The information processing apparatus according to claim 3 .
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
を有し、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理装置。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
has
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project determined to be at risk in an item different from the item determined to be at risk of the first project.
Information processing equipment.
前記通知手段は、前記第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
請求項5に記載の情報処理装置。
The notification means selects, as the second project, another project determined to have a risk among the items determined to have no risk in the first project.
The information processing device according to claim 5 .
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
を有し、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理装置。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
has
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project determined to have a risk among the items determined to have no risk in the first project.
Information processing equipment.
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
請求項に記載の情報処理装置。
The notification means selects, as the second project, another project determined to be at risk in an item different from the item determined to be at risk of the first project.
The information processing apparatus according to claim 7 .
コンピュータを、
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
として機能させ、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、リスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理プログラム。
the computer,
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
function as
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project that is determined to be risk-free among the items determined to be risky in the first project.
Information processing program.
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
として機能させ、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目において、過去にリスク有りと判定され、現在はリスク無しと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理プログラム。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
function as
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project that has been determined to have a risk in the past and is currently determined to have no risk in the items that have been determined to have a risk in the first project.
Information processing program.
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
として機能させ、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク有りと判定された項目とは異なる項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理プログラム。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
function as
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project determined to be at risk in an item different from the item determined to be at risk of the first project.
Information processing program.
複数のユーザーで構成される第1のユーザー群が参加する第1のプロジェクトにおいて、該第1のプロジェクトに関わるコミュニケーション情報と、該第1のプロジェクトの進捗を示す進捗情報を取得する取得手段と、
前記取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第1のプロジェクトの進捗におけるリスクの有無の判定を行う判定手段と、
前記判定手段によってリスクが有りと判定された場合に、前記第1のユーザー群の少なくとも1人以上のユーザーに対して、該第1のユーザー群の少なくとも1人以上が異なる第2のユーザー群が参加する第2のプロジェクトをコラボレーション相手の候補として通知する通知手段と、
前記第1のプロジェクト以外の他のプロジェクトにおいて、該他のプロジェクトに関わるコミュニケーション情報と、該他のプロジェクトの進捗を示す進捗情報を取得する第2の取得手段
として機能させ、
前記通知手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記第2のプロジェクトを選択し、
前記判定手段は、前記第2の取得手段によって取得された前記コミュニケーション情報と前記進捗情報から、前記他のプロジェクトの進捗におけるリスクの有無の判定を行い、
前記通知手段は、前記第1のプロジェクトのリスク無しと判定された項目において、リスク有りと判定された他のプロジェクトを前記第2のプロジェクトとして選択する、
情報処理プログラム。
Acquisition means for acquiring communication information related to the first project and progress information indicating the progress of the first project in a first project in which a first user group composed of a plurality of users participates;
determination means for determining whether there is a risk in the progress of the first project from the communication information and the progress information acquired by the acquisition means;
When it is determined that there is a risk by the determination means, a second user group in which at least one or more people in the first user group are different from at least one or more users in the first user group notification means for notifying the participating second project as a collaboration partner candidate ;
Second acquisition means for acquiring communication information related to the project other than the first project and progress information indicating the progress of the project.
function as
the notification means selects the second project from the communication information and the progress information acquired by the second acquisition means;
The determination means determines whether or not there is a risk in the progress of the other project from the communication information and the progress information acquired by the second acquisition means,
The notification means selects, as the second project, another project determined to have a risk among the items determined to have no risk in the first project.
Information processing program.
JP2018158040A 2018-08-27 2018-08-27 Information processing device and information processing program Active JP7206694B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018158040A JP7206694B2 (en) 2018-08-27 2018-08-27 Information processing device and information processing program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018158040A JP7206694B2 (en) 2018-08-27 2018-08-27 Information processing device and information processing program

Publications (2)

Publication Number Publication Date
JP2020034963A JP2020034963A (en) 2020-03-05
JP7206694B2 true JP7206694B2 (en) 2023-01-18

Family

ID=69668114

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018158040A Active JP7206694B2 (en) 2018-08-27 2018-08-27 Information processing device and information processing program

Country Status (1)

Country Link
JP (1) JP7206694B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050026131A1 (en) 2003-07-31 2005-02-03 Elzinga C. Bret Systems and methods for providing a dynamic continual improvement educational environment
JP2006079257A (en) 2004-09-08 2006-03-23 Toshiba Mitsubishi-Electric Industrial System Corp Business management system
JP2006260112A (en) 2005-03-16 2006-09-28 Ricoh Co Ltd Project management system, project management method, program and storage medium
US20140136439A1 (en) 2012-11-09 2014-05-15 International Business Machines Corporation Selecting collaborators for projects
JP2016062149A (en) 2014-09-16 2016-04-25 株式会社日立パワーソリューションズ Information processing unit, process buffer calculation method, and program
US20160203433A1 (en) 2015-01-12 2016-07-14 International Business Machines Corporation Optimization of trait and expertise for workforce selection
US20180150739A1 (en) 2016-11-30 2018-05-31 Microsoft Technology Licensing, Llc Systems and methods for performing automated interviews

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050026131A1 (en) 2003-07-31 2005-02-03 Elzinga C. Bret Systems and methods for providing a dynamic continual improvement educational environment
JP2006079257A (en) 2004-09-08 2006-03-23 Toshiba Mitsubishi-Electric Industrial System Corp Business management system
JP2006260112A (en) 2005-03-16 2006-09-28 Ricoh Co Ltd Project management system, project management method, program and storage medium
US20140136439A1 (en) 2012-11-09 2014-05-15 International Business Machines Corporation Selecting collaborators for projects
JP2016062149A (en) 2014-09-16 2016-04-25 株式会社日立パワーソリューションズ Information processing unit, process buffer calculation method, and program
US20160203433A1 (en) 2015-01-12 2016-07-14 International Business Machines Corporation Optimization of trait and expertise for workforce selection
US20180150739A1 (en) 2016-11-30 2018-05-31 Microsoft Technology Licensing, Llc Systems and methods for performing automated interviews

Also Published As

Publication number Publication date
JP2020034963A (en) 2020-03-05

Similar Documents

Publication Publication Date Title
US10755221B2 (en) Worker answer confidence estimation for worker assessment
KR102076162B1 (en) Apparatus for processing work object and method performing the same
US20210049538A1 (en) Apparatus for processing work object and method performing the same
US11074415B2 (en) Context-sensitive aggregation of chatbot conversations
US20240031488A1 (en) Systems and methods for creating and managing breakout sessions for a conference session
JP2006323738A (en) Program for evaluating contribution level of community participant and electronic communication system
US20140156550A1 (en) Systems and methods for conducting an interview
US20160335579A1 (en) Business continuity plan scoring
US20220138651A1 (en) Generation of recommended actions based on strength and diversity of collaboration in a user network
US20160173437A1 (en) Balancing a workload based on commitments to projects
US20230199036A1 (en) Systems and methods for creating and managing breakout sessions for a conference session
US20140156333A1 (en) Systems and methods for interview scheduling
JP2012203905A (en) System, method and computer program for detecting leadership
JP7206694B2 (en) Information processing device and information processing program
US20140156356A1 (en) Systems and methods for determining effectiveness of interviews and meetings
Lee Impacts of public relations on corporate reputation
JP5652047B2 (en) Information processing apparatus and information processing program
US20200184424A1 (en) Computer-generated team based metrics for candidate onboarding and retention
JP7073693B2 (en) Information processing equipment and information processing programs
Liberona et al. Customer knowledge management in the age of social networks
JP2017228004A (en) Information processing apparatus and information processing program
JP7106873B2 (en) Information processing device and information processing program
Madsen et al. On-the-job learning: bright spots of governmental public health employee reflections on the COVID-19 response
Kwan The study of socio-technical coordination using a socio-technical congruence model
US20230245070A1 (en) System and method supporting virtual hallway collision

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210721

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220614

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220725

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221206

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221219

R150 Certificate of patent or registration of utility model

Ref document number: 7206694

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150