Drawer transfer device for spring tension balancer Download PDF

Info

Publication number
JP7182491B2
JP7182491B2 JP2019023109A JP2019023109A JP7182491B2 JP 7182491 B2 JP7182491 B2 JP 7182491B2 JP 2019023109 A JP2019023109 A JP 2019023109A JP 2019023109 A JP2019023109 A JP 2019023109A JP 7182491 B2 JP7182491 B2 JP 7182491B2
Authority
JP
Japan
Prior art keywords
cylinder
inner cylinder
pull
outer cylinder
tension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019023109A
Other languages
Japanese (ja)
Other versions
JP2020131730A (en
Inventor
晴一 田川
崇 田村
貴弘 濱田
伯晃 川崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Tekki Corp
Original Assignee
Sanwa Tekki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Tekki Corp filed Critical Sanwa Tekki Corp
Priority to JP2019023109A priority Critical patent/JP7182491B2/en
Publication of JP2020131730A publication Critical patent/JP2020131730A/en
Application granted granted Critical
Publication of JP7182491B2 publication Critical patent/JP7182491B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

ばね式張力バランサは、設置したときに所定の張力を得られるように、予めばね力に抗して、内筒を外筒から所定長さ引き出す工程を必要とする。本発明は、バランサの保管施設内等における内筒の引き出し工程において、作業用の支持架台として用いられ、引き出し工程が終了したら、そのまま、張力バランサを設置現場まで運搬するための搬送用架台として用いられるばね式張力バランサの引き出し搬送装置に関する。 A spring-type tension balancer requires a process in which the inner cylinder is pulled out from the outer cylinder by a predetermined length against the spring force in order to obtain a predetermined tension when installed. INDUSTRIAL APPLICABILITY The present invention is used as a work support frame in the process of pulling out the inner cylinder in a balancer storage facility or the like, and after the process of pulling out is completed, it is used as a transport frame for transporting the tension balancer to the installation site. It relates to a pull-out transport device for a spring-loaded tension balancer.

従来、ばね式張力バランサを設置現場において張力の調整を行わずに、と架空線と接続できるように、予め製造工場等、所要の設備を有する施設において、外筒から内筒を所望長さ引き出す張力調整が行われる。張力調整後、張力バランサは、固定装置により、外筒と内筒を固定された状態で設置現場へ搬送される。固定装置は、張力バランサが、架空線へ接続された後、撤去される。この固定装置として、特許文献1に記載されたものが知られている。 Conventionally, in order to connect a spring-type tension balancer to an overhead line without adjusting the tension at the installation site, the desired length of the inner cylinder is pulled out from the outer cylinder in a facility such as a manufacturing factory that has the necessary equipment in advance. Tension adjustments are made. After the tension adjustment, the tension balancer is transported to the installation site with the outer cylinder and the inner cylinder fixed by the fixing device. The fixing device is removed after the tension balancer is connected to the overhead line. As this fixing device, one described in Patent Document 1 is known.

この装置は、ばね式張力バランサの外筒(ケーシング)と内筒(ロッド)との間に着脱自在に介設されるもので、外筒の端部に当接する当接部材と、この当接部材に一端が連結され、内筒の両側をこれと平行に所定長さ伸びる一対の抗圧杆と、内筒の軸線と直交する方向に伸び、中間部が内筒のクレビス(引手)に係止され、両端において一対の抗圧杆の他端に連結される固定ヨークとを具備する。固定装置を張力バランサに装着することにより、電車線に対する所定の張力が得られるまで内筒をばね力に抗して外筒から引き出した状態を抗圧杆で維持する。張力バランサを設置した後に、固定装置を撤去すれば、張力バランサは所定の張力で電車線を引き留めることになる。 This device is detachably interposed between an outer cylinder (casing) and an inner cylinder (rod) of a spring-type tension balancer. A pair of pressure-resisting rods, one end of which is connected to the member and extends parallel to both sides of the inner cylinder for a predetermined length, and a pair of pressure-resisting rods extending in a direction perpendicular to the axis of the inner cylinder, the middle part of which engages a clevis (pull) of the inner cylinder. and a fixed yoke that is fixed and connected at both ends to the other ends of the pair of pressure-resisting rods. By attaching the fixing device to the tension balancer, the tension rod maintains the state in which the inner cylinder is pulled out from the outer cylinder against the spring force until a predetermined tension is obtained for the overhead contact line. After the tension balancer is installed, if the fixing device is removed, the tension balancer will hold the overhead contact line with a predetermined tension.

特開2004-42780号公報JP-A-2004-42780

上記張力バランサの張力調整作業には、所要の設備を必要とするので、張力バランサが製造工場から納入された後、保管されている施設内では張力調整作業を行うことができない。このため、従来は、張力バランサを所要の設備を有する製造工場等に戻して張力調整をした後、そこから設置現場へ搬送している。製造工場等から設置現場への張力バランサの搬送は、付属する張力のインジケータが損傷しないように、これを上向きにしてパレット上に搭載した状態で行われる。張力バランサは、張力のインジケータを下向きにして設置する必要があるから、設置作業に当たっては、上下の向きを180°変えて高所へ吊り上げなければならない。この際インジケータが損傷しないように慎重に作業を進める必要があり、これが作業効率を低下させる要因となっている。
したがって、本発明の第1の課題は、張力バランサを支持して張力調整作業を製造工場以外の保管施設内等で容易に行うことができ、そこから設置現場への搬送と設置作業を効率的に行うことができるばね式張力バランサの引き出し搬送装置を提供することである。本発明の第2の課題は、加えて、インジケータに損傷を与えることなく、張力バランサの搬送と設置作業を行うことができるばね式張力バランサの引き出し搬送装置を提供することである。
Since the tension adjustment work of the tension balancer requires necessary facilities, the tension adjustment work cannot be performed in the facility where the tension balancer is stored after it is delivered from the manufacturing factory. For this reason, conventionally, the tension balancer is returned to a manufacturing factory or the like having the required equipment, and after the tension is adjusted, the tension balancer is transported from there to the installation site. When the tension balancer is transported from the manufacturing plant or the like to the installation site, it is mounted on a pallet with the tension balancer facing upward so that the attached tension indicator is not damaged. Since the tension balancer must be installed with the tension indicator facing downward, the tension balancer must be turned 180 degrees and lifted to a high place during the installation work. At this time, it is necessary to carefully proceed with the work so as not to damage the indicator, which is a factor in lowering work efficiency.
Therefore, the first object of the present invention is to support the tension balancer so that the tension adjustment work can be easily performed in a storage facility other than the manufacturing factory, and the transportation from there to the installation site and the installation work can be performed efficiently. Another object of the present invention is to provide a pull-out conveying device for a spring-type tension balancer that can be carried out at any time. A second object of the present invention is, in addition, to provide a spring-loaded tension balancer pull-out conveying device that allows the tension balancer conveying and installation operations to be carried out without damaging the indicator.

以下、添付図面の符号を参照して説明するが、本発明はこれに限定されるものではない。
上記課題を解決するための、本発明のばね式張力バランサの引き出し搬送装置1は、バランサ400を保持する架台100と、内筒420を所望位置まで外筒410から引き出す引き出し部材200と、引き出された内筒420を外筒410に固定することによって引き出し部材200の撤去を許容する固定部材300とを具備する。架台100は、外筒410を水平に固定して保持する外筒支持部120と、引き出し部材200の油圧シリンダ220を着脱自在に係止するシリンダ係止部130,131とを具備する。引き出し部材200は、内筒420の先端部に着脱自在に固定される引き出し金具210と、この引き出し金具210とシリンダ係止部130,131との間に着脱自在に固定される油圧シリンダ220とを具備する。固定部材300は、引き出し部材200により所望の引き出し位置まで引き出された内筒420の先端部に着脱自在に固定される固定ヨーク310と、この固定ヨーク310と外筒410の先端部との間に着脱自在に介設されるテンション部材320とを具備する。
The following description refers to the reference numerals in the attached drawings, but the present invention is not limited thereto.
In order to solve the above-described problems, the pull-out conveying device 1 for a spring-type tension balancer of the present invention comprises a frame 100 for holding a balancer 400, a pull-out member 200 for pulling out an inner cylinder 420 from an outer cylinder 410 to a desired position, and a and a fixing member 300 that allows removal of the drawer member 200 by fixing the inner cylinder 420 to the outer cylinder 410 . The frame 100 includes an outer cylinder support portion 120 that horizontally fixes and holds the outer cylinder 410 , and cylinder locking portions 130 and 131 that detachably lock the hydraulic cylinder 220 of the drawer member 200 . The pull-out member 200 includes a pull-out metal fitting 210 detachably fixed to the tip of the inner cylinder 420 and a hydraulic cylinder 220 detachably fixed between the pull-out metal fitting 210 and the cylinder locking portions 130 and 131. equip. The fixing member 300 is provided between a fixed yoke 310 detachably fixed to the tip of the inner cylinder 420 pulled out to a desired pulled-out position by the pull-out member 200, and between the fixed yoke 310 and the tip of the outer cylinder 410. and a tension member 320 that is detachably interposed.

本発明のばね式張力バランサの引き出し搬送装置1によれば、架台100上に張力バランサ400を支持した状態で、引き出し部材200によって容易に内筒420を外筒410から引き出し、張力の調整を行うことができ、調整後は、固定部材300により内筒420を外筒410に固定して引き出し部材200を撤去し、そのまま架台100上に張力バランサ400を固定して設置現場まで搬送することができる。 According to the pull-out conveying device 1 for the spring-type tension balancer of the present invention, the tension balancer 400 is supported on the frame 100, and the inner cylinder 420 is easily pulled out from the outer cylinder 410 by the pull-out member 200 to adjust the tension. After adjustment, the inner cylinder 420 can be fixed to the outer cylinder 410 by the fixing member 300, the drawer member 200 can be removed, the tension balancer 400 can be fixed as it is on the base 100, and the tension balancer 400 can be transported to the installation site. .

本発明に係るばね式張力バランサの引き出し搬送装置における架台の正面図である。FIG. 4 is a front view of a pedestal in the pull-out conveying device for the spring-type tension balancer according to the present invention; 図1の引き出し搬送装置の架台の平面図である。FIG. 2 is a plan view of a pedestal of the drawer conveyor of FIG. 1; 図1の引き出し搬送装置の架台の側面図である。FIG. 2 is a side view of the cradle of the drawer conveyor of FIG. 1; 図1のIV-IV矢視図斜視図である。FIG. 2 is a perspective view taken along line IV-IV in FIG. 1; 図1のV-V矢視図である。FIG. 2 is a view taken along line VV in FIG. 1; 図1のVI-VI矢視図である。FIG. 2 is a view taken along line VI-VI in FIG. 1; 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図1の引き出し搬送装置による引き出し操作を順を追って示す一部の平面図である。1. It is a partial top view which shows drawing-out operation by the drawing-out conveying apparatus of FIG. 1 in order. 図7の状態の引き出し搬送装置の側面図である。FIG. 8 is a side view of the drawer transport device in the state of FIG. 7; 図10の状態の引き出し搬送装置の側面図である。FIG. 11 is a side view of the drawer transport device in the state of FIG. 10;

図面を参照して本発明の実施の形態を説明する。
図1ないし図3において、引き出し搬送装置1を用いて張力の調整を行い、かつ搬送を行うばね式張力バランサ400は、ばねを内蔵し、後方の基端側が図示しない支持構造物に係止される外筒410と、この外筒410内に入れ子式に嵌挿され前方の先端が外筒410の先端側へ突出するように配置され、内蔵ばねにより外筒410の基端側へ引き込む方向に付勢される内筒420とを備え、内筒420の前方先端側に図示しない架空線が接続され、それにより架空線に一定の張力を付与する公知の張力バランサである。内筒420は、前方の先端部から半径方向下方へ延出して外筒410の外周に沿って後方へ軸線方向に延びる内筒引き出し長のインジケータ421を具備する。張力バランサ400は、下方から視認できるように、インジケータ421を下方に向けた状態で設置される。内筒420は、クレビス422を先端側に具備する。クレビス422は、内筒420の軸線方向前後に並んだ第1及び第2の垂直方向の係止孔422a,422bを有する。
Embodiments of the present invention will be described with reference to the drawings.
In FIGS. 1 to 3, a spring-type tension balancer 400 that adjusts the tension using the drawer/conveyor 1 and conveys the balance has a built-in spring, and its rear proximal end is locked to a support structure (not shown). and an outer cylinder 410 which is telescopically inserted into the outer cylinder 410 and arranged so that the front end thereof protrudes toward the distal end of the outer cylinder 410, and is pulled toward the base end of the outer cylinder 410 by a built-in spring. An overhead wire (not shown) is connected to the front tip side of the inner cylinder 420 to apply a constant tension to the overhead wire. The inner tube 420 includes an inner tube withdrawal length indicator 421 that extends radially downward from a forward tip and axially rearward along the outer circumference of the outer tube 410 . The tension balancer 400 is installed with the indicator 421 directed downward so that it can be visually recognized from below. The inner cylinder 420 has a clevis 422 on its distal end. The clevis 422 has first and second vertical lock holes 422a, 422b aligned in the longitudinal direction of the inner cylinder 420. As shown in FIG.

図7ないし図14に示すように、引き出し搬送装置1は、バランサ400を保持する架台100と、内筒420を所望位置まで外筒410から引き出すための油圧シリンダ220を含む引き出し部材200と、引き出された内筒420を外筒410に固定することによって引き出し部材200の撤去を許容する固定部材300とを具備する。 As shown in FIGS. 7 to 14, the drawer transport device 1 includes a base 100 holding a balancer 400, a drawer member 200 including a hydraulic cylinder 220 for drawing an inner cylinder 420 from an outer cylinder 410 to a desired position, and a drawer member 200. and a fixing member 300 that allows removal of the drawer member 200 by fixing the inner cylinder 420 to the outer cylinder 410 .

図1ないし図6に示すように、架台100は、上部が開放した直方体トラス構造の鋼製の架台本体110と、外筒410を水平に固定して保持する外筒支持部120と、引き出し部材200の油圧シリンダ220を着脱自在に係止するシリンダ係止部130,131とを具備する。シリンダ係止部130は、後方左右に一対、シリンダ係止部131は、前方左右に一対それぞれ設けられる。 As shown in FIGS. 1 to 6, the gantry 100 includes a steel gantry body 110 having a rectangular parallelepiped truss structure with an open top, an outer cylinder support 120 that horizontally fixes and holds an outer cylinder 410, and a drawer member. Cylinder locking portions 130 and 131 for detachably locking the hydraulic cylinder 220 of 200 are provided. A pair of cylinder locking portions 130 are provided on the rear left and right sides, and a pair of cylinder locking portions 131 are provided on the front left and right sides.

外筒支持部120は、バランサ400の外筒410を水平に載せ受けるように、架台本体110の内側に複数固着される。外筒支持部120は、インジケータ421に干渉しないように左右に分かれて配置され、インジケータ421を下方に向け、かつインジケータ421が接地しない高さ位置においてバランサ400を水平に支持する。最前部の外筒支持部120の前端部には、前端当接部140が設けられる。前端当接部140は、外筒支持部120上に載せ受けられた外筒410の前端部の下半分の左右を当接させることにより、バランサ400の前方への移動を拘束する。 A plurality of outer cylinder support portions 120 are fixed inside the gantry main body 110 so as to receive the outer cylinder 410 of the balancer 400 horizontally. Outer cylinder support part 120 is arranged separately to the left and right so as not to interfere with indicator 421, faces indicator 421 downward, and horizontally supports balancer 400 at a height position where indicator 421 does not touch the ground. A front end contact portion 140 is provided at the front end portion of the outer cylinder support portion 120 at the foremost portion. The front end abutment portion 140 abuts the left and right of the lower half of the front end portion of the outer cylinder 410 placed on the outer cylinder support portion 120 to restrain the forward movement of the balancer 400 .

図7、図10に示すように引き出し部材200は、内筒420の先端部に着脱自在に固定される引き出し金具210と、この引き出し金具210とシリンダ係止部130,131との間に着脱自在に固定される一対の油圧シリンダ220とを具備する。 As shown in FIGS. 7 and 10, the drawer member 200 includes a drawer metal fitting 210 detachably fixed to the tip of the inner cylinder 420, and a drawer metal fitting 210 detachably mounted between the drawer metal fitting 210 and the cylinder locking portions 130, 131. and a pair of hydraulic cylinders 220 fixed to.

引き出し金具210は、内筒420の軸線と直交して左右方向に水平にクレビス422を貫通し、中間部においてクレビス422の第1の係止孔422aにボルト211にて係止され、両端部において一対の油圧シリンダ220のピストンロッド221を接続可能である。 The drawer fitting 210 passes through the clevis 422 horizontally in the left-right direction perpendicular to the axis of the inner cylinder 420, is locked in the first locking hole 422a of the clevis 422 at the intermediate portion by a bolt 211, and is locked at both ends. Piston rods 221 of a pair of hydraulic cylinders 220 can be connected.

油圧シリンダ220は、フランジ部222をシリンダ係止部130,131に係止され、バランサ400の左右側面に沿ってそれの軸線と平行に設置される。 The hydraulic cylinder 220 has a flange portion 222 locked to the cylinder locking portions 130 and 131 and is installed along the left and right side surfaces of the balancer 400 parallel to its axis.

図示の実施形態においては、油圧シリンダ220は、架台の小型化の要請により、比較的小型のものが用いられる。このため、内筒420の引き出し長が油圧シリンダ220の伸張長さに足りない場合、二段階に分けて引き出し操作を行う。 In the illustrated embodiment, a relatively small hydraulic cylinder 220 is used due to the demand for downsizing of the frame. Therefore, when the pull-out length of the inner cylinder 420 is insufficient for the extension length of the hydraulic cylinder 220, the pull-out operation is performed in two stages.

すなわち、図7に示すように、油圧シリンダ220を後方のシリンダ係止部130へ係止して第一段階の引き出し操作を行ったところで、図8に示すように、固定部材300により内筒420を外筒410に固定した後、油圧シリンダ220を後方のシリンダ係止部130から取り外し、図9、図10に示すように、前方のシリンダ係止部131へ係止位置を移動して第二段階の引き出し操作を行うように構成される。このため、図3に示すように、後方のシリンダ係止部130と前方のシリンダ係止部131とは、油圧シリンダ220の着脱操作時に干渉を生じないように、設置位置が、バランサ400の中心軸周りに180°ずらしてある。したがって、図13、図14に示すように、引き出し金具210は、油圧シリンダ220の係止位置を変更する際に、180°回転させてクレビス422に固定される。 That is, as shown in FIG. 7, when the hydraulic cylinder 220 is engaged with the rear cylinder engaging portion 130 and the first step of the pullout operation is performed, as shown in FIG. is fixed to the outer cylinder 410, the hydraulic cylinder 220 is removed from the rear cylinder locking portion 130, and as shown in FIGS. configured to perform a staged withdrawal operation; Therefore, as shown in FIG. 3, the rear cylinder locking portion 130 and the front cylinder locking portion 131 are installed at the center of the balancer 400 so as not to interfere with each other when the hydraulic cylinder 220 is attached and detached. It is shifted by 180° around the axis. Therefore, as shown in FIGS. 13 and 14 , the drawer fitting 210 is rotated by 180° and fixed to the clevis 422 when changing the locking position of the hydraulic cylinder 220 .

なお、内筒420の引き出し長が油圧シリンダ220の伸張長さに足りれば、シリンダ係止部130,131は一対のみで足り、2回に分けた引き出し操作も不要である。 If the pull-out length of the inner cylinder 420 is sufficient for the extension length of the hydraulic cylinder 220, only one pair of the cylinder locking portions 130 and 131 is sufficient, and there is no need to perform the pull-out operation in two steps.

図8に示すように、固定部材300は、内筒420を引き出し位置において外筒410に固定するものであり、所望の引き出し位置まで引き出された内筒420と外筒410との間に介設される。固定部材300は、内筒420の先端側のクレビス422に固定される固定ヨーク310と、この固定ヨーク310と外筒410の先端部との間に介設されるテンション部材320とを具備する。 As shown in FIG. 8, the fixing member 300 fixes the inner cylinder 420 to the outer cylinder 410 at the pulled-out position, and is interposed between the inner cylinder 420 pulled out to a desired pulled-out position and the outer cylinder 410 . be done. The fixed member 300 includes a fixed yoke 310 fixed to a clevis 422 on the distal end side of the inner cylinder 420 and a tension member 320 interposed between the fixed yoke 310 and the distal end of the outer cylinder 410 .

固定ヨーク310は、内筒420の軸線と直交して左右方向に水平にクレビス422を貫通し、中間部においてクレビス422の第2の係止孔422bに角ピン311で係止される。 The fixed yoke 310 penetrates the clevis 422 horizontally in the left-right direction perpendicular to the axis of the inner cylinder 420 , and is locked in a second locking hole 422 b of the clevis 422 with a square pin 311 at the intermediate portion.

テンション部材320は、当接部材321と、伸縮自在の一対のテンションロッド322とを具備する。当接部材321は、概略半円弧状の板材からなり、外筒410の先端部上半分に当接するように配置される。一対のテンションロッド322は、当接部材321に一端が固定され、他端側がヨーク310の両端部に接続される。テンションロッド322は、設置状態において内筒420の左右外側を水平に並んで内筒420と平行に前方へ伸びる。 The tension member 320 comprises a contact member 321 and a pair of extendable tension rods 322 . The abutting member 321 is made of a substantially semicircular arc-shaped plate material, and is arranged so as to abut on the upper half of the distal end portion of the outer cylinder 410 . One end of the pair of tension rods 322 is fixed to the contact member 321 and the other end is connected to both ends of the yoke 310 . The tension rods 322 are arranged horizontally on the left and right outer sides of the inner cylinder 420 in the installed state and extend forward in parallel with the inner cylinder 420 .

図示の実施形態の引き出し搬送装置1を用いた内筒420の引き出し工程を説明する。 A process of drawing out the inner cylinder 420 using the drawer conveying device 1 of the illustrated embodiment will be described.

図1ないし図6に示すように、引き出し搬送装置1上にバランサ400をセットする。このとき、バランサ400のインジケータ421を下方に向け、クレビス422を水平に配置すると共に、外筒410の先端を前端当接部140に当接させる。 As shown in FIGS. 1 to 6, a balancer 400 is set on the drawer conveying device 1. As shown in FIG. At this time, the indicator 421 of the balancer 400 is directed downward, the clevis 422 is horizontally arranged, and the tip of the outer cylinder 410 is brought into contact with the front end contact portion 140 .

次いで、図7、図13に示すように、油圧シリンダ220を第1のシリンダ係止部130に係止すると共に、引き出し金具210をクレビス422の係止孔422aにボルト211で固定し、それの両端をピストンロッド221に接続する。油圧シリンダ220を図示しない油圧機に接続して仮想線で示すように、内筒420を所定長さ前方へ引き出す。 Next, as shown in FIGS. 7 and 13, the hydraulic cylinder 220 is locked to the first cylinder locking portion 130, and the drawer fitting 210 is fixed to the locking hole 422a of the clevis 422 with the bolt 211. Both ends are connected to the piston rod 221 . The hydraulic cylinder 220 is connected to a hydraulic machine (not shown), and the inner cylinder 420 is pulled forward by a predetermined length as indicated by the phantom lines.

次いで、油圧をかけたまま、図8に示すように、固定ヨーク310をクレビス422の第2の係止孔422bに角ピン311で取り付けると共に、テンション部材320の当接部材321を外筒410の先端に当接させ、テンションロッド322の長さを調整し、その先端を固定ヨーク310の両端に接続する。これで外筒410に対して所定の引き出し位置で内筒420が固定される。この引き出し操作により内筒420が所望の長さ引き出した後、油圧シリンダ220の油圧を解除し、ピストンロッド221を引き出し金具210から外すと共に、油圧シリンダ220と引き出し金具210を取り外せば、図8に示すように、引き出し工程は終了する。 Next, with the hydraulic pressure applied, as shown in FIG. The length of the tension rod 322 is adjusted by bringing it into contact with the tip, and the tip is connected to both ends of the fixed yoke 310 . Thus, the inner cylinder 420 is fixed at a predetermined pulled-out position with respect to the outer cylinder 410 . After the inner cylinder 420 is pulled out by the desired length by this pulling operation, the hydraulic pressure of the hydraulic cylinder 220 is released, the piston rod 221 is removed from the pull-out metal fitting 210, and the hydraulic cylinder 220 and the pull-out metal fitting 210 are removed. As shown, the withdrawal process ends.

第2段の引き出し操作を必要とする場合には、図14に示すように、引き出し金具210を180°回転させてクレビス422に接続し、図9に示すように、油圧シリンダ220を第2の係止部131に係止し、ピストンロッド221の先端を引き出し金具210に接続する。油圧シリンダ220を加圧してピストンロッド221を少し突出させ、これにバランサ400の荷重が移ったことを確認したら、テンションロッド322を固定ヨーク310から外し、図10に示すように、油圧シリンダ220を再び加圧し、第2段の引き出し操作を行い、内筒420を所望の位置まで引き出す。 When a second stage pullout operation is required, the pullout fitting 210 is rotated 180 degrees and connected to the clevis 422 as shown in FIG. The end of the piston rod 221 is connected to the drawer metal fitting 210 by being locked to the locking portion 131 . Pressurize the hydraulic cylinder 220 to slightly project the piston rod 221. After confirming that the load of the balancer 400 has been transferred to this, the tension rod 322 is removed from the fixed yoke 310, and the hydraulic cylinder 220 is moved as shown in FIG. Pressurization is again applied, and the second stage of drawing operation is performed to draw the inner cylinder 420 to a desired position.

第2段の引き出し操作が完了したら、図11に示すように、再び固定ヨーク310をクレビス422の第2の係止孔422bに角ピン311で取り付けると共に、テンション部材320の当接部材321を外筒410の先端に当接させ、テンションロッド322の長さを調整し、その先端を固定ヨーク310の両端に接続すれば、外筒410に対して所望の引き出し位置で内筒420が固定される。 11, the fixed yoke 310 is again attached to the second locking hole 422b of the clevis 422 with the square pin 311, and the contact member 321 of the tension member 320 is removed. By bringing the tension rod 322 into contact with the tip of the tube 410, adjusting the length of the tension rod 322, and connecting the tip of the tension rod 322 to both ends of the fixed yoke 310, the inner tube 420 is fixed to the outer tube 410 at the desired pulled-out position. .

次いで、油圧シリンダ220の油圧を解除し、図12に示すように、ピストンロッド221を引き出し金具210から外すと共に、油圧シリンダ220と引き出し金具210を取り外す。 Next, the hydraulic pressure of the hydraulic cylinder 220 is released, the piston rod 221 is removed from the drawer fitting 210, and the hydraulic cylinder 220 and the drawer fitting 210 are removed as shown in FIG.

ここまでの作業は、架台100に付属の引き出し部材200及び固定部材300を用いて、バランサ400の保管施設内において行うことができる。 The work up to this point can be performed in the storage facility of the balancer 400 using the drawer member 200 and the fixing member 300 attached to the gantry 100 .

第1段または第2段の引き出し操作により、内筒420を所定長さ外筒410から引き出した図12に示す状態で、バランサ400をベルト等で架台100に固定し、この状態で、架台100に乗せて、バランサ400を設置現場へ搬送する。 In the state shown in FIG. 12 in which the inner cylinder 420 is pulled out from the outer cylinder 410 by a predetermined length by the first stage or second stage drawing operation, the balancer 400 is fixed to the pedestal 100 with a belt or the like. to transport the balancer 400 to the installation site.

設置現場では、地上で架台100に対するバランサ400の拘束を解き、固定部材300を取り付けたまま、バランサ400を所定の取り付け高さ位置まで吊り上げ、外筒410の後端側を図示しない支持物に接続すると共に、内筒の先端側を図示しない電車線等の架空電に接続して荷重を架空線に移した後、固定部材300を取り外してバランサ400の設置が完了する。バランサ400は、インジケータ421を下方に向けた、設置姿勢と同じ上下方向の向きで架台100に保持されているから、設置工事に当たって、バランサ40の姿勢を上下転倒させる工程は不要である。 At the installation site, the balancer 400 is released from the pedestal 100 on the ground, the balancer 400 is lifted up to a predetermined mounting height position with the fixing member 300 attached, and the rear end side of the outer cylinder 410 is connected to a support (not shown). At the same time, after the tip end of the inner cylinder is connected to an overhead power line such as a trolley line (not shown) to transfer the load to the overhead line, the fixing member 300 is removed to complete the installation of the balancer 400 . The balancer 400 is held on the pedestal 100 with the indicator 421 directed downward and in the same vertical direction as the installation posture.

1 引き出し搬送装置
100 架台
110 架台本体
120 外筒支持部
130 第1のシリンダ係止部
131 第2のシリンダ係止部
140 前端当接部
200 引き出し部材
210 引き出し金具
211 ボルト
220 油圧シリンダ
221 ピストンロッド
222 フランジ部
300 固定部材
310 固定ヨーク
311 角ピン
320 テンション部材
321 当接部材
322 テンションロッド
400 ばね式張力バランサ
410 外筒
420 内筒
421 インジケータ
422 クレビス
422a 第1の係止孔
422b 第2の係止孔
1 drawer conveying device 100 pedestal 110 pedestal main body 120 outer cylinder support portion 130 first cylinder locking portion 131 second cylinder locking portion 140 front end contacting portion 200 drawer member 210 drawer fitting 211 bolt 220 hydraulic cylinder 221 piston rod 222 Flange 300 Fixed member 310 Fixed yoke 311 Square pin 320 Tension member 321 Contact member 322 Tension rod 400 Spring type tension balancer 410 Outer cylinder 420 Inner cylinder 421 Indicator 422 Clevis 422a First locking hole 422b Second locking hole

Claims (4)

ばねを内蔵し後方の基端側が支持構造物に係止される外筒と、この外筒内に入れ子式に嵌挿され前方の先端が外筒の先端側へ突出するように配置され前記ばねにより外筒の基端側へ引き込む方向に付勢される内筒とを備え、内筒の先端側に架空線が接続され当該架空線に一定の張力を付与するばね式張力バランサの当該内筒を所望位置まで外筒から引き出した状態で設置現場まで搬送するための装置であって、
前記バランサを保持する架台と、前記内筒を所望位置まで前記外筒から引き出すための油圧シリンダを含む引き出し部材と、引き出された前記内筒を前記外筒に固定することによって前記引き出し部材の撤去を許容する固定部材とを具備し、
前記架台は、前記外筒を水平に固定して保持する外筒支持部と、前記油圧シリンダを着脱自在に係止する少なくとも一対のシリンダ係止部とを具備し、
前記引き出し部材は、前記内筒の先端部に着脱自在に固定される引き出し金具と、この引き出し金具と前記シリンダ係止部との間に着脱自在に固定される少なくとも一対の前記油圧シリンダとを具備し、
前記固定部材は、引き出された前記内筒の先端部に着脱自在に固定される固定ヨークと、この固定ヨークと前記外筒の先端部との間に介設されるテンション部材とを具備することを特徴とするばね式張力バランサの引き出し搬送装置。
an outer cylinder which incorporates a spring and whose rear base end side is engaged with the support structure; and the spring which is inserted telescopically into the outer cylinder and arranged so that the front end thereof protrudes toward the distal end side of the outer cylinder. The inner cylinder of a spring-type tension balancer that is biased in a direction to pull the outer cylinder toward the base end side by means of the inner cylinder, and that an overhead wire is connected to the distal end side of the inner cylinder and applies a constant tension to the overhead wire. is pulled out from the outer cylinder to a desired position and transported to the installation site,
A base for holding the balancer, a pull-out member including a hydraulic cylinder for pulling out the inner cylinder from the outer cylinder to a desired position, and removing the pull-out member by fixing the pulled-out inner cylinder to the outer cylinder. and a fixing member that allows
The pedestal includes an outer cylinder support portion that horizontally fixes and holds the outer cylinder, and at least a pair of cylinder locking portions that detachably lock the hydraulic cylinder,
The pull-out member includes a pull-out metal fitting detachably fixed to the tip of the inner cylinder, and at least a pair of hydraulic cylinders detachably fixed between the pull-out metal fitting and the cylinder locking portion. death,
The fixing member comprises a fixed yoke detachably fixed to the tip of the pulled-out inner cylinder, and a tension member interposed between the fixed yoke and the tip of the outer cylinder. A pull-out conveying device for a spring-loaded tension balancer, characterized by:
前記内筒は、前方の先端部から半径方向下方へ延出して前記外筒の外周に沿って後方へ軸線方向へ延びる内筒引き出し長のインジケータを具備し、
前記架台は、上部が開放した直方体トラス構造の鋼製の架台本体を含み、
前記外筒支持部は、前記インジケータを下方に向け、当該インジケータが接地しない高さ位置において前記外筒を水平に載せ受けるように、前記架台本体の内側に複数固着されることを特徴とする請求項1に記載のばね式張力バランサの引き出し搬送装置。
the inner cylinder includes an inner cylinder pull-out length indicator extending radially downward from a forward tip and axially rearward along the outer circumference of the outer cylinder;
The gantry includes a steel gantry body having a cuboid truss structure with an open top,
A plurality of said outer cylinder support parts are fixed to the inner side of said gantry main body so that said outer cylinder is horizontally mounted and received at a height position where said indicator faces downward and said indicator does not touch the ground. Item 2. A pull-out conveying device for a spring-type tension balancer according to item 1.
前記内筒は、それの軸線方向前後に並んだ第1及び第2の垂直方向の係止孔を有するクレビスを先端側に具備し、
前記架台のシリンダ係止部は、前記油圧シリンダを前記内筒の両外側をそれの軸線と平行に前後方向に延びるように保持可能に配置され、
前記引き出し金具は、前記内筒の軸線と直交して左右方向に前記クレビスを貫通し中間部において前記クレビスの第1の係止孔に係止され両端部において前記一対の油圧シリンダのピストンロッドを接続可能に構成され、
前記固定ヨークは、前記内筒の軸線と直交して左右方向に水平に前記クレビスを貫通し中間部において前記クレビスの第2の係止孔に係止され、
前記テンション部材は、前記外筒の先端側に当接する当接部材と、この当接部材に一端が連結され前記内筒の左右外側を水平に並んで内筒と平行に伸び他端側が前記ヨークの両端部に接続される長さ調整自在の一対のテンションロッドとを具備することを特徴とする請求項1に記載のばね式張力バランサの引き出し搬送装置。
the inner cylinder has a clevis on the distal end side thereof, the clevis having first and second vertical locking holes arranged longitudinally of the inner cylinder;
The cylinder locking portion of the mount is arranged so as to be able to hold the hydraulic cylinder on both outer sides of the inner cylinder so as to extend in the front-rear direction in parallel with the axis thereof,
The drawer fitting passes through the clevis in the left-right direction perpendicular to the axis of the inner cylinder, is locked in the first locking hole of the clevis at the intermediate portion, and engages the piston rods of the pair of hydraulic cylinders at both ends. configured to be connectable,
the fixed yoke passes through the clevis horizontally in the left-right direction orthogonal to the axis of the inner cylinder, and is locked in a second locking hole of the clevis at an intermediate portion;
The tension member has an abutting member that abuts on the tip end side of the outer cylinder, and one end of which is connected to the abutting member, is arranged horizontally on the left and right outer sides of the inner cylinder and extends parallel to the inner cylinder, and the other end of the tension member is the yoke. 2. A pull-out conveying device for a spring type tension balancer according to claim 1, further comprising a pair of length-adjustable tension rods connected to both ends of the tension balancer.
前記架台は、後方に配置される第1の前記シリンダ係止部と、前方に配置される第2の前記シリンダ係止部とを具備し、
前記油圧シリンダは、前記第1のシリンダ係止部から前記第2のシリンダ係止部へと係止位置を変更可能に構成され、それにより前記内筒を2段階に分けて外筒から引き出し可能に構成されることを特徴とする請求項1に記載のばね式張力バランサの引き出し搬送装置。
The pedestal includes the first cylinder locking portion arranged in the rear and the second cylinder locking portion arranged in the front,
The hydraulic cylinder is configured such that the locking position can be changed from the first cylinder locking portion to the second cylinder locking portion, so that the inner cylinder can be pulled out from the outer cylinder in two stages. 2. The pull-out conveying device for a spring-type tension balancer according to claim 1, wherein:
JP2019023109A 2019-02-13 2019-02-13 Drawer transfer device for spring tension balancer Active JP7182491B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019023109A JP7182491B2 (en) 2019-02-13 2019-02-13 Drawer transfer device for spring tension balancer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019023109A JP7182491B2 (en) 2019-02-13 2019-02-13 Drawer transfer device for spring tension balancer

Publications (2)

Publication Number Publication Date
JP2020131730A JP2020131730A (en) 2020-08-31
JP7182491B2 true JP7182491B2 (en) 2022-12-02

Family

ID=72262038

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019023109A Active JP7182491B2 (en) 2019-02-13 2019-02-13 Drawer transfer device for spring tension balancer

Country Status (1)

Country Link
JP (1) JP7182491B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007290410A (en) 2006-04-20 2007-11-08 Niigata Transys Co Ltd Device and method for installing automatic electric traction tensioner
JP2010173545A (en) 2009-01-30 2010-08-12 East Japan Railway Co Drawer device of spring tension balancer for aerial wire of rail track, restoration device for disconnected aerial wire of rail track, and method of restoring disconnected aerial wire of rail track using the same
JP2017210055A (en) 2016-05-24 2017-11-30 東日本旅客鉄道株式会社 Overhead wire spring type tension balancer drawer device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3590626B2 (en) * 2002-07-11 2004-11-17 東日本旅客鉄道株式会社 Tension balancer fixing device for train lines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007290410A (en) 2006-04-20 2007-11-08 Niigata Transys Co Ltd Device and method for installing automatic electric traction tensioner
JP2010173545A (en) 2009-01-30 2010-08-12 East Japan Railway Co Drawer device of spring tension balancer for aerial wire of rail track, restoration device for disconnected aerial wire of rail track, and method of restoring disconnected aerial wire of rail track using the same
JP2017210055A (en) 2016-05-24 2017-11-30 東日本旅客鉄道株式会社 Overhead wire spring type tension balancer drawer device

Also Published As

Publication number Publication date
JP2020131730A (en) 2020-08-31

Similar Documents

Publication Publication Date Title
US5123802A (en) Motorcycle wheel lift adapter kit
US9637366B2 (en) Reel handling device and method
US11298785B1 (en) Method and apparatus for removing or reinstalling riser pipes of a riser bundle
JP7182491B2 (en) Drawer transfer device for spring tension balancer
KR102022160B1 (en) Flange welding device for pipe
JP6071581B2 (en) Pipe laying method
US11872662B2 (en) Apparatus, systems and kits for loosening and retorquing hydraulic cylinder piston-retaining nuts
JP6533043B2 (en) Aircraft engine installation method
KR101529015B1 (en) Method and apparatus for energy chain installation
US20210032052A1 (en) Structure for transport and organization of large power cables on a wellsite
KR200462150Y1 (en) Jig set for setting the pump tower in the cargo tank of LNG carrier
US5924660A (en) Load handling equipment
US10266376B2 (en) Lifting method and apparatus
KR101901728B1 (en) Feed water booster pump rotor disassemble tool
JP6902417B2 (en) Seat hanging auxiliary device
KR101547620B1 (en) Apparatus for expanding bore over full length of pipe
US10466008B2 (en) Weapon maintenance stand
JP2016156159A (en) Simple step for temporary scaffold turning
JP2003112089A (en) Moving device for shoulder type working machine
JP3221014U (en) Carrier frame for transport truck
US20220127867A1 (en) Temporary brace system for a structure
US12098561B2 (en) Temporary brace system for a structure
CN216660669U (en) Carrying tool
WO2020157968A1 (en) Rail-type workbench
CN211639626U (en) Horizontal positioning cast iron pipe accessory

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211118

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221107

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221121

R150 Certificate of patent or registration of utility model

Ref document number: 7182491

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150