JP7113128B1 - Information processing device, information processing system, and program - Google Patents

Information processing device, information processing system, and program Download PDF

Info

Publication number
JP7113128B1
JP7113128B1 JP2021157991A JP2021157991A JP7113128B1 JP 7113128 B1 JP7113128 B1 JP 7113128B1 JP 2021157991 A JP2021157991 A JP 2021157991A JP 2021157991 A JP2021157991 A JP 2021157991A JP 7113128 B1 JP7113128 B1 JP 7113128B1
Authority
JP
Japan
Prior art keywords
work
standard time
information
worker
schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021157991A
Other languages
Japanese (ja)
Other versions
JP2023048580A (en
Inventor
雄介 東条
桃子 栗原
香織 石黒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2021157991A priority Critical patent/JP7113128B1/en
Application granted granted Critical
Publication of JP7113128B1 publication Critical patent/JP7113128B1/en
Publication of JP2023048580A publication Critical patent/JP2023048580A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

Figure 0007113128000001

【課題】作業ごとの実態が十分に考慮されることなく策定された作業者のスケジュールに比べて、より確度の高いスケジュールを策定する。
【解決手段】情報処理装置としての管理サーバ10は、制御部11を備え、制御部11では、取得部101が、作業および作業に要した時間に関する情報を少なくとも含む、作業者からの作業報告の情報を取得し、標準時間算出部103が、作業報告の情報に基づいて、作業に要する時間の標準値である標準時間を算出し、情報管理部102が、標準時間を作業に対応付けて記憶し、記憶している標準時間を、新たに取得された作業報告の情報に基づき新たに算出された標準時間に更新する。
【選択図】図4

Figure 0007113128000001

Kind Code: A1 To formulate a schedule with higher accuracy than a worker's schedule that is formulated without sufficient consideration of the actual state of each work.
A management server (10) as an information processing device includes a control unit (11), in which an acquisition unit (101) receives a work report from a worker, including at least information on work and time required for the work. Information is acquired, the standard time calculation unit 103 calculates the standard time, which is the standard value of the time required for the work, based on the information in the work report, and the information management unit 102 stores the standard time in association with the work. Then, the stored standard time is updated to the standard time newly calculated based on the newly acquired work report information.
[Selection drawing] Fig. 4

Description

本発明は、情報処理装置、情報処理システム、およびプログラムに関する。 The present invention relates to an information processing device, an information processing system, and a program.

機器の設置や、設置された機器のメンテナンス等の作業の効率化を図るために、点検種別ごとの点検に要するベース時間を予め記憶しておき、そのベース時間を用いてスケジューリングを行う技術が存在する(例えば、特許文献1)。 In order to improve the efficiency of work such as installation of equipment and maintenance of installed equipment, there is a technology that stores in advance the base time required for inspection for each inspection type and schedules using that base time. (for example, Patent Document 1).

特開2019-219815号公報JP 2019-219815 A

しかしながら、機器の設置や、設置された機器のメンテナンス等の作業は、作業の対象となる機器や現場固有の条件の影響を受けるため、たとえ同じ作業であったとしても、作業に要する時間に差異が生じてしまうのが通常である。このため、おおよその見積もりによって作業者のスケジュールが策定されることが多い。ただし、作業ごとの実態が十分に考慮されることなく作業者のスケジュールが策定されることになるため、策定されたスケジュールの確度が意図したものにならないことがある。 However, work such as installation of equipment and maintenance of installed equipment is affected by the equipment to be worked on and the conditions unique to the site, so even if the work is the same, the time required for the work will vary. usually occurs. For this reason, workers' schedules are often formulated based on rough estimates. However, since the worker's schedule is formulated without sufficiently considering the actual condition of each work, the accuracy of the formulated schedule may not be as intended.

本発明の目的は、作業ごとの実態が十分に考慮されることなく策定された作業者のスケジュールに比べて、より確度の高いスケジュールの策定を可能にすることにある。 An object of the present invention is to make it possible to formulate a schedule with higher accuracy than a worker's schedule that is formulated without sufficient consideration of the actual state of each work.

請求項1に記載された発明は、作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出手段と、算出された前記標準時間を、前記作業に対応付けて記憶する記憶手段と、前記記憶手段に記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新手段と、を備えることを特徴とする、情報処理装置である。
請求項2に記載された発明は、前記記憶手段にて前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成手段をさらに備えることを特徴とする、請求項1に記載の情報処理装置である。
請求項3に記載された発明は、前記算出手段は、前記標準時間として、前記作業そのものに要する時間の標準時間と、当該作業のための移動に要する時間の標準時間との各々を算出し、前記生成手段は、1以上の案件に含まれる1以上の作業の各々の作業そのものに要する時間の標準時間および当該作業のための移動に要する時間の標準時間と、当該1以上の案件の前後関係とに基づいて、当該1以上の案件のスケジュールを生成することを特徴とする、請求項2に記載の情報処理装置である。
請求項4に記載された発明は、生成された前記案件ごとのスケジュールの状況を、前記作業者ごとに可視化する可視化手段をさらに備えることを特徴とする、請求項2に記載の情報処理装置である。
請求項5に記載された発明は、前記取得手段は、前記作業報告に対する承認の状況を示す情報をさらに取得し、前記可視化手段は、前記承認の状況を示す情報に基づいて、前記案件ごとのスケジュールの状況として、前記案件ごとの承認の状況を、前記作業者ごとに可視化することを特徴とする、請求項4に記載の情報処理装置である。
請求項6に記載された発明は、前記記憶手段は、前記標準時間として、機器の設置、または設置された機器に関する作業に要する時間の標準時間を、当該機器の設置、または設置された機器に関する作業ごとに記憶することを特徴とする、請求項1に記載の情報処理装置である。
請求項7に記載された発明は、作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値を算出する算出手段と、算出された前記標準値を、前記作業に対応付けて記憶する記憶手段と、前記記憶手段に記憶されている前記標準値を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準値に更新する更新手段と、を備えることを特徴とする情報処理システムである。
請求項8に記載された発明は、コンピュータに、作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する機能と、取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値を算出する機能と、算出された前記標準値を、前記作業に対応付けて記憶する機能と、記憶されている前記標準値を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準値に更新する機能と、を実現させるためのプログラムである。
The invention described in claim 1 includes an acquisition means for acquiring information of a work report from a worker of the work, including at least information about the work and the time required for the work, and the acquired information of the work report. Calculation means for calculating a standard time, which is a standard value of the time required for the work, storage means for storing the calculated standard time in association with the work, and stored in the storage means and updating means for updating the standard time in which the worker is present to the standard time newly calculated based on the newly acquired information of the work report.
The invention according to claim 2 further comprises generating means for generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each work in the storage means. The information processing apparatus according to claim 1, characterized by:
In the invention described in claim 3, the calculating means calculates, as the standard time, a standard time required for the work itself and a standard time required for movement for the work, and The generating means generates the standard time required for each of the one or more tasks included in the one or more projects, the standard time required for movement for the task, and the context of the one or more projects. 3. The information processing apparatus according to claim 2, wherein the schedule for the one or more projects is generated based on the above.
The invention recited in claim 4 is the information processing apparatus according to claim 2, further comprising visualization means for visualizing the status of the generated schedule for each item for each worker. be.
In the invention recited in claim 5, the acquisition means further acquires information indicating the status of approval for the work report, and the visualization means provides information for each case based on the information indicating the status of approval. 5. The information processing apparatus according to claim 4, wherein the approval status for each item is visualized for each worker as the schedule status.
According to the sixth aspect of the present invention, the storage means stores, as the standard time, a standard time required for installation of the equipment or a work related to the installed equipment. 2. The information processing apparatus according to claim 1, wherein the information is stored for each task.
The invention described in claim 7 comprises an acquisition means for acquiring information of a work report from a worker of the work, including at least information about the work and the time required for the work, and the acquired information of the work report. calculation means for calculating a standard value of the time required for the work based on; storage means for storing the calculated standard value in association with the work; and the standard value stored in the storage means to the standard value newly calculated based on the newly acquired information of the work report.
According to the eighth aspect of the invention, a computer has a function of acquiring work report information from a worker of the work, including at least information on the work and the time required for the work, and the work report obtained. A function of calculating a standard value of the time required for the work based on the information of, a function of storing the calculated standard value in association with the work, and a function of newly renewing the stored standard value and a function of updating to the standard value newly calculated based on the acquired information of the work report.

請求項1の本発明によれば、作業ごとの実態が十分に考慮されることなく策定された作業者のスケジュールに比べて、より確度の高いスケジュールの策定を可能にする情報処理装置を提供することができる。
請求項2の本発明によれば、作業ごとの実態が考慮されたスケジュールを策定できる。
請求項3の本発明によれば、作業ごとの実態として、作業そのものに要する時間と、作業のための移動に要する時間とが個々に考慮されたスケジュールを策定できる。
請求項4の本発明によれば、担当者ごとの案件のスケジュールの状況を一見して把握することができるので、スケジュールの策定を担当する者と、策定されたスケジュールに沿って作業を行う作業者との各々の利便性を向上させることができる。
請求項5の本発明によれば、作業者ごとの案件の進捗状況を一見して把握することができるので、作業者および承認者の利便性を向上させることができる。
請求項6の本発明によれば、機器の設置、または設置された機器に関する作業ごとの実態が考慮された確度の高いスケジュールを策定できる。
請求項7の本発明によれば、作業ごとの実態が十分に考慮されることなく策定された作業者のスケジュールに比べて、より確度の高いスケジュールの策定を可能にする情報処理システムを提供することができる。
請求項8の本発明によれば、作業ごとの実態が十分に考慮されることなく策定された作業者のスケジュールに比べて、より確度の高いスケジュールの策定を可能にするプログラムを提供することができる。
According to the first aspect of the present invention, there is provided an information processing apparatus that enables formulation of a schedule with higher accuracy than a worker's schedule that is formulated without sufficient consideration of the actual state of each work. be able to.
According to the second aspect of the present invention, it is possible to formulate a schedule that considers the actual condition of each work.
According to the third aspect of the present invention, it is possible to formulate a schedule that individually considers the time required for the work itself and the time required for movement for the work as the actual state of each work.
According to the fourth aspect of the present invention, it is possible to grasp the status of the project schedule for each person in charge at a glance. It is possible to improve the convenience of each person.
According to the fifth aspect of the present invention, it is possible to grasp the progress of the case for each worker at a glance, so it is possible to improve the convenience of the worker and the approver.
According to the sixth aspect of the present invention, it is possible to formulate a highly accurate schedule that takes into consideration the installation of the equipment or the actual situation of each work related to the installed equipment.
According to the seventh aspect of the present invention, there is provided an information processing system capable of formulating a schedule with higher accuracy than a worker's schedule that is formulated without sufficient consideration of the actual conditions of each work. be able to.
According to the eighth aspect of the present invention, it is possible to provide a program that enables formulation of a schedule with higher accuracy than a worker's schedule that is formulated without sufficient consideration of the actual state of each work. can.

本実施の形態が適用される情報処理システムの全体の構成を示す図である。It is a figure showing composition of the whole information processing system to which this embodiment is applied. 管理サーバのハードウェア構成を示す図である。It is a figure which shows the hardware constitutions of a management server. 営業者端末のハードウェア構成を示す図である。It is a figure which shows the hardware constitutions of a sales person terminal. 管理サーバの制御部の機能構成を示す図である。It is a figure which shows the functional structure of the control part of a management server. 管理サーバの処理のうち、標準時間を算出して管理する処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the process which calculates and manages standard time among the processes of a management server. 管理サーバの処理のうち、案件のスケジュールを生成して提示する処理の流れを示すフローチャートである。7 is a flow chart showing a flow of processing of generating and presenting a schedule of an item among processing of the management server; 案件を予約するための入力操作が行われる際、営業者端末に表示される画面の具体例を示す図である。FIG. 10 is a diagram showing a specific example of a screen displayed on the salesperson terminal when an input operation for reserving an item is performed; 営業者端末、作業者端末、および承認者端末に表示されるスケジュールの画面の具体例を示す図である。It is a figure which shows the specific example of the screen of the schedule displayed on a sales person terminal, a worker terminal, and an approver terminal. 作業報告のための入力操作と、作業報告に対する承認のための入力操作との各々が行われる際、作業者端末と、承認者端末との各々に表示される画面の具体例を示す図である。FIG. 10 is a diagram showing a specific example of a screen displayed on each of a worker terminal and an approver terminal when an input operation for a work report and an input operation for approving the work report are performed; . 管理サーバの記憶部のデータベースに記憶されている標準時間の具体例を示す図である。FIG. 4 is a diagram showing a specific example of standard times stored in the database of the storage unit of the management server;

以下、添付図面を参照して、本発明の実施の形態について詳細に説明する。
(情報処理システムの構成)
図1は、本実施の形態が適用される情報処理システム1の全体の構成を示す図である。
情報処理システム1は、管理サーバ10と、営業者端末30と、作業者端末50と、承認者端末70とがネットワーク90を介して接続されることにより構成されている。ネットワーク90は、例えば、LAN(Local Area Network)、インターネット等である。なお、図1において、営業者端末30および作業者端末50はそれぞれ1台のみ図示されているが、実際には複数台がネットワーク90に接続されている。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
(Configuration of information processing system)
FIG. 1 is a diagram showing the overall configuration of an information processing system 1 to which this embodiment is applied.
The information processing system 1 is configured by connecting a management server 10 , a salesperson terminal 30 , an operator terminal 50 , and an approver terminal 70 via a network 90 . The network 90 is, for example, a LAN (Local Area Network), the Internet, or the like. In FIG. 1 , only one sales person terminal 30 and one worker terminal 50 are shown, but in reality, a plurality of terminals are connected to the network 90 .

管理サーバ10は、情報処理システム1の全体の管理をするサーバとしての情報処理装置である。管理サーバ10は、1以上の作業の組み合わせからなる案件の予約を受け付ける。「作業」とは、作業者Wが現場で行う作業のことをいう。「作業」には、機器の設置や、設置された機器のメンテナンス等が含まれる。 The management server 10 is an information processing device as a server that manages the entire information processing system 1 . The management server 10 accepts a reservation for a project consisting of a combination of one or more works. "Work" refers to work performed by the worker W at the site. "Work" includes installation of equipment, maintenance of installed equipment, and the like.

具体的には、管理サーバ10は、営業者Lが案件の予約のために営業者端末30に入力した情報と、作業ごとに予め定められた標準時間とに基づいて、作業者Wごとの案件のスケジュールを生成する。これにより、案件の予約が受け付けられる。「標準時間」とは、作業者Wが対象となる作業を行うために要する時間の標準値のことをいう。「作業を行うために要する時間」は、作業そのものに要する標準時間であってもよいし、作業そのものに要する標準時間と、作業のための移動に要する標準時間との合計値であってもよい。 Specifically, the management server 10, based on the information input by the sales person L to the sales person terminal 30 for reservation of the item and the standard time predetermined for each work, generate a schedule for As a result, the reservation for the item is accepted. "Standard time" means a standard value of the time required for the worker W to perform the target work. The "time required to perform the work" may be the standard time required for the work itself, or the sum of the standard time required for the work itself and the standard time required for movement for the work. .

また、管理サーバ10は、案件のスケジュールに沿って作業を行った作業者Wからの作業報告の情報に基づいて標準時間を更新する。具体的には、管理サーバ10は、作業者Wが作業報告のために作業者端末50に入力した情報を取得し、取得した作業報告の情報と、データベースに既に記憶されている作業報告の情報とに基づいて、標準時間を改めて算出し直す。そして、算出し直した標準時間をデータベースに反映させることでデータベースを更新する。このデータベースを更新する処理は、作業者端末50に入力された作業報告の情報を管理サーバ10が取得する度に行われる。 In addition, the management server 10 updates the standard time based on the information of the work report from the worker W who performed the work according to the schedule of the item. Specifically, the management server 10 acquires the information input by the worker W to the worker terminal 50 for the work report, and acquires the acquired work report information and the work report information already stored in the database. Based on this, the standard time is recalculated. Then, the database is updated by reflecting the recalculated standard time in the database. The process of updating this database is performed each time the management server 10 acquires the information of the work report input to the worker terminal 50 .

また、管理サーバ10は、作業者Wからの作業報告の情報を承認者Mに報知する。具体的には、管理サーバ10は、作業者Wが作業者端末50に入力した作業報告の情報を承認者端末70の画面に表示させることで承認者Mに報知する。また、管理サーバ10は、作業報告に対する承認者Mによる承認の有無を示す情報を、営業者Lおよび作業者Wに報知する。具体的には、管理サーバ10は、承認者端末70から作業報告に対する承認の有無を示す情報を取得し、案件または作業ごとの承認の状況を、一覧視可能な態様で営業者端末30および作業者端末50の各々に表示させることで営業者Lおよび作業者Wに報知する。 In addition, the management server 10 notifies the approver M of the work report information from the worker W. FIG. Specifically, the management server 10 notifies the approver M of the work report information input by the worker W to the worker terminal 50 by displaying it on the screen of the approver terminal 70 . In addition, the management server 10 notifies the sales person L and the worker W of information indicating whether or not the approver M approves the work report. Specifically, the management server 10 acquires information indicating whether or not the work report has been approved from the approver terminal 70, and displays the approval status for each item or work in a viewable manner. The sales person L and the worker W are notified by displaying it on each of the worker terminals 50 .

営業者端末30は、営業業務を担当する営業者Lが操作するパーソナルコンピュータ、タブレット端末、スマートフォン等の情報処理装置である。営業者端末30は、営業者Lによる案件を予約するための操作を受け付ける。案件を予約するための操作には、例えば、カレンダーで予約の空き状況を確認等する操作、顧客情報(例えば、名前、住所、電話番号等)を入力する操作、作業の対象となる機器を設置する現場(または、機器が設置されている現場)の作業条件に関する情報を入力する操作、作業の名称や作業の対象となる機器を選択する操作、現場調査時のヒアリング結果を入力する操作、営業者Lが事前に撮像した現場の撮像画像のデータをアップロードする操作等が含まれる。作業の対象となる機器を設置する現場、または機器が設置されている現場の作業条件に関する情報としては、例えば、エレベータの有無、駐車場の有無、高所、狭所、ガスの取り扱いの有無等が挙げられる。 The salesperson terminal 30 is an information processing device such as a personal computer, a tablet terminal, or a smart phone operated by the salesperson L in charge of sales operations. The salesperson terminal 30 accepts an operation by the salesperson L to reserve an item. Operations for making a reservation include, for example, checking the availability of reservations on a calendar, entering customer information (e.g., name, address, phone number, etc.), and setting up the equipment to be worked on. Operations to input information about the work conditions of the site (or the site where the equipment is installed), operations to select the name of the work and the equipment to be worked on, operations to input the results of interviews during site surveys, sales It includes an operation of uploading the data of the captured image of the site captured in advance by the person L, and the like. Information on the work conditions of the site where the equipment to be worked on or the site where the equipment is installed, for example, whether there is an elevator, whether there is a parking lot, high places, narrow places, whether gas is handled, etc. is mentioned.

営業者端末30は、案件を予約するための操作を受け付ける際、作業の対象となる1以上の機器の各々に対応する標準時間の情報を管理サーバ10から取得して画面に表示する。なお、案件の予約の操作を受け付ける際、営業者端末30に表示される画面の具体例については、図7を参照して後述する。また、営業者端末30は、管理サーバ10により生成された案件のスケジュールを取得して画面に表示する。なお、営業者端末30に表示される案件のスケジュールの画面の具体例については、図8を参照して後述する。 When accepting an operation for reserving an item, the salesperson terminal 30 acquires from the management server 10 standard time information corresponding to each of one or more devices to be worked on, and displays the information on the screen. A specific example of the screen displayed on the salesperson terminal 30 when accepting an operation for reserving an item will be described later with reference to FIG. Further, the sales person terminal 30 acquires the schedule of the item generated by the management server 10 and displays it on the screen. A specific example of the item schedule screen displayed on the salesperson terminal 30 will be described later with reference to FIG.

作業者端末50は、機器の設置、および設置した機器のメンテナンス等の作業を担当する作業者Wが操作するスマートフォン、タブレット端末、パーソナルコンピュータ等の情報処理装置である。作業者端末50は、管理サーバ10により生成された案件のスケジュールを取得して表示する。また、作業者端末50は、作業者Wによる作業が完了した際、作業報告の内容を入力するための操作を受け付ける。作業報告の内容を入力するための操作には、例えば、作業者Wが作業の前後に撮像した現場の撮像画像のデータをアップロードする操作が含まれる。なお、作業者Wが作業報告の内容を入力する際、作業者端末50に表示される画面の具体例については、図9を参照して後述する。 The worker terminal 50 is an information processing device such as a smart phone, a tablet terminal, or a personal computer operated by a worker W who is in charge of work such as installation of equipment and maintenance of the installed equipment. The worker terminal 50 acquires and displays the schedule of the item generated by the management server 10 . Moreover, the worker terminal 50 accepts an operation for inputting the content of the work report when the work by the worker W is completed. The operation for inputting the contents of the work report includes, for example, the operation of uploading data of captured images of the site captured by the worker W before and after the work. A specific example of the screen displayed on the worker terminal 50 when the worker W inputs the content of the work report will be described later with reference to FIG.

承認者端末70は、作業者Wからの作業報告に対する承認を行う承認者Mが使用するパーソナルコンピュータ、タブレット端末、スマートフォン等の情報処理装置である。承認者端末70は、管理サーバ10により生成された作業者Wごとの案件のスケジュールを取得して画面に表示する。また、承認者端末70は、承認者Mが作業報告に対する承認を行うための入力操作を受け付ける。なお、承認者Mが作業報告に対する承認を行う際、承認者端末70に表示される画面の具体例については、図9を参照して後述する。 The approver terminal 70 is an information processing device such as a personal computer, a tablet terminal, or a smart phone used by the approver M who approves the work report from the worker W. FIG. The approver terminal 70 acquires the item schedule for each worker W generated by the management server 10 and displays it on the screen. The approver terminal 70 also receives an input operation for the approver M to approve the work report. A specific example of the screen displayed on the approver terminal 70 when the approver M approves the work report will be described later with reference to FIG.

なお、上述した情報処理装置ごとの機能は一例であり、情報処理システム1全体として上述の機能を備えていればよい。このため、上述の機能のうち一部または全部を情報処理システム1内で分担してもよいし協働してもよい。例えば、管理サーバ10の機能の一部または全部を他の情報処理装置(営業者端末30、作業者端末50、および承認者端末70)の機能としてもよい。これにより、情報処理システム1全体としての処理の促進や、処理を補完し合うことが可能となる。また、例えば、営業者Lと作業者Wとが同一人物である場合には、営業者端末30と作業者端末50とを兼ねた情報処理装置が情報処理システム1を構成してもよい。 Note that the functions of each information processing apparatus described above are examples, and the information processing system 1 as a whole may have the above functions. Therefore, part or all of the functions described above may be shared within the information processing system 1 or may be cooperated. For example, some or all of the functions of the management server 10 may be functions of other information processing devices (the salesperson terminal 30, the worker terminal 50, and the approver terminal 70). This makes it possible to promote the processing of the information processing system 1 as a whole and to complement each other. Further, for example, when the sales person L and the worker W are the same person, an information processing device serving as the sales person terminal 30 and the worker terminal 50 may constitute the information processing system 1 .

(管理サーバのハードウェア構成)
図2は、管理サーバ10のハードウェア構成を示す図である。
管理サーバ10は、制御部11と、メモリ12と、記憶部13と、通信部14と、操作部15と、表示部16とを有している。これらの各部は、データバス、アドレスバス、PCI(Peripheral Component Interconnect)バス等で接続されている。
(Hardware configuration of management server)
FIG. 2 is a diagram showing the hardware configuration of the management server 10. As shown in FIG.
The management server 10 has a control section 11 , a memory 12 , a storage section 13 , a communication section 14 , an operation section 15 and a display section 16 . These units are connected by a data bus, an address bus, a PCI (Peripheral Component Interconnect) bus, or the like.

制御部11は、OS(基本ソフトウェア)やアプリケーションソフトウェア(応用ソフトウェア)等の各種ソフトウェアの実行を通じて管理サーバ10の動作を制御するプロセッサである。制御部11は、例えばCPU(Central Processing Unit)で構成される。メモリ12は、各種ソフトウェアやその実行に用いるデータ等を記憶する記憶領域であり、演算に際して作業エリアとして用いられる。メモリ12は、例えばRAM(Random Access Memory)等で構成される。 The control unit 11 is a processor that controls the operation of the management server 10 through execution of various software such as an OS (basic software) and application software. The control unit 11 is configured by, for example, a CPU (Central Processing Unit). The memory 12 is a storage area for storing various software and data used for executing the software, and is used as a work area for calculation. The memory 12 is composed of, for example, a RAM (Random Access Memory) or the like.

記憶部13は、各種ソフトウェアに対する入力データや各種ソフトウェアからの出力データ等を記憶する記憶領域であり、各種情報を記憶するデータベースが格納されている。記憶部13は、例えばプログラムや各種設定データなどの記憶に用いられるHDD(Hard Disk Drive)やSSD(Solid State Drive)、半導体メモリ等で構成される。通信部14は、ネットワーク90を介して、または赤外線通信等の通信方式によるデータの送受信を行う。通信部14は、営業者端末30、作業者端末50、承認者端末70、および外部との間でデータの送受信を行う。 The storage unit 13 is a storage area for storing input data for various software, output data from various software, and the like, and stores a database for storing various information. The storage unit 13 is composed of, for example, a HDD (Hard Disk Drive), an SSD (Solid State Drive), a semiconductor memory, or the like used for storing programs and various setting data. The communication unit 14 transmits and receives data via the network 90 or by a communication method such as infrared communication. The communication unit 14 transmits and receives data to and from the sales person terminal 30, the worker terminal 50, the approver terminal 70, and the outside.

操作部15は、例えばキーボード、マウス、機械式のボタン、スイッチで構成され、入力操作を受け付ける。操作部15には、表示部16と一体的にタッチパネルを構成するタッチセンサも含まれる。表示部16は、画像やテキスト情報などを表示する。表示部16は、例えば情報の表示に用いられる液晶ディスプレイや有機EL(=Electro Luminescence)ディスプレイで構成される。 The operation unit 15 includes, for example, a keyboard, a mouse, mechanical buttons and switches, and receives input operations. The operation unit 15 also includes a touch sensor that constitutes a touch panel integrally with the display unit 16 . The display unit 16 displays images, text information, and the like. The display unit 16 is configured by, for example, a liquid crystal display or an organic EL (=Electro Luminescence) display used for displaying information.

(営業者端末、作業者端末、および承認者端末のハードウェア構成)
図3は、営業者端末30のハードウェア構成を示す図である。
営業者端末30は、図2に示す管理サーバ10のハードウェア構成と同様の構成に加え、撮像部37を備えている。すなわち、営業者端末30は、CPU等のプロセッサで構成される制御部31と、RAM等の記憶領域で構成されるメモリ32と、HDDやSSD、半導体メモリ等の記憶領域で構成される記憶部33とを有している。また、ネットワーク90を介して管理サーバ10、作業者端末50、承認者端末70、および外部との間でデータの送受信を行う通信部34と、入力操作を受け付ける操作部35と、液晶ディスプレイや有機ELディスプレイ等で構成される表示部36と、撮像部37とを有している。撮像部37は、カメラ等で構成され、現場や、現場に設置された機器を撮像する。そして、これらの各部は、データバス、アドレスバス、PCIバス等で接続されている。なお、作業者端末50および承認者端末70のハードウェア構成は、営業者端末30のハードウェア構成と同様であり、図示および説明を省略する。
(Hardware configuration of sales person terminal, worker terminal, and approver terminal)
FIG. 3 is a diagram showing the hardware configuration of the salesperson terminal 30. As shown in FIG.
The salesperson terminal 30 includes an imaging unit 37 in addition to the same hardware configuration as the management server 10 shown in FIG. That is, the sales person terminal 30 includes a control unit 31 configured by a processor such as a CPU, a memory 32 configured by a storage area such as a RAM, and a storage unit configured by a storage area such as an HDD, an SSD, a semiconductor memory, etc. 33. In addition, the management server 10, the worker terminal 50, the approver terminal 70, and the communication unit 34 that transmits and receives data to and from the outside via the network 90, the operation unit 35 that receives input operations, a liquid crystal display and an organic It has a display unit 36 configured by an EL display or the like, and an imaging unit 37 . The imaging unit 37 is composed of a camera or the like, and images the site or equipment installed on the site. These units are connected by a data bus, an address bus, a PCI bus, and the like. The hardware configurations of the operator terminal 50 and the approver terminal 70 are the same as the hardware configuration of the business operator terminal 30, and illustration and description thereof will be omitted.

(管理サーバの制御部の機能構成)
図4は、管理サーバ10の制御部11の機能構成を示す図である。
管理サーバ10の制御部11では、取得部101と、情報管理部102と、標準時間算出部103と、スケジュール生成部104と、報知部105とが機能する。
(Functional configuration of control unit of management server)
FIG. 4 is a diagram showing the functional configuration of the control unit 11 of the management server 10. As shown in FIG.
In the control unit 11 of the management server 10, an acquisition unit 101, an information management unit 102, a standard time calculation unit 103, a schedule generation unit 104, and a notification unit 105 function.

取得部101は、営業者Lが案件の予約のために営業者端末30に入力した情報を取得する。また、取得部101は、作業および作業に要した時間に関する情報を少なくとも含む、作業を行った作業者Wが作業報告のために作業者端末50に入力した情報を取得する。また、取得部101は、作業報告に対する承認が行われた旨を示す情報を取得する。具体的には、取得部101は、承認者Mが作業報告に対する承認のために承認者端末70に入力した情報を取得する。 The acquisition unit 101 acquires information that the sales person L has input to the sales person terminal 30 for reservation of the item. The acquisition unit 101 also acquires information input to the worker terminal 50 for a work report by the worker W who performed the work, including at least information about the work and the time required for the work. The acquisition unit 101 also acquires information indicating that the work report has been approved. Specifically, the acquisition unit 101 acquires information input by the approver M to the approver terminal 70 for approving the work report.

情報管理部102は、取得部101により取得された情報をデータベースに記憶して管理する。具体的には、情報管理部102は、取得部101により取得された、案件の予約のために入力された情報、作業報告のために入力された情報、および作業報告に対する承認のために入力された情報を、記憶部13の案件DB802に記憶して管理する。また、情報管理部102は、標準時間算出部103により算出された、作業ごとの標準時間を、記憶部13の標準時間DB801に記憶して管理する。また、情報管理部102は、作業者Wごとの勤怠のスケジュールを管理する。 The information management unit 102 stores and manages the information acquired by the acquisition unit 101 in a database. Specifically, the information management unit 102 obtains the information input for the reservation of the item, the information input for the work report, and the information input for approval of the work report. The obtained information is stored in the case DB 802 of the storage unit 13 and managed. Further, the information management unit 102 stores the standard time for each task calculated by the standard time calculation unit 103 in the standard time DB 801 of the storage unit 13 and manages it. The information management unit 102 also manages the attendance schedule for each worker W. FIG.

標準時間算出部103は、作業ごとに標準時間を算出する。具体的には、作業そのものに要する標準時間と、作業のための移動に要する標準時間とを算出する。このうち、作業そのものに要する標準時間は、案件DB802に記憶された1以上の作業報告の情報に含まれる作業に要した時間に関する情報に基づいて算出される。また、作業のための移動に要する標準時間は、別途取得される作業者Wが所属する事務所等の位置に関する情報や、作業者Wが使用し得る交通手段に関する情報等に基づいて算出される。標準時間算出部103により算出された標準時間は、作業に対応付けられて標準時間DB801に記憶され管理される。 The standard time calculation unit 103 calculates the standard time for each task. Specifically, the standard time required for the work itself and the standard time required for movement for the work are calculated. Among these, the standard time required for the work itself is calculated based on information related to the time required for the work included in the information of one or more work reports stored in the case DB 802 . In addition, the standard time required for movement for work is calculated based on separately obtained information regarding the location of the office to which the worker W belongs, information regarding means of transportation that the worker W can use, and the like. . The standard time calculated by the standard time calculation unit 103 is stored and managed in the standard time DB 801 in association with the work.

標準時間算出部103により算出された作業ごとの標準時間は、固定された値ではなく、逐次更新される値である。具体的には、標準時間算出部103は、案件DB802に記憶されている作業報告の情報と、取得部101により逐次取得される作業報告の情報と、別途取得される作業者Wが所属する事務所等の位置に関する情報等に基づいて、標準時間を算出し直す。そして、算出し直された標準時間が標準時間DB801に反映される。 The standard time for each task calculated by the standard time calculation unit 103 is not a fixed value but a value that is sequentially updated. Specifically, the standard time calculation unit 103 calculates the work report information stored in the case DB 802, the work report information sequentially acquired by the acquisition unit 101, and the work report to which the worker W belongs, which is separately acquired. The standard time is recalculated based on the information about the location of the place. Then, the recalculated standard time is reflected in the standard time DB 801 .

スケジュール生成部104は、案件のスケジュールを生成する。具体的には、スケジュール生成部104は、情報管理部102が管理する、案件の予約のために入力された情報、作業ごとの標準時間、および作業者Wごとの勤怠のスケジュールに基づいて、作業者Wごとの案件のスケジュールを生成する。 The schedule generation unit 104 generates a schedule for an item. Specifically, the schedule generation unit 104 generates a work based on the information input for the reservation of the item, the standard time for each work, and the attendance schedule for each worker W, which is managed by the information management unit 102. A schedule of the matter for each person W is generated.

報知部105は、スケジュール生成部104により生成された案件のスケジュールを、営業者L、作業者W、および承認者Mに報知する。具体的には、報知部105は、生成された作業者Wごとの案件のスケジュールを、一覧視できる態様で営業者端末30、作業者端末50、および承認者端末70の各々の画面に表示させる制御を行う。営業者端末30、作業者端末50、および承認者端末70の各々の画面には、その営業者端末30、作業者端末50、および承認者端末70の各々を操作する営業者L、作業者W、および承認者Mの各々が担当する案件のスケジュールのみが表示されるようにしてもよいし、すべての案件のスケジュールが表示されるようにしてもよい。なお、営業者端末30、作業者端末50、および承認者端末70の各々の画面に表示される案件のスケジュールの画面の具体例については、図8を参照して後述する。 The notification unit 105 notifies the sales person L, the worker W, and the approver M of the schedule of the item generated by the schedule generation unit 104 . Specifically, the notification unit 105 causes the generated schedule of the item for each worker W to be displayed on the respective screens of the sales person terminal 30, the worker terminal 50, and the approver terminal 70 in a viewable manner. control. On the screens of each of the salesperson terminal 30, the worker terminal 50, and the approver terminal 70, the salesperson L and the worker W operating each of the salesperson terminal 30, the worker terminal 50, and the approver terminal 70 are displayed. , and approver M may be displayed, or the schedules of all the cases may be displayed. A specific example of the item schedule screen displayed on each screen of the salesperson terminal 30, the worker terminal 50, and the approver terminal 70 will be described later with reference to FIG.

また、報知部105は、作業者Wからの作業報告の情報を承認者Mに報知する。なお、報知部105がどのような手法を用いて承認者Mに報知するかについては特に限定されない。例えば、報知部105は、案件DB802に記憶されている作業報告の情報を、承認者端末70に表示させる制御を行う。また、報知部105は、承認者Mによる承認の有無を示す情報を作業者Wに報知する。具体的には、管理サーバ10は、承認者端末70から、作業報告に対する承認の有無を示す情報を取得し、案件または作業ごとの進捗状況を一覧視可能な態様で作業者端末50に表示させる制御を行う。なお、作業者端末50に表示される、案件または作業ごとの進捗状況を示す画面の具体例については、図8を参照して後述する。 In addition, the notification unit 105 notifies the approver M of the work report information from the worker W. FIG. It should be noted that the method by which the notification unit 105 notifies the approver M is not particularly limited. For example, the reporting unit 105 controls the approver terminal 70 to display the work report information stored in the case DB 802 . In addition, the notification unit 105 notifies the worker W of information indicating the presence or absence of approval by the approver M. FIG. Specifically, the management server 10 acquires information indicating whether or not the work report has been approved from the approver terminal 70, and causes the worker terminal 50 to display the progress status of each item or work in a viewable form. control. A specific example of the screen showing the progress of each item or work displayed on the worker terminal 50 will be described later with reference to FIG. 8 .

(管理サーバの処理)
図5は、管理サーバ10の処理のうち、標準時間を算出して管理する処理の流れを示すフローチャートである。
管理サーバ10は、作業を行った作業者Wの作業報告の情報が作業者端末50に入力されると(ステップ401でYES)、その作業報告の情報を取得して(ステップ402)、データベースに記憶する(ステップ403)。具体的には、記憶部13の案件DB802に記憶させる。これに対して、作業報告の情報が作業者端末50に入力されていない場合(ステップ401でNO)、管理サーバ10は、作業報告の情報が作業者端末50に入力されるまでステップ401の処理を繰り返す。
(Management server processing)
FIG. 5 is a flow chart showing the flow of processing for calculating and managing the standard time among the processing of the management server 10 .
When the information of the work report of the worker W who performed the work is input to the worker terminal 50 (YES in step 401), the management server 10 acquires the information of the work report (step 402) and saves it in the database. Store (step 403). Specifically, it is stored in the case DB 802 of the storage unit 13 . On the other hand, if the work report information has not been input to the worker terminal 50 (NO in step 401 ), the management server 10 continues the processing of step 401 until the work report information is input to the worker terminal 50 . repeat.

管理サーバ10は、ステップ402で取得した作業報告の情報に基づいて、作業ごとの標準時間を算出する(ステップ404)。管理サーバ10は、ステップ404で算出した標準時間と、作業とを対応付けてデータベースに記憶する(ステップ405)。具体的には、記憶部13の標準時間DB801に記憶させる。 The management server 10 calculates the standard time for each work based on the work report information acquired in step 402 (step 404). The management server 10 associates the standard time calculated in step 404 with the work and stores them in the database (step 405). Specifically, it is stored in the standard time DB 801 of the storage unit 13 .

管理サーバ10によるステップ401乃至405の処理は、作業者Wからの作業報告が行われる度に繰り返し実行される。これにより、例えば、従来のように大規模な更新作業を業者に依頼することもなく、また、更新のための入力作業を手作業で行うようなこともなく、標準時間DB801に記憶されている標準時間を陳腐化させることなく最新の状態が維持される。その結果、作業ごとの実態が考慮されずに策定されたスケジュールと比較して、確度の高いスケジュールの策定が可能になる。 The processing of steps 401 to 405 by the management server 10 is repeatedly executed each time the worker W reports the work. As a result, for example, there is no need to ask a contractor to perform large-scale update work as in the conventional art, and there is no need to manually perform input work for update. The latest state is maintained without making the standard time obsolete. As a result, it is possible to formulate a highly accurate schedule compared to a schedule formulated without considering the actual condition of each work.

図6は、管理サーバ10の処理のうち、案件のスケジュールを生成して提示する処理の流れを示すフローチャートである。
管理サーバ10は、案件を予約するための情報が営業者端末30に入力されると(ステップ601でYES)、入力された情報を取得して(ステップ602)、データベースに記憶する(ステップ603)。具体的には、記憶部13の案件DB802に記憶させる。これに対して、案件を予約するための情報が営業者端末30に入力されていない場合(ステップ601でNO)、管理サーバ10は、案件を予約するための情報が営業者端末30に入力されるまでステップ601の処理を繰り返す。
FIG. 6 is a flow chart showing a flow of processing for generating and presenting a schedule of an item among the processing of the management server 10. As shown in FIG.
When the information for reserving the item is input to the salesperson terminal 30 (YES in step 601), the management server 10 acquires the input information (step 602) and stores it in the database (step 603). . Specifically, it is stored in the case DB 802 of the storage unit 13 . On the other hand, if the information for reserving the item has not been input to the salesperson terminal 30 (NO in step 601), the management server 10 confirms that the information for reserving the item has not been input to the salesperson terminal 30. The process of step 601 is repeated until

管理サーバ10は、ステップ602で取得した情報に基づいて、案件の予約のために入力された情報、作業ごとの標準時間、および作業者Wごとの勤怠のスケジュールに基づいて、作業者Wごとの案件のスケジュールを生成する(ステップ604)。管理サーバ10は、ステップ604で生成した案件のスケジュールを、営業者L、作業者W、および承認者Mに報知する(ステップ605)。具体的には、報知部105は、生成された作業者Wごとの案件のスケジュールを、一覧視できる態様で、営業者端末30、作業者端末50、および承認者端末70の各々の画面に表示させる制御を行う。 Based on the information acquired in step 602, the management server 10 calculates the schedule for each worker W based on the information input for the appointment reservation, the standard time for each task, and the attendance schedule for each worker W. A schedule for the item is generated (step 604). The management server 10 notifies the sales person L, the worker W, and the approver M of the project schedule generated in step 604 (step 605). Specifically, the notification unit 105 displays the generated schedule of the item for each worker W on the respective screens of the sales person terminal 30, the worker terminal 50, and the approver terminal 70 in a viewable manner. control to allow

(具体例)
図7は、案件を予約するための入力操作が行われる際、営業者端末30に表示される画面の具体例を示す図である。
営業者Lが営業者端末30を操作して案件の予約をする場合、上述のように、カレンダーで予約の空き状況を確認等する操作や、顧客情報(例えば、名前、住所、電話番号等)等を入力する操作と、作業に関する具体的な情報を入力する操作とが行われる。作業に関する具体的な情報は、例えば図7の画面のようなユーザインターフェースに入力される。図7のユーザインターフェースには、現場の撮像画像(接点写真)のデータをアップロードして登録するためのボタンB1と、案件を予約するための情報を入力するための入力領域R1乃至R3とが設けられている。
(Concrete example)
FIG. 7 is a diagram showing a specific example of a screen displayed on the salesperson terminal 30 when an input operation for reserving an item is performed.
When the business operator L operates the business operator terminal 30 to make a reservation for an item, as described above, the operation to check the availability of the reservation on the calendar, and the customer information (for example, name, address, telephone number, etc.) and the like, and an operation of inputting specific information about work are performed. Specific information about work is input to a user interface such as the screen in FIG. 7, for example. The user interface of FIG. 7 is provided with a button B1 for uploading and registering captured image (contact photograph) data of the site, and input areas R1 to R3 for inputting information for reserving a project. It is

図7に示すユーザインターフェースのうち、ボタンB1を押下すると、営業者Lが事前に現場で撮像した画像のデータを登録することができる。また、登録の対象となる撮像画像のデータには、撮像画像のデータの種類を分類するための情報が紐付けられる。この情報の紐付けは、営業者Lが撮像画像を登録する際に選択されるカテゴリの内容に基づいて行われる。例えば、予約される案件に含まれる作業が「給湯器」の設置作業である場合には、図示はしないが、大分類として「給湯器・風呂釜」を選択し、中分類として「給湯器」を選択するような操作が行われる。 By pressing the button B1 in the user interface shown in FIG. 7, the data of the image captured in advance by the salesperson L at the site can be registered. In addition, information for classifying the type of captured image data is associated with the captured image data to be registered. This information is linked based on the content of the category selected when the business operator L registers the captured image. For example, if the work included in the item to be reserved is the installation work of "water heater", although not illustrated, select "water heater/bathtub" as the major category and "water heater" as the middle category. An operation such as selecting is performed.

図7に示すユーザインターフェースの入力領域R1には、現場の作業条件に関する情報として、現場の階数、エレベータの有無、敷地内の駐車場の有無、高所作業の有無、狭所作業の有無、ガス工事の有無が入力される。具体的には、現場の階数については数字で入力され、エレベータの有無、敷地内の駐車場の有無、高所作業の有無、狭所作業の有無、ガス工事の有無の各々については、「あり」または「なし」を示すチェックボックスにチェックが入力される。 In the input area R1 of the user interface shown in FIG. 7, the number of floors of the site, presence/absence of an elevator, presence/absence of a parking lot on the premises, presence/absence of work at height, presence/absence of work in narrow places, gas The presence or absence of construction work is entered. Specifically, the number of floors at the site is entered as a number, and whether there is an elevator, whether there is a parking lot on the premises, whether there is work at height, whether there is work in narrow places, and whether there is gas work, etc. ” or “None” is checked.

入力領域R2には、作業の名称と、作業の対象となる機器の名称とが入力される。具体的には、「工事名」と表記されたドロップダウンリストから作業の名称が選択され、「作業機種」と表記されたドロップダウンリストから作業の対象となる機器の名称が選択される。作業の名称と作業の対象となる機器の名称とが選択されると、選択された作業の標準時間と、選択された作業のための移動に要する標準時間とが算出されて、その算出結果が入力領域R2に表示される。具体的には、「作業時間/移動時間」という表記の下に、選択された作業の標準時間と、選択された作業のための移動に要する標準時間とが表示される。この場合、営業者Lは、入力領域R2に表示された標準時間にて案件の予約を行う。 In the input area R2, the name of the work and the name of the device to be worked on are input. Specifically, the name of the work is selected from the drop-down list labeled "Construction Name", and the name of the equipment to be the work target is selected from the drop-down list labeled "Work Model". When the name of the work and the name of the equipment to be worked on are selected, the standard time for the selected work and the standard time required for movement for the selected work are calculated, and the calculation result is It is displayed in the input area R2. Specifically, the standard time for the selected work and the standard time required for movement for the selected work are displayed under the notation "work time/travel time". In this case, the salesperson L reserves the item at the standard time displayed in the input area R2.

また、入力領域R2には、メインとなる作業者Wの名前と、サブとなる2人の作業者Wの各々の名前とが入力される。具体的には、「主担当者」と表記されたドロップダウンリストからメインとなる作業者Wの名前が選択され、「同行者1」と表記されたドロップダウンリスト、および「同行者2」と表記されたドロップダウンリストの各々からサブとなる作業者Wの名前が選択される。また、入力領域R2には、受注金額と、付帯工事金額と、粗利金額とが入力される。 Also, the name of the main worker W and the names of the two sub workers W are entered in the input area R2. Specifically, the name of the main worker W is selected from the drop-down list labeled "main person in charge", the drop-down list labeled "companion 1", and the drop-down list labeled "companion 2". The name of the sub worker W is selected from each of the indicated drop-down lists. In the input area R2, the order amount, the ancillary work amount, and the gross profit amount are input.

入力領域R3には、現場調査時のヒアリングの内容、営業者Lから作業者Wに対する指示内容、およびその他の情報の各々を入力するための入力欄と、顧客が作業の対象となる機器を購入した契機を選択するためのドロップダウンリストとが設けられている。具体的には、現場調査時のヒアリングの内容は、「現調時のヒアリング(作業内容)」と表記された入力欄に入力される。現場調査時のヒアリングの内容としては、例えば、ヒアリングの結果から付帯作業を行うことが明らかであり、そのために作業時間を延長する必要があることを示す情報や、ヒアリング時に顧客から指定された作業時間を示す情報等が挙げられる。 In the input area R3, there are input fields for inputting the content of the hearing during the field survey, the content of the instruction from the salesperson L to the worker W, and other information, and the purchase of the equipment to be worked by the customer. A drop-down list is provided for selecting the triggered trigger. Specifically, the content of the hearing during the field survey is entered in an input field labeled “Hearing during the field survey (work content)”. The contents of the interviews during the on-site investigation include, for example, information indicating that it is clear from the results of the interviews that ancillary work will be carried out, and that it is necessary to extend the work hours for that purpose, and the work specified by the customer at the time of the hearing. Information indicating time and the like are included.

また、営業者Lから作業者Wに対する指示内容は、「作業指示メモ」と表記された入力欄に入力される。また、社内で共有しておくべき参考情報や、営業者Lのメモ書き等は、「その他備考」と表記された入力欄に入力される。また、顧客が作業の対象となる機器を購入したきっかけを示す情報は、「購入契機」と表記されたドロップダウンリストから選択される。そして、最後に、「追加」と表記されたボタンB2が押下されると、案件の予約(または仮予約)が完了する。ボタンB2が押下されると、「予約者名」いう表記の右側に、案件の予約を行った営業者Lの名前が表示される。また、後に予約内容が更新された場合には、「最終更新者」という表記の右側に、直近で更新を行った営業者Lの名前が表示される。 In addition, the contents of instructions from the salesperson L to the worker W are entered in an input field labeled "work instruction memo". In addition, reference information to be shared within the company, notes written by the salesperson L, etc. are entered in the entry field labeled "other remarks". Information indicating the reason why the customer purchased the device to be worked on is selected from a drop-down list labeled "Purchase Trigger". Finally, when the button B2 labeled "Add" is pressed, the reservation (or provisional reservation) of the item is completed. When the button B2 is pressed, the name of the salesperson L who made the reservation for the item is displayed to the right of the notation "reservation name". Also, when the reservation details are updated later, the name of the business operator L who performed the most recent update is displayed to the right of the notation "last updater".

図8は、営業者端末30、作業者端末50、および承認者端末70に表示されるスケジュールの画面の具体例を示す図である。
営業者Lが営業者端末30を操作して案件の予約を行い、予約が受け付けられると、その予約の内容が図8のスケジュール表に反映される。このスケジュール表には、時間軸(横軸)の方向に伸びたラベルVが、作業者Wの案件や勤怠情報を示している。ラベルVが案件を示す場合、ラベルVの左端は、作業開始の予定時刻を示し、ラベルVの右端は、作業終了の予定時刻を示す。なお、作業開始の予定時刻、および作業終了の予定時刻は、作業者Wの移動に要する標準時間が考慮されていてもよいし、考慮されていなくてもよい。また、ラベルVが作業者Wの勤怠情報としての有給休暇を示す場合、ラベルVの左端は、有給休暇の開始日時を示し、ラベルVの右端は、有給休暇の終了日時を示す。
FIG. 8 is a diagram showing a specific example of a schedule screen displayed on the sales person terminal 30, the worker terminal 50, and the approver terminal 70. As shown in FIG.
When the sales person L operates the sales person terminal 30 to make a reservation for a project and the reservation is accepted, the content of the reservation is reflected in the schedule table of FIG. In this schedule table, labels V extending in the direction of the time axis (horizontal axis) indicate the cases and attendance information of the worker W. FIG. When the label V indicates a project, the left end of the label V indicates the scheduled work start time, and the right end of the label V indicates the scheduled work end time. Note that the scheduled work start time and the scheduled work end time may or may not take into consideration the standard time required for the worker W to move. When the label V indicates the paid vacation as attendance information of the worker W, the left end of the label V indicates the start date and time of the paid vacation, and the right end of the label V indicates the end date and time of the paid vacation.

また、ラベルVには、案件の情報が表示される。例えば、作業の対象となる機器の名称、作業者Wの人数、現場の住所等が表示される。また、ラベルVは、色や模様を付して分類することができる。色や模様を付すことでラベルVをどのように分類するかは特に限定されない。例えば、顧客の購入契機の種類ごとに色や模様を付してもよいし、案件の進捗状況を一見して把握できるように色や模様を付してもよい。具体的には、例えば、案件の進捗状況として、作業報告が完了している案件のラベルVの色は白抜き、作業報告に対して1人目の承認者Mによる承認が完了している案件のラベルVの色は赤色、2人目の承認者Mによる承認が完了している案件のラベルVの色は濃赤色といったように分類することもできる。 Also, the label V displays the information of the item. For example, the name of the equipment to be worked on, the number of workers W, the address of the site, etc. are displayed. Also, the labels V can be classified by adding colors and patterns. There is no particular limitation on how the labels V are classified by adding colors and patterns. For example, colors and patterns may be added for each type of customer's purchase opportunity, or colors and patterns may be added so that the progress of the project can be grasped at a glance. Specifically, for example, as the progress status of the matter, the color of the label V of the matter whose work report has been completed is white, and the matter whose approval by the first approver M has been completed for the work report. It is also possible to classify the color of the label V as red, and the color of the label V of the matter that has been approved by the second approver M as dark red.

図8に示すスケジュール表は、案件の予約を行った営業者Lの営業者端末30の画面に表示されるだけでなく、作業者端末50および承認者端末70の画面にも表示される。なお、図8に示すスケジュール表は、すべての作業者Wのスケジュールが表示されるようにしてもよいし、例えば、営業者L、作業者W、および承認者Mの各々が、自身が担当する案件の作業を行う作業者Wのスケジュールのみが表示されるようにしてもよい。 The schedule table shown in FIG. 8 is displayed not only on the screen of the salesperson terminal 30 of the salesperson L who made the appointment, but also on the screens of the worker terminal 50 and approver terminal 70 . The schedule table shown in FIG. 8 may display the schedules of all the workers W. For example, each of the sales person L, the worker W, and the approver M may Only the schedule of the worker W who works on the item may be displayed.

図9は、作業報告のための入力操作と、作業報告に対する承認のための入力操作との各々が行われる際、作業者端末50と、承認者端末70との各々に表示される画面の具体例を示す図である。
図9に示す画面は、作業者端末50を操作する作業者Wと、承認者端末70を操作する承認者Mとによって共有される画面であり、作業者Wによる作業報告と、承認者Mによる承認との各々の入力操作を受け付け可能なユーザインターフェースとなる。
FIG. 9 shows specific screens displayed on worker terminal 50 and approver terminal 70 respectively when an input operation for a work report and an input operation for approving the work report are performed. FIG. 4 is a diagram showing an example;
The screen shown in FIG. 9 is shared by the worker W who operates the worker terminal 50 and the approver M who operates the approver terminal 70, and the work report by the worker W and the work report by the approver M It becomes a user interface capable of accepting each input operation including approval.

作業を完了させた作業者Wは、作業者端末50を操作することで、作業報告の情報を入力する。作業報告の情報は、図9の画面のようなユーザインターフェースに入力される。また、作業報告がなされた後、承認者Mが承認者端末70を操作することで、作業報告に対する承認を行うための情報を入力する。承認のための情報は、図9に示すユーザインターフェースに入力される。 The worker W who has completed the work inputs the information of the work report by operating the worker terminal 50 . Information on the work report is entered into a user interface such as the screen in FIG. Further, after the work report is made, the approver M operates the approver terminal 70 to input information for approving the work report. Information for approval is entered into the user interface shown in FIG.

図9に示すユーザインターフェースは、作業ごとに表示される。例えば、図8に示すスケジュール表のラベルVを選択する操作により案件が指定されると、図9に示すユーザインターフェースが表示されるようにしてもよい。また、例えば、案件番号や日付等をキーとする検索結果から案件が指定されると、図9に示すユーザインターフェースが表示されるようにしてもよい。 The user interface shown in FIG. 9 is displayed for each task. For example, the user interface shown in FIG. 9 may be displayed when an item is designated by the operation of selecting label V in the schedule table shown in FIG. Further, for example, when an item is specified from search results using item numbers, dates, etc. as keys, the user interface shown in FIG. 9 may be displayed.

図9に示す画面には、作業を担当した作業者Wが作業報告の情報を入力するための入力領域R11およびR12が設けられている。入力領域R11には、報告区分を選択するためのドロップダウンボタンと、現場の撮像画像のデータをアップロードするための入力欄とが設けられている。なお、現場の撮像画像のデータをアップロードするための入力欄は、報告区分が選択されたことをトリガとして表示される。入力領域R12には、備考情報を入力する欄と、作業報告を登録するためのボタンB11とが設けられている。 The screen shown in FIG. 9 is provided with input areas R11 and R12 for the worker W in charge of the work to input work report information. The input area R11 is provided with a drop-down button for selecting a report category and an input field for uploading data of captured images of the site. It should be noted that the entry field for uploading the captured image data of the site is displayed triggered by the selection of the report category. The input area R12 is provided with a field for inputting remark information and a button B11 for registering a work report.

作業者Wは、まず、入力領域R11の「報告区分」のドロップダウンリストから作業の対象となった機器の名称を選択する。例えば、作業者Wが担当した作業が、給湯器の新規設置である場合には、ドロップダウンリストの中から「給湯器」を選択する。すると、選択された機器(給湯器)に関する作業報告を行うために必要となる撮像画像のデータをアップロードするための入力欄が表示される。 First, the worker W selects the name of the device to be worked on from the "report category" drop-down list in the input area R11. For example, if the work that the worker W was in charge of is the installation of a new water heater, he selects "water heater" from the drop-down list. Then, an input field for uploading captured image data necessary for making a work report on the selected device (water heater) is displayed.

撮像画像のデータをアップロードするための入力欄には、作業の経過に対応する撮像画像のデータをアップロードできるようになっている。例えば、図9の例では、作業前、作業中、および作業後の各々のタイミングで撮像された画像のデータをアップロードできるようになっている。作業者端末50には、作業者Wが現場で撮像した画像のデータが予め記憶されているので、作業者Wは、その中から適当な撮像画像のデータを選択してアップロードする。撮像画像のデータがアップロードされると、その撮像画像のデータに対応付けられている撮像年月日および時刻が「撮影日時」として表示される。 The input field for uploading captured image data allows uploading of captured image data corresponding to the progress of the work. For example, in the example of FIG. 9, it is possible to upload image data taken before, during, and after work. Since data of images taken by the worker W at the site are stored in advance in the worker terminal 50, the worker W selects and uploads data of an appropriate taken image from the data. When the captured image data is uploaded, the captured image date and time associated with the captured image data are displayed as the “shooting date and time”.

図9の例では、「作業前」として、給湯器が設置される前の現場の状態を撮像した画像のデータと、「作業中」として、給湯器の本体部分が設置された段階で現場を撮像した画像のデータと、「機器本体(作業後)」として、ダクトを含む給湯器全体の設置作業が完了した段階で現場を撮像した画像のデータとがアップロードされている。また、「作業前」、「作業中」、および「機器本体(作業後)」の各々のタイミングにおける撮像年月日および時刻として、「20XX年XX月XX日 13:10」、「20XX年XX月XX日 13:50」、および「20XX年XX月XX日 14:50」の各々が表示されている。 In the example of FIG. 9, "before work" is image data of the site before the water heater is installed, and "during work" is data of the site when the main body of the water heater is installed. The data of the captured image and the data of the image of the site captured at the stage when the installation work of the entire water heater including the duct is completed are uploaded as "equipment main body (after work)". In addition, as the imaging date and time at each of the timings of "before work", "during work", and "apparatus body (after work)", "13:10 on XX, 20XX", "20XX, XX 13:50 on the XXth of the month” and “14:50 on the XXth of the XX, 20XX” are displayed.

これにより、作業者Wによる現場での給湯器の設置作業が、午後1時10分に開始され、同日の午後2時50分に完了したことを示す情報と、給湯器の新規設置作業そのものに要した時間が100分であったことを示す情報とが、案件DB802に反映される。そして、標準時間DB801に記憶されている、給湯器の新規設置作業の標準時間の更新が行われる。 As a result, the information indicating that the on-site water heater installation work by worker W started at 1:10 pm and was completed at 2:50 pm on the same day, and the new water heater installation work itself Information indicating that the required time was 100 minutes is reflected in the case DB 802 . Then, the standard time for installing a new water heater stored in the standard time DB 801 is updated.

なお、図示はしないが、図9に示す3種類の撮像画像のデータのほか、例えば、機器に貼付された品名ラベル、現場の周辺状況(例えば、可燃物、開口など)、点検スペース、搬入経路などの撮像画像のデータを個々にアップロードすることもできる。また、撮像画像のデータがアップロードされていない状態では、作業報告としてどのような画像をアップロードすべきかを示すサンプルデータが表示されるようにしてもよい。サンプルデータには、案件DB802に記憶されている撮像画像のデータが用いられるようにして、必要に応じて更新されるようにしてもよい。 Although not shown, in addition to the data of the three types of captured images shown in FIG. 9, for example, product name labels affixed to equipment, surrounding conditions of the site (for example, combustibles, openings, etc.), inspection space, carry-in route It is also possible to individually upload captured image data such as Also, sample data indicating what kind of image should be uploaded as a work report may be displayed in a state in which captured image data has not been uploaded. The captured image data stored in the case DB 802 may be used as the sample data and updated as necessary.

作業者Wは、撮像画像のデータをアップロードすると、必要に応じて「備考メモ(作業者)」と表記された入力欄に備考情報を入力し、最後に「登録」と表記されたボタンB11を押下する。この場合、「備考メモ(作業者)」と表記された入力欄には、備考情報として、例えば「XX月XX日 〇〇確認 OK」といった備忘録となるメモが入力される。「登録」と表記されたボタンB11が押下されると、「登録日時」という表記の右側に、作業報告の情報と入力して登録を行った作業者Wの名前が表示される。これにより、作業報告の登録が完了する。 After uploading the data of the captured image, the worker W inputs remarks information in the input field labeled "remarks memo (worker)" as necessary, and finally presses the button B11 labeled "registration". Press. In this case, a memorandum such as "XX month XX confirmation OK" is entered as remark information in the input column labeled "Remark memo (worker)". When the button B11 labeled "Registration" is pressed, the name of the worker W who entered and registered the work report information is displayed to the right of the "Registration date and time". This completes the registration of the work report.

また、図9に示す画面には、承認者Mが作業報告に対する承認を行うための入力領域R13が設けられている。入力領域R13には、備考情報を入力する欄と、承認を行う際に押下するボタンB12と、承認の取り消しを行う際に押下するボタンB13とが設けられている。承認者Mは、作業報告の情報の登録が完了した案件に対して承認を行う場合、必要に応じて「備考メモ(承認者)」と表記された入力欄に備考情報を入力し、最後に「承認」と表記されたボタンB12を押下する。この場合、「備考メモ(承認者)」と表記された入力欄には、備考情報として、例えば「係長〇〇が承認」といった備忘録となるメモが入力される。「承認」と表記されたボタンB12が押下されると、「承認者1」という表記の右側に、承認を行った承認者Mの名前が表示され、「承認日1」という表記の右側に、承認を行った年月日および時刻が表示される。これにより、作業報告に対する承認が完了する。 Further, the screen shown in FIG. 9 is provided with an input area R13 for the approver M to approve the work report. The input area R13 is provided with a column for inputting remark information, a button B12 to be pressed when approving, and a button B13 to be pressed when canceling the approval. Approver M, when approving a matter for which registration of work report information has been completed, enters remarks information in the input field labeled "remarks memo (approver)" as necessary, and finally The button B12 labeled "Approve" is pressed. In this case, a memorandum, for example, "Approved by chief XX," is entered as remark information in the input field labeled "Remark memo (approver)." When the button B12 labeled "Approve" is pressed, the name of the approver M who has performed the approval is displayed to the right of "Approver 1", and to the right of "Approval date 1", The date and time of approval are displayed. This completes the approval of the work report.

一度承認した案件について承認を取り消す場合、承認者Mは、必要に応じて「備考メモ(承認者)」と表記された入力欄に備考情報を入力し、最後に「承認取消」と表記されたボタンB13を押下する。この場合、「備考メモ(承認者)」と表記された入力欄には、備考情報として、例えば「係長〇〇が承認」といった備忘録となるメモに加えて、または上書きされるように、「係長〇〇が承認取り消し」といったメモが入力される。「承認取消」と表記されたボタンB13が押下されると、「承認者1」という表記の右側に表示されていた承認者Mの名前と、「承認日1」という表記の右側に表示されていた年月日および時刻とが消える。 When canceling the approval of a matter that has already been approved, the approver M enters remarks information in the input field labeled "Remarks memo (approver)" as necessary, and finally, "Approval cancellation" is entered. Press the button B13. In this case, in the input field labeled "Remarks memo (approver)", as remarks information, for example, in addition to or overwriting a memorandum such as "Section manager XX approves", "Section manager A memo such as 〇〇 is canceled approval is entered. When the button B13 labeled "Approval Cancel" is pressed, the name of approver M displayed to the right of "Approver 1" and the name of approver M displayed to the right of "Approval date 1" are displayed. The date and time will disappear.

なお、1つの作業報告に対して承認を行う承認者Mは1人である必要はなく、複数人の承認者Mが承認する操作を行うこともできる。図9の例では、2人の承認者Mが承認を行うため、2人目の承認者Mが承認を行うと、「承認者2」という表記の右側に、承認を行った2人目の承認者Mの名前が表示されるとともに、「承認日2」という表記の右側に、2人目の承認者が承認を行った年月日および時刻が表示される。この場合、「備考メモ(承認者)」と表記された入力欄には、備考情報として、例えば「係長〇〇が承認」といった備忘録となるメモに加えて、「課長〇〇が承認」といったメモが入力される。承認者Mによる承認のための操作や、承認を取り消す操作が行われると、その内容が図8のスケジュール表のラベルVの表示(例えば模様等)に反映される。 Note that the number of approvers M who approve one work report does not have to be one, and a plurality of approvers M can perform the approval operation. In the example of FIG. 9, since two approvers M approve, when the second approver M approves, the second The name of M is displayed, and the date and time of approval by the second approver are displayed to the right of the notation "Approval date 2". In this case, in the input field labeled "Remarks memo (approver)", in addition to a memorandum such as "Section manager XX approves" as remarks information, a memo such as "Section manager XX approves" is entered. When the approver M performs an operation for approval or an operation for canceling the approval, the content of the operation is reflected in the display (for example, pattern) of the label V in the schedule table of FIG.

図10は、管理サーバ10の記憶部13の標準時間DB802に記憶されている標準時間の具体例を示す図である。
標準時間DB801では、作業の「大分類」、「工事名」、「作業機種」、「標準時間(作業)」、「標準時間(移動)」、「予定枠数」、「変更」、および「削除」の各情報が対応付けられて記憶されている。このうち、「工事名」は、作業の名称を示し、「作業機種」は、作業の対象となる機器の名称を示している。また、「標準時間(作業)」は、作業そのものに要する標準時間を示し、「標準時間(移動)」は、作業のための移動に要する標準時間を示している。また、作業ごとに「変更」と表記されたボタンと、「削除」と表記されたボタンとが設けられているため、手作業で修正したり削除したりすることもできる。
FIG. 10 is a diagram showing a specific example of standard times stored in the standard time DB 802 of the storage unit 13 of the management server 10. As shown in FIG.
In the standard time DB 801, "major classification", "work name", "work type", "standard time (work)", "standard time (movement)", "scheduled number of slots", "change", and " Each information of "delete" is associated and stored. Among them, the "work name" indicates the name of the work, and the "work model" indicates the name of the equipment that is the target of the work. "Standard time (work)" indicates the standard time required for the work itself, and "Standard time (travel)" indicates the standard time required for movement for the work. In addition, since a button labeled "change" and a button labeled "delete" are provided for each task, it is also possible to manually correct or delete.

なお、「予定枠数」とは、作業者Wが作業を行うことができる時間帯を示す単位として予め定められた「枠」の予定数のことをいう。「枠」は、例えば、1日を3枠に区分して、午前中で1枠、午後1時から午後3時で1枠、午後3時から午後5時で1枠とすることもできる。この場合、午後1時に開始して午後5時に完了するような作業の予定枠数は「2」となる。また、例えば、特に時間を要する特殊な作業は、1日を1枠とすることもできる。 In addition, the "scheduled number of slots" refers to the scheduled number of "slots" predetermined as a unit indicating a time slot in which the worker W can work. For example, one day can be divided into three slots, one slot in the morning, one slot from 1:00 pm to 3:00 pm, and one slot from 3:00 pm to 5:00 pm. In this case, the number of scheduled slots for work that starts at 1:00 pm and ends at 5:00 pm is "2". Also, for example, a special work that requires a particularly long time can be set as one frame per day.

標準時間DB801において、「工事名」および「作業機種」に対応付けられた「標準時間(作業)」、「標準時間(移動)」、および「予定枠数」は、作業ごとに登録される作業報告の情報に基づいて逐次更新されるので、陳腐化することなく最新の状態が維持される。その結果、案件の予約により生成される作業者Wのスケジュールの内容は、実態に即した信頼性の高いものとなり、作業者Wの作業や勤怠のスケジュール管理を的確に行うことが可能となる。 In the standard time DB 801, "standard time (work)", "standard time (movement)", and "scheduled number of slots" associated with "work name" and "work type" are registered for each work. Since it is continuously updated based on the information in the report, the latest state is maintained without becoming obsolete. As a result, the content of the schedule of the worker W generated by the reservation of the item becomes highly reliable in line with the actual situation, and the work and attendance schedule of the worker W can be managed accurately.

以上、本実施の形態について説明したが、本発明は上述した本実施の形態に限るものではない。また、本発明による効果も、上述した本実施の形態に記載されたものに限定されない。例えば、図1に示すシステム構成、図2および図3に示すハードウェア構成は、本発明の目的を達成するための例示に過ぎず、特に限定されない。また、図4および図5に示す機能構成も例示に過ぎず、特に限定されない。上述した処理を全体として実行できる機能が図1の情報処理システム1に備えられていれば足り、この機能を実現するためにどのような機能構成を用いるかは図4の例に限定されない。 Although the embodiment has been described above, the present invention is not limited to the embodiment described above. Moreover, the effects of the present invention are not limited to those described in the above embodiment. For example, the system configuration shown in FIG. 1 and the hardware configuration shown in FIGS. 2 and 3 are merely examples for achieving the object of the present invention, and are not particularly limited. Also, the functional configurations shown in FIGS. 4 and 5 are merely examples, and are not particularly limited. It is sufficient that the information processing system 1 of FIG. 1 has a function capable of executing the above-described processing as a whole, and the functional configuration used to realize this function is not limited to the example of FIG. 4 .

また、図5および図6に示す処理のステップの順序も例示に過ぎず、特に限定されない。図示されたステップの順序に沿って時系列的に行われる処理だけではなく、必ずしも時系列的に処理されなくとも、並列的あるいは個別的に行われてもよい。また、図7乃至図9に示す画面や、図10に示す標準時間DB801に記憶された情報の具体例も一例に過ぎず、特に限定されない。 Also, the order of the processing steps shown in FIGS. 5 and 6 is merely an example and is not particularly limited. In addition to the processing performed chronologically along the order of the illustrated steps, the steps may not necessarily be processed chronologically, but may be performed in parallel or individually. Further, the screens shown in FIGS. 7 to 9 and the specific examples of the information stored in the standard time DB 801 shown in FIG. 10 are merely examples, and are not particularly limited.

1…情報処理システム、10…管理サーバ、11…制御部、30…営業者端末、31…制御部、50…作業者端末、70…承認者端末、90…ネットワーク、101…取得部、102…情報管理部、103…標準時間算出部、104…スケジュール生成部、105…報知部 DESCRIPTION OF SYMBOLS 1... Information processing system 10... Management server 11... Control part 30... Sales person terminal 31... Control part 50... Worker terminal 70... Approver terminal 90... Network 101... Acquisition part 102... Information management unit 103 Standard time calculation unit 104 Schedule generation unit 105 Notification unit

Claims (9)

作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出手段と、
算出された前記標準時間を、前記作業に対応付けて記憶する記憶手段と、
前記記憶手段に記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新手段と、
前記記憶手段にて前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成手段と、
生成された前記案件ごとのスケジュールの状況を、前記作業者と、当該作業者の前記作業と、当該作業の開始予定時刻および終了予定時刻と、当該案件の進捗状況とを、時間軸との関係で表した表により前記作業者ごとに可視化する可視化手段と、
を備え
前記取得手段は、前記作業報告に対する承認の状況を示す情報をさらに取得し、
前記可視化手段は、前記承認の状況を示す情報に基づいて、前記案件ごとのスケジュールの状況として、前記案件ごとの承認の状況を、前記作業者ごとに可視化することを特徴とする情報処理装置。
Acquisition means for acquiring information of a work report from the worker of the work, including at least information about the work and the time required for the work;
Calculation means for calculating a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
storage means for storing the calculated standard time in association with the task;
updating means for updating the standard time stored in the storage means to the standard time newly calculated based on the information of the newly acquired work report;
generating means for generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each work in the storage means;
The relationship between the status of the generated schedule for each matter, the worker, the work of the worker, the scheduled start time and scheduled end time of the work, and the progress status of the matter with respect to the time axis Visualization means for visualizing each worker by a table represented by
with
The acquisition means further acquires information indicating the approval status of the work report,
The information processing apparatus , wherein the visualization means visualizes the approval status for each item as the schedule status for each item based on the information indicating the approval status for each worker. .
作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出手段と、
算出された前記標準時間を、前記作業に対応付けて記憶する記憶手段と、
前記記憶手段に記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新手段と、
前記記憶手段にて前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成手段と、
を備え、
前記算出手段は、前記標準時間として、前記作業そのものに要する時間の標準時間と、当該作業のための移動に要する時間の標準時間との各々を算出し、
前記生成手段は、1以上の案件に含まれる1以上の作業の各々の作業そのものに要する時間の標準時間および当該作業のための移動に要する時間の標準時間と、当該1以上の案件の前後関係とに基づいて、当該1以上の案件のスケジュールを生成することを特徴とする情報処理装置。
Acquisition means for acquiring information of a work report from the worker of the work, including at least information about the work and the time required for the work;
Calculation means for calculating a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
storage means for storing the calculated standard time in association with the task;
updating means for updating the standard time stored in the storage means to the standard time newly calculated based on the information of the newly acquired work report;
generating means for generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each work in the storage means;
with
The calculating means calculates, as the standard time, a standard time required for the work itself and a standard time required for movement for the work, and
The generating means generates the standard time required for each of the one or more tasks included in the one or more projects, the standard time required for movement for the task, and the context of the one or more projects. and generating a schedule for the one or more cases.
生成された前記案件ごとのスケジュールの状況を、前記作業者ごとに可視化する可視化手段をさらに備えることを特徴とする、
請求項に記載の情報処理装置。
Further comprising visualization means for visualizing the status of the generated schedule for each item for each worker,
The information processing apparatus according to claim 2 .
前記取得手段は、前記作業報告に対する承認の状況を示す情報をさらに取得し、
前記可視化手段は、前記承認の状況を示す情報に基づいて、前記案件ごとのスケジュールの状況として、前記案件ごとの承認の状況を、前記作業者ごとに可視化することを特徴とする、
請求項に記載の情報処理装置。
The acquisition means further acquires information indicating the approval status of the work report,
The visualization means visualizes the approval status for each item as the schedule status for each item based on the information indicating the approval status for each worker,
The information processing apparatus according to claim 3 .
前記記憶手段は、前記標準時間として、機器の設置、または設置された機器に関する作業に要する時間の標準時間を、当該機器の設置、または設置された機器に関する作業ごとに記憶することを特徴とする、
請求項に記載の情報処理装置。
The storage means stores, as the standard time, a standard time required for installation of the equipment or work related to the installed equipment for each installation of the equipment or work related to the installed equipment. ,
The information processing apparatus according to claim 2 .
作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出手段と、
算出された前記標準時間を、前記作業に対応付けて記憶する記憶手段と、
前記記憶手段に記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新手段と、
前記記憶手段にて前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成手段と、
生成された前記案件ごとのスケジュールの状況を、前記作業者と、当該作業者の前記作業と、当該作業の開始予定時刻および終了予定時刻と、当該案件の進捗状況とを、時間軸との関係で表した表により前記作業者ごとに可視化する可視化手段と、
を備え
前記取得手段は、前記作業報告に対する承認の状況を示す情報をさらに取得し、
前記可視化手段は、前記承認の状況を示す情報に基づいて、前記案件ごとのスケジュールの状況として、前記案件ごとの承認の状況を、前記作業者ごとに可視化することを特徴とする情報処理システム。
Acquisition means for acquiring information of a work report from the worker of the work, including at least information about the work and the time required for the work;
Calculation means for calculating a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
storage means for storing the calculated standard time in association with the task;
updating means for updating the standard time stored in the storage means to the standard time newly calculated based on the information of the newly acquired work report;
generating means for generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each work in the storage means;
The relationship between the status of the generated schedule for each matter, the worker, the work of the worker, the scheduled start time and scheduled end time of the work, and the progress status of the matter with respect to the time axis Visualization means for visualizing each worker by a table represented by
with
The acquisition means further acquires information indicating the approval status of the work report,
The information processing system , wherein the visualization means visualizes the approval status for each item as the schedule status for each item based on the information indicating the approval status for each worker. .
作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する取得手段と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出手段と、
算出された前記標準時間を、前記作業に対応付けて記憶する記憶手段と、
前記記憶手段に記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新手段と、
前記記憶手段にて前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成手段と、
を備え、
前記算出手段は、前記標準時間として、前記作業そのものに要する時間の標準時間と、当該作業のための移動に要する時間の標準時間との各々を算出し、
前記生成手段は、1以上の案件に含まれる1以上の作業の各々の作業そのものに要する時間の標準時間および当該作業のための移動に要する時間の標準時間と、当該1以上の案件の前後関係とに基づいて、当該1以上の案件のスケジュールを生成することを特徴とする情報処理システム。
Acquisition means for acquiring information of a work report from the worker of the work, including at least information about the work and the time required for the work;
Calculation means for calculating a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
storage means for storing the calculated standard time in association with the task;
updating means for updating the standard time stored in the storage means to the standard time newly calculated based on the information of the newly acquired work report;
generating means for generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each work in the storage means;
with
The calculating means calculates, as the standard time, a standard time required for the work itself and a standard time required for movement for the work, and
The generating means generates the standard time required for each of the one or more tasks included in the one or more projects, the standard time required for movement for the task, and the context of the one or more projects. and generating a schedule for the one or more items.
コンピュータに、
作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する機能と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する機能と、
算出された前記標準時間を、前記作業に対応付けて記憶する機能と、
記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する機能と、
前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する機能と、
生成された前記案件ごとのスケジュールの状況を、前記作業者と、当該作業者の前記作業と、当該作業の開始予定時刻および終了予定時刻と、当該案件の進捗状況とを、時間軸との関係で表した表により前記作業者ごとに可視化する機能と、
を実現させるためのプログラムであって、
前記作業報告の情報を取得する機能は、前記作業報告に対する承認の状況を示す情報をさらに取得し、
前記可視化する機能は、前記承認の状況を示す情報に基づいて、前記案件ごとのスケジュールの状況として、前記案件ごとの承認の状況を、前記作業者ごとに可視化する、
ことを特徴とするプログラム
to the computer,
the ability to obtain work report information from the worker of the work, including at least information about the work and the time required for the work;
A function of calculating a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
a function of storing the calculated standard time in association with the task;
A function of updating the stored standard time to the standard time newly calculated based on the information of the newly acquired work report;
a function of generating a schedule of an item consisting of a combination of one or more of the works based on the standard time stored for each of the works;
The relationship between the status of the generated schedule for each matter, the worker, the work of the worker, the scheduled start time and scheduled end time of the work, and the progress status of the matter with respect to the time axis A function to visualize each worker by a table represented by
A program for realizing
The function of acquiring information on the work report further acquires information indicating the approval status of the work report,
The visualization function visualizes the approval status of each matter for each worker as the schedule status of each matter, based on the information indicating the approval status.
A program characterized by
コンピュータに、
作業および当該作業に要した時間に関する情報を少なくとも含む、当該作業の作業者からの作業報告の情報を取得する機能と、
取得された前記作業報告の情報に基づいて、前記作業に要する時間の標準値である標準時間を算出する算出機能と、
算出された前記標準時間を、前記作業に対応付けて記憶する記憶機能と、
記憶されている前記標準時間を、新たに取得された前記作業報告の情報に基づき新たに算出された前記標準時間に更新する更新機能と、
前記作業ごとに記憶されている前記標準時間に基づいて、1以上の前記作業の組み合わせからなる案件のスケジュールを生成する生成機能と、
を実現させるプログラムであって、
前記算出機能は、前記標準時間として、前記作業そのものに要する時間の標準時間と、当該作業のための移動に要する時間の標準時間との各々を算出し、
前記生成機能は、1以上の案件に含まれる1以上の作業の各々の作業そのものに要する時間の標準時間および当該作業のための移動に要する時間の標準時間と、当該1以上の案件の前後関係とに基づいて、当該1以上の案件のスケジュールを生成することを特徴とするプログラム。
to the computer,
the ability to obtain work report information from the worker of the work, including at least information about the work and the time required for the work;
A calculation function that calculates a standard time, which is a standard value of the time required for the work, based on the acquired information of the work report;
a storage function that stores the calculated standard time in association with the task;
an update function of updating the stored standard time to the standard time newly calculated based on the information of the newly acquired work report;
a generation function for generating a schedule of an item consisting of a combination of one or more of the work based on the standard time stored for each work;
A program that realizes
The calculation function calculates, as the standard time, a standard time required for the work itself and a standard time required for movement for the work, and
The generating function includes the standard time required for each of the one or more tasks included in the one or more projects, the standard time required for movement for the task, and the context of the one or more projects. and generating a schedule for the one or more projects.
JP2021157991A 2021-09-28 2021-09-28 Information processing device, information processing system, and program Active JP7113128B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021157991A JP7113128B1 (en) 2021-09-28 2021-09-28 Information processing device, information processing system, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021157991A JP7113128B1 (en) 2021-09-28 2021-09-28 Information processing device, information processing system, and program

Publications (2)

Publication Number Publication Date
JP7113128B1 true JP7113128B1 (en) 2022-08-04
JP2023048580A JP2023048580A (en) 2023-04-07

Family

ID=82702018

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021157991A Active JP7113128B1 (en) 2021-09-28 2021-09-28 Information processing device, information processing system, and program

Country Status (1)

Country Link
JP (1) JP7113128B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009151733A (en) 2007-12-25 2009-07-09 Hitachi Ltd Facility check schedule making support apparatus and method, and facilities management system
JP2016212729A (en) 2015-05-12 2016-12-15 株式会社日立システムズ Device check support system, operation progress confirmation method, and operation progress confirmation program
JP2017117247A (en) 2015-12-25 2017-06-29 三菱電機株式会社 Project management device and project management method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3754476B2 (en) * 1995-12-11 2006-03-15 株式会社日立製作所 Construction process management method and apparatus

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009151733A (en) 2007-12-25 2009-07-09 Hitachi Ltd Facility check schedule making support apparatus and method, and facilities management system
JP2016212729A (en) 2015-05-12 2016-12-15 株式会社日立システムズ Device check support system, operation progress confirmation method, and operation progress confirmation program
JP2017117247A (en) 2015-12-25 2017-06-29 三菱電機株式会社 Project management device and project management method

Also Published As

Publication number Publication date
JP2023048580A (en) 2023-04-07

Similar Documents

Publication Publication Date Title
US8296170B2 (en) Process management system and method
JP4703917B2 (en) Rental system and rental business support method
JP6839521B2 (en) Project progress management system
EP1178417A2 (en) Maintenance information management system and method of providing a maintenance plan
US9542160B2 (en) System and method for software development report generation
US20120235944A1 (en) Touchscreen entry of construction punch list items directly on a plan
JP2007504538A (en) Customer service support system
US20150242782A1 (en) Interactive Planning Method And Tool
US8688596B2 (en) Project activity reporting
US20140258882A1 (en) Collaborative task management
CA2899189A1 (en) System and method for assigning employees to coverage and/or tasks based on schedule and preferences
JP7113128B1 (en) Information processing device, information processing system, and program
US20230229989A1 (en) Punch item worker interface
KR20230012229A (en) Collaborative project management platform and method of the same
JP2006235849A (en) Home care service processing support system
JP7191364B2 (en) REPORT SUPPORT SERVER, REPORT SUPPORT SYSTEM, REPORT SUPPORT METHOD, AND REPORT SUPPORT PROGRAM
JP4639793B2 (en) Information processing apparatus and program
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP5981607B1 (en) Gas equipment work management system
JP6407364B1 (en) Computer system for providing services related to an apartment, method and program executed in the computer system
US20190266544A1 (en) Techniques for managing process-flows across an enterprise
JP2009259219A (en) Rater resource allocation system and method
JP2005267337A (en) Business activity support system
JP5579308B1 (en) Approval time prediction device, approval time prediction method, and approval time prediction program
JP4268151B2 (en) Production management apparatus, production management program, and production management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210928

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20210928

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220215

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220411

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220524

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220705

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220719

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220725

R150 Certificate of patent or registration of utility model

Ref document number: 7113128

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150