JP6927461B1 - 生産設備の操業方法及び操業システム - Google Patents
生産設備の操業方法及び操業システム Download PDFInfo
- Publication number
- JP6927461B1 JP6927461B1 JP2021515241A JP2021515241A JP6927461B1 JP 6927461 B1 JP6927461 B1 JP 6927461B1 JP 2021515241 A JP2021515241 A JP 2021515241A JP 2021515241 A JP2021515241 A JP 2021515241A JP 6927461 B1 JP6927461 B1 JP 6927461B1
- Authority
- JP
- Japan
- Prior art keywords
- production
- data
- equipment
- base
- production equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
- C21B5/006—Automatically controlling the process
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
- G05B23/0227—Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions
- G05B23/0237—Qualitative history assessment, whereby the type of data acted upon, e.g. waveforms, images or patterns, is not relevant, e.g. rule based assessment; if-then decisions based on parallel systems, e.g. comparing signals produced at the same time by same type systems and detect faulty ones by noticing differences among their responses
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41815—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the cooperation between machine tools, manipulators and conveyor or other workpiece supply system, workcell
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/24—Test rods or other checking devices
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B2300/00—Process aspects
- C21B2300/04—Modeling of the process, e.g. for control purposes; CII
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32085—Layout of factory, facility, cell, production system planning
Abstract
Description
まず、図1及び図2を参照して、本発明の一実施形態である生産設備の操業システムの構成について説明する。図1は、本発明の一実施形態である生産設備の操業システムの構成を示すブロック図である。図2は、図1に示す生産設備の操業システムの変形例の構成を示すブロック図である。
図3は、本発明の一実施形態である設備監視処理の流れを示すフローチャートである。図3に示す設備監視処理は、高炉の操業が開始されたタイミングで開始となり、設備監視処理はステップS1の処理に進む。
2 高炉センサー
3 プロセスコンピューター
4 エッジサーバーコンピューター
5 グローバルデータサーバーコンピューター
Claims (6)
- 複数の生産拠点に配置された複数の同種の生産設備を操業する生産設備の操業方法であって、
生産拠点毎に生産設備の操業データを集約するデータ情報整備ステップと、
前記データ情報整備ステップにおいて集約された操業データをデータ集積地に配置されたコンピューターに集積するデータ集積ステップと、
前記データ集積ステップにおいて集積された操業データを用いて、各生産設備の操業状況を解析するデータ解析ステップと、
前記データ解析ステップにおいて解析された各生産設備の操業状況に関する情報を各生産拠点に配置された表示手段に表示するデータ表示ステップと、
前記データ表示ステップにより表示された情報を参照して、第一の生産拠点から第二の生産拠点に配置されている生産設備を操作する設備操作ステップと、
を含む、生産設備の操業方法。 - 前記データ表示ステップは、前記複数の生産拠点とは異なる管理拠点に配置された表示装置に各生産設備の現在の操業状況に関する情報を表示するステップを含み、
前記設備操作ステップは、前記第一の生産拠点に代えて、前記管理拠点から前記第二の生産拠点に配置されている生産設備を操作するステップを含む、
請求項1に記載の生産設備の操業方法。 - 前記設備操作ステップに代えて、前記第一の生産拠点又は前記管理拠点から前記第二の生産拠点に配置されている生産設備の操業オペレーターに対して生産設備の操作ガイダンス情報を提示する情報提示ステップを含む、請求項2に記載の生産設備の操業方法。
- 前記データ解析ステップの解析結果に基づいて各生産設備における操業異常の有無を判定する操業状況判定ステップを含み、
前記設備操作ステップ又は前記情報提示ステップは、操業異常と判定された生産設備がある場合に実施する、
請求項3に記載の生産設備の操業方法。 - 前記操業状況判定ステップは、同一スケール化した操業指標、操業データ、及び操業条件のうちの少なくとも一つのメタデータを用いて操業異常の有無を判定するステップを含む、請求項4に記載の生産設備の操業方法。
- 複数の生産拠点に配置された複数の同種の生産設備を操業する生産設備の操業システムであって、
生産拠点毎に生産設備の操業データを集約するデータ情報整備手段と、
前記データ情報整備手段によって集約された操業データを集積するデータ集積手段と、
前記データ集積手段によって集積された操業データを用いて、各生産設備の操業状況を解析するデータ解析手段と、
前記データ解析手段によって解析された各生産設備の操業状況に関する情報を表示する、各生産拠点に配置された表示手段と、
前記表示手段に表示する情報を参照して、第一の生産拠点から第二の生産拠点に配置されている生産設備を操作する設備操作手段と、
を備える、生産設備の操業システム。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019205417 | 2019-11-13 | ||
JP2019205417 | 2019-11-13 | ||
PCT/JP2020/041117 WO2021095595A1 (ja) | 2019-11-13 | 2020-11-02 | 生産設備の操業方法及び操業システム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6927461B1 true JP6927461B1 (ja) | 2021-09-01 |
JPWO2021095595A1 JPWO2021095595A1 (ja) | 2021-11-25 |
Family
ID=75912489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021515241A Active JP6927461B1 (ja) | 2019-11-13 | 2020-11-02 | 生産設備の操業方法及び操業システム |
Country Status (7)
Country | Link |
---|---|
US (1) | US20220390930A1 (ja) |
EP (1) | EP4060056A4 (ja) |
JP (1) | JP6927461B1 (ja) |
KR (1) | KR20220073806A (ja) |
CN (1) | CN114730180A (ja) |
BR (1) | BR112022007991A2 (ja) |
WO (1) | WO2021095595A1 (ja) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI818628B (zh) * | 2022-07-18 | 2023-10-11 | 中國鋼鐵股份有限公司 | 鋼胚表面熔渣之去除方法、碳鋼材及合金鋼材 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003005816A (ja) * | 2001-06-22 | 2003-01-08 | Toshiba Electronic Engineering Corp | 設備稼働状況データ集計方法およびそのシステム |
JP2004334492A (ja) * | 2003-05-07 | 2004-11-25 | Toyota Motor Corp | 部品供給系の危機管理支援方法、装置及びプログラム |
JP2005018282A (ja) * | 2003-06-24 | 2005-01-20 | Nippon Steel Corp | 生産設備制御装置、生産設備制御方法、コンピュータプログラム、及びコンピュータ読み取り可能な記録媒体 |
JP2015170055A (ja) * | 2014-03-05 | 2015-09-28 | Jfeエンジニアリング株式会社 | リモートバックアップオペレーションシステム |
WO2018122962A1 (ja) * | 2016-12-27 | 2018-07-05 | 株式会社Fuji | 基板生産ラインの稼動情報モニタリングシステム |
JP2019169159A (ja) * | 2019-04-17 | 2019-10-03 | ファナック株式会社 | ネットワークを利用した診断サービスシステム及び診断方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040158474A1 (en) * | 2003-02-06 | 2004-08-12 | Karschnia Robert J. | Service facility for providing remote diagnostic and maintenance services to a process plant |
US9958860B2 (en) * | 2014-05-01 | 2018-05-01 | Rockwell Automation Technologies, Inc. | Systems and methods for broadcasting data and data tags associated with an industrial automation system |
WO2017033353A1 (ja) * | 2015-08-25 | 2017-03-02 | 川崎重工業株式会社 | 遠隔操作ロボットシステム |
JP2017128805A (ja) | 2016-01-19 | 2017-07-27 | Jfeスチール株式会社 | 高炉の操業方法 |
US20180052451A1 (en) * | 2016-08-19 | 2018-02-22 | Rockwell Automation Technologies, Inc. | Remote industrial automation site operation in a cloud platform |
-
2020
- 2020-11-02 KR KR1020227014616A patent/KR20220073806A/ko unknown
- 2020-11-02 EP EP20887724.1A patent/EP4060056A4/en active Pending
- 2020-11-02 CN CN202080076143.4A patent/CN114730180A/zh active Pending
- 2020-11-02 JP JP2021515241A patent/JP6927461B1/ja active Active
- 2020-11-02 WO PCT/JP2020/041117 patent/WO2021095595A1/ja unknown
- 2020-11-02 BR BR112022007991A patent/BR112022007991A2/pt unknown
- 2020-11-02 US US17/774,546 patent/US20220390930A1/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003005816A (ja) * | 2001-06-22 | 2003-01-08 | Toshiba Electronic Engineering Corp | 設備稼働状況データ集計方法およびそのシステム |
JP2004334492A (ja) * | 2003-05-07 | 2004-11-25 | Toyota Motor Corp | 部品供給系の危機管理支援方法、装置及びプログラム |
JP2005018282A (ja) * | 2003-06-24 | 2005-01-20 | Nippon Steel Corp | 生産設備制御装置、生産設備制御方法、コンピュータプログラム、及びコンピュータ読み取り可能な記録媒体 |
JP2015170055A (ja) * | 2014-03-05 | 2015-09-28 | Jfeエンジニアリング株式会社 | リモートバックアップオペレーションシステム |
WO2018122962A1 (ja) * | 2016-12-27 | 2018-07-05 | 株式会社Fuji | 基板生産ラインの稼動情報モニタリングシステム |
JP2019169159A (ja) * | 2019-04-17 | 2019-10-03 | ファナック株式会社 | ネットワークを利用した診断サービスシステム及び診断方法 |
Also Published As
Publication number | Publication date |
---|---|
JPWO2021095595A1 (ja) | 2021-11-25 |
KR20220073806A (ko) | 2022-06-03 |
BR112022007991A2 (pt) | 2022-07-05 |
US20220390930A1 (en) | 2022-12-08 |
EP4060056A4 (en) | 2022-12-21 |
WO2021095595A1 (ja) | 2021-05-20 |
CN114730180A (zh) | 2022-07-08 |
EP4060056A1 (en) | 2022-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7078176B2 (ja) | 生産設備の監視方法、生産設備の監視装置、及び生産設備の操業方法 | |
JP6690081B2 (ja) | 操業状況評価システム | |
CN111593155B (zh) | 高炉诊断系统及方法 | |
CN103439999B (zh) | 根据冷却壁温度变化进行高炉异常炉温控制的方法 | |
CN111607673B (zh) | 铁前诊断系统及方法 | |
JP2021507115A (ja) | 炉況管理装置及び方法 | |
JP6927461B1 (ja) | 生産設備の操業方法及び操業システム | |
CN106319122B (zh) | 在线测量高炉炉缸渣铁液面信息的方法和装置 | |
RU2801735C1 (ru) | Способ управления и система управления для производственных установок | |
RU2800300C1 (ru) | Способ контроля производственных средств, устройство контроля производственных средств и способ эксплуатации производственных средств | |
IWAMURA et al. | Sensor and signal quantification for blast furnace gas distribution control | |
Agrawal et al. | Advances in thermal level measurement techniques using mathematical models, statistical models and decision support systems in blast furnace | |
CN113110322B (zh) | 一种虚拟工长决策控制方法、装置、系统及存储介质 | |
Agrawal et al. | A novel method to detect the water leakage from tuyere nose cooling circuit in blast furnace | |
CN114185976A (zh) | 一种高炉可视化智能感知平台 | |
KR101412403B1 (ko) | 고로의 장입물 강하 판단 방법 | |
KR20140002212A (ko) | 고로의 가스 분포 판단 방법 | |
CN205115514U (zh) | 一种监测高炉上翘炉底温度变化的装置 | |
CN220564658U (zh) | 一种炼铁厂高炉热风炉在线监测报警系统 | |
CN111271981B (zh) | 一种冶金炉温度监控方法及监控系统 | |
CN117234170B (zh) | 一种钢铁关键工艺参数监测管理方法和装置 | |
CN113061683B (zh) | 转炉终点氧和转炉终点补吹次数质量因子的自动匹配方法 | |
CN105219905A (zh) | 一种监测高炉上翘炉底温度变化的装置及其应用 | |
JPH04365807A (ja) | 高熱炉の壁落ちに伴なう炉熱低下予測方法 | |
Green | Condition monitoring: its impact on plant performance at British Steel, Scunthorpe works |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210318 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20210318 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20210419 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210706 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210719 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6927461 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |