JP6872885B2 - Injection molding machine and its control method - Google Patents

Injection molding machine and its control method Download PDF

Info

Publication number
JP6872885B2
JP6872885B2 JP2016220911A JP2016220911A JP6872885B2 JP 6872885 B2 JP6872885 B2 JP 6872885B2 JP 2016220911 A JP2016220911 A JP 2016220911A JP 2016220911 A JP2016220911 A JP 2016220911A JP 6872885 B2 JP6872885 B2 JP 6872885B2
Authority
JP
Japan
Prior art keywords
resin
injection
valve
cylinder
plunger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016220911A
Other languages
Japanese (ja)
Other versions
JP2018075816A (en
Inventor
寛貴 大澤
寛貴 大澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canon Electronics Inc
Original Assignee
Canon Electronics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canon Electronics Inc filed Critical Canon Electronics Inc
Priority to JP2016220911A priority Critical patent/JP6872885B2/en
Publication of JP2018075816A publication Critical patent/JP2018075816A/en
Application granted granted Critical
Publication of JP6872885B2 publication Critical patent/JP6872885B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、射出成形機に関するものである。 The present invention relates to an injection molding machine.

特許文献1に開示されているように、従来の成形機は、インラインスクリュ式や、プリプランジャ式の物が多く作られているが、いずれも、装置が大型化していた。また、樹脂材料の経路の合流部で、樹脂の入り切りを変える、チェック弁の駆動精度のばらつきにより、成形品の寸法精度がばらつくなど、高精度な成形品の寸法要求に追従できないことがあった。 As disclosed in Patent Document 1, many conventional molding machines are of the in-line screw type and the pre-plunger type, but in each case, the size of the apparatus has been increased. In addition, it may not be possible to meet the dimensional requirements of high-precision molded products, such as changing the on / off of the resin at the confluence of the resin material path and variations in the dimensional accuracy of the molded product due to variations in the drive accuracy of the check valve. ..

また、加熱シリンダの着脱も大型かつ複雑で、クレーン作業資格が要求され、現場での解体復帰作業に多くの時間を浪費していた。 In addition, the attachment and detachment of the heating cylinder is large and complicated, and a crane work qualification is required, and a lot of time is wasted on the dismantling and returning work at the site.

特開2014−136356号公報Japanese Unexamined Patent Publication No. 2014-136356 特開平11−277592号公報Japanese Unexamined Patent Publication No. 11-277592

しかしながら、近年、マイクロファクトリーの考えや、成形機のインライン化構想に伴い、装置を小型化したいというニーズが高まっている。また、更なる高精度の成形品へのニーズが高まり、安定したチェック弁動作を行い成形品の寸法を安定させることが求められている。 However, in recent years, there has been an increasing need for miniaturization of equipment due to the idea of a microfactory and the concept of in-line molding machine. Further, there is an increasing need for a molded product with higher precision, and it is required to perform a stable check valve operation to stabilize the dimensions of the molded product.

また、生産現場では、生産の合間に加熱筒やノズルの分解洗浄が必要であったが、装置が大きい事でクレーン等の専用資格が必要で、解体が難しく、生産復帰に時間がかかっていた。 In addition, at the production site, it was necessary to disassemble and clean the heating cylinder and nozzle between productions, but due to the large size of the equipment, special qualifications such as cranes were required, disassembly was difficult, and it took time to return to production. ..

本発明は、この点に鑑みてなされたものであり、
樹脂供給部から液状の樹脂を溶融射出すべく設けられた射出シリンダと、
前記射出シリンダ内部に設けられた流路の先端に設けられたノズルと、
記射出シリンダ内部に設けられ、先端に押圧部を有するプランジャと、
前記プランジャを移動することで前記ノズルから射出させる駆動手段と、
前記射出シリンダ内に設けられた第一開閉弁と
前記樹脂供給部から前記射出シリンダに樹脂を供給する第二開閉弁と、を備え、
前記第一開閉弁よりも前記ノズル側における前記射出シリンダと前記プランジャとの間の第1の空間と、
前記第一開閉弁よりも前記樹脂供給部側における前記射出シリンダと前記プランジャとの間の第2の空間と、を有し、
前記プランジャを前記ノズルに近づけるように移動させることによって、前記第1の空間に充填された樹脂を前記ノズルから射出させると同時に、樹脂の圧力差を利用して前記第二開閉弁を通して前記樹脂供給部から前記第2の空間へ樹脂を供給し、
前記プランジャを前記ノズルから遠ざかるように移動させることによって、樹脂の圧力差を利用して前記第一開閉弁を通して前記第2の空間から前記第1の空間へ樹脂を供給することを特徴とする射出成形機。
The present invention has been made in view of this point.
An injection cylinder which the liquid resin was kicked melt injection all rather set from the resin supply section,
A nozzle provided at the tip of the flow path provided inside the injection cylinder and
Provided inside before Symbol injection cylinder, a plunger having a pressing portion at the tip,
Driving means for injection before Symbol nozzle by moving the plunger,
A first shut-off valve was provided, et al in the injection cylinder,
A second on-off valve for supplying resin from the resin supply unit to the injection cylinder is provided.
A first space between the injection cylinder and the plunger on the nozzle side of the first on-off valve,
It has a second space between the injection cylinder and the plunger on the resin supply unit side of the first on-off valve.
By moving the plunger closer to the nozzle, the resin filled in the first space is ejected from the nozzle, and at the same time, the resin is supplied through the second on-off valve by utilizing the pressure difference of the resin. The resin is supplied from the part to the second space,
By moving the plunger away from the nozzle, and characterized by utilizing a pressure difference of the resin through the first shut-off valve for supplying the resin into the first space from the second space Injection molding machine.

本発明によれば、簡易な構成で安定したチェック弁動作を行うことができ、成形機を小型化することができる。また、容易に解体できる射出機構を提供する事ができる。 According to the present invention, a stable check valve operation can be performed with a simple configuration, and the molding machine can be miniaturized. Further, it is possible to provide an injection mechanism that can be easily disassembled.

本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す正面図であり、型締状態である。It is a front view schematically showing an embodiment in which the injection mechanism according to the present invention is applied to a vertical injection molding machine, and is in a mold clamping state. 本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す断面図であり、型締状態で、正面の真中を断面線とする。It is sectional drawing which shows typically one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and the center of the front surface is a cross-sectional line in a mold compaction state. 本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す断面図であり、型開き状態で、プランジャが上昇した状態を表す射出拡大断面図である。また、ノズルはオープンノズルである。It is sectional drawing which shows typically one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and is the injection enlarged sectional view which shows the state which the plunger is raised in the mold open state. The nozzle is an open nozzle. 本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す断面図であり、型開き状態で、プランジャが下降した状態を表す射出拡大断面図であり、樹脂供給側の断面を表す。It is a cross-sectional view schematically showing an embodiment in which the injection mechanism according to the present invention is applied to a vertical injection molding machine, and is an enlarged injection cross-sectional view showing a state in which the plunger is lowered in the mold open state, and is on the resin supply side. Represents a cross section. 本発明による射出機構を竪型射出成形機に応用した他の実施形態を模式的に表す断面図であり、プランジャが下降した状態を表す射出拡大断面図であり、ノズルがシャットオフノズルである。It is a cross-sectional view schematically showing another embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, is the injection enlarged cross-sectional view which shows the state which the plunger is lowered, and the nozzle is a shut-off nozzle. 本発明による竪型射出成形機の一実施形態を模式的に表す立体投影図であり、型開き状態である。It is a three-dimensional projection drawing schematically showing one embodiment of the vertical injection molding machine according to the present invention, and is in a mold-opened state. 本発明による竪型射出成形機の一実施形態を模式的に表す立体投影図であり、樹脂を押すプランジャの部位を表す。It is a three-dimensional projection drawing which schematically represents one Embodiment of the vertical injection molding machine by this invention, and shows the part of a plunger which pushes a resin. 本発明による竪型射出成形機の一実施形態を模式的に表す立体投影図であり、樹脂の供給側(合流側)の第二開閉弁を表し、弁が閉じた状態である。It is a three-dimensional projection drawing schematically showing one embodiment of the vertical injection molding machine according to the present invention, represents the second on-off valve on the resin supply side (merging side), and is in a state where the valve is closed. 本発明による竪型射出成形機の一実施形態を模式的に表す立体投影図であり、樹脂の供給側(合流側)の第二開閉弁を表し、弁が開いた状態である。It is a three-dimensional projection drawing schematically showing one embodiment of the vertical injection molding machine according to the present invention, represents the second on-off valve on the resin supply side (merging side), and is in a state where the valve is open. 本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す断面図であり、型開き状態で、正面の真中を断面線とする。It is sectional drawing which shows typically one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and the center of the front surface is a sectional line in the mold open state. 本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す図であり、型締状態で、樹脂供給機構が自動のタイプを示す。It is a figure which shows typically one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the type which the resin supply mechanism is automatic in the mold compaction state. 本発明による射出機構を竪型射出成形機に応用した一実施形態の制御のフローチャートを模式的に表す図であり、樹脂供給機構が手動のタイプを示す。It is a figure which shows typically the flow chart of the control of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the type which the resin supply mechanism is manual. 本発明による射出機構を竪型射出成形機に応用した一実施形態の制御のフローチャートを模式的に表す図であり、樹脂供給機構が自動のタイプを示す。It is a figure which shows typically the flow chart of the control of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the type which the resin supply mechanism is automatic. 本発明による射出機構を竪型射出成形機に応用した一実施形態の制御のフローチャートを模式的に表す図であり、自動のパージ専用のトレイタイプを示す。It is a figure which shows typically the flow chart of the control of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the tray type only for automatic purging. 本発明による射出機構を竪型射出成形機に応用した他の実施形態の制御のフローチャートを模式的に表す図であり、材料供給側に弁がついたタイプを示す。It is a figure which shows typically the flow chart of the control of another embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the type which has a valve on the material supply side. 本発明による射出機構を竪型射出成形機に応用した他の実施形態の制御のフローチャートを模式的に表す図であり、材料供給にモータ制御機構のついたタイプを示す。It is a figure which shows typically the flow chart of the control of another embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the type which attached the motor control mechanism to the material supply. 本発明による竪型射出成形機の一実施形態を模式的に表す立体投影図であり、樹脂を押すプランジャの部位を表し、弁がバネ力に逆らって下に下がり、開いた状態を表す。It is a three-dimensional projection drawing schematically showing one embodiment of the vertical injection molding machine according to the present invention, represents a portion of a plunger that pushes a resin, and represents a state in which a valve is lowered against a spring force and opened. 本発明による射出機構を竪型射出成形機に応用した一実施形態の立体図を表す図であり、樹脂供給機構が手動のガンタイプを示す。It is a figure which shows the three-dimensional figure of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the gun type which the resin supply mechanism is manual. 本発明による射出機構を竪型射出成形機に応用した一実施形態の立体図を表す図であり、樹脂供給機構が手動のガンタイプの着脱を表す。It is a figure which shows the three-dimensional figure of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the attachment / detachment of a gun type which the resin supply mechanism manually attaches and detached. 本発明による射出機構を竪型射出成形機に応用した一実施形態の立体図を表す図であり、加熱シリンダの着脱を表す。解体手順の1番目である。It is a figure which shows the three-dimensional figure of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the attachment / detachment of a heating cylinder. This is the first dismantling procedure. 本発明による射出機構を竪型射出成形機に応用した一実施形態の立体図を表す図であり、加熱シリンダの着脱を表す。解体手順の2番目で、加熱シリンダを傾けた図である。It is a figure which shows the three-dimensional figure of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the attachment / detachment of a heating cylinder. The second of the dismantling procedures is a view in which the heating cylinder is tilted. 本発明による射出機構を竪型射出成形機に応用した一実施形態の立体図を表す図であり、加熱シリンダの着脱を表す。解体手順の3番目で、加熱シリンダを外した図である。It is a figure which shows the three-dimensional figure of one Embodiment which applied the injection mechanism by this invention to a vertical injection molding machine, and shows the attachment / detachment of a heating cylinder. It is the third of the dismantling procedure, and is the figure which removed the heating cylinder. 本発明による射出機構を竪型射出成形機に応用した二実施形態を模式的に表す射出拡大斜視図であり、ノズルはオープンノズルである。金型と面でタッチするノズルで、樹脂出口が交換式の図である。It is an injection enlarged perspective view schematically showing two embodiments in which the injection mechanism according to the present invention is applied to a vertical injection molding machine, and the nozzle is an open nozzle. It is a nozzle that touches the mold on the surface, and the resin outlet is a replaceable figure. 本発明による射出機構を竪型射出成形機に応用した二実施形態を模式的に表す射出拡大斜視図であり、ノズルはオープンノズルである。金型と面でタッチするノズルで、樹脂出口が交換式の図である。流路部が解りやすく切断されている図である。It is an injection enlarged perspective view schematically showing two embodiments in which the injection mechanism according to the present invention is applied to a vertical injection molding machine, and the nozzle is an open nozzle. It is a nozzle that touches the mold on the surface, and the resin outlet is a replaceable figure. It is the figure which the flow path part is cut in an easy-to-understand manner. 本発明による射出機構を竪型射出成形機に応用した二実施形態を模式的に表す拡大斜視図であり、装置正面を斜め下から見た図である。金型が外され、オープンノズルが見えている。It is an enlarged perspective view schematically showing two embodiments which applied the injection mechanism by this invention to a vertical injection molding machine, and is the figure which looked at the front of the apparatus from diagonally below. The mold has been removed and the open nozzle is visible.

本発明による射出機構を竪型射出成形機に応用した一実施形態について、図1〜図4、
図10を用いて詳細に説明する。しかしながら、本発明はこのような実施形態のみに限らず、
特許請求の範囲に記載された本発明の概念に包含されるあらゆる変更や修正が可能であり、
従って本発明の精神に帰属する他の任意の技術にも当然応用することができる。
An embodiment in which the injection mechanism according to the present invention is applied to a vertical injection molding machine is shown in FIGS.
This will be described in detail with reference to FIG. However, the present invention is not limited to such embodiments.
Any modification or modification included in the concept of the invention described in the claims may be made.
Therefore, it can be naturally applied to any other technique belonging to the spirit of the present invention.

図1は、本発明による射出機構を竪型射出成形機に応用した一実施形態を模式的に表す正面図であり、型締状態である。 FIG. 1 is a front view schematically showing an embodiment in which the injection mechanism according to the present invention is applied to a vertical injection molding machine, and is in a mold clamping state.

以下、まず射出部において説明する。射出モータ20により、駆動プーリ46と射出ベルト21を介して従動プーリ45が回転し、射出ボールねじ17へと動力が伝わり、ネジの軸が上下する。ネジの軸と連結したプランジャガイドプレート35が、ガイドポスト34に案内される。プランジャ25は、プランジャホルダ48でプランジャガイド35に下から上にネジ止めされている。ねじ軸方向の負荷は、射出軸受け52と射出ボールねじ17とで受ける。 Hereinafter, the injection section will be described first. The injection motor 20 rotates the driven pulley 45 via the drive pulley 46 and the injection belt 21, and power is transmitted to the injection ball screw 17, so that the screw shaft moves up and down. The plunger guide plate 35 connected to the screw shaft is guided to the guide post 34. The plunger 25 is screwed to the plunger guide 35 from the bottom to the top by the plunger holder 48. The load in the screw axis direction is received by the injection bearing 52 and the injection ball screw 17.

ディスペンサ69に収納された樹脂は、材料押し出し機により、図4における左側に押し出され、分岐点63を通り、固定型のミキサ30へと送られて混合される。ディスペンサ69には、複数の樹脂材料が収納され、2種類で混ざり合って反応するものや、マスタバッチのように着色剤を混ぜるもの、複数の比率が1対1の物から、4対1と様々な比率の違うものも着脱ができて、射出可能である。所定量の使用が終わるとディスペンサ69を交換することで再度射出が可能となる。 The resin stored in the dispenser 69 is extruded to the left side in FIG. 4 by a material extruder, passes through a branch point 63, and is sent to a fixed mixer 30 for mixing. A plurality of resin materials are stored in the dispenser 69, and two types of resin materials are mixed and reacted, a colorant is mixed like a master batch, and a plurality of ratios of 1: 1 are changed to 4: 1. Items with different ratios can be attached and detached and can be ejected. When the predetermined amount has been used, the dispenser 69 can be replaced to enable re-injection.

ミキサ30は、通常のスタティックミキサのように鉄板をねじったもの、すなわち、樹脂材料の混錬を促すエレメントが複数積層したものが好ましい。スタティックミキサに限らず、混錬を促すものであればどのような形状でも構わない。ミキサ30は、ミキサホルダ33に収納され、チェックホルダ31との間に挟み込まれ、樹脂漏れが無いようにシールされる。 The mixer 30 is preferably one in which an iron plate is twisted like a normal static mixer, that is, one in which a plurality of elements for promoting kneading of a resin material are laminated. The shape is not limited to the static mixer, and any shape may be used as long as it promotes kneading. The mixer 30 is housed in the mixer holder 33, sandwiched between the mixer 30 and the check holder 31, and sealed so that there is no resin leakage.

ここで、図8は、本発明による堅型射出成形機の一実施形態を模式的に表す立体投影図であって、樹脂の供給側(合流側)の第二開閉弁を表し、弁が閉じた状態を示している。液状樹脂に対しては、図8のように、ミキサ30のつきあて部にOリング14等を設けてシールされるようにすることが有効である。 Here, FIG. 8 is a three-dimensional projection drawing schematically showing an embodiment of a rigid injection molding machine according to the present invention, showing a second on-off valve on the resin supply side (merging side), and the valve is closed. It shows the state. As shown in FIG. 8, it is effective to provide an O-ring 14 or the like at the contact portion of the mixer 30 so that the liquid resin can be sealed.

ミキサ30を通過した樹脂は、混錬され、分布が均一となり、合流通路62へと移動する。
合流通路62の先には、第二開閉弁32が流動方向に微動できるようになっている。第二開閉弁32は、流動方向に沿う紡錘形状をなして、流動方向の奥側が面になっている。送る方向に圧力がかかると、第二開閉弁32は、奥側へと微動する。微動量は、使用する樹脂材料により、弁の移動方向の大きさで変えることが好ましく、0.5〜3mm程度が好ましい。奥側へ移動すると、第二開閉弁32の外周で案内している弁爪15との間に隙間ができる。弁爪15は、鳥の爪に似た形状をし、4つの爪を有している。すなわち、第二開閉弁32を、弁爪15が掴んでいるように見え、爪の間から、樹脂が流れ出す構造である。この爪の数は問わない。
The resin that has passed through the mixer 30 is kneaded, has a uniform distribution, and moves to the confluence passage 62.
At the end of the merging passage 62, the second on-off valve 32 can be slightly moved in the flow direction. The second on-off valve 32 has a spindle shape along the flow direction, and the back side in the flow direction is a surface. When pressure is applied in the feeding direction, the second on-off valve 32 slightly moves toward the back side. The amount of fine movement is preferably changed depending on the size of the valve in the moving direction depending on the resin material used, and is preferably about 0.5 to 3 mm. When moved to the back side, a gap is formed between the valve claw 15 and the valve claw 15 which is guided by the outer circumference of the second on-off valve 32. The valve claw 15 has a shape similar to a bird's claw and has four claws. That is, the structure is such that the valve claw 15 appears to grip the second on-off valve 32, and the resin flows out from between the claws. The number of these nails does not matter.

反対に奥側から樹脂が戻されようとすると第二開閉弁32は、同様の紡錘形状の穴に押し当てられ、シールする。このように第二開閉弁32を構成することによって、樹脂が逆流しないようになっている。 On the contrary, when the resin is about to be returned from the back side, the second on-off valve 32 is pressed against a similar spindle-shaped hole to seal it. By configuring the second on-off valve 32 in this way, the resin does not flow back.

なお、樹脂材料の粘性により流れやすさが変わるため、第二開閉弁32の微動量については、上述したように、組み込み時に調整すると良い。液状の樹脂の場合、0.5mm程度が好ましい。 Since the ease of flow changes depending on the viscosity of the resin material, the amount of fine movement of the second on-off valve 32 may be adjusted at the time of assembly as described above. In the case of a liquid resin, about 0.5 mm is preferable.

この第二開閉弁32は、上記実施形態では、その前後での樹脂圧力の差により開閉するタイプにしたが、電磁弁や空気弁の物のように強制的に外部の動力で開閉できるものでも構わない。供給精度を要求される場合は、こちらの方が好ましい。 In the above embodiment, the second on-off valve 32 is of a type that opens and closes depending on the difference in resin pressure before and after the valve, but it may be forcibly opened and closed by an external power such as a solenoid valve or an air valve. I do not care. This is preferable when supply accuracy is required.

樹脂材料は材料供給口23を通って、射出シリンダ1へと送られる。なお、樹脂材料の供給の仕方については、手動のガンタイプすなわちディスペンサ69で送ってもよいし、液体の熱硬化性樹脂のように、全自動でポンプ計量して、吐出量を管理する装置を付随してもよい。図11には全自動でポンプ計量するタイプの装置構成を表し、図13にその時の制御を表している。供給装置には、ディスペンサ69から射出シリンダ1までの供給経路中に電磁弁をつけて供給のON/OFFを切り替え、射出シリンダ1の手前に脱気装置を介在させ、樹脂の気泡を射出シリンダ1への供給前に事前に抜いてから供給する。脱気装置は遠心力を利用した分離気等が好ましい。樹脂材料の搬送力は、エアーによる空圧で搬送するものや、電動ポンプで送る機構の装置等様々であり、IO信号を接続すれば、どの装置にも対応可能である。 The resin material is sent to the injection cylinder 1 through the material supply port 23. Regarding the method of supplying the resin material, a manual gun type, that is, a dispenser 69 may be used, or a device such as a liquid thermosetting resin that automatically pumps and controls the discharge amount is used. It may accompany. FIG. 11 shows a fully automatic pump weighing type device configuration, and FIG. 13 shows the control at that time. A solenoid valve is attached to the supply device in the supply path from the dispenser 69 to the injection cylinder 1 to switch the supply ON / OFF, and a degassing device is interposed in front of the injection cylinder 1 to inject resin bubbles into the injection cylinder 1. Before supplying to, pull out in advance and then supply. The degassing device is preferably a separated air using centrifugal force or the like. The transporting force of the resin material is various, such as one that transports by air pressure and a device of a mechanism that sends by an electric pump, and any device can be supported by connecting an IO signal.

射出シリンダ1への樹脂材料の供給後の構成について、図3、図4の断面拡大図で説明する。射出シリンダ1に送られた樹脂は、バンドヒータ2により加熱され溶融される。熱硬化性樹脂の場合は、バンドヒータ2ではなく、温調水管が加工された冷却ホルダのようなもので冷却する。その場合、ホルダに水管とホースをつけ、外部温調機で、温度を管理する。射出シリンダ1に3D配管が加工されて直接温調するとなおよい。低圧の樹脂圧力専用機の場合には、樹脂圧力に耐えうる強度が必要でないため、この構成が好ましい。 The configuration of the resin material after being supplied to the injection cylinder 1 will be described with reference to the enlarged cross-sectional views of FIGS. 3 and 4. The resin sent to the injection cylinder 1 is heated by the band heater 2 and melted. In the case of a thermosetting resin, it is cooled not by the band heater 2 but by something like a cooling holder in which a temperature control pipe is processed. In that case, attach a water pipe and a hose to the holder, and control the temperature with an external temperature controller. It is even more preferable that the injection cylinder 1 is machined with a 3D pipe to directly control the temperature. In the case of a low-pressure resin pressure dedicated machine, this configuration is preferable because strength that can withstand the resin pressure is not required.

射出シリンダ1の穴の内径に対して、プランジャ25の外径は、材料供給口23を考慮して小さく設定され、樹脂材料はその隙間を通ってプランジャヘッド26の前方(図3における下側)へと送られる。プランジャ25が上昇する事で、プランジャヘッド26の前方、すなわち図3のシリンダ樹脂流路61の部屋(空間)及びノズル樹脂流路60の空間へと送られる。 The outer diameter of the plunger 25 is set smaller than the inner diameter of the hole of the injection cylinder 1 in consideration of the material supply port 23, and the resin material passes through the gap in front of the plunger head 26 (lower side in FIG. 3). Will be sent to. When the plunger 25 rises, it is sent to the front of the plunger head 26, that is, to the room (space) of the cylinder resin flow path 61 and the space of the nozzle resin flow path 60 in FIG.

図3におけるプランジャヘッド26の上部にはスプリング29と、更にその上には第一開閉弁28が設けられる。第一開閉弁28は上下に摺動可能で、その上に樹脂穴ガイドリング27が設けられている。図7に、プランジャ25の立体投影図を示す。 A spring 29 is provided above the plunger head 26 in FIG. 3, and a first on-off valve 28 is provided above the spring 29. The first on-off valve 28 is slidable up and down, and a resin hole guide ring 27 is provided on the first on-off valve 28. FIG. 7 shows a stereoscopic projection drawing of the plunger 25.

樹脂穴ガイドリング27には、流路穴が無数にあり、そこを通過して樹脂が下へと送られる。常時、第一開閉弁28がスプリング29の付勢力で樹脂穴ガイドリング27に押し付けられており、樹脂穴ガイドリング27の流路穴がふさがれている。その流路穴に流れ込む圧力が強くなると、スプリング29の力に抗い、第一開閉弁28が下に下がり、シールが解除され、第一開閉弁28の外周を通って、プランジャヘッド26の外周から、下へと流れ込む。図17がその状態を表している。逆流しようとする(樹脂が上方向に行こうする)と、第一開閉弁28が上に上がり、樹脂穴ガイドリング27の流路穴をふさぎ、樹脂が戻らないようになる。そのため、常にプランジャヘッド26には、新しい樹脂が入り、先入先出し構造となり、樹脂の滞留や焼けの問題がない。 The resin hole guide ring 27 has innumerable flow path holes, through which the resin is sent downward. The first on-off valve 28 is constantly pressed against the resin hole guide ring 27 by the urging force of the spring 29, and the flow path hole of the resin hole guide ring 27 is blocked. When the pressure flowing into the flow path hole becomes stronger, the force of the spring 29 is resisted, the first on-off valve 28 is lowered, the seal is released, the outer circumference of the first on-off valve 28 is passed, and the outer periphery of the plunger head 26 is used. , Flows down. FIG. 17 shows the state. When the backflow is attempted (the resin tries to go upward), the first on-off valve 28 rises upward, blocks the flow path hole of the resin hole guide ring 27, and prevents the resin from returning. Therefore, the plunger head 26 always contains a new resin and has a first-in first-out structure, so that there is no problem of resin retention or burning.

また、スプリング29の付勢力で、樹脂の流れの圧力差のばらつきを抑制できる。そのため、プランジャヘッド26側(シリンダ樹脂流路61)へ送る樹脂材料の量を適切に管理しやすくなる。第一開閉弁28の前後で樹脂の圧力差による弁の解放だけだと、水のような液状粘性材料である場合、プランジャヘッド25側へ流れ込む量がばらつき、流入量が変わって、成形品への充填圧力が変化してしまい、安定成形ができなくなってしまう。本実施形態においては、スプリング29による所定の押圧力で第一開閉弁28を樹脂ガイドリング27に付勢する事で、強制的に入り口を遮断し、不安定な圧力差を補助する事が出来る。 Further, the urging force of the spring 29 can suppress the variation in the pressure difference in the resin flow. Therefore, it becomes easy to appropriately manage the amount of the resin material sent to the plunger head 26 side (cylinder resin flow path 61). If only the valve is released due to the pressure difference of the resin before and after the first on-off valve 28, in the case of a liquid viscous material such as water, the amount flowing to the plunger head 25 side varies, and the inflow amount changes to the molded product. The filling pressure will change, and stable molding will not be possible. In the present embodiment, by urging the first on-off valve 28 to the resin guide ring 27 with a predetermined pressing force by the spring 29, the inlet can be forcibly shut off and an unstable pressure difference can be assisted. ..

ここで、射出圧力をP1とし、スプリング29の力をFとする。プランジャヘッド26の先の樹脂圧力をP2とすると、P1>F+P2の時、第一開閉弁28が下がり、流路が開き、樹脂材料が下へと流れる。 Here, the injection pressure is P1, and the force of the spring 29 is F. Assuming that the resin pressure at the tip of the plunger head 26 is P2, when P1> F + P2, the first on-off valve 28 is lowered, the flow path is opened, and the resin material flows downward.

プランジャ25は、射出シリンダ1の内穴に圧入されたシール65により、樹脂が逆流しないように防御される。また、シール65の上には、ブッシュ64が射出シリンダ1の内穴に圧入され、そのブッシュ64の内周にプランジャ25の外周が案内され、摺動する。ブッシュ64は、メタルブッシュが望ましく、上下に動くプランジャ25の上側のガイドになる。 The plunger 25 is protected from backflow of resin by a seal 65 press-fitted into the inner hole of the injection cylinder 1. Further, a bush 64 is press-fitted into the inner hole of the injection cylinder 1 on the seal 65, and the outer circumference of the plunger 25 is guided to the inner circumference of the bush 64 and slides. The bush 64 is preferably a metal bush and serves as a guide on the upper side of the plunger 25 that moves up and down.

また、プランジャ25は、第一開閉弁28上の樹脂穴ガイドリング27の外周と、射出シリンダ1の内穴とで案内され、摺動する。これがプランジャ25の下側のガイドとなる。上下のガイドの間隔が広がれば、プランジャ25の上下の摺動精度(同軸精度、傾き精度)は上がる。プランジャ25が下がれば下がるほど、摺動精度が向上することになる。装置上、樹脂に負荷をかけ、もっともガイド性の欲しいのは、プランジャが下がり、樹脂圧により逆の反力がかかった状態であり、この機構はその時に精度が出やすい。そのため、樹脂が高圧力の時に摺動精度が高まり、樹脂漏れを低減できる。また、ガイドの寸法精度も管理しやすい。上下に広くとることで、ブッシュ64の無い外径精度や射出シリンダ1の内径精度、プランジャの外径精度もラフにでき、ブッシュ64単体だけでなく、装置トータルのコストも下げられる。 Further, the plunger 25 is guided by the outer circumference of the resin hole guide ring 27 on the first on-off valve 28 and the inner hole of the injection cylinder 1 and slides. This serves as a guide for the lower side of the plunger 25. The wider the distance between the upper and lower guides, the higher the vertical sliding accuracy (coaxial accuracy, tilt accuracy) of the plunger 25. The lower the plunger 25, the better the sliding accuracy. On the device, a load is applied to the resin, and what is most desired to be a guide is a state in which the plunger is lowered and a reverse reaction force is applied due to the resin pressure, and this mechanism tends to be accurate at that time. Therefore, when the resin has a high pressure, the sliding accuracy is improved and the resin leakage can be reduced. In addition, the dimensional accuracy of the guide is easy to manage. By widening the top and bottom, the outer diameter accuracy without the bush 64, the inner diameter accuracy of the injection cylinder 1, and the outer diameter accuracy of the plunger can be made rough, and not only the bush 64 alone but also the total cost of the device can be reduced.

プランジャ25の上下動作により、流路の前後で、第一開閉弁28を境界として、圧力差が生まれる。プランジャ25が上昇すると、プランジャ25の下の樹脂流路の空間(第一開閉弁28の下側でありノズル側)は圧力が低くなり、反対側は高くなる。樹脂は圧力の高い方から低い方へ流れる。その際、スプリング29の力よりも流れる力が強いと樹脂が樹脂流路の空間(ノズル側)へと送られる。また、材料供給側の弁も解放され、プランジャ25側へ引き込まれる。 Due to the vertical movement of the plunger 25, a pressure difference is created before and after the flow path with the first on-off valve 28 as a boundary. When the plunger 25 rises, the pressure in the space of the resin flow path under the plunger 25 (the lower side of the first on-off valve 28 and the nozzle side) becomes lower, and the pressure on the opposite side becomes higher. The resin flows from the higher pressure side to the lower pressure side. At that time, if the flowing force is stronger than the force of the spring 29, the resin is sent to the space (nozzle side) of the resin flow path. In addition, the valve on the material supply side is also released and pulled into the plunger 25 side.

プランジャ25が下降し始めると、プランジャ25の下の樹脂流路の空間(ノズル側)は圧力が高くなり、反対側は低くなる。樹脂は圧力の高い方から低い方へ行こうとする。その際、
スプリング29の力により、流れる力に抗い第一開閉弁28が動き、樹脂穴ガイドリング27の流路を塞ぐ。樹脂が樹脂流路の空間(ノズル側)へと送られた量が計量値となる。この正逆のタイミングの差が少ないほど、計量値が安定する。そのため、スプリングが付勢する。また、材料供給側の弁が圧力で閉じ、逆流しない。
When the plunger 25 begins to descend, the pressure in the space (nozzle side) of the resin flow path under the plunger 25 becomes high, and the pressure on the opposite side becomes low. The resin tries to go from the higher pressure side to the lower pressure side. that time,
The force of the spring 29 causes the first on-off valve 28 to move against the flowing force and block the flow path of the resin hole guide ring 27. The amount of resin sent to the space (nozzle side) of the resin flow path is the measured value. The smaller the difference between the forward and reverse timings, the more stable the measured value. Therefore, the spring is urged. In addition, the valve on the material supply side closes due to pressure and does not flow back.

射出シリンダ1の先にはオープンノズル4が付けられ、ノズル樹脂出口36から樹脂が出る。オープンノズル4の凸部とロケートリング38の凹部とが、いずれも球形状で稜線接触する。通常、オープンノズル4の凸部のRとロケートリング38のRでは方が大きく設定される。図3、図4は、オープンノズル4の凸部とロケートリング38の凹部とが、接触していない型開き状態の絵を表す。この状態では、熱の分離がなされ、熱伝導がない。この状態においては、オープンノズル4とロケートリング38とは接触領域を減らし、断熱されている事が好ましい。本実施形態においては、図4に示すように、ロケートリング38と嵌合する固定プラテン3側に断熱材37を挟んで別部品にし、熱が伝わらないように工夫している。 An open nozzle 4 is attached to the tip of the injection cylinder 1, and resin is discharged from the nozzle resin outlet 36. The convex portion of the open nozzle 4 and the concave portion of the locating ring 38 both have a spherical shape and come into contact with the ridgeline. Normally, the R of the convex portion of the open nozzle 4 and the R of the locating ring 38 are set to be larger. 3 and 4 show a picture of a mold-opened state in which the convex portion of the open nozzle 4 and the concave portion of the locating ring 38 are not in contact with each other. In this state, heat is separated and there is no heat conduction. In this state, it is preferable that the open nozzle 4 and the locating ring 38 are insulated by reducing the contact area. In the present embodiment, as shown in FIG. 4, a heat insulating material 37 is sandwiched between the fixed platen 3 side to be fitted with the locating ring 38 to form a separate part so that heat is not transferred.

図23、24は、オープンノズルの凸部の先が球形状ではなく平面になっている図を示す。金型に対して面で接触する第二の実施例である。詳しくは後述する。 FIGS. 23 and 24 show a diagram in which the tip of the convex portion of the open nozzle is not spherical but flat. This is the second embodiment in which the mold is in surface contact with the mold. Details will be described later.

射出シリンダ1の上部には、ノズルタッチバネ49を介してシリンダバックプレート47が、射出シリンダホルダ39にボルトで固定されている。型締めし、ノズルタッチすると、ノズルタッチバネ49の付勢力でロケートリング38に押し付けられ、樹脂漏れがないようにシールされる。ノズルタッチバネ49の付勢力は、生産する樹脂材料に応じて変えることが好ましい。特別な動力が要らず、バネの力と型締め力を利用しているため、簡易な構造であり、装置全体の小型化可能となっている。図6によると、シリンダバックプレート47は、ボルトでネジ止めされているが、手前側が開放されている。すなわち、プランジャ25とはU溝で逃げており、着脱交換も容易である。着脱方法は、図18〜22で説明する。 A cylinder back plate 47 is bolted to the injection cylinder holder 39 on the upper part of the injection cylinder 1 via a nozzle touch spring 49. When the mold is tightened and the nozzle is touched, it is pressed against the locating ring 38 by the urging force of the nozzle touch spring 49, and is sealed so that there is no resin leakage. The urging force of the nozzle touch spring 49 is preferably changed according to the resin material to be produced. Since no special power is required and the spring force and mold clamping force are used, the structure is simple and the entire device can be miniaturized. According to FIG. 6, the cylinder back plate 47 is screwed with bolts, but the front side is open. That is, it escapes from the plunger 25 in the U groove, and it is easy to attach / detach and replace it. The attachment / detachment method will be described with reference to FIGS. 18 to 22.

図5は、本発明による射出機構を堅型射出成形機に応用した他の実施形態を模式的に表す断面図である。プランジャが加工した状態を表す射出拡大断面図であり、ノズルとしてシャットオフノズル5を搭載している図5に示すように、ノズルヘッドの後部にバネを内蔵し、ピンが上下に出入りすることで樹脂材料を遮断するタイプである。樹脂材料の圧力差を利用して、ピンが上下する機構である。シャットオフノズル5の先端部が微小なテーパ部を形成し、ノズルプレート16と嵌合する。 FIG. 5 is a cross-sectional view schematically showing another embodiment in which the injection mechanism according to the present invention is applied to a rigid injection molding machine. It is an injection enlarged cross-sectional view showing a state processed by a plunger, and as shown in FIG. 5 in which a shut-off nozzle 5 is mounted as a nozzle, a spring is built in the rear part of the nozzle head, and a pin moves in and out up and down. A type that blocks resin materials. It is a mechanism that the pin moves up and down by using the pressure difference of the resin material. The tip of the shut-off nozzle 5 forms a minute tapered portion and fits with the nozzle plate 16.

図23、24は、オープンノズル4の凸部の先が球形状ではなく平面になっており、樹脂材料の吐き出し口に交換出口72が設けられ別体化されている。金型とは面で接触する第二の実施例である。交換出口72は六角ネジの形状になっており、装置下から、上に向かってノズルの凸部にねじ込まれている。ノズルの凸部には雌ネジが切られており、交換出口72と螺合する。交換出口72の中央には樹脂が通過する穴であるノズル樹脂出口36が設けられている。本実施形態においては、φ0.5〜2.0の径の中から、生産する樹脂により選択して、交換できる。ネジ頭が六角形状であるため、ボックスレンチ等で着脱交換が可能である。 In FIGS. 23 and 24, the tip of the convex portion of the open nozzle 4 is not spherical but flat, and the exchange outlet 72 is provided at the discharge port of the resin material to be separated. The mold is a second embodiment in which the mold is in contact with the surface. The replacement outlet 72 has a hexagonal screw shape, and is screwed upward from the bottom of the device into the convex portion of the nozzle. A female thread is cut on the convex portion of the nozzle, and the nozzle is screwed with the replacement outlet 72. A nozzle resin outlet 36, which is a hole through which the resin passes, is provided in the center of the exchange outlet 72. In the present embodiment, the diameter can be selected from φ0.5 to 2.0 depending on the resin to be produced and replaced. Since the screw head has a hexagonal shape, it can be attached and detached with a box wrench or the like.

ガラス入りの樹脂や長繊維の樹脂はノズルの交換出口72に相当する部分の流路の摩耗が激しく、消耗品扱いであった。一度摩耗してしまうと、成形条件が変化し、成形品の寸法変化が発生し、安定した生産ができない。従来は、ノズルと加熱シリンダごと装置から外し、ノズルは廃棄する必要があった。また、このノズル樹脂出口36の流路径の違いにより、残留圧力の差が生じ、糸引きが発生して生産が止、まってしまうことがあった。流路の交換出口72のみを交換する事で、樹脂材料のうち粘性が水程度であるような液体成形にも対応でき、ノズル全体を廃棄する必要がない。また、たとえガラス入りの樹脂等で樹脂流路径が摩耗しても、加熱シリンダやノズルを装置から外すことなく、そのまま交換することができる。 The glass-containing resin and the long-fiber resin were treated as consumables because the flow path of the portion corresponding to the nozzle replacement outlet 72 was severely worn. Once worn, the molding conditions change and the dimensions of the molded product change, making stable production impossible. In the past, it was necessary to remove the nozzle and heating cylinder from the device and discard the nozzle. Further, due to the difference in the flow path diameter of the nozzle resin outlet 36, a difference in residual pressure may occur, stringing may occur, and production may be stopped. By exchanging only the exchange outlet 72 of the flow path, it is possible to cope with liquid molding in which the viscosity of the resin material is about water, and it is not necessary to dispose of the entire nozzle. Further, even if the resin flow path diameter is worn by a resin containing glass or the like, the heating cylinder or nozzle can be replaced as it is without removing it from the device.

以下、その交換について説明する。図25は、本実施形態の堅型射出成形機を下側から見上げた状態の斜視図であり、金型が外れた状態である。金型さえ外れれば、ノズル凸部に容易にアクセスでき、レンチでの交換出口72の交換が可能になっている。従って、生産を止めずることなく、交換出口72を交換するだけで糸引き等の発生に対処できる。型開きの状態で行うと、スペースが広がり作業がしやすい。交換出口72は、小さい部材で作れば作るほど、そのものを安く作れ、交換、調達も容易であり、ランニングコストもかからない。交換出口72の六角形状の頭にシール材を仕込み、オープンノズル4の面と合わせると、樹脂漏れもしにくくすることができる。また、ネジ部の一部に精密嵌合部を設けるとシール性が高まり、樹脂漏れがない。 The exchange will be described below. FIG. 25 is a perspective view of the rigid injection molding machine of the present embodiment looking up from below, and is a state in which the mold is removed. As long as the mold is removed, the convex portion of the nozzle can be easily accessed, and the replacement outlet 72 can be replaced with a wrench. Therefore, it is possible to deal with the occurrence of stringing or the like simply by exchanging the exchange outlet 72 without stopping the production. If you do it with the mold open, the space will expand and it will be easier to work. The smaller the replacement outlet 72 is made of, the cheaper it can be made, the easier it is to replace and procure, and the lower the running cost. If a sealing material is placed in the hexagonal head of the replacement outlet 72 and combined with the surface of the open nozzle 4, resin leakage can be prevented. Further, if a precision fitting portion is provided in a part of the screw portion, the sealing property is improved and there is no resin leakage.

図18、19で、材料供給する手動のディスペンサ69の着脱方法を説明する。ディスペンサ69は2液を混合できるシステムで、図18には1対1の容量の樹脂を2つのシリンジで押すタイプを示す。2つの円筒の筒の内部に樹脂が入り、後部よりピストンのように押し出される。この円筒部が異形状のもので容量比が変えられるものが市販されており、それに樹脂を封入して用いることができる。ディスペンサ69の先には雄ネジがあり、リテインナット74の雌ネジと螺合する。ディスペンサ69固定時は、リテインナット74を締める。 18 and 19 show a method of attaching and detaching the manual dispenser 69 for supplying the material. The dispenser 69 is a system capable of mixing two liquids, and FIG. 18 shows a type in which one-to-one volume of resin is pushed by two syringes. Resin enters the inside of the two cylindrical cylinders and is pushed out from the rear like a piston. A cylinder having a different shape and having a variable capacity ratio is commercially available, and a resin can be sealed therein. There is a male screw at the tip of the dispenser 69, which is screwed with the female screw of the retain nut 74. When fixing the dispenser 69, tighten the retain nut 74.

図19は、ディスペンサ69が外れた状態である。カートリッジジョイント73には、リテインナット74が流動方向に摺動できるようになっており、ディスペンサ69側は径がテーパになり抜けないようになっている。カートリッジジョイント73のディスペンサ69側の穴径は、ディスペンサ69の先端部と嵌合する。精密嵌め合いで、人の手で押し込むレベルで挿入できる嵌合い径が好ましい。ディスペンサ69を取りつける時は、カートリッジジョイント73のディスペンサ69側の穴径に押し込み、嵌合させ、リテインナット74をずらして、ディスペンサ69の先(嵌合部後ろ)にある雄ねじと、リテインナット74とで螺合する。 FIG. 19 shows a state in which the dispenser 69 is removed. A retain nut 74 can slide in the flow direction of the cartridge joint 73, and the dispenser 69 side has a tapered diameter to prevent it from coming off. The hole diameter of the cartridge joint 73 on the dispenser 69 side fits with the tip of the dispenser 69. It is preferable to have a fitting diameter that allows precision fitting and can be inserted at a level where it can be pushed in by hand. When installing the dispenser 69, push it into the hole diameter on the dispenser 69 side of the cartridge joint 73 to fit it, shift the retain nut 74, and use the male screw at the tip of the dispenser 69 (behind the fitting portion) and the retain nut 74. Screw in.

リテインナット74は外径に羽根があり、専用工具が要らず、手で回しやすい形状にしてある。カートリッジジョイント73は、ミキサホルダ33に雌ネジがあり、螺合する。図19には、ネジ部近辺に二方取り加工がしてあり、ここを使ってスパナが入り、締め込める。リテインナット74のねじは配管用のテーパねじにし、樹脂漏れがないようにする事が好ましい。 The retain nut 74 has blades on the outer diameter, does not require a special tool, and has a shape that is easy to turn by hand. The cartridge joint 73 has a female screw on the mixer holder 33 and is screwed. In FIG. 19, a two-way wrench is formed near the screw portion, and a spanner can be inserted and tightened using this. It is preferable that the screw of the retain nut 74 is a tapered screw for piping so that there is no resin leakage.

このように、ディスペンサ69の先端の嵌合部とねじとで、リテインナット74を回すだけで着脱ができるため、メンテナンス作業が楽になった。専用工具が要らず、手で回しやすい。 In this way, the fitting portion at the tip of the dispenser 69 and the screw can be attached and detached simply by turning the retain nut 74, which facilitates the maintenance work. No special tools are required and it is easy to turn by hand.

図20、21、22で、射出シリンダ1の着脱方法を説明する。作業の前に、まず、金型を外す。 The method of attaching and detaching the injection cylinder 1 will be described with reference to FIGS. 20, 21 and 22. Before work, first remove the mold.

図20は、解体作業の最初の状態を表す。まず、シリンダオサエ40とノズルくさびブロック71を外す。シリンダオサエ40は、U溝を有し、ミキサホルダ33の経路外径を逃げ、ミキサホルダ33のフランジ部(射出シリンダ1との連結側)を抑えて、材料供給機構全体がずれないように、射出シリンダホルダ39に押さえつけている。射出シリンダ1の外径と、射出シリンダホルダ39のU溝が嵌合し、射出シリンダ1の位置決めがされる(装置正面から見た時のY軸方向)。シリンダオサエ40を取りつけると、XYでの位置決めができる。シリンダオサエ40と射出シリンダホルダ39との間には微小隙間があり、シリンダオサエ40が、ミキサホルダ33のフランジ部(射出シリンダ1との連結側)とで当接し、挟み込まれることが好ましい。具体的には熱膨張を加味した隙間となっていることが好ましい。プランジャ25は、プランジャホルダ48のプランジャガイド35に対し下から上に止めているネジを外すと、上方向へ支持しているものがなくなり、射出シリンダ1内部へと摺動しながら落ち、樹脂が残っている部位まで下がる。
ノズルオサエ70を固定しているビスを取り外す。
FIG. 20 shows the initial state of the dismantling work. First, the cylinder osae 40 and the nozzle wedge block 71 are removed. The cylinder osae 40 has a U groove, escapes the path outer diameter of the mixer holder 33, suppresses the flange portion (connecting side with the injection cylinder 1) of the mixer holder 33, and prevents the entire material supply mechanism from shifting. It is pressed against the holder 39. The outer diameter of the injection cylinder 1 and the U groove of the injection cylinder holder 39 are fitted to position the injection cylinder 1 (in the Y-axis direction when viewed from the front of the device). When the cylinder osae 40 is attached, positioning in XY is possible. It is preferable that there is a minute gap between the cylinder holder 40 and the injection cylinder holder 39, and the cylinder holder 40 comes into contact with the flange portion (connecting side with the injection cylinder 1) of the mixer holder 33 and is sandwiched. Specifically, it is preferable that the gap is a gap that takes into account thermal expansion. When the screw that holds the plunger 25 from the bottom to the top of the plunger guide 35 of the plunger holder 48 is removed, there is no support for the plunger 25 in the upward direction, and the plunger 25 slides into the injection cylinder 1 and falls, and the resin is removed. It goes down to the remaining part.
Remove the screw fixing the nozzle osae 70.

図21は、解体作業の2番目の状態を表す。ノズルオサエ70が外され、三角形の形状のシリンダバックプレート47の固定ネジを緩めると、その下のノズルタッチバネ49の力でシリンダバックプレート47が浮き上がる。そのまま、射出シリンダ1を構成するユニットごと、図21のように傾ける。三角形の形状のシリンダバックプレート47にはU溝があり、プランジャ25を入れたまま傾けられるように考えられている。 FIG. 21 shows the second state of the dismantling work. When the nozzle osae 70 is removed and the fixing screw of the triangular shaped cylinder back plate 47 is loosened, the cylinder back plate 47 is lifted by the force of the nozzle touch spring 49 underneath. As it is, the units constituting the injection cylinder 1 are tilted as shown in FIG. The triangular shaped cylinder back plate 47 has a U-groove so that it can be tilted with the plunger 25 inserted.

更に傾けて、上方向へと引き出すと、図22のようにユニットごと射出シリンダ1が外れる。ノズルオサエ70が外された空間と、固定プレート3にも傾けられるだけの逃げ空間が用意され、オープンノズル4がぶつからないようになっている。プランジャ25だけ交換したい場合は、傾けるだけの図21の状態で、着脱交換ができる。 When it is further tilted and pulled out upward, the injection cylinder 1 is disengaged together with the unit as shown in FIG. A space from which the nozzle osae 70 has been removed and an escape space that can be tilted to the fixed plate 3 are provided so that the open nozzle 4 does not collide. If only the plunger 25 is to be replaced, it can be detached and replaced in the state shown in FIG. 21 by simply tilting it.

解体の前にオープンノズル4の先端部の外径部に保護キャップ(樹脂製)をかぶせて作業すると、金型との精密嵌合部が保護され、傾けた時に誤ってぶつけても、キズや打痕がつかない。 If you cover the outer diameter of the tip of the open nozzle 4 with a protective cap (made of resin) before dismantling, the precision fitting part with the mold will be protected, and even if you accidentally hit it when tilted, it will be scratched. There are no dents.

あらかじめディスペンサ69を外しておくと、作業は更に楽になる。ユニット全体が小型にしてあるため、重量もさほどなく、女性でも容易に交換ができる。マニュアルに沿って進める事で誰でも交換が容易なため、いちいちサービスマンを呼ぶ必要がない。射出シリンダユニットをもうワンセット予備保管しておくことで、生産を止めることなく連続して成形ができる。 If the dispenser 69 is removed in advance, the work will be easier. Since the entire unit is small, it is not very heavy and even women can easily replace it. Since it is easy for anyone to exchange by following the manual, there is no need to call a service person one by one. By preserving another set of injection cylinder units, continuous molding can be performed without stopping production.

取付けは、図22、21、20の順で、上述した説明の逆の順序で進める。まず、射出シリンダユニットごと斜めに挿入する。 The installation proceeds in the order of FIGS. 22, 21, and 20 in the reverse order of the above description. First, the injection cylinder unit is inserted diagonally.

射出シリンダ1と射出シリンダホルダ39の嵌合部U溝は、図では説明していないが、射出シリンダ1がD形状になっており、Dの突き当て部とU溝の底とで位置決めがされ回り止めとなっている。次いでシリンダオサエ40を取りつけて、ボルトで仮締めする。その後、ノズルオサエ70とノズルくさびブロック71を取りつける。 Although the fitting portion U groove of the injection cylinder 1 and the injection cylinder holder 39 is not described in the figure, the injection cylinder 1 has a D shape and is positioned at the abutting portion of the D and the bottom of the U groove. It is a detent. Next, the cylinder osae 40 is attached and temporarily tightened with bolts. After that, the nozzle osae 70 and the nozzle wedge block 71 are attached.

プランジャホルダ48でプランジャガイド35に向けて下から上にネジをつけ、プランジャ25を上部に保持する。三角形の形状のシリンダバックプレート47の固定ネジを締めつけると、シリンダバックプレート47が下がる。その下のノズルタッチバネ49の力で、射出シリンダ1が下側に付勢される。最後に、シリンダオサエ40のボルトで増し締めすることでユニットがしっかりと固定される。 Screw the plunger holder 48 from the bottom to the top toward the plunger guide 35 to hold the plunger 25 at the top. When the fixing screw of the triangular shaped cylinder back plate 47 is tightened, the cylinder back plate 47 is lowered. The injection cylinder 1 is urged downward by the force of the nozzle touch spring 49 below it. Finally, the unit is firmly fixed by retightening with the bolts of the cylinder osae 40.

シリンダオサエ40は、ミキサホルダ33のフランジ部(射出シリンダ1との連結側)とで当接し、射出シリンダ1が、射出シリンダホルダ39に挟み込まれることが好ましく、熱膨張を加味した嵌合がよい。 It is preferable that the cylinder osae 40 is in contact with the flange portion (connecting side with the injection cylinder 1) of the mixer holder 33, and the injection cylinder 1 is sandwiched between the injection cylinder holder 39, and the fitting in consideration of thermal expansion is preferable.

また、金型を取り付けた後で、シリンダオサエ40のボルトで増し締めするとユニットがしっかりとさらに金型基準で固定される。 Further, after the mold is attached, if the cylinder is retightened with the bolt of the cylinder osae 40, the unit is further firmly fixed based on the mold.

上記で説明したように、射出シリンダ1は簡単に着脱ができる。交換作業時間は、20分〜40分あれば十分である。専用の資格もいらず、専用工具もいらない。 As described above, the injection cylinder 1 can be easily attached and detached. A replacement work time of 20 to 40 minutes is sufficient. No special qualifications required, no special tools required.

本実施例ではディスペンサ69で説明したが、自動材料供給機と接続しても構わない。熱硬化性の液体樹脂成形の場合には、リテインナット74の雌ネジに合うテーパ径の配管にし、上記同様の考えを盛り込めば、着脱は容易である。リテインナット74外径は手で回しやすい形状にしてあればどんな形状でも良い。カートリッジジョイント73は、ミキサホルダ33に雌ネジがあり、螺合する。 Although the dispenser 69 has been described in this embodiment, it may be connected to an automatic material feeder. In the case of thermosetting liquid resin molding, if a pipe having a tapered diameter that matches the female screw of the retain nut 74 is used and the same idea as described above is incorporated, attachment / detachment is easy. The outer diameter of the retain nut 74 may be any shape as long as it has a shape that can be easily turned by hand. The cartridge joint 73 has a female screw on the mixer holder 33 and is screwed.

以下型締め部において説明する。図1は上述した通り、本発明を適用した竪型射出成形機の型締機構部の型締状態を示す概略図である。図1はシングルトグルリンク機構を採用した例で型開状態を示し、以下型締め部において説明する。 This will be described below in the mold clamping section. As described above, FIG. 1 is a schematic view showing a mold clamping state of a mold clamping mechanism portion of a vertical injection molding machine to which the present invention is applied. FIG. 1 shows an example in which a single toggle link mechanism is adopted, showing a mold open state, and will be described below in a mold clamping portion.

図1のシングルトグルリンク機構は比較的小型の成形機に適用されている。固定側金型10を取付ける固定プラテン3はタイバ24の上部に固定され、可動側金型7を取付ける可動プラテン9は前記タイバ24に案内される形で保持され、固定側金型10方向及びその逆である反固定側方向へ移動可能で、ブッシュ64等によりがたつきの無いように取付けられる。固定プラテン3に固定されたタイバ24のもう一方はベースプレート41に固定される。金型の開閉動作はトグルリンク機構によって行われ、トグルリンク機構上18は可動プラテン9に取付けられ回転可動可能に接続され、トグルリンク機構下19と連動する。 The single toggle link mechanism of FIG. 1 is applied to a relatively small molding machine. The fixed platen 3 to which the fixed side mold 10 is attached is fixed to the upper part of the tie bar 24, and the movable platen 9 to which the movable side mold 7 is attached is held in a form guided by the tie bar 24, and is held in the fixed side mold 10 direction and its direction. It can be moved in the opposite direction to the anti-fixing side, and is attached by a bush 64 or the like without rattling. The other end of the tie bar 24 fixed to the fixed platen 3 is fixed to the base plate 41. The opening and closing operation of the mold is performed by the toggle link mechanism, and the upper 18 of the toggle link mechanism is attached to the movable platen 9 and is rotatably connected to the lower 19 of the toggle link mechanism.

図2の断面図に示すリンク軸ロング59がベースプレート41からの部材に固定され、リンク軸ロング59を支点にして、トグルリンク機構下19が旋回する。トグルリンク機構下19の下側には、トグルリンク機構を動作させるための駆動ユニットにリンクカムフォロア50(図1参照)で接続される。駆動ユニットは、型締モータ43と、型締モータ43にベルト、プーリで接続された型締ボールネジ42で、この型締ボールねじ42に螺合されたボールねじナットにナットホルダ51が接続されることで構成される。ナットホルダ51は前後方向にリンクカムフォロア50を受けるブロックがあり、型締めボールネジ42が前後進すると、リンクカムフォアに力が伝達される。尚、本発明の実施例ではサーボモータによる駆動となっているが、その駆動源は油圧あるいは空圧のシリンダ等でもよく、特に限定される物ではない。 The link shaft long 59 shown in the cross-sectional view of FIG. 2 is fixed to the member from the base plate 41, and the toggle link mechanism lower 19 rotates around the link shaft long 59 as a fulcrum. Below the toggle link mechanism lower 19, a link cam follower 50 (see FIG. 1) is connected to a drive unit for operating the toggle link mechanism. The drive unit is a mold clamping motor 43, a mold clamping ball screw 42 connected to the mold clamping motor 43 with a belt and a pulley, and a nut holder 51 is connected to a ball screw nut screwed into the mold clamping ball screw 42. It is composed of things. The nut holder 51 has a block that receives the link cam follower 50 in the front-rear direction, and when the mold clamping ball screw 42 moves back and forth, the force is transmitted to the link cam follower. In the embodiment of the present invention, the drive is driven by a servomotor, but the drive source may be a hydraulic or pneumatic cylinder or the like, and is not particularly limited.

駆動源となる型締モータ43の回転動力ベルトとプーリを介し、型締ボールねじ42を回転させ、螺合されたナットをボールねじの軸に沿って移動させる。 The mold clamping ball screw 42 is rotated via the rotary power belt and pulley of the mold clamping motor 43 as a drive source, and the screwed nut is moved along the axis of the ball screw.

型締力の発生は図2の断面図の様にトグルリンク機構のトグルリンク機構上18と、トグルリンク機構下19とが直線となると最大型締力を発生する。実際にはトグルリンク機構のトグルリンク機構上18と、トグルリンク機構下19が直線となる少し手前で固定金型10と可動金型7が完全に閉じ、そこからトグルリンク機構が伸びきる時の上方向の移動量分だけタイバ24が伸ばされ、そのタイバ24の伸びにより発生する弾性力で型締力を発生させている。 As shown in the cross-sectional view of FIG. 2, the mold clamping force is generated when the toggle link mechanism upper 18 and the toggle link mechanism lower 19 are in a straight line. Actually, when the fixed mold 10 and the movable mold 7 are completely closed just before the toggle link mechanism upper 18 and the toggle link lower 19 become a straight line, and the toggle link mechanism is fully extended from there. The tie bar 24 is stretched by the amount of movement in the upward direction, and the mold clamping force is generated by the elastic force generated by the stretch of the tie bar 24.

型締完了後、射出・冷却工程が完了し、型締モータ43が型締時とは逆方向に回転しトグルリンク機構各部が型締工程とは逆の動作をすることで型開動作が完了し、製品排出等を行い一連の成形工程が完了する。図10の状態が型開き状態である。リンク機構が折りたたまれている。 After the mold clamping is completed, the injection / cooling process is completed, the mold clamping motor 43 rotates in the direction opposite to that at the time of mold clamping, and each part of the toggle link mechanism operates in the opposite direction to the mold clamping process to complete the mold opening operation. Then, the product is discharged and a series of molding processes are completed. The state of FIG. 10 is the mold opening state. The link mechanism is folded.

<材料供給量の制御方法>
以下に、本実施形態における、射出機構への樹脂材料の供給について説明する。本実施形態においては、液状の材料を金型に射出し、金型の温度を上昇させることで材料を熱硬化させる。以下にその制御について詳述する。
<Control method of material supply amount>
The supply of the resin material to the injection mechanism in the present embodiment will be described below. In this embodiment, a liquid material is injected into a mold and the temperature of the mold is raised to thermally cure the material. The control will be described in detail below.

<材料供給量の制御方法(手動供給)>
本実施形態においては、液状の材料を金型に射出し、金型の温度を上昇させることで材料を熱硬化させる。以下にその制御について詳述する。図12は射出部とシリンダへの材料供給の例を示すフローチャートである。
<Control method of material supply (manual supply)>
In this embodiment, a liquid material is injected into a mold and the temperature of the mold is raised to thermally cure the material. The control will be described in detail below. FIG. 12 is a flowchart showing an example of material supply to the injection unit and the cylinder.

フローチャート開始点では型締めは完了し、射出シリンダ1内には樹脂材料が充填されているものとする。また、材料供給口23への樹脂材料の供給は作業者が、注入ガンタイプ等の注入器を用いて行うものとする。以後、図12の流れに沿って材料供給の制御方法を解説する。 It is assumed that the mold clamping is completed at the start point of the flowchart, and the injection cylinder 1 is filled with the resin material. Further, the resin material is supplied to the material supply port 23 by the operator using an injection device such as an injection gun type. Hereinafter, a method of controlling material supply will be described along the flow of FIG.

ステップS101において、射出モータ20を駆動し、プランジャ25を下降位置まで下げ、射出シリンダ1内部の樹脂を、オープンノズル4を経由し金型10及び金型7内に射出する。 In step S101, the injection motor 20 is driven, the plunger 25 is lowered to the lowered position, and the resin inside the injection cylinder 1 is injected into the mold 10 and the mold 7 via the open nozzle 4.

ステップS102では、プランジャ25の位置を維持し、保圧時間が経過するのを待つ。この保圧時間は使用者が自在に設定出来るものとする。型開き時にオープンノズル4のノズル樹脂出口36から樹脂材料が垂れる場合には、保圧時間経過後に再度射出モータ20を逆に動かし、わずかに上昇させるいわゆるサックバックを行って、ノズル樹脂流路60の残留圧力を除去するとノズルの先端から樹脂材料が垂れるのを防げる。 In step S102, the position of the plunger 25 is maintained and the holding pressure time elapses. This holding time can be freely set by the user. If the resin material drips from the nozzle resin outlet 36 of the open nozzle 4 when the mold is opened, the injection motor 20 is moved in the reverse direction again after the holding pressure time has elapsed, and so-called suckback is performed to slightly raise the injection motor 20 to perform a so-called suckback. By removing the residual pressure of, the resin material can be prevented from dripping from the tip of the nozzle.

ステップS103では、射出モータ20を駆動し、プランジャ25供給位置へ上昇させる。ここで供給位置は下降位置から射出量/プランジャ径だけ上昇させた位置である。成形品のサイズに合わせて、ユーザが所望の位置に設定できる。大きいサイズの成形品は、その量にあった位置に上昇させる。ユーザーインターフェース上で、成形品の重量、体積を入力することで、自動でサックバック量を制御するようにすることもできる。作業者はプランジャ25が上昇している間に樹脂材料を材料供給口23より供給する。作業者が材料を供給するタイミングはシグナルタワーや、表示パネル等で作業者に通知してもよい。また、本実施例では上述した第二開閉弁32を使用している為、弁の制御は必要ないが、ここで、圧縮エアーや電動による切替弁を使用する装置構成でもよい。その場合はステップS103の前に切替弁を開いておき、プランジャ25が供給位置へ上昇した後、切替弁を閉じればよい。 In step S103, the injection motor 20 is driven and raised to the plunger 25 supply position. Here, the supply position is a position where the injection amount / plunger diameter is increased from the descending position. The user can set the desired position according to the size of the molded product. Larger size articles are raised to the appropriate position. By inputting the weight and volume of the molded product on the user interface, the amount of suckback can be automatically controlled. The operator supplies the resin material from the material supply port 23 while the plunger 25 is rising. The timing at which the worker supplies the material may be notified to the worker by a signal tower, a display panel, or the like. Further, in this embodiment, since the above-mentioned second on-off valve 32 is used, it is not necessary to control the valve, but here, a device configuration using compressed air or an electric switching valve may be used. In that case, the switching valve may be opened before step S103, and the switching valve may be closed after the plunger 25 has risen to the supply position.

以上が、1サイクルの動作となる。引き続き成形を行う場合は、型締め後に再度ステップS101から行えば良い。 The above is the operation of one cycle. If molding is to be continued, the molding may be performed again from step S101 after molding.

<材料供給量の制御方法(自動供給)>
図13は射出部とシリンダへの材料供給の他の例を示すフローチャートである。
<Control method of material supply (automatic supply)>
FIG. 13 is a flowchart showing another example of material supply to the injection unit and the cylinder.

フローチャート開始点では型締めは完了し、射出シリンダ1内には樹脂材料が充填されているものとする。 It is assumed that the mold clamping is completed at the start point of the flowchart, and the injection cylinder 1 is filled with the resin material.

外部供給装置の材料供給を射出シリンダ1へ押し出す圧力Pdは、第二開閉弁32におけるチェック弁開放の必要圧力Poより大きく、第1開閉弁28におけるノズル射出の必要圧力Pnより低いものとする。つまりPn>Pd>Poとなるものとする。 The pressure Pd for pushing the material supply of the external supply device to the injection cylinder 1 is larger than the required pressure Po for opening the check valve in the second on-off valve 32 and lower than the required pressure Pn for nozzle injection in the first on-off valve 28. That is, it is assumed that Pn> Pd> Po.

フローチャート開始点では型締めは完了し、射出シリンダ1内には樹脂材料が充填されているものとする。また、材料供給口23への樹脂材料の供給は材料供給機で行うものとする。供給装置は、供給経路に電磁弁をつけ供給のON/OFFを切り替え、射出シリンダ1の手前に脱気装置を介在させ、樹脂材料の気泡を射出シリンダ1への供給前に抜いてから供給する。脱気装置は遠心力を利用した分離気等が優れる。樹脂の搬送力は、エアーによる空圧で搬送するものや、電動ポンプで送る機構の装置等様々であり、IO信号を接続すれば、どの装置にも対応可能である。 It is assumed that the mold clamping is completed at the start point of the flowchart, and the injection cylinder 1 is filled with the resin material. Further, the resin material is supplied to the material supply port 23 by the material supply machine. The supply device is provided with a solenoid valve in the supply path to switch the supply ON / OFF, an degassing device is interposed in front of the injection cylinder 1, and air bubbles of the resin material are removed before being supplied to the injection cylinder 1 before being supplied. .. The degassing device is excellent in separating air using centrifugal force. There are various transporting forces of resin, such as those that transport by air pressure and devices with a mechanism that feeds by an electric pump, and any device can be supported by connecting an IO signal.

材料供給機は成形機とIO信号、または通信信号で電気的に接続され、成形機の指示で樹脂材料の供給、停止を切り替えられる。以後、図13の流れに沿って材料供給の制御方法を解説する。 The material feeder is electrically connected to the molding machine by an IO signal or a communication signal, and the supply and stop of the resin material can be switched according to the instruction of the molding machine. Hereinafter, a method of controlling material supply will be described along the flow of FIG.

ステップS121において、射出モータ20を駆動し、プランジャ25を下降位置まで下げ、射出シリンダ1内部の樹脂材料を、ノズル部を経由して射出する。 In step S121, the injection motor 20 is driven, the plunger 25 is lowered to the lowered position, and the resin material inside the injection cylinder 1 is injected via the nozzle portion.

ステップS122では、プランジャ25の位置を維持し、保圧時間が経過するのを待つ。この保圧時間は使用者が自在に設定出来るものとする。型開き時にオープンノズル4より樹脂材料が垂れる場合には、保圧時間経過後に射出モータ20をわずかに上昇させ、ノズル内部の樹脂圧力を低下させる、いわゆるサックバックを行っても良い。 In step S122, the position of the plunger 25 is maintained and the holding pressure time elapses. This holding time can be freely set by the user. If the resin material drips from the open nozzle 4 when the mold is opened, the injection motor 20 may be slightly raised after the holding pressure time has elapsed to lower the resin pressure inside the nozzle, so-called suckback.

ステップS123では型締め部が型開き動作を行うのを待つ。型開き動作は完全に開き切るまで待つ必要はなく、カセット型固定側型板10とオープンノズル4に隙間が空けば良い。 In step S123, the mold clamping portion waits for the mold opening operation. It is not necessary to wait until the mold opening operation is completely opened, and it is sufficient that there is a gap between the cassette type fixed side template 10 and the open nozzle 4.

ステップS124では、外部材料供給機に材料供給を指示する。 In step S124, the external material feeder is instructed to supply the material.

ステップS125では、プランジャ上昇ディレイ時間が経過するのを待つ。プランジャ上昇ディレイ時間は、材料供給機に供給指示をしてから、実際に材料供給口23に樹脂材料が押し出されるまでの時間を待つ。本実施例では100msとしている。この時間の最適な設定値は使用する材料供給機によって変わる為、複数の材料供給機を使い分ける場合には、作業者が自由に設定できるようにしても良い。 In step S125, it waits for the plunger rise delay time to elapse. The plunger rise delay time waits for a time from when the material supply machine is instructed to supply the resin material until the resin material is actually extruded into the material supply port 23. In this example, it is set to 100 ms. Since the optimum set value of this time varies depending on the material feeder to be used, the operator may freely set it when using a plurality of material feeders properly.

ステップS126では、射出モータ20を駆動し、プランジャ25を供給位置へ上昇させる。ここで供給位置とは下降位置から射出量/プランジャ径だけ上昇させた位置である。また、本実施例では第1開閉弁28にチェック弁を使用している為、弁を直接制御する必要はないが、圧縮エアーや電動による切替弁を使用してもよい。その場合はステップS124の前に切替弁を開いて置くと良い。 In step S126, the injection motor 20 is driven to raise the plunger 25 to the supply position. Here, the supply position is a position where the injection amount / plunger diameter is increased from the descending position. Further, in this embodiment, since the check valve is used for the first on-off valve 28, it is not necessary to directly control the valve, but a compressed air or electric switching valve may be used. In that case, it is advisable to open the switching valve before step S124.

ステップS127では、供給停止ディレイ時間が経過するのを待つ。供給停止ディレイタイマはプランジャ25が上昇停止した後、樹脂材料がプランジャ25内に完全に充填されるまでの時間を待つ。本実施例では100msとしている。 In step S127, the supply stop delay time waits for elapse. The supply stop delay timer waits for the time until the resin material is completely filled in the plunger 25 after the plunger 25 has stopped rising. In this example, it is set to 100 ms.

ステップS128では、外部材料供給機に材料供給の停止を指示する。 In step S128, the external material feeder is instructed to stop the material supply.

以上が、1サイクルの動作となる。引き続き成形を行う場合は、型締め後にステップS121から行えば良い。 The above is the operation of one cycle. If molding is to be continued, it may be carried out from step S121 after molding.

<材料供給量の制御方法(パージ動作)>
図14は射出部とシリンダへのパージ動作の例を示すフローチャートである。
<Control method of material supply (purge operation)>
FIG. 14 is a flowchart showing an example of a purging operation for the injection unit and the cylinder.

成形を繰り返し行うと、射出シリンダ1内に樹脂材料から発生したエアーが残留したり、一部の樹脂材料は排出されず、射出シリンダに残留し続ける事が想定される。本パージ動作では、これらの残留エアーや残留樹脂を射出シリンダ1内から排出させるのが目的である。 When the molding is repeated, it is assumed that the air generated from the resin material remains in the injection cylinder 1 or some of the resin material is not discharged and remains in the injection cylinder. The purpose of this purging operation is to discharge these residual air and residual resin from the inside of the injection cylinder 1.

本パージ動作は材料射出前後に行う。実行頻度は本実施例では数サイクルに1度の頻度で行う事を想定しているが、毎回実行する事を含み、それ以外の頻度であっても構わない。また、実行頻度は作業者が自由に変更出来るものや、使用する材料によって自動で最適な実行頻度を選択するようなものでも構わない。 This purging operation is performed before and after material injection. In this embodiment, the execution frequency is assumed to be once every several cycles, but it may be executed every time, and the frequency may be other than that. Further, the execution frequency may be freely changed by the operator or may be such that the optimum execution frequency is automatically selected according to the material used.

本実施例ではフローチャート開始点では型締めは開いており、オープンノズル4の下部にはスペースがあるものとする。パージトレイはアクチュエータに取り付けられており、オープンノズル4下部と型締めの可動範囲外とを移動できるように設けられている。パージトレイのアクチュエータは前記の移動が可能であれば何でも良く、例えば駆動源圧縮空気を原動力としたシリンダを使用しても、電動式モータを使用したものでも良い。 In this embodiment, it is assumed that the mold clamping is open at the start point of the flowchart and there is a space under the open nozzle 4. The purge tray is attached to the actuator and is provided so as to be able to move between the lower part of the open nozzle 4 and the outside of the movable range of the mold clamping. The actuator of the purge tray may be any actuator as long as it can move as described above. For example, a cylinder driven by compressed air as a drive source may be used, or an electric motor may be used.

射出シリンダ1内には樹脂材料が充填されているものとする。以後、図14の流れに沿って材料供給の制御方法を解説する。 It is assumed that the injection cylinder 1 is filled with a resin material. Hereinafter, a method of controlling material supply will be described along the flow of FIG.

ステップS141では、パージ動作を行うか判断する。実行頻度設定によってパージ動作を実行する場合はステップS142に進み、パージ動作を行わず通常の成形動作を行う場合はステップS146へ進む。 In step S141, it is determined whether to perform the purge operation. If the purge operation is executed by setting the execution frequency, the process proceeds to step S142, and if the normal molding operation is performed without performing the purge operation, the process proceeds to step S146.

ステップS142では、パージトレイをパージ位置に移動させる。パージ位置とはパージトレイがオープンノズル4下部にある位置である。 In step S142, the purge tray is moved to the purge position. The purge position is a position where the purge tray is located at the lower part of the open nozzle 4.

ステップS143では、射出モータ20を駆動し、プランジャ25を射出シリンダ1の最下降点へ下降させる。本実施例ではパージ時のプランジャ25の下降位置を最下降点とし、成形時のプランジャ25の下降位置を射出位置としているが、この二つは同じ位置でもよい。 In step S143, the injection motor 20 is driven to lower the plunger 25 to the lowest point of the injection cylinder 1. In this embodiment, the lowering position of the plunger 25 at the time of purging is set as the lowest point, and the lowering position of the plunger 25 at the time of molding is set as the injection position, but these two may be the same position.

ステップS144では、パージ保圧時間が経過するのを待つ。 In step S144, it waits for the purge holding time to elapse.

ステップS145では、パージトレイを待機位置へ移動させる。待機位置とは型締め時にパージトレイが装置と干渉しない位置である。パージトレイ上には排出された樹脂材料が残っているが、これは作業者が取り除いてもよいし、パージトレイにさらにアクチュエータを付け、排出動作をさせてもよい。排出動作は、樹脂材料が取り除ければどのような動作を行わせてもよい。例えば旋回を行い、パージトレイを180℃旋回させ、待機位置下部に取り付けられた廃材入れに樹脂材料を落とすといった動作が出来る。もしくは、パージトレイが待機位置に移動したことに伴って廃材入れへの排出経路が連通し、待機位置に移動することでパージトレイからの樹脂材料の除去が可能なように構成されていてもよい。パージトレイの形状は、図示はしていないが箱形状でも良いし、板状でも良い。箱形状にして、側面にガラス窓を入れると樹脂が出たか出ていないかが外からでも視認できる。トレイの柄が、ロボシリンダと連結されていることが好ましい。 In step S145, the purge tray is moved to the standby position. The standby position is a position where the purge tray does not interfere with the device during mold clamping. The discharged resin material remains on the purge tray, which may be removed by the operator, or an actuator may be further attached to the purge tray to cause the discharge operation. Any operation may be performed as long as the resin material is removed. For example, it is possible to perform an operation such as turning, turning the purge tray by 180 ° C., and dropping the resin material into the waste material container attached to the lower part of the standby position. Alternatively, the discharge route to the waste material container may communicate with the purge tray as it moves to the standby position, and the resin material may be removed from the purge tray by moving to the standby position. Although the shape of the purge tray is not shown, it may be box-shaped or plate-shaped. If you make it into a box shape and put a glass window on the side, you can see from the outside whether the resin has come out or not. It is preferable that the handle of the tray is connected to the Robo cylinder.

ステップS146では型締め部が型締め動作を開始する。以後ステップS147〜ステップS151は型締め動作と並行して行われる。 In step S146, the mold clamping portion starts the mold clamping operation. After that, steps S147 to S151 are performed in parallel with the mold clamping operation.

ステップS147では、外部材料供給機に材料供給を指示する。 In step S147, the external material feeder is instructed to supply the material.

ステップS148では、プランジャ上昇ディレイ時間が経過するのを待つ。プランジャ上昇ディレイ時間は、材料供給機に供給指示をしてから、実際に材料供給口23に樹脂材料が押し出されるまでの時間を待つ。本実施例では100msとしている。この時間の最適な設定値は使用する材料供給機によって変わる為、複数の材料供給機を使い分ける場合には、作業者が自由に設定できるようにしても良い。 In step S148, the plunger rise delay time waits for elapse. The plunger rise delay time waits for a time from when the material supply machine is instructed to supply the resin material until the resin material is actually extruded into the material supply port 23. In this example, it is set to 100 ms. Since the optimum set value of this time varies depending on the material feeder to be used, the operator may freely set it when using a plurality of material feeders properly.

ステップS149では、射出モータ20を駆動し、プランジャ25を供給位置へ上昇させる。ここで供給位置は最下降位置から射出量/プランジャ径+(射出位置-最下降位置)だけ上昇させた位置である。また、本実施例では第1開閉弁28にチェック弁を使用している為、弁の制御は必要ないが、ここで、圧縮エアーや電動による切替弁を使用してもよい。その場合はステップS149の前に切替弁を開いて置くと良い。 In step S149, the injection motor 20 is driven to raise the plunger 25 to the supply position. Here, the supply position is a position raised by the injection amount / plunger diameter + (injection position-minimum lowering position) from the lowest descending position. Further, in this embodiment, since the check valve is used for the first on-off valve 28, it is not necessary to control the valve, but here, a switching valve by compressed air or electric power may be used. In that case, it is advisable to open the switching valve before step S149.

ステップS150では、供給停止ディレイ時間が経過するのを待つ。供給停止ディレイタイマはプランジャ25が上昇停止後、樹脂材料がプランジャ25内に完全に充填されるまでの時間を待つ。本実施例では100msとしている。 In step S150, the supply stop delay time waits for elapse. The supply stop delay timer waits for the time until the resin material is completely filled in the plunger 25 after the plunger 25 has stopped rising. In this example, it is set to 100 ms.

ステップS151では、外部材料供給機に材料供給の停止を指示する。 In step S151, the external material supply machine is instructed to stop the material supply.

以上が、パージ動作を行う時の1サイクルの動作となる。引き続き成形を行う場合は、上述した実施形態のステップS121から行えば良い。また、パージ動作を繰り返し行う場合はステップS141から繰り返し行う。連続してパージを行う場合には最終サイクル以外はステップS146の型締め開始を行う必要はない。 The above is the operation of one cycle when the purge operation is performed. When the molding is continued, it may be carried out from step S121 of the above-described embodiment. If the purging operation is to be repeated, it is repeated from step S141. When purging continuously, it is not necessary to start mold clamping in step S146 except for the final cycle.

以上説明した本実施形態の竪型射出成形機では、図21等に示すように、射出シリンダ1を射出シリンダホルダ39に対して一側方から着脱可能な構成とし、更に射出シリンダ1を射出シリンダホルダ39に装着固定するときにはバネの力と型締め力を利用する簡易な構成としているので、射出シリンダ1の着脱及びその後の清掃(メンテナンス)が簡単であり、装置全体の小型化にも極めて有利な構成となる。また、本実施形態の縦型射出成形機では、図4等に示すように、射出シリンダ1内にてプランジャ25を駆動制御してその軸方向に上下動させるだけで、このプランジャ25の先端部に連結されたプランジャヘッド26に設けられた第一開閉弁28の作動により射出シリンダ1内の材料供給(上流)側空間と材料射出側(下流)側空間との間で圧力差を簡便に調整できるため、射出シリンダ1の構成が複雑化することなく、材料供給と射出動作とを効率良く実施することができ、装置の小型化にも有効である。また、上記の実施形態において説明したように、金型の型締については、トグルリンク機構(シングルトグルリンク)を用いており、トグルリンク機構下19を旋回させるだけで簡易に型締力を発生させることができ、この構造も併せて採用することにより、装置全体の更なる小型化が可能となる。 In the vertical injection molding machine of the present embodiment described above, as shown in FIG. 21 and the like, the injection cylinder 1 is configured to be removable from one side with respect to the injection cylinder holder 39, and the injection cylinder 1 is further attached to the injection cylinder. Since it has a simple structure that uses the spring force and mold clamping force when mounting and fixing to the holder 39, it is easy to attach / detach the injection cylinder 1 and subsequent cleaning (maintenance), which is extremely advantageous for miniaturization of the entire device. Configuration. Further, in the vertical injection molding machine of the present embodiment, as shown in FIG. 4 and the like, the tip portion of the plunger 25 is simply driven and controlled in the injection cylinder 1 and moved up and down in the axial direction thereof. The pressure difference between the material supply (upstream) side space and the material injection side (downstream) side space in the injection cylinder 1 can be easily adjusted by operating the first on-off valve 28 provided in the plunger head 26 connected to the injection cylinder 1. Therefore, the material supply and the injection operation can be efficiently performed without complicating the configuration of the injection cylinder 1, which is also effective for miniaturization of the apparatus. Further, as described in the above embodiment, a toggle link mechanism (single toggle link) is used for mold clamping of the mold, and a mold clamping force is easily generated only by turning 19 under the toggle link mechanism. By adopting this structure as well, the entire device can be further miniaturized.

<材料供給量の制御方法(自動運転 バルブ制御)>
(第二実施形態)
図15は射出部とシリンダへの射出動作の例を示すフローチャートである。これまで説明した実施形態と異なり、射出シリンダ1の供給部(第一開閉弁28)にチェック弁ではなく、圧縮エアーや電動で動作する切替弁を使用している。また、オープンノズル4とカセット型固定側型板10の間にも圧縮エアーや電動で動作する切替弁を使用している。上記実施形態に比べ、材料供給時の圧力差によって、オープンノズル4からの樹脂材料の流出や、チェック弁部からの樹脂材料の逆流が起こりづらい。
<Control method of material supply (automatic operation valve control)>
(Second Embodiment)
FIG. 15 is a flowchart showing an example of injection operation to the injection unit and the cylinder. Unlike the embodiments described so far, the supply unit (first on-off valve 28) of the injection cylinder 1 uses a switching valve that operates by compressed air or electric power instead of a check valve. Further, a switching valve operated by compressed air or electric power is also used between the open nozzle 4 and the cassette type fixed side template 10. Compared with the above embodiment, the outflow of the resin material from the open nozzle 4 and the backflow of the resin material from the check valve portion are less likely to occur due to the pressure difference during material supply.

射出シリンダ1の材料供給部(第一開閉弁28)に設置されたバルブを材料供給バルブ、オープンノズル4とカセット型固定側型板10の間に設置されたバルブをノズルバルブとする。 The valve installed in the material supply section (first on-off valve 28) of the injection cylinder 1 is a material supply valve, and the valve installed between the open nozzle 4 and the cassette type fixed side template 10 is a nozzle valve.

本実施例ではフローチャート開始点では型締めは閉じているものとする。また、材料供給バルブとノズルバルブは共に閉まっているものとする。外部材料供給は事前に供給指示を出しておき、材料供給バルブを開けば樹脂材料はシリンダ内に流れ込むようにしておく。以後、フローチャートの流れに沿って動作内容を解説する。 In this embodiment, it is assumed that the mold clamping is closed at the start point of the flowchart. It is also assumed that both the material supply valve and the nozzle valve are closed. For external material supply, give a supply instruction in advance so that the resin material will flow into the cylinder when the material supply valve is opened. After that, the operation contents will be explained according to the flow of the flowchart.

ステップS161ではノズルバルブを開き、ノズルから流出する樹脂材料が下方(金型)へ排出されるようにしている。 In step S161, the nozzle valve is opened so that the resin material flowing out of the nozzle is discharged downward (mold).

ステップS162ではディレイ時間が経過するのを待つ。ディレイ時間はノズルバルブの動作時間にマージンを追加したものでよく、例えば100msで動作するものとする。 In step S162, the delay time waits for elapse. The delay time may be the operating time of the nozzle valve plus a margin, and is assumed to operate at, for example, 100 ms.

ステップS163において、射出モータ20を駆動し、プランジャ25を下降位置まで下げ、射出シリンダ1内部の樹脂を、ノズル部を経由し金型へ射出する。 In step S163, the injection motor 20 is driven, the plunger 25 is lowered to the lowered position, and the resin inside the injection cylinder 1 is injected into the mold via the nozzle portion.

ステップS164において、保圧時間が経過するのを待つ。保圧時間の経過後は、ステップS165において、ノズルバルブを閉じる。 In step S164, it waits for the holding pressure time to elapse. After the holding pressure time has elapsed, the nozzle valve is closed in step S165.

ステップS166ではディレイ時間が経過するのを待つ。ディレイ時間はノズルバルブの動作時間にマージンを追加したものでよく、例えば100msで動作するものとする。また、型締め動作部はこの時点で型開き動作を開始して良い。 In step S166, the delay time waits for elapse. The delay time may be the operating time of the nozzle valve plus a margin, and is assumed to operate at, for example, 100 ms. Further, the mold clamping operation unit may start the mold opening operation at this point.

ステップS167において、材料供給バルブを開き、射出シリンダ1内部に樹脂材料を流入させる。 In step S167, the material supply valve is opened to allow the resin material to flow into the injection cylinder 1.

ステップS168ではディレイ時間が経過するのを待つ。ディレイ時間はノズルバルブの動作時間にマージンを追加したものでよく、例えば100msで動作するものとする。 In step S168, the delay time elapses. The delay time may be the operating time of the nozzle valve plus a margin, and is assumed to operate at, for example, 100 ms.

ステップS169では、射出モータ20を駆動し、プランジャ25を供給位置へ上昇させる。ここで供給位置は下降位置から射出量/プランジャ径だけ上昇させた位置である。 In step S169, the injection motor 20 is driven to raise the plunger 25 to the supply position. Here, the supply position is a position where the injection amount / plunger diameter is increased from the descending position.

ステップS170において、では供給停止ディレイ時間が経過するのを待つ。供給停止ディレイ時間はプランジャ25の上昇が停止してから、材料がシリンダ内に完全にいきわたるまでの時間で良い。例えば200msで動作するものとする。 In step S170, the process waits for the supply stop delay time to elapse. The supply stop delay time may be the time from when the rise of the plunger 25 is stopped until the material is completely spread in the cylinder. For example, it is assumed that it operates at 200 ms.

ステップS171において、材料供給バルブを閉じる。 In step S171, the material supply valve is closed.

以上が、1サイクルの動作となる。引き続き成形を行う場合は、型締め後にステップS121から行えば良い。 The above is the operation of one cycle. If molding is to be continued, it may be carried out from step S121 after molding.

<材料供給量の制御方法(自動運転 2次供給動作)>
(第三実施形態)
図16は射出部とシリンダへの射出動作の他の例を示すフローチャートである。第一実施形態と異なり、材料供給部にシリンダとそれを動作させるモータが設置されている。充填を2工程で行う事により、外部材料供給機の樹脂材料の射出圧力が安定していない場合でも、シリンダ内へのシリンダへの樹脂材料の供給圧を一定に保つ事が出来る為、射出シリンダ1の射出量を安定させる事が出来る。
<Control method of material supply amount (automatic operation secondary supply operation)>
(Third Embodiment)
FIG. 16 is a flowchart showing another example of the injection operation to the injection unit and the cylinder. Unlike the first embodiment, a cylinder and a motor for operating the cylinder are installed in the material supply unit. By performing filling in two steps, even if the injection pressure of the resin material of the external material feeder is not stable, the supply pressure of the resin material to the cylinder can be kept constant, so the injection cylinder The injection amount of 1 can be stabilized.

外部供給装置の材料供給を材料供給シリンダへ押し出す圧力Pdは、チェック弁開放の必要圧力Poより小さいPd<Poとなる。もし、Pd≧Poとなる外部材料供給装置を使用する場合は、材料供給シリンダと外部材料供給機の間に流路を開閉できるバルブを設置し、外部材料供給機に常に材料供給指示を出して置き、バルブの開閉指示で樹脂材料の投入と停止を制御しても良い。 The pressure Pd for pushing the material supply of the external supply device to the material supply cylinder is Pd <Po, which is smaller than the required pressure Po for opening the check valve. If an external material supply device with Pd ≥ Po is used, a valve that can open and close the flow path is installed between the material supply cylinder and the external material supply machine, and the material supply instruction is always issued to the external material supply machine. It may be placed and the injection and stop of the resin material may be controlled by the opening / closing instruction of the valve.

本実施例の追加機構の説明をする。ミキサホルダ33後部に材料供給シリンダと材料供給プランジャを持つ。材料供給プランジャは材料供給モータと連結し、プランジャは前後に動作出来る。材料供給シリンダは外部材料供給機と連結された材料供給口と、材料供給口を開閉する材料供給バルブを持つ。外部材料供給機に材料供給指示を出し、材料供給バルブを開くと樹脂材料は材料供給シリンダ内に流れ込む。材料供給バルブは圧縮空気を使用したものでも、電動式のものでも良い。 The additional mechanism of this embodiment will be described. A material supply cylinder and a material supply plunger are provided at the rear of the mixer holder 33. The material supply plunger is connected to the material supply motor, and the plunger can move back and forth. The material supply cylinder has a material supply port connected to an external material supply machine and a material supply valve that opens and closes the material supply port. When the material supply instruction is issued to the external material supply machine and the material supply valve is opened, the resin material flows into the material supply cylinder. The material supply valve may be one using compressed air or an electric one.

以後、図16の流れに沿って材料供給の制御方法を解説する。 Hereinafter, a method of controlling material supply will be described along the flow of FIG.

ステップS181において、射出モータ20を駆動し、プランジャ25を下降位置まで下げ、射出シリンダ1内部の樹脂を、ノズル部を経由して射出する。 In step S181, the injection motor 20 is driven, the plunger 25 is lowered to the lowered position, and the resin inside the injection cylinder 1 is injected via the nozzle portion.

ステップS182では、プランジャ25の位置を維持し、保圧時間が経過するのを待つ。この保圧時間は使用者が自在に設定出来るものとする。型開き時にオープンノズル4より樹脂材料が垂れる場合には、保圧時間経過後に射出モータ20をわずかに上昇させ、ノズル内部の樹脂圧力を低下させる、いわゆるサックバックを行っても良い。 In step S182, the position of the plunger 25 is maintained and the holding pressure time elapses. This holding time can be freely set by the user. If the resin material drips from the open nozzle 4 when the mold is opened, the injection motor 20 may be slightly raised after the holding pressure time has elapsed to lower the resin pressure inside the nozzle, so-called suckback.

ステップS183では型締め部が型開き動作を行うのを待つ。型開き動作は完全に開き切るまで待つ必要はなく、カセット型固定側型板10とオープンノズル4に隙間が空けば良い。 In step S183, the mold clamping portion waits for the mold opening operation. It is not necessary to wait until the mold opening operation is completely opened, and it is sufficient that there is a gap between the cassette type fixed side template 10 and the open nozzle 4.

ステップS184では材料供給モータを前進し、材料供給シリンダを前進させる。この時、材料供給シリンダが樹脂材料を押す力は材料供給口23のチェック弁を開閉させる圧力より、高い。材料供給モータの制御方法はトルク制御が望ましいが、前記のような相対的な圧力関係を満たしていれば、他の制御方法でも良い。 In step S184, the material supply motor is advanced and the material supply cylinder is advanced. At this time, the force with which the material supply cylinder pushes the resin material is higher than the pressure for opening and closing the check valve of the material supply port 23. Torque control is desirable as the control method for the material supply motor, but other control methods may be used as long as the relative pressure relationship as described above is satisfied.

ステップS184では材料供給モータを前進し、材料供給シリンダを前進させる。この時、材料供給シリンダが樹脂材料を押す圧力Pmは材料供給口23のチェック弁(第に開閉弁32)開放の必要圧力Poより高く、ノズル射出必要圧力Pnより低くなっている。つまりPn>Pm>Poとなる。 In step S184, the material supply motor is advanced and the material supply cylinder is advanced. At this time, the pressure Pm at which the material supply cylinder pushes the resin material is higher than the required pressure Po for opening the check valve (first on-off valve 32) of the material supply port 23 and lower than the nozzle injection required pressure Pn. That is, Pn> Pm> Po.

ステップS185では、射出モータ20を駆動し、プランジャ25を供給位置から弁閉じ量分上昇させた位置で停止させる。ここで供給位置は下降位置から射出量/プランジャ径だけ上昇させた位置である。弁閉じ量についてS188で解説する。この時点で、射出シリンダ1内は樹脂材料で満たされている。 In step S185, the injection motor 20 is driven, and the plunger 25 is stopped at a position raised by the valve closing amount from the supply position. Here, the supply position is a position where the injection amount / plunger diameter is increased from the descending position. The valve closing amount will be described in S188. At this point, the inside of the injection cylinder 1 is filled with a resin material.

ステップS186では、供給停止ディレイ時間が経過するのを待つ。このタイマはプランジャ25が上昇を停止してから材料供給部から送られる樹脂材料が射出シリンダ1に満たされるまでの時間である。この時間は樹脂材料の種類によって設定値を変える必要があり、作業者がタイマ値を自由に設定できるようにしても良い。また、作業者から指示された樹脂材料によって自動的にタイマ値を決定するものでも良い。 In step S186, the supply stop delay time waits for elapse. This timer is the time from when the plunger 25 stops rising until the resin material sent from the material supply unit is filled in the injection cylinder 1. It is necessary to change the set value for this time depending on the type of resin material, and the operator may be able to freely set the timer value. Further, the timer value may be automatically determined by the resin material instructed by the operator.

ステップS187では、射出モータ20を停止し、プランジャ25を供給位置へ上昇させる。 In step S187, the injection motor 20 is stopped and the plunger 25 is raised to the supply position.

ステップS188では、材料供給シリンダが停止するのを待つ。射出モータ20を駆動し、プランジャ25を弁閉じ量分下降させる。この時シリンダ内圧Piはノズル射出必要圧力Pnより低くチェック弁閉必要圧力Tcよりも高い、つまりPn>Pi>Pcが成り立つようになっている。内圧の調整方法は弁閉じ量で行う。この数値は作業者が自由に調整できるようにしても良い。また、射出シリンダの内部圧力検知手段を設置し、内圧を監視しながら、動的に定めても良い。 In step S188, it waits for the material supply cylinder to stop. The injection motor 20 is driven, and the plunger 25 is lowered by the valve closing amount. At this time, the cylinder internal pressure Pi is lower than the nozzle injection required pressure Pn and higher than the check valve closing required pressure Tc, that is, Pn> Pi> Pc holds. The internal pressure is adjusted by the valve closing amount. This value may be freely adjusted by the operator. Further, the internal pressure detecting means of the injection cylinder may be installed and dynamically determined while monitoring the internal pressure.

ステップS188では、外部材料供給機へ材料供給指示を出す。また、材料供給シリンダと外部材料供給機の間にバルブを設置した場合は、バルブを開く。 In step S188, a material supply instruction is issued to the external material supply machine. If a valve is installed between the material supply cylinder and the external material supply machine, open the valve.

ステップS189では、材料供給プランジャ後退ディレイ時間が経過するのを待つ。このタイマは材料供給シリンダ内に樹脂材料が満たされるまでの時間である。また、材料供給シリンダと外部材料供給機の間にバルブを設置した場合は、その動作時間も含める。 In step S189, the material supply plunger retreat delay time waits for elapse. This timer is the time until the resin material is filled in the material supply cylinder. If a valve is installed between the material supply cylinder and the external material supply machine, its operating time is also included.

ステップS190では、材料供給モータを動作させ、材料供給シリンダを後退位置に移動させる。 In step S190, the material supply motor is operated to move the material supply cylinder to the retracted position.

ステップS191では、供給停止ディレイ時間が経過するのを待つ。このタイマは材料供給シリンダ内に樹脂材料が満たされるまでの時間である。 In step S191, it waits for the supply stop delay time to elapse. This timer is the time until the resin material is filled in the material supply cylinder.

ステップS188では、外部材料供給機へ材料供給停止指示を出す。また、材料供給シリンダと外部材料供給機の間にバルブを設置した場合は、バルブを閉じる。 In step S188, a material supply stop instruction is issued to the external material supply machine. If a valve is installed between the material supply cylinder and the external material supply machine, close the valve.

本発明に係る射出成形機およびその制御方法は、以上説明した実施形態に限られず、本発明の技術思想を逸脱しない範囲で種々の変更を施すことが可能である。 The injection molding machine and its control method according to the present invention are not limited to the embodiments described above, and various modifications can be made without departing from the technical idea of the present invention.

1. 射出シリンダ
2. バンドヒータ
3. 固定側プラテン
4. オープンノズル
5. シャットオフノズル
6. 固定側型板ホルダ
7. カセット型可動側型板
8. カセット型受板
9. 可動側型板ホルダ
10. カセット型固定側型板
11. カセット型リターンピン
12. カセット型エジェクタピン
13. カセット型エジェクタプレート
14. Oリング
15. 弁爪
16. ノズルプレート
17. 射出ボールねじ
18. トグルリンク機構上
19. トグルリンク機構下
20. 射出モータ
21. 射出ベルト
22. 射出ボールねじ
23. 材料供給口
24. タイバ
25. プランジャ
26. プランジャヘッド
27. 樹脂穴ガイドリング
28. 第一開閉弁
29. スプリング
30. ミキサ
31. チェックホルダ
32. 第二開閉弁
33. ミキサホルダ
34. ガイドポスト
35. プランジャガイドプレート
36. ノズル樹脂出口
37. 断熱板
38. ロケートリング
39. 射出シリンダホルダ
40. シリンダオサエ
41. ベースプレート
42. 型締ボールネジ
43. 型締モータ
44. ボールネジサポート前
45. 従動プーリ
46. 駆動プーリ
47. シリンダバックプレート
48. プランジャホルダ
49. ノズルタッチバネ
50. リンクカムフォロア
51. ナットホルダ
52. 射出軸受け
53. メインフレーム
54. 電装BOX
55. キャスター
56. アンカーLアングル
57. レベルパッド
58. リンク軸
59. リンク軸ロング
60. ノズル樹脂流路
61. シリンダ樹脂流路
62. 合流通路
63. 分岐点
64. ブッシュ
65. シール
66. ホルダ足
67. 射出センサフラッグ
68. 射出センサ取り付け板
69. ディスペンサ
70. ノズルオサエ
71. ノズルくさびブロック
72. 交換出口
73. カートリッジジョイント
74. リテインナット
1. Injection cylinder 2. Band heater 3. Fixed platen 4. Open nozzle 5. Shut-off nozzle 6. Fixed side template holder 7. Cassette type movable side template 8. Cassette type receiving plate 9. Movable side template holder 10. Cassette type fixed side template 11. Cassette type return pin 12. Cassette type ejector pin 13. Cassette type ejector plate 14. O ring 15. Valve claw 16. Nozzle plate 17. Injection ball screw 18. Toggle link mechanism top 19 Under the toggle link mechanism 20. Injection motor 21. Injection belt 22. Injection ball screw 23. Material supply port 24. Tie bar 25. Plunger 26. Plunger head 27. Resin hole guide ring 28. First on-off valve 29. Spring 30. Mixer 31. Check holder 32. Second on-off valve 33. Mixer holder 34. Guide post 35. Plunger guide plate 36. Nozzle resin outlet 37. Insulation plate 38. Locating ring 39. Injection cylinder holder 40. Cylinder cassette 41. Base plate 42. Molding ball screw 43. Molding motor 44. Before ball screw support 45. Driven pulley 46. Drive pulley 47. Cylinder back plate 48. Plunger holder 49. Nozzle touch spring 50. Link cam follower 51. Nut holder 52. Injection bearing 53. Main Frame 54. Electrical BOX
55. Caster 56. Anchor L angle 57. Level pad 58. Link shaft 59. Link shaft long 60. Nozzle resin flow path 61. Cylinder resin flow path 62. Confluence passage 63. Branch point 64. Bush 65. Seal 66. Holder Feet 67. Injection sensor flag 68. Injection sensor mounting plate 69. Dispenser 70. Nozzle sash 71. Nozzle wedge block 72. Replacement outlet 73. Cartridge joint 74. Retain nut

Claims (6)

樹脂供給部からの液状の樹脂を溶融射出すべく設けられた射出シリンダと、
前記射出シリンダ内部に設けられた流路の先端に設けられたノズルと、
記射出シリンダ内部に設けられ、先端に押圧部を有するプランジャと、
前記プランジャを移動することで前記ノズルから射出させる駆動手段と、
前記射出シリンダ内に設けられた第一開閉弁と
前記樹脂供給部から前記射出シリンダに樹脂を供給する第二開閉弁と、を備え、
前記第一開閉弁よりも前記ノズル側における前記射出シリンダと前記プランジャとの間の第1の空間と、
前記第一開閉弁よりも前記樹脂供給部側における前記射出シリンダと前記プランジャとの間の第2の空間と、を有し、
前記プランジャを前記ノズルに近づけるように移動させることによって、前記第1の空間に充填された樹脂を前記ノズルから射出させると同時に、樹脂の圧力差を利用して前記第二開閉弁を通して前記樹脂供給部から前記第2の空間へ樹脂を供給し、
前記プランジャを前記ノズルから遠ざかるように移動させることによって、樹脂の圧力差を利用して前記第一開閉弁を通して前記第2の空間から前記第1の空間へ樹脂を供給することを特徴とする射出成形機。
An injection cylinder which the liquid resin was kicked melt injection all rather setting of the resin feed section,
A nozzle provided at the tip of the flow path provided inside the injection cylinder and
Provided inside before Symbol injection cylinder, a plunger having a pressing portion at the tip,
Driving means for injection before Symbol nozzle by moving the plunger,
A first shut-off valve was provided, et al in the injection cylinder,
A second on-off valve for supplying resin from the resin supply unit to the injection cylinder is provided.
A first space between the injection cylinder and the plunger on the nozzle side of the first on-off valve,
It has a second space between the injection cylinder and the plunger on the resin supply unit side of the first on-off valve.
By moving the plunger closer to the nozzle, the resin filled in the first space is ejected from the nozzle, and at the same time, the resin is supplied through the second on-off valve by utilizing the pressure difference of the resin. The resin is supplied from the part to the second space,
By moving the plunger away from the nozzle, and characterized by utilizing a pressure difference of the resin through the first shut-off valve for supplying the resin into the first space from the second space Injection molding machine.
記射出シリンダの流路内径と嵌合し、かつ前記押圧部の外周に複数の流路穴が設けられたリング状部材を有し、
前記第一開閉弁は、前記流路内における前記第一開閉弁の前後での樹脂の圧力差で前記複数の流路穴を開閉する
ことを特徴とする請求項1に記載の射出成形機。
Fitted to the flow path inner diameter of the front Symbol injection cylinder, and has a ring-shaped member provided with a plurality of flow through holes in the outer periphery of the pressing portion,
The first on-off valve, an injection molding machine according to claim 1, characterized in that opening and closing the plurality of flow through holes in the pressure difference between the resin before and after the first shut-off valve in the flow path.
前記第一開閉弁は、樹脂の流動方向に沿ってバネで付勢されていること
を特徴とする請求項1または2に記載の射出成形機。
The injection molding machine according to claim 1 or 2, wherein the first on-off valve is urged by a spring along the flow direction of the resin.
前記プランジャの移動は、前記射出シリンダの内壁上端側に備えたブッシュの内径と、
前記押圧部の外周に設けられた複数の流路穴の外径とで案内される
ことを特徴とする請求項1から3のいずれか一項に記載の射出成形機。
The movement of the plunger is based on the inner diameter of the bush provided on the upper end side of the inner wall of the injection cylinder.
The injection molding machine according to any one of claims 1 to 3, wherein the injection molding machine is guided by the outer diameters of a plurality of flow path holes provided on the outer periphery of the pressing portion.
記第二開閉弁は、紡錘形状であって、供給経路内を流動方向に微動可能に設けられ、前記供給経路内における前後での樹脂の圧力差で開閉すること
を特徴とする請求項1から4のいずれか一項に記載の射出成形機。
Prior Symbol second shut-off valve, according to a spinning spindle shape, a supply path is provided to be finely moved in the direction of flow, characterized in that open and close at a pressure difference of the resin before and after in the feed path The injection molding machine according to any one of Items 1 to 4.
前記射出シリンダを保持するシリンダホルダを備え、
前記射出シリンダにおける前記シリンダホルダからの離脱方向と、前記射出シリンダに対して前記供給経路が設けられる方向が同一であり、
前記射出シリンダを前記供給経路側に傾けることによって、前記射出シリンダを前記シリンダホルダから取り外せること
を特徴とする請求項5に記載の射出成形機。
A cylinder holder for holding the injection cylinder is provided.
The direction in which the injection cylinder is detached from the cylinder holder and the direction in which the supply path is provided for the injection cylinder are the same.
The injection molding machine according to claim 5, wherein the injection cylinder can be removed from the cylinder holder by tilting the injection cylinder toward the supply path side.
JP2016220911A 2016-11-11 2016-11-11 Injection molding machine and its control method Active JP6872885B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016220911A JP6872885B2 (en) 2016-11-11 2016-11-11 Injection molding machine and its control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016220911A JP6872885B2 (en) 2016-11-11 2016-11-11 Injection molding machine and its control method

Publications (2)

Publication Number Publication Date
JP2018075816A JP2018075816A (en) 2018-05-17
JP6872885B2 true JP6872885B2 (en) 2021-05-19

Family

ID=62150050

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016220911A Active JP6872885B2 (en) 2016-11-11 2016-11-11 Injection molding machine and its control method

Country Status (1)

Country Link
JP (1) JP6872885B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7420539B2 (en) 2019-12-06 2024-01-23 ファナック株式会社 Injection molding machine control device and control method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60234805A (en) * 1984-05-09 1985-11-21 株式会社日立製作所 High-pressure high-speed injection molding machine
JPS63178114U (en) * 1987-04-03 1988-11-17
JPH0236419U (en) * 1988-09-01 1990-03-09
EP0846050B1 (en) * 1995-08-23 1999-05-12 Ettlinger Kunststoffmaschinen GmbH Injection moulding machine with integrated hot channel system
JP4117754B2 (en) * 1999-11-26 2008-07-16 松下電器産業株式会社 Injection method of injection molding machine
JP5350554B1 (en) * 2013-05-17 2013-11-27 センチュリーイノヴェーション株式会社 Injection device in molding machine
JP5572257B1 (en) * 2013-11-18 2014-08-13 センチュリーイノヴェーション株式会社 Resin-bonded first member and second member

Also Published As

Publication number Publication date
JP2018075816A (en) 2018-05-17

Similar Documents

Publication Publication Date Title
JP7182658B2 (en) Apparatus and method for plastic molding by shaper module
US20090101669A1 (en) Dispensing apparatus with heat exchanger and method of using same
KR102360684B1 (en) Molding machine and method of molding a part
US20160089832A1 (en) Resin bonding device
JP6630826B2 (en) Grease exchange method and grease suction device
JP6872885B2 (en) Injection molding machine and its control method
CN209955176U (en) Multi-station temperature control injection molding machine
KR20120085440A (en) Staking tool with hot wind
WO2020243375A1 (en) Injection molding machine
JP5546123B2 (en) Pre-plastic injection device
JP6758381B2 (en) Parts molding method
KR101374828B1 (en) Vacuum centrifugal casting apparatus with mold changer rail
JP5377502B2 (en) Mold tool with built-in injector
JP2020055198A (en) Injection molding machine
CN110814281A (en) Pneumatic die head preparation device and method
KR101688205B1 (en) Molten light metal casting apparatus using a vacuum
CN218190339U (en) Release agent spraying mechanism
US20220258389A1 (en) Machine for injecting thermoplastic material
CN211756476U (en) Servo dispensing system
CN220721637U (en) Semi-automatic filling machine
KR101307433B1 (en) Method and Apparatus for Rapidly Heating and Cooling the Mold Apparatus
RU2427449C1 (en) Gasostatic extruder
US20150321248A1 (en) Apparatus for injecting molten metal into a die cast machine and methods and control systems for cooling the same
KR20180009282A (en) Fully Automatic Wax Injection Machine
KR20170090761A (en) An injection mold having a PET dust extraction systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191111

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20191111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201211

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20201218

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20210125

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210216

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210322

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210420

R150 Certificate of patent or registration of utility model

Ref document number: 6872885

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250