JP6825468B2 - Sending method - Google Patents

Sending method Download PDF

Info

Publication number
JP6825468B2
JP6825468B2 JP2017080703A JP2017080703A JP6825468B2 JP 6825468 B2 JP6825468 B2 JP 6825468B2 JP 2017080703 A JP2017080703 A JP 2017080703A JP 2017080703 A JP2017080703 A JP 2017080703A JP 6825468 B2 JP6825468 B2 JP 6825468B2
Authority
JP
Japan
Prior art keywords
pier
delivery
hand
bridge body
abutment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017080703A
Other languages
Japanese (ja)
Other versions
JP2018178572A (en
Inventor
敏 葛西
敏 葛西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
JFE Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Engineering Corp filed Critical JFE Engineering Corp
Priority to JP2017080703A priority Critical patent/JP6825468B2/en
Publication of JP2018178572A publication Critical patent/JP2018178572A/en
Application granted granted Critical
Publication of JP6825468B2 publication Critical patent/JP6825468B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、手延機を取り付けた橋体を橋軸方向に移動させる送り出し工法に関する。 The present invention relates to a delivery method for moving a bridge body to which a hand-rolling machine is attached in the direction of the bridge axis.

橋体の架設工法の一種として、手延機を取り付けた橋体を橋軸方向に移動させる送り出し工法が知られている。橋体は、送り出し装置によって橋脚の径間を片持ち状態で送り出される。径間が長い場合、橋体が先の橋脚に到達する前に、橋体に大きな曲げモーメントが発生し、橋体が変形や破損するおそれがある。これを防止するために、橋体の先に橋体よりも軽い手延機を取り付け、手延機が先に橋脚に到達するように送り出し、手延機及び橋体を両持ち状態にして送り出す手延機を用いた送り出し工法が採用されている(特許文献1参照)。 As a kind of bridge erection method, a delivery method is known in which a bridge body with a hand-rolling machine is moved in the direction of the bridge axis. The bridge body is sent out in a cantilevered state between the spans of the piers by the sending device. If the span is long, a large bending moment is generated in the bridge body before the bridge body reaches the previous pier, and the bridge body may be deformed or damaged. In order to prevent this, a hand-rolling machine that is lighter than the bridge body is attached to the tip of the bridge body, and the hand-rolling machine is sent out so that it reaches the pier first, and the hand-rolling machine and the bridge body are sent out with both hands held. A feeding method using a hand-rolling machine is adopted (see Patent Document 1).

特開2016−108771号公報Japanese Unexamined Patent Publication No. 2016-108771

しかし、従来の手延機を用いた送り出し工法において、橋台にパラペットが施工されている場合、パラペットを避けるために、手延機を高い位置で送り出す必要があるという課題がある。橋脚に既設桁が施工されている場合も同様である。 However, in the conventional feeding method using a hand-rolling machine, when a parapet is installed on the abutment, there is a problem that the hand-rolling machine needs to be fed at a high position in order to avoid the parapet. The same applies when an existing girder is installed on the pier.

すなわち、図3に示すように、まず、手延機11を高い位置で送り出せるように、橋台12及び橋脚13,13の上に、支承、送り出し装置、架台等の設備14を設置する。そして、送り出し装置によって、手延機11及び橋体15,15をパラペット12aを避けた高い位置で送り出す(S1)。橋体15が橋台12に到達後(S2)、手延機11を撤去し、油圧ジャッキ等を用いたジャッキダウン工法によって、橋体15,15,15を橋台12及び橋脚13,13に設置する(S3)。 That is, as shown in FIG. 3, first, as Okuridaseru the Tenobeki 11 at a high position, above the abutment 12 and the abutment 13 1, 13 2, placed bearing, delivery device, the equipment 14 of the gantry such .. The delivery device by Tenobeki 11 and Hashitai 15 1, 15 sends 2 at a high position avoiding the parapet 12a a (S1). After the bridge body 15 1 reaches the bridge base 12 (S2), the hand-rolling machine 11 is removed, and the bridge bodies 15 1 , 15 2 , 15 3 are replaced with the bridge body 12 and the pier 13 1 by the jack-down method using a hydraulic jack or the like. , installed in 13 2 (S3).

橋台12のパラペット12aの高さが高い場合、橋脚13,13から例えば5m以上の高い位置で手延機11及び橋体15,15,15を送り出すことになる。この場合、橋台12及び橋脚13,13の上に支承、送り出し装置、架台等の大掛かりな設備が必要になる。特に陸上部から離れた河川内の橋脚上に設備を設置するとき、クレーンの作業半径が大きくなり、大型重機が必要になる。さらに、ジャッキダウン工法で橋体15,15,15を橋脚13,13毎に少しずつ、例えば10〜15cmずつ降下させるので、降下作業に手間と時間がかかる。 If the height of the parapet 12a of abutment 12 is high, resulting in feeding the pier 13 1, 13 hand caster 11 and Hashitai 15 1 2 For example, in a high position above 5 m, 15 2, 15 3. In this case, bearing on the abutment 12 and the abutment 13 1, 13 2, delivery device, it is necessary to large-scale equipment of the gantry, and the like. Especially when installing equipment on a pier in a river away from the land, the working radius of the crane becomes large and a large heavy machine is required. Furthermore, in the jack-down construction method the bridge member 15 1, 15 2, 15 3 little by little 13 1, 13 every two piers, for example because the lowering by 10 to 15 cm, labor and time consuming to fall operations.

そこで、本発明は、送り出し先に橋台のパラペット、橋脚上の既設桁等の障害物があっても、橋体を低い位置で送り出すことができる送り出し工法を提供することを目的とする。 Therefore, an object of the present invention is to provide a delivery method capable of delivering a bridge body at a low position even if there is an obstacle such as a parapet of a bridge stand or an existing girder on a pier at the delivery destination.

上記課題を解決するために、本発明は、手延機を取り付けた橋体を橋軸方向に移動させる送り出し工法において、前記橋体が最終径間に到達した後、前記手延機が送り出し先の橋台又は橋脚の障害物に干渉しないように前記手延機を前記橋体の高い位置に取り付け直す工程と、前記工程後、前記橋体が前記送り出し先の前記橋台又は前記橋脚に到達するまで前記橋体を送り出し、前記送り出し先の前記橋台又は前記橋脚に設置する工程と、を備える送り出し工法である。 In order to solve the above problems, the present invention presents a feeding method in which a bridge body to which a hand-rolling machine is attached is moved in the direction of the bridge axis, and after the bridge body reaches the final span, the hand-rolling machine is sent to a destination. The step of reattaching the hand-rolling machine to a high position of the bridge body so as not to interfere with the obstacles of the bridge pier or the pier, and after the step, until the bridge body reaches the bridge pier or the pier of the delivery destination. This is a delivery method including a step of sending out the bridge body and installing it on the abutment or the pier of the delivery destination.

本発明によれば、送り出し先にパラペット、既設桁等の障害物があっても、橋体を低い位置で送り出すことができる。このため、橋台及び橋脚の上の設備を軽減でき、橋体の降下作業も大幅に軽減する。また、橋体を低い位置で送り出せるので、安全性が極めて高い送り出し工法になる。 According to the present invention, the bridge body can be sent out at a low position even if there is an obstacle such as a parapet or an existing girder at the sending destination. Therefore, the equipment on the abutment and the pier can be reduced, and the descent work of the bridge body is also greatly reduced. In addition, since the bridge body can be sent out at a low position, it is a very safe sending method.

本発明の一実施形態の送り出し工法の工程図である。It is a process drawing of the delivery method of one Embodiment of this invention. 送り出しヤードを示す図である。It is a figure which shows the delivery yard. 従来の送り出し工法の工程図である。It is a process diagram of the conventional delivery method.

以下、添付図面を参照して、本発明の実施形態の送り出し工法を説明する。ただし、本発明の送り出し工法は種々の形態で具体化することができ、明細書に記載される実施形態に限定されるものではない。本実施形態は、明細書の開示を十分にすることによって、当業者が発明の範囲を十分に理解できるようにする意図をもって提供されるものである。 Hereinafter, the delivery method according to the embodiment of the present invention will be described with reference to the accompanying drawings. However, the delivery method of the present invention can be embodied in various forms, and is not limited to the embodiments described in the specification. The present embodiment is provided with the intention of allowing those skilled in the art to fully understand the scope of the invention by adequately disclosing the specification.

図1は、本発明の実施形態の送り出し工法の工程図を示す。1は手延機、2,2,2は接合された橋体、3は連結構、4は送り出し先の橋台、5,5は橋脚である。橋台4には、低く送り出す際に障害となるパラペット4aが設けられている。橋体2の上面には、予めブラケット6が取り付けられている。 FIG. 1 shows a process diagram of a delivery method according to an embodiment of the present invention. 1 Tenobe machine, 2 1, 2 2, 2 3 bridges body joined, 3 communicating fine, 4 delivery destination abutment, 5 1, 5 2 is piers. The abutment 4 is provided with a parapet 4a, which is an obstacle when sending out low. On the upper surface of Hashitai 2 1, in advance bracket 6 is attached.

S1に示すように、橋体2,2の先に連結構3を介して手延機1を取り付け、手延機1及び橋体2,2を図1の右から左に向かって送り出す。橋台、橋脚には、予め支承、送り出し装置、架台等の設備が設置されている。これらの設備は、陸上部に設置したクレーンにより設置されてもよいし、手延機1に設置したクレーンにより設置されてもよい。手延機1及び橋体2,2は、手延機1がパラペット4aに干渉するような低い位置で送り出される。このため、これらの設備を最小限にすることができる。 As shown in S1, attaching a hand caster 1 through Hashitai 2 1, 2 2 of the previously continuous fine 3, toward the left Tenobeki 1 and Hashitai 2 1, 2 2 from right Figure 1 And send it out. Equipment such as bearings, delivery devices, and pedestals are installed in advance on the abutments and piers. These facilities may be installed by a crane installed on the land portion, or may be installed by a crane installed on the hand-rolling machine 1. The hand-rolling machine 1 and the bridge bodies 2 1 and 2 2 are sent out at a low position so that the hand-rolling machine 1 interferes with the parapet 4a. Therefore, these facilities can be minimized.

支承、送り出し装置には、例えば、鉛直ジャッキ(支承)と押し引き用水平ジャッキ(送り出し装置)を交互に尺取り虫のように動かすもの、水平ジャッキとスライディングブロックとの組み合わせによって橋体を移動させ、垂直ジャッキにて盛り替えるスライディングブロック付き送り出し装置、キャタピラ式送り出し装置等を用いることができる。 The bearing and feeding devices include, for example, a device that alternately moves a vertical jack (bearing) and a horizontal jack for pushing and pulling (feeding device) like a scale insect, and a combination of a horizontal jack and a sliding block to move the bridge body vertically. A feeding device with a sliding block, a caterpillar type feeding device, or the like that can be replaced with a jack can be used.

S1に示すように、橋体2が最終径間L、すなわち橋台4の一つ手前の橋脚5に到達したとき、送り出しを停止する。この実施形態では、橋体2が最終径間Lに到達し、さらに手延機1が橋台4に到達したとき、送り出しを停止する。そして、S2に示すように、手延機1を橋体2から取り外し、手延機1が橋台4に干渉しないように手延機1を橋体2の高い位置に取り付け直す。橋体2の上面には、手延機1を高い位置に取り付けるためのブラケット6が取り付けられている。手延機1は、連結構3を介してこのブラケット6に取り付けられる。手延機1の橋体2側の一端は、図示しないジャッキングホイスト等の吊り装置で持ち上げられる。手延機1の橋台4側の一端は、橋台4付近に設置したクレーン7で持ち上げられる。橋台4付近は陸上部であるので、クレーン7を配置し易い。あるいは橋台4上に設置された油圧ジャッキによってジャッキアップされても良い。 As shown in S1, Hashitai 2 1 final span L, that when it reaches the one before the pier 5 1 of abutment 4, to stop the delivery. In this embodiment, Hashitai 2 1 reaches the final span L, more when Tenobe machine 1 reaches the abutment 4, to stop the delivery. Then, as shown in S2, remove the Tenobeki 1 from Hashitai 2 1, Tenobeki 1 reinstalled in a higher position to Tenobe machine 1 of Hashitai 2 1 so as not to interfere with the abutment 4. On the upper surface of Hashitai 2 1, the bracket 6 for attaching the Tenobeki 1 at a higher position is attached. The hand-rolling machine 1 is attached to the bracket 6 via the connecting structure 3. Bridge member 2 1 side end of Tenobeki 1 is lifted by lifting apparatus such as jacking hoist (not shown). One end of the hand-rolling machine 1 on the abutment 4 side is lifted by a crane 7 installed near the abutment 4. Since the vicinity of the abutment 4 is on land, it is easy to arrange the crane 7. Alternatively, it may be jacked up by a hydraulic jack installed on the pier 4.

S3に示すように、送り出し装置を用いて、高い位置に取り付け直した手延機1と橋体2,2,2を橋台4に向かって図1中に右から左に送り出す。手延機1を高い位置に取り付け直すことで、手延機1にセッティングビームと同様の機能を持たせる、すなわち橋体2,2,2を低い位置に保ったまま手延機1が橋台4に仮受けされた状態をつくり出すことができる。なお、ブラケット6の6aは圧縮荷重かがかかる支圧構造、6bは引張り荷重がかかる剛結合又はピン結合を示す。ブラケット6への荷重のかかり方はセッティングビームと同様である。 As shown in S3, feeding by using a device, 1 Tenobe machine 1 and Hashitai 2 reinstalled in a higher position, 2 2, 2 sends 3 from right in FIG. 1 toward the abutment 4 to the left. By reseated Tenobeki 1 at a high position, to have the same function as setting beam Tenobeki 1, i.e. Hashitai 2 1, 2 2, 2 3 while maintaining the lower position the hand caster 1 Can create a state in which is temporarily received by the abutment 4. Note that 6a of the bracket 6 indicates a bearing structure to which a compressive load is applied, and 6b indicates a rigid connection or a pin connection to which a tensile load is applied. The method of applying the load to the bracket 6 is the same as that of the setting beam.

S3に示すように、手延機1が橋台4を過ぎたら、手延機1の過ぎた部分を撤去する。S4に示すように、橋体2が橋台4に到達したら、送り出しを停止し、手延機1、ブラケット6を撤去する。そして、ジャッキダウン工法により橋体2,2,2を降下させ、橋体2,2,2を橋台4及び橋脚5,5に設置する。降下量は、送り出し装置と必要最小限の架台の分で済むので、例えば70cm〜1mである。 As shown in S3, when the hand-rolling machine 1 has passed the abutment 4, the passed portion of the hand-rolling machine 1 is removed. As shown in S4, when the bridge body 2 1 reaches the abutment base 4, the delivery is stopped, and the hand-rolling machine 1 and the bracket 6 are removed. Then, lowering the Hashitai 2 1, 2 2, 2 3 by the jack-down method, installing the Hashitai 2 1, 2 2, 2 3 to abutment 4 and pier 5 1, 5 2. The amount of descent is, for example, 70 cm to 1 m because it is sufficient for the delivery device and the minimum necessary gantry.

図2は、出発側の橋台8にパラペット8aがある場合の送り出しヤード9を示す。出発側の橋台8にパラペット8aがある場合、送り出しヤード9は、出発側の橋台8よりも送り出し側、この実施形態では、出発側の橋台8と第1橋脚5との間に配置される。そして、橋体2がパラペット8aに干渉しないように、送り出しヤード9で橋体2を接合する。送り出しヤード9の架台上に軌条が設置され、軌条には橋体2を支持する走行台車10が走行可能に設けられる。 FIG. 2 shows a delivery yard 9 when the parapet 8a is on the abutment 8 on the departure side. When the parapet 8a is on the departure side abutment 8, the delivery yard 9 is arranged on the delivery side rather than the departure side abutment 8, and in this embodiment, between the departure side abutment 8 and the first pier 5 n. .. Then, Hashitai 2 1 so as not to interfere with parapets 8a, joining the bridge member 2 1 feed yard 9. Are rails on the feed yard 9 cradle installation, the rail traveling truck 10 is provided to be run to support the Hashitai 2 1.

本実施形態の送り出し工法によれば、以下の効果を奏する。送り出し先の橋台4にパラペット4aがあっても、橋体2,2,2を低い位置で送り出すことができるので、橋台4及び橋脚5,5上の設備を軽減でき、橋体2,2,2の降下作業も大幅に軽減する。また、橋体2,2,2を低い位置で送り出せるので、安全性が極めて高い送り出し工法になる。 According to the sending method of the present embodiment, the following effects are obtained. Even if there is a parapet 4a on the delivery destination abutment 4, the bridge bodies 2 1 , 2 2 and 2 3 can be sent out at a low position, so the equipment on the abutment 4 and the piers 5 1 and 5 2 can be reduced, and the bridge. body 2 1, 2 2, 2 3 of descent operations is also greatly reduced. Further, since Okuridaseru the Hashitai 2 1, 2 2, 2 3 at a low position, the safety is very high delivery method.

手延機1が送り出し先の橋台4に到達した後、手延機1を橋体2の高い位置に取り付け直すので、手延機1を取り付け直す作業が容易である。 After Tenobeki 1 reaches the abutment 4 destination delivery, since reseated Tenobeki 1 at a high position of Hashitai 2 1, operation is easy to be reseated Tenobeki 1.

橋体2の上面にセッティングビーム類似のブラケット6を設けるので、手延機1を取り付け直す作業が容易である。 Since the upper surface of Hashitai 2 1 provided setting beam similar bracket 6, it is easy to work to be reseated Tenobeki 1.

出発側の橋台8よりも送り出し側に送り出しヤード9を設け、送り出しヤード9で橋体2,2,2を接合するので、出発側の橋台8にパラペット8aがあっても橋体2,2,2を低い位置で送り出すことができる。 Since the sending yard 9 is provided on the sending side of the starting side abutment 8 and the bridge bodies 2 1 , 2 2 and 2 3 are joined at the sending yard 9, the bridge body 2 even if the parapet 8a is on the starting side abutment 8 1 , 2 2 , 2 3 can be sent out at a low position.

なお、本発明は上記実施形態に具現化されるのに限られることはなく、本発明の要旨を変更しない範囲で他の実施形態に変更可能である。 The present invention is not limited to the above embodiment, and can be changed to other embodiments without changing the gist of the present invention.

上記実施形態では、障害物が橋体のパラペットである例を説明したが、障害物が橋台又は橋脚上の既設桁でもよい。 In the above embodiment, the example in which the obstacle is a parapet of the bridge body has been described, but the obstacle may be an existing girder on a bridge pier or a pier.

上記実施形態では、手延機が送り出し先の橋台に到達した後、手延機を高い位置に取り付け直しているが、手延機が送り出し先の橋台に到達する前に手延機を高い位置に取り付け直すこともできる。 In the above embodiment, after the hand-rolling machine reaches the delivery destination pier, the hand-rolling machine is reattached to a high position, but the hand-rolling machine is placed in a high position before reaching the delivery-destination pier. It can also be reattached to.

出発側の橋台にパラペット等の障害物がない場合、橋体を出発側の橋台の背面側から送り出すこともできる。 If there are no obstacles such as parapets on the departure side pier, the bridge body can be sent out from the back side of the departure side pier.

上記実施形態では、手延機を橋体から取り外し、手延機を橋体のブラケットに取り付け直しているが、手延機を橋体に上下方向にスライド可能に設け、手延機を橋体の高い位置に取り付け直すこともできる。 In the above embodiment, the hand-rolling machine is removed from the bridge body and the hand-rolling machine is reattached to the bracket of the bridge body. However, the hand-rolling machine is provided on the bridge body so as to be slidable in the vertical direction, and the hand-rolling machine is provided on the bridge body. It can also be reattached to a higher position.

送り出し先の橋台と一つ手前の橋脚との間に仮支持脚を配置することも可能である。この場合、送り出し先の橋台と仮支持脚との間が最終径間となる。 It is also possible to place a temporary support pier between the pier at the destination and the pier immediately before. In this case, the final span is between the delivery destination pier and the temporary support leg.

多径間の橋梁の場合、現地の状況によっては送り出しヤードの場所は橋台付近とは限らない。例えば送り出しヤードを第8橋脚と第9橋脚との間に配置することもできる。 In the case of multi-span bridges, the location of the delivery yard is not always near the abutment depending on the local conditions. For example, the delivery yard can be arranged between the 8th pier and the 9th pier.

1…手延機
,2,2…橋体
4…橋台
4a…パラペット
,5,5n…橋脚
…第1橋脚
6…ブラケット
8…出発側の橋台
8a…パラペット
9…送り出しヤード
L…最終径間
1 ... Hand-rolling machine 2 1 , 2 2 , 2 3 ... Bridge body 4 ... Bridge 4a ... Parapet 5 1 , 5 2 , 5n ... Pier 5 n ... First pier 6 ... Bracket 8 ... Departure side bridge 8a ... Parapet 9 ... Delivery yard L ... Final span

Claims (5)

手延機を取り付けた橋体を橋軸方向に移動させる送り出し工法において、
前記橋体が最終径間に到達した後、前記手延機が送り出し先の橋台又は橋脚の障害物に干渉しないように前記手延機を前記橋体の高い位置に取り付け直す工程と、
前記工程後、前記橋体が前記送り出し先の前記橋台又は前記橋脚に到達するまで前記橋体を送り出し、前記送り出し先の前記橋台又は前記橋脚に設置する工程と、を備える送り出し工法。
In the sending method that moves the bridge body with the hand-rolling machine in the direction of the bridge axis,
After the bridge body reaches the final span, the step of reattaching the hand-rolling machine to a high position of the bridge body so that the hand-rolling machine does not interfere with obstacles on the delivery destination abutment or pier.
A delivery method comprising a step of delivering the bridge body until the bridge body reaches the bridge pier or the pier of the delivery destination after the step, and installing the bridge body on the pier or the pier of the delivery destination.
前記手延機が前記送り出し先の前記橋台又は前記橋脚に到達した後、前記手延機を前記橋体の前記高い位置に取り付け直すことを特徴とする請求項1に記載の送り出し工法。 The delivery method according to claim 1, wherein after the hand-rolling machine reaches the abutment or the pier of the delivery destination, the hand-rolling machine is reattached to the high position of the bridge body. 前記橋体の上面に前記手延機を前記高い位置に取り付け直すためのブラケットを設けることを特徴とする請求項1又は2に記載の送り出し工法。 The delivery method according to claim 1 or 2, wherein a bracket for reattaching the hand-rolling machine to the high position is provided on the upper surface of the bridge body. 障害物のある出発側の橋台又は橋脚よりも送り出し側に送り出しヤードを設け、
前記送り出しヤードで前記橋体を接合することを特徴とする請求項1ないし3のいずれか1項に記載の送り出し工法。
Provide a delivery yard on the delivery side of the pier or pier on the departure side with obstacles.
The delivery method according to any one of claims 1 to 3, wherein the bridge body is joined at the delivery yard.
前記障害物は、前記橋台のパラペット、又は前記橋台若しくは前記橋脚上の既設桁であることを特徴とする請求項1ないし4のいずれか1項に記載の送り出し工法。 The delivery method according to any one of claims 1 to 4, wherein the obstacle is a parapet of the abutment, or an existing girder on the abutment or the pier.
JP2017080703A 2017-04-14 2017-04-14 Sending method Active JP6825468B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017080703A JP6825468B2 (en) 2017-04-14 2017-04-14 Sending method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017080703A JP6825468B2 (en) 2017-04-14 2017-04-14 Sending method

Publications (2)

Publication Number Publication Date
JP2018178572A JP2018178572A (en) 2018-11-15
JP6825468B2 true JP6825468B2 (en) 2021-02-03

Family

ID=64281431

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017080703A Active JP6825468B2 (en) 2017-04-14 2017-04-14 Sending method

Country Status (1)

Country Link
JP (1) JP6825468B2 (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2743273C2 (en) * 1977-09-27 1981-04-23 Dyckerhoff & Widmann AG, 8000 München Process for the production of elongated structures, in particular multi-span bridge structures made of reinforced or prestressed concrete
JPH0814092B2 (en) * 1991-09-18 1996-02-14 株式会社ピー・エス Bridge girder erection device
JP3104771B2 (en) * 1992-05-30 2000-10-30 前田建設工業株式会社 Construction method of composite cable-stayed bridge by extrusion method
JP2000282413A (en) * 1999-03-31 2000-10-10 Sumitomo Heavy Ind Ltd Launching machine with deflection eliminator
JP2004107972A (en) * 2002-09-18 2004-04-08 Mitsubishi Heavy Ind Ltd Launching method and launching machine for bridge
JP3905099B2 (en) * 2004-07-12 2007-04-18 川崎重工業株式会社 Hand girder delivery construction method for bridge girder
JP4558609B2 (en) * 2005-08-30 2010-10-06 オリエンタル白石株式会社 Extrusion construction method of bridge
JP5032787B2 (en) * 2006-04-25 2012-09-26 横河工事株式会社 Heavy equipment installation equipment
JP6514882B2 (en) * 2014-12-03 2019-05-15 大成建設株式会社 Construction method of bridge girder

Also Published As

Publication number Publication date
JP2018178572A (en) 2018-11-15

Similar Documents

Publication Publication Date Title
JP4414906B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP2010047905A (en) Apparatus and method for cantilever overhanging bridge
JP5649637B2 (en) Bridge erection device and bridge erection method
CN109610330B (en) Hole passing method of bridge girder erection machine
JP6533109B2 (en) Bridge demolition method
CN105735139A (en) Supporting system for construction of cast-in-situ box beam in overpass and construction method of box beam
JP2021031884A (en) Bridge upper structure removal method
JP2019044453A (en) Replacement method and erection machine
CN108383015B (en) Hoisting device is assisted to super high-rise creeping formwork
CN110359373B (en) Beam body deviation rectifying method for portal pier bridge
CN103912128A (en) Construction method of high-altitude one-piece steel truss
KR101704550B1 (en) lift method for upper structure of bridge by using computer and hydraulic jack including safety device
JP4361775B2 (en) Bridge erection method and bridge erection device
JP6825468B2 (en) Sending method
CN108086169B (en) The installation method for improving of bridge construction mobile formwork
JP4978443B2 (en) Special work cart device for PC block installation work for preventing falling bridges
JP2009091816A (en) Method and device for constructing bridge
CN107524093A (en) A kind of bridge jacking method
JP4861892B2 (en) Gap widening adjusting device and jack for widening adjustment used in the gage widening adjusting device
CN109610346B (en) Cantilever beam adjusting method
JP2004107972A (en) Launching method and launching machine for bridge
JP6788557B2 (en) Bridge crane
JP2007205130A (en) Girder construction method by erection garter from side of bridge
JP3905099B2 (en) Hand girder delivery construction method for bridge girder
JP3349463B2 (en) How to install additional girder

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190813

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200630

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200817

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201228

R150 Certificate of patent or registration of utility model

Ref document number: 6825468

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350