JP4978443B2 - Special work cart device for PC block installation work for preventing falling bridges - Google Patents

Special work cart device for PC block installation work for preventing falling bridges Download PDF

Info

Publication number
JP4978443B2
JP4978443B2 JP2007311565A JP2007311565A JP4978443B2 JP 4978443 B2 JP4978443 B2 JP 4978443B2 JP 2007311565 A JP2007311565 A JP 2007311565A JP 2007311565 A JP2007311565 A JP 2007311565A JP 4978443 B2 JP4978443 B2 JP 4978443B2
Authority
JP
Japan
Prior art keywords
block
work
bridge
prevention
bridge prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007311565A
Other languages
Japanese (ja)
Other versions
JP2009114822A (en
Inventor
政博 鷲田
Original Assignee
株式会社拓恵
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社拓恵 filed Critical 株式会社拓恵
Priority to JP2007311565A priority Critical patent/JP4978443B2/en
Publication of JP2009114822A publication Critical patent/JP2009114822A/en
Application granted granted Critical
Publication of JP4978443B2 publication Critical patent/JP4978443B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、地震時等において橋桁等が橋脚や橋台から落下するのを防止するための、落橋防止PCブロック取付工事用に使用される落橋防止PCブロック取付工事用特殊作業台車装置に関するものである。  TECHNICAL FIELD The present invention relates to a special work cart device for a fallen bridge prevention PC block mounting construction used for a fallen bridge prevention PC block mounting construction for preventing a bridge girder or the like from falling from a pier or an abutment during an earthquake or the like. .

一般に、図7に示すように、橋桁15に鋼製の落橋防止ストッパーブラケット16を取り付けるとともに、橋脚(または橋台、以下同様)14に落橋防止PCブロック8を取り付けて、地震時等において橋桁15等が橋脚14から落下して大災害を発生することを防止する対策が行われている。  In general, as shown in FIG. 7, a steel falling bridge prevention stopper bracket 16 is attached to the bridge girder 15, and a falling bridge prevention PC block 8 is attached to the bridge pier (or abutment, the same shall apply hereinafter) 14. Measures are taken to prevent a catastrophe from falling from the pier 14 and causing a major disaster.

従来、上記落橋防止PCブロック8を橋脚14に取り付ける工事技術としては、図7に示すように橋桁15の下にアンカーを打設して、これに図示していないチェーンブロックを取り付け、該チェーンブロックにより上記落橋防止PCブロック8を持ち上げて所定の位置近くまで運び上げ、落橋防止PCブロック8を宙吊り状態で人手により取付位置まで移動させ、あらかじめ橋脚14に取り付けたPCブロック取付アンカーボルト11の頭にPCブロック8に開けた取付アンカーボルト穴9の位置を合わせ、その後PCブロック8を取り付けアンカーボルト11に差し込み橋脚14に取り付けていた。  Conventionally, as a construction technique for attaching the above-mentioned bridge prevention PC block 8 to the pier 14, as shown in FIG. 7, an anchor is placed under the bridge girder 15 and a chain block (not shown) is attached thereto. The above-described fallen bridge prevention PC block 8 is lifted and carried close to a predetermined position, and the fallen bridge prevention PC block 8 is manually moved to the mounting position in a suspended state, and is attached to the head of the PC block mounting anchor bolt 11 previously attached to the bridge pier 14. The position of the mounting anchor bolt hole 9 opened in the PC block 8 was aligned, and then the PC block 8 was inserted into the mounting anchor bolt 11 and attached to the pier 14.

また従来、図8に示すように、クレーン19の伸縮ブーム17の先端部に落橋防止PCブロック取付用先端治具18を設けて、このPCブロック取付用先端治具18に落橋防止PCブロック8をセットし、該伸縮ブーム17により高さや位置等を調整しながら落橋防止PCブロック8を橋脚14の取付位置まで移動させて取付ける技術があった。(例えば、特許文献1参照)  Conventionally, as shown in FIG. 8, a tip jig 18 for attaching a fall prevention PC block is provided at the tip of the telescopic boom 17 of the crane 19, and the fall prevention PC block 8 is attached to the tip jig 18 for attaching the PC block. There has been a technique of setting and moving the fallen bridge prevention PC block 8 to the mounting position of the pier 14 while adjusting the height and position with the telescopic boom 17. (For example, see Patent Document 1)

さらに、クレーン19の替わりに、俯仰および旋回自在で、伸縮可能なブームの先端部に作業デッキを設けた高所作業車を使用する工事技術も提案されている。(例えば、特許文献2参照)
特開平11−147691号公報 特開2005−133324号公報
Further, a construction technique using an aerial work vehicle in which a work deck is provided at the tip of a boom that can be lifted and swung in place of the crane 19 and can be expanded and contracted has been proposed. (For example, see Patent Document 2)
JP-A-11-147691 JP 2005-133324 A

しかし、上記チェーンブロックによる取付作業は、落橋防止PCブロック8のような重量物を作業者の頭上の狭い空間で、しかも吊り下げた不安定な状態で落橋防止PCブロック8を移動させて、PCブロック8に開けた取付アンカーボルト穴9を取付アンカーボルト11の頭に合わせなければならないので、危険極まりない苦渋作業で時間がかかるだけでなく、別途作業用の足場を組む必要があったり、落橋防止PCブロック8にワイヤを引っ掛けて吊り上げていたため、コンクリート製のPCブロックが欠けたりして、落橋防止工事の品質の低下を生じさせる等の問題があった。  However, the installation work by the chain block is performed by moving the falling bridge prevention PC block 8 in an unstable state in which a heavy object such as the falling bridge prevention PC block 8 is suspended in a narrow space above the operator's head. Since the mounting anchor bolt hole 9 opened in the block 8 must be aligned with the head of the mounting anchor bolt 11, not only does it take a lot of time and effort, but it is necessary to assemble a separate scaffold for work and prevent falling bridges. Since the PC block 8 was hooked and lifted, there was a problem that the PC block made of concrete was chipped and the quality of the fall bridge prevention work was deteriorated.

また、上記特許文献1のクレーン伸縮ブーム17の先端部のPCブロック取付用先端治具18による場合は、操作が遠方のクレーン運転室からの遠隔操作となるので、落橋防止PCブロック8の位置およびPCブロック8の姿勢や傾きの微調整が困難で、手間と時間がかかるだけでなく、クレーン伸縮ブーム17との干渉を防止するために、作業足場の安全手摺りを部分的に撤去する必要があり危険な作業となる等の問題点もあった。特許文献2の高所作業車を使用する落橋防止PCブロック取付工事の場合も、特許文献1と類似の問題点があった。  Further, in the case of using the PC block mounting tip jig 18 at the tip of the crane telescopic boom 17 of the above-mentioned Patent Document 1, since the operation is a remote operation from a remote crane operator's cab, the position of the falling bridge prevention PC block 8 and It is difficult to finely adjust the posture and inclination of the PC block 8, which takes time and labor, and in order to prevent interference with the crane telescopic boom 17, it is necessary to partially remove the safety handrail of the work scaffold. There were also problems such as being dangerous work. In the case of the installation work for preventing the falling bridge PC block using the aerial work vehicle of Patent Document 2, there was a problem similar to that of Patent Document 1.

さらに、一般に落橋防止工事の工事現場は橋の下となるため足場が悪く、大型のクレーン車や高所作業車の進入が困難な場所が多い。クレーン車や高所作業車の作業足場を設置しようとすると、落橋防止PCブロック8の10数倍の重量の作業車用の高強度な作業足場が必要となり、その高強度作業足場設置費用だけでも莫大なコストとなるため、そのような作業足場の設置は困難であり、クレーン車や高所作業車の使用が難しいという問題点もあった。また、山間部にある橋梁の場合は、橋脚14がクレーンや高所作業車では届かないほど高さが高くなる場合が多く、この場合はクレーンや高所作業車を使用することはできず、人手で困難な取付作業を強いられるという労働安全衛生上も好ましくない問題が発生していた。  Furthermore, in general, the construction site for the fall prevention work is under the bridge, so the scaffolding is bad, and there are many places where large crane vehicles and aerial work vehicles are difficult to enter. If you want to install a work platform for a crane truck or an aerial work platform, you will need a high-strength work platform for work vehicles that weighs more than 10 times the weight of the PC block 8 that prevents falling bridges. Since the cost is enormous, it is difficult to set up such a working scaffold, and it is difficult to use a crane vehicle or an aerial work platform. In addition, in the case of a bridge in a mountainous area, the height of the pier 14 is often so high that it cannot be reached by a crane or an aerial work vehicle. In this case, a crane or an aerial work vehicle cannot be used, There was an unfavorable problem in terms of occupational safety and health, in which it was forced to carry out difficult manual installation work.

本発明は、上記の現状の多くの課題を解決するためになされたものであって、重量物である落橋防止PCブロック8の移動、搬送及び、上下昇降、上下位置調整、前後左右の位置と落橋防止PCブロック8の微妙な姿勢や傾きの微調整を人手で容易にできるようにする落橋防止PCブロック8の橋脚14への取付工事用特殊作業台車装置を提供することを目的としている。  The present invention has been made in order to solve the above-mentioned many problems of the present situation, and is intended to move, convey, move up and down, move up and down, adjust the vertical position, adjust the vertical and horizontal positions, It is an object of the present invention to provide a special work carriage device for installation work on the bridge pier 14 of the fall-bridge prevention PC block 8 that enables fine adjustment of the delicate posture and inclination of the fall-bridge prevention PC block 8 manually.

本発明の解決しようとする課題は以上のごとくであり、次にこの課題を解決するための手段を説明する。
請求項1に記載の本発明の落橋防止PCブロック取付工事用特殊作業台車装置Aは、作業足場上部ステージ12に仮設された2本のH型鋼レール13上を横行可能な横行ローラー7を有する横行台車1と、該横行台車1の上に3本の昇降姿勢制御油圧ジャッキ5a,5b,6により上下に昇降可能に設けられた昇降フレーム2と、該昇降フレーム2の上に設けられたフリーローラーテーブル3と、該フリーローラーテーブル3の上に前後に移動可能な落橋防止PCブロック積載板4とから構成されることを特徴とする落橋防止PCブロック取付工事用特殊作業台車装置である。
The problem to be solved by the present invention is as described above. Next, means for solving the problem will be described.
The special work cart apparatus A for the installation of a fallen bridge prevention PC block according to the first aspect of the present invention has a traversing roller 7 capable of traversing on the two H-shaped steel rails 13 temporarily installed on the work scaffold upper stage 12. A carriage 1, a raising / lowering frame 2 provided on the transverse carriage 1 by three raising / lowering posture control hydraulic jacks 5 a, 5 b, and 6 so as to be moved up and down, and a free roller provided on the lifting frame 2 This is a special work carriage device for installation work for preventing a fallen bridge PC block comprising a table 3 and a fallen bridge prevention PC block loading plate 4 that can move back and forth on the free roller table 3.

また、請求項2に記載された該作業台車装置は、個別に昇降可能な3本の昇降油圧ジャッキ5a、5b、6を橋脚に向かって前方左右に2本、後方に1本配置して、昇降フレームを3点支持することを特徴としており、このことにより昇降フレーム2を介して、積載された落橋防止PCブロック8の姿勢や前後左右の傾きと上下の微妙な高さ位置を容易に微調整でき、橋脚14にセットされているPCブロック取付アンカーボルト11の頭とPCブロック8に開けられた取付アンカーボルト穴9との微妙な位置合わせが可能となり、人手で容易にかつ安全に落橋防止PCブロック8の橋脚14への取付作業を可能とすることを特徴とする落橋防止PCブロック取付工事用特殊作業台車装置である。  Further, the work cart apparatus according to claim 2 has three lifting hydraulic jacks 5a, 5b, 6 that can be lifted and lowered individually, two on the front left and right, and one on the rear. It is characterized by supporting the lifting frame at three points, which makes it easy to determine the posture of the loaded bridge prevention PC block 8 and the tilting of the front and rear, left and right, and the subtle height position of the top and bottom via the lifting frame 2. It can be adjusted, and it is possible to delicately align the head of the PC block mounting anchor bolt 11 set on the pier 14 with the mounting anchor bolt hole 9 opened in the PC block 8, and it can be easily and safely prevented by hand. This is a special work carriage device for a fallen bridge prevention PC block installation work characterized in that the PC block 8 can be attached to the pier 14.

上記構成によると、橋の下の橋脚部14に設けられた作業足場12の上に仮設の2本のH型鋼レール13を落橋防止PCブロック8の取付工事に必要な長さだけ設置して、本発明の特殊作業台車Aを取付けることにより、落橋防止PCブロック8を橋の上から特殊作業台車装置に取り込み、人手で簡単にかつ安全に取付工事を実施することが可能となる。  According to the above configuration, the temporary two H-shaped steel rails 13 are installed on the work platform 12 provided on the pier 14 under the bridge, as long as necessary for the installation work of the falling bridge prevention PC block 8, By attaching the special work carriage A of the present invention, the falling bridge prevention PC block 8 can be taken into the special work carriage device from the top of the bridge and can be easily and safely installed manually.

以上で説明したように、本発明の落橋防止PCブロック取付工事用特殊作業台車装置Aを使用することにより、落橋防止PCブロック8の橋脚14への取付に際して、重量物である落橋防止PCブロック8の水平、垂直位置やその姿勢や傾きの調整を高精度で能率良く行うことができ、また、作業足場12上で人手で安全に落橋防止PCブロック8の取付作業を行うことができるという工事作業品質面と工事作業安全環境面から大きな工業的効果が得られるものである。特に、山間部等の従来クレーン車や高所作業車の使用が困難であった多くの取付工事現場における本発明の落橋防止PCブロック取付工事用特殊作業台車装置Aの使用の効果は、作業者の負荷軽減と危険回避面で著しいものがある。  As described above, the use of the special work carriage device A for installing the fallen bridge prevention PC block 8 according to the present invention enables the fallen bridge prevention PC block 8 which is a heavy object when the fallen bridge prevention PC block 8 is attached to the pier 14. The horizontal and vertical position, the posture and the inclination of the work can be adjusted with high accuracy and efficiency, and the installation work of the PC block 8 for preventing the falling bridge can be safely performed manually on the work platform 12. Great industrial effects can be obtained from the aspect of quality and construction work safety environment. In particular, the effect of the use of the special work carriage device A for installing the anti-falling bridge PC block according to the present invention in many installation work sites where it has been difficult to use conventional crane vehicles and aerial work platforms in mountainous areas is There are remarkable things in terms of reducing the load and avoiding danger.

このように、本発明は、工事作業品質面、工事コスト面、工事作業安全環境面からの効果が大きく、落橋防止工事業界のみならず、世の中に多数設置されている橋梁の地震に対する安全性の向上が高品質の工事品質により確保されることにより、世の中に多大な貢献をするものである。  As described above, the present invention has a great effect in terms of construction work quality, construction cost, and construction work safety and environment, and not only in the fall bridge prevention construction industry, but also in the safety of earthquakes of many bridges installed in the world. The improvement is ensured by high quality construction quality, which makes a great contribution to the world.

以下、本発明の好ましい実施形態について、図1から図6に基づいて説明する。
図1は、本発明の落橋防止PCブロック取付工事用特殊作業台車装置Aの概略構成を示す正面図である。図2、図3はそれぞれ、該落橋防止PCブロック取付工事用特殊作業台車の概略構成を示す側面図及び、平面図である。図4は、落橋防止PCブロックの一例を示す斜視図である。該落橋防止PCブロック8は、ブロック本体にPCブロック取付用のアンカーボルト穴9が複数個開けられており、上部の落橋防止ストッパーとの接触部には地震時の接触の衝撃を吸収するためのハニカム構造等の衝撃緩衝板10が取り付けられている。
Hereinafter, a preferred embodiment of the present invention will be described with reference to FIGS.
FIG. 1 is a front view showing a schematic configuration of a special work cart apparatus A for installation work for preventing falling bridge PC blocks according to the present invention. FIG. 2 and FIG. 3 are a side view and a plan view, respectively, showing a schematic configuration of the special work cart for the installation work of preventing the falling bridge PC block. FIG. 4 is a perspective view showing an example of a fallen bridge prevention PC block. The falling bridge prevention PC block 8 has a plurality of anchor bolt holes 9 for mounting the PC block in the block body, and the contact portion with the upper falling bridge prevention stopper absorbs the impact of the contact during an earthquake. An impact buffer plate 10 such as a honeycomb structure is attached.

図1で、1は、作業足場12の上部デッキ上面に仮設された2本のH型鋼レールを横行可能な台車横行ローラー7を取付けた横行台車である。2は、該横行台車1に取り付けられた3本の昇降姿勢制御油圧ジャッキ5a,5b,6により、上下に昇降可能な昇降フレームである。該昇降フレーム2の上面にはフリーローラーテーブル3が取付けられており、該フリーローラーテーブル3の上には、落橋防止PCブロック8を積載し、フリーローラーテーブル3を介して落橋防止PCブロック8を前後に移動可能なPCブロック積載板4が載っている構造となっている。  In FIG. 1, reference numeral 1 denotes a traversing cart to which a cart traversing roller 7 that can traverse two H-shaped steel rails temporarily installed on the upper surface of the upper deck of the work scaffold 12 is attached. Reference numeral 2 denotes an elevating frame that can be moved up and down by three elevating posture control hydraulic jacks 5 a, 5 b, 6 attached to the traversing carriage 1. A free roller table 3 is mounted on the upper surface of the elevating frame 2, and a falling bridge prevention PC block 8 is loaded on the free roller table 3, and the falling bridge prevention PC block 8 is mounted via the free roller table 3. A PC block stacking plate 4 that can be moved back and forth is mounted.

図2、図3に示すように、上下昇降用の3本の昇降姿勢制御用油圧ジャッキは、積載した落橋防止PCブロック8に開けられたPCブロック取付アンカーボルト穴9が橋脚14に取り付けられたPCブロック取付アンカーボルト11の頭の位置に合うまで上昇させ、さらに、取付アンカーボルト11にPCブロック8がスムーズに挿入できるように、落橋防止PCブロックの姿勢や前後左右の傾きを微妙に調整できるように、橋脚14に向かって横行台車1の前方左右位置に各1本の昇降姿勢制御油圧ジャッキ5a,5bを、横行台車1の後方に1本の昇降姿勢制御油圧ジャッキ6を、3点支持機構を構成する形で配置している。  As shown in FIGS. 2 and 3, the three hydraulic jacks for raising and lowering the vertical posture are provided with a PC block mounting anchor bolt hole 9 opened in the loaded fall prevention PC block 8 and attached to the pier 14. The PC block mounting anchor bolt 11 can be raised until it matches the head position, and the PC block 8 can be smoothly inserted into the mounting anchor bolt 11 so that the attitude of the fallen bridge prevention PC block and the front / rear / left / right inclination can be finely adjusted. As described above, three lifting / lowering attitude control hydraulic jacks 5 a and 5 b are supported at the front left and right positions of the traversing carriage 1 toward the pier 14, and one lifting attitude control hydraulic jack 6 is supported at the rear of the traversing carriage 1 at three points. They are arranged in a form that constitutes a mechanism.

このように、該昇降フレーム2は、3点支持の3本の昇降姿勢制御油圧ジャッキ5a,5b,6を介して、横行台車1上に姿勢や前後左右の傾きが制御可能に取り付けられている。そのため、3本の昇降姿勢制御油圧ジャッキ5a,5b,6をそれぞれ微調整することにより、台車装置に積載された落橋防止PCブロック8の姿勢や前後左右の傾きを微妙に調整することが可能になり、PCブロック取付アンカーボルト11の取付の誤差に対して、取付アンカーボルト穴9の位置を人手で容易に合わせる作業が可能となるのである。  In this way, the lifting frame 2 is mounted on the traversing carriage 1 so that the posture and the tilt in the front, rear, left and right directions can be controlled via the three lifting posture control hydraulic jacks 5a, 5b, 6 supported at three points. . Therefore, by finely adjusting the three lifting / lowering posture control hydraulic jacks 5a, 5b, 6 respectively, it is possible to finely adjust the posture and the front / rear / left / right inclination of the fallen bridge prevention PC block 8 loaded on the carriage device. Thus, it is possible to easily adjust the position of the mounting anchor bolt hole 9 manually with respect to the mounting error of the PC block mounting anchor bolt 11.

図5は、本発明の作業台車装置Aを使用した作業の全体イメージ図である。
図6は、本発明の作業台車装置を使用して落橋防止PCブロック8を橋脚14に取付ける場合の取付状況を示す図で、図6(a)は、落橋防止PCブロックをPCブロック取付アンカーボルト11の高さ位置まで作業台車装置Aの昇降フレーム2により上昇させた状態図である。図6(b)は、落橋防止PCブロック8を橋脚14に取り付けられたPCブロック取付用アンカーボルト11にセットした状態を示す状態図である。
以下に、本発明による落橋防止PCブロック取付工事用特殊作業台車装置Aを使用して取付作業を行う場合の実際の作業要領を図5、図6に基づき説明する。
FIG. 5 is an overall image diagram of work using the work cart apparatus A of the present invention.
FIG. 6 is a view showing an installation situation when the fall bridge prevention PC block 8 is attached to the pier 14 using the work carriage device of the present invention, and FIG. 6A shows the fall bridge prevention PC block as a PC block mounting anchor bolt. It is the state figure raised to the height position of 11 with the raising / lowering frame 2 of the work trolley apparatus A. FIG. 6B is a state diagram showing a state in which the fallen bridge prevention PC block 8 is set to the PC block mounting anchor bolt 11 attached to the pier 14.
Below, the actual operation | work point in the case of performing attachment work using the special work cart apparatus A for fallen bridge prevention PC block attachment work by this invention is demonstrated based on FIG. 5, FIG.

まず、道路橋の上の片側車線に設置した小型移動クレーン車20から落橋防止PCブロック8を吊り下げ、橋の下の橋脚周りに設置された作業足場の上部デッキ12に橋幅をかわして伸ばして取り付けられた仮設の2本のH型鋼レール13の上に載せられた本発明の落橋防止PCブロック取付工事用特殊作業台車装置AのPCブロック積載板4の上に静かに積載する。積載したPCブロック8を転倒防止対策を施した後、横行台車1に取り付けられた台車横行ローラー7を使用して橋脚14の落橋防止PCブロック取付位置の下部に横行移動する。  First, the falling bridge prevention PC block 8 is hung from a small mobile crane 20 installed in one lane above the road bridge, and the bridge width is extended to the upper deck 12 of the work scaffold installed around the pier under the bridge. It is quietly loaded on the PC block loading plate 4 of the special work cart apparatus A for falling bridge prevention PC block mounting work of the present invention mounted on the two temporarily mounted H-shaped steel rails 13 mounted. After taking measures for preventing the fall of the loaded PC block 8, the carriage traverse roller 7 attached to the traversing carriage 1 is used to traverse to the lower part of the bridge pier 14 where the fall prevention PC block is attached.

次に、PCブロック8の取付位置で横行台車1を止めた後、横行台車1に取付けられた3本の昇降姿勢制御油圧ジャッキを使用して落橋防止PCブロック8を積載した昇降フレーム2を、取付アンカーボルト穴9が取付アンカーボルト11の頭の位置に来るまで上昇させる。  Next, after stopping the traversing carriage 1 at the mounting position of the PC block 8, the lifting frame 2 loaded with the falling bridge prevention PC block 8 using the three lifting posture control hydraulic jacks attached to the traversing carriage 1, The mounting anchor bolt hole 9 is raised until it comes to the position of the head of the mounting anchor bolt 11.

次に、主に前方左右に取付けられた2本の昇降姿勢制御油圧ジャッキ5a,5bを操作して、昇降フレーム2上にあるPCブロック積載板4の上に積載された落橋防止PCブロック8の姿勢や前後左右の傾きを微調整して、取付アンカーボルト11のセットの微妙なずれに対して、取付アンカーボルト穴9の位置を合わせる。取付アンカーボルト穴9と取付アンカーボルト11の位置を正確に合わせた後、昇降フレーム2の上部に取り付けられたフリーローラーテーブル3の上にセットされた前後移動可能なPCブロック積載板4をPCブロック8を積載した状態で前方へスライドさせて、PCブロック8を橋脚14に取り付けられたPCブロック取付アンカーボルト11に挿入セットする。  Next, by operating two lifting / lowering posture control hydraulic jacks 5a and 5b attached mainly to the front left and right, the falling bridge prevention PC block 8 loaded on the PC block loading plate 4 on the lifting frame 2 is used. The position and the position of the mounting anchor bolt hole 9 are adjusted with respect to a slight shift of the mounting anchor bolt 11 set by finely adjusting the posture and the front / rear / left / right inclination. After accurately aligning the positions of the mounting anchor bolt holes 9 and the mounting anchor bolts 11, the PC block loading plate 4, which is set on the free roller table 3 mounted on the upper part of the lifting frame 2, can be moved back and forth. The PC block 8 is slid forward in a loaded state, and the PC block 8 is inserted and set in the PC block mounting anchor bolt 11 attached to the pier 14.

落橋防止PCブロック8がPCブロック取付アンカーボルト11に挿入セットされた時点で、再度作業台車Aを操作して落橋防止PCブロック8の位置を、PCブロック8が橋脚14に対して所定の位置に納まるように微調整する。  When the falling bridge prevention PC block 8 is inserted and set in the PC block mounting anchor bolt 11, the work carriage A is operated again to bring the position of the falling bridge prevention PC block 8 to the predetermined position with respect to the pier 14. Fine-tune to fit.

落橋防止PCブロック8が所定の位置に納まった時点で、すべての取付アンカーボルト穴9と取付アンカーボルトボルトの隙間に予め準備したスペーサーを挿入し、落橋防止PCブロックの下がりを防止し、所定のナットで落橋防止PCブロック8を橋脚14にしっかりと締め付ける。  When the falling bridge prevention PC block 8 is placed in a predetermined position, a spacer prepared in advance is inserted into the gaps between all the mounting anchor bolt holes 9 and the mounting anchor bolt bolts to prevent the falling bridge prevention PC block from falling. Tighten the falling bridge prevention PC block 8 to the pier 14 with the nut.

PCブロック取付ナットを全数締め付けた時点で、昇降フレームを下降させ、PCブロック積載板4を元の位置まで後退させて、横行台車1をPCブロック荷降ろし位置まで移動させて、次のPCブロックの荷降ろし準備を行う。  When all the PC block mounting nuts are tightened, the elevating frame is lowered, the PC block loading plate 4 is retracted to the original position, and the traversing carriage 1 is moved to the PC block unloading position, so that the next PC block Prepare for unloading.

以上で説明したように、本発明の落橋防止PCブロック取付工事用特殊作業台車装置Aを使用して、落橋防止PCブロック取付工事を行うことにより、簡単な足場や仮設H型鋼レール等の準備工事を行うことで、人手により簡単で安全でありながら、取付工事品質が良好で高能率な取付工事の実施が可能となる。  As explained above, by using the special work cart device A for installing a bridge prevention PC block for installation according to the present invention, a construction for preparing a simple scaffolding or a temporary H-shaped steel rail is performed by performing the installation work for the installation of a PC block for preventing a fallen bridge. By performing the above, it is possible to carry out the installation work with high efficiency and high installation quality while being easy and safe by hand.

本発明の作業台車装置の概略構成を示す正面図The front view which shows schematic structure of the work trolley | bogie apparatus of this invention. 本発明の作業台車装置の概略構成を示す側面図The side view which shows schematic structure of the work trolley | bogie apparatus of this invention. 本発明の作業台車装置の概略構成を示す平面図The top view which shows schematic structure of the work trolley | bogie apparatus of this invention. 落橋防止PCブロックの一例を示す斜視図Perspective view showing an example of a fallen bridge prevention PC block 本発明の作業台車装置を使用した作業の全体説明図Whole work explanatory drawing using the work trolley | bogie apparatus of this invention 本発明の作業台車装置を使用してPCブロックの取付要領図 (a) PCブロックを取付アンカーボルトの高さまで上昇させた状態図 (b) PCブロックを取付アンカーボルトにセットした状態図(A) State diagram in which the PC block is raised to the height of the mounting anchor bolt using the work carriage apparatus of the present invention (b) State diagram in which the PC block is set on the mounting anchor bolt 落橋防止PCブロックの取付状態図Installation state diagram of PC block クレーンを使用した取付工事を示す該略図The schematic diagram showing installation work using a crane

符号の説明Explanation of symbols

A 落橋防止PCブロック取付工事用特殊作業台車装置
1 横行台車
2 昇降フレーム
3 フリーローラーテーブル
4 PCブロック積載板
5a 右前方昇降姿勢制御油圧ジャッキ
5b 左前方昇降姿勢制御油圧ジャッキ
6 後方昇降姿勢制御油圧ジャッキ
7 台車横行ローラー
8 落橋防止PCブロック
9 PCブロック取付アンカーボルト穴
10 衝撃緩衝板
11 PCブロック取付アンカーボルト
12 作業足場
13 台車横行用仮設H型鋼レール
14 橋脚(または橋台)
15 橋桁
16 落橋防止ストッパーブラケット
17 伸縮ブーム
18 PCブロック取付用先端治具
19 クレーン車
A. Special work cart apparatus 1 for installing a PC block for preventing a falling bridge 1 Traversing cart 2 Lifting frame 3 Free roller table 4 PC block loading plate 5a Right front lifting posture control hydraulic jack 5b Left front lifting posture control hydraulic jack 6 Back lifting posture control hydraulic jack 7 Traverse roller 8 Falling bridge prevention PC block 9 PC block mounting anchor bolt hole 10 Shock buffer 11 PC block mounting anchor bolt 12 Working scaffold 13 Temporary H-shaped steel rail 14 for traversing bogie pier (or abutment)
15 Bridge Girder 16 Falling Bridge Prevention Stopper Bracket 17 Telescopic Boom 18 PC Block Mounting Tip Jig 19 Crane

Claims (2)

横行レール上を横移動可能とする複数の横行ローラーを取付けた横行台車と、該横行台車に取付けられた上下昇降可能な昇降姿勢制御用の3本の油圧ジャッキと、該油圧ジャッキにより上下昇降可能な昇降フレームと、該昇降フレーム上にフリーローラーテーブルを取り付け、該フリーローラーテーブル上に前後にスライド可能なPCブロック積載板を具備したことを特徴とする落橋防止PCブロック取付工事用特殊作業台車装置。  A traversing carriage with a plurality of traversing rollers that can traverse on the traversing rail, three hydraulic jacks attached to the traversing carriage that can be moved up and down, and that can be moved up and down, and that can be moved up and down by the hydraulic jacks And a PC block loading plate that can be slid back and forth on the free roller table, and a special work carriage device for fallen bridge prevention PC block mounting construction comprising: . 上記上下昇降用の3本の昇降姿勢制御油圧ジャッキを、橋脚に向かって前側左右に2本、後側に1本取り付けることにより安定した3点支持機構を構成し、昇降フレーム上に積載されたPCブロックの上下位置と前後左右の姿勢傾きの微調整制御を可能にしたことを特徴とする請求項1記載の落橋防止PCブロック取付工事用特殊作業台車装置。  The above three lifting / lowering posture control hydraulic jacks for lifting and lowering are mounted on the lifting frame by constructing a stable three-point support mechanism by attaching two on the left and right front and one on the rear. 2. The special work cart apparatus for installation work for prevention of falling bridge PC blocks according to claim 1, wherein fine adjustment control of the vertical position of the PC block and the posture inclination of the front, rear, left and right is made possible.
JP2007311565A 2007-11-01 2007-11-01 Special work cart device for PC block installation work for preventing falling bridges Active JP4978443B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007311565A JP4978443B2 (en) 2007-11-01 2007-11-01 Special work cart device for PC block installation work for preventing falling bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007311565A JP4978443B2 (en) 2007-11-01 2007-11-01 Special work cart device for PC block installation work for preventing falling bridges

Publications (2)

Publication Number Publication Date
JP2009114822A JP2009114822A (en) 2009-05-28
JP4978443B2 true JP4978443B2 (en) 2012-07-18

Family

ID=40782260

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007311565A Active JP4978443B2 (en) 2007-11-01 2007-11-01 Special work cart device for PC block installation work for preventing falling bridges

Country Status (1)

Country Link
JP (1) JP4978443B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691264B (en) * 2012-05-16 2014-07-30 天津市公路工程总公司 Slipping slot type cross transfer device and method for assisting hoisting of large-size box girder
CN107354871A (en) * 2017-08-11 2017-11-17 中国水利水电第七工程局有限公司 A kind of precast beam is traversing and vertical fall girder apparatus and falls beam method
CN110593133B (en) * 2019-10-18 2021-04-20 山东华亿钢机股份有限公司 Movable construction equipment and method for bridge steel structure
CN111794125B (en) * 2020-05-19 2021-12-24 陕西高速公路工程咨询有限公司 Adjusting device and method for controlling height difference of closure section of curved bridge
JP7498949B2 (en) 2020-07-13 2024-06-13 ベルテクス株式会社 Bridge fall prevention blocks
JP7278554B1 (en) 2022-02-17 2023-05-22 大成建設株式会社 Horizontal force sharing structure installation frame, horizontal force sharing structure installation device, and horizontal force sharing structure installation method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07116831B2 (en) * 1986-04-25 1995-12-18 岡部株式会社 Traveling mobile formwork device
JPH02218530A (en) * 1989-02-21 1990-08-31 Mitsubishi Heavy Ind Ltd Support for machine tool or the like
JPH0325966U (en) * 1989-07-19 1991-03-18
JP4051584B2 (en) * 1997-11-17 2008-02-27 国土総合建設株式会社 Apparatus and method for supporting and supporting heavy loads for work at height
JPH11172922A (en) * 1997-12-09 1999-06-29 Kumagai Gumi Co Ltd Beam positioning device and beam positioning method
JP2000230205A (en) * 1999-02-09 2000-08-22 Shimizu Corp Elevated track construction method and device
JP2004169492A (en) * 2002-11-22 2004-06-17 Taisei Corp Support device
JP4389200B2 (en) * 2003-10-28 2009-12-24 東急建設株式会社 Steel bracket and block mounting device for preventing falling bridges

Also Published As

Publication number Publication date
JP2009114822A (en) 2009-05-28

Similar Documents

Publication Publication Date Title
EP1846631B1 (en) Apparatus for use in the construction of buildings
JP4978443B2 (en) Special work cart device for PC block installation work for preventing falling bridges
JP7346246B2 (en) Heavy object moving method using heavy object moving device and heavy object moving device
JP6476426B2 (en) Member renewal method using lifting device
GB2520939A (en) A Platform
JP4556136B2 (en) Fall prevention tool and its use, and fall prevention fence and its use
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JPH08199580A (en) Side slope lifting device
JP5577538B2 (en) Mobile safety experience equipment frame and safety experience education method
JP6873435B2 (en) Suspended scaffolding and its erection method
JP4353343B2 (en) Large elevating stage, lifting method and reverse driving method using the same
GB2409851A (en) Work Platform
KR100681661B1 (en) The high capacity support tower for erection of rudder horn
JP2016142097A (en) Portable hoist unit and horizontal member dismantling method
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
GB2390079A (en) Aerial lift platform with lifting jacks
JP4389200B2 (en) Steel bracket and block mounting device for preventing falling bridges
CN214456513U (en) Crane rail mounting vehicle
JP6031295B2 (en) Scaffolding trolley and work stage
JP2024063540A (en) Method for mounting bridge fall prevention device and attachment used therefor
AU2004200088B2 (en) Work platform
JP3685778B2 (en) Bearing loading / unloading device and bearing loading / unloading method
CN115352995A (en) Auxiliary hoisting device for gas collecting hood for ship
JP2023120174A (en) Horizontal force distribution structure installation trestle, horizontal force distribution structure installation device, and horizontal force distribution structure installation method
JP3175648U (en) Heavy lifting equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120313

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120403

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20180427

Year of fee payment: 6

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250