JP6817082B2 - Work completion control device, work completion control method, and work completion control program - Google Patents

Work completion control device, work completion control method, and work completion control program Download PDF

Info

Publication number
JP6817082B2
JP6817082B2 JP2017007023A JP2017007023A JP6817082B2 JP 6817082 B2 JP6817082 B2 JP 6817082B2 JP 2017007023 A JP2017007023 A JP 2017007023A JP 2017007023 A JP2017007023 A JP 2017007023A JP 6817082 B2 JP6817082 B2 JP 6817082B2
Authority
JP
Japan
Prior art keywords
sales
work
completion
purchase
work completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017007023A
Other languages
Japanese (ja)
Other versions
JP2017174401A (en
Inventor
丈士 宮武
丈士 宮武
邦明 芹澤
邦明 芹澤
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Publication of JP2017174401A publication Critical patent/JP2017174401A/en
Application granted granted Critical
Publication of JP6817082B2 publication Critical patent/JP6817082B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

本発明は、作業完了制御装置、作業完了制御方法、および、作業完了制御プログラムに関する。 The present invention relates to a work completion control device, a work completion control method, and a work completion control program.

特許文献1には、会計処理の専門知識や、複雑な振替伝票処理が不要となり、支払い事務が優先するような場面において、簡単な作業(つまり請求書の入力)で電子化(データベース化)された工事台帳を容易に作成することができ、毎月の支払い管理等を容易に行うことができる工事台帳作成システムに関する発明が記載されている。 Patent Document 1 is digitized (created as a database) by simple work (that is, inputting an invoice) in a situation where specialized knowledge of accounting processing and complicated transfer slip processing are not required and payment affairs are prioritized. An invention relating to a construction ledger creation system that can easily create a construction ledger and manage monthly payments and the like is described.

特開2000−123075号公報Japanese Unexamined Patent Publication No. 2000-12307

しかしながら、従来技術では、作業予定管理区分により売上・仕入を紐付けて管理することで、仕入計上が完了するまで売上計上を行えないように制御することは出来ない、という問題点があった。 However, in the conventional technology, there is a problem that it is not possible to control sales and purchases so that they cannot be recorded until the purchases are completed by managing the sales and purchases in association with each other according to the work schedule management category. It was.

本発明は、上記問題点に鑑みてなされたものであって、作業予定管理区分により売上・仕入を紐付けて管理することで、仕入計上が完了するまで売上計上を行えないように制御することができる作業完了制御装置、作業完了制御方法、および、作業完了制御プログラムを提供することを目的とする。 The present invention has been made in view of the above problems, and by managing sales and purchases in association with each other according to the work schedule management category, it is controlled so that sales cannot be recorded until the purchases are completed. It is an object of the present invention to provide a work completion control device, a work completion control method, and a work completion control program which can be performed.

上述した課題を解決し、目的を達成するために、本発明に係る作業完了制御装置は、記憶部と制御部とを備えた作業完了制御装置であって、前記記憶部は、販売後の商品の保守業務の委託先への手配に関する仕入データを記憶する仕入データ記憶手段と、前記保守業務の売上データを記憶する売上データ記憶手段と、を備え、前記制御部は、前記仕入データの前記仕入データ記憶手段への登録が完了しているか否か判定する完了判定手段と、前記完了判定手段により完了していると判定された場合、前記売上データを前記売上データ記憶手段に登録する売上登録手段と、を備えたことを特徴とする。 In order to solve the above-mentioned problems and achieve the object, the work completion control device according to the present invention is a work completion control device including a storage unit and a control unit, and the storage unit is a product after sale. The control unit is provided with a purchase data storage means for storing purchase data related to arrangements to a contractor for maintenance work and a sales data storage means for storing sales data for the maintenance work. The sales data is registered in the sales data storage means when it is determined by the completion determination means for determining whether or not the registration to the purchase data storage means has been completed and the completion determination means. It is characterized by being equipped with a sales registration means.

また、本発明に係る作業完了制御装置は、前記仕入データは、前記委託先からの前記保守業務の完了報告、または、前記商品の所有者からの検収確認報告を含むことを特徴とする。 Further, the work completion control device according to the present invention is characterized in that the purchase data includes a completion report of the maintenance work from the contractor or an acceptance confirmation report from the owner of the product.

また、本発明に係る作業完了制御装置は、前記仕入データは、前記委託先への支払計上データを含むことを特徴とする。 Further, the work completion control device according to the present invention is characterized in that the purchase data includes payment accounting data to the contractor.

また、本発明に係る作業完了制御方法は、記憶部と制御部とを備えた作業完了制御装置に実行させるための作業完了制御方法であって、前記制御部で実行させる、販売後の商品の保守業務の委託先への手配に関する仕入データの前記記憶部への登録が完了しているか否か判定する完了判定ステップと、前記完了判定ステップにて完了していると判定された場合、前記保守業務の売上データを前記記憶部に登録する売上登録ステップと、を含むことを特徴とする。 Further, the work completion control method according to the present invention is a work completion control method for causing a work completion control device including a storage unit and a control unit to execute the product, which is executed by the control unit after sales. When it is determined in the completion determination step of determining whether or not the registration of the purchase data related to the arrangement to the maintenance work contractor has been completed in the storage unit and the completion determination step have been completed, the above It is characterized by including a sales registration step of registering sales data of maintenance work in the storage unit.

また、本発明に係る作業完了制御プログラムは、記憶部と制御部とを備えた作業完了制御装置に実行させるための作業完了制御プログラムであって、前記制御部において、販売後の商品の保守業務の委託先への手配に関する仕入データの前記記憶部への登録が完了しているか否か判定する完了判定ステップと、前記完了判定ステップにて完了していると判定された場合、前記保守業務の売上データを前記記憶部に登録する売上登録ステップと、を実行させることを特徴とする。 Further, the work completion control program according to the present invention is a work completion control program for being executed by a work completion control device including a storage unit and a control unit, and the control unit performs maintenance work for a product after sales. The completion determination step for determining whether or not the registration of the purchase data related to the arrangement to the contractor has been completed in the storage unit, and the maintenance operation when it is determined that the purchase data has been completed in the completion determination step. It is characterized in that the sales registration step of registering the sales data of the above in the storage unit is executed.

本発明によれば、作業予定管理区分により売上・仕入を紐付けて管理することで、仕入計上が完了するまで売上計上を行えないように制御することができるという効果を奏する。 According to the present invention, by managing sales and purchases in association with each other according to the work schedule management category, it is possible to control so that sales cannot be recorded until the purchases are completed.

図1は、本実施形態の処理の概要を示す図である。FIG. 1 is a diagram showing an outline of the processing of the present embodiment. 図2は、本実施形態の処理の概要を示す図である。FIG. 2 is a diagram showing an outline of the processing of the present embodiment. 図3は、作業完了制御装置の構成の一例を示すブロック図である。FIG. 3 is a block diagram showing an example of the configuration of the work completion control device. 図4は、本実施形態における作業完了制御装置の処理の一例を示すフローチャートである。FIG. 4 is a flowchart showing an example of processing of the work completion control device according to the present embodiment. 図5−1は、売上明細画面の一例を示す図である。FIG. 5-1 is a diagram showing an example of a sales detail screen. 図5−2は、仕入明細画面の一例を示す図である。FIG. 5-2 is a diagram showing an example of the purchase details screen. 図5−3は、仕入明細画面の一例を示す図である。FIG. 5-3 is a diagram showing an example of the purchase details screen. 図6は、作業完了・仕入計上前状態の売上データ作成処理の一例を示す図である。FIG. 6 is a diagram showing an example of sales data creation processing in the state before work completion / purchase accounting. 図7は、仕入データ作成処理の一例を示す図である。FIG. 7 is a diagram showing an example of purchase data creation processing. 図8は、作業完了・仕入計上済み状態の売上データ作成処理の一例を示す図である。FIG. 8 is a diagram showing an example of sales data creation processing in a state where work is completed and purchases have been recorded. 図9は、サンプルデータを示す図である。FIG. 9 is a diagram showing sample data. 図10は、サンプルデータを示す図である。FIG. 10 is a diagram showing sample data. 図11は、サンプルデータを示す図である。FIG. 11 is a diagram showing sample data. 図12は、サンプルデータを示す図である。FIG. 12 is a diagram showing sample data.

本発明の実施形態を図面に基づいて詳細に説明する。なお、本発明は本実施形態により限定されるものではない。 Embodiments of the present invention will be described in detail with reference to the drawings. The present invention is not limited to the present embodiment.

[1.概要]
図1および図2を参照して、本発明の概要を説明する。図1および図2は、本実施形態の処理の概要を示す図である。
[1. Overview]
The outline of the present invention will be described with reference to FIGS. 1 and 2. 1 and 2 are diagrams showing an outline of the processing of the present embodiment.

まず、大型機械販売業者(工作機械、エレベータ、または、特殊車両など)は、機器販売後に機器のアフターフォロー(保守)を行っており、保守業務については、外注先に委託する場合がある。ここで、保守作業についての社内売上計上を行うにあたり、外注先の作業完了報告、または、客先検収を必須(すなわち、下請けの作業が完了を必須)とする場合がある。 First, large machine dealers (machine tools, elevators, special vehicles, etc.) perform after-sales follow-up (maintenance) of equipment after selling the equipment, and maintenance work may be outsourced to a subcontractor. Here, in order to record in-house sales for maintenance work, there are cases where the work completion report of the subcontractor or the customer acceptance inspection is indispensable (that is, the subcontracting work must be completed).

ここで、従来の販売管理システムでは、契約に基づく売上・請求の計上について、売上/仕入の紐づけが存在しない為、担当者の判断にて制御を行っていた。これにより、従来の販売管理システムでは、提供している保守サービス売上と、外注へ手配を行っている仕入と、の紐づきがない為、別々の計上を行っていたため、外注先からの作業完了報告、または、客先からの検収確認を得る前に、売上計上を行うことが可能となっていた。また、従来の販売管理システムにおいて、作業完了有無の確認は、担当者の判断に任されていたため、売上計上後の差し戻しが発生する原因となっていた。 Here, in the conventional sales management system, the recording of sales / invoices based on the contract is controlled by the judgment of the person in charge because there is no link between sales / purchase. As a result, in the conventional sales management system, there is no link between the maintenance service sales provided and the purchases arranged for outsourcing, so the work is done separately from the subcontractor. It was possible to record sales before receiving a completion report or confirmation of acceptance from the customer. Further, in the conventional sales management system, confirmation of whether or not the work is completed is left to the judgment of the person in charge, which causes a remand after the sales are recorded.

そこで、本実施形態においては、外注先からの作業完了報告と機械を保有しているところの検収とがすべて完了していなければ、売上を上げてはいけないため、それをシステム内で宣言することによって、それらの項目が完了していることを前提に売上計上することを、商品(売上)ごと、作業(仕入)ごとに、それぞれ設定させ、また、その紐づけができるようにする事で、作業・検収が完了していないものは売上計上できないようにしている。すなわち、本実施形態においては、売上予定データ作成時に、作業完了管理「あり」とする事で、売上計上時に対象仕入が完了していることを条件にすることを実現した。 Therefore, in this embodiment, if the work completion report from the subcontractor and the acceptance inspection of the place where the machine is owned are not completed, the sales should not be increased, so declare it in the system. By making it possible to set sales recording on the premise that those items have been completed for each product (sales) and each work (purchase), and to be able to link them. , It is not possible to record sales for items for which work / acceptance has not been completed. That is, in the present embodiment, by setting the work completion management "Yes" at the time of creating the sales schedule data, it is realized that the target purchase is completed at the time of recording the sales.

ここで、本実施形態における売上時作業完了管理においては、作業完了し、外注先への支払準備が完了するまで、売上の社内計上を行えない制御が必要なため、図1に示すように、売上(予定)および仕入(予定)の紐づけを管理し、該当仕入の計上が行われていないと、売上計上を不可としている。ここで、本実施形態においては、商品明細毎に保持している「(売上)作業予定管理区分」が「1:あり」に設定された場合、仕入明細側で紐づけ売上明細行番として登録可能となっている。また、本実施形態においては、1つの売上明細に対して、複数(N件)の仕入明細の紐付を可能としてもよい。 Here, in the sales work completion management in the present embodiment, it is necessary to control that the sales cannot be recorded in-house until the work is completed and the preparation for payment to the subcontractor is completed. Therefore, as shown in FIG. It manages the association between sales (planned) and purchases (planned), and if the relevant purchases are not recorded, sales cannot be recorded. Here, in the present embodiment, when the "(sales) work schedule management category" held for each product item is set to "1: yes", it is used as the linked sales item line number on the purchase item side. It is possible to register. Further, in the present embodiment, it may be possible to link a plurality of (N cases) purchase details to one sales item.

また、図2に示すように、本実施形態においては、作業予定管理が「1:あり」と登録され、且つ、仕入作業明細毎に紐づき売上明細行番号が指定された場合、定期契約売上明細において、売上明細毎に作業予定管理区分が保持され、商品毎に作業予定管理有無の設定が可能となり、定期契約仕入明細において、1つの売上商品に対して、複数(N件)の仕入明細の作業予定管理の紐づけが可能となる。そして、本実施形態においては、定期契約仕入詳細において、仕入一括計上実施時に、作業完了日、作業完了区分、仕入計上日、および、仕入完了区分が「1:済み」に更新される。そして、本実施形態においては、売上一括計上処理実行時に、紐づけ仕入明細の完了状態を確認して売上計上可否を判断し、可と判断された場合、売上完了日、および、売上完了区分が「1:済み」に更新されてもよい。 Further, as shown in FIG. 2, in the present embodiment, when the work schedule management is registered as "1: Yes" and the sales detail line number is specified for each purchase work detail, a fixed-term contract is made. In the sales statement, the work schedule management category is maintained for each sales statement, and it is possible to set whether or not to manage the work schedule for each product. In the fixed-term contract purchase statement, there are a plurality (N cases) for one sales product. It is possible to link the work schedule management of purchase details. Then, in the present embodiment, in the fixed-term contract purchase details, the work completion date, the work completion classification, the purchase recording date, and the purchase completion classification are updated to "1: completed" at the time of carrying out the purchase batch accounting. To. Then, in the present embodiment, when the sales batch recording process is executed, the completion status of the linked purchase details is confirmed to determine whether or not the sales can be recorded, and if it is determined, the sales completion date and the sales completion classification. May be updated to "1: Done".

[2.構成]
図3を参照して、本実施形態に係る作業完了制御装置100の構成の一例について説明する。図3は、作業完了制御装置100の構成の一例を示すブロック図である。
[2. Constitution]
An example of the configuration of the work completion control device 100 according to the present embodiment will be described with reference to FIG. FIG. 3 is a block diagram showing an example of the configuration of the work completion control device 100.

作業完了制御装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、作業完了制御装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The work completion control device 100 is a commercially available desktop personal computer. The work completion control device 100 is not limited to a stationary information processing device such as a desktop personal computer, but is also portable such as a commercially available notebook personal computer, PDA (Personal Digital Assistants), smartphone, and tablet personal computer. It may be a type information processing device.

作業完了制御装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。作業完了制御装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The work completion control device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each part of the work completion control device 100 is communicably connected via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、作業完了制御装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、作業完了制御装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。 The communication interface unit 104 connects the work completion control device 100 to the network 300 so as to be communicable via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the work completion control device 100 and the server 200 so as to be able to communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

記憶部106には、各種のデータベース、テーブル、およびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。記憶部106は、仕入データファイル106aと、売上データファイル106bとを備えている。 Various databases, tables, files, and the like are stored in the storage unit 106. In the storage unit 106, a computer program for giving a command to a CPU (Central Processing Unit) in cooperation with an OS (Operating System) to perform various processes is recorded. As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, or the like can be used. The storage unit 106 includes a purchase data file 106a and a sales data file 106b.

仕入データファイル106aは、販売後の商品の保守業務(保守作業)の委託先への手配に関する仕入データを記憶する。ここで、仕入データは、委託先(外注先)からの保守業務の完了報告、または、商品の所有者からの検収確認報告を含んでもよい。ここで、保守業務の完了報告は、完了日の日付を含んでいてもよい。また、検収確認報告は、検収確認日の日付を含んでいてもよい。また、仕入データは、委託先への支払計上データ(支払準備の完了報告)を含んでもよい。ここで、委託先への支払計上データは、仕入計上日の日付、仕入予定日の日付、作業完了日の日付、仕入金額、支払予定日の日付、および/または、支払金額等を含んでいてもよい。また、商品は、工作機械、エレベータ、または、特殊車両等の大型機械であってもよい。また、仕入データファイル106aは、定期契約ヘッダ、定期契約仕入明細、定期契約仕入詳細、定期契約支払詳細、仕入ヘッダ、および、仕入明細を含んでいてもよい。 The purchase data file 106a stores purchase data related to arrangements for maintenance work (maintenance work) of the product after sale to the contractor. Here, the purchase data may include a completion report of maintenance work from a subcontractor (subcontractor) or an acceptance confirmation report from the owner of the product. Here, the completion report of the maintenance work may include the date of the completion date. In addition, the acceptance confirmation report may include the date of the acceptance confirmation date. In addition, the purchase data may include payment recording data to the contractor (payment preparation completion report). Here, the payment recording data to the contractor includes the date of the purchase recording date, the date of the scheduled purchase date, the date of the work completion date, the purchase amount, the date of the scheduled payment date, and / or the payment amount, etc. It may be included. Further, the product may be a machine tool, an elevator, or a large machine such as a special vehicle. Further, the purchase data file 106a may include a fixed-term contract header, a fixed-term contract purchase details, a fixed-term contract purchase details, a fixed-term contract payment details, a purchase header, and a purchase details.

売上データファイル106bは、保守業務の売上データを記憶する。ここで、売上データは、売上計上日の日付、売上予定日の日付、売上金額、請求予定日の日付、回収予定日の日付、および/または、請求金額等を含んでいてもよい。また、売上データファイル106bは、定期契約ヘッダ、定期契約売上明細、定期契約売上詳細、定期契約支払詳細、売上ヘッダ、および、売上明細を含んでいてもよい。 The sales data file 106b stores the sales data of the maintenance work. Here, the sales data may include the date of the sales recording date, the date of the scheduled sales date, the sales amount, the date of the scheduled billing date, the date of the scheduled collection date, and / or the billing amount. Further, the sales data file 106b may include a fixed-term contract header, a fixed-term contract sales details, a fixed-term contract sales details, a fixed-term contract payment details, a sales header, and a sales details.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、および、マイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input / output interface unit 108. As the output device 114, a speaker or a printer can be used in addition to a monitor (including a home television). As the input device 112, in addition to a keyboard, a mouse, and a microphone, a monitor that cooperates with the mouse to realize a pointing device function can be used. In the following, the output device 114 may be referred to as a monitor 114, and the input device 112 may be referred to as a keyboard 112 or a mouse 112.

制御部102は、作業完了制御装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、仕入登録部102aと、完了判定部102b、売上登録部102cとを備えている。 The control unit 102 is a CPU or the like that collectively controls the work completion control device 100. The control unit 102 has an internal memory for storing a control program such as an OS, a program that defines various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Execute. The control unit 102 functionally includes a purchase registration unit 102a, a completion determination unit 102b, and a sales registration unit 102c.

仕入登録部102aは、仕入データを仕入データファイル106aに登録する。ここで、仕入登録部102aは、入力装置112を介して入力された仕入データを仕入データファイル106aに登録してもよい。 The purchase registration unit 102a registers the purchase data in the purchase data file 106a. Here, the purchase registration unit 102a may register the purchase data input via the input device 112 in the purchase data file 106a.

完了判定部102bは、仕入データの仕入データファイル106aへの登録が完了しているか否か判定する。 The completion determination unit 102b determines whether or not the registration of the purchase data in the purchase data file 106a is completed.

売上登録部102cは、売上データを売上データファイル106bに登録する。ここで、売上登録部102cは、完了判定部102bにより完了していると判定された場合、売上データを売上データ記憶手段に登録してもよい。また、売上登録部102cは、入力装置112を介して入力された売上データを売上データファイル106bに登録してもよい。 The sales registration unit 102c registers the sales data in the sales data file 106b. Here, the sales registration unit 102c may register the sales data in the sales data storage means when the completion determination unit 102b determines that the sales have been completed. Further, the sales registration unit 102c may register the sales data input via the input device 112 in the sales data file 106b.

[3.具体例]
本実施形態の具体例について、図4から図12を参照して説明する。
[3. Concrete example]
Specific examples of this embodiment will be described with reference to FIGS. 4 to 12.

[売上振替処理]
ここで、図4を参照して、本実施形態における作業完了制御処理の一例について説明する。図4は、本実施形態における作業完了制御装置100の処理の一例を示すフローチャートである。
[Sales transfer processing]
Here, an example of the work completion control process in the present embodiment will be described with reference to FIG. FIG. 4 is a flowchart showing an example of processing of the work completion control device 100 in the present embodiment.

図4に示すように、仕入登録部102aは、ユーザにより入力装置112を介して販売後の大型機械の保守業務の委託先への手配に関する、委託先からの保守業務の完了報告または商品の所有者からの検収確認報告、ならびに、委託先への支払計上データを含む仕入データが入力された場合、入力された仕入データを仕入データファイル106aに登録する(ステップSA−1)。 As shown in FIG. 4, the purchase registration unit 102a reports the completion of the maintenance work from the contractor or the product regarding the arrangement by the user to the contractor for the maintenance work of the large machine after sale via the input device 112. When the purchase confirmation report from the owner and the purchase data including the payment accounting data to the contractor are input, the input purchase data is registered in the purchase data file 106a (step SA-1).

そして、完了判定部102bは、仕入登録部102aによる仕入データの仕入データファイル106aへの登録が完了しているか否か判定する(ステップSA−2)。 Then, the completion determination unit 102b determines whether or not the registration of the purchase data by the purchase registration unit 102a in the purchase data file 106a is completed (step SA-2).

そして、完了判定部102bは、仕入データの仕入データファイル106aへの登録が完了していないと判定した場合(ステップSA−2:No)、処理をステップSA−1に移行させる。 Then, when the completion determination unit 102b determines that the registration of the purchase data in the purchase data file 106a has not been completed (step SA-2: No), the process shifts to step SA-1.

一方、完了判定部102bは、仕入データの仕入データファイル106aへの登録が完了していると判定した場合(ステップSA−2:Yes)、処理をステップSA−3に移行させる。 On the other hand, when the completion determination unit 102b determines that the registration of the purchase data in the purchase data file 106a is completed (step SA-2: Yes), the process shifts to step SA-3.

そして、売上登録部102cは、ユーザにより入力装置112を介して入力された販売後の大型機械の保守業務の売上データを売上データファイル106bに登録し(ステップSA−3)、処理を終了する。 Then, the sales registration unit 102c registers the sales data of the maintenance work of the large machine after sales input by the user via the input device 112 in the sales data file 106b (step SA-3), and ends the process.

ここで、図5を参照して、本実施形態における定期契約入力処理の一例について説明する。図5−1は、売上明細画面の一例を示す図である。図5−2および図5−3は、仕入明細画面の一例を示す図である。 Here, an example of the fixed-term contract input process in the present embodiment will be described with reference to FIG. FIG. 5-1 is a diagram showing an example of a sales detail screen. 5-2 and 5-3 are diagrams showing an example of the purchase details screen.

本実施形態においては、図5−1に示す売上明細画面に示すように、「売上作業予定管理区分」が「1:あり」とユーザにより設定された場合、図5−2に示すように、仕入明細画面にて「対応売上明細行番」の選択が可能となり、図5−3に示すように、仕入明細画面側で、「対応売上明細行番」を指定する事で、売上/仕入の紐づけが行われる。 In the present embodiment, as shown in the sales details screen shown in FIG. 5-1 when the “sales work schedule management category” is set to “1: yes” by the user, as shown in FIG. 5-2, "Corresponding sales detail line number" can be selected on the purchase details screen, and as shown in Fig. 5-3, by specifying the "corresponding sales details line number" on the purchase details screen side, sales / The purchase is linked.

また、図6を参照して、本実施形態における売上データ作成処理(作業完了・仕入計上前状態)の一例について説明する。図6は、作業完了・仕入計上前状態の売上データ作成処理の一例を示す図である。 Further, with reference to FIG. 6, an example of the sales data creation process (work completion / pre-purchase accounting state) in the present embodiment will be described. FIG. 6 is a diagram showing an example of sales data creation processing in the state before work completion / purchase accounting.

図6に示すように、「売上作業予定管理」が「1:あり」と設定されている場合、紐づきの仕入データ側が、作業完了、および、仕入計上済みになるまで、社内売上計上を行う事ができないようにしているため、該当月の売上計上対象データは、候補として挙がってくるが、計上対象チェックを付ける事ができないようになっている。 As shown in FIG. 6, when "Sales work schedule management" is set to "1: Yes", in-house sales are recorded until the purchase data side of the link is completed and the purchase is recorded. Since it is not possible to perform the above, the sales recording target data for the corresponding month is listed as a candidate, but it is not possible to check the recording target.

また、図7を参照して、本実施形態における仕入データ作成処理の一例について説明する。図7は、仕入データ作成処理の一例を示す図である。 Further, an example of the purchase data creation process in the present embodiment will be described with reference to FIG. 7. FIG. 7 is a diagram showing an example of purchase data creation processing.

図7に示すように、委託先(外注先)からの作業完了報告、および、客先からの検収報告を受けた後、外注作業に対しての仕入計上を行うことができる。 As shown in FIG. 7, after receiving the work completion report from the outsourcer (subcontractor) and the acceptance inspection report from the customer, it is possible to record the purchase for the outsourced work.

また、図8を参照して、本実施形態における売上データ作成処理の一例について説明する。図8は、作業完了・仕入計上済み状態の売上データ作成処理の一例を示す図である。 Further, an example of the sales data creation process in the present embodiment will be described with reference to FIG. FIG. 8 is a diagram showing an example of sales data creation processing in a state where work is completed and purchases have been recorded.

図8に示すように、「売上作業予定管理」が「1:あり」と設定されている際に、紐づきの仕入データ側が、全て作業完了、および、仕入計上済みにステータス変更が行われた場合、売上計上可能となるため、該当月の売上計上対象データが計上対象の候補となり、計上対象チェックを付ける事が可能となる。 As shown in FIG. 8, when "Sales work schedule management" is set to "1: Yes", all the work is completed on the purchase data side of the link, and the status is changed to "Purchase recorded". In that case, since sales can be recorded, the sales target data of the corresponding month becomes a candidate for recording target, and it is possible to check the recording target.

また、図9から図12を参照して、本実施形態における売上時作業予定管理(売上/仕入の紐づき管理)処理の一例について説明する。図9から図12は、サンプルデータを示す図である。 Further, with reference to FIGS. 9 to 12, an example of the work schedule management at the time of sales (sales / purchase linking management) processing in the present embodiment will be described. 9 to 12 are diagrams showing sample data.

図9に示すように、作業完了の場合、複数の外注に作業手配を行っており、作業完了日が2種類以上取得される場合がある。そこで、本実施形態においては、定期契約仕入詳細の作業完了日の最も遅い日付(6/30)を、売上一括計上画面の作業完了日にセットすることで、予定通り201X+1年6月日付での売上計上が可能となる。 As shown in FIG. 9, when the work is completed, the work is arranged for a plurality of outsourcers, and two or more types of work completion dates may be acquired. Therefore, in the present embodiment, by setting the latest work completion date (6/30) of the fixed-term contract purchase details to the work completion date of the sales lump sum recording screen, the date is 201X + 1 June, as scheduled. Sales can be recorded.

また、図10に示すように、作業未完了の場合、全ての外注作業が完了していないとみなし、売上計上を不可とすることで、全ての外注作業が6月中に完了するのを待ってから、売上計上を行うように制御する。 In addition, as shown in FIG. 10, when the work is not completed, it is considered that all the outsourced work has not been completed, and sales cannot be recorded, so that all the outsourced work is waited for to be completed by the end of June. After that, control to record sales.

また、図11に示すように、複数の外注先に作業手配を行っている場合、作業完了日が月跨ぎになる場合がある。そこで、本実施形態においては、売上と仕入との会計年月日で比較を行うことで、定期契約仕入詳細の作業完了日の最も遅い日付(7/3)を、売上一括計上画面の作業完了日にセットする。すなわち、6月末時点では、売上計上を行うことができないように制御する。 Further, as shown in FIG. 11, when work is arranged to a plurality of subcontractors, the work completion date may span months. Therefore, in the present embodiment, by comparing the sales and the purchases by the accounting date, the latest date (7/3) of the work completion date of the fixed-term contract purchase details can be set on the sales batch recording screen. Set on the work completion date. That is, as of the end of June, it is controlled so that sales cannot be recorded.

また、図12に示すように、売上・一部仕入の会計年月(計上予定月)を変更した場合、仕入先A社への仕入計上は、6月中に発生させ、残りのB社の作業完了を待って、売上計上を行い、売上および仕入ともに会計年月を7月に変更することで、定期契約仕入詳細の作業完了日の最も遅い日付(7/10)を、売上一括計上画面の作業完了日にセットする。すなわち、6月末時点では、売上計上を行うことができないように制御する。 In addition, as shown in Fig. 12, if the fiscal year / month (scheduled recording month) of sales / partial purchases is changed, purchases will be recorded to supplier A during June, and the rest will be recorded. By waiting for the completion of the work of Company B, recording sales, and changing the accounting date for both sales and purchases to July, the latest date (7/10) of the work completion date of the fixed-term contract purchase details can be set. , Set the work completion date on the sales batch recording screen. That is, as of the end of June, it is controlled so that sales cannot be recorded.

このように、本実施形態においては、機械業の保守業務用向けに、売上と仕入との紐付け管理を可能としている。すなわち、本実施形態においては、仕入側に保持している(外注作業)完了日の情報をもとに、紐づく売上を計上出来るかどうかの判断をしている。なお、本実施形態においては、必ずしもこのルールに則って計上する必要はなく、紐付け計上するかどうかは契約単位に設定してもよい。 As described above, in the present embodiment, it is possible to manage the association between sales and purchases for maintenance work in the machinery industry. That is, in the present embodiment, it is determined whether or not the associated sales can be recorded based on the information on the completion date held on the purchasing side (outsourced work). In addition, in this embodiment, it is not always necessary to record according to this rule, and whether or not to record in association may be set for each contract.

また、本実施形態においては、契約型債権と違い、該当作業分を明確に出来るようになり、作業按分の考え方も新たに追加し、売上と仕入との紐付けを追加している。 Further, in the present embodiment, unlike the contract type receivable, the corresponding work portion can be clarified, the concept of work apportionment is newly added, and the link between sales and purchase is added.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
In addition to the above-described embodiments, the present invention may be implemented in various different embodiments within the scope of the technical ideas described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, of each of the processes described in the embodiments, all or part of the processes described as being automatically performed may be performed manually, or all the processes described as being performed manually. Alternatively, a part thereof can be automatically performed by a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, the processing procedure, control procedure, specific name, information including parameters such as registration data and search conditions of each processing, screen examples, and database configuration shown in this specification and drawings are not specified unless otherwise specified. Can be changed arbitrarily.

また、作業完了制御装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Further, with respect to the work completion control device 100, each component shown in the figure is a functional concept and does not necessarily have to be physically configured as shown in the figure.

例えば、作業完了制御装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて作業完了制御装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, with respect to the processing functions included in the work completion control device 100, particularly each processing function performed by the control unit, all or any part thereof is realized by the CPU and a program interpreted and executed by the CPU. It may be realized as hardware by wired logic. The program is recorded on a non-temporary computer-readable recording medium including a programmed instruction for causing the information processing apparatus to execute the process described in the present embodiment, and work completion control is performed as necessary. It is read mechanically by the device 100. That is, in a storage unit such as a ROM or an HDD (Hard Disk Drive), a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded. This computer program is executed by being loaded into RAM, and constitutes a control unit in cooperation with a CPU.

また、このコンピュータプログラムは、作業完了制御装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 Further, this computer program may be stored in an application program server connected to the work completion control device 100 via an arbitrary network, and all or a part thereof can be downloaded as needed. Is.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD−ROM(Compact Disk Read Only Memory)、MO(Magneto−Optical disk)、DVD(Digital Versatile Disk)、および、Blu−ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, the program for executing the process described in the present embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EEPROM (registration). Trademarks) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magnet-Optical Disk), MO (Magnet-Optical Disk), Digital Disk, DVD (Digital), DVD (Digital) It shall include any "portable physical medium".

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Further, the "program" is a data processing method described in any language or description method, regardless of the format such as source code or binary code. The "program" is not necessarily limited to a single program, but is distributed as a plurality of modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. A well-known configuration and procedure can be used for a specific configuration and reading procedure for reading the recording medium in each device shown in the embodiment, an installation procedure after reading, and the like.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。 Various databases and the like stored in the storage unit are memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and storage means such as optical disks, and are used for various processes and website provision. Stores programs, tables, databases, files for web pages, etc.

また、作業完了制御装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、作業完了制御装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the work completion control device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which an arbitrary peripheral device is connected. Further, the work completion control device 100 may be realized by mounting software (including a program or data) that realizes the processing described in the present embodiment on the device.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution / integration of the device is not limited to that shown in the figure, and all or part of the device is functionally or physically in any unit according to various additions or functional loads. It can be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and implemented, or the embodiments may be selectively implemented.

本発明は、特に、大型機械製造販売業(アフターフォロー有)、メンテナンス業などにおいて有用である。 The present invention is particularly useful in the large machine manufacturing and sales industry (with after-sales follow-up), the maintenance industry, and the like.

100 作業完了制御装置
102 制御部
102a 仕入登録部
102b 完了判定部
102c 売上登録部
104 通信インターフェース部
106 記憶部
106a 仕入データファイル
106b 売上データファイル
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Work completion control device 102 Control unit 102a Purchase registration unit 102b Completion judgment unit 102c Sales registration unit 104 Communication interface unit 106 Storage unit 106a Purchase data file 106b Sales data file 108 Input / output interface unit 112 Input device 114 Output device 200 server 300 networks

Claims (5)

記憶部と制御部とを備えた作業完了制御装置であって、
前記記憶部は、
販売後の商品の保守業務の委託先への手配に関する仕入データを記憶する仕入データ記憶手段と、
前記保守業務の売上データを記憶する売上データ記憶手段と、
を備え、
前記制御部は、
前記仕入データの前記仕入データ記憶手段への登録が完了しているか否か判定する完了判定手段と、
前記完了判定手段により完了していると判定された場合、前記売上データを前記売上データ記憶手段に登録する売上登録手段と、
を備えたことを特徴とする作業完了制御装置。
A work completion control device equipped with a storage unit and a control unit.
The storage unit
Purchasing data storage means for storing purchase data related to arrangements for maintenance work of products after sales
A sales data storage means for storing sales data of the maintenance work and
With
The control unit
A completion determination means for determining whether or not the purchase data has been registered in the purchase data storage means, and
When it is determined by the completion determination means that the sales have been completed, the sales registration means for registering the sales data in the sales data storage means and the sales registration means.
A work completion control device characterized by being equipped with.
前記仕入データは、
前記委託先からの前記保守業務の完了報告、または、前記商品の所有者からの検収確認報告を含むことを特徴とする請求項1に記載の作業完了制御装置。
The purchase data is
The work completion control device according to claim 1, further comprising a completion report of the maintenance work from the contractor or an acceptance confirmation report from the owner of the product.
前記仕入データは、
前記委託先への支払計上データを含むことを特徴とする請求項1または2に記載の作業完了制御装置。
The purchase data is
The work completion control device according to claim 1 or 2, wherein the work completion control device includes the payment accounting data to the contractor.
記憶部と制御部とを備えた作業完了制御装置に実行させるための作業完了制御方法であって、
前記制御部で実行させる、
販売後の商品の保守業務の委託先への手配に関する仕入データの前記記憶部への登録が完了しているか否か判定する完了判定ステップと、
前記完了判定ステップにて完了していると判定された場合、前記保守業務の売上データを前記記憶部に登録する売上登録ステップと、
を含むことを特徴とする作業完了制御方法。
It is a work completion control method for causing a work completion control device having a storage unit and a control unit to execute the work completion control device.
It is executed by the control unit.
A completion determination step for determining whether or not the registration of purchase data related to arrangements for maintenance work of the product after sale in the storage unit has been completed, and
When it is determined that the completion is completed in the completion determination step, the sales registration step of registering the sales data of the maintenance work in the storage unit and the sales registration step.
A work completion control method characterized by including.
記憶部と制御部とを備えた作業完了制御装置に実行させるための作業完了制御プログラムであって、
前記制御部において、
販売後の商品の保守業務の委託先への手配に関する仕入データの前記記憶部への登録が完了しているか否か判定する完了判定ステップと、
前記完了判定ステップにて完了していると判定された場合、前記保守業務の売上データを前記記憶部に登録する売上登録ステップと、
を実行させるための作業完了制御プログラム。
A work completion control program for executing a work completion control device having a storage unit and a control unit.
In the control unit
A completion determination step for determining whether or not the registration of purchase data related to arrangements for maintenance work of the product after sale in the storage unit has been completed, and
When it is determined that the completion is completed in the completion determination step, the sales registration step of registering the sales data of the maintenance work in the storage unit and the sales registration step.
Work completion control program to execute.
JP2017007023A 2016-03-16 2017-01-18 Work completion control device, work completion control method, and work completion control program Active JP6817082B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016052657 2016-03-16
JP2016052657 2016-03-16

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2020213089A Division JP7046153B2 (en) 2016-03-16 2020-12-23 Work completion control device, work completion control method, and work completion control program

Publications (2)

Publication Number Publication Date
JP2017174401A JP2017174401A (en) 2017-09-28
JP6817082B2 true JP6817082B2 (en) 2021-01-20

Family

ID=59971391

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2017007023A Active JP6817082B2 (en) 2016-03-16 2017-01-18 Work completion control device, work completion control method, and work completion control program
JP2020213089A Active JP7046153B2 (en) 2016-03-16 2020-12-23 Work completion control device, work completion control method, and work completion control program

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2020213089A Active JP7046153B2 (en) 2016-03-16 2020-12-23 Work completion control device, work completion control method, and work completion control program

Country Status (1)

Country Link
JP (2) JP6817082B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7499112B2 (en) 2020-08-20 2024-06-13 株式会社オービック Sales recording device, sales recording method, and sales recording program
JP7502206B2 (en) 2021-01-18 2024-06-18 株式会社オービック Consigned item management device, consigned item management method, and consigned item management program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002352021A (en) 2001-05-24 2002-12-06 Ricoh Co Ltd Method for receiving and repairing device, system, program, and recording medium
JP2003006746A (en) * 2001-06-21 2003-01-10 Hitachi Software Eng Co Ltd Method for automatically registering stocking from registered sales in sales management system, and sales management system
JP2003132203A (en) 2001-10-22 2003-05-09 Kawasaki Steel Corp Budget management system
US20030220812A1 (en) 2002-04-09 2003-11-27 Jones Michael B. Method of coordinating business transactions between repair service participants

Also Published As

Publication number Publication date
JP7046153B2 (en) 2022-04-01
JP2021047912A (en) 2021-03-25
JP2017174401A (en) 2017-09-28

Similar Documents

Publication Publication Date Title
JP7029929B2 (en) Cost accounting equipment, cost accounting method, and cost accounting program
JP7046153B2 (en) Work completion control device, work completion control method, and work completion control program
JP7032164B2 (en) Work-in-process automatic transfer device, work-in-process automatic transfer method, and work-in-process automatic transfer program
JP7079673B2 (en) Cost-bearing department setting device, cost-bearing department setting method and cost-bearing department setting program
JP2024015351A (en) Cost budget/actual management device, cost budget/actual management method, and cost budget/actual management program
JP2018055265A (en) Expense calculation device, expense calculation method and expense calculation program
JP6923408B2 (en) Retroactive unit price correction device, retroactive unit price correction method, and retroactive unit price correction program
JP2019168980A (en) Progress rate calculation device, progress rate calculation method and progress rate calculation program
JP7344190B2 (en) Construction business accounting device, construction business accounting method, and construction business accounting program
JP2022097622A (en) Information processing device, information processing method and information processing program
JP2023119201A (en) Business support device, business support method, and program
JP7011470B2 (en) Work-in-process automatic transfer device, work-in-process automatic transfer method, and work-in-process automatic transfer program
JP7093267B2 (en) Data generator, data generation method and data generation program
JP2021149405A (en) Management device associating prepayment with transfer, management method associating prepayment with transfer and management program associating prepayment with transfer
JP2021077284A (en) Device, method, and program for transferring generated cost
JP2016091384A (en) Information processor, program, and information processing method
JP7104817B2 (en) Voucher registration control device, voucher registration control method, and voucher registration control program
JP7312137B2 (en) Manufacturing control device, manufacturing control method, and manufacturing control program
JP7261332B2 (en) Automatic work-in-process transfer device, automatic work-in-process transfer method, and automatic work-in-process transfer program
JP7481193B2 (en) Procurement management device, procurement management method, and procurement management program
JP7064381B2 (en) Miscalculation confirmation business support device, miscalculation confirmation business support method and miscalculation confirmation business support program
JP7499112B2 (en) Sales recording device, sales recording method, and sales recording program
JP7194063B2 (en) Journal writing device, journal writing method and journal writing program
JP2022039639A (en) Business support device, business support program, and business support method
JP2023047663A (en) Construction industry law automatic checking device, construction industry law automatic checking method and construction industry law automatic checking program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200106

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20201028

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201224

R150 Certificate of patent or registration of utility model

Ref document number: 6817082

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250