JP6709485B1 - Support device - Google Patents

Support device Download PDF

Info

Publication number
JP6709485B1
JP6709485B1 JP2020005643A JP2020005643A JP6709485B1 JP 6709485 B1 JP6709485 B1 JP 6709485B1 JP 2020005643 A JP2020005643 A JP 2020005643A JP 2020005643 A JP2020005643 A JP 2020005643A JP 6709485 B1 JP6709485 B1 JP 6709485B1
Authority
JP
Japan
Prior art keywords
frame member
bolt
frame
ceiling
air conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020005643A
Other languages
Japanese (ja)
Other versions
JP2021113571A (en
Inventor
真 生野
真 生野
将司 石川
将司 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
N-Pat Co., Ltd.
Original Assignee
N-Pat Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by N-Pat Co., Ltd. filed Critical N-Pat Co., Ltd.
Priority to JP2020005643A priority Critical patent/JP6709485B1/en
Application granted granted Critical
Publication of JP6709485B1 publication Critical patent/JP6709485B1/en
Publication of JP2021113571A publication Critical patent/JP2021113571A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

【課題】空気調和機などの天井吊り下げ物を効率的に適切な位置に設置できるようにする。【解決手段】概略箱形形状の互いに平行な左右両側面にボルト部材9を取り付けるための取付片121が設けられた天井吊り下げ物100を、天井空間に吊り下げた状態で支持する支持装置1は、天井吊り下げ物100の上面を左右方向に横断するように配置され、両端部にボルト部材9が連結されることにより天井吊り下げ物100の上面に対して固定される第1フレーム部材10と、天井吊り下げ物100の上面を前後方向に横断するように配置される第2フレーム部材20と、第1フレーム部材10と第2フレーム部材20とが互いに直交し、且つ、第1フレーム部材10と第2フレーム部材20とを上下方向に所定間隔を隔てた状態で相互に連結するフレーム連結部材30と、下端部が第2フレーム部材20に連結され、上端部が天井構造に接続される吊りボルト40と、を備える。【選択図】図1PROBLEM TO BE SOLVED: To efficiently install a suspended object such as an air conditioner at an appropriate position. SOLUTION: A supporting device 1 for supporting a ceiling hanging object 100 in which mounting pieces 121 for mounting a bolt member 9 are provided on both left and right side surfaces of a generally box-shaped parallel to each other in a suspended state in a ceiling space. Is a first frame member 10 which is arranged so as to traverse the upper surface of the ceiling hanging object 100 in the left-right direction and is fixed to the upper surface of the ceiling hanging object 100 by connecting the bolt members 9 to both ends. And a second frame member 20 arranged so as to traverse the upper surface of the suspended object 100 in the front-rear direction, the first frame member 10 and the second frame member 20 are orthogonal to each other, and the first frame member A frame connecting member 30 for connecting the 10 and the second frame member 20 to each other in the vertical direction with a predetermined space therebetween, a lower end portion is connected to the second frame member 20, and an upper end portion is connected to the ceiling structure. And a hanging bolt 40. [Selection diagram] Figure 1

Description

本発明は、空気調和機などの天井吊り下げ物を天井空間に吊り下げた状態で支持する支持装置に関する。 The present invention relates to a support device that supports a suspended object such as an air conditioner in a suspended state in a ceiling space.

従来、天井空間に吊り下げられた状態に設置される空気調和機が知られている(例えば、特許文献1,2)。この種の空気調和機は、平面視略矩形状であり、互いに平行な二つの側面のそれぞれの下部近傍位置に、吊りボルトなどのボルト部材を連結するための取付片を備えている。このような空気調和機を天井空間に設置する場合、二つの側面のそれぞれに設けられている取付片に対して、天井スラブなどの天井構造から垂下するボルト部材の下端部が連結される。すなわち、空気調和機は、合計4本のボルト部材によって互いに平行な二つの側面に設けられている取付片が支持された状態で天井空間に設置される。 Conventionally, an air conditioner installed in a state suspended from a ceiling space is known (for example, Patent Documents 1 and 2). This type of air conditioner has a substantially rectangular shape in a plan view, and is provided with mounting pieces for connecting bolt members such as suspension bolts at positions near lower portions of two parallel side surfaces. When installing such an air conditioner in a ceiling space, the lower end portion of a bolt member that hangs from a ceiling structure such as a ceiling slab is connected to mounting pieces provided on each of the two side surfaces. That is, the air conditioner is installed in the ceiling space with a total of four bolt members supporting the mounting pieces provided on the two side surfaces parallel to each other.

図13は、空気調和機400を天井空間に設置した状態における従来の支持構造300を示す図である。図13に示すように、従来の支持構造300は、天井スラブなどの天井構造200から吊りボルトなどのボルト部材309が垂下しており、そのボルト部材309の下端部において空気調和機400を支持する構造である。空気調和機400は、側面の下部近傍位置にボルト部材309を連結するための一対の取付片411,411を備えており、その一対の取付片411,411にボルト部材309の下端部が連結される。これにより、空気調和機400は、天井空間に吊り下げられた状態で支持される。 FIG. 13: is a figure which shows the conventional support structure 300 in the state which installed the air conditioner 400 in the ceiling space. As shown in FIG. 13, in a conventional support structure 300, a bolt member 309 such as a hanging bolt hangs from a ceiling structure 200 such as a ceiling slab, and the lower end portion of the bolt member 309 supports the air conditioner 400. It is a structure. The air conditioner 400 includes a pair of mounting pieces 411, 411 for connecting the bolt member 309 to a position near the lower portion of the side surface, and the lower end portion of the bolt member 309 is connected to the pair of mounting pieces 411, 411. It Accordingly, the air conditioner 400 is supported in a state of being suspended in the ceiling space.

空気調和機400がボルト部材309によって吊り下げられた状態に設置されると、空気調和機400を振れ止めするためのブレース310がボルト部材309に取り付けられる。ブレース310は、互いに隣り合う2本のボルト部材309どうしを連結するように斜め方向に配置され、一方のボルト部材309の上部と他方のボルト部材309の下部とを連結固定する。隣り合う2本のボルト部材309,309の間に2本のブレース310が交叉配置されることにより、ボルト部材309,309が固定され、空気調和機400を振れ止めすることができる。 When the air conditioner 400 is installed in a state of being suspended by the bolt member 309, the brace 310 for stopping the steady state of the air conditioner 400 is attached to the bolt member 309. The brace 310 is diagonally arranged so as to connect two bolt members 309 adjacent to each other, and connects and fixes an upper portion of one bolt member 309 and a lower portion of the other bolt member 309. Since the two braces 310 are arranged to cross each other between the two adjacent bolt members 309, 309, the bolt members 309, 309 are fixed and the air conditioner 400 can be steady.

特開平7−71789号公報JP-A-7-71789 特開2001−330272号公報JP, 2001-330272, A

ところで、天井空間において空気調和機400を設置する位置は、設計上予め定められている。そのため、上述した従来の支持構造300は、設計上予め定められた空気調和機400の設置位置に基づき、空気調和機400の二つの側面に設けられている取付片411の位置に適合するように、天井構造200から垂下するボルト部材309が設置される。 By the way, the position where the air conditioner 400 is installed in the ceiling space is predetermined in design. Therefore, the conventional support structure 300 described above is adapted to the positions of the mounting pieces 411 provided on the two side surfaces of the air conditioner 400 based on the predetermined installation position of the air conditioner 400 in design. A bolt member 309 hanging from the ceiling structure 200 is installed.

しかしながら、例えば天井空間において天井構造200と取付片411との間に配管やダクトなどの障害物が存在していると、天井構造200から取付片411の位置に対してボルト部材309を垂下させることができず、設計上予め定められた適切な位置に空気調和機400を設置することができないという問題がある。 However, for example, when an obstacle such as a pipe or a duct exists between the ceiling structure 200 and the mounting piece 411 in the ceiling space, the bolt member 309 may be hung from the ceiling structure 200 to the position of the mounting piece 411. However, there is a problem that the air conditioner 400 cannot be installed at an appropriate position that is predetermined in design.

また、天井構造200の下面には、図14に示すようにデッキプレート201が配置されていることがある。デッキプレート201は、山部202と谷部203とが所定間隔で形成されており、その上面にコンクリートなどの天井スラブが打設される。デッキプレート201にボルト部材309が取り付ける場合、強度低下を防ぐため、山部202に対してボルト部材309を取り付ける必要がある。 Further, a deck plate 201 may be arranged on the lower surface of the ceiling structure 200 as shown in FIG. The deck plate 201 has a peak portion 202 and a valley portion 203 formed at a predetermined interval, and a ceiling slab such as concrete is placed on the upper surface thereof. When the bolt member 309 is attached to the deck plate 201, it is necessary to attach the bolt member 309 to the mountain portion 202 in order to prevent a decrease in strength.

しかし、空気調和機400においてボルト部材309を接続するための一対の取付片411の間隔が山部202の設置間隔に適合しないことがある。そのような場合、従来は、図14に示すように、デッキプレート201の山部202に対し、剛性の高いH形鋼などを用いてボルト部材309を垂設支持するための支持構造350を設置しなければならない。支持構造350を設置する作業は高所作業となるため、作業効率が悪い。そのため、空気調和機400を天井空間に設置するために多大な時間を要するという問題がある。 However, in the air conditioner 400, the interval between the pair of mounting pieces 411 for connecting the bolt member 309 may not match the installation interval of the crests 202. In such a case, conventionally, as shown in FIG. 14, a support structure 350 for vertically supporting the bolt member 309 is installed on the mountain portion 202 of the deck plate 201 by using a highly rigid H-shaped steel or the like. Must. Since the work of installing the support structure 350 is a work at a high place, the work efficiency is low. Therefore, there is a problem that it takes a lot of time to install the air conditioner 400 in the ceiling space.

そこで本発明は、上記問題点を解決するためになされたものであり、空気調和機などの天井吊り下げ物を効率的に適切な位置に設置できるようにした支持装置を提供することを目的とする。 Therefore, the present invention has been made to solve the above problems, and an object of the present invention is to provide a support device capable of efficiently installing a suspended object such as an air conditioner at an appropriate position. To do.

上記目的を達成するため、第1に、本発明は、概略箱形形状の互いに平行な左右両側面にボルト部材を取り付けるための取付片が設けられた天井吊り下げ物を、天井空間に吊り下げた状態で支持する支持装置であって、前記天井吊り下げ物の上面を左右方向に横断するように配置され、両端部に前記取付片に取り付けられた前記ボルト部材が連結されることにより前記天井吊り下げ物の上面に対して固定される第1フレーム部材と、前記天井吊り下げ物の上面を前後方向に横断するように配置される第2フレーム部材と、前記第1フレーム部材と前記第2フレーム部材とが互いに直交し、且つ、前記第1フレーム部材と前記第2フレーム部材とが上下方向に所定間隔を隔てた状態で前記第1フレーム部材と前記第2フレーム部材とを連結するフレーム連結部材と、下端部が前記第2フレーム部材に連結され、上端部が天井構造に接続される吊りボルトと、を備え、前記第1フレーム部材に対する前記フレーム連結部材の取付位置が、前記第1フレーム部材の長手方向に沿って調整可能であることを特徴とする構成である。
第2に、本発明は、概略箱形形状の互いに平行な左右両側面にボルト部材を取り付けるための取付片が設けられた天井吊り下げ物を、天井空間に吊り下げた状態で支持する支持装置であって、前記天井吊り下げ物の上面を左右方向に横断するように配置され、両端部に前記取付片に取り付けられた前記ボルト部材が連結されることにより前記天井吊り下げ物の上面に対して固定される第1フレーム部材と、前記天井吊り下げ物の上面を前後方向に横断するように配置される第2フレーム部材と、前記第1フレーム部材と前記第2フレーム部材とが互いに直交し、且つ、前記第1フレーム部材と前記第2フレーム部材とが上下方向に所定間隔を隔てた状態で前記第1フレーム部材と前記第2フレーム部材とを連結するフレーム連結部材と、下端部が前記第2フレーム部材に連結され、上端部が天井構造に接続される吊りボルトと、を備え、前記第2フレーム部材に対する前記吊りボルトの取付位置が、前記第2フレーム部材の長手方向に沿って調整可能であることを特徴とする構成である。
第3に、本発明は、上記第2の構成を有する支持装置において、前記第1フレーム部材に対する前記フレーム連結部材の取付位置が、前記第1フレーム部材の長手方向に沿って調整可能であることを特徴とする構成である。
In order to achieve the above-mentioned object, firstly, the present invention hangs a ceiling hanging object, in which mounting pieces for mounting bolt members are provided on both left and right side surfaces of a substantially box shape, which are parallel to each other, in a ceiling space. In the supporting device, the ceiling suspended object is arranged so as to traverse the upper surface of the suspended object in the left-right direction, and the ceiling is formed by connecting the bolt members attached to the attachment pieces to both ends. A first frame member fixed to the upper surface of the suspended object, a second frame member arranged to cross the upper surface of the suspended object in the front-rear direction, the first frame member, and the second frame member. A frame connection that connects the first frame member and the second frame member in a state where the frame members are orthogonal to each other and the first frame member and the second frame member are vertically spaced apart by a predetermined distance. A suspension bolt having a lower end portion connected to the second frame member and an upper end portion connected to the ceiling structure, and a mounting position of the frame connection member with respect to the first frame member is the first frame. adjustable der isosamples along the longitudinal direction of the member is configured to said.
Secondly, the present invention is a support device for supporting a suspended ceiling object, in which mounting pieces for mounting bolt members are provided on both left and right side surfaces of a substantially box-shaped parallel shape, in a suspended state in a ceiling space. Is arranged so as to traverse the upper surface of the ceiling hanging object in the left-right direction, and the bolt members attached to the mounting pieces are connected to both ends with respect to the upper surface of the ceiling hanging object. The first frame member fixed so as to be fixed, the second frame member arranged so as to cross the upper surface of the ceiling hanging object in the front-rear direction, and the first frame member and the second frame member are orthogonal to each other. A frame connecting member that connects the first frame member and the second frame member in a state where the first frame member and the second frame member are vertically spaced apart from each other by a predetermined distance; A suspension bolt connected to the second frame member and having an upper end connected to the ceiling structure, and a mounting position of the suspension bolt with respect to the second frame member is adjusted along a longitudinal direction of the second frame member. It can der is Rukoto configuration characterized by.
Thirdly, according to the present invention, in the supporting device having the second configuration, the mounting position of the frame connecting member with respect to the first frame member is adjustable along the longitudinal direction of the first frame member. The configuration is characterized by.

に、本発明は、上記第1乃至第3のいずれかの構成を有する支持装置において、前記フレーム連結部材は、前記第2フレーム部材に取り付けられる支持ボルトと、前記第1フレーム部材に接続され、前記第1フレーム部材から立設する縦板部と、前記縦板部の上部に設けられ、前記支持ボルトを挿通する孔が形成された横板部と、前記横板部の孔に装着され、前記支持ボルトの下部に連結される防振部材と、を備えることを特徴とする構成である。 Fourth, the present invention provides a supporting device having a structure of any one the first to third, the frame connecting member includes a support bolt attached to said second frame member, connected to the first frame member And a vertical plate portion standing upright from the first frame member, a horizontal plate portion provided at an upper portion of the vertical plate portion and having a hole for inserting the support bolt formed therein, and attached to the hole of the horizontal plate portion. And a vibration damping member connected to a lower portion of the support bolt.

に、本発明は、上記第の構成を有する支持装置において、前記縦板部は、前記防振部材の高さ寸法よりも長いことを特徴とする構成である。 Fifthly , the present invention is the supporting device having the above-mentioned fourth configuration, wherein the vertical plate portion is longer than the height dimension of the vibration isolating member.

に、本発明は、上記第1乃至第のいずれかの構成を有する支持装置において、前記第1フレーム部材は、互いに平行に配置される一対のフレーム部材を有し、前記一対のフレーム部材が前記天井吊り下げ物の前後方向に沿って配置される連結ボルトによって相互に連結されることを特徴とする構成である。 Sixthly , the present invention provides the supporting device having any one of the first to fifth configurations, wherein the first frame member has a pair of frame members arranged in parallel with each other, The members are connected to each other by connecting bolts arranged along the front-rear direction of the suspended object.

に、本発明は、上記第の構成を有する支持装置において、前記天井吊り下げ物は、空気調和機本体を有し、前記連結ボルトは、前記空気調和機本体の前後方向両端位置まで延設され、両端部に前記空気調和機本体の前面側及び後面側に係合する係合部材が装着されることを特徴とする構成である。 Seventhly , the present invention provides the supporting device having the sixth configuration, wherein the suspended object has an air conditioner body, and the connecting bolts extend to both front and rear end positions of the air conditioner body. Engaging members that extend and that are engaged with the front surface side and the rear surface side of the air conditioner body are attached to both ends.

に、本発明は、上記第1乃至第のいずれかの構成を有する支持装置において、前記第2フレーム部材は、両端部が前記天井吊り下げ物の前後方向両端近傍位置まで延設され、該両端部に前記天井吊り下げ物の前後方向両端部を吊り下げ支持するためのボルトが取り付けられることを特徴とする構成である。 Eighthly, according to the present invention, in the supporting device having any one of the first to seventh configurations, both ends of the second frame member are extended to positions near both ends in the front-rear direction of the ceiling hanging object. Bolts for suspending and supporting the front and rear ends of the suspended object are attached to the both ends.

に、本発明は、上記第の構成を有する支持装置において、前記第2フレーム部材は、前記フレーム連結部材によって支持される支持フレームと、前記支持フレームの前後方向両端部に接続され、前記第2フレーム部材の前後方向の長さを前記天井吊り下げ物の前後方向両端近傍位置まで延設する補助フレームと、を有し、前記ボルトが前記補助フレームに取り付けられることを特徴とする構成である。 Ninth , the present invention provides the support device having the above-mentioned eighth configuration, wherein the second frame member is connected to a support frame supported by the frame connecting member, and both front and rear end portions of the support frame, An auxiliary frame that extends the length of the second frame member in the front-rear direction to positions near both ends in the front-rear direction of the ceiling hanging object, and the bolt is attached to the auxiliary frame. Is.

10に、本発明は、上記第1乃至第のいずれかの構成を有する支持装置において、前記吊りボルトの上端部には、前記天井構造に取り付けられたボルトに固定するための天井取付金具が予め取り付けられることを特徴とする構成である。 Tenth , the present invention provides the supporting device having any one of the first to ninth configurations, wherein a ceiling mounting metal fitting for fixing to a bolt mounted on the ceiling structure is provided at an upper end portion of the hanging bolt. Is attached in advance.

本発明の支持装置によれば、空気調和機などの天井吊り下げ物を効率的に適切な位置に吊り下げた状態で設置することができるようになる。また、本発明の支持装置によれば、高所作業が軽減されるため作業効率が向上する。 According to the supporting device of the present invention, a suspended object such as an air conditioner can be efficiently installed in a suspended state at an appropriate position. Further, according to the supporting device of the present invention, work at high places is reduced, so that work efficiency is improved.

支持装置を用いた天井吊り下げ物の支持構造を示す斜視図である。It is a perspective view showing a support structure of a suspended object using a support device. 支持装置を用いた天井吊り下げ物の支持構造を示す側面図である。It is a side view which shows the support structure of the suspended object using a support device. 第1フレーム部材の一構成例を示す図である。It is a figure which shows one structural example of a 1st frame member. 第2フレーム部材の一構成例を示す図である。It is a figure which shows one structural example of a 2nd frame member. フレーム連結部材の一構成例を示す図である。It is a figure which shows one structural example of a frame connection member. 吊りボルトの上端部に予め取り付けられる天井取付金具の一構成例を示す図である。It is a figure which shows one structural example of the ceiling mounting metal fitting previously attached to the upper end part of a hanging bolt. 支持装置が組み付けられた空気調和機を天井空間に設置する作業工程を例示する図である。It is a figure which illustrates the work process which installs the air conditioner with which the support device was assembled in the ceiling space. デッキプレートが設けられた天井構造に支持装置を取り付けた状態を示す図である。It is a figure which shows the state which attached the supporting device to the ceiling structure in which the deck plate was provided. 空気調和機の高さ調整機能を例示する図である。It is a figure which illustrates the height adjustment function of an air conditioner. 吊りボルトに対してブレースを配置した支持装置の構成例を示す斜視図である。It is a perspective view which shows the structural example of the support apparatus which has arrange|positioned the brace with respect to the hanging bolt. 吊りボルトに対してブレースを配置した支持装置の構成例を示す側面図である。It is a side view which shows the structural example of the support device which has arrange|positioned the brace with respect to the suspension bolt. 剛性部材を用いてブレースを取り付けた支持装置を例示する側面図である。It is a side view which illustrates the support device which attached the brace using the rigid member. 空気調和機を天井空間に設置した状態における従来の支持構造を示す図である。It is a figure which shows the conventional support structure in the state which installed the air conditioner in the ceiling space. デッキプレートに空気調和機を設置する従来の支持構造を示す図である。It is a figure which shows the conventional support structure which installs an air conditioner in a deck plate.

以下、本発明の好ましい実施形態について図面を参照しつつ詳細に説明する。尚、以下において参照する各図面では互いに共通する部材に同一符号を付しており、それらについての重複する説明は省略する。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings. In each of the drawings referred to below, members common to each other are designated by the same reference numerals, and duplicate description thereof will be omitted.

図1は、本発明の一実施形態である支持装置1を用いた天井吊り下げ物100の支持構造を示す斜視図であり、図2は、その側面図である。図1に示すXYZ三次元座標系は、XY平面を水平面とし、Z方向を鉛直方向とする座標系であり、図2を含む他の図においても共通する座標系である。本実施形態の支持装置1は、天井吊り下げ物100を天井空間に吊り下げた状態で支持する装置である。本実施形態では、天井吊り下げ物100として、隠蔽式の空気調和機110を例示する。隠蔽式の空気調和機110は、天井スラブなどの天井構造と天井パネルとの間の天井空間に隠蔽された状態で設置される空気調和機である。 FIG. 1 is a perspective view showing a supporting structure of a ceiling hanging object 100 using a supporting device 1 according to an embodiment of the present invention, and FIG. 2 is a side view thereof. The XYZ three-dimensional coordinate system shown in FIG. 1 is a coordinate system in which the XY plane is a horizontal plane and the Z direction is a vertical direction, and is a coordinate system common to other drawings including FIG. The support device 1 of the present embodiment is a device that supports a suspended object 100 in a suspended state in a ceiling space. In this embodiment, a concealment type air conditioner 110 is exemplified as the suspended object 100. The concealment type air conditioner 110 is an air conditioner installed in a concealed state in a ceiling space between a ceiling structure such as a ceiling slab and a ceiling panel.

空気調和機110は、内部に熱交換器が設けられた平面視略矩形状の箱形ユニットであり、空気調和機本体120と、フィルタユニット130と、吹出ユニット140と、吸気ユニット150とがY方向に沿って直列に組み付けられる構成である。具体的に説明すると、空気調和機本体120の吸気側(後方側)にはフィルタユニット130が接続され、フィルタユニット130は空気調和機本体120と一体構造となる。尚、空気調和機本体120は、予めフィルタユニット130が一体形成されたものであっても構わない。また、フィルタユニット130の更に吸気側(後方側)には、吸気ユニット150が接続される。また、空気調和機本体120の吹出側(前方側)には吹出ユニット140が接続される。つまり、この空気調和機110は、後方側に設けられている吸気ユニット150から空気を吸い込み、空気調和機本体120の内部の熱交換機で熱交換を行ってから前方側に設けられている吹出ユニット140から熱交換された空気を吹き出すように構成される。ただし、フィルタユニット130の吸気側には、吸気ユニット150が接続されないこともある。その場合、空気調和機110は、フィルタユニット130から空気を吸い込み、空気調和機本体120の内部の熱交換機で熱交換を行ってから前方側に設けられている吹出ユニット140から熱交換された空気を吹き出す。尚、吹出ユニット140の吹出口には、図示を省略する送風ダクトなどが接続される。 The air conditioner 110 is a box-shaped unit in which a heat exchanger is provided and has a substantially rectangular shape in a plan view. The air conditioner body 120, the filter unit 130, the blowout unit 140, and the intake unit 150 are Y-shaped. It is a structure which is assembled in series along the direction. More specifically, the filter unit 130 is connected to the intake side (rear side) of the air conditioner body 120, and the filter unit 130 is integrated with the air conditioner body 120. The air conditioner body 120 may have the filter unit 130 integrally formed in advance. An intake unit 150 is connected to the intake side (rear side) of the filter unit 130. A blowing unit 140 is connected to the blowing side (front side) of the air conditioner body 120. In other words, the air conditioner 110 sucks air from the intake unit 150 provided on the rear side, performs heat exchange with the heat exchanger inside the air conditioner body 120, and then blows out the unit on the front side. It is configured to blow out heat-exchanged air from 140. However, the intake unit 150 may not be connected to the intake side of the filter unit 130. In this case, the air conditioner 110 sucks air from the filter unit 130, performs heat exchange with the heat exchanger inside the air conditioner body 120, and then exchanges heat with the blowout unit 140 provided on the front side. Blow out. A blower duct (not shown) or the like is connected to the outlet of the blowout unit 140.

空気調和機本体120の内部には上述した熱交換機やファンなどが設けられる。そのため、空気調和機110における空気調和機本体120の重量割合が大きい。そこで空気調和機本体120の左側面には、前後方向両端の下部近傍位置に、吊りボルトなどのボルト部材9の下端部を接続するための一対の取付片121,121が設けられている。また、空気調和機本体120の右側面にも、同様に、前後方向両端の下部近傍位置に、図示を省略する一対の取付片121,121が設けられている。例えば、空気調和機本体120の左右両側面に設けられる一対の取付片121,121は、空気調和機本体120の前後方向(Y方向)において互いに同じ位置に設けられる。 Inside the air conditioner body 120, the heat exchanger, the fan, etc. described above are provided. Therefore, the weight ratio of the air conditioner main body 120 in the air conditioner 110 is large. Therefore, on the left side surface of the air conditioner body 120, a pair of mounting pieces 121, 121 for connecting the lower end portions of the bolt members 9 such as hanging bolts are provided at positions near the lower portions on both ends in the front-rear direction. Similarly, on the right side surface of the air conditioner body 120, a pair of mounting pieces 121, 121 (not shown) are provided in the vicinity of the lower portions at both ends in the front-rear direction. For example, the pair of mounting pieces 121, 121 provided on the left and right side surfaces of the air conditioner body 120 are provided at the same position in the front-rear direction (Y direction) of the air conditioner body 120.

本実施形態の支持装置1は、上記のような概略箱形形状を成す空気調和機110の外面に対して装着固定される。以下、支持装置1の詳細について説明する。 The support device 1 of the present embodiment is mounted and fixed to the outer surface of the air conditioner 110 having the above-described general box shape. Hereinafter, details of the supporting device 1 will be described.

図1に示すように、支持装置1は、空気調和機110の天井吊り下げ物の上面を左右方向(X方向)に横断するように配置される一対の第1フレーム部材10と、第1フレーム部材10の上方位置において空気調和機110の上面を前後方向(Y方向)に横断するように配置される一対の第2フレーム部材20と、第1フレーム部材10及び第2フレーム部材20が互いに直交した状態で、且つ、第1フレーム部材10及び第2フレーム部材20を互いに上下方向に所定間隔を隔てた状態となるように第1フレーム部材10と第2フレーム部材20とを相互に連結するフレーム連結部材30と、下端部が第2フレーム部材20に連結され、上端部が天井構造に接続される吊りボルト40と、吊りボルト40の上端部に予め取り付けられる天井取付金具50と、を備えている。 As shown in FIG. 1, the support device 1 includes a pair of first frame members 10 arranged to cross the upper surface of the suspended object of the air conditioner 110 in the left-right direction (X direction), and the first frame. The pair of second frame members 20 arranged so as to traverse the upper surface of the air conditioner 110 in the front-rear direction (Y direction) above the member 10 and the first frame member 10 and the second frame member 20 are orthogonal to each other. And a frame for connecting the first frame member 10 and the second frame member 20 to each other so that the first frame member 10 and the second frame member 20 are vertically spaced from each other by a predetermined distance. A connecting member 30, a hanging bolt 40 having a lower end connected to the second frame member 20 and an upper end connected to the ceiling structure, and a ceiling mounting bracket 50 previously attached to the upper end of the hanging bolt 40 are provided. There is.

一対の第1フレーム部材10は、その左右両端部が空気調和機本体120の左右両側面において取付片121の上方位置となるように設置される。そのため、一対の第1フレーム部材10は、Y方向に所定間隔を隔てて互いに平行な状態で空気調和機本体120の上面に配置される。 The pair of first frame members 10 are installed such that the left and right ends thereof are located above the mounting pieces 121 on the left and right side surfaces of the air conditioner body 120. Therefore, the pair of first frame members 10 are arranged on the upper surface of the air conditioner main body 120 in parallel with each other at a predetermined interval in the Y direction.

図3は、第1フレーム部材10の一構成例を示す図である。第1フレーム部材10は、例えば断面L型のアングル鋼材(山形鋼)によって構成され、平板部11と縦板部12とを有している。 FIG. 3 is a diagram showing a configuration example of the first frame member 10. The first frame member 10 is made of, for example, an angle steel material (angle steel) having an L-shaped cross section, and has a flat plate portion 11 and a vertical plate portion 12.

平板部11の左右両端部には、空気調和機本体120の取付片121に取り付けられるボルト部材9の上端部を取り付けるための取付部13が設けられる。例えば、取付部13は、例えばボルト部材9を挿通可能な孔として形成される。尚、取付部13は、空気調和機本体120の様々な幅寸法に適合させるため、ボルト部材9を挿通可能な孔を複数箇所に形成したものであっても構わない。また、取付部13は、丸孔ではなく、第1フレーム部材10の長手方向に沿って形成した長孔として形成し、長孔の任意の位置にボルト部材9を固定できるようにしても良い。 Mounting portions 13 for mounting the upper end portions of the bolt members 9 mounted on the mounting pieces 121 of the air conditioner main body 120 are provided at both left and right ends of the flat plate portion 11. For example, the mounting portion 13 is formed as a hole through which the bolt member 9 can be inserted, for example. The mounting portion 13 may have a plurality of holes through which the bolt member 9 can be inserted in order to adapt it to various width dimensions of the air conditioner body 120. Further, the mounting portion 13 may be formed as a long hole formed along the longitudinal direction of the first frame member 10 instead of the round hole so that the bolt member 9 can be fixed at an arbitrary position of the long hole.

また縦板部12の左右両端部には、フレーム連結部材30や連結ボルト15を取り付けるための取付部14が設けられる。例えば、取付部14は、フレーム連結部材30を取り付けるためのボルトや、後述する連結ボルト15を挿通可能な複数の孔14aによって構成され、それら複数の孔14aが第1フレーム部材10の長手方向(X方向)に沿って所定間隔で形成されたものである。取付部14として複数の孔14aを第1フレーム部材10の長手方向に沿って設けることにより、第1フレーム部材10に対して第2フレーム部材20を連結する位置を第1フレーム部材10の長手方向に沿って調整することができる。例えば、空気調和機本体120の左右両側面に設けられている取付片121,121の上方位置に、配管やダクトなどの障害物が存在する場合、第1フレーム部材10に対してフレーム連結部材30を取り付ける位置をX方向に調整することで、上方の障害物を避けた位置に第2フレーム部材20を取り付けることが可能である。尚、取付部14は、第1フレーム部材10の長手方向に沿って形成した長孔として形成されるものであっても構わない。 Further, mounting portions 14 for mounting the frame coupling member 30 and the coupling bolts 15 are provided on both left and right ends of the vertical plate portion 12. For example, the mounting portion 14 is composed of a bolt for mounting the frame connecting member 30 and a plurality of holes 14a through which a connecting bolt 15 described later can be inserted, and the plurality of holes 14a are formed in the longitudinal direction of the first frame member 10 ( It is formed at a predetermined interval along the (X direction). By providing a plurality of holes 14a as the mounting portion 14 along the longitudinal direction of the first frame member 10, the position at which the second frame member 20 is connected to the first frame member 10 is set in the longitudinal direction of the first frame member 10. Can be adjusted along. For example, when there are obstacles such as pipes and ducts above the mounting pieces 121, 121 provided on the left and right side surfaces of the air conditioner main body 120, the frame connecting member 30 is not attached to the first frame member 10. By adjusting the mounting position in the X direction, the second frame member 20 can be mounted at a position avoiding an obstacle above. The mounting portion 14 may be formed as a long hole formed along the longitudinal direction of the first frame member 10.

このような第1フレーム部材10は、平板部11の左右両端部に設けられた取付部13に対してボルト部材9の上端部が接続される。すなわち、ボルト部材9は、その下端部が空気調和機本体120の左右両側面に設けられている取付片121に取り付けられ、その上端部が第1フレーム部材10の左右両端部に設けられた取付部13に接続される。具体的には、取付部13から上方に突出するボルト部材9の上端部に対してナットを装着し、そのナットを締め付けることにより、第1フレーム部材10は、平板部11の下面側を空気調和機本体120の上面に押し付けた状態で固定される。ボルト部材9の上端部に装着したナットを一定のトルクで締め付けることにより、第1フレーム部材10は、ボルト部材9からの軸力を受ける。この軸力は、第1フレーム部材10が空気調和機本体120の上面を押し付ける力として作用する。そのため、第1フレーム部材10は、ボルト部材9の上端部に装着されるナットが平板部11に対して一定のトルクで締着されることにより、空気調和機本体120の上面に接触した状態で固定されるのである。これにより、ボルト部材9の下部と上部の双方を空気調和機本体120の側面において固定することが可能であり、ボルト部材9の振れ止め効果を発揮する。 In the first frame member 10 as described above, the upper end portions of the bolt members 9 are connected to the mounting portions 13 provided at the left and right ends of the flat plate portion 11. That is, the bolt member 9 has its lower end attached to the attachment pieces 121 provided on both left and right side surfaces of the air conditioner body 120, and its upper end provided on both left and right end portions of the first frame member 10. Connected to the section 13. Specifically, by mounting a nut on the upper end portion of the bolt member 9 protruding upward from the mounting portion 13 and tightening the nut, the first frame member 10 causes the lower surface side of the flat plate portion 11 to air-condition. It is fixed while being pressed against the upper surface of the machine body 120. The first frame member 10 receives the axial force from the bolt member 9 by tightening the nut mounted on the upper end portion of the bolt member 9 with a constant torque. This axial force acts as a force with which the first frame member 10 presses the upper surface of the air conditioner body 120. Therefore, the first frame member 10 is in a state of being in contact with the upper surface of the air conditioner main body 120 by the nut attached to the upper end portion of the bolt member 9 being fastened to the flat plate portion 11 with a constant torque. It will be fixed. Thereby, both the lower part and the upper part of the bolt member 9 can be fixed to the side surface of the air conditioner body 120, and the steadying effect of the bolt member 9 is exhibited.

また、一対の第1フレーム部材10は、空気調和機110の前後方向(Y方向)に沿って配置される連結ボルト15によって相互に連結され、所定間隔を隔てた平行な状態を保持するように一体化される。例えば図1に示すように、連結ボルト15は、一対の第1フレーム部材10の左右両端部に対して1本ずつ接続される。 In addition, the pair of first frame members 10 are connected to each other by the connecting bolts 15 arranged along the front-rear direction (Y direction) of the air conditioner 110, and are maintained in a parallel state with a predetermined interval. Be integrated. For example, as shown in FIG. 1, one connecting bolt 15 is connected to each of the left and right ends of the pair of first frame members 10.

図1及び図2に示すように、一対の第1フレーム部材10を相互に連結する連結ボルト15は、一対の第1フレーム部材10の配置間隔よりも長く、フィルタユニット130が装着された空気調和機本体120の前後方向(Y方向)の長さと略同一又はそれよりも若干長い寸法を有している。つまり、連結ボルト15の両端は、フィルタユニット130が装着された空気調和機本体120の前後方向両端近傍位置まで延設される。そして、連結ボルト15の両端部には、空気調和機本体120の前面側及び後面側に係合する係合部材17が装着される。係合部材17は、例えば金属プレートに連結ボルト15を挿通可能な孔を設けた部材であり、金属プレートに設けた孔に連結ボルト15を挿通した状態で金属プレートの前後両側をナットで締め付けることにより、連結ボルト15に対する取付位置を固定することができる。この係合部材17は、空気調和機本体120の前面及び後面のそれぞれに係合することにより、第1フレーム部材10が空気調和機本体120の上面において前後方向(Y方向)に変位することを抑制することができる。そのため、仮に大規模地震が発生した場合であっても、第1フレーム部材10は、空気調和機本体120の上面において前後方向に相対振動することがないように固定される。 As shown in FIGS. 1 and 2, the connecting bolt 15 that connects the pair of first frame members 10 to each other is longer than the arrangement interval of the pair of first frame members 10, and the air conditioner in which the filter unit 130 is mounted. It has a size that is substantially the same as or slightly longer than the length of the machine body 120 in the front-rear direction (Y direction). That is, both ends of the connecting bolt 15 extend to positions near both ends in the front-rear direction of the air conditioner body 120 to which the filter unit 130 is attached. Then, the engaging members 17 that engage with the front surface side and the rear surface side of the air conditioner body 120 are attached to both ends of the connecting bolt 15. The engagement member 17 is, for example, a member provided with a hole through which the connecting bolt 15 can be inserted in a metal plate, and tightens nuts on both front and rear sides of the metal plate with the connecting bolt 15 inserted through the hole provided in the metal plate. Thus, the attachment position for the connecting bolt 15 can be fixed. The engagement member 17 engages with each of the front surface and the rear surface of the air conditioner main body 120, so that the first frame member 10 is displaced in the front-back direction (Y direction) on the upper surface of the air conditioner main body 120. Can be suppressed. Therefore, even if a large-scale earthquake occurs, the first frame member 10 is fixed on the upper surface of the air conditioner body 120 so as not to vibrate in the front-rear direction.

尚、本実施形態では、空気調和機本体120の左右両側面において下部近傍位置に一対の取付片121,121が設けられている。そのため、ボルト部材9は上下方向に所定値以上の長さを有することから、上述のように連結ボルト15によって一対の第1フレーム部材10を相互に連結しておくことが好ましい。これに対し、空気調和機本体120の左右両則面に設けられる一対の取付片121が空気調和機本体120の上部近傍位置に設けられることもある。そのような場合、ボルト部材9の上下方向の長さは所定値未満となる。ボルト部材9の長さが所定値未満となると、連結ボルト15を用いない場合であっても、第1フレーム部材10は前後方向に変位しない状態に固定される。そのため、一対の取付片121,121が空気調和機本体120の上部近傍位置にある場合には、連結ボルト15を用いて一対の第1フレーム部材10を相互に連結しない構成を採用しても良い。 In the present embodiment, a pair of mounting pieces 121, 121 is provided on the left and right side surfaces of the air conditioner main body 120 in the vicinity of the lower portion. Therefore, since the bolt member 9 has a length equal to or greater than a predetermined value in the vertical direction, it is preferable to connect the pair of first frame members 10 to each other by the connecting bolt 15 as described above. On the other hand, a pair of mounting pieces 121 provided on both left and right sides of the air conditioner body 120 may be provided near the upper portion of the air conditioner body 120. In such a case, the vertical length of the bolt member 9 is less than the predetermined value. When the length of the bolt member 9 is less than the predetermined value, the first frame member 10 is fixed so as not to be displaced in the front-rear direction even when the connecting bolt 15 is not used. Therefore, when the pair of mounting pieces 121, 121 are located near the upper portion of the air conditioner main body 120, a configuration in which the pair of first frame members 10 are not coupled to each other by using the coupling bolt 15 may be adopted. ..

第2フレーム部材20は、フレーム連結部材30によって第1フレーム部材10に連結され、第1フレーム部材10と直交する状態で空気調和機110の上方位置に設置される。この第2フレーム部材20は、その両端部が空気調和機110の前後方向(Y方向)の両端近傍位置まで延設される。すなわち、第2フレーム部材20の前方側端部は、吹出ユニット140の前方側端面よりも長くなるように延設され、後方側端部は、吸気ユニット150の後方側端面よりも長くなるように延設される。尚、空気調和機本体120に対して吸気ユニット150が装着されていない場合、第2フレーム部材20の後方側端部は、フィルタユニット130の後方側端面と同程度まで延設されたものであれば良い。 The second frame member 20 is connected to the first frame member 10 by the frame connecting member 30, and is installed above the air conditioner 110 in a state of being orthogonal to the first frame member 10. Both ends of the second frame member 20 are extended to positions near both ends in the front-rear direction (Y direction) of the air conditioner 110. That is, the front end of the second frame member 20 is extended so as to be longer than the front end surface of the blowout unit 140, and the rear end thereof is longer than the rear end surface of the intake unit 150. It will be extended. When the intake unit 150 is not attached to the air conditioner body 120, the rear end of the second frame member 20 may be extended to the same extent as the rear end surface of the filter unit 130. Good.

また一対の第2フレーム部材20は、互いに所定間隔を隔てて互いに平行な状態となるように設置される。例えば、一対の第2フレーム部材20の間隔は、天井構造に予め取り付けられるアンカーボルトなどの複数のボルト部材のX方向の設置間隔と略一致するように設置される。 In addition, the pair of second frame members 20 are installed so as to be in parallel with each other with a predetermined gap therebetween. For example, the interval between the pair of second frame members 20 is set so as to be substantially the same as the installation interval in the X direction of a plurality of bolt members such as anchor bolts that are previously attached to the ceiling structure.

図4は、第2フレーム部材20の一構成例を示す図である。第2フレーム部材20は、第1フレーム部材10と同様、例えば断面L型のアングル鋼材によって構成され、平板部と縦板部とを有している。第2フレーム部材20は、例えば、支持フレーム23と、その支持フレーム23の前後方向両端部のそれぞれに連結される補助フレーム21,22とを備えて構成される。 FIG. 4 is a diagram showing a configuration example of the second frame member 20. Similar to the first frame member 10, the second frame member 20 is made of, for example, an angle steel material having an L-shaped cross section, and has a flat plate portion and a vertical plate portion. The second frame member 20 is configured to include, for example, a support frame 23 and auxiliary frames 21 and 22 that are connected to both end portions of the support frame 23 in the front-rear direction.

支持フレーム23は、フレーム連結部材30によって第1フレーム部材10に連結されるL型のフレーム部材である。この支持フレーム23の前後方向両端部には、補助フレーム21,22を連結するための連結部20a,20bが設けられている。例えば、連結部20a,20bは、支持フレーム23と補助フレーム21,22とを相互に固定するためのボルト24を挿通可能な孔として形成される。 The support frame 23 is an L-shaped frame member connected to the first frame member 10 by the frame connecting member 30. Connection portions 20a and 20b for connecting the auxiliary frames 21 and 22 are provided at both ends of the support frame 23 in the front-rear direction. For example, the connecting portions 20a and 20b are formed as holes through which bolts 24 for fixing the support frame 23 and the auxiliary frames 21 and 22 to each other can be inserted.

また支持フレーム23の平板部の所定位置には、フレーム連結部材30を取り付けるための取付部26と、吊りボルト40を取り付けるための取付部27とが設けられる。これら取付部26,27は、例えばボルトを挿通可能な孔として形成される。尚、支持フレーム23の平板部には、取付部26,27となる孔を、第2フレーム部材20の長手方向(Y方向)に沿って所定間隔で複数箇所に設けるようにしても良い。平板部の複数箇所に取付部26,27を設けることにより、第2フレーム部材20に対する吊りボルト40の取付位置や、第1フレーム部材10に対する連結位置を適宜調整することが可能となる。そのため、天井空間に存在する配管やダクトなどの障害物を避けた位置に第2フレーム部材20を取り付けることが可能であり、更には障害物を避けた位置に吊りボルト40を取り付けることが可能となる。 Further, a mounting portion 26 for mounting the frame connecting member 30 and a mounting portion 27 for mounting the suspension bolt 40 are provided at predetermined positions on the flat plate portion of the support frame 23. These attachment parts 26 and 27 are formed as holes through which bolts can be inserted, for example. The flat plate portion of the support frame 23 may be provided with holes serving as the attachment portions 26 and 27 at a plurality of positions at predetermined intervals along the longitudinal direction (Y direction) of the second frame member 20. By providing the mounting portions 26 and 27 at a plurality of positions on the flat plate portion, the mounting position of the hanging bolt 40 on the second frame member 20 and the connecting position on the first frame member 10 can be adjusted appropriately. Therefore, the second frame member 20 can be attached at a position avoiding obstacles such as pipes and ducts existing in the ceiling space, and further, the hanging bolt 40 can be attached at a position avoiding obstacles. Become.

また、取付部26,27を複数箇所に設けることにより、天井構造にデッキプレートが配置されている場合であっても、デッキプレートの山部の位置に適合するように吊りボルト40を取り付けることができるようになる。そのため、従来のように高所作業を行ってデッキプレートに支持構造350(図14参照)を設置する必要がなく、作業効率が向上する。 Further, by providing the mounting portions 26 and 27 at a plurality of positions, even when the deck plate is arranged in the ceiling structure, the hanging bolt 40 can be mounted so as to match the position of the mountain portion of the deck plate. become able to. Therefore, it is not necessary to perform work at a high place to install the support structure 350 (see FIG. 14) on the deck plate as in the conventional case, and the work efficiency is improved.

尚、取付部26,27は、ボルトを挿通可能な丸孔として設けるものに限られず、例えば第2フレーム部材20の長手方向に長孔として形成されたものであっても構わない。また、取付部26,27を丸孔として設ける場合は、電動ドリルなどを用いれば施工現場でも簡単に穿孔形成することが可能であるため、工場出荷時には取付部26,27としての丸孔をそれぞれ1つずつ設けたものであっても構わない。 The mounting portions 26 and 27 are not limited to those provided as round holes into which bolts can be inserted, and may be formed as elongated holes in the longitudinal direction of the second frame member 20, for example. In addition, when the mounting portions 26 and 27 are provided as round holes, it is possible to easily form the holes at the construction site by using an electric drill or the like. They may be provided one by one.

補助フレーム21は、支持フレーム23の前方側端部に接続されるL型のフレームである。補助フレーム21の一方の端部には、支持フレーム23を連結するための連結部21aが設けられている。例えば、連結部21aは、支持フレーム23と補助フレーム21とを相互に固定するためのボルト24を挿通可能な孔として形成される。また、補助フレーム21の他方の端部には、吹出ユニット140の前方端部を吊り下げ支持するボルト29を取り付けるための取付部21bが設けられる。例えば、取付部21bは、ボルト29を挿通可能な孔として形成される。 The auxiliary frame 21 is an L-shaped frame connected to the front end of the support frame 23. A connecting portion 21 a for connecting the support frame 23 is provided at one end of the auxiliary frame 21. For example, the connecting portion 21a is formed as a hole into which a bolt 24 for fixing the support frame 23 and the auxiliary frame 21 to each other can be inserted. Further, the other end of the auxiliary frame 21 is provided with a mounting portion 21b for mounting a bolt 29 that suspends and supports the front end of the blowout unit 140. For example, the mounting portion 21b is formed as a hole into which the bolt 29 can be inserted.

補助フレーム22は、支持フレーム23の後方側端部に接続されるL型のフレームである。補助フレーム22の一方の端部には、支持フレーム23を連結するための連結部22aが設けられている。例えば、連結部22aは、支持フレーム23と補助フレーム22とを相互に固定するためのボルト24を挿通可能な孔として形成される。また、補助フレーム22の他方の端部には、吸気ユニット150の後方端部を吊り下げ支持するボルト29を取り付けるための取付部22bが設けられる。例えば、取付部22bは、ボルト29を挿通可能な孔として形成される。 The auxiliary frame 22 is an L-shaped frame connected to the rear end of the support frame 23. A connecting portion 22 a for connecting the support frame 23 is provided at one end of the auxiliary frame 22. For example, the connecting portion 22a is formed as a hole through which a bolt 24 for fixing the support frame 23 and the auxiliary frame 22 to each other can be inserted. Further, a mounting portion 22b for mounting a bolt 29 for suspending and supporting the rear end portion of the intake unit 150 is provided at the other end portion of the auxiliary frame 22. For example, the mounting portion 22b is formed as a hole into which the bolt 29 can be inserted.

吹出ユニット140や吸気ユニット150は、外形サイズが統一されていないため、補助フレーム21,22に設けられる取付部21b,22bは、様々なサイズに適合できるようにするため、複数箇所に設けておくようにしても良い。また、補助フレーム21,22は、支持フレーム23の長手方向にスライド可能とし、第2フレーム部材20の前後方向両端側に延設する長さを調整できるようにしても構わない。 Since the blow-out unit 140 and the intake unit 150 do not have uniform outer sizes, the attachment portions 21b and 22b provided on the auxiliary frames 21 and 22 are provided at a plurality of locations so that they can be adapted to various sizes. You may do it. Further, the auxiliary frames 21 and 22 may be slidable in the longitudinal direction of the support frame 23, and the lengths of the second frame members 20 extending to both ends in the front-rear direction may be adjusted.

第2フレーム部材20は、支持フレーム23の両端部に対して補助フレーム21,22を、ボルト24とナット25とを用いて連結することにより構成される。このように第2フレーム部材20を、複数のフレーム部材で構成することにより、支持装置1を施工現場へ搬送するときには第2フレーム部材20を分解した状態で搬送することができるため、搬送効率に優れている。ただし、第2フレーム部材20は、必ずしも複数のフレーム部材によって構成されるものに限定されず、1本のフレーム部材によって構成されるものであっても構わない。 The second frame member 20 is configured by connecting the auxiliary frames 21 and 22 to both ends of the support frame 23 using bolts 24 and nuts 25. By configuring the second frame member 20 with a plurality of frame members in this way, the second frame member 20 can be transported in a disassembled state when the support device 1 is transported to a construction site. Are better. However, the second frame member 20 is not necessarily limited to one configured by a plurality of frame members, and may be configured by one frame member.

また、上記のような第2フレーム部材20は、取付部26に対してフレーム連結部材30が取付られることにより、図1に示すように、空気調和機110の上面から所定高さの位置に設置される。そして第2フレーム部材20は、前後方向に延設された両端部の取付部21b,22bに対してボルト29が取り付けられ、そのボルト29によって吸気ユニット150の後方端部及び吹出ユニット140の前方端部を支持する。 Further, the second frame member 20 as described above is installed at a predetermined height from the upper surface of the air conditioner 110, as shown in FIG. 1, by mounting the frame connecting member 30 to the mounting portion 26. To be done. The second frame member 20 has bolts 29 attached to the attachment portions 21b and 22b at both ends extending in the front-rear direction. The bolts 29 attach the bolts 29 to the rear end of the intake unit 150 and the front end of the blowout unit 140. Support the department.

例えば、吸気ユニット150の後方端部には、図1に示すように、ボルト29を取り付ける取付片153が設けられている。また、吹出ユニット140の前方端部にも、ボルト29を取り付けるための取付片143が設けられている。ボルト29の下部は、それら取付片153,143に挿通され、先端にナットが装着される。また、取付片153,143の下面と、ナットとの間には、ゴムなどの弾性部材によって構成される防振部材28が介挿される。そのため、空気調和機110の稼働中に発生する振動は、防振部材28によって吸収され、ボルト29に伝わることがなくなる。 For example, at the rear end of the intake unit 150, a mounting piece 153 for mounting the bolt 29 is provided as shown in FIG. A mounting piece 143 for mounting the bolt 29 is also provided at the front end of the blowout unit 140. The lower portion of the bolt 29 is inserted through the mounting pieces 153 and 143, and a nut is attached to the tip. Further, a vibration damping member 28 formed of an elastic member such as rubber is inserted between the lower surfaces of the mounting pieces 153 and 143 and the nut. Therefore, the vibration generated during the operation of the air conditioner 110 is absorbed by the vibration isolator 28 and is not transmitted to the bolt 29.

尚、空気調和機110に吸気ユニット150が存在しない場合、第2フレーム部材20は、前方端部において吹出ユニット140だけを支持すれば良い。 If the air conditioner 110 does not have the intake unit 150, the second frame member 20 may support only the blowout unit 140 at the front end portion.

次に図5は、フレーム連結部材30の一構成例を示す図である。図5(a)は、フレーム連結部材30を正面側から視た図であり、図5(b)は、フレーム連結部材30を背面側から視た図である。フレーム連結部材30は、第2フレーム部材20の取付部26に取り付けられる支持ボルト33と、第1フレーム部材10に接続され、第1フレーム部材10から立設する縦板部31と、縦板部31の上部に設けられ、支持ボルト33を挿通する孔34が形成された横板部32と、横板部32の孔34に装着され、支持ボルト33の下部に連結される防振部材35と、を備えている。 Next, FIG. 5 is a diagram showing a configuration example of the frame connecting member 30. 5A is a view of the frame connecting member 30 viewed from the front side, and FIG. 5B is a view of the frame connecting member 30 viewed from the rear side. The frame connecting member 30 includes a support bolt 33 attached to the attachment portion 26 of the second frame member 20, a vertical plate portion 31 that is connected to the first frame member 10 and stands upright from the first frame member 10, and a vertical plate portion. A horizontal plate portion 32 provided in an upper portion of the base plate 31 and having a hole 34 through which the support bolt 33 is inserted; and a vibration damping member 35 attached to the hole 34 of the horizontal plate portion 32 and connected to a lower portion of the support bolt 33. , Are provided.

縦板部31の下部には、縦板部31を第1フレーム部材10の縦板部12に固定するためのボルト孔31aが設けられると共に、第1フレーム部材10の縦板部12の上端部に係合する係合部31bが設けられる。例えば、係合部31bは、上方に延びる縦板部31の左右両側に設けられており、第1フレーム部材10の上端部に係合する。そのため、縦板部31は、下部に設けられた係合部31bを第1フレーム部材10の縦板部12の上端部に係合させると共に、ボルト孔31aを第1フレーム部材10の縦板部12に設けられている取付部14の複数の孔14aのうちの一つの孔14aに適合させ、ボルトとナットを用いて締着することにより、第1フレーム部材10に固定される。このとき、係合部31bが第1フレーム部材10の縦板部12の上端部に係合しているため、ボルトとナットが締め付けられるときに縦板部31がボルトを中心に回転してしまうことがなく、鉛直姿勢を良好に保持することができる。尚、縦板部31の左右両側にリブを設けて強度を増したものを採用しても良い。 A bolt hole 31 a for fixing the vertical plate portion 31 to the vertical plate portion 12 of the first frame member 10 is provided in the lower portion of the vertical plate portion 31, and the upper end portion of the vertical plate portion 12 of the first frame member 10 is provided. An engaging portion 31b that engages with is provided. For example, the engaging portions 31b are provided on both left and right sides of the vertical plate portion 31 extending upward, and engage with the upper end portion of the first frame member 10. Therefore, the vertical plate portion 31 engages the engaging portion 31b provided at the lower portion with the upper end portion of the vertical plate portion 12 of the first frame member 10, and the bolt hole 31a is formed in the vertical plate portion of the first frame member 10. It is fixed to the first frame member 10 by fitting into one hole 14a of the plurality of holes 14a of the mounting portion 14 provided in 12 and tightening with bolts and nuts. At this time, since the engaging portion 31b is engaged with the upper end portion of the vertical plate portion 12 of the first frame member 10, the vertical plate portion 31 rotates around the bolt when the bolt and the nut are tightened. It is possible to maintain a good vertical posture. In addition, you may employ|adopt the thing which provided the rib on the both right and left sides of the vertical plate part 31, and increased strength.

横板部32の孔34に装着される防振部材35は、横板部32に孔34に固定されるコイルバネ36と、コイルバネ36の下部に接合するワッシャー37と、支持ボルト33の下部に装着されるナット38とを備えて構成される。尚、ナット38は、支持ボルト33の頭部として支持ボルト33に一体的に設けられたものであっても構わない。コイルバネ36は、支持ボルト33の外周面に接触することがない状態に配置され、その下部がナット38(又は支持ボルト33の頭部)支持ボルト33によって支持される。つまり、支持ボルト33は、コイルバネ36を含む防振部材35を介して横板部32及び縦板部31に連結される。 The anti-vibration member 35 attached to the hole 34 of the horizontal plate portion 32 is attached to the coil spring 36 fixed to the hole 34 in the horizontal plate portion 32, the washer 37 joined to the lower portion of the coil spring 36, and the lower portion of the support bolt 33. And a nut 38 that is formed. The nut 38 may be provided integrally with the support bolt 33 as the head of the support bolt 33. The coil spring 36 is arranged so as not to contact the outer peripheral surface of the support bolt 33, and the lower portion thereof is supported by the nut 38 (or the head of the support bolt 33) support bolt 33. That is, the support bolt 33 is connected to the horizontal plate portion 32 and the vertical plate portion 31 via the vibration damping member 35 including the coil spring 36.

支持ボルト33は、その上方に突出した部分が第2フレーム部材20の平板部に設けられている取付部26の孔に挿通される。支持ボルト33の上部には、2つのナット39a,39bが装着される。ナット39bは、第2フレーム部材20の平板部の下面側に配置されるナットである。またナット39aは、第2フレーム部材20の平板部の上面側に配置されるナットである。それら2つのナット39a,39bで第2フレーム部材20の平板部を挟み込むことにより、支持ボルト33は、第2フレーム部材20を所定高さ位置に支持することができる。 The portion of the support bolt 33 protruding upward is inserted into the hole of the mounting portion 26 provided in the flat plate portion of the second frame member 20. Two nuts 39a and 39b are mounted on the upper portion of the support bolt 33. The nut 39b is a nut arranged on the lower surface side of the flat plate portion of the second frame member 20. The nut 39a is a nut arranged on the upper surface side of the flat plate portion of the second frame member 20. By sandwiching the flat plate portion of the second frame member 20 with these two nuts 39a and 39b, the support bolt 33 can support the second frame member 20 at a predetermined height position.

また、第2フレーム部材20の取付部27に取り付けられる吊りボルト40の下部にも上記と同様に2つのナットが装着される。吊りボルト40の下部は、それら2つのナットで第2フレーム部材20の平板部を挟み込むことにより、第2フレーム部材20に固定される。 Also, two nuts are attached to the lower portion of the suspension bolt 40 attached to the attachment portion 27 of the second frame member 20 as in the above. The lower portion of the hanging bolt 40 is fixed to the second frame member 20 by sandwiching the flat plate portion of the second frame member 20 with these two nuts.

このように支持装置1は、第1フレーム部材10と第2フレーム部材20とを相互に連結するフレーム連結部材30に、防振部材35が配置されている。そのため、空気調和機110の稼働中に発生する振動は、防振部材35によって吸収され、第2フレーム部材20に伝わることがなくなる。そのため、支持装置1が天井構造に設置されると、第2フレーム部材20が天井構造に対して固定され、第1フレーム部材10及び空気調和機110が防振部材35,28を介して第2フレーム部材20に支持された状態となる。 As described above, in the support device 1, the vibration isolating member 35 is arranged on the frame connecting member 30 that connects the first frame member 10 and the second frame member 20 to each other. Therefore, the vibration generated during the operation of the air conditioner 110 is absorbed by the vibration isolator 35 and is not transmitted to the second frame member 20. Therefore, when the support device 1 is installed in the ceiling structure, the second frame member 20 is fixed to the ceiling structure, and the first frame member 10 and the air conditioner 110 are connected to the second vibration member 35, 28 via the vibration damping members 35, 28. It is in a state of being supported by the frame member 20.

図6は、吊りボルト40の上端部に予め取り付けられる天井取付金具50の一構成例を示す図である。図6に示すように、天井取付金具50は、吊りボルト40の上端部に装着される金属製部材であり、概略コ字状の形態を有している。すなわち、天井取付金具50は、平板部51と、平板部51の両側において互いに平行な状態で立設する一対の側板部52とを有する。例えば、平板部51は長方形状に形成される。また、平板部51には、円形状の第1の孔54と、その第1の孔54に隣接し、平板部51の長手方向に沿って形成される長孔状の第2の孔55とが形成される。第1の孔54は、例えば吊りボルト40の上端部を挿通する孔であり、吊りボルト40の外径よりも若干大きい内径の孔である。第2の孔55は、天井構造に取り付けられるアンカーボルトやインサートに装着されるボルトなどのボルト部材を挿通するための孔であり、それらボルト部材の直径よりも若干大きい内幅の長孔である。 FIG. 6 is a diagram showing a configuration example of a ceiling mounting bracket 50 that is mounted in advance on the upper end portion of the hanging bolt 40. As shown in FIG. 6, the ceiling mounting member 50 is a metal member mounted on the upper end portion of the hanging bolt 40, and has a substantially U-shape. That is, the ceiling mounting member 50 has a flat plate portion 51 and a pair of side plate portions 52 standing upright on both sides of the flat plate portion 51 in parallel with each other. For example, the flat plate portion 51 is formed in a rectangular shape. Further, the flat plate portion 51 has a circular first hole 54 and a long hole-shaped second hole 55 that is adjacent to the first hole 54 and is formed along the longitudinal direction of the flat plate portion 51. Is formed. The first hole 54 is, for example, a hole through which the upper end portion of the hanging bolt 40 is inserted, and has an inner diameter slightly larger than the outer diameter of the hanging bolt 40. The second hole 55 is a hole for inserting a bolt member such as an anchor bolt attached to a ceiling structure or a bolt attached to an insert, and is an elongated hole having an inner width slightly larger than the diameter of the bolt member. ..

尚、上記とは反対に、第1の孔54に対して天井構造に取り付けられるアンカーボルトやインサートに装着されるボルトなどを挿通し、第2の孔55に対して吊りボルト40の上端部を挿通するようにしても良い。また、第1の孔54と第2の孔55は、必ずしも区分けした状態に形成する必要はないため、第1の孔54と第2の孔55とを連通させた長孔状の1つの取付孔を形成し、その1つの取付孔に対し、天井構造に取り付けられるボルト部材と吊りボルト40との双方を挿通するようにしても良い。 Contrary to the above, an anchor bolt attached to the ceiling structure or a bolt attached to the insert is inserted into the first hole 54, and the upper end portion of the hanging bolt 40 is inserted into the second hole 55. It may be inserted. Further, since the first hole 54 and the second hole 55 do not necessarily need to be formed in a divided state, one long-hole-shaped attachment that connects the first hole 54 and the second hole 55 to each other is attached. A hole may be formed, and both the bolt member mounted on the ceiling structure and the hanging bolt 40 may be inserted through the one mounting hole.

一対の側板部52は、平板部51の長手方向において中央部よりも両端部の高さが高くなっており、この両端部が天井スラブやデッキプレートなどの天井構造に対して当接する接合部53として形成される。側板部52の長手方向中央部が両端部の接合部53よりも低くなることにより、接合部53が天井構造に当接した状態であっても高さの低い中央部を窓として天井取付金具50の内側の状態を目視で確認することが可能であるという利点がある。また、デッキプレートが山部と谷部とを有する波形形状であり、且つ、山部の中央にインサート装着用の溝部が形成されている場合、側板部52の中央に高さの低い部分を設けておくことで、天井取付金具50をデッキプレートの溝部に干渉させることなく、接合部53をデッキプレートの下面に当接させた状態に設置することができるという利点もある。 The pair of side plate parts 52 has a height at both ends which is higher than a central part in the longitudinal direction of the flat plate part 51, and the both ends are in contact with a ceiling structure such as a ceiling slab or a deck plate. Formed as. Since the central portion in the longitudinal direction of the side plate portion 52 is lower than the joint portions 53 at both end portions, even if the joint portion 53 is in contact with the ceiling structure, the central portion having a low height is used as a window for the ceiling mounting bracket 50. There is an advantage that it is possible to visually check the inside state of the. Further, when the deck plate has a corrugated shape having a peak portion and a valley portion, and a groove portion for insert mounting is formed at the center of the peak portion, a low-height portion is provided at the center of the side plate portion 52. This also has the advantage that the joint 53 can be placed in contact with the lower surface of the deck plate without interfering with the ceiling mounting bracket 50 in the groove of the deck plate.

このような天井取付金具50は、ロングナット58とナット59とを用いて吊りボルト40の上端部に取り付けられる。すなわち、吊りボルト40の上端部にまずロングナット58を装着し、ロングナット58の上端から吊りボルト40の先端を突出させた状態とし、その突出した先端を、天井取付金具50の第1の孔54に挿通してナット59を装着する。これにより、天井取付金具50が吊りボルト40の上端部に仮止めされた状態となる。ここで、一対の側板部52に設けられる接合部53の高さHは、少なくともナット59の高さ寸法以上であれば良い。ただし、天井取付金具50がインサートに装着されるボルトに取り付けられることを想定すれば、接合部53の高さHは、天井構造から下方に突出した状態となるインサートの高さ寸法よりも高くなるように予め設計しておくことが好ましい。 Such a ceiling mounting bracket 50 is attached to the upper end portion of the hanging bolt 40 by using the long nut 58 and the nut 59. That is, the long nut 58 is first attached to the upper end of the hanging bolt 40, and the tip of the hanging bolt 40 is projected from the upper end of the long nut 58, and the projected tip is attached to the first hole of the ceiling mounting bracket 50. Insert the nut 59 by inserting it through 54. As a result, the ceiling mount 50 is temporarily fixed to the upper end of the hanging bolt 40. Here, the height H of the joint portion 53 provided on the pair of side plate portions 52 may be at least the height dimension of the nut 59 or more. However, assuming that the ceiling mounting bracket 50 is attached to a bolt mounted on the insert, the height H of the joint portion 53 is higher than the height dimension of the insert protruding downward from the ceiling structure. It is preferable to design in advance.

ロングナット58は、軸方向(鉛直方向)に所定長さを有しており、吊りボルト40の雄螺子と螺合する雌螺子を有している。天井取付金具50は、ロングナット58が吊りボルト40に取り付けられた状態で平板部51の下面がロングナット58の上面に支持される。天井取付金具50において吊りボルト40が挿通される第1の孔54は吊りボルト40の外径よりも若干大きいため、天井取付金具50は、第1の孔54に対して吊りボルト40が挿通された状態になると、吊りボルト40の軸回りに回動可能な状態となる。そして天井取付金具50が吊りボルト40から抜け落ちてしまうことを防止するために、吊りボルト40の先端にはナット59が取り付けられる。尚、ナット59は、吊りボルト40の先端から抜け落ちないようにするための緩み止め機能や抜け止め機能を有するものを用いることが好ましい。 The long nut 58 has a predetermined length in the axial direction (vertical direction), and has a female screw that is screwed into the male screw of the hanging bolt 40. In the ceiling mounting member 50, the lower surface of the flat plate portion 51 is supported on the upper surface of the long nut 58 with the long nut 58 attached to the hanging bolt 40. Since the first hole 54 of the ceiling mounting bracket 50 into which the hanging bolt 40 is inserted is slightly larger than the outer diameter of the hanging bolt 40, the ceiling mounting bracket 50 allows the hanging bolt 40 to be inserted into the first hole 54. In this state, the suspension bolt 40 is rotatable about its axis. A nut 59 is attached to the tip of the hanging bolt 40 in order to prevent the ceiling mounting bracket 50 from falling off the hanging bolt 40. In addition, it is preferable to use the nut 59 having a loosening prevention function or a retention function for preventing the nut 59 from falling off from the tip of the hanging bolt 40.

上記のように天井取付金具50は、吊りボルト40の上端部に対し、ロングナット58とナット59とで平板部51が挟み込まれることによって取り付けられる。ロングナット58が天井取付金具50の下面に対してきつく締着されていない状態のとき、上述したように天井取付金具50は、吊りボルト40の軸回りに回動可能である。つまり、天井取付金具50は仮止め状態のとき、吊りボルト40の軸周りに回動する。これに対し、ロングナット58が天井取付金具50の下面に対してきつく締着された状態になると、天井取付金具50はロングナット58とナット59とに挟まれた状態で固定されるため、吊りボルト40の軸回りに回動しない状態となる。 As described above, the ceiling mounting member 50 is attached to the upper end portion of the hanging bolt 40 by sandwiching the flat plate portion 51 with the long nut 58 and the nut 59. When the long nut 58 is not tightly fastened to the lower surface of the ceiling mounting member 50, the ceiling mounting member 50 is rotatable about the axis of the suspension bolt 40 as described above. That is, the ceiling mounting member 50 rotates around the axis of the hanging bolt 40 in the temporarily fixed state. On the other hand, when the long nut 58 is tightly fastened to the lower surface of the ceiling mounting bracket 50, the ceiling mounting bracket 50 is fixed by being sandwiched between the long nut 58 and the nut 59. The bolt 40 does not rotate about its axis.

上記のように構成される支持装置1は、各構成部材を分解した状態で施行現場に搬入可能であり、天井構造に設置する高所作業を行う前に予め床面上で空気調和機110に対する組み付け作業が行われる。そして支持装置1を空気調和機110に組み付ける作業が行われた後に、支持装置1を組み付けた空気調和機110を天井構造の近傍位置まで持ち上げ、支持装置1を天井構造から垂下するアンカーボルトなどのボルト部材に取り付ける作業が行われる。以下、このような作業の手順について説明する。 The support device 1 configured as described above can be carried into the execution site in a state where the respective constituent members are disassembled, and the support device 1 can be installed on the floor in advance on the air conditioner 110 before performing work at a high place to be installed in the ceiling structure. Assembly work is performed. Then, after the work of assembling the support device 1 to the air conditioner 110 is performed, the air conditioner 110 to which the support device 1 is assembled is lifted to a position near the ceiling structure, and an anchor bolt or the like that hangs the support device 1 from the ceiling structure. Work to attach to the bolt member is performed. Hereinafter, the procedure of such work will be described.

空気調和機110に支持装置1を組み付ける床面作業では、最初に空気調和機本体120の左右両側面に設けられている取付片121に対してボルト部材9を取り付けた後、そのボルト部材9の上端部に第1フレーム部材10を取り付ける。このとき、第1フレーム部材10の平板部11を固定するためのナットを所定トルク以上で締め付けることにより、ボルト部材9の振れ止め効果を発揮させることができる。 In the floor work for assembling the support device 1 to the air conditioner 110, after the bolt members 9 are first attached to the mounting pieces 121 provided on the left and right side surfaces of the air conditioner body 120, the bolt members 9 are removed. The first frame member 10 is attached to the upper end. At this time, by tightening the nut for fixing the flat plate portion 11 of the first frame member 10 with a predetermined torque or more, the steadying effect of the bolt member 9 can be exhibited.

次に連結ボルト15を用いて一対の第1フレーム部材10を相互に連結し、連結ボルト15の両端部に係合部材17を取り付ける。係合部材17を、空気調和機本体120の前面及び後面のそれぞれに係合させることにより、第1フレーム部材10を空気調和機本体120の上面において位置決めすることができる。尚、一対の第1フレーム部材10を相互に連結する必要がない場合、連結ボルト15を取り付ける工程は省略可能である。 Next, the pair of first frame members 10 are connected to each other using the connecting bolts 15, and the engaging members 17 are attached to both ends of the connecting bolts 15. By engaging the engaging member 17 with each of the front surface and the rear surface of the air conditioner body 120, the first frame member 10 can be positioned on the upper surface of the air conditioner body 120. When it is not necessary to connect the pair of first frame members 10 to each other, the step of attaching the connecting bolt 15 can be omitted.

続いて、第1フレーム部材10の取付部14に対してフレーム連結部材30を取り付け、更にフレーム連結部材30の支持ボルト33に対して第2フレーム部材20を取り付ける。尚、第2フレーム部材20において、支持フレーム23の両端部に対して補助フレーム21,22を接続する作業は、フレーム連結部材30に第2フレーム部材20を取り付けた後に行うようにしても良いし、フレーム連結部材30に第2フレーム部材20を取り付ける前に行うようにしても良い。そして第2フレーム部材20に対して吊りボルト40を取り付け、吊りボルト40の上端部に天井取付金具50を取り付ける。尚、吊りボルト40を第2フレーム部材20に取り付ける前に、吊りボルト40の上端部に対して先に天井取付金具50を取り付けておいても良い。 Subsequently, the frame connecting member 30 is attached to the attaching portion 14 of the first frame member 10, and the second frame member 20 is attached to the support bolt 33 of the frame connecting member 30. In the second frame member 20, the work of connecting the auxiliary frames 21 and 22 to both ends of the support frame 23 may be performed after the second frame member 20 is attached to the frame connecting member 30. Alternatively, it may be performed before the second frame member 20 is attached to the frame connecting member 30. Then, the suspension bolt 40 is attached to the second frame member 20, and the ceiling mounting bracket 50 is attached to the upper end portion of the suspension bolt 40. Before attaching the hanging bolt 40 to the second frame member 20, the ceiling mounting bracket 50 may be attached to the upper end portion of the hanging bolt 40 in advance.

作業者は、上記の作業を行うとき、設計上予め定められている空気調和機110の設置位置に基づき、天井空間に存在する障害物や、デッキプレートの山部の位置などを確認し、第1フレーム部材10に対してフレーム連結部材30を取り付ける位置や、フレーム連結部材30に対して第2フレーム部材20を取り付ける位置、第2フレーム部材20に対して吊りボルト40を取り付ける位置などを適宜調整する。つまり、支持装置1は、天井空間に存在する障害物を避けることができる位置に吊りボルト40を取り付けることが可能であり、またデッキプレートの山部のピッチに対応する位置に吊りボルト40を取り付けることが可能である。 When performing the above work, the operator confirms the obstacles existing in the ceiling space, the position of the mountain portion of the deck plate, etc. based on the installation position of the air conditioner 110 which is predetermined in design, and 1 The position where the frame connecting member 30 is attached to the frame member 10, the position where the second frame member 20 is attached to the frame connecting member 30, the position where the hanging bolt 40 is attached to the second frame member 20, etc. are adjusted as appropriate. To do. That is, in the supporting device 1, the suspension bolts 40 can be attached at positions where obstacles existing in the ceiling space can be avoided, and the suspension bolts 40 are attached at positions corresponding to the pitches of the mountain portions of the deck plate. It is possible.

上記のように、空気調和機110に対して支持装置1を組み付ける作業は、床面上に空気調和機110を設置した状態で行うことが可能であるため、作業者にとって作業しやすく、効率的に支持装置1を組み付けることができる。 As described above, the work of assembling the support device 1 to the air conditioner 110 can be performed in a state where the air conditioner 110 is installed on the floor surface, so that it is easy and efficient for the worker to work. The support device 1 can be assembled to the.

空気調和機110に支持装置1が組み付けられると、空気調和機110は、図7に示すように、昇降装置250に載置される。そして昇降装置250が矢印F1で示すように上昇駆動されることにより、支持装置1が組み付けられた空気調和機110が天井スラブなどの天井構造200の近傍位置まで持ち上げられる。天井構造200には、予めアンカーボルトなのボルト部材210が取り付けられている。作業者は、天井構造200から垂下するボルト部材210の位置と、支持装置1の上端に装着される天井取付金具50の位置とが合致するように昇降装置250を床面上で位置合わせし、昇降装置250を上昇駆動する。ただし、天井取付金具50は、吊りボルト40の軸周りに回動可能であり、ボルト部材210の位置が多少ずれていても天井取付金具50の第2の孔55にボルト部材210を取り付けることが可能であるため、作業者は、ボルト部材210の位置と、天井取付金具50の位置とを厳密に位置合わせする必要はない。 When the support device 1 is assembled to the air conditioner 110, the air conditioner 110 is placed on the elevating device 250 as shown in FIG. 7. Then, the lifting device 250 is driven to rise as shown by an arrow F1, so that the air conditioner 110 in which the support device 1 is assembled is lifted to a position near the ceiling structure 200 such as a ceiling slab. A bolt member 210 such as an anchor bolt is attached to the ceiling structure 200 in advance. The operator aligns the lifting device 250 on the floor so that the position of the bolt member 210 hanging from the ceiling structure 200 and the position of the ceiling mounting bracket 50 attached to the upper end of the support device 1 match, The elevating device 250 is driven to rise. However, the ceiling mounting bracket 50 is rotatable around the axis of the hanging bolt 40, and even if the position of the bolt member 210 is slightly displaced, the bolt member 210 can be mounted in the second hole 55 of the ceiling mounting bracket 50. Since it is possible, the operator does not have to strictly align the position of the bolt member 210 with the position of the ceiling mounting bracket 50.

そして支持装置1の天井取付金具50の第2の孔55にボルト部材210を挿入し、ボルト部材210の先端にナットを装着して締着することにより、天井取付金具50が支持装置1及び空気調和機110を支持した状態で天井構造200に取り付けられる。その後、天井取付金具50の下部に装着されているロングナット58が天井取付金具50の下面に対して締着されることにより、天井取付金具50と吊りボルト40とが相互に固定され、支持装置1は、空気調和機110を支持した状態で天井構造200に設置される。 Then, the bolt member 210 is inserted into the second hole 55 of the ceiling mounting bracket 50 of the supporting device 1, and the nut of the bolt member 210 is attached and tightened to fix the ceiling mounting bracket 50 to the supporting device 1 and the air. It is attached to the ceiling structure 200 with the conditioner 110 being supported. After that, the long nut 58 attached to the lower portion of the ceiling mounting bracket 50 is fastened to the lower surface of the ceiling mounting bracket 50, so that the ceiling mounting bracket 50 and the suspension bolt 40 are fixed to each other, and the supporting device is provided. 1 is installed in the ceiling structure 200 while supporting the air conditioner 110.

図8は、デッキプレート201が設けられた天井構造200に支持装置1を取り付けた状態を示す図である。デッキプレート201は、山部202と谷部203とが所定間隔で形成された波形形状を有している。このようなデッキプレート201に支持装置1を取り付ける場合、吊りボルト40は、デッキプレート201の山部202に取り付けることが必要である。本実施形態の支持装置1は、第2フレーム部材20に対する吊りボルト40の取り付け位置を第2フレーム部材20の長手方向(Y方向)の任意の位置に取り付け可能である。そのため、空気調和機110を設計上予め定められた位置に設置したとき、空気調和機本体120の側面に設けられている一対の取付片121,121の上方位置にデッキプレート201の山部202が存在していない場合であっても、第2フレーム部材20に対して吊りボルト40を取り付ける際に、デッキプレート201の山部202の位置に適合する位置に吊りボルト40を予め取り付けておくことにより、図8に示すように吊りボルト40の上端部をデッキプレート201の山部202に設けられたボルト部材210に対して固定することができる。それ故、作業者にとっては、高所作業が軽減され、作業効率に優れているという利点がある。 FIG. 8 is a diagram showing a state in which the supporting device 1 is attached to the ceiling structure 200 provided with the deck plate 201. The deck plate 201 has a corrugated shape in which peaks 202 and valleys 203 are formed at predetermined intervals. When mounting the supporting device 1 on such a deck plate 201, it is necessary to mount the suspension bolt 40 on the mountain portion 202 of the deck plate 201. In the support device 1 of the present embodiment, the mounting position of the suspension bolt 40 with respect to the second frame member 20 can be mounted at any position in the longitudinal direction (Y direction) of the second frame member 20. Therefore, when the air conditioner 110 is installed at a predetermined position in design, the mountain portion 202 of the deck plate 201 is located above the pair of mounting pieces 121, 121 provided on the side surface of the air conditioner body 120. Even when the suspension bolt 40 does not exist, when the suspension bolt 40 is attached to the second frame member 20, the suspension bolt 40 is previously attached to a position that matches the position of the mountain portion 202 of the deck plate 201. As shown in FIG. 8, the upper end portion of the hanging bolt 40 can be fixed to the bolt member 210 provided on the mountain portion 202 of the deck plate 201. Therefore, for workers, there is an advantage that work at high places is reduced and work efficiency is excellent.

図8では、デッキプレート201の山部202と谷部203がY方向に沿って連続している場合を例示したが、山部202と谷部203がX方向に沿って連続している場合も同様である。すなわち、支持装置1は、第1フレーム部材10に対するフレーム連結部材30の取付位置をX方向に沿って調整可能であるため、山部202と谷部203とがX方向に沿って連続している場合には第2フレーム部材20が山部202の下方に位置するようにフレーム連結部材30を取り付ければ良い。 Although FIG. 8 illustrates the case where the peaks 202 and the valleys 203 of the deck plate 201 are continuous along the Y direction, the peaks 202 and the valleys 203 are also continuous along the X direction. It is the same. That is, in the supporting device 1, since the mounting position of the frame connecting member 30 with respect to the first frame member 10 can be adjusted along the X direction, the peaks 202 and the valleys 203 are continuous along the X direction. In this case, the frame connecting member 30 may be attached so that the second frame member 20 is located below the mountain portion 202.

このように本実施形態の支持装置1は、吊りボルト40の取付位置をXY平面内で調整することができるため、空気調和機本体120の側面に設けられた一対の取付片121,121の上方に障害物が存在する場合であっても空気調和機110を設計上予め定められた適切な位置に設置することが可能であり、しかも一対の取付片121,121の上方位置にデッキプレート201の山部202が存在しない場合であっても吊りボルト40の取付位置を調整することにより、山部202に対して吊りボルト40の上端部を固定することが可能である。 As described above, in the supporting device 1 of the present embodiment, the mounting position of the hanging bolt 40 can be adjusted within the XY plane, and thus the upper side of the pair of mounting pieces 121, 121 provided on the side surface of the air conditioner body 120. Even if there is an obstacle in the air conditioner, it is possible to install the air conditioner 110 at an appropriate position which is predetermined in design, and moreover, the deck plate 201 is provided above the pair of mounting pieces 121, 121. Even if the mountain portion 202 does not exist, it is possible to fix the upper end portion of the hanging bolt 40 to the mountain portion 202 by adjusting the mounting position of the hanging bolt 40.

また、上記のように構成される支持装置1は、例えば天井構造200に設置された後であっても、空気調和機110の高さ位置を簡単に微調整することが可能である。図9は、空気調和機110の高さ調整機能を例示する図である。支持装置1が天井構造200に取り付けられた後、空気調和機110の高さ位置の微調整を行う場合、作業者は、図9に示すように、第2フレーム部材20の下面側に配置されているナット39bを予め緩めておく。その状態で、作業者は、電動工具に装着したビットを第2フレーム部材20の上面側に位置するナット39aに嵌め込み、電動工具を作動させることでナット39aを支持ボルト33の軸周り(R方向)に回転させる。例えばナット39aを右回り方向に回転させると、支持ボルト33が上昇する。これに伴い、空気調和機110が上方に移動する。また、ナット39aを左周り方向に回転させると、支持ボルト33が下降する。これに伴い、空気調和機110が下方へ移動する。つまり、支持装置1は、第2フレーム部材20の上面側に配置されている4つのナット39aをR方向に回転させることにより、空気調和機110の高さ位置を微調整することができるのである。そして空気調和機110の高さ位置が決まれば、第2フレーム部材20の下面側のナット39bを締め付けることにより、支持ボルト33と第2フレーム部材20とを固定することができる。 Further, the support device 1 configured as described above can easily finely adjust the height position of the air conditioner 110 even after being installed in the ceiling structure 200, for example. FIG. 9 is a diagram illustrating a height adjusting function of the air conditioner 110. After performing the fine adjustment of the height position of the air conditioner 110 after the support device 1 is attached to the ceiling structure 200, the operator is placed on the lower surface side of the second frame member 20 as shown in FIG. 9. The nut 39b that is being used is loosened in advance. In this state, the worker fits the bit mounted on the power tool into the nut 39a located on the upper surface side of the second frame member 20, and operates the power tool to move the nut 39a around the axis of the support bolt 33 (R direction). ) Rotate to. For example, when the nut 39a is rotated clockwise, the support bolt 33 rises. Along with this, the air conditioner 110 moves upward. Further, when the nut 39a is rotated counterclockwise, the support bolt 33 is lowered. Along with this, the air conditioner 110 moves downward. That is, the support device 1 can finely adjust the height position of the air conditioner 110 by rotating the four nuts 39a arranged on the upper surface side of the second frame member 20 in the R direction. .. When the height position of the air conditioner 110 is determined, the support bolt 33 and the second frame member 20 can be fixed by tightening the nut 39b on the lower surface side of the second frame member 20.

このように本実施形態の支持装置1は、第1フレーム部材10に取り付けられるフレーム連結部材30が、第2フレーム部材20を第1フレーム部材10の上方位置で支持するように構成であるため、第2フレーム部材20と第1フレーム部材10との間隔を簡単に調整することが可能であり、空気調和機110の高さ調整を行い易いという利点がある。 As described above, the support device 1 according to the present embodiment is configured so that the frame connecting member 30 attached to the first frame member 10 supports the second frame member 20 at a position above the first frame member 10. There is an advantage that the distance between the second frame member 20 and the first frame member 10 can be easily adjusted, and the height of the air conditioner 110 can be easily adjusted.

また、天井構造200から空気調和機110を設置する距離が長くなる場合には、それに応じて吊りボルト40の長さを長くすれば良い。この場合、吊りボルト40の長さが所定長さを超えると、地震発生時に吊りボルト40が大きく振動し、それに応じて空気調和機110が大きく振れる。そのような振動を防止するため、吊りボルト40が所定長さを超える場合には、互いに隣り合う吊りボルト40に対して補強材となるブレースを予め配置しておくことが好ましい。 In addition, when the distance to install the air conditioner 110 from the ceiling structure 200 becomes long, the length of the hanging bolt 40 may be increased accordingly. In this case, if the length of the suspension bolt 40 exceeds the predetermined length, the suspension bolt 40 vibrates greatly when an earthquake occurs, and the air conditioner 110 largely shakes accordingly. In order to prevent such vibrations, when the suspension bolts 40 exceed a predetermined length, it is preferable to previously arrange braces that serve as reinforcing materials for the suspension bolts 40 adjacent to each other.

図10は、吊りボルト40に対してブレース70を配置した支持装置1の構成例を示す斜視図であり、図11は、その側面図である。図10及び図11に示す支持装置1は、一対の第2フレーム部材20から上方に突出する4本の吊りボルト40のうち、互いに隣り合う2本の吊りボルト40の間に2本のブレース70を交叉配置したものである。例えば、4本の吊りボルト40の上端近傍位置には、ブレース70の上部を接続するブレース連結金具71が取り付けられ、そのブレース連結金具71に対してブレース70の上部が固定される。また、ブレース70の下部は、ブレース固定金具72,73によって第2フレーム部材20や吊りボルト40の下端部に固定される。 FIG. 10 is a perspective view showing a configuration example of the support device 1 in which the brace 70 is arranged with respect to the hanging bolt 40, and FIG. 11 is a side view thereof. The supporting device 1 shown in FIGS. 10 and 11 includes two braces 70 between two hanging bolts 40 adjacent to each other among the four hanging bolts 40 protruding upward from the pair of second frame members 20. It is a crossover arrangement. For example, a brace connecting fitting 71 that connects the upper portion of the brace 70 is attached at a position near the upper ends of the four hanging bolts 40, and the upper portion of the brace 70 is fixed to the brace connecting fitting 71. Further, the lower portion of the brace 70 is fixed to the lower ends of the second frame member 20 and the hanging bolt 40 by the brace fixing fittings 72 and 73.

特に、XZ平面内に配置されるブレース70の下部は、第2フレーム部材20から下方に突出する吊りボルト40の先端部にブレース固定金具73を用いて固定される好ましい。ブレース70の固定位置を第2フレーム部材20の上側に設けるよりも、第2フレーム部材20の下側に設けることにより、より高い振れ止め効果を得ることができるからである。 In particular, the lower portion of the brace 70 arranged in the XZ plane is preferably fixed to the tip end portion of the hanging bolt 40 protruding downward from the second frame member 20 by using the brace fixing metal fitting 73. By providing the brace 70 on the lower side of the second frame member 20 rather than on the upper side of the second frame member 20, a higher steady rest effect can be obtained.

また、YZ平面に配置されるブレース70の下部は、ブレース固定金具72と第2フレーム部材20との間に挟み込まれた状態で1つのボルトで固定される。ブレース70の下部を1つのボルトを締め付けることによって固定できるようにすることで作業効率を向上させることができる。 Further, the lower portion of the brace 70 arranged on the YZ plane is fixed with one bolt while being sandwiched between the brace fixing metal fitting 72 and the second frame member 20. The work efficiency can be improved by fixing the lower portion of the brace 70 by tightening one bolt.

図10及び図11に示すように、床面上での作業で4本の吊りボルト40のそれぞれに対してブレース70を予め交叉配置しておくことにより、高所作業でブレース70を設置する作業を行わなくて済むため、作業性がより一層向上する。そしてブレース70が交叉配置された吊りボルト40の上端部に天井取付金具50を予め床面作業で取り付けておく点は、上述した通りである。 As shown in FIGS. 10 and 11, by installing the braces 70 in advance on each of the four hanging bolts 40 in the work on the floor surface, the work to install the braces 70 in the work at high places Therefore, the workability is further improved. As described above, the ceiling mounting bracket 50 is preliminarily attached to the upper end portion of the hanging bolt 40 on which the brace 70 is crossed by the floor surface work.

また、隣り合う2本の吊りボルト40の間に梁などの障害物が存在する場合には、図10及び図11に示したように2本の吊りボルト40の間にブレース70を交叉配置することができない場合がある。そのような場合には、障害物の近傍位置において2本の吊りボルト40の間に剛性部材を配置し、その剛性部材を利用してブレース70を配置すれば良い。 Further, when an obstacle such as a beam exists between the two hanging bolts 40 adjacent to each other, the brace 70 is cross-arranged between the two hanging bolts 40 as shown in FIGS. 10 and 11. It may not be possible. In such a case, a rigid member may be arranged between the two suspension bolts 40 in the vicinity of the obstacle, and the brace 70 may be arranged using the rigid member.

図12は、剛性部材80を用いてブレース70を取り付けた支持装置1を例示する側面図である。例えば、図12に示すように天井構造200に梁などの障害物280が存在し、2本の吊りボルト40の間にブレース70を交叉配置することができない場合、支持装置1を床面作業で組み付けるとき、障害物280を挟む状態に位置する2本の吊りボルト40の間に、金属プレートなどによって構成される剛性部材80を取り付ける。剛性部材80は、その両端が吊りボルト40の所定高さ位置に固定され、2本の吊りボルト40の間を横断するように取り付けられる。このような剛性部材80は、障害物280の近傍位置に取り付けられることが好ましい。剛性部材80は、それ自体で2本の吊りボルト40の振れ止め効果を発揮する。ただし、より好ましくは、図12に示すように剛性部材80に対してブレース70を更に取り付けることである。そのとき、ブレース70の一端を、上述したブレース固定金具72を用いて剛性部材80の平面に固定することにより、簡単にブレース70を取り付けることができる。 FIG. 12 is a side view illustrating the supporting device 1 to which the brace 70 is attached using the rigid member 80. For example, when there is an obstacle 280 such as a beam in the ceiling structure 200 as shown in FIG. 12 and the brace 70 cannot be crossed between the two suspension bolts 40, the support device 1 can be used for floor work. At the time of assembling, the rigid member 80 composed of a metal plate or the like is attached between the two hanging bolts 40 positioned so as to sandwich the obstacle 280. Both ends of the rigid member 80 are fixed to a predetermined height position of the suspension bolt 40, and the rigid member 80 is attached so as to traverse between the two suspension bolts 40. Such a rigid member 80 is preferably attached to a position near the obstacle 280. The rigid member 80 itself exerts an anti-sway effect for the two hanging bolts 40. However, more preferably, the brace 70 is further attached to the rigid member 80 as shown in FIG. At that time, the brace 70 can be easily attached by fixing one end of the brace 70 to the plane of the rigid member 80 using the brace fixing metal fitting 72 described above.

また、剛性部材80から上方に配置するブレース70は、図12に示すように天井構造200に別途取り付けたボルト部材220に対してブレース固定金具73を用いて取り付けるようにしても良い。ただし、この場合、剛性部材80から上方に配置するブレース70の取付作業は、高所作業として行う必要がある。また、吊りボルト40に取り付けられているブレース連結金具71にブレース70の上端部を取り付けるようにしても良い。この場合は、床面作業で全てのブレース70を支持装置1に予め組み付けておくことができる。 The brace 70 arranged above the rigid member 80 may be attached to the bolt member 220 separately attached to the ceiling structure 200 by using the brace fixing metal fitting 73 as shown in FIG. However, in this case, the work of attaching the brace 70 arranged above the rigid member 80 needs to be performed as work at a high place. Further, the upper end portion of the brace 70 may be attached to the brace connecting fitting 71 attached to the hanging bolt 40. In this case, all the braces 70 can be assembled to the support device 1 in advance by floor work.

以上のように本実施形態の支持装置1は、概略箱形形状の互いに平行な左右両側面にボルト部材9を取り付けるための取付片121が設けられた空気調和機110を、天井空間に吊り下げた状態で支持するように構成される。この支持装置1は、空気調和機110の上面を左右方向(X方向)に横断するように配置され、両端部に取付片121に取り付けられるボルト部材9が連結されることにより空気調和機110の上面に対して固定される第1フレーム部材10と、空気調和機110の上面を前後方向(Y方向)に横断するように配置される第2フレーム部材20と、第1フレーム部材10と第2フレーム部材20とが互いに直交し、且つ、第1フレーム部材10と第2フレーム部材20とが上下方向に所定間隔を隔てた状態で第1フレーム部材10と第2フレーム部材20とを相互に連結するフレーム連結部材30と、下端部が第2フレーム部材20に連結され、上端部が天井構造200に接続される吊りボルト40と、を備えている。 As described above, the support device 1 of the present embodiment suspends the air conditioner 110 in which the mounting pieces 121 for mounting the bolt members 9 are provided on the left and right side surfaces of the substantially box-shaped parallel to each other in the ceiling space. It is configured to support in an open state. The support device 1 is arranged so as to traverse the upper surface of the air conditioner 110 in the left-right direction (X direction), and the bolt members 9 attached to the attachment pieces 121 are connected to both ends of the air conditioner 110. The first frame member 10 fixed to the upper surface, the second frame member 20 arranged to cross the upper surface of the air conditioner 110 in the front-rear direction (Y direction), the first frame member 10 and the second frame member 10. The first frame member 10 and the second frame member 20 are connected to each other in a state where the frame member 20 is orthogonal to each other and the first frame member 10 and the second frame member 20 are vertically spaced apart by a predetermined distance. And a suspension bolt 40 having a lower end connected to the second frame member 20 and an upper end connected to the ceiling structure 200.

このような構成を有する支持装置1は、床面作業で比較的簡単に空気調和機110に組み付けが可能である。また、支持装置1は、空気調和機110を支持するボルト部材9の上端部を第1フレーム部材10に接続して固定する。そのため、ボルト部材9に軸力を作用させた状態でボルト部材9を固定することができ、仮に大規模地震が発生したとしてもボルト部材9が振動してしまうことを良好に防止することが可能であり、空気調和機110の振動も抑制することができる。それ故、地震発生時に、空気調和機110に接続される冷媒配管や送風ダクトなどの接続部の破損を抑制することが可能であり、地震が収まった後、直ぐに空気調和機110を正常稼働させることができる。 The supporting device 1 having such a configuration can be relatively easily assembled to the air conditioner 110 by floor work. In addition, the support device 1 connects and fixes the upper end portion of the bolt member 9 that supports the air conditioner 110 to the first frame member 10. Therefore, the bolt member 9 can be fixed in a state in which the axial force is applied to the bolt member 9, and it is possible to favorably prevent the bolt member 9 from vibrating even if a large-scale earthquake occurs. Therefore, the vibration of the air conditioner 110 can also be suppressed. Therefore, when an earthquake occurs, it is possible to suppress damage to the connection parts such as the refrigerant pipes and the air ducts connected to the air conditioner 110, and immediately after the earthquake is over, the air conditioner 110 is normally operated normally. be able to.

また、上記構成を有する支持装置1は、第1フレーム部材10よりも下方に、ボルト部材9以外の部材を配置しないため、空気調和機110の左右両側面に設けられる冷媒配管などの接続部の近傍位置や、フィルタユニット130の開閉扉の近傍位置などに邪魔な部材を配置しない構成となっている。そのため、例えば空気調和機110のメンテナンス時に支持装置1が邪魔になるようなことはなく、メンテナンス作業をスムーズに行うことができるという利点もある。 Further, in the supporting device 1 having the above-described configuration, since no members other than the bolt members 9 are arranged below the first frame member 10, the connection parts such as the refrigerant pipes provided on the left and right side surfaces of the air conditioner 110 are not provided. The configuration is such that no obstructive member is arranged at a nearby position, a position near the opening/closing door of the filter unit 130, or the like. Therefore, there is also an advantage that the maintenance work can be performed smoothly without the support device 1 interfering with the maintenance of the air conditioner 110, for example.

また、支持装置1は、フレーム連結部材30に防振部材35が設けられおり、また第2フレーム部材20の両端部も防振部材28を介して吸気ユニット150及び吹出ユニット140を支持するように構成されている。そのため、空気調和機110が稼働するときに、空気調和機110の振動が天井構造200に伝搬することを防止することが可能である。 Further, in the support device 1, the frame coupling member 30 is provided with the vibration isolator 35, and both ends of the second frame member 20 also support the intake unit 150 and the blowout unit 140 via the vibration isolator 28. It is configured. Therefore, when the air conditioner 110 operates, it is possible to prevent the vibration of the air conditioner 110 from propagating to the ceiling structure 200.

以上、本発明に関する好ましい実施形態を説明したが、本発明は、上記実施形態において説明したものに限定されるものではない。すなわち、本発明には、上記各実施形態において説明したものに種々の変形例を適用したものの含まれる。 Although the preferred embodiments of the present invention have been described above, the present invention is not limited to those described in the above embodiments. That is, the present invention includes various modifications applied to those described in the above embodiments.

例えば、上記実施形態では、天井吊り下げ物100の一例として隠蔽式の空気調和機110を例示した。しかし、上述した支持装置1を使用して吊り下げ可能な物体は、必ずしも空気調和機に限られない。すなわち、上述した支持装置1は、概略箱形形状を有する物体であれば、どのような物体であっても天井構造200に吊り下げた状態で良好に支持することができる装置である。 For example, in the above embodiment, the concealed air conditioner 110 is illustrated as an example of the suspended object 100. However, the object that can be suspended using the support device 1 described above is not necessarily limited to the air conditioner. That is, the support device 1 described above is a device capable of favorably supporting any object having a substantially box shape while being suspended from the ceiling structure 200.

また、上記実施形態では、第1フレーム部材10と第2フレーム部材20との間に防振部材35は配置する例を説明したが、これに限られるものではない。例えば、防振部材35は、吊りボルト40と第2フレーム部材20との接続部に配置しても良い。ただし、吊りボルト40と第2フレーム部材20との接続部に防振部材35を配置すると、地震発生時に第2フレーム部材20が大きく振れることになり、それに伴って天井吊り下げ物100の振れ幅も大きくなる。そのため、地震発生時における天井吊り下げ物100の振れ幅を小さくするためには、上記実施形態で説明したように、第1フレーム部材10と第2フレーム部材20との間に防振部材35を配置することが好ましい。 Further, in the above embodiment, an example in which the vibration isolator 35 is arranged between the first frame member 10 and the second frame member 20 has been described, but the present invention is not limited to this. For example, the anti-vibration member 35 may be arranged at the connecting portion between the suspension bolt 40 and the second frame member 20. However, if the vibration damping member 35 is arranged at the connecting portion between the hanging bolt 40 and the second frame member 20, the second frame member 20 will largely shake when an earthquake occurs, and accordingly, the swing width of the ceiling hanging object 100. Also grows. Therefore, in order to reduce the swing width of the suspended object 100 when an earthquake occurs, as described in the above embodiment, the vibration damping member 35 is provided between the first frame member 10 and the second frame member 20. It is preferable to arrange them.

1…支持装置、10…第1フレーム部材、15…連結ボルト、17…係合部材、20…第2フレーム部材、21,22…補助フレーム、23…支持フレーム、28…防振部材、30…フレーム連結部材、31…縦板部、32…横板部、33…支持ボルト、35…防振部材、40…吊りボルト、50…天井取付金具、100…天井吊り下げ物、110…空気調和機、120…空気調和機本体、130…フィルタユニット、140…吹出ユニット、150…吸気ユニット。 DESCRIPTION OF SYMBOLS 1... Supporting device, 10... 1st frame member, 15... Connection bolt, 17... Engagement member, 20... 2nd frame member 21, 22... Auxiliary frame, 23... Support frame, 28... Vibration isolating member, 30... Frame connection member, 31... Vertical plate portion, 32... Horizontal plate portion, 33... Support bolt, 35... Vibration isolating member, 40... Suspension bolt, 50... Ceiling mount metal fitting, 100... Ceiling suspended object, 110... Air conditioner , 120... Air conditioner body, 130... Filter unit, 140... Blowing unit, 150... Intake unit.

Claims (10)

概略箱形形状の互いに平行な左右両側面にボルト部材を取り付けるための取付片が設けられた天井吊り下げ物を、天井空間に吊り下げた状態で支持する支持装置であって、
前記天井吊り下げ物の上面を左右方向に横断するように配置され、両端部に前記取付片に取り付けられた前記ボルト部材が連結されることにより前記天井吊り下げ物の上面に対して固定される第1フレーム部材と、
前記天井吊り下げ物の上面を前後方向に横断するように配置される第2フレーム部材と、
前記第1フレーム部材と前記第2フレーム部材とが互いに直交し、且つ、前記第1フレーム部材と前記第2フレーム部材とが上下方向に所定間隔を隔てた状態で前記第1フレーム部材と前記第2フレーム部材とを連結するフレーム連結部材と、
下端部が前記第2フレーム部材に連結され、上端部が天井構造に接続される吊りボルトと、
を備え
前記第1フレーム部材に対する前記フレーム連結部材の取付位置が、前記第1フレーム部材の長手方向に沿って調整可能であることを特徴とする支持装置。
A support device for supporting a ceiling hanging object provided with mounting pieces for mounting bolt members on both left and right side surfaces of a substantially box-shaped parallel to each other in a state of being suspended in a ceiling space,
It is arranged so as to cross the upper surface of the ceiling hanging object in the left-right direction, and is fixed to the upper surface of the ceiling hanging object by connecting the bolt members attached to the mounting pieces to both ends. A first frame member,
A second frame member arranged so as to traverse the upper surface of the suspended object in the front-rear direction;
The first frame member and the second frame member are orthogonal to each other, and the first frame member and the second frame member are vertically spaced apart from each other by a predetermined distance. A frame connecting member for connecting the two frame members,
A suspension bolt having a lower end connected to the second frame member and an upper end connected to the ceiling structure;
Equipped with
Supporting device mounted position of the frame coupling member relative to the first frame member, wherein the adjustable der isosamples along the longitudinal direction of the first frame member.
概略箱形形状の互いに平行な左右両側面にボルト部材を取り付けるための取付片が設けられた天井吊り下げ物を、天井空間に吊り下げた状態で支持する支持装置であって、
前記天井吊り下げ物の上面を左右方向に横断するように配置され、両端部に前記取付片に取り付けられた前記ボルト部材が連結されることにより前記天井吊り下げ物の上面に対して固定される第1フレーム部材と、
前記天井吊り下げ物の上面を前後方向に横断するように配置される第2フレーム部材と、
前記第1フレーム部材と前記第2フレーム部材とが互いに直交し、且つ、前記第1フレーム部材と前記第2フレーム部材とが上下方向に所定間隔を隔てた状態で前記第1フレーム部材と前記第2フレーム部材とを連結するフレーム連結部材と、
下端部が前記第2フレーム部材に連結され、上端部が天井構造に接続される吊りボルトと、
を備え
前記第2フレーム部材に対する前記吊りボルトの取付位置が、前記第2フレーム部材の長手方向に沿って調整可能であることを特徴とする支持装置。
A support device for supporting a ceiling hanging object provided with mounting pieces for mounting bolt members on both left and right side surfaces of a substantially box-shaped parallel to each other in a state of being suspended in a ceiling space,
It is arranged so as to cross the upper surface of the ceiling hanging object in the left-right direction, and is fixed to the upper surface of the ceiling hanging object by connecting the bolt members attached to the mounting pieces to both ends. A first frame member,
A second frame member arranged so as to traverse the upper surface of the suspended object in the front-rear direction;
The first frame member and the second frame member are orthogonal to each other, and the first frame member and the second frame member are spaced apart from each other in the vertical direction by a predetermined distance. A frame connecting member for connecting the two frame members,
A suspension bolt having a lower end connected to the second frame member and an upper end connected to the ceiling structure;
Equipped with
Supporting device mounting position of the hanger rod with respect to said second frame member, wherein the adjustable der isosamples along the longitudinal direction of the second frame member.
前記第1フレーム部材に対する前記フレーム連結部材の取付位置が、前記第1フレーム部材の長手方向に沿って調整可能であることを特徴とする請求項2に記載の支持装置。The support device according to claim 2, wherein a mounting position of the frame connecting member with respect to the first frame member is adjustable along a longitudinal direction of the first frame member. 前記フレーム連結部材は、
前記第2フレーム部材に取り付けられる支持ボルトと、
前記第1フレーム部材に接続され、前記第1フレーム部材から立設する縦板部と、
前記縦板部の上部に設けられ、前記支持ボルトを挿通する孔が形成された横板部と、
前記横板部の孔に装着され、前記支持ボルトの下部に連結される防振部材と、
を備えることを特徴とする請求項1乃至3のいずれかに記載の支持装置。
The frame connecting member is
A support bolt attached to the second frame member,
A vertical plate portion that is connected to the first frame member and stands upright from the first frame member;
A horizontal plate portion provided in the upper portion of the vertical plate portion and having a hole through which the support bolt is inserted,
A vibration damping member attached to the hole of the lateral plate portion and connected to a lower portion of the support bolt,
The support device according to any one of claims 1 to 3, further comprising:
前記縦板部は、前記防振部材の高さ寸法よりも長いことを特徴とする請求項に記載の支持装置。 The support device according to claim 4 , wherein the vertical plate portion is longer than a height dimension of the vibration isolation member. 前記第1フレーム部材は、互いに平行に配置される一対のフレーム部材を有し、前記一対のフレーム部材が前記天井吊り下げ物の前後方向に沿って配置される連結ボルトによって相互に連結されることを特徴とする請求項1乃至のいずれかに記載の支持装置。 The first frame member has a pair of frame members arranged in parallel with each other, and the pair of frame members are connected to each other by a connecting bolt arranged in the front-rear direction of the ceiling hanging object. The supporting device according to any one of claims 1 to 5 , wherein: 前記天井吊り下げ物は、空気調和機本体を有し、
前記連結ボルトは、前記空気調和機本体の前後方向両端位置まで延設され、両端部に前記空気調和機本体の前面側及び後面側に係合する係合部材が装着されることを特徴とする請求項に記載の支持装置。
The suspended object has an air conditioner body,
The connecting bolt is extended to both ends of the air conditioner body in the front-rear direction, and both ends thereof are provided with engaging members that engage with a front surface side and a rear surface side of the air conditioner body. The support device according to claim 6 .
前記第2フレーム部材は、両端部が前記天井吊り下げ物の前後方向両端近傍位置まで延設され、該両端部に前記天井吊り下げ物の前後方向両端部を吊り下げ支持するためのボルトが取り付けられることを特徴とする請求項1乃至のいずれかに記載の支持装置。 Both ends of the second frame member are extended to positions near both ends in the front-rear direction of the ceiling hanging object, and bolts for suspending and supporting the both ends of the ceiling hanging object in the front-rear direction are attached to the both ends. supporting device according to any one of claims 1 to 7, characterized in that it is. 前記第2フレーム部材は、
前記フレーム連結部材によって支持される支持フレームと、
前記支持フレームの前後方向両端部に接続され、前記第2フレーム部材の前後方向の長さを前記天井吊り下げ物の前後方向両端近傍位置まで延設する補助フレームと、
を有し、
前記ボルトが前記補助フレームに取り付けられることを特徴とする請求項に記載の支持装置。
The second frame member is
A support frame supported by the frame connecting member,
An auxiliary frame connected to both ends of the support frame in the front-rear direction, and extending the length of the second frame member in the front-rear direction to positions near both ends in the front-rear direction of the ceiling hanging object;
Have
The support device according to claim 8 , wherein the bolt is attached to the auxiliary frame.
前記吊りボルトの上端部には、前記天井構造に取り付けられたボルトに固定するための天井取付金具が予め取り付けられることを特徴とする請求項1乃至のいずれかに記載の支持装置。 The support device according to any one of claims 1 to 9 , wherein a ceiling attachment fitting for fixing to a bolt attached to the ceiling structure is previously attached to an upper end portion of the hanging bolt.
JP2020005643A 2020-01-17 2020-01-17 Support device Active JP6709485B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020005643A JP6709485B1 (en) 2020-01-17 2020-01-17 Support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020005643A JP6709485B1 (en) 2020-01-17 2020-01-17 Support device

Publications (2)

Publication Number Publication Date
JP6709485B1 true JP6709485B1 (en) 2020-06-17
JP2021113571A JP2021113571A (en) 2021-08-05

Family

ID=71079413

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020005643A Active JP6709485B1 (en) 2020-01-17 2020-01-17 Support device

Country Status (1)

Country Link
JP (1) JP6709485B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022069947A (en) * 2020-10-26 2022-05-12 三菱電機株式会社 Blowing device
CN115628536A (en) * 2022-10-25 2023-01-20 中建八局第二建设有限公司 Hanging installation method for steel grid structure air pipe
CN116084616A (en) * 2023-02-25 2023-05-09 北京建院装饰工程设计有限公司 Decorative board installation suspension frame combined with electromechanical pipeline
JP7486803B2 (en) 2020-09-01 2024-05-20 エヌパット株式会社 Supporting device
JP7493790B2 (en) 2020-12-01 2024-06-03 エヌパット株式会社 Supporting device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54182539U (en) * 1978-06-15 1979-12-24
JP6396348B2 (en) * 2016-02-19 2018-09-26 ダイキン工業株式会社 Ceiling mount
JP6388742B1 (en) * 2018-03-30 2018-09-12 真 生野 Construction method of frame structure and air conditioner using the same

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7486803B2 (en) 2020-09-01 2024-05-20 エヌパット株式会社 Supporting device
JP2022069947A (en) * 2020-10-26 2022-05-12 三菱電機株式会社 Blowing device
JP7493790B2 (en) 2020-12-01 2024-06-03 エヌパット株式会社 Supporting device
CN115628536A (en) * 2022-10-25 2023-01-20 中建八局第二建设有限公司 Hanging installation method for steel grid structure air pipe
CN115628536B (en) * 2022-10-25 2024-06-11 中建八局第二建设有限公司 Hanging installation method for steel grid structure air pipe
CN116084616A (en) * 2023-02-25 2023-05-09 北京建院装饰工程设计有限公司 Decorative board installation suspension frame combined with electromechanical pipeline
CN116084616B (en) * 2023-02-25 2023-09-26 北京建院装饰工程设计有限公司 Decorative board installation suspension frame combined with electromechanical pipeline

Also Published As

Publication number Publication date
JP2021113571A (en) 2021-08-05

Similar Documents

Publication Publication Date Title
JP6709485B1 (en) Support device
JP7257693B2 (en) Mounting frame and construction method using it
JP7190159B2 (en) Supporting device and construction method using it
JP2008020170A (en) Vibration control device for hanged type air conditioner, and construction method therefor
JP2008020170A5 (en)
JP3431790B2 (en) Outdoor unit fixture for separation type air conditioner
SG182046A1 (en) Hanging type vibration isolator
JP2009035942A (en) Ceiling reinforcing metal fitting and hung ceiling using its reinforcing metal fitting
JP7493749B2 (en) Support structure and connecting member used therein
JP3229813U (en) Chamber support bracket and air conditioner support structure
JP2008267524A (en) Vibration absorbing base device
JP7323920B2 (en) ceiling mounting bracket
JP2021067006A (en) Vibration stopping device
JP7504425B2 (en) Supporting device
JP7486803B2 (en) Supporting device
JP6954703B1 (en) Bolt support bracket
JP4646679B2 (en) Frame material support structure
JP2022014971A (en) Attitude holding device
JP3769502B2 (en) A ceiling mount for an air conditioner outdoor unit
JP3059792B2 (en) Air conditioner suspension device
JP2018179194A (en) Aseismic reinforcement mechanism
JP7257659B2 (en) Support device
JP7204795B2 (en) How to make a ceiling suspended air conditioning unit
CN219282740U (en) Ventilation and water pipe system sharing antidetonation support
JP7168636B2 (en) Ceiling suspended air conditioning unit and installation method for ceiling suspended air conditioner

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200117

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20200117

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20200131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200310

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200324

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200407

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200428

R150 Certificate of patent or registration of utility model

Ref document number: 6709485

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250