JP7486803B2 - Supporting device - Google Patents

Supporting device Download PDF

Info

Publication number
JP7486803B2
JP7486803B2 JP2020146534A JP2020146534A JP7486803B2 JP 7486803 B2 JP7486803 B2 JP 7486803B2 JP 2020146534 A JP2020146534 A JP 2020146534A JP 2020146534 A JP2020146534 A JP 2020146534A JP 7486803 B2 JP7486803 B2 JP 7486803B2
Authority
JP
Japan
Prior art keywords
frame
air conditioner
slide
fixed frame
slide frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020146534A
Other languages
Japanese (ja)
Other versions
JP2022041375A (en
Inventor
真 生野
将司 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
N-Pat Co., Ltd.
Original Assignee
N-Pat Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by N-Pat Co., Ltd. filed Critical N-Pat Co., Ltd.
Priority to JP2020146534A priority Critical patent/JP7486803B2/en
Publication of JP2022041375A publication Critical patent/JP2022041375A/en
Application granted granted Critical
Publication of JP7486803B2 publication Critical patent/JP7486803B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Description

本発明は、空気調和機本体の端部にチャンバが装着される空気調和機を天井空間に吊り下げた状態で支持する支持装置に関する。 The present invention relates to a support device that supports an air conditioner with a chamber attached to the end of the air conditioner body while hanging it in a ceiling space.

天井空間に隠蔽された状態で設置される空気調和機として、空気調和機本体の端部に吹出チャンバなどのチャンバが一体的に装着された状態で設置されるものが知られている。従来、この種の空気調和機を天井空間に設置する作業を効率化するため、空気調和機本体に対してチャンバが装着された状態の空気調和機を支持する支持装置が提案されている(例えば特許文献1)。この従来の支持装置を用いれば、支持装置を空気調和機に取り付ける作業を床面作業で行うことができる。つまり、空気調和機本体にチャンバが接続された状態の空気調和機に対して床面作業で支持装置を取り付けることにより、高所作業を軽減することができる。その後、支持装置によって支持された空気調和機を天井スラブなどの天井構造の近傍高さ位置まで持ち上げ、天井構造から垂下する吊りボルトに支持装置を連結することにより、空気調和機を天井空間に設置することができる。 As an air conditioner that is installed in a concealed state in the ceiling space, there is known one that is installed with a chamber such as a blowing chamber attached integrally to the end of the air conditioner body. In the past, in order to make the work of installing this type of air conditioner in the ceiling space more efficient, a support device that supports the air conditioner with the chamber attached to the air conditioner body has been proposed (for example, Patent Document 1). By using this conventional support device, the work of attaching the support device to the air conditioner can be done on the floor. In other words, by attaching the support device to the air conditioner with the chamber connected to the air conditioner body on the floor, the work at high altitudes can be reduced. After that, the air conditioner supported by the support device is lifted to a height position near the ceiling structure such as a ceiling slab, and the support device is connected to a hanging bolt hanging from the ceiling structure, so that the air conditioner can be installed in the ceiling space.

特開2019-207095号公報JP 2019-207095 A

ところで、上述した従来の支持装置は、互いに平行に配置される複数の上段フレーム材と、複数の上段フレーム材に対して直交する状態に配置される複数の下段フレーム材とが井桁状に組み付けられたフレーム枠体を備えている。このフレーム枠体の平面サイズは、空気調和機本体に対してチャンバが一体的に装着された空気調和機の平面サイズよりも大きいサイズとなる。そのため、フレーム枠体を予め工場で作成して空気調和機の設置現場へ搬入しようとすると、建築現場の仮設エレベータに積載することできないことがある。特に、建築現場の仮設エレベータは、奥行きが1m程度と狭いため、空気調和機の平面サイズよりも大きいフレーム枠体を積載することが困難である。 The conventional support device described above includes a frame body in which multiple upper frame members arranged parallel to each other and multiple lower frame members arranged perpendicular to the multiple upper frame members are assembled in a crisscross pattern. The planar size of this frame body is larger than the planar size of an air conditioner in which a chamber is integrally attached to the air conditioner body. For this reason, if a frame body is fabricated in a factory in advance and transported to the installation site of the air conditioner, it may not be possible to load it onto a temporary elevator at the construction site. In particular, temporary elevators at construction sites have a narrow depth of about 1m, making it difficult to load a frame body that is larger than the planar size of an air conditioner.

そのため、従来の支持装置は、空気調和機の設置現場でフレーム枠体を組み立てる作業を行わなければならず、設置現場での作業効率向上を阻害する要因となっている。 As a result, with conventional support devices, the frame body must be assembled at the installation site of the air conditioner, which is an obstacle to improving work efficiency at the installation site.

そこで本発明は、上記問題点を解決するためになされたものであり、予め工場で作成して空気調和機の設置現場に搬入することが可能であり、空気調和機の設置現場における作業効率を更に向上させることができる支持装置を提供することを目的とする。 The present invention was made to solve the above problems, and aims to provide a support device that can be fabricated in advance in a factory and transported to the installation site of the air conditioner, thereby further improving work efficiency at the installation site of the air conditioner.

上記目的を達成するため、第1に、本発明は、空気調和機本体の前後方向の少なくとも一端にチャンバが装着される空気調和機を天井空間に吊り下げた状態で支持する支持装置であって、前記空気調和機本体の上面側を左右方向に横断するように配置され、両端部が前記空気調和機本体の左右両側面に設けられる取付片の上方位置まで延設され、前記両端部から垂下する支持ボルトの下部が前記取付片に接続されることにより、前記空気調和機本体を支持する第1フレーム部材と、前記空気調和機本体の上面側を前後方向に横断するように配置され、前記第1フレーム部材と交差する交差部において前記第1フレーム部材と連結され、少なくとも一方の端部から垂下する支持ボルトの下部が前記チャンバの端面に設けられる係合片に接続されることにより、前記チャンバを支持する第2フレーム部材と、を備え、前記第2フレーム部材は、前記空気調和機本体の上面側において前記第1フレーム部材と連結された状態で固定される固定フレームと、前記固定フレームに対向する面にスリットが形成され、前記スリットを介して前記固定フレームにスライド可能に取り付けられ、前記チャンバを支持するスライドフレームと、を有し、前記スライドフレームを前記固定フレームに重ね合わせて前後方向の長さを縮小した状態と、前記スライドフレームを前記固定フレームの端部から突出させて前後方向の長さを拡大した状態とに変化させることが可能であり、前記スライドフレームは、前記スリットに、前記支持ボルトを固定するための固定金具が取り付けられることを特徴とする構成である。 In order to achieve the above object, firstly, the present invention provides a support device for supporting an air conditioner having a chamber attached to at least one end in the front-to-rear direction of the air conditioner main body in a suspended state in a ceiling space, the support device comprising: a first frame member that is arranged so as to traverse the upper surface side of the air conditioner main body in the left-to-right direction, both ends of which extend to positions above mounting pieces provided on both left and right sides of the air conditioner main body, and supports the air conditioner main body by connecting lower parts of support bolts hanging down from both ends to the mounting pieces; and a second frame member that is arranged so as to traverse the upper surface side of the air conditioner main body in the front-to-rear direction, and is connected to the first frame member at an intersection where it intersects with the first frame member, and the lower part of a support bolt hanging down from at least one end is connected to an engagement piece provided on an end face of the chamber. and a second frame member supporting the chamber, wherein the second frame member has a fixed frame that is fixed in a connected state to the first frame member on the upper surface side of the air conditioner main body, and a slide frame that has a slit formed on the surface facing the fixed frame and is slidably attached to the fixed frame via the slit to support the chamber, and the slide frame can be changed between a state in which the slide frame is overlapped on the fixed frame to reduce its length in the front-to-rear direction, and a state in which the slide frame protrudes from the end of the fixed frame to expand its length in the front-to-rear direction , and the slide frame is configured such that fixing brackets for fixing the support bolts are attached to the slits of the slide frame .

第1の構成を有する支持装置によれば、第2フレーム部材が固定フレームと、固定フレームに対してスライド可能に取り付けられ、チャンバを支持するスライドフレームと、を有しており、スライドフレームを固定フレームに重ね合わせて前後方向の長さを縮小した状態と、スライドフレームを固定フレームの端部から突出させて前後方向の長さを拡大した状態とに変化させることが可能であるため、予め工場で作成して空気調和機の設置現場に搬入する際に、サイズを縮小させた状態で搬入することができる。そのため、第1フレーム部材と第2フレーム部材とを予め工場で組み付けておくことが可能であり、空気調和機の設置現場で第1フレーム部材と第2フレーム部材とを組み付ける作業を行う必要がなくなる。 According to the support device having the first configuration, the second frame member has a fixed frame and a slide frame that is slidably attached to the fixed frame and supports the chamber, and the slide frame can be overlapped with the fixed frame to reduce the length in the front-to-rear direction, and the slide frame can be protruded from the end of the fixed frame to expand the length in the front-to-rear direction. Therefore, when the device is fabricated in a factory and transported to the installation site of the air conditioner, it can be transported in a reduced size. Therefore, the first frame member and the second frame member can be assembled in advance in the factory, eliminating the need to assemble the first frame member and the second frame member at the installation site of the air conditioner.

第2に、本発明は、上記第1の構成を有する支持装置において、前記第2フレーム部材は、前記固定フレームに対して前記スライドフレームを固定するための締着部材を更に有し、前記締着部材を緩めることにより前記スライドフレームが前記固定フレームに対してスライド可能となり、前記締着部材を締め付けることにより前記スライドフレームを前記固定フレームに固定することが可能であることを特徴とする構成である。 Secondly, the present invention is characterized in that in the support device having the above-mentioned first configuration, the second frame member further has a fastening member for fastening the slide frame to the fixed frame, and the slide frame can be slid relative to the fixed frame by loosening the fastening member, and the slide frame can be fixed to the fixed frame by tightening the fastening member.

第3に、本発明は、上記第1又は第2の構成を有する支持装置において、前記空気調和機は、前記空気調和機本体の前後方向両端のそれぞれにチャンバが装着され、前記スライドフレームは、前記固定フレームの前方側に向かってスライドする第1スライドフレームと、前記固定フレームの後方側に向かってスライドする第2スライドフレームと、を有し、前記第1スライドフレームは、前記固定フレームに重ね合わせた状態として前後方向の長さを縮小した状態とすることが可能であると共に、前記第2スライドフレームは、前記固定フレームと前記第1スライドフレームとが重なった部分に対して更に重ね合わせた状態として前後方向の長さを縮小した状態とすることが可能であることを特徴とする構成である。 Thirdly, the present invention is a support device having the above first or second configuration, characterized in that the air conditioner has a chamber attached to each of both front-rear ends of the air conditioner body, the slide frame has a first slide frame that slides toward the front side of the fixed frame and a second slide frame that slides toward the rear side of the fixed frame, and the first slide frame can be overlapped on the fixed frame to reduce its length in the front-rear direction, and the second slide frame can be further overlapped on the overlapping portion of the fixed frame and the first slide frame to reduce its length in the front-rear direction.

第4に、本発明は、上記第1乃至第3のいずれかの構成を有する支持装置において、前記固定フレームは、縦板部を有し、前記スライドフレームは、前記固定フレームの縦板部に対してスライド可能に取り付けられることを特徴とする構成である。 Fourthly, the present invention is a support device having any one of the configurations 1 to 3 above, characterized in that the fixed frame has a vertical plate portion, and the slide frame is slidably attached to the vertical plate portion of the fixed frame.

第5に、本発明は、上記第4の構成を有する支持装置において、前記スライドフレームは、前記縦板部と対向する面に、前記スリットを有することを特徴とする構成である。 Fifthly, the present invention provides a support device having the fourth configuration, wherein the slide frame has the slit on a surface facing the vertical plate portion.

に、本発明は、上記第1乃至5のいずれかの構成を有する支持装置において、前記固定金具は、前記スライドフレームとの間に前記支持ボルトを挟み込んで固定することを特徴とする構成である。 Sixthly , the present invention is a support device having any one of the configurations 1 to 5 above, characterized in that the fixing bracket fixes the support bolt by sandwiching it between the fixing bracket and the slide frame.

に、本発明は、上記第1乃至第のいずれかの構成を有する支持装置において、下端部が前記第1フレーム部材及び前記第2フレーム部材のいずれか一方に連結され、上端部が天井構造に接続される吊りボルト、を更に備えることを特徴とする構成である。
乃至のいずれかに記載の支持装置。
Seventh , the present invention is a support device having any of the configurations 1 to 6 above, further comprising a hanging bolt whose lower end is connected to either the first frame member or the second frame member and whose upper end is connected to a ceiling structure.
7. A support device according to any one of claims 1 to 6 .

に、本発明は、上記第の構成を有する支持装置において、前記吊りボルトの上端部には、前記天井構造に取り付けられたボルトに固定するための天井取付金具が取り付けられることを特徴とする構成である。 Eighth , the present invention is a support device having the above-mentioned seventh configuration, characterized in that a ceiling mounting bracket is attached to the upper end of the hanging bolt for fixing it to a bolt attached to the ceiling structure.

本発明の支持装置によれば、予め工場で第1フレーム部材と第2フレーム部材とを組み付けた状態で空気調和機の設置現場に搬入することが可能となり、空気調和機の設置現場における作業を軽減することができ、現場での作業効率を向上させることができるという利点がある。 The support device of the present invention makes it possible to transport the first frame member and the second frame member to the installation site of the air conditioner in a preassembled state at the factory, which has the advantage of reducing the work at the installation site of the air conditioner and improving the work efficiency at the site.

支持装置を用いた空気調和機の支持構造を示す斜視図である。FIG. 11 is a perspective view showing a support structure for an air conditioner using a support device. 支持装置を用いた空気調和機の支持構造を示す側面図である。FIG. 4 is a side view showing a support structure for an air conditioner using the support device. 支持装置を用いた空気調和機の支持構造を示す正面図である。FIG. 2 is a front view showing a support structure for an air conditioner using the support device. 支持装置が支持する空気調和機の一構成例を示す図である。FIG. 2 is a diagram showing an example of the configuration of an air conditioner supported by the support device. 支持装置を示す斜視図である。FIG. フレーム枠体における第1フレーム部材と第2フレーム部材との組み付け態様を示す斜視図である。10 is a perspective view showing an assembly state of a first frame member and a second frame member in a frame body. FIG. 固定フレームに対するスライドフレームの取り付け態様を示す図である。11A and 11B are diagrams showing a manner in which a slide frame is attached to a fixed frame. 固定金具の一構成例を示す図である。FIG. 13 is a diagram showing an example of a configuration of a fixing bracket. 固定フレームに対してスライドフレームをスライドさせる態様を示す図である。13A and 13B are diagrams showing a manner in which a slide frame is slid relative to a fixed frame. 第2フレーム部材を収縮させた状態のフレーム枠体を示す図である。13 is a diagram showing a frame body in a state in which the second frame member is contracted. FIG. 収縮させた複数のフレーム枠体を積み重ねた状態を示す図である。FIG. 13 is a diagram showing a state in which a plurality of contracted frame bodies are stacked.

以下、本発明の好ましい実施形態について図面を参照しつつ詳細に説明する。尚、以下において参照する各図面では互いに共通する部材に同一符号を付しており、それらについての重複する説明は省略する。 Below, preferred embodiments of the present invention will be described in detail with reference to the drawings. Note that in the drawings referred to below, the same reference numerals are used to designate common members, and redundant descriptions of those members will be omitted.

図1は、本発明の一実施形態である支持装置1を用いた空気調和機100の支持構造を示す斜視図であり、図2は、その側面図であり、図3は、その正面図である。図1乃至図3に示すXYZ三次元座標系は、XY平面を水平面とし、Z方向を鉛直方向とする座標系であって互いに共通する座標系である。尚、他の図に示すXYZ三次元座標系も同様である。本実施形態では、便宜上、X方向を空気調和機100の左右方向と定義し、Y方向を空気調和機100の前後方向と定義する。 Figure 1 is a perspective view showing a support structure for an air conditioner 100 using a support device 1 according to one embodiment of the present invention, Figure 2 is a side view thereof, and Figure 3 is a front view thereof. The XYZ three-dimensional coordinate system shown in Figures 1 to 3 is a common coordinate system in which the XY plane is the horizontal plane and the Z direction is the vertical direction. The same is true for the XYZ three-dimensional coordinate systems shown in the other figures. In this embodiment, for convenience, the X direction is defined as the left-right direction of the air conditioner 100, and the Y direction is defined as the front-rear direction of the air conditioner 100.

本実施形態の支持装置1は、隠蔽式の空気調和機100を天井空間に吊り下げた状態で支持する装置である。隠蔽式の空気調和機100は、天井スラブなどの天井構造と天井パネルとの間の天井空間に隠蔽された状態で設置される空気調和機である。 The support device 1 of this embodiment is a device that supports a concealed air conditioner 100 in a suspended state in the ceiling space. The concealed air conditioner 100 is an air conditioner that is installed in a concealed state in the ceiling space between a ceiling structure such as a ceiling slab and a ceiling panel.

図4は、空気調和機100の一構成例を示す図である。空気調和機100は、空気調和機本体120と、フィルタユニット130と、吹出チャンバ140と、吸気チャンバ150とが一体的に組み付けられることにより構成され、平面視略矩形状の箱形ユニットである。空気調和機本体120は、内部に熱交換機やファンなどが設けられ、後方側の吸気口から空気を流入させ、前方側の吹出口から空調された空気を吹き出すユニットである。フィルタユニット130は、空気調和機本体120の後方側に組み付けられ、空気調和機本体120と一体物となる。フィルタユニット130の内部には、空気調和機本体120の内部へ流入する空気から塵埃などを除去するフィルタが設けられる。尚、フィルタユニット130は、予め空気調和機本体120に対して一体的に組み付けられたものであっても構わない。 Figure 4 is a diagram showing an example of the configuration of the air conditioner 100. The air conditioner 100 is a box-shaped unit that is generally rectangular in plan view, and is configured by assembling an air conditioner main body 120, a filter unit 130, an air outlet chamber 140, and an air intake chamber 150 together. The air conditioner main body 120 is a unit that has a heat exchanger, a fan, etc. inside, takes in air from an air inlet on the rear side, and blows out conditioned air from an air outlet on the front side. The filter unit 130 is assembled to the rear side of the air conditioner main body 120 and is integrated with the air conditioner main body 120. Inside the filter unit 130, a filter is provided that removes dust and other particles from the air flowing into the air conditioner main body 120. The filter unit 130 may be assembled integrally with the air conditioner main body 120 in advance.

空気調和機本体120の前方側には吹出口が設けられる。その吹出口の周縁部は前方側に突出させたフランジ部121として形成され、そのフランジ部121に吹出チャンバ140を装着することが可能である。また、空気調和機本体120の後方側(フィルタユニット130の後方側)には、吸気口が設けられる。その吸気口の周縁部は後方側に突出させたフランジ部131として形成され、そのフランジ部131に吸気チャンバ150を装着することが可能である。 An air outlet is provided on the front side of the air conditioner body 120. The periphery of the air outlet is formed as a flange portion 121 that protrudes forward, and an air outlet chamber 140 can be attached to the flange portion 121. An air intake is provided on the rear side of the air conditioner body 120 (rear side of the filter unit 130). The periphery of the air intake is formed as a flange portion 131 that protrudes rearward, and an air intake chamber 150 can be attached to the flange portion 131.

また、空気調和機本体120の左右両側面には、空気調和機本体120を吊り下げた状態で支持するボルト部材を取り付けるための取付片123が設けられる。本実施形態では、空気調和機本体120の左右両側面の上端近傍に取付片123が設けられる場合を例示しているが、これに限られるものではない。すなわち、取付片123は、空気調和機本体120の左右両側面の中央又は下端近傍に設けられるものであっても構わない。このような取付片123は、例えば、ビスなどによって空気調和機本体120の側面に取り付けられる。 Mounting pieces 123 are provided on both the left and right side surfaces of the air conditioner body 120 for attaching bolt members that support the air conditioner body 120 in a suspended state. In this embodiment, an example is shown in which the mounting pieces 123 are provided near the upper ends of both the left and right side surfaces of the air conditioner body 120, but this is not limited to this. In other words, the mounting pieces 123 may be provided near the center or lower ends of both the left and right sides of the air conditioner body 120. Such mounting pieces 123 are attached to the sides of the air conditioner body 120 by, for example, screws or the like.

吹出チャンバ140は、内部が中空の箱形ユニットであり、その外周面に複数の吹出口142が設けられている。これら吹出口142には、図示を省略するフレキシブルダクトなどが接続される。フレキシブルダクトは、吹出チャンバ140と室内空間とを接続し、空調された空気を室内空間へ供給する。吹出チャンバ140の空気調和機本体120と対向する面(後方側の面)には、空気調和機本体120との接続口が設けられる。その接続口の周縁部は後方側に突出させたフランジ部141として形成される。吹出チャンバ140に形成されるフランジ部141は、空気調和機本体120に形成されるフランジ部121の内側又は外側に重ね合わせるように装着することが可能である。2つのフランジ部141,121のうちのいずれか一方を他方の内側に差し込んで互いに重ね合わせた状態とし、外部からビス等を打ち込むことで2つのフランジ部141,121が相互に固定される。そして互いに個体されたフランジ部141,121の外周面に断熱材を巻き付けることで吹出チャンバ140が空気調和機本体120に組み付けられる。また、吹出チャンバ140の前方側の端面上部には、吹出チャンバ140を吊り下げた状態で支持するボルト部材が接続される係合片143が設けられる。この係合片143は、例えばビスなどによって吹出チャンバ140の任意の位置に取り付け可能である。そのため、作業者が、空気調和機100の設置現場で係合片143を吹出チャンバ140に取り付けることも可能である。 The blow-out chamber 140 is a hollow box-shaped unit, and has a number of blow-out ports 142 on its outer periphery. A flexible duct (not shown) or the like is connected to these blow-out ports 142. The flexible duct connects the blow-out chamber 140 to the indoor space and supplies conditioned air to the indoor space. A connection port with the air conditioner main body 120 is provided on the surface (rear surface) of the blow-out chamber 140 facing the air conditioner main body 120. The peripheral portion of the connection port is formed as a flange portion 141 protruding rearward. The flange portion 141 formed on the blow-out chamber 140 can be attached so as to overlap the inside or outside of the flange portion 121 formed on the air conditioner main body 120. Either one of the two flange portions 141, 121 is inserted inside the other to overlap each other, and the two flange portions 141, 121 are fixed to each other by driving a screw or the like from the outside. The blow-out chamber 140 is then assembled to the air conditioner body 120 by wrapping a heat insulating material around the outer peripheral surfaces of the flanges 141, 121 that are connected to each other. In addition, an engagement piece 143 is provided on the upper part of the front end face of the blow-out chamber 140 to which a bolt member that supports the blow-out chamber 140 in a suspended state is connected. This engagement piece 143 can be attached to any position on the blow-out chamber 140, for example, with a screw. Therefore, it is also possible for an operator to attach the engagement piece 143 to the blow-out chamber 140 at the installation site of the air conditioner 100.

吸気チャンバ150は、吹出チャンバ140と同様に、内部が中空の箱形ユニットである。この吸気チャンバ150には、図示を省略する吸気口が設けられ、その吸気口から室外又は室内の空気を取り入れ、空気調和機本体120へ供給する。吹出チャンバ140の空気調和機本体120と対向する面(前方側の面)には、空気調和機本体120との接続口が設けられる。その接続口の周縁部は前方側に突出させたフランジ部151として形成される。吸気チャンバ150に形成されるフランジ部151は、空気調和機本体120に形成されるフランジ部131の内側又は外側に重ね合わせるように装着することが可能である。2つのフランジ部151,131のうちのいずれか一方を他方の内側に差し込んで互いに重ね合わせた状態とし、外部からビス等を打ち込むことで2つのフランジ部151,131が相互に固定される。これにより、吸気チャンバ150が空気調和機本体120に組み付けられる。また、吸気チャンバ150の後方側の端面上部には、吸気チャンバ150を吊り下げた状態で支持するボルト部材が接続される係合片153が設けられる。この係合片153は、例えばビスなどによって吸気チャンバ150の任意の位置に取り付け可能である。そのため、作業者が、空気調和機100の設置現場で係合片153を吸気チャンバ150に取り付けることも可能である。 The intake chamber 150 is a hollow box-shaped unit, similar to the blow-out chamber 140. The intake chamber 150 is provided with an intake port (not shown), through which outdoor or indoor air is taken in and supplied to the air conditioner main body 120. A connection port with the air conditioner main body 120 is provided on the surface (front surface) of the blow-out chamber 140 facing the air conditioner main body 120. The peripheral portion of the connection port is formed as a flange portion 151 protruding forward. The flange portion 151 formed on the intake chamber 150 can be attached so as to overlap the inside or outside of the flange portion 131 formed on the air conditioner main body 120. Either one of the two flange portions 151, 131 is inserted inside the other to overlap each other, and the two flange portions 151, 131 are fixed to each other by driving a screw or the like from the outside. In this way, the intake chamber 150 is assembled to the air conditioner main body 120. Additionally, an engagement piece 153 is provided on the upper end face on the rear side of the intake chamber 150 to which a bolt member that supports the intake chamber 150 in a suspended state is connected. This engagement piece 153 can be attached to any position on the intake chamber 150, for example, with a screw. Therefore, it is possible for an operator to attach the engagement piece 153 to the intake chamber 150 at the installation site of the air conditioner 100.

空気調和機100は、上記のように空気調和機本体120の前後方向の両端に対して吹出チャンバ140と吸気チャンバ150とが装着されることにより、一体物となる。尚、本実施形態では、空気調和機本体120の前後方向の両端に対して吹出チャンバ140と吸気チャンバ150とが装着される空気調和機100を例示しているが、空気調和機本体120の前後方向の少なくとも一端に吹出チャンバ140又は吸気チャンバ150が装着されるものであれば良い。 As described above, the air conditioner 100 is integrated by attaching the blow-out chamber 140 and the intake chamber 150 to both ends in the front-rear direction of the air conditioner main body 120. Note that, in this embodiment, an air conditioner 100 in which the blow-out chamber 140 and the intake chamber 150 are attached to both ends in the front-rear direction of the air conditioner main body 120 is exemplified, but it is sufficient that the blow-out chamber 140 or the intake chamber 150 is attached to at least one end in the front-rear direction of the air conditioner main body 120.

吹出チャンバ140や吸気チャンバ150は、上述のように内部が中空のユニットであり、空気調和機本体120とは異なるメーカーによって作成されることが多い。すなわち、吹出チャンバ140や吸気チャンバ150のサイズや形状は、空気調和機本体120のサイズと形状、並びに、空気調和機100が設置される天井空間に基づいて設計され、空気調和機本体120とは別に設置現場に搬送される。そのため、上記のように、空気調和機本体120に対して吹出チャンバ140や吸気チャンバ150を組み付けて一体的な空気調和機100を作成する作業は、空気調和機100の設置現場で行われるのが一般的である。 As described above, the blow-out chamber 140 and the intake chamber 150 are hollow units, and are often made by a different manufacturer than the air conditioner main body 120. That is, the size and shape of the blow-out chamber 140 and the intake chamber 150 are designed based on the size and shape of the air conditioner main body 120 and the ceiling space in which the air conditioner 100 will be installed, and are transported to the installation site separately from the air conditioner main body 120. Therefore, as described above, the work of assembling the blow-out chamber 140 and the intake chamber 150 to the air conditioner main body 120 to create an integrated air conditioner 100 is generally performed at the installation site of the air conditioner 100.

本実施形態の支持装置1は、上記のように設置現場で吹出チャンバ140と吸気チャンバ150とが空気調和機本体120に組み付けて一体的な空気調和機100を作成する作業が行われることに伴い、図1に示すように、空気調和機100に取り付けられる。以下、支持装置1の詳細について説明する。 The support device 1 of this embodiment is attached to the air conditioner 100 as shown in FIG. 1, in conjunction with the work of assembling the air outlet chamber 140 and the air intake chamber 150 to the air conditioner main body 120 at the installation site to create an integrated air conditioner 100 as described above. Details of the support device 1 are described below.

図1、図2及び図3に示すように、支持装置1は、吹出チャンバ140及び吸気チャンバ150が空気調和機本体120に対して一体的に組み付けられた空気調和機100の上面側に配置され、空気調和機本体120の左右両側面に設けられる取付片123と、吹出チャンバ140の端面に設けられる係合片143と、吸気チャンバ150の端面に設けられる係合片153とのそれぞれに対して支持ボルト40を係合させることにより、空気調和機100を吊り下げた状態で支持する。 As shown in Figures 1, 2 and 3, the support device 1 is disposed on the upper side of the air conditioner 100 in which the blow-out chamber 140 and the intake chamber 150 are integrally assembled to the air conditioner body 120, and supports the air conditioner 100 in a suspended state by engaging the support bolts 40 with the mounting pieces 123 provided on both the left and right sides of the air conditioner body 120, the engagement pieces 143 provided on the end face of the blow-out chamber 140, and the engagement pieces 153 provided on the end face of the intake chamber 150.

図5は、支持装置1を示す斜視図である。この支持装置1は、空気調和機本体120の上面側を左右方向(X方向)に横断するように配置される一対の第1フレーム部材10と、空気調和機本体120の上面側を前後方向(Y方向)に横断するように配置される一対の第2フレーム部材20と、空気調和機100を支持する支持ボルト40と、上端部が天井スラブなどの天井構造に取り付けられる吊りボルト50と、吊りボルト50の上端部に予め取り付けられる天井取付金具51と、を備えている。 Figure 5 is a perspective view showing the support device 1. This support device 1 includes a pair of first frame members 10 arranged to cross the upper surface side of the air conditioner body 120 in the left-right direction (X direction), a pair of second frame members 20 arranged to cross the upper surface side of the air conditioner body 120 in the front-rear direction (Y direction), support bolts 40 that support the air conditioner 100, hanging bolts 50 whose upper ends are attached to a ceiling structure such as a ceiling slab, and ceiling mounting brackets 51 that are attached in advance to the upper ends of the hanging bolts 50.

一対の第1フレーム部材10は、空気調和機本体120の左右方向(X方向)の長さよりも長尺であり、その左右両端部が空気調和機本体120の左右両側面に設けられる取付片123の上方位置まで延設される。これら一対の第1フレーム部材10は、Y方向に所定間隔を隔てて互いに平行な状態で空気調和機本体120の上面に配置される。本実施形態では、第1フレーム部材10は、例えば断面L型のアングル鋼材(山形鋼)によって構成される。そのため、第1フレーム部材10は、互いに直角を成す平板部11と縦板部12とを有している。そして第1フレーム部材10は、例えば平板部11が縦板部12の上部に位置する姿勢で配置される。 The pair of first frame members 10 are longer than the length of the air conditioner body 120 in the left-right direction (X direction), and both left and right ends of the pair of first frame members 10 extend to positions above the mounting pieces 123 provided on both left and right sides of the air conditioner body 120. The pair of first frame members 10 are arranged on the upper surface of the air conditioner body 120 in a parallel state with a predetermined distance in the Y direction. In this embodiment, the first frame member 10 is formed, for example, from an angle steel material (angle steel) with an L-shaped cross section. Therefore, the first frame member 10 has a flat plate portion 11 and a vertical plate portion 12 that are at right angles to each other. The first frame member 10 is arranged, for example, in a position in which the flat plate portion 11 is located above the vertical plate portion 12.

一対の第2フレーム部材20は、X方向に所定間隔を隔てて互いに平行な状態で空気調和機100の上方位置に配置される。例えば、第2フレーム部材20は、第1フレーム部材10の上側に配置され、第1フレーム部材10との交点がボルトとナットによる締着部材30によって第1フレーム部材10に一体的に固定される。これにより、第1フレーム部材10及び第2フレーム部材20は、井桁状のフレーム枠体4を構成する。 A pair of second frame members 20 are arranged above the air conditioner 100 in a parallel state with a predetermined distance between them in the X direction. For example, the second frame member 20 is arranged above the first frame member 10, and the intersection with the first frame member 10 is fixed integrally to the first frame member 10 by a fastening member 30 made of a bolt and a nut. In this way, the first frame member 10 and the second frame member 20 form a frame frame body 4 in a lattice shape.

一対の第2フレーム部材20は、空気調和機100の前後方向(Y方向)の長さよりも長尺であり、その前後方向両端部が空気調和機100の前後方向両端面に設けられる係合片143,153の上方位置まで延設される。ただし、第2フレーム部材20を1本の棒状材で形成すると、第2フレーム部材20が長くなってしまう。そのため、第2フレーム部材20は、固定フレーム21と、スライドフレーム22とを備えている。特に本実施形態の第2フレーム部材20は、スライドフレーム22として、第1スライドフレーム22aと、第2スライドフレーム22bとを備えており、これら2つのスライドフレーム22a,22bが固定フレーム21の両端部に取り付けられた構成である。 The pair of second frame members 20 are longer than the length of the air conditioner 100 in the front-rear direction (Y direction), and both front-rear end portions thereof extend to positions above the engagement pieces 143, 153 provided on both front-rear end faces of the air conditioner 100. However, if the second frame member 20 is formed from a single rod-shaped material, the second frame member 20 will be long. Therefore, the second frame member 20 includes a fixed frame 21 and a slide frame 22. In particular, the second frame member 20 of this embodiment includes a first slide frame 22a and a second slide frame 22b as the slide frame 22, and these two slide frames 22a, 22b are attached to both ends of the fixed frame 21.

固定フレーム21は、例えば断面L型のアングル鋼材(山形鋼)によって構成される。そのため、固定フレーム21は、互いに直角を成す平板部18と縦板部19とを有している。そして固定フレーム21は、例えば平板部18が縦板部19の下部に位置する姿勢で配置される。固定フレーム21は、Y方向の長さが、一対の第1フレーム部材10の設置間隔よりも若干長尺である。そのため、固定フレーム21は、前後方向の両端部において平板部18の下面が第1フレーム部材10の平板部11の上面と接合するように配置され、その接合部に対して締着部材30が取り付けられる。 The fixed frame 21 is made of, for example, an angle steel material (angle steel) with an L-shaped cross section. Therefore, the fixed frame 21 has a flat plate portion 18 and a vertical plate portion 19 that form a right angle with each other. The fixed frame 21 is arranged, for example, in a position in which the flat plate portion 18 is located below the vertical plate portion 19. The length of the fixed frame 21 in the Y direction is slightly longer than the installation distance between the pair of first frame members 10. Therefore, the fixed frame 21 is arranged so that the lower surface of the flat plate portion 18 is joined to the upper surface of the flat plate portion 11 of the first frame member 10 at both ends in the front-rear direction, and a fastening member 30 is attached to the joint.

図6は、フレーム枠体4における第1フレーム部材10と第2フレーム部材20との組み付け態様を示す斜視図である。第1フレーム部材10の平板部11には、固定フレーム21を固定するための孔13と、支持ボルト40を挿通する孔14とが設けられる。一方、固定フレーム21の平板部18には、第1フレーム部材10を固定するための孔16と、吊りボルト50を挿通する孔17とが設けられる。締着部材30は、ボルト31と、ワッシャ32と、ナット33とを備えて構成され、第1フレーム部材10の平板部11と固定フレーム21の平板部18とが接合した状態で2つの孔13,16に、ワッシャ32が装着されたボルト31の雄螺子部が挿通され、平板部11の下面から突出する雄螺子部に対してナット33が装着される。そしてボルト31に対してナット33が締め付けられることにより、第1フレーム部材10と固定フレーム21は互いに直角な状態で固定される。 6 is a perspective view showing the assembly of the first frame member 10 and the second frame member 20 in the frame frame 4. The flat plate portion 11 of the first frame member 10 is provided with a hole 13 for fixing the fixed frame 21 and a hole 14 for inserting the support bolt 40. Meanwhile, the flat plate portion 18 of the fixed frame 21 is provided with a hole 16 for fixing the first frame member 10 and a hole 17 for inserting the suspension bolt 50. The fastening member 30 is configured with a bolt 31, a washer 32, and a nut 33. When the flat plate portion 11 of the first frame member 10 and the flat plate portion 18 of the fixed frame 21 are joined, the male thread portion of the bolt 31 with the washer 32 attached is inserted into the two holes 13, 16, and the nut 33 is attached to the male thread portion protruding from the underside of the flat plate portion 11. Then, the nuts 33 are tightened onto the bolts 31, so that the first frame member 10 and the fixed frame 21 are fixed at right angles to each other.

図7は、固定フレーム21に対するスライドフレーム22の取り付け態様を示す図である。スライドフレーム22は、例えばアルミの押出成型によって形成される部材であり、互いに所定間隔を隔てた背面板60と前面板61とを有し、前面板61の中央部にY方向に沿って形成されるスリット61aを有している。背面板60と前面板61との間には、所定サイズの空間62が形成されている。スライドフレーム22は、その空間62にボルト部材63を収容することが可能である。ボルト部材63は、平板状の頭部64と、雄螺子部65とを有しており、頭部64はスライドフレーム22の内側の空間62に収容可能な形状及びサイズとして形成される。例えば、頭部64は、矩形状に形成され、スライドフレーム22の内壁と干渉することにより雄螺子部65を回転させないように形成される。また、ボルト部材63の雄螺子部65の直径はスリット61aの幅よりも小さく、雄螺子部65の先端を前面板61から突出させた状態に配置される。このボルト部材63は、スライドフレーム22の内側の空間62に収容されると、前面板61から雄螺子部65を突出させた状態でスリット61aの形成方向(Y方向)に沿って任意の位置に移動させることが可能である。 7 is a diagram showing the manner in which the slide frame 22 is attached to the fixed frame 21. The slide frame 22 is a member formed, for example, by extrusion molding of aluminum, and has a back plate 60 and a front plate 61 spaced apart from each other by a predetermined distance, and a slit 61a formed along the Y direction in the center of the front plate 61. A space 62 of a predetermined size is formed between the back plate 60 and the front plate 61. The slide frame 22 can accommodate a bolt member 63 in the space 62. The bolt member 63 has a flat head 64 and a male screw portion 65, and the head 64 is formed to have a shape and size that can be accommodated in the space 62 inside the slide frame 22. For example, the head 64 is formed in a rectangular shape and is formed so as not to rotate the male screw portion 65 by interfering with the inner wall of the slide frame 22. In addition, the diameter of the male screw portion 65 of the bolt member 63 is smaller than the width of the slit 61a, and the tip of the male screw portion 65 is arranged in a state where it protrudes from the front plate 61. When this bolt member 63 is housed in the space 62 inside the slide frame 22, it can be moved to any position along the direction in which the slit 61a is formed (Y direction) with the male screw portion 65 protruding from the front plate 61.

本実施形態では、スライドフレーム22に対して3つのボルト部材63が取り付けられる。それら3つのボルト部材63のうち、2つのボルト部材63は、スライドフレーム22の一端を固定フレーム21に取り付けるためのものである。また、残り1つのボルト部材63は、スライドフレーム22の他端において支持ボルト40を取り付けるためのものである。 In this embodiment, three bolt members 63 are attached to the slide frame 22. Of the three bolt members 63, two bolt members 63 are for attaching one end of the slide frame 22 to the fixed frame 21. The remaining bolt member 63 is for attaching the support bolt 40 at the other end of the slide frame 22.

固定フレーム21の縦板部19には、2つのボルト部材63の雄螺子部65を挿通するための孔15が形成される。また、スライドフレーム22は、スリット61aが形成された前面板61を固定フレーム21の縦板部19に対向させた状態に配置される。そして縦板部19の孔15に対してボルト部材63の雄螺子部65が挿通され、縦板部19から突出する雄螺子部65の先端にワッシャ23a及びナット23が締着されることにより、スライドフレーム22が固定フレーム21に取り付けられる。すなわち、スライドフレーム22は、ボルト部材63とナット23とを備える締着部材によって固定フレーム21に取り付けられる。そして雄螺子部65に対してナット23が緩められた仮止め状態のとき、スライドフレーム22は固定フレーム21に固定されず、固定フレーム21に沿ってY方向にスライド可能である。これに対し、雄螺子部65に対してナット23が締め付けられると、スライドフレーム22は固定フレーム21に対して固定されて固定フレーム21と一体物となる。 The vertical plate portion 19 of the fixed frame 21 has holes 15 for inserting the male screw portions 65 of the two bolt members 63. The slide frame 22 is arranged with the front plate 61 with the slit 61a facing the vertical plate portion 19 of the fixed frame 21. The male screw portion 65 of the bolt member 63 is inserted into the hole 15 of the vertical plate portion 19, and the washer 23a and the nut 23 are fastened to the tip of the male screw portion 65 protruding from the vertical plate portion 19, thereby attaching the slide frame 22 to the fixed frame 21. That is, the slide frame 22 is attached to the fixed frame 21 by a fastening member including the bolt member 63 and the nut 23. When the nut 23 is loosened from the male screw portion 65 and in a temporary fastening state, the slide frame 22 is not fixed to the fixed frame 21 and can slide in the Y direction along the fixed frame 21. In contrast, when the nut 23 is tightened against the male thread portion 65, the slide frame 22 is fixed to the fixed frame 21 and becomes one with the fixed frame 21.

また、支持ボルト40を取り付けるためのボルト部材63には、固定金具24が取り付けられる。この固定金具24は、支持ボルト40をスライドフレーム22との間に挟み込んで固定するための金具である。 The bolt member 63 for mounting the support bolt 40 is fitted with a fixing bracket 24. This fixing bracket 24 is a bracket for clamping and fixing the support bolt 40 between the slide frame 22.

図8は、固定金具24の一構成例を示す図である。図8(a)に示すように、固定金具24は、スライドフレーム22の前面板61と平行に配置される板部71と、板部71の両端部を略直角に折り曲げて形成した押圧部72とを有する。板部71には、ボルト部材63の雄螺子部65を挿通する孔73が設けられる。また、押圧部72には、支持ボルト40の外周面に係合する概略半円状の係合部74が形成される。係合部74の深さD2は、支持ボルト40の直径D1よりも小さい。 Figure 8 is a diagram showing an example of the configuration of the fixing bracket 24. As shown in Figure 8 (a), the fixing bracket 24 has a plate portion 71 arranged parallel to the front plate 61 of the slide frame 22, and a pressing portion 72 formed by bending both ends of the plate portion 71 at approximately right angles. The plate portion 71 is provided with a hole 73 through which the male screw portion 65 of the bolt member 63 is inserted. The pressing portion 72 is formed with a roughly semicircular engaging portion 74 that engages with the outer peripheral surface of the support bolt 40. The depth D2 of the engaging portion 74 is smaller than the diameter D1 of the support bolt 40.

この固定金具24は、図8(b)に示すように、係合部74に対して支持ボルト40の外周面を係合させた状態でボルト部材63の雄螺子部65を孔73に挿通し、その雄螺子部65の先端にナット25を締着することにより、スライドフレーム22との間に支持ボルト40を挟み込んだ状態で固定される。このとき、作業者は、1つのナット25を締め付ける作業を行うことによって支持ボルト40をスライドフレーム22に固定することができるため、作業効率に優れている。また、ナット25を緩めれば、固定金具24が仮止め状態となり、スライドフレーム22のスリット61aに沿って任意の位置に移動させることができる。そのため、支持ボルト40の取り付け位置を簡単に調整することができるという点でも作業効率に優れている。 As shown in FIG. 8(b), the fixing bracket 24 is fixed in a state where the support bolt 40 is sandwiched between the slide frame 22 and the male screw portion 65 of the bolt member 63 is inserted into the hole 73 with the outer circumferential surface of the support bolt 40 engaged with the engagement portion 74, and a nut 25 is fastened to the tip of the male screw portion 65. At this time, the worker can fix the support bolt 40 to the slide frame 22 by tightening one nut 25, so that the work efficiency is excellent. In addition, if the nut 25 is loosened, the fixing bracket 24 is temporarily fixed and can be moved to any position along the slit 61a of the slide frame 22. Therefore, the work efficiency is also excellent in that the mounting position of the support bolt 40 can be easily adjusted.

図6に戻り、第1フレーム部材10の平板部11に設けられた孔14にも支持ボルト40が取り付けられる。すなわち、支持ボルト40は、その上端部が孔14に挿通され、ナットが締着されることにより、図5に示すように、第1フレーム部材10の両端部に取り付けられる。尚、支持ボルト40の上端部には2つのナットが取り付けられ、それら2つのナットで平板部11を挟み込んだ状態で締め付けることにより、支持ボルト40を平板部11に固定することができる。 Returning to FIG. 6, a support bolt 40 is also attached to a hole 14 provided in the flat plate portion 11 of the first frame member 10. That is, the support bolt 40 is attached to both ends of the first frame member 10 as shown in FIG. 5 by inserting its upper end into the hole 14 and tightening a nut. Two nuts are attached to the upper end of the support bolt 40, and the support bolt 40 can be fixed to the flat plate portion 11 by clamping the flat plate portion 11 between the two nuts and tightening them.

また、図5に示すように、第1フレーム部材10及び第2フレーム部材20に取り付けられる支持ボルト40の下部には、ゴムなどで構成される防振部材41が取り付けられる。防振部材41は、例えば円錐台状の形状を有し、中央に支持ボルト40を挿通する孔が設けられる。その孔に支持ボルト40を挿通し、支持ボルト40の下端部にナット42が装着されることで、防振部材41は、支持ボルト40の下端部に取り付けられる。この防振部材41は、図1に示すように、取付片123又は係合片143,153の下側に配置される。そのため、第1フレーム部材10及び第2フレーム部材20によって構成されるフレーム枠体4が天井構造に設置されると、支持ボルト40は、防振部材41を介して取付片123及び係合片143,153の下面側を支持する状態となる。 As shown in FIG. 5, a vibration-proof member 41 made of rubber or the like is attached to the lower part of the support bolt 40 attached to the first frame member 10 and the second frame member 20. The vibration-proof member 41 has, for example, a truncated cone shape, and has a hole in the center through which the support bolt 40 is inserted. The support bolt 40 is inserted into the hole, and a nut 42 is attached to the lower end of the support bolt 40, so that the vibration-proof member 41 is attached to the lower end of the support bolt 40. As shown in FIG. 1, the vibration-proof member 41 is disposed below the mounting piece 123 or the engagement pieces 143, 153. Therefore, when the frame body 4 formed by the first frame member 10 and the second frame member 20 is installed in the ceiling structure, the support bolt 40 supports the lower side of the mounting piece 123 and the engagement pieces 143, 153 via the vibration-proof member 41.

支持装置1は、防振部材41を介して空気調和機100を支持することにより、例えば空気調和機100の運転中に空気調和機本体120の内部の熱交換機やファンによって発生する振動が第1フレーム部材10及び第2フレーム部材20に伝わることを抑制することができ、吊りボルト50を介して上のフロアに振動が伝わることを防止することができる。 By supporting the air conditioner 100 via the vibration-proof member 41, the support device 1 can suppress the transmission of vibrations generated by the heat exchanger and fan inside the air conditioner main body 120 during operation of the air conditioner 100 to the first frame member 10 and the second frame member 20, and can prevent the vibrations from being transmitted to the floor above via the hanging bolts 50.

また、第2フレーム部材20の平板部18に設けられた孔17(図6参照)には、吊りボルト50が取り付けられる。すなわち、支持ボルト40は、その下端部が孔17に挿通され、ナットが締着されることにより、図5に示すように、固定フレーム21の両端部に取り付けられる。尚、吊りボルト50の下端部には2つのナットが取り付けられ、2つのナットで平板部18を挟み込んだ状態で締め付けることにより、吊りボルト50を固定フレーム21の平板部18に固定することができる。 The hanging bolt 50 is attached to the hole 17 (see FIG. 6) provided in the flat plate portion 18 of the second frame member 20. That is, the support bolt 40 is attached to both ends of the fixed frame 21 as shown in FIG. 5 by inserting its lower end into the hole 17 and tightening a nut. Two nuts are attached to the lower end of the hanging bolt 50, and the hanging bolt 50 can be fixed to the flat plate portion 18 of the fixed frame 21 by tightening the two nuts while sandwiching the flat plate portion 18.

尚、吊りボルト50は、必ずしも固定フレーム21に取り付けられるものに限られない。例えば、吊りボルト50は、第2フレーム部材20のスライドフレーム22に対して上述した固定金具24を用いて取り付けるようにしても良い。また、吊りボルト50は、第1フレーム部材10の平板部18に取り付けるようにしても構わない。 The hanging bolt 50 is not necessarily limited to being attached to the fixed frame 21. For example, the hanging bolt 50 may be attached to the slide frame 22 of the second frame member 20 using the above-mentioned fixing bracket 24. The hanging bolt 50 may also be attached to the flat plate portion 18 of the first frame member 10.

吊りボルト50の上端部には、天井取付金具51が取り付けられる。この天井取付金具51は、空気調和機100を支持する支持装置1が天井構造の近傍位置まで持ち上げられたときに、天井構造から垂下するボルトに対して吊りボルト50の上端部を取り付けるための金具である。吊りボルト50の上端部に、天井取付金具51が取り付けられることにより、支持装置1を床面作業で空気調和機100に取り付けることが可能となり、支持装置1を空気調和機100に取り付ける作業の効率化を図ることができる。 A ceiling mounting bracket 51 is attached to the upper end of the hanging bolt 50. This ceiling mounting bracket 51 is a bracket for attaching the upper end of the hanging bolt 50 to a bolt hanging down from the ceiling structure when the support device 1 supporting the air conditioner 100 is raised to a position near the ceiling structure. By attaching the ceiling mounting bracket 51 to the upper end of the hanging bolt 50, it becomes possible to attach the support device 1 to the air conditioner 100 by working on the floor, and the work of attaching the support device 1 to the air conditioner 100 can be made more efficient.

上記のような支持装置1は、第1フレーム部材10と第2フレーム部材20とが工場で組み付けられ、フレーム枠体4が予め作成される。そして支持装置1は、フレーム枠体4が作成された状態で、空気調和機100の設置現場へ搬入される。そのため、空気調和機100の設置現場では、第1フレーム部材10と第2フレーム部材20とを組み付けてフレーム枠体4を作成する作業を行う必要がなく、現場での作業負担を軽減することができる。尚、支持ボルト40及び吊りボルト50は、工場ではフレーム枠体4に組み付けられず、空気調和機100の設置現場に付属部品として搬入される。支持装置1を工場から建築現場へ搬送するときのフレーム枠体4の高さ寸法を低減することが可能であり、搬送効率を向上させることができると共に、搬送コストを抑えることも可能である。 In the support device 1 as described above, the first frame member 10 and the second frame member 20 are assembled in a factory, and the frame body 4 is created in advance. The support device 1 is then transported to the installation site of the air conditioner 100 with the frame body 4 already created. Therefore, at the installation site of the air conditioner 100, there is no need to assemble the first frame member 10 and the second frame member 20 to create the frame body 4, which reduces the workload at the site. The support bolts 40 and the hanging bolts 50 are not assembled to the frame body 4 at the factory, but are transported to the installation site of the air conditioner 100 as accessories. It is possible to reduce the height dimension of the frame body 4 when transporting the support device 1 from the factory to the construction site, which improves transport efficiency and also reduces transport costs.

特に本実施形態の支持装置1は、第1フレーム部材10と、第2フレーム部材20の固定フレーム21とを交差させた状態で固定することにより、フレーム枠体4が構成されており、第2フレーム部材20のスライドフレーム22は第1フレーム部材10には固定されていない。そのため、工場から建築現場へフレーム枠体4を搬送する際には、図9に示すように、固定フレーム21に対してスライドフレーム22を取り付けるナット23を緩めることにより、スライドフレーム22を固定フレーム21に対して重ね合わせる方向(矢印F1で示す方向)にスライドさせ、フレーム枠体4の前後方向(Y方向)の長さを縮小した状態にして搬送することが可能である。 In particular, in the support device 1 of this embodiment, the frame body 4 is formed by fixing the first frame member 10 and the fixed frame 21 of the second frame member 20 in a crossed state, and the slide frame 22 of the second frame member 20 is not fixed to the first frame member 10. Therefore, when transporting the frame body 4 from the factory to the construction site, as shown in FIG. 9, by loosening the nuts 23 that attach the slide frame 22 to the fixed frame 21, the slide frame 22 can be slid in the direction in which it overlaps the fixed frame 21 (the direction indicated by the arrow F1), and the frame body 4 can be transported in a state in which its length in the front-to-rear direction (Y direction) is reduced.

このとき、2つのスライドフレーム22は、いずれも固定フレーム21の端部に設けられるボルト部材63とナット23とによって固定フレーム21に取り付けられている。そのため、ナット23を緩めることにより、スライドフレーム22と固定フレーム21との間隔を広げることが可能であり、特にボルト部材63及びナット23が設けられた位置から離れる程、スライドフレーム22と固定フレーム21との間隔をより大きく広げることができるようになる。 At this time, both slide frames 22 are attached to the fixed frame 21 by bolt members 63 and nuts 23 provided at the ends of the fixed frame 21. Therefore, by loosening the nuts 23, it is possible to widen the gap between the slide frames 22 and the fixed frame 21, and in particular, the farther away from the positions where the bolt members 63 and nuts 23 are provided, the greater the gap between the slide frames 22 and the fixed frame 21 can be widened.

図10は、スライドフレーム22を固定フレーム21に重ね合わせることにより、第2フレーム部材20を収縮させた状態を示す図である。本実施形態の支持装置1は、図10に示すように、第2フレーム部材20の2つのスライドフレーム22を固定フレーム21に重ね合わせた状態に収縮させることにより、搬送時におけるフレーム枠体4のサイズを縮小することができる。特に、第2フレーム部材20の2つのスライドフレーム22a,22bのうち、一方のスライドフレーム22aを固定フレーム21と重ね合わせた状態で他方のスライドフレーム22bをスライドさせることにより、他方のスライドフレーム22bを、固定フレーム21とスライドフレーム22aとの双方に重ね合わせた状態に収縮させることができるため、フレーム枠体4の面積を1/3程度に縮小できるという利点がある。つまり、第2フレーム部材20は、空気調和機100を支持する使用状態のときには第1フレーム部材10よりも長尺の部材となるのに対し、図10に示すようにスライドフレーム22を固定フレーム21に重ね合わせることにより、搬送時には第1フレーム部材10よりも短尺の状態にして搬送することが可能であり、搬送時の取り扱いに優れている。また、例えば、固定フレーム21を90cm程度の長さに形成すれば、図10に示すように2つのスライドフレーム22a,22bを固定フレーム21に重ね合わせることにより、前後方向(Y方向)の長さを1m程度に抑えることが可能であり、建築現場における奥行きが1m程度の仮設エレベータにも積載することが可能であり、空気調和機100の設置現場へスムーズに搬入することができる。 Figure 10 is a diagram showing a state in which the second frame member 20 is contracted by overlapping the slide frame 22 with the fixed frame 21. As shown in Figure 10, the support device 1 of this embodiment can reduce the size of the frame body 4 during transportation by contracting the two slide frames 22 of the second frame member 20 to a state in which they are overlapped with the fixed frame 21. In particular, by sliding the other slide frame 22b with one of the two slide frames 22a and 22b of the second frame member 20 overlapped with the fixed frame 21, the other slide frame 22b can be contracted to a state in which it is overlapped with both the fixed frame 21 and the slide frame 22a, which has the advantage of reducing the area of the frame body 4 to about 1/3. That is, the second frame member 20 is longer than the first frame member 10 when in use to support the air conditioner 100, but by overlapping the slide frame 22 with the fixed frame 21 as shown in FIG. 10, it can be transported in a shorter state than the first frame member 10, which makes it easier to handle during transportation. Also, for example, if the fixed frame 21 is formed to a length of about 90 cm, the length in the front-to-back direction (Y direction) can be kept to about 1 m by overlapping the two slide frames 22a, 22b with the fixed frame 21 as shown in FIG. 10, and it can be loaded into a temporary elevator with a depth of about 1 m at a construction site, and it can be smoothly transported to the installation site of the air conditioner 100.

例えば、図11に示すように、複数のフレーム枠体4を上積みした状態でパレットなどの載置台に載せれば、そのままの状態で工場から設置現場へ搬送することができる。このとき、支持ボルト40や吊りボルト50といった付属部品は、フレーム枠体4から取り外されているため、複数のフレーム枠体4を上積みしたときの高さ寸法も抑えることができるため、1つの載置台に対して多くのフレーム枠体4を積載することが可能であり、搬送効率にも優れているのである。尚、支持ボルト40や吊りボルト50などの付属部品は、フレーム枠体4の中央の空きスペースに収容して搬送することも可能である。 For example, as shown in FIG. 11, if multiple frame bodies 4 are stacked and placed on a pallet or other mounting platform, they can be transported from the factory to the installation site in that state. At this time, accessories such as the support bolts 40 and hanging bolts 50 are removed from the frame body 4, so the height dimension when multiple frame bodies 4 are stacked can be reduced, making it possible to load many frame bodies 4 on one mounting platform, and transport efficiency is also excellent. In addition, accessories such as the support bolts 40 and hanging bolts 50 can also be stored in the empty space in the center of the frame body 4 for transport.

それ故、本実施形態の支持装置1は、フレーム枠体4を井桁状に組み立てた状態で工場から設置現場へ搬入することが可能であり、空気調和機100の設置現場で支持装置1のフレーム枠体4を組み立てる必要がなくなるため、現場での作業効率を著しく軽減することができるのである。 Therefore, the support device 1 of this embodiment can be transported from the factory to the installation site with the frame body 4 already assembled in a crisscross pattern, eliminating the need to assemble the frame body 4 of the support device 1 at the installation site of the air conditioner 100, significantly reducing work efficiency at the site.

そして支持装置1は、空気調和機100の設置現場に搬入されると、スライドフレーム22a,22bをスライドさせて固定フレーム21の両端から延長させてスライドフレーム22a,22bを固定フレーム21に固定することにより、第2フレーム部材20を、空気調和機100の前後方向の長さよりも長尺にすることができる。その後、フレーム枠体4に対して支持ボルト40と吊りボルト50とを取り付けると共に、支持ボルト40の下端部を空気調和機本体120の取付片123と、吹出チャンバ140及び吸気チャンバ150の係合片143,153に取り付けることにより、支持装置1を空気調和機100に装着することができる。尚、支持装置1を空気調和機100に装着する作業は、設置現場において床面作業として行うことができる。 When the support device 1 is delivered to the installation site of the air conditioner 100, the slide frames 22a and 22b are slid to extend from both ends of the fixed frame 21 and fixed to the fixed frame 21, thereby making it possible to make the second frame member 20 longer than the length in the front-rear direction of the air conditioner 100. After that, the support bolts 40 and the hanging bolts 50 are attached to the frame body 4, and the lower ends of the support bolts 40 are attached to the mounting pieces 123 of the air conditioner main body 120 and the engagement pieces 143, 153 of the blow-out chamber 140 and the intake chamber 150, thereby making it possible to attach the support device 1 to the air conditioner 100. The work of attaching the support device 1 to the air conditioner 100 can be performed as floor work at the installation site.

床面作業で支持装置1を空気調和機100に取り付けた後、空気調和機100を昇降台などに乗せて天井スラブなどの天井構造の近傍高さ位置まで持ち上げ、天井構造から垂下するボルトに対して天井取付金具51を取り付けることにより、空気調和機100は、天井空間に設置される。したがって、本実施形態の支持装置1を用いれば、高所作業を軽減することが可能である。 After the support device 1 is attached to the air conditioner 100 through floor work, the air conditioner 100 is placed on a lifting platform or the like and lifted to a height position near the ceiling structure such as a ceiling slab, and the ceiling mounting bracket 51 is attached to a bolt hanging down from the ceiling structure, so that the air conditioner 100 is installed in the ceiling space. Therefore, by using the support device 1 of this embodiment, it is possible to reduce the amount of work done at height.

以上のように本実施形態における支持装置1は、空気調和機本体120の前後方向の少なくとも一端に吹出チャンバ140又は吸気チャンバ150が装着される空気調和機100を天井空間に吊り下げた状態で支持する装置であり、空気調和機本体120の上面側を左右方向に横断するように配置され、両端部が空気調和機本体120の左右両側面に設けられる取付片123の上方位置まで延設され、その両端部から垂下する支持ボルト40の下部が取付片123に接続されることにより、空気調和機本体120を支持する第1フレーム部材10と、空気調和機本体120の上面側を前後方向に横断するように配置され、第1フレーム部材10と交差する交差部において第1フレーム部材10と連結され、少なくとも一方の端部から垂下する支持ボルト40の下部が吹出チャンバ140又は吸気チャンバ150の端面に設けられる係合片143,153に接続されることにより、吹出チャンバ140又は吸気チャンバ150を支持する第2フレーム部材20と、を備えている。 As described above, the support device 1 in this embodiment is a device that supports the air conditioner 100, in which the blow-out chamber 140 or the intake chamber 150 is attached to at least one end in the front-rear direction of the air conditioner main body 120, in a suspended state in the ceiling space, and is arranged so as to cross the upper surface side of the air conditioner main body 120 in the left-right direction, with both ends extending up to positions above the mounting pieces 123 provided on both the left and right sides of the air conditioner main body 120, and the lower parts of the support bolts 40 hanging down from both ends are connected to the mounting pieces 123, The air conditioner includes a first frame member 10 that supports the air conditioner body 120, and a second frame member 20 that is arranged across the upper surface side of the air conditioner body 120 in the front-to-rear direction and is connected to the first frame member 10 at the intersection where it intersects with the first frame member 10, and supports the blow-out chamber 140 or the intake chamber 150 by connecting the lower part of the support bolt 40 that hangs down from at least one end to an engagement piece 143, 153 provided on the end face of the blow-out chamber 140 or the intake chamber 150.

この支持装置1において、第1フレーム部材10と第2フレーム部材20とは互いに直交する状態に固定され、井桁状のフレーム枠体4を構成する。このフレーム枠体4は、複数の支持ボルト40を垂下させることにより、天井空間に設置される空気調和機100の端面に設けられる取付片123及び係合片143,153を支持する。そのため、フレーム枠体4は、空気調和機100を天井空間において支持する状態となるとき、空気調和機100の平面サイズよりも大きい平面サイズとなる。 In this support device 1, the first frame member 10 and the second frame member 20 are fixed perpendicular to each other to form a crisscross frame body 4. This frame body 4 supports the mounting pieces 123 and engagement pieces 143, 153 provided on the end faces of the air conditioner 100 installed in the ceiling space by hanging down a number of support bolts 40. Therefore, when the frame body 4 is in a state where it supports the air conditioner 100 in the ceiling space, it has a planar size larger than the planar size of the air conditioner 100.

一方、第2フレーム部材20は、空気調和機本体120の上面側において第1フレーム部材10と連結された状態で固定される固定フレーム21と、固定フレーム21に対してスライド可能に取り付けられ、吹出チャンバ140又は吸気チャンバ150を支持するスライドフレーム22と、を備えている。このような構成を備える第2フレーム部材20は、スライドフレーム22をスライドさせることにより、スライドフレーム22を固定フレーム21に重ね合わせて前後方向の長さを縮小した状態と、スライドフレーム22を固定フレーム21の端部から突出させて前後方向の長さを拡大した状態とに変化させることが可能である。そのため、フレーム枠体4は、予め工場で作成し、前後方向の長さを縮小させた状態で工場から建築現場へ搬送することが可能であると共に、空気調和機100の設置現場では前後方向の長さを拡大させて支持ボルト40を取り付けることにより、空気調和機100の端面に設けられる取付片123及び係合片143,153を支持することができる。 On the other hand, the second frame member 20 includes a fixed frame 21 that is fixed in a state where it is connected to the first frame member 10 on the upper surface side of the air conditioner main body 120, and a slide frame 22 that is slidably attached to the fixed frame 21 and supports the blow-out chamber 140 or the intake chamber 150. The second frame member 20 having such a configuration can be changed by sliding the slide frame 22 between a state where the slide frame 22 is overlapped with the fixed frame 21 to reduce the length in the front-rear direction, and a state where the slide frame 22 protrudes from the end of the fixed frame 21 to increase the length in the front-rear direction. Therefore, the frame body 4 can be made in advance at a factory and transported from the factory to the construction site with the length in the front-rear direction reduced, and at the installation site of the air conditioner 100, the length in the front-rear direction is increased and the support bolt 40 is attached to support the mounting piece 123 and the engagement pieces 143, 153 provided on the end surface of the air conditioner 100.

特に、固定フレーム21に対するスライドフレーム22のスライド量は、無段階に調整することが可能である。そのため、設置現場において第2フレーム部材20の前後方向の長さを拡大させるときには、空気調和機100の前後方向の長さに応じて適合な長さに調整することが可能であり、空気調和機100が設置される天井空間において、周囲の他の吊り下げ物に接触しない長さに調整することが可能である。 In particular, the amount of sliding of the slide frame 22 relative to the fixed frame 21 can be adjusted steplessly. Therefore, when the length of the second frame member 20 in the front-to-rear direction is expanded at the installation site, it can be adjusted to a length that is appropriate for the length of the air conditioner 100 in the front-to-rear direction, and can be adjusted to a length that does not come into contact with other hanging objects in the vicinity in the ceiling space where the air conditioner 100 is installed.

また、スライドフレーム22に設けられる固定金具24は、スライドフレーム22に設けられたスリット61aに沿って前後方向に移動させることが可能である。そのため、吹出チャンバ140又は吸気チャンバ150を支持する支持ボルト40の取り付け位置を簡単に調整することが可能である。特に、吹出チャンバ140又は吸気チャンバ150を支持する支持ボルト40は、固定金具24をスライドフレーム22に固定するための1つのナット25を締め付けることによってスライドフレーム22に固定することができる。つまり、支持ボルト40をスライドフレーム22に固定する際には、1つのナット25を締め付けるだけで良いため、作業効率に優れている。 The fixing bracket 24 provided on the slide frame 22 can be moved in the front-rear direction along the slit 61a provided on the slide frame 22. This makes it possible to easily adjust the mounting position of the support bolt 40 supporting the blow-out chamber 140 or the intake chamber 150. In particular, the support bolt 40 supporting the blow-out chamber 140 or the intake chamber 150 can be fixed to the slide frame 22 by tightening one nut 25 for fixing the fixing bracket 24 to the slide frame 22. In other words, when fixing the support bolt 40 to the slide frame 22, it is only necessary to tighten one nut 25, resulting in excellent work efficiency.

以上、本発明に関する好ましい実施形態を説明したが、本発明は、上記実施形態において説明したものに限定されるものではない。すなわち、本発明には、上記各実施形態において説明したものに種々の変形例を適用したものの含まれる。 Although the preferred embodiments of the present invention have been described above, the present invention is not limited to those described in the above embodiments. In other words, the present invention includes various modified versions of the above embodiments.

例えば、上記実施形態では、支持装置1が支持する空気調和機100の一例として隠蔽式の空気調和機を例示した。しかし、上述した支持装置1を使用して吊り下げ可能な空気調和機100は、必ずしも隠蔽式の空気調和機に限られない。すなわち、上述した支持装置1は、概略箱形形状を有する空気調和機であれば、どのような空気調和機であっても構わない。 For example, in the above embodiment, a concealed air conditioner is given as an example of the air conditioner 100 supported by the support device 1. However, the air conditioner 100 that can be suspended using the support device 1 described above is not necessarily limited to a concealed air conditioner. In other words, the support device 1 described above can be any air conditioner as long as it has a roughly box-shaped configuration.

また、上記実施形態では、第2フレーム部材20の固定フレーム21の両端部に2つのスライドフレーム22a,22bが取り付けられる構成を例示した。しかし、これに限られるものではなく、第2フレーム部材20は、固定フレーム21に対して1つのスライドフレーム22が取り付けられた構成であっても構わない。 In the above embodiment, a configuration in which two slide frames 22a, 22b are attached to both ends of the fixed frame 21 of the second frame member 20 is exemplified. However, this is not limited to this, and the second frame member 20 may be configured such that one slide frame 22 is attached to the fixed frame 21.

また、上記実施形態では、第2フレーム部材20と第1フレーム部材10との交点がボルトとナットによる締着部材30によって互いに接合するように固定され、一体的な井桁状のフレーム枠体4を構成する例を説明した。しかし、第2フレーム部材20と第フレーム部材10とは必ずしも互いに接合した状態に連結されない態様であっても構わない。例えば、第2フレーム部材20は、第1フレーム部材10に取り付けられる一定の高さ寸法を有する連結部材に対して固定されることにより、第1フレーム部材10から離間した位置で第1フレーム部材10に固定されるものであっても構わない。この場合、井桁状のフレーム枠体4は、一定の高さ寸法を有することになる。ただし、フレーム枠体4の小型化という観点からすれば、上記実施形態で説明したように第2フレーム部材20と第1フレーム部材10とを互いに接合させた状態で固定することがより好ましい。 In the above embodiment, the intersections of the second frame member 20 and the first frame member 10 are fixed to each other by the fastening members 30 of bolts and nuts to form an integral lattice-shaped frame body 4. However, the second frame member 20 and the first frame member 10 may not necessarily be connected to each other in a joined state. For example, the second frame member 20 may be fixed to the first frame member 10 at a position separated from the first frame member 10 by being fixed to a connecting member having a certain height dimension attached to the first frame member 10. In this case, the lattice-shaped frame body 4 has a certain height dimension. However, from the viewpoint of miniaturization of the frame body 4, it is more preferable to fix the second frame member 20 and the first frame member 10 in a joined state as described in the above embodiment.

また、上記実施形態では、第2フレーム部材20が、空気調和機100の前後方向(Y方向)の長さよりも長尺であり、その前後方向両端部が空気調和機100の前後方向両端面を超える位置まで延設される場合を例示した。しかし、これに限られるものではない。例えば、吹出チャンバ140や吸気チャンバ150の左右方向の寸法が空気調和機本体120の寸法よりも小さく、上述した係合片143,153が吹出チャンバ140や吸気チャンバ150の左右両側面に設けられる場合には、それら係合片143,153の上方位置まで第2フレーム部材20が延設されていれば良い。そのため、第2フレーム部材20の前後方向の長さは、空気調和機100の前後方向(Y方向)の長さよりも短尺であっても構わない。 In the above embodiment, the second frame member 20 is longer than the length of the air conditioner 100 in the front-rear direction (Y direction), and both ends of the second frame member 20 extend to positions that exceed both front-rear direction end faces of the air conditioner 100. However, this is not limited to this. For example, if the left-right dimensions of the blow-out chamber 140 and the intake chamber 150 are smaller than the dimensions of the air conditioner main body 120 and the above-mentioned engagement pieces 143, 153 are provided on both the left and right sides of the blow-out chamber 140 and the intake chamber 150, the second frame member 20 may be extended to a position above the engagement pieces 143, 153. Therefore, the length of the second frame member 20 in the front-rear direction may be shorter than the length of the air conditioner 100 in the front-rear direction (Y direction).

1…支持装置、4…フレーム枠体、10…第1フレーム部材、19…縦板部、20…第2フレーム部材、21…固定フレーム、22(22a,22b)…スライドフレーム、24…固定金具、40…支持ボルト、50…吊りボルト、51…天井取付金具、61a…スリット、100…空気調和機、120…空気調和機本体、140…吹出チャンバ、150…吸気チャンバ。 1...support device, 4...frame body, 10...first frame member, 19...vertical plate portion, 20...second frame member, 21...fixed frame, 22 (22a, 22b)...slide frame, 24...fixing bracket, 40...support bolt, 50...hanging bolt, 51...ceiling mounting bracket, 61a...slit, 100...air conditioner, 120...air conditioner body, 140...blowout chamber, 150...intake chamber.

Claims (8)

空気調和機本体の前後方向の少なくとも一端にチャンバが装着される空気調和機を天井空間に吊り下げた状態で支持する支持装置であって、
前記空気調和機本体の上面側を左右方向に横断するように配置され、両端部が前記空気調和機本体の左右両側面に設けられる取付片の上方位置まで延設され、前記両端部から垂下する支持ボルトの下部が前記取付片に接続されることにより、前記空気調和機本体を支持する第1フレーム部材と、
前記空気調和機本体の上面側を前後方向に横断するように配置され、前記第1フレーム部材と交差する交差部において前記第1フレーム部材と連結され、少なくとも一方の端部から垂下する支持ボルトの下部が前記チャンバの端面に設けられる係合片に接続されることにより、前記チャンバを支持する第2フレーム部材と、
を備え、
前記第2フレーム部材は、
前記空気調和機本体の上面側において前記第1フレーム部材と連結された状態で固定される固定フレームと、
前記固定フレームに対向する面にスリットが形成され、前記スリットを介して前記固定フレームにスライド可能に取り付けられ、前記チャンバを支持するスライドフレームと、
を有し、
前記スライドフレームを前記固定フレームに重ね合わせて前後方向の長さを縮小した状態と、前記スライドフレームを前記固定フレームの端部から突出させて前後方向の長さを拡大した状態とに変化させることが可能であり、
前記スライドフレームは、前記スリットに、前記支持ボルトを固定するための固定金具が取り付けられることを特徴とする支持装置。
A support device that supports an air conditioner in a state where the air conditioner is suspended in a ceiling space, the air conditioner having a chamber attached to at least one end in the front-rear direction of the air conditioner body,
a first frame member disposed so as to traverse an upper surface side of the air conditioner body in the left-right direction, with both ends extending to positions above mounting pieces provided on both left and right sides of the air conditioner body, with lower parts of support bolts hanging down from both ends being connected to the mounting pieces, thereby supporting the air conditioner body;
a second frame member arranged across an upper surface side of the air conditioner main body in a front-rear direction, connected to the first frame member at an intersection where the second frame member intersects with the first frame member, and supporting the chamber by connecting a lower portion of a support bolt hanging down from at least one end to an engagement piece provided on an end face of the chamber;
Equipped with
The second frame member is
a fixed frame that is fixed in a state where it is connected to the first frame member on the upper surface side of the air conditioner main body;
a slide frame having a slit formed on a surface facing the fixed frame, the slide frame being slidably attached to the fixed frame via the slit and supporting the chamber;
having
The slide frame can be changed between a state in which the length in the front-rear direction is reduced by overlapping the slide frame with the fixed frame, and a state in which the length in the front-rear direction is expanded by protruding the slide frame from an end of the fixed frame ,
A support device according to claim 1, wherein a fixing bracket for fixing the support bolt is attached to the slit of the slide frame .
前記第2フレーム部材は、前記固定フレームに対して前記スライドフレームを固定するための締着部材を更に有し、前記締着部材を緩めることにより前記スライドフレームが前記固定フレームに対してスライド可能となり、前記締着部材を締め付けることにより前記スライドフレームを前記固定フレームに固定することが可能であることを特徴とする請求項1に記載の支持装置。 The support device according to claim 1, characterized in that the second frame member further has a fastening member for fastening the slide frame to the fixed frame, and the slide frame can be slid relative to the fixed frame by loosening the fastening member, and the slide frame can be fixed to the fixed frame by tightening the fastening member. 前記空気調和機は、前記空気調和機本体の前後方向両端のそれぞれにチャンバが装着され、
前記スライドフレームは、
前記固定フレームの前方側に向かってスライドする第1スライドフレームと、
前記固定フレームの後方側に向かってスライドする第2スライドフレームと、
を有し、
前記第1スライドフレームは、前記固定フレームに重ね合わせた状態として前後方向の長さを縮小した状態とすることが可能であると共に、前記第2スライドフレームは、前記固定フレームと前記第1スライドフレームとが重なった部分に対して更に重ね合わせた状態として前後方向の長さを縮小した状態とすることが可能であることを特徴とする請求項1又は2に記載の支持装置。
The air conditioner has a chamber attached to each of both ends in the front-rear direction of the air conditioner body,
The slide frame is
a first slide frame that slides toward a front side of the fixed frame;
A second slide frame that slides toward the rear side of the fixed frame;
having
The support device described in claim 1 or 2, characterized in that the first slide frame can be placed in a state where its length in the front-to-back direction is reduced when it is overlapped on the fixed frame, and the second slide frame can be placed in a state where its length in the front-to-back direction is reduced when it is further overlapped on the overlapping portion of the fixed frame and the first slide frame.
前記固定フレームは、縦板部を有し、
前記スライドフレームは、前記固定フレームの前記縦板部に対してスライド可能に取り付けられることを特徴とする請求項1乃至3のいずれかに記載の支持装置。
The fixed frame has a vertical plate portion,
4. The supporting device according to claim 1, wherein the slide frame is attached slidably to the vertical plate portion of the fixed frame.
前記スライドフレームは、前記縦板部と対向する面に、前記スリットを有することを特徴とする請求項4に記載の支持装置。 The supporting device according to claim 4 , wherein the slide frame has the slit on a surface facing the vertical plate portion. 前記固定金具は、前記スライドフレームとの間に前記支持ボルトを挟み込んで固定することを特徴とする請求項1乃至5のいずれかに記載の支持装置。 6. The support device according to claim 1 , wherein the fixing metal fitting fixes the support bolt by sandwiching it between the fixing metal fitting and the slide frame. 下端部が前記第1フレーム部材及び前記第2フレーム部材のいずれか一方に連結され、上端部が天井構造に接続される吊りボルト、
を更に備えることを特徴とする請求項1乃至のいずれかに記載の支持装置。
a suspension bolt having a lower end connected to one of the first frame member and the second frame member and an upper end connected to a ceiling structure;
7. The support device according to claim 1, further comprising:
前記吊りボルトの上端部には、前記天井構造に取り付けられたボルトに固定するための天井取付金具が取り付けられることを特徴とする請求項に記載の支持装置。 8. The support device according to claim 7 , wherein a ceiling mounting bracket is attached to an upper end of the hanging bolt for fastening to a bolt attached to the ceiling structure.
JP2020146534A 2020-09-01 2020-09-01 Supporting device Active JP7486803B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020146534A JP7486803B2 (en) 2020-09-01 2020-09-01 Supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020146534A JP7486803B2 (en) 2020-09-01 2020-09-01 Supporting device

Publications (2)

Publication Number Publication Date
JP2022041375A JP2022041375A (en) 2022-03-11
JP7486803B2 true JP7486803B2 (en) 2024-05-20

Family

ID=80499817

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020146534A Active JP7486803B2 (en) 2020-09-01 2020-09-01 Supporting device

Country Status (1)

Country Link
JP (1) JP7486803B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115265168B (en) * 2022-07-25 2024-05-14 安徽辰宇机械科技有限公司 Grain drier main unit underframe with high stress supporting structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019207095A (en) 2018-05-25 2019-12-05 エヌパット株式会社 Frame and installation method using the same
JP6709485B1 (en) 2020-01-17 2020-06-17 エヌパット株式会社 Support device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019207095A (en) 2018-05-25 2019-12-05 エヌパット株式会社 Frame and installation method using the same
JP6709485B1 (en) 2020-01-17 2020-06-17 エヌパット株式会社 Support device

Also Published As

Publication number Publication date
JP2022041375A (en) 2022-03-11

Similar Documents

Publication Publication Date Title
JP6709485B1 (en) Support device
JP7257693B2 (en) Mounting frame and construction method using it
JP7190159B2 (en) Supporting device and construction method using it
JP7486803B2 (en) Supporting device
JP7493749B2 (en) Support structure and connecting member used therein
JP7141718B2 (en) Anti-vibration device
JP3229813U (en) Chamber support bracket and air conditioner support structure
JP7323920B2 (en) ceiling mounting bracket
JP6921570B2 (en) Underfloor air conditioning structure
JP5100326B2 (en) Air conditioner mounting structure for elevator cab
JP2024007611A (en) support device
JP7535294B2 (en) Posture Control Device
JP7168637B2 (en) Construction method of ceiling suspended air conditioner
JP7168636B2 (en) Ceiling suspended air conditioning unit and installation method for ceiling suspended air conditioner
JP5324989B2 (en) Fixture for piping duct
JP7204795B2 (en) How to make a ceiling suspended air conditioning unit
JP7257659B2 (en) Support device
JP2022132761A (en) Support device and construction method
JP2011122810A (en) Fitting for mounting duct reinforcement and duct reinforcement tool
JP7385331B1 (en) Frame and loading method
JP7454845B2 (en) ceiling mounting bracket
WO2022202745A1 (en) Pump support bracket and pump support structure
JP4295706B2 (en) Double floor
JPWO2011013743A1 (en) Underfloor air conditioning duct structure
JP2022119502A (en) Bolt reinforcement metal fitting, support device, and ceiling hanging object support structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230412

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231226

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240402

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240426

R150 Certificate of patent or registration of utility model

Ref document number: 7486803

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150