JP6621243B2 - Yamadome frame and its construction method - Google Patents

Yamadome frame and its construction method Download PDF

Info

Publication number
JP6621243B2
JP6621243B2 JP2015060230A JP2015060230A JP6621243B2 JP 6621243 B2 JP6621243 B2 JP 6621243B2 JP 2015060230 A JP2015060230 A JP 2015060230A JP 2015060230 A JP2015060230 A JP 2015060230A JP 6621243 B2 JP6621243 B2 JP 6621243B2
Authority
JP
Japan
Prior art keywords
retaining wall
mountain
reinforcing bar
ground
mountain retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015060230A
Other languages
Japanese (ja)
Other versions
JP2016180223A (en
Inventor
秀夫 温品
秀夫 温品
良幸 和泉
良幸 和泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2015060230A priority Critical patent/JP6621243B2/en
Publication of JP2016180223A publication Critical patent/JP2016180223A/en
Application granted granted Critical
Publication of JP6621243B2 publication Critical patent/JP6621243B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

本発明は、掘削領域を囲んで構築される山留壁を含む山留架構、および、その構築方法に関する。   The present invention relates to a mountain retaining frame including a mountain retaining wall constructed surrounding an excavation area, and a construction method thereof.

従来より、山留壁の支持方法として、第1に、山留壁の掘削領域側に控え杭や梁材を設けて、これら控え杭や梁材により山留壁を支持する方法(特許文献1参照)がある。また、第2に、山留壁を構成する部材の強度や厚みを大きくして、山留壁自体の強度を向上させて自立させる方法がある。
また、第3に、山留壁の背面の地盤に控え杭を打設し、この控え杭と山留壁をタイロッド(繋ぎ材)で連結するタイロッド構法がある(特許文献2参照)。
Conventionally, as a method for supporting a retaining wall, first, a retaining pile and a beam material are provided on the excavation region side of the retaining wall, and the retaining wall is supported by the retaining pile and the beam material (Patent Document 1). See). Second, there is a method of increasing the strength and thickness of the members constituting the retaining wall and improving the strength of the retaining wall itself so as to be independent.
Thirdly, there is a tie rod construction method in which a retaining pile is placed on the ground on the back of the retaining wall, and the retaining pile and the retaining wall are connected by a tie rod (connecting material) (see Patent Document 2).

特許第4820276号公報Japanese Patent No. 4820276 特開2014−5650号公報JP 2014-5650 A

日本建築学会関東支部編:プレストレストコンクリート構造の設計―構造計算のすすめ方・5―、1988.10、第2版Architectural Institute of Japan Kanto Chapter: Designing prestressed concrete structures-How to proceed with structural calculations-5-, 1988.10, 2nd edition

しかしながら、第1の方法では、これら構造物が掘削作業の邪魔になるので、掘削作業に手間がかかって、工期が長期化する、という問題があった。
また、第2の方法では、山留壁を構成する部材の強度に限界があるため、掘削深さが深くなると、山留壁の高さが高くなってしまい、対応できない場合があった。
However, in the first method, since these structures obstruct the excavation work, there is a problem that the excavation work takes time and the construction period is prolonged.
Further, in the second method, there is a limit to the strength of the members constituting the mountain retaining wall. Therefore, when the excavation depth is increased, the height of the mountain retaining wall is increased, which may not be supported.

そこで、第1の方法および第2の方法の問題を解決するため、山留壁に地盤アンカーを打設することが提案されている。しかし、地盤アンカー工法の場合、山留壁の背面側にある程度広い敷地が必要であった。また、山留壁に設ける地盤アンカーの取付け高さ位置より下方側にアンカーの定着地盤が存在しない場合には、使用出来なかった。よって、一般的には、アンカー長としては、20m程度が必要であった。   Therefore, in order to solve the problems of the first method and the second method, it has been proposed to place a ground anchor on the mountain retaining wall. However, in the case of the ground anchor method, a somewhat large site was required on the back side of the mountain retaining wall. In addition, it could not be used when there was no anchor anchor ground below the mounting height of the ground anchor provided on the mountain wall. Therefore, generally, an anchor length of about 20 m is necessary.

また、第3の方法では、控え杭は非掘削領域の地盤中に単独で打ち込まれており、山留壁はタイロッドを介して控え杭単体で支持されている。よって、地盤中に打ち込まれた複数の控え杭同士は連結されておらず、複数の控え杭が群をなして山留壁の傾斜を抑止することはできなかった。よって、複数の控え杭が一体として自立して抵抗することはできていなかった。   Further, in the third method, the retaining pile is driven alone into the ground of the non-excavation region, and the mountain retaining wall is supported by the retaining pile alone via a tie rod. Therefore, the plurality of reserve piles driven into the ground are not connected to each other, and the plurality of reserve piles cannot form a group to suppress the inclination of the mountain retaining wall. Therefore, a plurality of reserve piles could not stand up and resist as a whole.

また、タイロッドは、特殊な係合部材を介して控え杭と連結されており、一般的に、構造材としてのPC鋼材(鉄筋やPC鋼棒、あるいはPC鋼より線)に緊張力を導入してプレストレスト架構体を構築する際には、PC鋼材には規格降伏強度の70%〜80%程度の緊張力相当の引張力が導入させるため、係合部材が破断するおそれがあった(非特許文献1参照)。よって、タイロッド材の弛み防止を目的として導入する緊張力程度であれば、ターンバックル等でタイロッド同士を連結することが可能であったが、山留壁と、控え杭と、緊張力が導入された連結部材によって山留架構を形成させるには、連結部材の両端部には構造材を定着させる程度の定着具が必要であった。   Also, the tie rod is connected to the holding pile through a special engagement member, and generally, tension is introduced into the PC steel material (rebar, PC steel bar, or PC steel strand) as a structural material. When building a prestressed frame, a tensile force equivalent to a tensile force of about 70% to 80% of the standard yield strength is introduced into the PC steel material, which may cause the engagement member to break (non-patent) Reference 1). Therefore, it was possible to connect the tie rods with a turnbuckle or the like as long as the tension force introduced for the purpose of preventing the tie rod material from slackening. In order to form the mountain retaining frame by using the connecting member, a fixing tool to fix the structural material is required at both ends of the connecting member.

また、タイロッドの周囲に埋め戻られた土によって形成される地盤上を工事車両などが通行した際には、車両重量が地盤を介してタイロッドに直接加わり、引張部材であるタイロッドにせん断力が作用して部材耐力が低下する、という問題があった。   In addition, when a construction vehicle or the like passes on the ground formed by the soil buried around the tie rod, the vehicle weight is directly applied to the tie rod through the ground, and a shearing force acts on the tie rod as a tension member. As a result, there was a problem that the yield strength of the member was reduced.

以上のような課題を踏まえて、本発明は、山留壁の背面側の敷地が狭い場合や、山留壁の背面に所定の空間があればアンカー定着地盤がない場合であっても、山留壁を高強度部材によって形成したり、山留壁の本体壁を厚くしたりすることなく、短工期で構築できる山留架構およびその構築方法を提供することを目的とする。   In light of the above problems, the present invention can be applied to a mountain where the site on the back side of the mountain retaining wall is narrow, or even if there is no anchor anchorage ground if there is a predetermined space on the back of the mountain retaining wall. An object of the present invention is to provide a mountain retaining structure that can be constructed in a short construction period and a construction method thereof without forming the retaining wall with a high-strength member or thickening the main wall of the retaining wall.

本発明者らは、地盤アンカーを用いない山留架構として、山留壁の背面の地盤に複数の控え杭を打ち込み、控え杭同士を連結部材で接続させた控え杭の群体と、山留壁と、緊張力を導入した連結部材により構成される山留架構を地盤中に構築することによって、山留壁と控え杭とが一体となり地震時に作用する水平荷重に対してせん断抵抗できることに着眼して、山留壁の掘削領域側への傾斜やせり出しを防止できる山留架構を発明するに至った。   The inventors of the present invention, as a mountain frame that does not use a ground anchor, drive a plurality of piles into the ground on the back of the mountain wall, connect the piles to each other with a connecting member, and a pile wall With the construction of a mountain retaining frame composed of connecting members that introduced tension in the ground, we focused on the fact that the mountain retaining wall and the holding pile can be integrated to provide shear resistance against horizontal loads acting during an earthquake. Thus, the incline frame that can prevent the incline and protrusion of the incline toward the excavation area side has been invented.

第一の発明の山留架構(例えば、後述の山留架構1)は、鉛直方向に延びる山留壁(例えば、後述の山留壁10)と、当該山留壁の掘削領域側とは反対側の地盤に設けられた複数の控え杭(例えば、後述の控え杭20)と、前記山留壁と前記控え杭とを緊張状態で連結している連結部材(例えば、後述の連結部材30)と、を備え、前記連結部材は、外周面にねじが形成されたねじふし鉄筋(例えば、後述のねじふし鉄筋31)と、前記山留壁に係止して前記ねじふし鉄筋が貫通する第1定着部材(例えば、後述の第1定着部材32)と、前記控え杭に係止して前記ねじふし鉄筋が貫通する第2定着部材(例えば、後述の第2定着部材33)と、前記ねじふし鉄筋の両端部に螺合されて前記第1定着部材および前記第2定着部材に係止された締付部材(例えば、後述の第1ナット34、第2ナット35)と、を備えることを特徴とする。また、複数の控え杭同士は、腹起し部材で連結されていなく、山留壁とそれぞれの控え杭が、緊張力が導入された連結部材で連結されていてもよい。   The mountain retaining frame (for example, a mountain retaining frame 1 described later) of the first invention is opposite to a mountain retaining wall (for example, a mountain retaining wall 10 described later) extending in the vertical direction and the excavation region side of the mountain retaining wall. A connecting member (for example, a connecting member 30 described later) connecting the plurality of retaining piles (for example, a retaining pile 20 described later), the mountain retaining wall and the retaining pile in a tension state provided on the ground on the side. The connecting member includes a threaded reinforcing bar (for example, a threaded reinforcing bar 31 to be described later) having a screw formed on an outer peripheral surface, and a threaded reinforcing bar that is locked to the mountain retaining wall and penetrates the threaded reinforcing bar. A first fixing member (for example, a first fixing member 32 to be described later), a second fixing member (for example, a second fixing member 33 to be described later) that is locked to the retaining pile and penetrates the screw-reinforcing bar, and the screw Screwed into both ends of the brace reinforcing bar and locked to the first fixing member and the second fixing member Biasing member (e.g., the first nut 34, second nut 35 to be described later), characterized in that it comprises a a. In addition, the plurality of reserve piles may not be connected to each other by the erection member, and the mountain retaining wall and each of the reserve piles may be connected by a connection member into which tension is introduced.

第二の発明の山留架構は、前記控え杭同士を連結する腹起し部材(例えば、後述の第2腹起し22)をさらに備えることを特徴とする。   The mountain frame according to the second aspect of the present invention is further characterized by further including a belly raising member (for example, a second belly raising 22 described later) for connecting the reserve piles.

この発明によれば、山留壁の背面側の地盤に控え杭を設けて、この控え杭と山留壁とを連結部材で連結して緊張力を導入した。よって、山留壁の背面側の敷地が狭い場合でも、山留壁の背面側に控え杭を打ち込むスペースを確保できればよく、控え杭と山留壁とを接続する連結部材に予備緊張(プレロード)を与えておくことで、山留壁に作用する土圧によって生じる山留壁のせり出し変形分を予め控え杭側に引張っておくことができる。また、山留壁の掘削領域側に山留架構のための構造物が不要となるので、掘削作業に手間がかからないから、短工期で山留架構を構築できる。また、複数の控え杭同士が腹起し部材で連結されていることで、複数の控え杭と腹起し部材が一体となって山留壁のせり出し変形分を抑制することができる。   According to this invention, the reserve pile was provided in the ground on the back side of the mountain retaining wall, and the tension pile was introduced by connecting the reserve pile and the mountain retaining wall with the connecting member. Therefore, even if the site on the back side of the mountain retaining wall is narrow, it is only necessary to secure a space for driving the retaining pile on the rear side of the retaining wall, and pre-tensioning is applied to the connecting member that connects the retaining pile and the retaining wall (preload). Thus, the protruding deformation of the mountain retaining wall caused by the earth pressure acting on the mountain retaining wall can be pulled in advance to the pile side. In addition, since the structure for the mountain retaining structure is not required on the excavation area side of the retaining wall, the excavation work does not take time, so the mountain retaining structure can be constructed in a short construction period. In addition, since the plurality of retaining piles are connected by the erection member, the plurality of stake piles and the erection member are integrated to suppress the protruding deformation of the mountain retaining wall.

また、ねじふし鉄筋、定着部材、および締付部材を含んで連結部材を構成した。よって、締付部材を回転させるだけで、連結部材に導入する緊張力を容易に調整できる。また、ねじふし鉄筋や締付部材には、既製品を利用できるので、簡易に、かつ少ない部品数で連結部材を構成できて、低コストである。よって、控え杭に定着させる連結部材の端部には、特別に制作された係合部材等は不要である。   In addition, the connecting member is configured to include the threaded reinforcing bar, the fixing member, and the tightening member. Therefore, the tension | tensile_strength introduced into a connection member can be easily adjusted only by rotating a clamping member. In addition, since off-the-shelf products can be used for the threaded reinforcing bar and the fastening member, the connecting member can be configured easily and with a small number of parts, and the cost is low. Therefore, a specially produced engagement member or the like is not required at the end of the connecting member to be fixed to the storage pile.

第三の発明の山留架構は、前記ねじふし鉄筋は、地盤中に埋設されており、前記連結部材は、前記ねじふし鉄筋の少なくとも上面を覆う被覆部材(例えば、後述の被覆部材36)をさらに備えることを特徴とする。   In the mountain frame according to a third aspect of the present invention, the threaded reinforcing bar is embedded in the ground, and the connecting member is a covering member (for example, a covering member 36 described later) that covers at least the upper surface of the threaded reinforcing bar. It is further provided with the feature.

この発明によれば、山留壁と控え杭を連結する連結部材(ねじふし鉄筋)については、少なくとも上面を被覆部材で覆い、連結部材の外周囲に空間を確保したのでで山留壁の背面側の埋戻し土が連結部材に接することはなく、地盤上の積載荷重等が土を介して、直接、連結部材に局所的に作用しない。連結部材と土との間に、非接触領域を確保することで、連結部材に及ぼす土の影響を除いた。また、ねじふし鉄筋を地盤中に埋設することで、土砂によりねじふし鉄筋の変形を拘束し、山留壁をより確実に支持できる。また、山留壁と控え杭で形成された山留架構の周囲に土を埋め戻すことで、山留架構の変形を拘束し、鉛直剛性およびせん断剛性を向上させた。   According to the present invention, at least the upper surface of the connecting member (screw-reinforcing bar) for connecting the retaining wall and the retaining pile is covered with the covering member, and a space is secured around the outer periphery of the connecting member. The backfill soil on the side does not contact the connecting member, and the load on the ground does not act directly on the connecting member directly through the soil. By securing a non-contact area between the connecting member and the soil, the influence of the soil on the connecting member was eliminated. In addition, by embedding the screw breaker reinforcing bar in the ground, deformation of the screw breaker reinforcing bar is restrained by earth and sand, and the mountain retaining wall can be supported more reliably. In addition, the soil was backfilled around the mountain frame formed by the mountain retaining wall and the retaining pile, thereby restraining the deformation of the mountain frame and improving the vertical rigidity and shear rigidity.

また、山留壁と控え杭との間の領域では、地中にねじふし鉄筋が配置されているので、この山留壁と控え杭との間の領域で作業すると、地中のねじふし鉄筋に鉛直荷重がかかって、導入した緊張力が変化してしまうおそれがある。
しかしながら、この発明によれば、ねじふし鉄筋の少なくとも上面を覆う被覆部材を設けたので、山留壁と控え杭との間の領域で作業しても、ねじふし鉄筋には引張力以外の荷重が作用するのを防ぐことができる。よって、この山留壁と控え杭との間の領域の地盤面上を作業スペースとして活用できる。
In addition, in the area between the retaining wall and the retaining pile, the threaded reinforcing bar is placed in the ground, so if you work in the area between the retaining wall and the retaining pile, There is a possibility that the applied tension will change due to the vertical load applied to.
However, according to the present invention, since the covering member that covers at least the upper surface of the threaded reinforcing bar is provided, even if working in the region between the retaining wall and the retaining pile, the threaded reinforcing bar has a load other than the tensile force. Can be prevented from acting. Therefore, the ground surface in the area between the mountain retaining wall and the holding pile can be used as a work space.

第四の発明の山留架構の構築方法は、地盤中に鉛直方向に延びる山留壁を構築する工程(例えば、後述のステップS1)と、当該山留壁の掘削領域とは反対側の地盤に複数の控え杭を打設する工程(例えば、後述のステップS2)と、前記山留壁と前記控え杭との間の地盤を、当該控え杭の上部が露出するまで掘削する工程(例えば、後述のステップS3)と、前記複数の控え杭の間に腹起し部材を架設して前記控え杭同士を連結する工程(例えば、後述のステップS4)と、前記山留壁と前記控え杭との間に連結部材を架設し、当該連結部材に緊張力を導入する工程(例えば、後述のステップS4、S5)と、前記連結部材の上に土を埋め戻す工程(例えば、後述のステップS6)と、を備えることを特徴とする。   According to a fourth aspect of the present invention, there is provided a method of constructing a mountain retaining wall extending vertically in the ground (for example, step S1 described later), and a ground on the opposite side of the excavation region of the retaining wall. A step (for example, step S2 to be described later), and a step of excavating the ground between the mountain retaining wall and the reserve pile until the upper portion of the reserve pile is exposed (for example, Step S3) which will be described later, a step of erected a member between the plurality of retaining piles to connect the retaining piles (for example, Step S4 which will be described later), the mountain wall and the retaining pile, A step of laying a connecting member between them and introducing tension to the connecting member (for example, steps S4 and S5 described later), and a step of backfilling the soil on the connecting member (for example, step S6 described later). And.

本発明によれば、山留壁の背面側の敷地が狭い場合や、山留壁の背面に所定の空間があればアンカー定着地盤がない場合であっても、高強度材料を使用したり、山留壁の本体壁を厚くすることなく山留壁を短工期にて構築できる。   According to the present invention, even if the site on the back side of the mountain retaining wall is narrow, or even if there is no anchor fixing ground if there is a predetermined space on the back of the mountain retaining wall, a high-strength material is used, The Yamadome wall can be constructed in a short construction period without increasing the wall thickness of the Yamadome wall.

本発明の一実施形態に係る山留架構の縦断面図である。It is a longitudinal cross-sectional view of the mountain retaining frame concerning one Embodiment of this invention. 図1のA−A断面位置における平面図である。It is a top view in the AA cross section position of FIG. 図2のB−B断面図である。It is BB sectional drawing of FIG. 実施形態に係る山留架構を構築する手順のフローチャートである。It is a flowchart of the procedure which constructs the mountain retaining frame concerning an embodiment. 実施形態に係る山留架構を構築する手順の縦断面説明図(その1)である。It is a longitudinal cross-sectional explanatory drawing (the 1) of the procedure which constructs the mountain retaining frame which concerns on embodiment. 実施形態に係る山留架構を構築する手順の縦断面説明図(その2)である。It is a longitudinal cross-sectional explanatory drawing (the 2) of the procedure which constructs the mountain retaining frame which concerns on embodiment. 実施形態に係る山留架構を構築する手順の縦断面説明図(その3)である。It is a longitudinal cross-sectional explanatory drawing (the 3) of the procedure which constructs the mountain retaining frame concerning embodiment. 実施形態に係る山留架構を構築する手順の縦断面説明図(その4)である。It is a longitudinal cross-sectional explanatory drawing (the 4) of the procedure which constructs the mountain retaining frame concerning embodiment. 本発明の変形例に係る山留架構の縦断面図である。It is a longitudinal cross-sectional view of the mountain retaining frame which concerns on the modification of this invention.

以下、本発明の一実施形態について、図面を参照しながら説明する。
図1は、本発明の一実施形態に係る山留架構1の縦断面図であり、図2は、山留架構1のA−A断面位置での平面図である。
本実施形態では、山留架構1は、鉛直方向に延びる山留壁10と、この山留壁10の掘削領域側とは反対側つまり背面側の地盤2に設けられた複数の控え杭20と、これら控え杭20同士を連結する第2腹起し22と、山留壁10と控え杭20とを緊張力が導入された状態で連結する複数の連結部材30と、を備える。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is a longitudinal sectional view of a mountain retaining frame 1 according to an embodiment of the present invention, and FIG. 2 is a plan view of the mountain retaining frame 1 taken along the line AA.
In this embodiment, the mountain retaining frame 1 includes a mountain retaining wall 10 extending in the vertical direction, and a plurality of retaining piles 20 provided on the ground 2 opposite to the excavation region side of the mountain retaining wall 10, that is, on the back side. The 2nd erection 22 which connects these reserve piles 20 and the some connection member 30 which connects the mountain retaining wall 10 and the reserve pile 20 in the state by which tension | tensile_strength was introduced are provided.

山留壁10は、SMW(Soil Mixing Wall)連続壁である。このSMW連続壁は、土とセメントスラリーとを原位置で混合して攪拌することで地中に造成された壁体であり、所定間隔おきにH形鋼が芯材12として設けられている。   The Yamadome wall 10 is an SMW (Soil Mixing Wall) continuous wall. This SMW continuous wall is a wall formed in the ground by mixing and stirring soil and cement slurry in-situ, and H-shaped steel is provided as a core material 12 at predetermined intervals.

山留壁10には、複数の芯材12に跨がって、第1腹起し13が架設される。
第1腹起し13は、芯材12の掘削領域側の側面に当接して配置されて、水平方向に延びている。この第1腹起し13は、略コの字形状の溝形鋼を上下に背中合わせに配置して構成される。ここで、下側の溝形鋼を下段腹起し14とし、上側の溝形鋼を上段腹起し15とする。
On the mountain retaining wall 10, a first erection 13 is laid over a plurality of core members 12.
The first erection 13 is disposed in contact with the side surface of the core member 12 on the excavation region side, and extends in the horizontal direction. The first upset 13 is configured by placing substantially U-shaped channel steels back and forth in a back-and-forth manner. Here, the lower channel steel is referred to as the lower belly 14 and the upper channel steel is referred to as the upper belly 15.

控え杭20は、山留壁10に沿って所定間隔おきに複数配置され、これら複数の控え杭20に跨がって、第2腹起し22が架設される。   A plurality of the reserve piles 20 are arranged at predetermined intervals along the mountain retaining wall 10, and the second erections 22 are laid over the plurality of reserve piles 20.

第2腹起し22は、控え杭20の掘削領域とは反対側の側面に当接して配置されて、水平方向に延びている。この第2腹起し22は、略コの字形状の溝形鋼を上下に背中合わせに配置して構成される。ここで、下側の溝形鋼を下段腹起し23とし、上側の溝形鋼を上段腹起し24とする。   The second erection 22 is disposed in contact with the side surface opposite to the excavation region of the holding pile 20 and extends in the horizontal direction. The second erection 22 is configured by arranging substantially U-shaped channel steels back to back. Here, the lower channel steel is referred to as the lower belly 23 and the upper channel steel is referred to as the upper belly 24.

連結部材30は、各控え杭20について一対ずつ設けられている。
連結部材30は、外周面にねじが形成されたねじふし鉄筋31と、山留壁10の第1腹起し13に係止してねじふし鉄筋31が貫通する第1定着部材32と、控え杭20の第2腹起し22に係止してねじふし鉄筋31が貫通する第2定着部材33と、ねじふし鉄筋31の両端部に螺合されて第1定着部材32および第2定着部材33に係止された締付部材としての第1ナット34および第2ナット35と、ねじふし鉄筋31を覆う被覆部材36と、を備える。
A pair of connecting members 30 are provided for each of the reserve piles 20.
The connecting member 30 includes a threaded reinforcing bar 31 having a screw formed on the outer peripheral surface, a first fixing member 32 that is engaged with the first raised portion 13 of the retaining wall 10 and through which the threaded reinforcing bar 31 passes, and a holding member. A second fixing member 33 that is locked to the second flank 22 of the pile 20 and through which the threaded reinforcing bar 31 passes, and a first fixing member 32 and a second fixing member that are screwed to both ends of the threaded reinforcing bar 31. The first nut 34 and the second nut 35 serving as fastening members that are locked to the member 33 and a covering member 36 that covers the threaded reinforcing bar 31 are provided.

連結部材30には、SS400等の鋼材に比べて強度が高く軽量なねじふし鉄筋を使用した。また、第1定着部材32と第1ナット34、または、第2定着部材33と第2ナット35には、鋳物成形によってそれぞれが一体化された鋼製の定着具(既製品)を使用する。これによって、定着部材32、33を設置するとともに、ナット34、35で締め付ける工程を同時施工でき、短工期で緊張力を導入できる。また、連結部材30の設置高さは、山留壁10が掘削領域側に傾斜することを少ない鋼材量によって抑制するために、山留壁10の高さの2/3以上の高さ位置に設置することが好ましい。   The connection member 30 was a screw-in reinforcing bar that was stronger and lighter than steel materials such as SS400. Further, steel fixing tools (off-the-shelf products) integrated by casting are used for the first fixing member 32 and the first nut 34, or the second fixing member 33 and the second nut 35, respectively. As a result, the fixing members 32 and 33 can be installed, and the process of tightening with the nuts 34 and 35 can be performed simultaneously, and tension can be introduced in a short construction period. Further, the installation height of the connecting member 30 is set at a height position equal to or higher than 2/3 of the height of the mountain retaining wall 10 in order to suppress the mountain retaining wall 10 from being inclined to the excavation region side by a small amount of steel material. It is preferable to install.

ねじふし鉄筋31は、地盤2に埋設されており、一対のねじふし鉄筋31が控え杭20を挟んで配置されている。
ねじふし鉄筋31の山留壁10側の端部は、第1腹起し13の下段腹起し14と上段腹起し15との間に配置されている。第1定着部材32は、第1腹起し13の掘削領域側の側面に配置され、第1ナット34は、第1定着部材32の上に配置されている。
The screw breaker reinforcing bar 31 is embedded in the ground 2, and a pair of screw breaker reinforcing bars 31 are arranged with the retaining pile 20 interposed therebetween.
The end portion of the threaded reinforcing bar 31 on the mountain retaining wall 10 side is disposed between the lower belly ridge 14 and the upper belly ridge 15 of the first belly 13. The first fixing member 32 is disposed on the side surface of the first erection 13 on the side of the excavation area, and the first nut 34 is disposed on the first fixing member 32.

ねじふし鉄筋31の控え杭20側の端部は、第2腹起し22の下段腹起し23と上段腹起し24との間に配置されている。第2定着部材33は、第2腹起し22の掘削領域側とは反対側の側面に配置され、第2ナット35は、第2定着部材33の上に配置されている。   The end portion of the threaded reinforcing bar 31 on the side of the retaining pile 20 is disposed between the second belly ridge 22 and the lower belly ridge 23 and the upper belly ridge 24. The second fixing member 33 is disposed on the side surface of the second erection 22 opposite to the excavation region side, and the second nut 35 is disposed on the second fixing member 33.

被覆部材36は、円筒形状の樹脂製または鋼管であり、ねじふし鉄筋31は、この被覆部材36に挿通されている。図3に示すように、ねじふし鉄筋31は、被覆部材36内部の下端面に配置されており、これにより、ねじふし鉄筋31の側方および上方には、空間が確保されている。   The covering member 36 is a cylindrical resin or steel pipe, and the threaded reinforcing bar 31 is inserted through the covering member 36. As shown in FIG. 3, the screw thread reinforcing bar 31 is arranged on the lower end surface inside the covering member 36, and thereby a space is secured on the side and above the screw thread reinforcing bar 31.

以下、山留架構1を構築する手順について、図4のフローチャートを参照しながら説明する。
ステップS1では、図5に示すように、地盤2に鉛直方向に延びる山留壁10を構築する。ステップS2では、図5に示すように、山留壁10の掘削領域とは反対側つまり背面側の地盤2に控え杭20を打設する。
ステップS3では、図6に示すように、山留壁10の掘削領域側および背面側を掘削して、山留壁10の上部および控え杭20の上部を露出させる。
Hereinafter, the procedure for constructing the mountain frame 1 will be described with reference to the flowchart of FIG.
In step S1, the mountain retaining wall 10 extending in the vertical direction is constructed on the ground 2 as shown in FIG. In step S2, as shown in FIG. 5, the reserve pile 20 is driven on the ground 2 opposite to the excavation area of the retaining wall 10, that is, on the back side.
In step S3, as shown in FIG. 6, the excavation area side and the back side of the retaining wall 10 are excavated to expose the upper part of the retaining wall 10 and the upper part of the retaining pile 20.

ステップS4では、図6に示すように、先ず、地盤面と平行方向に、山留壁10の掘削領域の壁面側に第1腹起し13を設置するとともに、複数の控え杭20同士を第2腹起し22で連結する。次に、山留壁10と控え杭20との間に、所定間隔を空けて連結部材30を架設する。   In step S4, as shown in FIG. 6, first, in the direction parallel to the ground surface, the first uplift 13 is installed on the wall surface side of the excavation area of the mountain retaining wall 10, and the plurality of retaining piles 20 are first connected to each other. Connect with 2 angling 22. Next, the connecting member 30 is installed between the mountain retaining wall 10 and the holding pile 20 at a predetermined interval.

具体的には、まず、第1腹起し13の下段腹起し14を架設するとともに、第2腹起し22の下段腹起し23を架設する。次に、ねじふし鉄筋31を被覆部材36に挿通して、このねじふし鉄筋31を下段腹起し14、23の上に載置する。次に、ねじふし鉄筋31の上に、第1腹起し13の上段腹起し15を架設するとともに、第2腹起し22の上段腹起し24を架設する。   Specifically, first, the first belly 13 and the lower belly protuberance 14 are installed, and the second belly 22 and the lower belly protuberance 23 are installed. Next, the threaded reinforcing bar 31 is inserted into the covering member 36, and the threaded reinforcing bar 31 is raised on the lower stage 14 and placed on the upper part 14 and 23. Next, the first belly 13 and the upper belly 15 are erected on the threaded reinforcing bar 31, and the upper belly 24 of the second belly 22 is erected.

ステップS5では、図7に示すように、連結部材30に緊張力を導入する。
具体的には、第1腹起し13の掘削領域側に、緊張用腹起し40および油圧ジャッキ41を取り付けて、この油圧ジャッキ41により、ねじふし鉄筋31を図7中左方向に引っ張ることで、ねじふし鉄筋31に緊張力を導入する。この状態で、第1ナット34を締め付けて緊張力を保持し、その後、油圧ジャッキ41および緊張用腹起し40を取り外す。
In step S5, tension is introduced into the connecting member 30 as shown in FIG.
Specifically, a tension bulge 40 and a hydraulic jack 41 are attached to the excavation region side of the first flank 13, and the threaded reinforcing bar 31 is pulled leftward in FIG. 7 by the hydraulic jack 41. Then, a tension force is introduced into the threaded reinforcing bar 31. In this state, the first nut 34 is tightened to maintain the tension, and then the hydraulic jack 41 and the tension erection 40 are removed.

この段階では、山留壁10と控え杭20とを連結する連結部材30に予め緊張力を導入する(プレロード)ことで、二次掘削以降の土圧作用によって山留壁10が掘削領域側に傾斜していくせり出し分を、予め控え杭20側に引っ張っておくことで、せり出しを抑制することができる。また、これにより構築段階の終盤において、山留壁10の背面側に土を埋め戻した際に、山留壁10に過大なせり出しなどが生じないようにした。   At this stage, by introducing tension in advance to the connecting member 30 that connects the retaining wall 10 and the retaining pile 20 (preloading), the retaining wall 10 is moved to the excavation region side by earth pressure action after the secondary excavation. The protrusion can be suppressed by pulling the protruding portion that inclines toward the reserve pile 20 side in advance. In addition, at the end of the construction stage, when the soil is backfilled on the back side of the mountain retaining wall 10, no excessive protrusion or the like occurs on the mountain retaining wall 10.

ステップS6では、図8に示すように、連結部材30の上に土3を埋め戻す。このとき、ねじふし鉄筋31が被覆部材36内部の下端面に配置されるように、土砂を投入する。
また、複数の控え杭20同士を連結する第2腹起し22の周囲に土3を埋め戻すことで、第2腹起し22の側面と埋戻し土3との接合面には支圧抵抗が形成される。よって、第2腹起し22は、上述の連結部材30と同様、埋め戻し土の土圧によって山留壁10の掘削領域側への傾斜を抑制できる。
In step S <b> 6, the soil 3 is backfilled on the connecting member 30 as shown in FIG. 8. At this time, earth and sand are introduced so that the screw rebar 31 is disposed on the lower end surface inside the covering member 36.
In addition, the soil 3 is backfilled around the second protuberance 22 that connects the plurality of reserve piles 20, so that the bearing surface between the side surface of the second protuberance 22 and the backfill soil 3 has a bearing resistance. Is formed. Therefore, the 2nd erection 22 can suppress the inclination to the excavation area | region side of the retaining wall 10 with the earth pressure of backfill soil like the connection member 30 mentioned above.

本実施形態によれば、以下のような効果がある。
(1)山留壁10の背面側の地盤に控え杭20を設けて、この控え杭20と山留壁10とを連結部材30で連結して緊張力を導入した。よって、山留壁10の背面側の敷地が狭い場合でも、山留壁10の背面側に控え杭20を打ち込むスペースを確保できればよく、山留壁10を支持できる。また、山留壁10の高さが高い場合であっても、連結部材30で山留壁10を背面側に引っ張るので、山留壁10を支持できる。また、山留壁10の掘削領域側に山留架構のための構造物が不要となるので、掘削作業に手間がかからないから、山留架構1を短工期で掘削できる。
According to this embodiment, there are the following effects.
(1) The reserve pile 20 was provided in the ground on the back side of the mountain retaining wall 10, and this reserve pile 20 and the mountain retaining wall 10 were connected by the connection member 30, and tension was introduced. Therefore, even if the site on the back side of the mountain retaining wall 10 is narrow, it is only necessary to secure a space for driving the reserve pile 20 on the rear side of the mountain retaining wall 10, and the mountain retaining wall 10 can be supported. Even if the height of the retaining wall 10 is high, the retaining wall 10 can be supported because the retaining wall 10 is pulled to the back side by the connecting member 30. Further, since the structure for the mountain retaining frame is not required on the excavation region side of the mountain retaining wall 10, the excavation work is not time-consuming, and the mountain retaining frame 1 can be excavated in a short construction period.

(2)連結部材30を構成するねじふし鉄筋31は、SS400等の鋼材に比べて、高強度で、軽量である。また、ねじふし鉄筋31は、ねじふし鉄筋31同士の継手部や端部の定着部に既製品の定着具を使用できる。よって、連結部材30の定着方法として、溶接を行うことなく、全長に亘って品質の高い緊張材を構成できる。   (2) The threaded reinforcing bar 31 constituting the connecting member 30 is higher in strength and lighter than steel materials such as SS400. In addition, the threaded reinforcing bar 31 can use a ready-made fixing tool at a joint part between the threaded reinforcing bars 31 or a fixing part at the end. Therefore, as a fixing method of the connecting member 30, a high-quality tension material can be formed over the entire length without performing welding.

(3)連結部材30に導入する緊張力は、切梁を設置する際に使用する油圧ジャッキ41を用いる。連結部材30に予備緊張力を与えて、プレロード状態を実現して、連結部材30に予め伸びを発生させることで、山留壁10の変位を抑制することができる。また、従来工法では、タイロッド材に用いられているターンバックルによる緊張方法はたるみを取る程度であり、本願発明で想定している一般的なプレロード荷重(引張張力の70〜90%程度)相当は連結部材(タイロッド材)に与えることはできない。   (3) The tension force introduced into the connecting member 30 uses the hydraulic jack 41 that is used when installing the beam. Displacement of the mountain retaining wall 10 can be suppressed by applying a pretensioning force to the connecting member 30 to realize a preload state and causing the connecting member 30 to stretch in advance. Moreover, in the conventional construction method, the tension method using the turnbuckle used for the tie rod material is about taking a slack, and the equivalent to a general preload load (about 70 to 90% of the tensile tension) assumed in the present invention is It cannot be applied to the connecting member (tie rod material).

なお、本発明は前記実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。
本実施形態では、被覆部材36を円筒形状としたが、これに限らず、ねじふし鉄筋31の側方および上方に空間を確保できれば、どのような形状でもよい。例えば、被覆部材を、ねじふし鉄筋31に上から被せる断面山形状としてもよい。
It should be noted that the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within a scope that can achieve the object of the present invention are included in the present invention.
In the present embodiment, the covering member 36 has a cylindrical shape. However, the shape is not limited to this, and any shape may be used as long as a space can be secured on the side and upper side of the threaded reinforcing bar 31. For example, it is good also as a cross-sectional mountain shape which covers a coating | coated member from the top of the screw rebar 31.

また、本実施形態では、連結部材30をねじふし鉄筋31としたが、施工場所等の影響で棒状の連結部材30が設置出来ない場合には、連結部材30を可とう性を有するPC鋼より線としてもよい。
また、本実施形態では、連結部材30の設置高さを地盤面からある程度掘り下げた位置としたが、これに限らず、図9に示す山留架構1Aのように、連結部材30を地盤面に近い位置に設置し、被覆部材を設けなくてもよい。
Moreover, in this embodiment, although the connection member 30 was used as the screwed reinforcing bar 31, when the rod-shaped connection member 30 cannot be installed by the influence of a construction place etc., the connection member 30 is made from PC steel which has flexibility. It may be a line.
Moreover, in this embodiment, although the installation height of the connection member 30 was set to the position dug down to some extent from the ground surface, it is not limited to this, and the connection member 30 is placed on the ground surface as in the mountain retaining frame 1A shown in FIG. It is not necessary to provide a covering member by installing it at a close position.

1、1A…山留架構
2…地盤
3…土(埋め戻し土)
10…山留壁
12…芯材
13…第1腹起し 14…下段腹起し 15…上段腹起し
20…控え杭
22…第2腹起し(腹起し部材) 23…下段腹起し 24…上段腹起し
30…連結部材
31…ねじふし鉄筋 32…第1定着部材 33…第2定着部材
34…第1ナット(締付部材) 35…第2ナット(締付部材)
36…被覆部材 40…緊張用腹起し 41…油圧ジャッキ
1, 1A ... Yamato frame 2 ... Ground 3 ... Soil (backfill soil)
DESCRIPTION OF SYMBOLS 10 ... Yamato wall 12 ... Core material 13 ... 1st abdominal rise 14 ... Lower abdomen 15 ... Upper abdomen 20 ... Reservoir pile 22 ... 2nd abdomen (abdominal erection member) 23 ... Lower abdomen 24 ... Upper flank 30 ... Connecting member 31 ... Threaded reinforcing bar 32 ... First fixing member 33 ... Second fixing member 34 ... First nut (clamping member) 35 ... Second nut (clamping member)
36 ... Covering member 40 ... Tension raising 41 ... Hydraulic jack

Claims (2)

山留壁を背面の地盤から支持する山留架構であって、
地中に造成されて所定間隔おきに複数の芯材が設けられた鉛直方向に延びる山留壁と、
当該芯材に跨がって架設された第1腹起しと、
当該山留壁の掘削領域側とは反対側の地盤に前記複数の芯材のうち所定のものに対向して設けられた複数の控え杭と、
当該複数の控え杭同士を連結する第2腹起しと、
前記控え杭および前記所定の芯材の両側に一対ずつ設けられ、前記第1腹起しと前記第2腹起しとを緊張状態で連結している連結部材と、
前記山留壁と前記控え杭との間に埋め戻された土砂と、を備え、
前記連結部材は、外周面にねじが形成されたねじふし鉄筋と、
当該ねじふし鉄筋が挿通される筒状の被覆部材と、
前記第1腹起しに係止して前記ねじふし鉄筋が貫通する第1定着部材と、
前記第2腹起しに係止して前記ねじふし鉄筋が貫通する第2定着部材と、
前記ねじふし鉄筋の両端部に螺合されて前記第1定着部材および前記第2定着部材に係止された締付部材と、を備え、
前記被覆部材の両端は、前記第1腹起しおよび前記第2腹起しに当接しており、
前記ねじふし鉄筋は、前記被覆部材内部の下端面に配置されて、当該ねじふし鉄筋の側方および上方には、空間が確保されることを特徴とする山留架構。
It is a mountain frame that supports the mountain wall from the back ground,
A mountain retaining wall that extends in the vertical direction and is formed in the ground and provided with a plurality of cores at predetermined intervals ;
A first erection erected across the core;
A plurality of retaining piles provided on the ground opposite to the excavation region side of the mountain retaining wall and facing a predetermined one of the plurality of core members ;
A second erection that connects the plurality of stakes;
Provided in pairs on both sides of the copy pile and the predetermined core, a connecting member which connects the second wale and the first wale under tension,
Earth and sand buried back between the mountain retaining wall and the reserve pile ,
The connecting member is a screw rebar with a screw formed on the outer peripheral surface;
A cylindrical covering member through which the threaded reinforcing bar is inserted;
A first fixing member reinforcing bars and the Nejifu engaged in the first wale penetrates,
A second fixing member to which the Nejifu to rebar engaged with the second wale penetrates,
A fastening member that is screwed to both ends of the threaded reinforcing bar and is locked to the first fixing member and the second fixing member;
Both ends of the covering member are in contact with the first erection and the second erection ,
The screw retaining bar is arranged on the lower end surface inside the covering member , and a space is secured on the side and upper side of the screw fixing bar.
山留壁を背面の地盤から支持する山留架構を構築する方法であって、
所定間隔おきに複数の芯材が設けられた山留壁を地盤中に構築する工程と、
当該山留壁の掘削領域とは反対側の地盤に、前記複数の芯材のうち所定のものに対向して複数の控え杭を打設する工程と、
前記山留壁と前記控え杭との間の地盤を、当該控え杭の上部が露出するまで掘削する工程と、
前記山留壁の芯材同士に跨がって第1腹起しを架設するとともに、前記複数の控え杭の間に第2腹起しを架設して前記控え杭同士を連結する工程と、
前記控え杭および前記所定の芯材の両側で、かつ、前記第1腹起しと前記第2腹起しとの間に、外周面にねじが形成されたねじふし鉄筋と当該ねじふし鉄筋が挿通される筒状の被覆部材とを備える連結部材を一対ずつ架設し、前記被覆部材の両端を前記第1腹起しおよび前記第2腹起しに当接させて、前記ねじふし鉄筋に緊張力を導入する工程と、
前記ねじふし鉄筋を前記被覆部材内部の下端面に配置して、当該ねじふし鉄筋の側方および上方に空間を確保して、前記連結部材の上に土を埋め戻す工程と、を備えることを特徴とする山留架構の構築方法。
A method of constructing a mountain retaining frame that supports a mountain retaining wall from the ground on the back,
Building a mountain retaining wall provided with a plurality of cores at predetermined intervals in the ground ;
A step of driving a plurality of reserve piles on the ground opposite to the excavation region of the retaining wall , facing a predetermined one of the plurality of core members ;
Excavating the ground between the mountain retaining wall and the retaining pile until the upper portion of the retaining pile is exposed;
A step of constructing a first erection over the cores of the mountain retaining wall, and a step of constructing a second erection between the plurality of reserve piles to connect the reserve piles together,
A threaded reinforcing bar having a screw formed on an outer peripheral surface thereof on both sides of the retaining pile and the predetermined core material and between the first and second raised parts, and the threaded reinforcing bar A pair of connecting members each including a cylindrical covering member to be inserted are installed one by one , and both ends of the covering member are brought into contact with the first and second abdominal protrusions, and tension is applied to the threaded reinforcing bar. A process of introducing power,
Arranging the screw thread reinforcing bar on the lower end surface inside the covering member , securing a space on the side and above the screw thread reinforcing bar, and backfilling the soil on the connecting member. A method for constructing a featured mountain retaining structure.
JP2015060230A 2015-03-23 2015-03-23 Yamadome frame and its construction method Active JP6621243B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015060230A JP6621243B2 (en) 2015-03-23 2015-03-23 Yamadome frame and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015060230A JP6621243B2 (en) 2015-03-23 2015-03-23 Yamadome frame and its construction method

Publications (2)

Publication Number Publication Date
JP2016180223A JP2016180223A (en) 2016-10-13
JP6621243B2 true JP6621243B2 (en) 2019-12-18

Family

ID=57131656

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015060230A Active JP6621243B2 (en) 2015-03-23 2015-03-23 Yamadome frame and its construction method

Country Status (1)

Country Link
JP (1) JP6621243B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851515B (en) * 2020-06-13 2021-09-28 中交一公局集团有限公司 Adjacent foundation pit cooperative construction enclosure structure and construction method thereof
CN113123346B (en) * 2021-04-16 2022-11-29 中国建筑第八工程局有限公司 Assembly type anchor pulling node between support pile and surrounding purlin profile steel and construction method thereof
CN113529695A (en) * 2021-09-09 2021-10-22 石庆林 Positioning pile for hydraulic engineering with stable positioning and positioning method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS597401Y2 (en) * 1979-06-05 1984-03-07 日本プレスコンクリ−ト株式会社 Sheet pile fixing device
JPS62137311A (en) * 1985-12-09 1987-06-20 Kyosei Gijutsu Kaihatsu Kiko Kk Construction of steel sheet pile segment double-wall structure
JPH0355633Y2 (en) * 1986-12-09 1991-12-11
JPH0663234B2 (en) * 1989-06-30 1994-08-22 建設基礎エンジニアリング株式会社 Yamadome method
JP3705903B2 (en) * 1997-08-05 2005-10-12 株式会社熊谷組 Earth anchor combined earth retaining structure
JP4893391B2 (en) * 2007-03-14 2012-03-07 株式会社大林組 Steel pipe sheet pile upset, steel pipe sheet pile using upset, and upset method
KR100866162B1 (en) * 2008-08-14 2008-10-30 이재호 Chair-type self-supported earth retaining wall constructing method
JP5854508B2 (en) * 2012-06-25 2016-02-09 大成建設株式会社 Yamato wall support structure
JP6166072B2 (en) * 2013-03-19 2017-07-19 鹿島建設株式会社 Earth retaining structure and earth retaining method

Also Published As

Publication number Publication date
JP2016180223A (en) 2016-10-13

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100904857B1 (en) A constructing method of underground structure using steel pipe and segment
US9683347B2 (en) Systems and methods to reinforce excavation walls
KR101780370B1 (en) Composite structure using shear connector made of anchor and socket shoe
KR101463231B1 (en) Apparatus for fixing reinforced retainaing wall block
JP5180022B2 (en) Constraining method for mountain retaining wall head
KR101494132B1 (en) Self reliance type sheathing structure
JP6621243B2 (en) Yamadome frame and its construction method
KR20140013497A (en) Method for constructing block type reinforced retaining wall in cut site
JP2008180082A (en) Construction method of wall structure having permanent anchor and wall structure having permanent anchor
JP2017122358A (en) Earth retaining frame
KR101472753B1 (en) The Reinforced Stiffness Self-supporting Temporary Structure And Method Of The Same
JP5031463B2 (en) Earth retaining wall reinforcement structure and method
KR101061516B1 (en) Temporary wall structure using arched steel pile
KR100770250B1 (en) Construnction method of retaining wall and retaining wall structure using the same
KR101628079B1 (en) Retaining panel assembly for reinforcing slope and construction method thereof
JP2004293281A (en) Construction method for permanent anchor-applied wall structure and permanent anchor-applied wall structure
JP3831737B2 (en) Steel tower basic structure
JP5516643B2 (en) Earth retaining wall reinforcement structure and method
KR102476068B1 (en) Retaining wall structure with multidirectional anchor fixtures and construction method thereof
KR101297679B1 (en) Self-supporting Temporary Structure Using Steel Wire And Method Of The Same
KR101390683B1 (en) Retaining wall using precast concrete panel and construction method of the same
JP2016035177A (en) Wall structure and construction method for wall structure
JP6461690B2 (en) Foundation structure and foundation construction method
KR101298020B1 (en) Special prestressed method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171219

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180808

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180910

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190408

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190520

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191028

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191119

R150 Certificate of patent or registration of utility model

Ref document number: 6621243

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150