JP6619298B2 - Support system and support method - Google Patents

Support system and support method Download PDF

Info

Publication number
JP6619298B2
JP6619298B2 JP2016118770A JP2016118770A JP6619298B2 JP 6619298 B2 JP6619298 B2 JP 6619298B2 JP 2016118770 A JP2016118770 A JP 2016118770A JP 2016118770 A JP2016118770 A JP 2016118770A JP 6619298 B2 JP6619298 B2 JP 6619298B2
Authority
JP
Japan
Prior art keywords
work
person
charge
terminal
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016118770A
Other languages
Japanese (ja)
Other versions
JP2017224139A (en
Inventor
宮尾 浩
浩 宮尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2016118770A priority Critical patent/JP6619298B2/en
Publication of JP2017224139A publication Critical patent/JP2017224139A/en
Application granted granted Critical
Publication of JP6619298B2 publication Critical patent/JP6619298B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、支援システムおよび支援方法に関する。   The present invention relates to a support system and a support method.

従来、PCを使って共同作業を実施する場合に、各担当者が各自の実績を管理サーバに登録することにより、管理者が進捗を管理したり、作業に精通しているスキル者が遅れている担当者を見つけて支援したりしていた(非特許文献1、2参照)。   Conventionally, when collaborative work is carried out using a PC, each person in charge registers his / her achievements in the management server, so that the manager manages the progress or the skilled person who is familiar with the work is delayed. The person in charge was found and supported (see Non-Patent Documents 1 and 2).

「Redmine.JP」、[online]、2016年5月、ファーエンドテクノロジー株式会社、[2016年5月10日検索]、インターネット<URL:http://redmine.jp/overview/>"Redmine.JP", [online], May 2016, Far-end Technology Co., Ltd., [Search May 10, 2016], Internet <URL: http://redmine.jp/overview/> 「WBSガントチャート for JIRA(進捗管理ツール)」、[online]、2016年5月、リックソフト株式会社、[2016年5月10日検索]、インターネット<URL:https://www.ricksoft.jp/atlassian/wbs-ganttchart/#cl>"WBS Gantt Chart for JIRA (Progress Management Tool)", [online], May 2016, Ricksoft Co., Ltd. [Search May 10, 2016], Internet <URL: https://www.ricksoft.jp / atlassian / wbs-ganttchart / # cl>

しかしながら、従来の技術によれば、例えば各担当者の作業が何%完了したかといった作業状況や、遅れている理由や発生している問題等の進捗に関する補足説明を記述した文章を、各担当者が手作業により入力していた。そのため、担当者に依って進捗に関する情報の的確さが異なり、管理者やスキル者は、作業状況や問題の原因等を正しく把握するために、別途担当者にヒアリングを行わなければならかった。その結果、適切な対応が遅れてしまう場合があった。   However, according to the conventional technology, for example, the percentage of work completed by each person in charge, a sentence describing supplementary explanations regarding the progress of the work situation such as the reason behind the delay or the problem that has occurred, etc. Entered manually. For this reason, the accuracy of information regarding progress differs depending on the person in charge, and the manager and skill person had to interview the person in charge separately in order to correctly grasp the work status and the cause of the problem. As a result, there has been a case where an appropriate response is delayed.

本発明は、上記に鑑みてなされたものであって、担当者に負担をかけることなく担当者の作業の進捗を迅速かつ的確に把握することを目的とする。   The present invention has been made in view of the above, and an object of the present invention is to quickly and accurately grasp the progress of the work of the person in charge without imposing a burden on the person in charge.

上述した課題を解決し、目的を達成するために、本発明に係る支援システムは、担当者が作業を実施する端末と、サーバとを有する支援システムであって、前記端末は、実施された作業と該作業の作業時間と該作業により作成された成果物の作成量とを前記サーバに通知する通知部を備え、前記サーバは、前記端末で作成される成果物の完成に要する作成量の総量と完成日の目標値とを含む計画情報を記憶する記憶部と、前記端末から通知された前記作成量と前記作業時間とを用いて作業能率を算出し、該作業能率と前記計画情報に含まれる前記作成量の総量とを用いて、完成日の予測値を算出する算出部と、前記予測値が前記目標値より遅い場合に、前記計画情報の管理者に対する通報を出力する通報部と、を備える、ことを特徴とする。   In order to solve the above-described problems and achieve the object, a support system according to the present invention is a support system including a terminal on which a person in charge performs work and a server, and the terminal performs work performed. A notification unit that notifies the server of the work time of the work and the creation amount of the product created by the work, and the server includes a total amount of creation amount required for completion of the product created by the terminal And calculating the work efficiency using the storage unit storing plan information including the target value of the completion date and the creation amount notified from the terminal and the work time, and included in the work efficiency and the plan information A calculation unit that calculates a predicted value of a completion date using the total amount of the created amount, and a notification unit that outputs a report to an administrator of the plan information when the predicted value is later than the target value; It is characterized by comprising.

本発明によれば、担当者に負担をかけることなく担当者の作業の進捗を迅速かつ的確に把握することができる。   According to the present invention, it is possible to quickly and accurately grasp the progress of the work of the person in charge without imposing a burden on the person in charge.

図1は、本発明の一実施形態に係る支援システムの概略構成を示す模式図である。FIG. 1 is a schematic diagram showing a schematic configuration of a support system according to an embodiment of the present invention. 図2は、担当者端末の概略構成を示す模式図である。FIG. 2 is a schematic diagram showing a schematic configuration of the person-in-charge terminal. 図3は、作業状況を説明するための説明図である。FIG. 3 is an explanatory diagram for explaining a work situation. 図4は、管理サーバの概略構成を示す模式図である。FIG. 4 is a schematic diagram illustrating a schematic configuration of the management server. 図5は、計画情報のデータ構成を例示する図である。FIG. 5 is a diagram illustrating a data configuration of the plan information. 図6は、支援情報のデータ構成を例示する図である。FIG. 6 is a diagram illustrating a data configuration of support information. 図7は、実績情報のデータ構成を例示する図である。FIG. 7 is a diagram illustrating an example of the data structure of the record information. 図8は、支援処理手順を示すシーケンス図である。FIG. 8 is a sequence diagram showing a support processing procedure. 図9は、支援プログラムを実行するコンピュータを例示する図である。FIG. 9 is a diagram illustrating a computer that executes a support program.

以下、図面を参照して、本発明の一実施形態を詳細に説明する。なお、この実施形態により本発明が限定されるものではない。また、図面の記載において、同一部分には同一の符号を付して示している。   Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. In addition, this invention is not limited by this embodiment. Moreover, in description of drawing, the same code | symbol is attached | subjected and shown to the same part.

[支援システムの構成]
図1は、本実施形態に係る支援システム1の概略構成を例示する図である。図1に例示するように、支援システム1は、担当者端末10と管理サーバ20と管理者/スキル者端末30とが、LAN(Local Area Network)やインターネットなどの電気通信回線を介して接続されて構成される。担当者端末10および管理者/スキル者端末30は、それぞれ複数台が接続されてもよい。
[Configuration of support system]
FIG. 1 is a diagram illustrating a schematic configuration of a support system 1 according to the present embodiment. As illustrated in FIG. 1, in the support system 1, a person-in-charge terminal 10, a management server 20, and an administrator / skilled person terminal 30 are connected via an electric communication line such as a LAN (Local Area Network) or the Internet. Configured. A plurality of person-in-charge terminals 10 and manager / skilled person terminals 30 may be connected to each other.

担当者端末10では、担当者が作業を実施して成果物を作成する。そして、支援システム1は、後述する支援処理を実行する。すなわち、担当者端末10は、本発明の端末として、自動的に担当者の作業状況を管理サーバ20に通知する。また、管理サーバ20は、本発明のサーバとして、管理者が管理する作業の計画情報と、担当者端末10から通知される作業状況とを用いて、成果物の完成日を予測する。また、管理サーバ20は、予測される完成日が計画より遅い場合に、管理者や作業に精通したスキル者が使用する管理者/スキル者端末30に通知する。これにより、通知を受けた管理者やスキル者が、計画より遅れている担当者に適切に対応することができるようになる。   In the person-in-charge terminal 10, the person in charge performs work and creates a product. And the support system 1 performs the support process mentioned later. That is, the person-in-charge terminal 10 automatically notifies the management server 20 of the work status of the person in charge as the terminal of the present invention. In addition, the management server 20 predicts the completion date of the deliverable using the work plan information managed by the administrator and the work status notified from the person-in-charge terminal 10 as the server of the present invention. In addition, when the predicted completion date is later than the plan, the management server 20 notifies the manager / skilled person terminal 30 used by the manager or the skillful person skilled in the work. As a result, the administrator or skill person who has received the notification can appropriately respond to the person in charge who is behind the plan.

[担当者端末の構成]
図2は、担当者端末10の概略構成を示す模式図である。担当者端末10は、パソコン等の汎用コンピュータで実現され、図2に示すように、入力部11、出力部12、通信制御部13、記憶部14、および制御部15を備える。
[Configuration of person in charge]
FIG. 2 is a schematic diagram illustrating a schematic configuration of the person-in-charge terminal 10. The person-in-charge terminal 10 is realized by a general-purpose computer such as a personal computer, and includes an input unit 11, an output unit 12, a communication control unit 13, a storage unit 14, and a control unit 15, as shown in FIG.

入力部11は、キーボードやマウス等の入力デバイスを用いて実現され、操作者による入力操作に対応して、制御部15に対して処理開始などの各種指示情報を入力する。出力部12は、液晶ディスプレイなどの表示装置、プリンター等の印刷装置等によって実現される。   The input unit 11 is realized by using an input device such as a keyboard or a mouse, and inputs various instruction information such as processing start to the control unit 15 in response to an input operation by the operator. The output unit 12 is realized by a display device such as a liquid crystal display or a printing device such as a printer.

通信制御部13は、NIC(Network Interface Card)等で実現され、LANやインターネットなどの電気通信回線を介した管理サーバ20等の外部の装置と制御部15との通信を制御する。   The communication control unit 13 is realized by a NIC (Network Interface Card) or the like, and controls communication between an external device such as the management server 20 and the control unit 15 via an electric communication line such as a LAN or the Internet.

記憶部14は、RAM(Random Access Memory)、フラッシュメモリ(Flash Memory)等の半導体メモリ素子、または、ハードディスク、光ディスク等の記憶装置によって実現される。なお、記憶部14は、通信制御部13を介して制御部15と通信する構成でもよい。   The storage unit 14 is realized by a semiconductor memory device such as a RAM (Random Access Memory) or a flash memory, or a storage device such as a hard disk or an optical disk. The storage unit 14 may be configured to communicate with the control unit 15 via the communication control unit 13.

制御部15は、CPU(Central Processing Unit)等を用いて実現され、メモリに記憶された処理プログラムを実行する。これにより、制御部15は、図2に例示するように、通知部15aとして機能する。   The controller 15 is implemented using a CPU (Central Processing Unit) or the like, and executes a processing program stored in a memory. Thereby, the control part 15 functions as the notification part 15a so that it may illustrate in FIG.

通知部15aは、実施された作業と該作業の作業時間と該作業により作成された成果物の作成量とを管理サーバ20に通知する。また、通知部15aは、作業が所定の時間以上中断されるごとに集計した作業時間を通知する。また、通知部15aは、担当者が担当する成果物を作成する作業以外の作業についての作業時間を通知する。   The notification unit 15a notifies the management server 20 of the work performed, the work time of the work, and the creation amount of the product created by the work. In addition, the notification unit 15a notifies the totaled work time every time the work is interrupted for a predetermined time or more. In addition, the notification unit 15a notifies a work time for a work other than a work for creating a deliverable handled by the person in charge.

具体的に、通知部15aは、例えば、自端末10で担当者により実施された作業の開始と所定の時間以上の中断とを検知して、実施された作業の作業状況を集計する。ここで集計される作業状況は、成果物で識別される作業と、作業を実施した時間を意味する作業時間とを含む。さらに、通知部15aは、後述する計画情報に規定されたこの担当者が担当する成果物の作成の作業以外の作業についても、作業状況を集計して通知する。   Specifically, the notification unit 15a detects, for example, the start of work performed by the person in charge at the terminal 10 and the interruption of a predetermined time or more, and totals the work status of the work performed. The work status totaled here includes the work identified by the deliverables and the work time meaning the time when the work was performed. Furthermore, the notification unit 15a also aggregates and notifies the work status for work other than the work of creating the deliverables handled by the person in charge specified in the plan information described later.

また、成果物の作成量は、例えば、成果物であるドキュメントの作成頁数や作成行数等で表され、作業の終了を検知した際等に集計される。そして、通知部15aは、集計した作業状況と成果物の作成量とを通信制御部13を介して管理サーバ20に送信する。   The creation amount of the deliverable is represented by, for example, the number of created pages and the number of created lines of the document that is the deliverable, and is totaled when the end of work is detected. Then, the notification unit 15a transmits the totaled work status and the creation amount of the product to the management server 20 via the communication control unit 13.

図3は、担当者端末10で実施され集計された作業の作業状況を説明するための説明図である。図3には、例えば、成果物を設計書2とする作業が、中断をはさんで60分、30分、20分、10分、10分、合計130分、実施されたことが示されている。また、図3には、同様に、成果物をMailとする作業が、10分、20分、5分、5分、合計40分、実施され、成果物を仕様書2とする作業が、中断をはさんで30分、10分、合計40分、実施されたことが示されている。   FIG. 3 is an explanatory diagram for explaining the work status of the work performed on the person-in-charge terminal 10 and totalized. FIG. 3 shows that, for example, the work of making the deliverable as the design document 2 was performed for 60 minutes, 30 minutes, 20 minutes, 10 minutes, 10 minutes, and 130 minutes in total with interruptions. Yes. Similarly, in FIG. 3, the work of setting the deliverable to Mail is performed for 10 minutes, 20 minutes, 5 minutes, 5 minutes, a total of 40 minutes, and the work of setting the deliverable to the specification 2 is interrupted. It is shown that it was carried out for 30 minutes, 10 minutes, 40 minutes in total.

なお、担当者端末10において作業時間の合計の集計は必須ではない。また、管理サーバ20に通知する作業状況の形式は特に限定されないが、例えば、後述するように、作業と作業時間とをタグで囲んだ形式で送信する。   Note that the total work time is not necessarily counted in the person-in-charge terminal 10. Further, the format of the work status notified to the management server 20 is not particularly limited. For example, as described later, the work and the work time are transmitted in a format surrounded by tags.

[管理サーバの構成]
図4は、管理サーバ20の概略構成を示す模式図である。管理サーバ20は、ワークステーションやパソコン等の汎用コンピュータで実現され、図4に示すように、入力部21、出力部22、通信制御部23、記憶部24、および制御部25を備える。
[Management server configuration]
FIG. 4 is a schematic diagram illustrating a schematic configuration of the management server 20. The management server 20 is realized by a general-purpose computer such as a workstation or a personal computer, and includes an input unit 21, an output unit 22, a communication control unit 23, a storage unit 24, and a control unit 25 as shown in FIG.

入力部21は、キーボードやマウス等の入力デバイスを用いて実現され、操作者による入力操作に対応して、制御部25に対して処理開始などの各種指示情報を入力する。出力部22は、液晶ディスプレイなどの表示装置、プリンター等の印刷装置等によって実現される。   The input unit 21 is realized by using an input device such as a keyboard or a mouse, and inputs various instruction information such as processing start to the control unit 25 in response to an input operation by the operator. The output unit 22 is realized by a display device such as a liquid crystal display or a printing device such as a printer.

通信制御部23は、NIC等で実現され、LANやインターネットなどの電気通信回線を介した担当者端末10や管理者/スキル者端末30等の外部の装置と制御部25との通信を制御する。   The communication control unit 23 is realized by a NIC or the like, and controls communication between an external device such as the person-in-charge terminal 10 or the administrator / skilled person terminal 30 and the control unit 25 via an electric communication line such as a LAN or the Internet. .

記憶部24は、RAM、フラッシュメモリ等の半導体メモリ素子、または、ハードディスク、光ディスク等の記憶装置によって実現され、計画情報24a、支援情報24b、および実績情報24cが記憶される。なお、記憶部24は、通信制御部23を介して制御部25と通信する構成でもよい。   The storage unit 24 is realized by a semiconductor memory device such as a RAM or a flash memory, or a storage device such as a hard disk or an optical disk, and stores plan information 24a, support information 24b, and performance information 24c. The storage unit 24 may be configured to communicate with the control unit 25 via the communication control unit 23.

計画情報24aは、担当者端末10で作成される成果物の完成に要する作成量の総量と完成日の目標値とを含む。図5は、計画情報24aのデータ構成を例示する図である。図5に例示するように、計画情報24aには、担当者、成果物、総作成量(完成)、および完成日が含まれる。ここで、担当者は、担当者端末10を識別する情報で表される。成果物とは、担当者が作成する成果物を意味する。総作成量(完成)とは、成果物の完成に要する作成量の総量を意味する。完成日とは、完成日の目標値すなわち完成日の目標である日付を意味する。   The plan information 24a includes the total amount of creation required for completion of the deliverable created at the person-in-charge terminal 10, and the target value for the completion date. FIG. 5 is a diagram illustrating a data configuration of the plan information 24a. As illustrated in FIG. 5, the plan information 24 a includes a person in charge, a deliverable, a total creation amount (completed), and a completion date. Here, the person in charge is represented by information for identifying the person-in-charge terminal 10. A deliverable means a deliverable created by a person in charge. The total creation amount (completion) means the total amount of creation required to complete the deliverable. The completion date means a completion date target value, that is, a date that is a completion date target.

図5には、例えば、担当者Bが成果物として18頁の設計書2の作成を担当する計画と、その完成日の目標値がA月C日であることが示されている。なお、計画情報24aは、管理者により作成され予め記憶部24に格納される。   FIG. 5 shows, for example, a plan in which the person in charge B is in charge of creating the 18-page design document 2 as a deliverable, and the target value of the completion date is A month C day. The plan information 24a is created by the administrator and stored in the storage unit 24 in advance.

支援情報24bは、成果物と担当者とこの担当者の作業を支援できる支援者とを対応付けした情報である。図6は、支援情報24bのデータ構成を例示する図である。図6に例示するように、支援情報24bには、成果物、担当者およびサポート者が含まれる。ここで、成果物および担当者は、計画情報24aの成果物とその担当者を意味する。また、サポート者とは、対応する成果物の作成に精通し、担当者の作業を支援できる支援者を意味する。図6には、例えば、担当者Bが担当する設計書2の作成の作業を、スキル者Bが支援可能であることが示されている。   The support information 24b is information in which a product, a person in charge, and a person who can support the work of the person in charge are associated with each other. FIG. 6 is a diagram illustrating a data configuration of the support information 24b. As illustrated in FIG. 6, the support information 24b includes a product, a person in charge, and a support person. Here, the product and the person in charge mean the product of the plan information 24a and the person in charge thereof. The supporter means a supporter who is familiar with the creation of the corresponding deliverable and can support the work of the person in charge. FIG. 6 shows that, for example, the skill person B can support the work of creating the design document 2 that the person in charge B is in charge of.

実績情報24cは、担当者端末10から通知された作業状況と成果物の作成量とを担当者端末10ごとに蓄積して生成された情報である。図7は、実績情報24cのデータ構成を例示する図である。図7に例示するように、実績情報24cは、各担当者端末10について、日付、成果物、作成量、および作業状況を含む。ここで、日付は、担当者端末10で作業が実施された日を意味する。成果物とは、担当者端末10に対応する担当者が担当する計画情報24aの成果物を意味する。作成量および作業状況は、担当者端末10から通知された成果物の作成量および作業状況(図3参照)を表す。   The record information 24c is information generated by accumulating the work status notified from the person-in-charge terminal 10 and the creation amount of the deliverable for each person-in-charge terminal 10. FIG. 7 is a diagram illustrating a data configuration of the record information 24c. As illustrated in FIG. 7, the record information 24 c includes a date, a product, a creation amount, and a work status for each person-in-charge terminal 10. Here, the date means the date when the work is performed on the person-in-charge terminal 10. The deliverable means a deliverable of the plan information 24a handled by a person in charge corresponding to the person-in-charge terminal 10. The creation amount and the work status represent the creation amount and work status of the deliverable notified from the person-in-charge terminal 10 (see FIG. 3).

なお、本実施形態においては、作業状況は、図7に例示するように、作業を識別するタグと作業時間を示すタグとで囲まれた形式で記述されている。例えば、図7には、各作業の作業時間は、タグ<Time>とタグ</Time>とで囲んで示されている。さらに、設計書2を作成する作業の作業時間は、タグ<Time>とタグ</Time>とで囲んで示された作業時間を、タグ<Work:設計書2>とタグ</Work>とで囲んで示されている。すなわち、図7には、例えば設計書2を作成する作業の作業時間が、中断をはさんで60分、30分、20分、10分、10分であることが例示されている。   In the present embodiment, the work situation is described in a format surrounded by a tag for identifying the work and a tag indicating the work time, as illustrated in FIG. For example, in FIG. 7, the work time of each work is shown surrounded by a tag <Time> and a tag </ Time>. Furthermore, the work time of the work for creating the design document 2 is the work time enclosed by the tag <Time> and the tag </ Time>, and the tag <Work: Design document 2> and the tag </ Work>. It is shown surrounded by. That is, FIG. 7 illustrates, for example, that the work time for creating the design document 2 is 60 minutes, 30 minutes, 20 minutes, 10 minutes, and 10 minutes with interruptions.

また、図7には、担当者Bが担当する成果物として計画情報24aに規定される設計書2の作成の作業以外の作業として、Mailを作成する作業および仕様書2を作成する作業が実施され、作業状況としてそれぞれの作業時間が通知されたことが示されている。   Further, in FIG. 7, the work of creating Mail and the work of creating the specification 2 are performed as work other than the work of creating the design document 2 defined in the plan information 24a as the deliverable handled by the person in charge B. It is shown that each work time is notified as the work status.

制御部25は、CPU等を用いて実現され、メモリに記憶された処理プログラムを実行する。これにより、制御部25は、図4に例示するように、算出部25aおよび通報部25bとして機能する。   The control unit 25 is implemented using a CPU or the like and executes a processing program stored in a memory. Thereby, the control part 25 functions as the calculation part 25a and the notification part 25b so that it may illustrate in FIG.

算出部25aは、担当者端末10から通知された作成量と作業時間とを用いて作業能率を算出し、該作業能率と計画情報24aに含まれる作成量の総量とを用いて、完成日の予測値を算出する。   The calculation unit 25a calculates the work efficiency using the creation amount and work time notified from the person-in-charge terminal 10, and uses the work efficiency and the total amount of creation amount included in the plan information 24a to calculate the completion date. Calculate the predicted value.

具体的に、算出部25aは、まず、担当者端末10から通知された作成量と作業時間とを用いて、作業時間と作成量との関係を表す作業能率を算出する。例えば、図7に示す例において、成果物を設計書2とする作業のX月Y日における作業能率は、設計書2を作成する作業の作業時間の合計130分(≒2.2時間)で作成量5頁を除算することにより算出される。この例では、作業能率は1時間当たり2.3頁と算出される。   Specifically, the calculation unit 25a first calculates the work efficiency representing the relationship between the work time and the creation amount using the creation amount and the work time notified from the person-in-charge terminal 10. For example, in the example shown in FIG. 7, the work efficiency on the XX day of the work for which the product is the design document 2 is 130 minutes (≈2.2 hours) of the work time of the work for creating the design document 2. Calculated by dividing the creation amount by 5 pages. In this example, the work efficiency is calculated as 2.3 pages per hour.

次に、算出部25aは、計画情報24aの作成量の総量を、算出した作業能率で除算することにより、成果物の完成までに要する残りの日数が算出される。これにより、完成日の予測値が求められる。例えば、図5に例示した計画情報24aおよび図7に示した例において、担当者Bが担当する設計書2の作成量の総量は18頁であることから、残りの13頁の作成に5.7時間を要することが算出される。これにより、完成日の予測値が算出される。   Next, the calculation unit 25a calculates the remaining number of days required for completion of the deliverable by dividing the total amount of the creation amount of the plan information 24a by the calculated work efficiency. Thereby, the predicted value of the completion date is obtained. For example, in the plan information 24a illustrated in FIG. 5 and the example shown in FIG. 7, the total amount of the design document 2 in charge of the person in charge B is 18 pages. It is calculated that it takes 7 hours. Thereby, the predicted value of the completion date is calculated.

なお、算出部25aは、作業が所定の時間以上中断されるごとに集計された作業時間を用いて、作業時間の分布を求めることができる。例えば、作業時間を2時間以上、1時間以上2時間未満、30分以上1時間未満、15分以上30分未満、および15分未満の5つの区分に分類し、各区分の回数(度数)を集計する。図7に示した例において、担当者Bによる設計書2を作成する作業のX月Y日における作業時間(60分、30分、20分、10分、10分)の分布は、2時間以上が0回、1時間以上2時間未満が1回、30分以上1時間未満が1回、15分以上30分未満が1回、15分未満が2回と集計される。   Note that the calculation unit 25a can obtain the work time distribution by using the work time that is counted every time the work is interrupted for a predetermined time or more. For example, the work time is classified into five categories of 2 hours or more, 1 hour or more and less than 2 hours, 30 minutes or more and less than 1 hour, 15 minutes or more and less than 30 minutes, and 15 minutes or less. Tally. In the example shown in FIG. 7, the distribution of the work time (60 minutes, 30 minutes, 20 minutes, 10 minutes, 10 minutes) on the X month Y day of the work for creating the design document 2 by the person in charge B is 2 hours or more. 0 times, 1 hour to less than 2 hours, 1 time from 30 minutes to less than 1 hour, 1 time from 15 minutes to less than 30 minutes, and 2 times less than 15 minutes.

また、算出部25aは、担当者が担当する成果物を作成する作業以外の作業についての作業時間を用いて、全作業における成果物を作成する作業の実施状況を分析することができる。例えば、図7に示した例において、担当者Bが担当する設計書2を作成する作業以外に、Mailを作成する作業と、仕様書2を作成する作業とが実施されている。ここで、設計書2を作成する作業の作業時間が合計130分、Mailを作成する作業の作業時間が合計40分、仕様書2を作成する作業の作業時間が合計40分である。この場合に、全作業における設計書2を作成する作業の実施状況として、例えば、全作業時間に対する設計書2を作成する作業の作業時間の比率を意味する実施率を算出する。図7に示す例において、実施率は62%(=130分/(130分+40分+40分))と算出される。   In addition, the calculation unit 25a can analyze the implementation status of the work for creating the deliverables in all work using the work time for the work other than the work for creating the deliverables handled by the person in charge. For example, in the example shown in FIG. 7, in addition to the work of creating the design document 2 in charge of the person in charge B, the work of creating the Mail and the work of creating the specification document 2 are performed. Here, the total work time for creating the design document 2 is 130 minutes, the total work time for creating Mail is 40 minutes, and the total work time for creating the specification sheet 2 is 40 minutes. In this case, as an implementation status of the work for creating the design document 2 in all work, for example, an implementation rate is calculated which means the ratio of the work time of the work to create the design document 2 to the total work time. In the example shown in FIG. 7, the implementation rate is calculated as 62% (= 130 minutes / (130 minutes + 40 minutes + 40 minutes)).

また、上記の例では、算出部25aは、日毎の作業状況を用いて作業能率、作業時間の分布、または作業の実施状況を算出しているが、週毎に作業状況を集計して、同様に週毎の作業能率、作業時間の分布、または作業の実施状況を算出してもよい。   In the above example, the calculation unit 25a calculates the work efficiency, work time distribution, or work execution status using the daily work status. In addition, the work efficiency, work time distribution, or work execution status for each week may be calculated.

通報部25bは、完成日の予測値が目標値より遅い場合に、計画情報24aの管理者に対する通報を出力する。通報部25bは、さらに、支援情報24bの対応する支援者に通報を出力する。   The reporting unit 25b outputs a report to the manager of the plan information 24a when the predicted value of the completion date is later than the target value. The reporting unit 25b further outputs a report to the supporter corresponding to the support information 24b.

具体的に、通報部25bは、計画情報24aを参照して完成日の目標の日付を抽出し、算出部25aが予測した完成日がそれより遅い場合に、その旨の通報を管理者が使用する管理者/スキル者端末30に対して出力する。これにより、計画情報24aの管理者が、担当者が担当する成果物を作成する作業が遅れていることを把握できる。   Specifically, the reporting unit 25b refers to the plan information 24a, extracts the target date of the completion date, and when the completion date predicted by the calculation unit 25a is later than that, the administrator uses the notification to that effect Output to the administrator / skilled person terminal 30. Thereby, the manager of the plan information 24a can grasp that the work for creating the deliverables that the person in charge is responsible for is delayed.

さらに、通報部25bは、支援情報24bを参照してこの担当者端末10に対応するスキル者を特定し、特定したスキル者が使用する管理者/スキル者端末30に対して、同様の通報を出力する。これにより、担当者の作業を支援可能なスキル者が、担当者の作業が遅れていることを把握して、適切に対応することができる。   Further, the reporting unit 25b refers to the support information 24b, identifies a skill person corresponding to the person-in-charge terminal 10, and makes a similar report to the manager / skilled person terminal 30 used by the identified skill person. Output. Thereby, the skill person who can support the work of the person in charge can grasp that the work of the person in charge is delayed and can appropriately respond.

また、通報部25bは、上記の通報に、算出部25aが算出した作業時間の分布を付加して出力してもよい。これにより、管理者やスキル者が担当者の作業時間の分布を把握して、より適切に対応することができる。   In addition, the reporting unit 25b may output the report by adding the work time distribution calculated by the calculation unit 25a. Thereby, an administrator or a skill person can grasp the distribution of the work time of the person in charge and can respond more appropriately.

また、通報部25bは、上記の通報に、算出部25aが分析した全作業における担当者が担当する成果物を作成する作業の実施状況を付加して出力してもよい。これにより、管理者やスキル者が担当者の作業の実施状況を把握して、より適切に対応することが可能となる。   In addition, the reporting unit 25b may output the above report by adding the implementation status of the work for creating the deliverables handled by the person in charge in all the work analyzed by the calculation unit 25a. Thereby, an administrator or a skill person can grasp the implementation status of the work of the person in charge and can respond more appropriately.

[支援処理]
次に、図8を参照して、本実施形態に係る支援システム1による支援処理について説明する。図8は、支援処理手順を示すシーケンス図である。図8のシーケンス図は、例えば、担当者端末10に処理の開始を指示する操作入力があったタイミングで開始される。
[Support processing]
Next, with reference to FIG. 8, the support process by the support system 1 according to the present embodiment will be described. FIG. 8 is a sequence diagram showing a support processing procedure. The sequence diagram of FIG. 8 is started, for example, at a timing when there is an operation input instructing the person-in-charge terminal 10 to start processing.

担当者端末10では、成果物を作成する作業が実施される(ステップS1)。その際、通知部15aが、この担当者端末10において実施された作業と作業時間と成果物の作成量とを集計し、管理サーバ20に送信する(ステップS2)。   In the person-in-charge terminal 10, an operation for creating a deliverable is performed (step S1). At that time, the notification unit 15a totals the work performed on the person-in-charge terminal 10, the work time, and the creation amount of the deliverable, and transmits it to the management server 20 (step S2).

管理サーバ20では、算出部25aが、通知された作業の作業時間と作成量とを用いて作業能率を算出する。また、算出部25aが、算出した作業能率と計画情報24aの成果物の作成量の総量とを用いて、成果物の完成日を予測する(ステップS3)。   In the management server 20, the calculation unit 25a calculates the work efficiency using the notified work time and creation amount of the work. Further, the calculation unit 25a predicts the completion date of the product using the calculated work efficiency and the total amount of the product creation amount of the plan information 24a (step S3).

また、通報部25bが、計画情報24aを参照して完成日の目標値を抽出し、予測された完成日が目標を超過する場合に、管理者/スキル者端末30に対する通報を出力する(ステップS4)。これにより、一連の支援処理が終了する。   Further, the reporting unit 25b extracts the target value of the completion date with reference to the plan information 24a, and outputs a report to the manager / skilled person terminal 30 when the predicted completion date exceeds the target (step) S4). Thereby, a series of support processing ends.

なお、通報部25bは、支援情報24bを参照し、担当者に対応するスキル者を特定して、このスキル者の管理者/スキル者端末30に対しても通報を出力する。また、通報部25bは、通報に算出部25aが算出した作業時間の分布を付加する。また、通報部25bは、通報に算出部25aが分析した全作業における担当者が担当する成果物を作成する作業の実施状況を付加する。   The reporting unit 25b refers to the support information 24b, specifies a skill person corresponding to the person in charge, and outputs a report to the manager / skilled person terminal 30 of the skill person. In addition, the reporting unit 25b adds the work time distribution calculated by the calculation unit 25a to the report. In addition, the reporting unit 25b adds to the report the implementation status of the work for creating the deliverables handled by the person in charge in all the work analyzed by the calculation unit 25a.

以上、説明したように、本実施形態の支援システム1において、担当者が作業を実施する担当者端末10では、通知部15aが、実施された作業と該作業の作業時間と該作業により作成された成果物の作成量とを管理サーバ20に通知する。管理サーバ20では、記憶部24が担当者端末10で作成される成果物の完成に要する作成量の総量と完成日の目標値とを含む計画情報24aを記憶する。また、算出部25aが、担当者端末10から通知された作成量と作業時間とを用いて作業能率を算出し、該作業能率と計画情報24aに含まれる作成量の総量とを用いて、完成日の予測値を算出する。また、通報部25bが、予測値が目標値より遅い場合に、計画情報24aの管理者に対する通報を出力する。   As described above, in the support system 1 according to the present embodiment, in the person-in-charge terminal 10 on which the person in charge performs work, the notification unit 15a is created by the work performed, the work time of the work, and the work. The management server 20 is notified of the creation amount of the finished product. In the management server 20, the storage unit 24 stores plan information 24 a including the total amount of creation required for completion of the product created by the person-in-charge terminal 10 and the target value for the completion date. Further, the calculation unit 25a calculates the work efficiency using the creation amount and work time notified from the person-in-charge terminal 10, and completes using the work efficiency and the total amount of creation amount included in the plan information 24a. Calculate the predicted value for the day. In addition, the reporting unit 25b outputs a report to the administrator of the plan information 24a when the predicted value is slower than the target value.

これにより、管理者が、担当者が担当する成果物を作成する作業が遅れていることを把握できる。このように、担当者に負担をかけることなく担当者の作業の進捗を迅速かつ的確に把握することができるので、管理者が適切に対応することができる。   As a result, the administrator can grasp that the work of creating the deliverable for which the person in charge is responsible is delayed. As described above, since the progress of the work of the person in charge can be grasped quickly and accurately without imposing a burden on the person in charge, the manager can appropriately respond.

また、通報部25bは、さらに、支援情報24bの担当者に対応する支援者に通報を出力する。これにより、担当者の作業を支援可能なスキル者が、担当者の作業が遅れていることを把握して、適切に対応することができる。   Further, the reporting unit 25b further outputs a report to a supporter corresponding to the person in charge of the support information 24b. Thereby, the skill person who can support the work of the person in charge can grasp that the work of the person in charge is delayed and can appropriately respond.

また、通報部25bは、上記の通報に、算出部25aが算出した作業時間の分布を付加して出力してもよい。これにより、管理者やスキル者が担当者の作業時間の分布を把握して、より適切に対応することができる。   In addition, the reporting unit 25b may output the report by adding the work time distribution calculated by the calculation unit 25a. Thereby, an administrator or a skill person can grasp the distribution of the work time of the person in charge and can respond more appropriately.

また、通報部25bは、上記の通報に、算出部25aが分析した全作業における担当者が担当する成果物を作成する作業の実施状況を付加して出力してもよい。これにより、管理者やスキル者が担当者の作業の実施状況を把握して、より適切に対応することが可能となる。   In addition, the reporting unit 25b may output the above report by adding the implementation status of the work for creating the deliverables handled by the person in charge in all the work analyzed by the calculation unit 25a. Thereby, an administrator or a skill person can grasp the implementation status of the work of the person in charge and can respond more appropriately.

[プログラム]
上記実施形態に係る支援システム1が実行する処理をコンピュータが実行可能な言語で記述したプログラムを作成することもできる。一実施形態として、支援システム1を構成する担当者端末10および管理サーバ20は、パッケージソフトウェアやオンラインソフトウェアとして上記の支援処理を実行する支援プログラムを所望のコンピュータにインストールさせることによって実装できる。例えば、上記の支援プログラムを情報処理装置に実行させることにより、情報処理装置を支援システム1の担当者端末10および管理サーバ20として機能させることができる。ここで言う情報処理装置には、デスクトップ型またはノート型のパーソナルコンピュータが含まれる。また、その他にも、情報処理装置にはスマートフォン、携帯電話機やPHS(Personal Handyphone System)などの移動体通信端末、さらには、PDA(Personal Digital Assistants)などのスレート端末などがその範疇に含まれる。また、管理サーバ20は、アウトソーシングによって上記の支援処理に関するサービスを提供するクラウドとして実装することとしてもかまわない。以下に、支援システム1の担当者端末10および管理サーバ20と同様の機能を実現する支援プログラムを実行するコンピュータの一例を説明する。
[program]
It is also possible to create a program in which the processing executed by the support system 1 according to the above embodiment is described in a language that can be executed by a computer. As one embodiment, the person-in-charge terminal 10 and the management server 20 configuring the support system 1 can be implemented by installing a support program for executing the above-described support processing as package software or online software on a desired computer. For example, the information processing apparatus can function as the person-in-charge terminal 10 and the management server 20 of the support system 1 by causing the information processing apparatus to execute the above support program. The information processing apparatus referred to here includes a desktop or notebook personal computer. In addition, the information processing apparatus includes mobile communication terminals such as smart phones, mobile phones and PHS (Personal Handyphone System), and slate terminals such as PDA (Personal Digital Assistants). In addition, the management server 20 may be implemented as a cloud that provides services related to the above-described support processing by outsourcing. Below, an example of the computer which performs the support program which implement | achieves the function similar to the person-in-charge terminal 10 and the management server 20 of the support system 1 is demonstrated.

図9に示すように、支援プログラムを実行するコンピュータ1000は、例えば、メモリ1010と、CPU1020と、ハードディスクドライブインタフェース1030と、ディスクドライブインタフェース1040と、シリアルポートインタフェース1050と、ビデオアダプタ1060と、ネットワークインタフェース1070とを有する。これらの各部は、バス1080によって接続される。   As shown in FIG. 9, a computer 1000 that executes a support program includes, for example, a memory 1010, a CPU 1020, a hard disk drive interface 1030, a disk drive interface 1040, a serial port interface 1050, a video adapter 1060, and a network interface. 1070. These units are connected by a bus 1080.

メモリ1010は、ROM(Read Only Memory)1011およびRAM1012を含む。ROM1011は、例えば、BIOS(Basic Input Output System)等のブートプログラムを記憶する。ハードディスクドライブインタフェース1030は、ハードディスクドライブ1031に接続される。ディスクドライブインタフェース1040は、ディスクドライブ1041に接続される。ディスクドライブ1041には、例えば、磁気ディスクや光ディスク等の着脱可能な記憶媒体が挿入される。シリアルポートインタフェース1050には、例えば、マウス1051およびキーボード1052が接続される。ビデオアダプタ1060には、例えば、ディスプレイ1061が接続される。   The memory 1010 includes a ROM (Read Only Memory) 1011 and a RAM 1012. The ROM 1011 stores a boot program such as BIOS (Basic Input Output System). The hard disk drive interface 1030 is connected to the hard disk drive 1031. The disk drive interface 1040 is connected to the disk drive 1041. For example, a removable storage medium such as a magnetic disk or an optical disk is inserted into the disk drive 1041. For example, a mouse 1051 and a keyboard 1052 are connected to the serial port interface 1050. For example, a display 1061 is connected to the video adapter 1060.

ここで、図9に示すように、ハードディスクドライブ1031は、例えば、OS1091、アプリケーションプログラム1092、プログラムモジュール1093およびプログラムデータ1094を記憶する。上記実施形態で説明した各テーブルは、例えばハードディスクドライブ1031やメモリ1010に記憶される。   Here, as shown in FIG. 9, the hard disk drive 1031 stores, for example, an OS 1091, an application program 1092, a program module 1093, and program data 1094. Each table described in the above embodiment is stored in the hard disk drive 1031 or the memory 1010, for example.

また、支援プログラムは、例えば、コンピュータ1000によって実行される指令が記述されたプログラムモジュール1093として、ハードディスクドライブ1031に記憶される。具体的には、上記実施形態で説明した支援システム1の担当者端末10および管理サーバ20が実行する各処理が記述されたプログラムモジュール1093が、ハードディスクドライブ1031に記憶される。   Further, the support program is stored in the hard disk drive 1031 as a program module 1093 in which a command to be executed by the computer 1000 is described, for example. Specifically, a program module 1093 describing each process executed by the person-in-charge terminal 10 and the management server 20 of the support system 1 described in the above embodiment is stored in the hard disk drive 1031.

また、支援プログラムによる情報処理に用いられるデータは、プログラムデータ1094として、例えば、ハードディスクドライブ1031に記憶される。そして、CPU1020が、ハードディスクドライブ1031に記憶されたプログラムモジュール1093やプログラムデータ1094を必要に応じてRAM1012に読み出して、上述した各手順を実行する。   Data used for information processing by the support program is stored as program data 1094 in, for example, the hard disk drive 1031. Then, the CPU 1020 reads the program module 1093 and the program data 1094 stored in the hard disk drive 1031 to the RAM 1012 as necessary, and executes the above-described procedures.

なお、支援プログラムに係るプログラムモジュール1093やプログラムデータ1094は、ハードディスクドライブ1031に記憶される場合に限られず、例えば、着脱可能な記憶媒体に記憶されて、ディスクドライブ1041等を介してCPU1020によって読み出されてもよい。あるいは、支援プログラムに係るプログラムモジュール1093やプログラムデータ1094は、LANやWAN(Wide Area Network)等のネットワークを介して接続された他のコンピュータに記憶され、ネットワークインタフェース1070を介してCPU1020によって読み出されてもよい。   Note that the program module 1093 and the program data 1094 related to the support program are not limited to being stored in the hard disk drive 1031, but are stored in, for example, a removable storage medium and read out by the CPU 1020 via the disk drive 1041 or the like. May be. Alternatively, the program module 1093 and the program data 1094 related to the support program are stored in another computer connected via a network such as a LAN or a WAN (Wide Area Network), and read by the CPU 1020 via the network interface 1070. May be.

以上、本発明者によってなされた発明を適用した実施形態について説明したが、本実施形態による本発明の開示の一部をなす記述および図面により本発明は限定されることはない。すなわち、本実施形態に基づいて当業者等によりなされる他の実施形態、実施例および運用技術等は全て本発明の範疇に含まれる。   As mentioned above, although embodiment which applied the invention made | formed by this inventor was described, this invention is not limited with the description and drawing which make a part of indication of this invention by this embodiment. That is, other embodiments, examples, operational techniques, and the like made by those skilled in the art based on this embodiment are all included in the scope of the present invention.

1 支援システム
10 担当者端末
11 入力部
12 出力部
13 通信制御部
14 記憶部
15 制御部
15a 通知部
20 管理サーバ
21 入力部
22 出力部
23 通信制御部
24 記憶部
24a 計画情報
24b 支援情報
24c 実績情報
25 制御部
25a 算出部
25b 通報部
DESCRIPTION OF SYMBOLS 1 Support system 10 Person in charge terminal 11 Input part 12 Output part 13 Communication control part 14 Storage part 15 Control part 15a Notification part 20 Management server 21 Input part 22 Output part 23 Communication control part 24 Storage part 24a Plan information 24b Support information 24c Results Information 25 Control unit 25a Calculation unit 25b Report unit

Claims (4)

担当者が作業を実施する端末と、サーバとを有する支援システムであって、
前記端末は、実施された作業と該作業の作業時間と該作業により作成された成果物の作成量とを前記サーバに通知する通知部を備え、
前記サーバは、前記端末で作成される成果物の完成に要する作成量の総量と完成日の目標値とを含む計画情報を記憶する記憶部と、
前記端末から通知された前記作成量と前記目標値の単位より細かい時間単位の前記作業時間とを用いて前記作業ごとの作業能率を算出し、各作業の作業能率と前記計画情報に含まれる各作業の作成量の総量とを用いて、完成日の予測値を算出するとともに、前記担当者が行う全作業に対する前記成果物を作成する作業の割合を実施状況として算出する算出部と、
前記予測値が前記目標値より遅い場合に、前記計画情報の管理者に対する通報に前記実施状況を付加して出力する通報部と、を備える、
ことを特徴とする支援システム。
A support system having a terminal and a server on which a person in charge performs work,
The terminal includes a notification unit that notifies the server of the work performed, the work time of the work, and the creation amount of the product created by the work,
The server stores a storage unit that stores plan information including a total amount of creation required for completion of a product created by the terminal and a target value for completion date;
Calculates a working efficiency of each of the work by using said working time of finer time unit than the unit of the target value and the created amount notified from the terminal, each included in the work efficiency and the planning information for each work A calculation unit that calculates a predicted value of a completion date using the total amount of creation of work, and calculates a ratio of work for creating the deliverable with respect to all work performed by the person in charge as an implementation status ;
When the predicted value is slower than the target value, a reporting unit that adds and outputs the implementation status to a report to the manager of the plan information, and
Support system characterized by that.
前記サーバの前記記憶部は、さらに、前記成果物と前記担当者と該担当者の作業を支援できる支援者とを対応付けした支援情報を記憶し、
前記通報部は、さらに、前記担当者に対応する支援者に対して前記通報を出力することを特徴とする請求項1に記載の支援システム。
The storage unit of the server further stores support information that associates the deliverable, the person in charge, and a supporter who can support the work of the person in charge,
The support system according to claim 1, wherein the reporting unit further outputs the report to a supporter corresponding to the person in charge.
前記端末の前記通知部は、前記作業が所定の時間以上中断されるごとに集計した作業時間を通知し、
前記サーバの前記算出部は、さらに、通知された作業時間の分布を求め、
前記通報部は、該分布を前記通報に付加して出力することを特徴とする請求項1または2に記載の支援システム。
The notification unit of the terminal notifies the work time that has been counted each time the work is interrupted for a predetermined time or more,
The calculation unit of the server further calculates a distribution of the notified work time,
The support system according to claim 1, wherein the notification unit outputs the distribution added to the notification.
担当者が作業を実施する端末と、サーバとを有する支援システムで実行される支援方法であって、
前記端末における、実施された作業と該作業の作業時間と該作業により作成された成果物の作成量とを前記サーバに通知する通知工程と、
前記サーバにおける、前記端末で作成される成果物の完成に要する作成量の総量と完成日の目標値とを含む計画情報を記憶する記憶部を参照し、前記端末から通知された前記作成量と前記目標値の単位より細かい時間単位の前記作業時間とを用いて前記作業ごとの作業能率を算出し、各作業の作業能率と前記計画情報に含まれる各作業の作成量の総量とを用いて、完成日の予測値を算出するとともに、前記担当者が行う全作業に対する前記成果物を作成する作業の割合を実施状況として算出する工程と、
前記予測値が前記目標値より遅い場合に、前記計画情報の管理者に対する通報に前記実施状況を付加して出力する通報工程と、
を含んだことを特徴とする支援方法。
A support method executed by a support system having a terminal on which a person in charge performs work and a server,
A notification step of notifying the server of the work performed, the work time of the work, and the creation amount of the product created by the work in the terminal;
In the server, referring to a storage unit that stores plan information including a total amount of creation amount required for completion of a product created at the terminal and a target value of completion date, the creation amount notified from the terminal The work efficiency for each work is calculated using the work time in units of time smaller than the unit of the target value, and the work efficiency of each work and the total amount of creation of each work included in the plan information are used. A step of calculating a predicted value of a completion date and calculating a ratio of work for creating the deliverable with respect to all work performed by the person in charge as an implementation status ;
When the predicted value is slower than the target value, a reporting step of adding and outputting the implementation status to a report to the manager of the plan information; and
The support method characterized by including.
JP2016118770A 2016-06-15 2016-06-15 Support system and support method Active JP6619298B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016118770A JP6619298B2 (en) 2016-06-15 2016-06-15 Support system and support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016118770A JP6619298B2 (en) 2016-06-15 2016-06-15 Support system and support method

Publications (2)

Publication Number Publication Date
JP2017224139A JP2017224139A (en) 2017-12-21
JP6619298B2 true JP6619298B2 (en) 2019-12-11

Family

ID=60686366

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016118770A Active JP6619298B2 (en) 2016-06-15 2016-06-15 Support system and support method

Country Status (1)

Country Link
JP (1) JP6619298B2 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07254024A (en) * 1994-03-15 1995-10-03 Hitachi Ltd Method/system for diagnostic work efficiency
JPH09101987A (en) * 1995-10-09 1997-04-15 Hitachi Ltd Project progress managing device
JP2007193581A (en) * 2006-01-19 2007-08-02 Hitachi Software Eng Co Ltd Operation time calculation system
JP2009276904A (en) * 2008-05-13 2009-11-26 Ricoh Co Ltd Project management device, project management method, project management program and recording medium
JP2012043103A (en) * 2010-08-17 2012-03-01 Nec System Technologies Ltd Work information collecting system for management, control method for work information collecting system for management and control program therefor
JP5796331B2 (en) * 2011-04-22 2015-10-21 富士ゼロックス株式会社 Information processing system
JP2013120579A (en) * 2011-12-09 2013-06-17 Hitachi Ltd Work result management method, work result management program and management server related to software development
JP5852546B2 (en) * 2012-10-17 2016-02-03 株式会社神戸製鋼所 Worker support system and worker support method

Also Published As

Publication number Publication date
JP2017224139A (en) 2017-12-21

Similar Documents

Publication Publication Date Title
Diethelm An efficient parallel algorithm for the numerical solution of fractional differential equations
Choudhury et al. A batch arrival retrial queue with general retrial times under Bernoulli vacation schedule for unreliable server and delaying repair
Lee et al. Permutation flowshop scheduling to minimize the total tardiness with learning effects
US20200374290A1 (en) Creation device, creation system, creation method, and creation program
US9207887B1 (en) Presentation of predicted steps in a print workflow
CN110532559B (en) Rule processing method and device
Schmidt et al. Schedule compliance operating curves and their application in designing the supply chain of a metal producer
CN114564294A (en) Intelligent service arranging method and device, computer equipment and storage medium
Ying Scheduling the two-machine flowshop to hedge against processing time uncertainty
CN117252564A (en) Resource scheduling method, device, computer equipment and storage medium
JP6881930B2 (en) Project accounting management device, project accounting management method, and project accounting management program
JP7310143B2 (en) Information processing device and program
JP6619298B2 (en) Support system and support method
CN111191999A (en) Product research and development management method and device, computer equipment and storage medium
JP7025298B2 (en) Environment construction support system and environment construction support method
EP3200083A1 (en) Resource scheduling method and related apparatus
CN113971074A (en) Transaction processing method and device, electronic equipment and computer readable storage medium
Ignizio Estimating the sustainable capacity of semiconductor fab workstations
CN108153595A (en) A kind of big data distributed task scheduling processing unit based on python
JP6473189B2 (en) Last order time identification device
JP2019016234A (en) Sales management device, sales management method, and sales management program
US9946749B2 (en) Rewriting inequality queries
WO2020225901A1 (en) Estimation device, estimation method, and estimation program
JP4192937B2 (en) Production management device
JP6536948B2 (en) Information processing apparatus and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190514

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190626

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191112

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191114

R150 Certificate of patent or registration of utility model

Ref document number: 6619298

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150