JP6588393B2 - Work machine - Google Patents

Work machine Download PDF

Info

Publication number
JP6588393B2
JP6588393B2 JP2016127048A JP2016127048A JP6588393B2 JP 6588393 B2 JP6588393 B2 JP 6588393B2 JP 2016127048 A JP2016127048 A JP 2016127048A JP 2016127048 A JP2016127048 A JP 2016127048A JP 6588393 B2 JP6588393 B2 JP 6588393B2
Authority
JP
Japan
Prior art keywords
hydraulic
command value
unit
speed
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016127048A
Other languages
Japanese (ja)
Other versions
JP2018003284A (en
Inventor
理優 成川
理優 成川
枝穂 泉
泉  枝穂
石川 広二
広二 石川
修一 廻谷
修一 廻谷
弘樹 武内
弘樹 武内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2016127048A priority Critical patent/JP6588393B2/en
Publication of JP2018003284A publication Critical patent/JP2018003284A/en
Application granted granted Critical
Publication of JP6588393B2 publication Critical patent/JP6588393B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

本発明は、例えば領域制限掘削制御を行うフロント制御部を備えた作業機械に関する。   The present invention relates to a work machine including a front control unit that performs, for example, area limited excavation control.

油圧ショベル等の作業機械では一般に複数の操作レバー装置を複合操作してフロント作業装置を動作させるが、所定領域内でフロント作業装置を動作させて掘削目標面を越えて掘削しないように巧みに操作レバー装置を操ることは不慣れな操作者には難度が高い。   Work machines such as hydraulic excavators generally operate multiple front levers by operating multiple control lever devices in a complex manner, but they can be operated skillfully so that they do not dig beyond the excavation target surface by operating the front work device within a specified area. It is difficult for an unfamiliar operator to operate the lever device.

近年、バケット位置等を基にフロント作業装置の動作を制限するフロント制御を実施する作業機械の活躍の場が広がりつつある。フロント制御が働くと、掘削目標面の下側を掘削しないようにフロント作業装置の動作が制限される。関連技術として、特許文献1には、操作レバー装置のパイロットラインに比例電磁弁を設け、フロント作業装置の速度が制限値を超えないように操作レバー装置から出力された油圧信号を比例電磁弁で減圧する技術が提唱されている。   2. Description of the Related Art In recent years, the field of work machines that perform front control that restricts the operation of a front work device based on the bucket position or the like is expanding. When the front control is activated, the operation of the front working device is restricted so as not to excavate the lower side of the excavation target surface. As a related technique, in Patent Document 1, a proportional solenoid valve is provided in the pilot line of the operating lever device, and the hydraulic signal output from the operating lever device is transmitted by the proportional solenoid valve so that the speed of the front working device does not exceed the limit value. A technique for reducing the pressure has been proposed.

特許第3091667号公報Japanese Patent No. 3091667

フロント制御用に設けられた比例電磁弁では、通常、フロント制御用の指令値である励磁電流を電磁駆動部に流して弁体であるスプールを駆動することでパイロットラインの流路開口面積を変化させてパイロット圧を制御する。しかし、フロント作業装置が掘削目標面から一定以上離れている場合はフロント制御が働かず、フロント制御用の比例電磁弁が制御されることがない。この場面でも、通常は比例電磁弁の電磁駆動部に励磁電流が流れている。   Proportional solenoid valves provided for front control usually change the pilot line flow path opening area by driving the spool, which is the valve body, by passing an excitation current, which is a command value for front control, through the electromagnetic drive unit. To control the pilot pressure. However, when the front work device is away from the excavation target surface by a certain distance or more, the front control does not work and the front control proportional solenoid valve is not controlled. Even in this scene, an exciting current normally flows through the electromagnetic drive unit of the proportional solenoid valve.

本発明の目的は、消費電力を抑制してエネルギー効率を向上させることができる作業機械を提供することにある。   The objective of this invention is providing the working machine which can suppress power consumption and can improve energy efficiency.

上記目的を達成するために、本発明は、車体、前記車体に設けたフロント作業装置、前記フロント作業装置を駆動する複数の油圧アクチュエータ、前記フロント作業装置の姿勢を検出する姿勢検出器、前記油圧アクチュエータを駆動する作動油を吐出する油圧ポンプ、前記油圧ポンプから対応する油圧アクチュエータに供給される作動油の流れを制御する複数のコントロールバルブ、対応する油圧アクチュエータの動作を指示する油圧信号を操作に応じて生成する操作レバー装置、前記操作レバー装置に作動油を供給するパイロットポンプ、前記操作レバー装置及び対応するコントロールバルブの油圧駆動部を接続する複数のパイロットライン、前記パイロットポンプ及びコントロールバルブの油圧駆動部を接続する複数のポンプライン、前記複数のパイロットラインのうち少なくとも1つに設けた減圧用の比例電磁弁、前記複数のポンプラインのうち少なくとも1つに設けた増圧用の比例電磁弁、並びに前記姿勢検出器の検出信号を基に前記比例電磁弁を制御して前記フロント作業装置の動作を制限する制限指令値を演算するフロント制御部を有するコントローラを備えた作業機械において、前記コントローラは、前記減圧用及び増圧用の比例電磁弁の電磁駆動部に対して開度調整域で印加する励磁電流の最小値よりも低く設定した励磁電流である省電力指令値を記憶した省電力指令値記憶部と、前記姿勢検出器の検出信号を基に前記フロント作業装置の特定点と掘削目標面との距離を演算する距離演算部と、前記特定点と掘削目標面との距離について予め定めた設定距離を記憶した設定距離記憶部と、前記特定点と掘削目標面との距離が前記設定距離よりも大きいか否かを判定する距離判定部と、前記操作レバー装置の油圧信号の圧力又は前記姿勢検出器の検出信号を基に前記油圧アクチュエータの動作速度を演算する速度演算部と、前記油圧アクチュエータの動作速度について予め定めた設定速度を記憶した設定速度記憶部と、前記速度演算部で演算された前記油圧アクチュエータの動作速度が前記設定速度よりも大きいか否かを判定する速度判定部と、前記距離判定部で前記特定点と掘削目標面との距離が前記設定距離より大きいと判定され、かつ前記速度判定部で前記油圧アクチュエータの動作速度が前記設定速度より小さいと判定された場合、前記省電力指令値記憶部から読み出した前記省電力指令値を前記比例電磁弁に対する指令値として決定する指令値決定部と、前記指令値決定部で決定した前記指令値を基に前記減圧用及び増圧用の比例電磁弁のうちの少なくとも1つに指令信号を出力する出力部とを備える。
To achieve the above object, the present invention provides a vehicle body, a front work device provided on the vehicle body, a plurality of hydraulic actuators that drive the front work device, a posture detector that detects a posture of the front work device, and the hydraulic pressure A hydraulic pump that discharges hydraulic fluid that drives the actuator, a plurality of control valves that control the flow of hydraulic fluid supplied from the hydraulic pump to the corresponding hydraulic actuator, and a hydraulic signal that instructs the operation of the corresponding hydraulic actuator And a pilot pump that supplies hydraulic fluid to the operation lever device, a plurality of pilot lines that connect the operation lever device and a hydraulic drive unit of the corresponding control valve, and hydraulic pressures of the pilot pump and the control valve Multiple pump lines connecting the drive unit, front Based on a proportional solenoid valve for pressure reduction provided in at least one of a plurality of pilot lines, a proportional solenoid valve for pressure increase provided in at least one of the plurality of pump lines, and a detection signal of the attitude detector In a work machine including a controller having a front control unit that calculates a restriction command value for controlling the operation of the front work device by controlling the proportional solenoid valve, the controller includes the pressure reducing and pressure increasing proportional solenoid valves. A power-saving command value storage unit that stores a power-saving command value that is an excitation current set lower than the minimum value of the excitation current applied to the electromagnetic drive unit in the opening adjustment range, and a detection signal of the attitude detector A distance calculation unit that calculates the distance between the specific point of the front work device and the excavation target surface, and stores a preset distance for the distance between the specific point and the excavation target surface And a setting distance storage unit, a large whether the distance determination unit than the distance the set distance between the specific point and drilling the target surface, the pressure or the position detector of the hydraulic signal of the operating lever device A speed calculation unit that calculates an operation speed of the hydraulic actuator based on a detection signal, a set speed storage unit that stores a preset set speed for the operation speed of the hydraulic actuator, and the hydraulic pressure calculated by the speed calculation unit A speed determination unit that determines whether or not an operation speed of the actuator is greater than the set speed; and the distance determination unit determines that the distance between the specific point and the excavation target surface is greater than the set distance , and the speed When the determination unit determines that the operating speed of the hydraulic actuator is lower than the set speed , the power saving command value read from the power saving command value storage unit is the ratio. Example: A command value is output to at least one of the pressure reducing and pressure increasing proportional solenoid valves based on the command value determining unit determined as a command value for the solenoid valve and the command value determined by the command value determining unit And an output unit.

本発明によれば、消費電力を抑制してエネルギー効率を向上させることができる。   According to the present invention, power consumption can be suppressed and energy efficiency can be improved.

本発明の一実施形態に係る作業機械である油圧ショベルの外観を表す斜視図である。1 is a perspective view illustrating an appearance of a hydraulic excavator that is a work machine according to an embodiment of the present invention. 図1に示した油圧ショベルに備えられた油圧駆動装置をコントローラユニットとともに示す図である。It is a figure which shows the hydraulic drive unit with which the hydraulic shovel shown in FIG. 1 was equipped with a controller unit. 図1に示した油圧ショベルに備えられたフロント制御用油圧ユニットの油圧回路図である。FIG. 2 is a hydraulic circuit diagram of a front control hydraulic unit provided in the hydraulic excavator shown in FIG. 1. 本発明の一実施形態に係る作業機械に備えられたコントローラユニットの機能ブロック図である。It is a functional block diagram of the controller unit with which the work machine concerning one embodiment of the present invention was equipped. 図4に示したコントローラユニットに備えられた指令値制御部の機能ブロック図である。It is a functional block diagram of the command value control part with which the controller unit shown in FIG. 4 was equipped. 図1に示した油圧ショベルに備えられた減圧用の比例電磁弁の指令信号と開度との関係を表す特性図である。It is a characteristic view showing the relationship between the command signal and opening degree of the proportional solenoid valve for pressure reduction provided in the hydraulic excavator shown in FIG. 図1に示した油圧ショベルに備えられた増圧用の比例電磁弁の指令信号と開度との関係を表す特性図である。It is a characteristic view showing the relationship between the command signal and opening degree of the proportional solenoid valve for pressure increase with which the hydraulic excavator shown in FIG. 1 was equipped. 図5に示した指令値制御部に備えられた距離演算部によるフロント作業装置の特定点と掘削目標面との距離の演算方法の説明図である。It is explanatory drawing of the calculation method of the distance of the specific point of a front work apparatus, and the excavation target surface by the distance calculating part with which the command value control part shown in FIG. 5 was equipped. 図5に示した指令値制御部による指令信号の決定手順を表すフローチャートである。It is a flowchart showing the determination procedure of the command signal by the command value control part shown in FIG.

以下に図面を用いて本発明の実施形態を説明する。   Embodiments of the present invention will be described below with reference to the drawings.

1.作業機械
図1は本発明の一実施形態に係る作業機械の外観を表す斜視図である。本実施形態ではフロント作業装置の先端のアタッチメントとしてバケットを装着した油圧ショベルを作業機械の例として説明する。但し、バケット以外のアタッチメントを備える油圧ショベルやブルドーザ等の他種の作業機械にも本発明は適用され得る。以降、運転席に着いた操作者から見て前側(図1中の左上側)、後側(同右下側)、左側(同左下側)、右側(同右上側)を油圧ショベルの前、後、左、右とし、それぞれ単に前側、後側、左側、右側と記載する。
1. Work Machine FIG. 1 is a perspective view showing an appearance of a work machine according to an embodiment of the present invention. In the present embodiment, a hydraulic excavator equipped with a bucket as an attachment at the tip of the front working device will be described as an example of a working machine. However, the present invention can also be applied to other types of work machines such as hydraulic excavators and bulldozers equipped with attachments other than buckets. Thereafter, the front side (upper left side in FIG. 1), rear side (lower right side), left side (lower left side), and right side (upper right side) viewed from the operator seated in the driver's seat are the front and rear of the excavator. , Left and right, respectively, simply referred to as front, back, left and right.

同図に示した油圧ショベルは、車体10及びフロント作業装置20を備えている。車体10は、下部走行体11及び上部旋回体12を備えている。   The hydraulic excavator shown in the figure includes a vehicle body 10 and a front working device 20. The vehicle body 10 includes a lower traveling body 11 and an upper swing body 12.

下部走行体11は、本実施形態では無限軌道履帯を有する左右のクローラ(走行駆動体)13を備えており、左右の走行モータ35により左右のクローラ13をそれぞれ駆動することで走行する。走行モータ35には例えば油圧モータが用いられる。   The lower traveling body 11 includes left and right crawlers (traveling driving bodies) 13 having endless track tracks in the present embodiment, and travels by driving the left and right crawlers 13 by left and right traveling motors 35, respectively. For example, a hydraulic motor is used as the travel motor 35.

上部旋回体12は、下部走行体11上に旋回装置(不図示)を介して旋回可能に設けた旋回体である。上部旋回体12の前部(本実施形態では前部左側)には、操作者が搭乗する運転室14が設けられている。上部旋回体12における運転室14の後側には、エンジンや油圧駆動装置等を収容した動力室15が、最後部には機体の前後方向のバランスを調整するカウンタウェイト16が搭載されている。上部旋回体12を下部走行体11に対して連結する旋回装置には旋回モータ34(図2)が含まれており、旋回モータ34によって下部走行体11に対して上部旋回体12が旋回駆動される。旋回モータ34には例えば油圧モータが用いられる。   The upper swing body 12 is a swing body provided on the lower traveling body 11 so as to be swingable via a swing device (not shown). A driver's cab 14 in which an operator is boarded is provided at the front of the upper swing body 12 (the front left side in the present embodiment). On the rear side of the cab 14 in the upper swing body 12, a power chamber 15 accommodating an engine, a hydraulic drive device and the like is mounted, and a counterweight 16 for adjusting the balance in the front-rear direction of the airframe is mounted at the rearmost portion. The turning device that connects the upper swing body 12 to the lower traveling body 11 includes a swing motor 34 (FIG. 2), and the upper swing body 12 is driven to swing relative to the lower traveling body 11 by the swing motor 34. The For example, a hydraulic motor is used as the swing motor 34.

フロント作業装置20は土砂の掘削等の作業を行うための装置であり、上部旋回体12の前部(本実施形態では運転室14の右側)に設けられている。このフロント作業装置20は、ブーム21、アーム22及びバケット23を備えた多関節型の作業装置である。ブーム21は、左右に延びるピン(不図示)によって上部旋回体12のフレームに連結され、またブームシリンダ31によっても上部旋回体12と連結されている。ブームシリンダ31の伸縮に伴って上部旋回体12に対してブーム21が上下に回動する構成である。アーム22は、左右に延びるピン(不図示)によってブーム21の先端に連結され、またアームシリンダ32によってもブーム21と連結されている。アームシリンダ32の伸縮に伴ってブーム21に対してアーム22が回動する構成である。バケット23は、水平左右に延びるピン(不図示)によってアーム22の先端に連結され、またバケットシリンダ33によってもアーム22と連結されている。バケットシリンダ33の伸縮に伴ってアーム22に対してバケット23が回動する構成である。ブームシリンダ31、アームシリンダ32及びバケットシリンダ33はフロント作業装置20を駆動する油圧シリンダである。   The front work device 20 is a device for performing work such as excavation of earth and sand, and is provided at the front portion of the upper swing body 12 (right side of the cab 14 in this embodiment). The front work device 20 is an articulated work device including a boom 21, an arm 22, and a bucket 23. The boom 21 is connected to the frame of the upper swing body 12 by pins (not shown) extending left and right, and is also connected to the upper swing body 12 by a boom cylinder 31. The boom 21 is configured to rotate up and down with respect to the upper swing body 12 as the boom cylinder 31 expands and contracts. The arm 22 is connected to the tip of the boom 21 by a pin (not shown) extending left and right, and is also connected to the boom 21 by an arm cylinder 32. The arm 22 rotates with respect to the boom 21 as the arm cylinder 32 expands and contracts. The bucket 23 is connected to the tip of the arm 22 by a pin (not shown) extending horizontally and horizontally, and is also connected to the arm 22 by a bucket cylinder 33. The bucket 23 rotates with respect to the arm 22 as the bucket cylinder 33 expands and contracts. The boom cylinder 31, the arm cylinder 32, and the bucket cylinder 33 are hydraulic cylinders that drive the front working device 20.

また、油圧ショベルには、位置や姿勢に関する情報を検出する検出器が適所に設けられている。例えば、ブーム21、アーム22及びバケット23の各回動支点にはそれぞれ角度検出器8a〜8cが設けられている。角度検出器8a〜8cは、フロント作業装置20の位置と姿勢に関する情報を検出する姿勢検出器として用いられ、それぞれブーム21、アーム22及びバケット23の回動角を検出する。その他、上部旋回体12には、傾斜検出器8d、測位装置9a,9b(図4)、無線機9c(図4)、油圧駆動装置30(図2)、コントローラユニット100(図4等)が備えられている。傾斜検出器8dは、上部旋回体12の前後方向及び左右方向の少なくとも一方の傾斜を検出する上部旋回体12の姿勢検出手段として用いられる。測位装置9a,9bには例えばRTK−GNSS(Real Time Kinematic - Global Navigation Satellite System)が用いられ、測位装置9a,9bによって車体10の位置情報が取得される。無線機9cは、基準局GNSS(不図示)からの補正情報を受信するものである。測位装置9a,9b及び無線機9cは上部旋回体12の位置や向きを検出する手段である。更には、運転室14内の操作パネル(不図示)や操作レバー装置51〜54(図2等)のいずれか1つのレバー部には、フロント制御部120の制御を入り切りするスイッチ7(図3参照)が設けられている。油圧駆動装置30やコントローラユニット100については次に説明する。   In addition, the hydraulic excavator is provided with a detector for detecting information related to the position and orientation in place. For example, angle detectors 8 a to 8 c are provided at the respective rotation fulcrums of the boom 21, the arm 22, and the bucket 23. The angle detectors 8a to 8c are used as posture detectors that detect information related to the position and posture of the front work device 20, and detect the rotation angles of the boom 21, the arm 22, and the bucket 23, respectively. In addition, the upper swing body 12 includes an inclination detector 8d, positioning devices 9a and 9b (FIG. 4), a radio device 9c (FIG. 4), a hydraulic drive device 30 (FIG. 2), and a controller unit 100 (FIG. 4 and the like). Is provided. The inclination detector 8d is used as a posture detection means for the upper swing body 12 that detects at least one tilt in the front-rear direction and the left-right direction of the upper swing body 12. For example, RTK-GNSS (Real Time Kinematic-Global Navigation Satellite System) is used for the positioning devices 9a and 9b, and the position information of the vehicle body 10 is acquired by the positioning devices 9a and 9b. The wireless device 9c receives correction information from a reference station GNSS (not shown). The positioning devices 9a and 9b and the wireless device 9c are means for detecting the position and orientation of the upper swing body 12. Further, a switch 7 (FIG. 3) for turning on / off the control of the front control unit 120 is provided in any one lever portion of the operation panel (not shown) in the cab 14 or the operation lever devices 51 to 54 (FIG. 2 and the like). Reference) is provided. The hydraulic drive device 30 and the controller unit 100 will be described next.

2.油圧駆動装置
図2は図1に示した油圧ショベルに備えられた油圧駆動装置をコントローラユニットとともに示す図である。説明済みのものについては、同図において既出図面と同符号を付して説明を省略する。
2. Hydraulic Drive Device FIG. 2 is a view showing a hydraulic drive device provided in the hydraulic excavator shown in FIG. 1 together with a controller unit. For those already described, the same reference numerals as those in the above-mentioned drawings are given in FIG.

油圧駆動装置30は、油圧ショベルの被駆動部材を駆動する装置であって動力室15に収容されている。被駆動部材には、フロント作業装置20(ブーム21、アーム22及びバケット23)並びに車体10(クローラ13及び上部旋回体12)が含まれる。この油圧駆動装置30は、油圧アクチュエータ31〜34、油圧ポンプ36、コントロールバルブ41〜44、パイロットポンプ37、操作レバー装置51〜54、フロント制御用油圧ユニット60等を含んでいる。   The hydraulic drive device 30 is a device that drives a driven member of a hydraulic excavator and is accommodated in the power chamber 15. The driven members include the front work device 20 (the boom 21, the arm 22, and the bucket 23) and the vehicle body 10 (the crawler 13 and the upper swing body 12). The hydraulic drive device 30 includes hydraulic actuators 31 to 34, a hydraulic pump 36, control valves 41 to 44, a pilot pump 37, operation lever devices 51 to 54, a front control hydraulic unit 60, and the like.

2−1.油圧アクチュエータ
油圧アクチュエータ31〜34は、ブームシリンダ31、アームシリンダ32、バケットシリンダ33及び旋回モータ34の総称である。走行モータ35は図2では図示省略してある。ブームシリンダ31、アームシリンダ32、バケットシリンダ33及び旋回モータ34のうち複数を挙げる場合に、「油圧アクチュエータ31〜34」、「油圧アクチュエータ31,32」等と総称で記載する場合がある。油圧アクチュエータ31〜35は、油圧ポンプ36から吐出される作動油により駆動される。
2-1. Hydraulic Actuators Hydraulic actuators 31 to 34 are generic names for the boom cylinder 31, the arm cylinder 32, the bucket cylinder 33, and the swing motor 34. The travel motor 35 is not shown in FIG. When there are a plurality of boom cylinders 31, arm cylinders 32, bucket cylinders 33, and swing motors 34, they may be collectively referred to as “hydraulic actuators 31 to 34”, “hydraulic actuators 31, 32”, and the like. The hydraulic actuators 31 to 35 are driven by hydraulic oil discharged from the hydraulic pump 36.

2−2.油圧ポンプ
油圧ポンプ36は油圧アクチュエータ31〜34等を駆動する作動油を吐出する可変容量型ポンプであり、原動機17により駆動される。本実施形態における原動機17は内燃機関等の燃焼エネルギーを動力に変換するエンジンである。図2では油圧ポンプ36を1個のみ図示しているが、複数個設けられる場合もある。油圧ポンプ36から吐出された作動油は吐出配管36aを流れ、コントロールバルブ41〜44を経由してそれぞれ油圧アクチュエータ31〜34に供給される。油圧アクチュエータ31〜34からの各戻り油は、それぞれコントロールバルブ41〜44を介して戻り油配管36bに流れ込んでタンク38に戻される。吐出配管36aには、吐出配管36aの最高圧力を規制するリリーフ弁(不図示)が設けられている。図2では図示していないが走行モータ35も同様の回路構成で駆動される。下部走行体11の前後の少なくとも一方に排土板を設けた場合、ブレーカ等のアクチュエータを持つアタッチメントをバケット23に代えてフロント作業装置20に装着した場合には、排土板やアタッチメントの油圧アクチュエータも同様の回路構成で駆動される。
2-2. Hydraulic Pump The hydraulic pump 36 is a variable displacement pump that discharges hydraulic oil that drives the hydraulic actuators 31 to 34 and the like, and is driven by the prime mover 17. The prime mover 17 in this embodiment is an engine that converts combustion energy into power, such as an internal combustion engine. Although only one hydraulic pump 36 is illustrated in FIG. 2, a plurality of hydraulic pumps 36 may be provided. The hydraulic oil discharged from the hydraulic pump 36 flows through the discharge pipe 36a and is supplied to the hydraulic actuators 31 to 34 via the control valves 41 to 44, respectively. Each return oil from the hydraulic actuators 31 to 34 flows into the return oil pipe 36b via the control valves 41 to 44, and is returned to the tank 38. The discharge pipe 36a is provided with a relief valve (not shown) that regulates the maximum pressure of the discharge pipe 36a. Although not shown in FIG. 2, the traveling motor 35 is also driven with a similar circuit configuration. When a soil removal plate is provided on at least one of the front and rear of the lower traveling body 11, when an attachment having an actuator such as a breaker is attached to the front working device 20 instead of the bucket 23, a hydraulic actuator for the soil removal plate or the attachment Are driven with the same circuit configuration.

2−3.コントロールバルブ
コントロールバルブ41〜44のうち、コントロールバルブ41はブームシリンダ用、コントロールバルブ42はアームシリンダ用、コントロールバルブ43はバケットシリンダ用、コントロールバルブ44は旋回モータ用である。走行モータ用のコントロールバルブは図示省略してある。コントロールバルブ41〜44は油圧ポンプ36から対応する油圧アクチュエータに供給される作動油の流れ(方向及び流量)を制御する油圧駆動式の流量制御弁であり、それぞれ油圧信号が入力される油圧駆動部45,46を備えている。コントロールバルブ41〜44は油圧駆動部45又は46に油圧信号が入力されると図中で左行又は右行し、油圧信号の入力が停止されるとバネの力で中立位置に復帰する構成である。例えばブームシリンダ用のコントロールバルブ41の油圧駆動部45に油圧信号が入力されると、図2においてコントロールバルブ41のスプールが油圧信号の大きさに応じた距離だけ右行する。これにより、油圧信号に応じた流量でブームシリンダ31のボトム側油室に油圧ポンプ36からの作動油が供給され、油圧信号の大きさに応じた速度でブームシリンダ31が伸長しブーム21が上がる。
2-3. Among the control valves 41 to 44, the control valve 41 is for the boom cylinder, the control valve 42 is for the arm cylinder, the control valve 43 is for the bucket cylinder, and the control valve 44 is for the swing motor. A control valve for the travel motor is not shown. The control valves 41 to 44 are hydraulically driven flow rate control valves for controlling the flow (direction and flow rate) of hydraulic oil supplied from the hydraulic pump 36 to the corresponding hydraulic actuators, and hydraulic drive units to which hydraulic signals are respectively input. 45 and 46 are provided. The control valves 41 to 44 are configured to move left or right in the drawing when a hydraulic signal is input to the hydraulic drive unit 45 or 46, and return to the neutral position by the force of the spring when the input of the hydraulic signal is stopped. is there. For example, when a hydraulic signal is input to the hydraulic drive unit 45 of the boom cylinder control valve 41, the spool of the control valve 41 moves rightward by a distance corresponding to the magnitude of the hydraulic signal in FIG. As a result, hydraulic oil from the hydraulic pump 36 is supplied to the bottom side oil chamber of the boom cylinder 31 at a flow rate corresponding to the hydraulic signal, and the boom cylinder 31 extends and the boom 21 is raised at a speed corresponding to the magnitude of the hydraulic signal. .

2−4.パイロットポンプ
パイロットポンプ37はコントロールバルブ41〜44等の制御弁を駆動する作動油を吐出する固定容量型ポンプであり、油圧ポンプ36と同じく原動機17により駆動される。このパイロットポンプ37の吐出配管であるポンプライン37aはロック弁39を通った後、複数に分岐して操作レバー装置51〜54及びフロント制御用油圧ユニット60の各弁に接続している。このポンプライン37aを介してパイロットポンプ37から吐出された作動油が操作レバー装置51〜54に供給される。分岐した複数のポンプライン37aは、特定のコントロールバルブ(本実施形態ではコントロールバルブ41,43)の油圧駆動部に接続している。
2-4. Pilot Pump The pilot pump 37 is a fixed displacement pump that discharges hydraulic oil that drives control valves such as the control valves 41 to 44, and is driven by the prime mover 17 like the hydraulic pump 36. The pump line 37a, which is a discharge pipe of the pilot pump 37, passes through the lock valve 39, and then branches into a plurality of branches connected to the valves of the operating lever devices 51 to 54 and the front control hydraulic unit 60. The hydraulic oil discharged from the pilot pump 37 through the pump line 37a is supplied to the operation lever devices 51 to 54. The branched pump lines 37a are connected to the hydraulic drive unit of a specific control valve (control valves 41 and 43 in this embodiment).

なお、ロック弁39は本例では電磁切換弁であり、その電磁駆動部は運転室14(図1)に配置されたゲートロックレバー(不図示)の位置検出器と電気的に接続している。ゲートロックレバーは寝かせた閉鎖姿勢で操作者の降車を妨げるように運転席の乗降側に設置されたバーであり、降車するにはゲートロックレバーを引き上げて運転席に対する乗降部を開放しなければならないようになっている。ゲートロックレバーのポジションとして、寝かせた姿勢を操作系の「ロック解除位置」、引き上げた姿勢を操作系の「ロック位置」と記載する。ゲートロックレバーのポジションは位置検出器で検出され、位置検出器からロック弁39に対してゲートロックレバーのポジションに応じた信号が入力される。ゲートロックレバーがロック位置にあればロック弁39が閉じてポンプライン37aが遮断され、ロック解除位置にあればロック弁39が開いてポンプライン37aが開通する。ポンプライン37aが遮断された状態では、操作レバー装置51〜54の元圧が断たれるので、操作の有無に関わらずコントロールバルブ41〜44には油圧信号が入力されなくなる。つまり操作レバー装置51〜54による操作が無効化され、旋回や掘削等の動作が禁止される。   The lock valve 39 is an electromagnetic switching valve in this example, and its electromagnetic drive unit is electrically connected to a position detector of a gate lock lever (not shown) disposed in the cab 14 (FIG. 1). . The gate lock lever is a bar installed on the driver's boarding side of the driver's seat so as to prevent the operator from getting off in the closed position, and to get off, the gate lock lever must be pulled up to open the driver's seat It is supposed not to be. As the position of the gate lock lever, the laid position is described as the “lock release position” of the operation system, and the raised position is described as the “lock position” of the operation system. The position of the gate lock lever is detected by a position detector, and a signal corresponding to the position of the gate lock lever is input to the lock valve 39 from the position detector. If the gate lock lever is in the locked position, the lock valve 39 is closed and the pump line 37a is shut off, and if it is in the unlocked position, the lock valve 39 is opened and the pump line 37a is opened. In the state where the pump line 37a is cut off, the original pressure of the operating lever devices 51 to 54 is cut off, so that no hydraulic signal is input to the control valves 41 to 44 regardless of whether or not there is an operation. That is, the operation by the operation lever devices 51 to 54 is invalidated, and operations such as turning and excavation are prohibited.

2−5.操作レバー装置
操作レバー装置51〜54は、それぞれ対応する油圧アクチュエータ31〜34の動作を指示する油圧信号を操作に応じて生成し出力するレバー操作式の操作装置であり、運転室14(図1)に備えられている。操作レバー装置51〜54のうち、操作レバー装置51はブーム操作用、操作レバー装置52はアーム操作用、操作レバー装置53はバケット操作用、操作レバー装置54は旋回操作用である。油圧ショベルの場合、一般に操作レバー装置51〜54は十字操作式のレバー装置であり、前後方向への傾倒操作で1つの油圧アクチュエータの動作を、左右方向への傾倒操作で別の油圧アクチュエータの動作を指示できる構成となっている。従って、4つの操作レバー装置51〜54は2つずつ2つのグループに区分され、各グループで1本のレバー部を共用する。従って、操作レバー装置51〜54のレバー部は右手操作用と左手操作用の合計2本であり、前述したスイッチ7をレバー部に設ける場合、2本のレバー部のうちの少なくとも一方に設けることになる。走行用の操作レバー装置は図示省略してある。
2-5. Operation Lever Device The operation lever devices 51 to 54 are lever operation type operation devices that generate and output hydraulic signals instructing the operations of the corresponding hydraulic actuators 31 to 34 according to the operations. ). Among the operation lever devices 51 to 54, the operation lever device 51 is for boom operation, the operation lever device 52 is for arm operation, the operation lever device 53 is for bucket operation, and the operation lever device 54 is for turning operation. In the case of a hydraulic excavator, the operation lever devices 51 to 54 are generally cross-operated lever devices, and one hydraulic actuator is operated by a tilting operation in the front-rear direction, and another hydraulic actuator is operated by a tilting operation in the left-right direction. Can be instructed. Accordingly, the four operation lever devices 51 to 54 are divided into two groups each including two, and each group shares one lever portion. Accordingly, the lever portions of the operating lever devices 51 to 54 are two in total for right-hand operation and left-hand operation, and when the switch 7 described above is provided in the lever portion, it is provided in at least one of the two lever portions. become. The operating lever device for traveling is not shown.

ブーム操作用の操作レバー装置51は、ブーム上げ指令用の信号出力弁51a及びブーム下げ指令用の信号出力弁51bを備えている。信号出力弁51a,51bの入力ポート(一次側ポート)にはポンプライン37aが接続している。ブーム上げ指令用の信号出力弁51aの出力ポート(二次側ポート)はパイロットライン51a1,51a2を介してブームシリンダ用のコントロールバルブ41の油圧駆動部45に接続している。ブーム下げ指令用の信号出力弁51bの出力ポートはパイロットライン51b1を介してコントロールバルブ41の油圧駆動部46に接続している。例えば操作レバー装置51をブーム上げ指令側に倒すと信号出力弁51aが操作量に応じた開度で開く。これによりポンプライン37aから入力されたパイロットポンプ37の吐出する作動油が、信号出力弁51aで操作量に応じて減圧されてコントロールバルブ41の油圧駆動部45に対する油圧信号として出力される。なお、パイロットライン51a1,51b1にはそれぞれ圧力検出器6a,6bが設けられており、信号出力弁51a,51bが出力する圧力信号の大きさ(圧力値)が圧力検出器6a,6bで検出されるようになっている。   The boom operating lever device 51 includes a boom raising command signal output valve 51a and a boom lowering command signal output valve 51b. A pump line 37a is connected to the input ports (primary ports) of the signal output valves 51a and 51b. The output port (secondary port) of the boom output command signal output valve 51a is connected to the hydraulic drive unit 45 of the boom cylinder control valve 41 via pilot lines 51a1 and 51a2. The output port of the boom lowering command signal output valve 51b is connected to the hydraulic drive unit 46 of the control valve 41 via the pilot line 51b1. For example, when the operation lever device 51 is tilted to the boom raising command side, the signal output valve 51a opens at an opening corresponding to the operation amount. As a result, the hydraulic oil discharged from the pilot pump 37 input from the pump line 37a is decompressed according to the operation amount by the signal output valve 51a and is output as a hydraulic signal to the hydraulic drive unit 45 of the control valve 41. The pilot lines 51a1 and 51b1 are provided with pressure detectors 6a and 6b, respectively. The magnitudes (pressure values) of the pressure signals output from the signal output valves 51a and 51b are detected by the pressure detectors 6a and 6b. It has become so.

同様に、アーム操作用の操作レバー装置52は、アームクラウド指令用の信号出力弁52a及びアームダンプ指令用の信号出力弁52bを備えている。バケット操作用の操作レバー装置53は、バケットクラウド指令用の信号出力弁53a及びバケットダンプ指令用の信号出力弁53bを備えている。旋回操作用の操作レバー装置54は、右旋回指令用の信号出力弁54a及び左旋回指令用の信号出力弁54bを備えている。信号出力弁52a,52b,53a,53b,54a,54bの入力ポートは、ポンプライン37aに接続している。アーム操作用の操作レバー装置52の信号出力弁52a,52bの出力ポートは、それぞれパイロットライン52a1,52b1を介してアームシリンダ用のコントロールバルブ42の油圧駆動部45,46に接続している。バケットクラウド指令用の信号出力弁53aの出力ポートは、パイロットライン53a1,53a2を介してバケットシリンダ用のコントロールバルブ43の油圧駆動部45に接続している。バケットダンプ指令用の信号出力弁53bの出力ポートは、パイロットライン53b1,53b2を介してコントロールバルブ43の油圧駆動部46に接続している。旋回操作用の操作レバー装置54の信号出力弁54a,54bの出力ポートは、それぞれパイロットライン54a1,54b1を介して旋回モータ用のコントロールバルブ44の油圧駆動部45,46に接続している。操作レバー装置52〜54の油圧信号の出力原理はブーム操作用の操作レバー装置51と同様である。   Similarly, the arm operating lever device 52 includes an arm cloud command signal output valve 52a and an arm dump command signal output valve 52b. The bucket operation lever device 53 includes a bucket cloud command signal output valve 53a and a bucket dump command signal output valve 53b. The operation lever device 54 for turning operation includes a signal output valve 54a for a right turn command and a signal output valve 54b for a left turn command. The input ports of the signal output valves 52a, 52b, 53a, 53b, 54a, 54b are connected to the pump line 37a. The output ports of the signal output valves 52a and 52b of the arm operating lever device 52 are connected to the hydraulic drive units 45 and 46 of the arm cylinder control valve 42 via pilot lines 52a1 and 52b1, respectively. The output port of the bucket cloud command signal output valve 53a is connected to the hydraulic drive unit 45 of the bucket cylinder control valve 43 through pilot lines 53a1 and 53a2. The output port of the bucket dump command signal output valve 53b is connected to the hydraulic drive unit 46 of the control valve 43 via the pilot lines 53b1 and 53b2. The output ports of the signal output valves 54a and 54b of the operation lever device 54 for turning operation are connected to the hydraulic drive portions 45 and 46 of the control valve 44 for the turning motor via pilot lines 54a1 and 54b1, respectively. The hydraulic signal output principle of the operation lever devices 52 to 54 is the same as that of the operation lever device 51 for boom operation.

なお、本実施形態においては、パイロットライン51a2,51b1,52a1,52b1,53a2,53b2,54a1,54b1の途中にシャトルブロック47が設けられている。操作レバー装置51〜54から出力された油圧信号が、このシャトルブロック47を介して油圧ポンプ36のレギュレータ48にも入力されるようになっている。シャトルブロック47の詳細構成は省略するが、油圧信号がシャトルブロック47を介してレギュレータ48に入力されることにより、油圧ポンプ36の吐出流量が油圧信号に応じて制御されるようになっている。   In the present embodiment, the shuttle block 47 is provided in the middle of the pilot lines 51a2, 51b1, 52a1, 52b1, 53a2, 53b2, 54a1, and 54b1. The hydraulic signal output from the operation lever devices 51 to 54 is also input to the regulator 48 of the hydraulic pump 36 via the shuttle block 47. Although a detailed configuration of the shuttle block 47 is omitted, the discharge flow rate of the hydraulic pump 36 is controlled in accordance with the hydraulic pressure signal by inputting the hydraulic pressure signal to the regulator 48 via the shuttle block 47.

2−6.フロント制御用油圧ユニット
フロント制御用油圧ユニット60は、操作レバー装置51〜53から出力される油圧信号を状況に応じて増減圧し、フロント作業装置20が掘削目標面を越えて掘削等しないようにするためのハードウェアである。フロント制御用油圧ユニット60はコントローラユニット100からの信号で駆動される。
2-6. Front Control Hydraulic Unit The front control hydraulic unit 60 increases or decreases the hydraulic pressure signal output from the operation lever devices 51 to 53 according to the situation so that the front work device 20 does not excavate beyond the excavation target surface. Hardware. The front control hydraulic unit 60 is driven by a signal from the controller unit 100.

図3はフロント制御用油圧ユニットの油圧回路図である。同図において他図面と同符号を付した要素は、他図面で図示された要素と同様の要素である。フロント制御用油圧ユニット60は、減圧用の比例電磁弁61b,62a,62b,63a,63b、増圧用の比例電磁弁71a,73a,73b、遮断弁70及びシャトル弁91〜93を備えている。   FIG. 3 is a hydraulic circuit diagram of the front control hydraulic unit. In the figure, the elements denoted by the same reference numerals as those in the other drawings are the same as the elements illustrated in the other drawings. The front control hydraulic unit 60 includes pressure reducing proportional solenoid valves 61b, 62a, 62b, 63a, 63b, pressure increasing proportional solenoid valves 71a, 73a, 73b, a shutoff valve 70, and shuttle valves 91-93.

・シャトル弁
シャトル弁91〜93は高圧選択弁であり、それぞれ2つの入口ポートと1つの出口ポートとを備えている。シャトル弁91の一方の入口ポートはパイロットライン51a1を介してブーム上げ指令用の信号出力弁51aに、他方の入口ポートは信号出力弁を介さずポンプライン37aを介してパイロットポンプ37に接続している。シャトル弁91の出口ポートは、パイロットライン51a2を介してブームシリンダ用のコントロールバルブ41の油圧駆動部45(ブーム上げ側)に接続している。シャトル弁92の一方の入口ポートはパイロットライン53a1を介してバケットクラウド指令用の信号出力弁53aに、他方の入口ポートは信号出力弁を介さずポンプライン37aを介してパイロットポンプ37に接続している。シャトル弁92の出口ポートは、パイロットライン53a2を介してバケットシリンダ用のコントロールバルブ43の油圧駆動部45(バケットクラウド側)に接続している。シャトル弁93の一方の入口ポートはパイロットライン53b1を介してバケットダンプ指令用の信号出力弁53bに、他方の入口ポートは信号出力弁を介さずポンプライン37aを介してパイロットポンプ37に接続している。シャトル弁93の出口ポートは、パイロットライン53b2を介してバケットシリンダ用のコントロールバルブ43の油圧駆動部46(バケットダンプ側)に接続している。
Shuttle valve The shuttle valves 91 to 93 are high pressure selection valves, each having two inlet ports and one outlet port. One inlet port of the shuttle valve 91 is connected to the boom raising command signal output valve 51a via the pilot line 51a1, and the other inlet port is connected to the pilot pump 37 via the pump line 37a without passing through the signal output valve. Yes. The outlet port of the shuttle valve 91 is connected to the hydraulic drive unit 45 (boom raising side) of the boom cylinder control valve 41 via the pilot line 51a2. One inlet port of the shuttle valve 92 is connected to the signal output valve 53a for bucket cloud command via the pilot line 53a1, and the other inlet port is connected to the pilot pump 37 via the pump line 37a without passing through the signal output valve. Yes. The outlet port of the shuttle valve 92 is connected to the hydraulic drive unit 45 (bucket cloud side) of the bucket cylinder control valve 43 via the pilot line 53a2. One inlet port of the shuttle valve 93 is connected to the bucket dump command signal output valve 53b via the pilot line 53b1, and the other inlet port is connected to the pilot pump 37 via the pump line 37a without passing through the signal output valve. Yes. The outlet port of the shuttle valve 93 is connected to the hydraulic drive unit 46 (bucket dump side) of the control valve 43 for the bucket cylinder via the pilot line 53b2.

・減圧用比例電磁弁
比例電磁弁61b,62a,62b,63a,63bはノーマルオープンタイプの比例弁であり、消磁されると最大開度となり、コントローラユニット100からの信号により励磁されると信号の大きさに比例して開度を低下させる(閉じてゆく)。これらはいずれも対応する信号出力弁のパイロットラインに設けられており、掘削目標面よりも下側を掘削することを抑制するために、対応する信号出力弁から出力された油圧信号の最大値をコントローラユニット100からの信号に従って制限する役割を果たす。なお、本願明細書において比例電磁弁の「消磁」とは、比例電磁弁をノーマル状態(ノーマルオープンタイプなら最大開度、ノーマルクローズタイプなら最小開度)にする値まで励磁電流の大きさを小さくすることをいい、励磁電流の出力を停止する場合も含む。
-Proportional solenoid valve for pressure reduction The proportional solenoid valves 61b, 62a, 62b, 63a, 63b are normally open type proportional valves. When the magnet is demagnetized, the maximum opening degree is obtained, and when excited by a signal from the controller unit 100, the signal Decrease the opening in proportion to the size (close). These are all provided in the pilot line of the corresponding signal output valve, and in order to suppress excavation below the target excavation surface, the maximum value of the hydraulic signal output from the corresponding signal output valve is set. It plays the role of limiting according to the signal from the controller unit 100. In this specification, “demagnetization” of the proportional solenoid valve means that the magnitude of the excitation current is reduced to a value that brings the proportional solenoid valve into a normal state (maximum opening for the normal open type, minimum opening for the normal closed type). This also includes stopping the output of excitation current.

具体的には、比例電磁弁61bは、ブーム下げ指令用の信号出力弁51bのパイロットライン51b1上に設けられていて、コントローラユニット100の信号S61bに従ってブーム下げ指令用の油圧信号の最大値を制限する。比例電磁弁62aはアームクラウド指令用の信号出力弁52aのパイロットライン52a1上に設けられていて、コントローラユニット100の信号S62aに従ってアームクラウド指令用の油圧信号の最大値を制限する。比例電磁弁62bはアームダンプ指令用の信号出力弁52bのパイロットライン52b1上に設けられていて、コントローラユニット100の信号S62bに従ってアームダンプ指令用の油圧信号の最大値を制限する。比例電磁弁63aはバケットクラウド指令用の信号出力弁53aのパイロットライン53a1上に設けられていて、コントローラユニット100の信号S63aに従ってバケットクラウド指令用の油圧信号の最大値を制限する。比例電磁弁63bはバケットダンプ指令用の信号出力弁53bのパイロットライン53b1上に設けられていて、コントローラユニット100の信号S63bに従ってバケットダンプ指令用の油圧信号の最大値を制限する。   Specifically, the proportional solenoid valve 61b is provided on the pilot line 51b1 of the boom lowering command signal output valve 51b, and limits the maximum value of the boom lowering command hydraulic signal according to the signal S61b of the controller unit 100. To do. The proportional solenoid valve 62a is provided on the pilot line 52a1 of the arm cloud command signal output valve 52a, and limits the maximum value of the arm cloud command hydraulic signal according to the signal S62a of the controller unit 100. The proportional solenoid valve 62b is provided on the pilot line 52b1 of the arm dump command signal output valve 52b, and limits the maximum value of the arm dump command hydraulic signal according to the signal S62b of the controller unit 100. The proportional solenoid valve 63a is provided on the pilot line 53a1 of the bucket cloud command signal output valve 53a, and limits the maximum value of the bucket cloud command hydraulic signal in accordance with the signal S63a of the controller unit 100. The proportional solenoid valve 63b is provided on the pilot line 53b1 of the bucket dump command signal output valve 53b, and limits the maximum value of the hydraulic signal for the bucket dump command in accordance with the signal S63b of the controller unit 100.

・増圧用比例電磁弁
比例電磁弁71a,73a,73bはノーマルクローズタイプの比例弁であり、消磁されると最小開度(ゼロ開度)となり、コントローラユニット100からの信号により励磁されると信号の大きさに比例して開度を上昇させる(開いてゆく)。これらはいずれもシャトル弁に繋がるポンプライン37aに設けられており、操作レバー装置をバイパスして操作レバー装置の操作に依存しない油圧信号をコントローラユニット100の信号に従って出力する役割を果たす。比例電磁弁71a,73a,73bからシャトル弁91〜93の他方側の入口ポートに入力される油圧信号は、シャトル弁91〜93の一方側の入口ポートに入力される操作レバー装置51,53からの油圧信号に干渉する。操作レバー装置51,53から出力される油圧信号よりも高圧の油圧信号を出力し得る点で、本願明細書では比例電磁弁71a,73a,73bを増圧用の比例電磁弁と称する。
-Proportional solenoid valve for pressure increase Proportional solenoid valves 71a, 73a, 73b are normally closed type proportional valves. When demagnetized, they have a minimum opening (zero opening), and when excited by a signal from the controller unit 100, Increase the opening in proportion to the size of (open). These are all provided in the pump line 37a connected to the shuttle valve, and play a role of bypassing the operation lever device and outputting a hydraulic signal not depending on the operation of the operation lever device according to the signal of the controller unit 100. Hydraulic signals input from the proportional solenoid valves 71a, 73a, 73b to the other inlet ports of the shuttle valves 91-93 are transmitted from the operation lever devices 51, 53 input to the one inlet port of the shuttle valves 91-93. Interferes with the hydraulic signal. In the present specification, the proportional solenoid valves 71a, 73a, and 73b are referred to as pressure-increasing proportional solenoid valves in that a hydraulic pressure signal that is higher than the hydraulic pressure signal output from the operation lever devices 51 and 53 can be output.

具体的には、比例電磁弁71aはシャトル弁91に繋がるポンプライン37a上に設けられていて、コントローラユニット100の信号S71aに従ってブーム自動上げ動作用の油圧信号を出力する。通常、増圧用の比例電磁弁71aに開指令信号が出力される場合には減圧用の比例電磁弁61bに閉指令信号が出力されるので、比例電磁弁71aが開くときには比例電磁弁61bが閉じるようになっている。この場合、仮にブーム下げ操作が行われていても、コントロールバルブ41に対して油圧駆動部45にのみ油圧信号が入力され、強制的にブーム上げ動作が行われる。この比例電磁弁71aは、掘削目標面より下側を掘削している際等に機能する。   Specifically, the proportional solenoid valve 71a is provided on a pump line 37a connected to the shuttle valve 91, and outputs a hydraulic signal for automatic boom raising operation according to a signal S71a of the controller unit 100. Normally, when an open command signal is output to the pressure increasing proportional solenoid valve 71a, a close command signal is output to the pressure reducing proportional solenoid valve 61b. Therefore, when the proportional solenoid valve 71a is opened, the proportional solenoid valve 61b is closed. It is like that. In this case, even if the boom lowering operation is performed, a hydraulic pressure signal is input only to the hydraulic drive unit 45 with respect to the control valve 41, and the boom raising operation is forcibly performed. This proportional solenoid valve 71a functions when excavating below the target excavation surface.

比例電磁弁73aはシャトル弁92に繋がるポンプライン37a上に設けられていて、コントローラユニット100の信号S73aに従ってバケットクラウド動作を指令する油圧信号を出力する。比例電磁弁73bはシャトル弁93に繋がるポンプライン37a上に設けられていて、コントローラユニット100の信号S73bに従ってバケットダンプ動作を指令する油圧信号を出力する。比例電磁弁73a,73bの出力する油圧信号はバケット23の姿勢を補正する信号である。これら油圧信号がシャトル弁92,93で選択されてコントロールバルブ43に入力されることで、掘削目標面に対して一定の角度となるようにバケット23の姿勢が補正される。   The proportional solenoid valve 73a is provided on a pump line 37a connected to the shuttle valve 92, and outputs a hydraulic signal that instructs a bucket cloud operation according to a signal S73a of the controller unit 100. The proportional solenoid valve 73b is provided on a pump line 37a connected to the shuttle valve 93, and outputs a hydraulic pressure signal for instructing a bucket dump operation according to a signal S73b of the controller unit 100. The hydraulic signal output from the proportional solenoid valves 73 a and 73 b is a signal for correcting the attitude of the bucket 23. These hydraulic pressure signals are selected by the shuttle valves 92 and 93 and input to the control valve 43, whereby the posture of the bucket 23 is corrected so as to have a constant angle with respect to the excavation target surface.

・遮断弁
遮断弁70はノーマルクローズタイプの電磁駆動式の開閉弁(電磁切換弁)であり、消磁されると全閉し(ゼロ開度となり)、コントローラユニット100からの信号S70を受けて励磁されると開く。この遮断弁70はポンプライン37aにおけるシャトル弁91〜93に繋がる支流の分岐部とロック弁39(図2)との間に設けられている。コントローラユニット100からの指令により遮断弁70が閉じると、操作レバー装置51,53の操作によらない油圧信号の生成、出力が禁止される。
-Shut-off valve The shut-off valve 70 is a normally closed type electromagnetically driven on-off valve (electromagnetic switching valve). When the magnet is demagnetized, the shut-off valve 70 is fully closed (zero opening) and excited by receiving a signal S70 from the controller unit 100. Open when done. This shut-off valve 70 is provided between the branch portion of the tributary connected to the shuttle valves 91 to 93 in the pump line 37a and the lock valve 39 (FIG. 2). When the shut-off valve 70 is closed by a command from the controller unit 100, generation and output of a hydraulic pressure signal that is not caused by operation of the operation lever devices 51 and 53 is prohibited.

2−7.コントローラユニット
図4はコントローラユニットの機能ブロック図である。同図に示したように、コントローラユニット100は、入力部110、フロント制御部120、指令値制御部130及び出力部170等の機能部を備えている。以下、各機能部について説明する。
2-7. Controller Unit FIG. 4 is a functional block diagram of the controller unit. As shown in the figure, the controller unit 100 includes functional units such as an input unit 110, a front control unit 120, a command value control unit 130, and an output unit 170. Hereinafter, each functional unit will be described.

・入力部/出力部
入力部110はセンサ類等からの信号を入力する機能部である。この入力部110には、圧力検出器6a,6b、スイッチ7、角度検出器8a〜8c、傾斜検出器8d、測位装置9a,9b、無線機9c等からの信号が入力される。
Input unit / output unit The input unit 110 is a functional unit that inputs signals from sensors and the like. Signals from the pressure detectors 6a and 6b, the switch 7, the angle detectors 8a to 8c, the inclination detector 8d, the positioning devices 9a and 9b, the wireless device 9c, and the like are input to the input unit 110.

出力部170は、フロント制御部120及び指令値制御部130の処理を経て決定された指令値を基に指令信号を生成してフロント制御用油圧ユニット60に出力し、対応する弁を制御する機能部である。制御対象となり得る弁は比例電磁弁61b,62a,62b,63a,63b,71a,73a,73b及び遮断弁70であり、実際に指令信号が出力されるのはそのうちの少なくとも1つであって必ずしも複数又は全部に指令信号が出力されるとは限らない。   The output unit 170 generates a command signal based on the command value determined through the processing of the front control unit 120 and the command value control unit 130, outputs the command signal to the front control hydraulic unit 60, and controls the corresponding valve. Part. The valves that can be controlled are the proportional solenoid valves 61b, 62a, 62b, 63a, 63b, 71a, 73a, 73b and the shutoff valve 70, and at least one of the command signals is actually output. The command signal is not necessarily output to a plurality or all of them.

・フロント制御部
フロント制御部120は、角度検出器8a〜8c及び傾斜検出器8dの信号を基に、掘削目標面を越えて(掘削目標面の下側を)掘削しないようにフロント作業装置20の動作を制限する制限指令値を演算する機能部である。制限指令値は指令値制御部130に出力される。フロント制御とは、掘削目標面とバケット23の特定点との距離や油圧アクチュエータ31〜33の伸縮速度等によってフロント制御用油圧ユニット60を制御する制御の総称である。例えば、減圧用の比例電磁弁61b,62a,62b,63a,63bのうちの少なくとも1つを制御し、掘削目標面近傍で油圧アクチュエータ31〜33のうちの少なくとも1つの動作を減速させる制御もフロント制御の1つである。増圧用の比例電磁弁71a,73a,73bのうちの少なくとも1つを制御し、掘削目標面の下側を掘削してしまっている場面で強制的にブーム上げ動作をするブーム自動上げ制御や、バケット23の角度を一定に保ったりする制御もフロント制御に含まれる。その他いわゆるブーム下げ停止制御やバケット増圧制御等も含まれる。また、減圧用の比例電磁弁61b,62a,62b,63a,63bのうちの少なくとも1つと、増圧用の比例電磁弁71a,73a,73bのうちの少なくとも1つとを複合的に制御するものもフロント制御に含まれる。更には、本願明細書では、フロント作業装置20の描く軌跡を一定の軌跡に制御するいわゆる軌跡制御もフロント制御の1つとする。フロント制御部120の詳細については説明を省略するが、このフロント制御部120には、例えば特開平8−333768号公報や特開2016−003442号公報等の公知技術が適宜適用できる。
Front control unit The front control unit 120 is configured to prevent the excavation from exceeding the excavation target surface (under the excavation target surface) based on the signals from the angle detectors 8a to 8c and the inclination detector 8d. It is a functional part which calculates a restriction command value that restricts the operation of The limit command value is output to the command value control unit 130. The front control is a general term for control for controlling the front control hydraulic unit 60 by the distance between the excavation target surface and a specific point of the bucket 23, the expansion / contraction speed of the hydraulic actuators 31 to 33, and the like. For example, at least one of the proportional solenoid valves 61b, 62a, 62b, 63a, and 63b for pressure reduction is controlled, and the control for decelerating the operation of at least one of the hydraulic actuators 31 to 33 near the excavation target surface is also performed on the front side. One of the controls. Automatic boom raising control for controlling at least one of the pressure increasing proportional solenoid valves 71a, 73a, 73b and forcibly raising the boom in a scene where the lower side of the excavation target surface has been excavated, Control for keeping the angle of the bucket 23 constant is also included in the front control. In addition, so-called boom lowering stop control and bucket pressure increase control are included. In addition, the one that controls at least one of the proportional solenoid valves 61b, 62a, 62b, 63a, and 63b for pressure reduction and at least one of the proportional solenoid valves 71a, 73a, and 73b for pressure increase is also the front. Included in control. Furthermore, in the present specification, so-called trajectory control for controlling the trajectory drawn by the front working device 20 to a constant trajectory is also one of the front controls. Although the details of the front control unit 120 are not described, publicly known techniques such as JP-A-8-333768 and JP-A-2006-003442 can be appropriately applied to the front control unit 120, for example.

3.指令値制御部
図5は指令値制御部の機能ブロック図である。同図に示したように、指令値制御部130は、入力判定部131、記憶部132、距離演算部133、距離判定部134、速度演算部135、速度判定部136及び指令値決定部137を備えている。
3. Command Value Control Unit FIG. 5 is a functional block diagram of the command value control unit. As shown in the figure, the command value control unit 130 includes an input determination unit 131, a storage unit 132, a distance calculation unit 133, a distance determination unit 134, a speed calculation unit 135, a speed determination unit 136, and a command value determination unit 137. I have.

・入力判定部
入力判定部131は、フロント制御部120から制限指令値が入力されているか否かを判定する機能部である。フロント制御部120は、フロント制御の機能が入り状態の場合、例えばバケット23が下降するブーム下げ動作時のように特定の制御対象動作時には、バケット23が掘削目標面に接近するにつれて比例電磁弁61b等を絞って圧力信号の最大値を制限してゆく。他方、フロント制御の機能が入り状態でも、例えばバケット23が上昇するブーム上げ動作のような特定の制御対象外動作時には、フロント制御部120による比例電磁弁61b等の開度制御は実行されない。従って、フロント作業装置20の特定点(後述)と掘削目標面Sとの距離Dが設定距離D0より大きいときの他、距離Dが設定距離D0以下でも制御対象外動作のときには、フロント制御部120から制限指令値が出力されない。フロント制御部120から制限指令値が出力されるのは例えば、フロント制御の機能が入り状態であること、距離Dが設定距離D0以下であること、制御対象動作が実施されていることの3つの条件が同時に満たされた場合である。入力判定部131は、このような制限指令値の入力の有無を判定する。
Input Determination Unit The input determination unit 131 is a functional unit that determines whether a limit command value is input from the front control unit 120. When the front control function is in the on state, for example, during a specific control target operation such as a boom lowering operation in which the bucket 23 descends, the proportional solenoid valve 61b as the bucket 23 approaches the excavation target surface. The maximum value of the pressure signal is limited by narrowing down etc. On the other hand, even when the front control function is on, the opening control of the proportional solenoid valve 61b and the like by the front control unit 120 is not executed during a non-control target operation such as a boom raising operation in which the bucket 23 is raised. Accordingly, when the distance D between a specific point (described later) of the front work device 20 and the excavation target surface S is larger than the set distance D0, and when the operation is out of the control target even when the distance D is equal to or less than the set distance D0, the front controller 120. No limit command value is output from. The restriction command value is output from the front control unit 120, for example, when the front control function is in the on state, the distance D is equal to or less than the set distance D0, and the control target operation is being performed. This is the case when the conditions are met simultaneously. The input determination unit 131 determines whether or not such a limit command value has been input.

・記憶部
記憶部132は各種情報を記憶する機能部であり、設定距離記憶部141、設定速度記憶部142、掘削目標面記憶部143、機体寸法記憶部144、待機指令値記憶部145及び省電力指令値記憶部146を含んでいる。
Storage unit The storage unit 132 is a functional unit that stores various types of information. The set distance storage unit 141, the set speed storage unit 142, the excavation target surface storage unit 143, the body size storage unit 144, the standby command value storage unit 145, and the saving A power command value storage unit 146 is included.

設定距離記憶部141は、フロント作業装置20の特定点Pと掘削目標面Sとの距離Dについて予め定めた設定距離D0(>0)を記憶した記憶領域である。設定速度記憶部142は、特定の油圧アクチュエータ(例えばブームシリンダ31)の動作速度Vについて予め定めた設定速度V0(>0)を記憶した記憶領域である。掘削目標面記憶部143は、掘削目標面Sを記憶した記憶領域である。掘削目標面Sは、油圧ショベルで掘削形成する(造形する)目標地形であり、上部旋回体12を基準とする座標系で手動設定したものが記憶される場合もあるし、地球座標系の三次元位置情報で予め記憶されている場合もある。掘削目標面Sの三次元位置情報は、掘削目標面Sをポリゴンで表した地形データに位置データを付した情報であり、予め作成されたものである。機体寸法記憶部144は、フロント作業装置20及び上部旋回体12の各部寸法を記憶した記憶領域である。   The set distance storage unit 141 is a storage area that stores a preset set distance D0 (> 0) for the distance D between the specific point P of the front work device 20 and the excavation target surface S. The set speed storage unit 142 is a storage area that stores a set speed V0 (> 0) predetermined for the operating speed V of a specific hydraulic actuator (for example, the boom cylinder 31). The excavation target surface storage unit 143 is a storage area in which the excavation target surface S is stored. The excavation target surface S is a target landform that is excavated (modeled) by a hydraulic excavator, and may be stored manually set in a coordinate system with the upper revolving body 12 as a reference, or may be stored in the tertiary of the earth coordinate system. In some cases, the original position information is stored in advance. The three-dimensional position information of the excavation target surface S is information obtained by adding position data to terrain data representing the excavation target surface S with polygons, and is created in advance. The body size storage unit 144 is a storage area that stores the dimensions of the front work device 20 and the upper swing body 12.

待機指令値記憶部145は、減圧用の比例電磁弁61b,62a,62b,63a,63bに出力する待機指令値を記憶した記憶領域である。省電力指令値記憶部146は、減圧用及び増圧用の比例電磁弁61b,62a,62b,63a,63b,71a,73a,73bの待機指令値よりも小さく設定された励磁電流である省電力指令値を記憶した記憶領域である。待機指令値及び省電力指令値については後述する。   The standby command value storage unit 145 is a storage area that stores standby command values output to the proportional solenoid valves 61b, 62a, 62b, 63a, 63b for pressure reduction. The power saving command value storage unit 146 is a power saving command that is an excitation current set smaller than the standby command value of the proportional solenoid valves 61b, 62a, 62b, 63a, 63b, 71a, 73a, 73b for pressure reduction and pressure increase. This is a storage area for storing values. The standby command value and the power saving command value will be described later.

・距離演算部
距離演算部133は、入力部110を介して入力された角度検出器8a〜8cの検出信号を基にフロント作業装置20の特定点Pと掘削目標面Sとの距離Dを演算する機能部である。距離Dの演算の例については後で説明する。
Distance calculation unit The distance calculation unit 133 calculates the distance D between the specific point P of the front work device 20 and the excavation target surface S based on the detection signals of the angle detectors 8a to 8c input via the input unit 110. It is a functional part to do. An example of the calculation of the distance D will be described later.

・距離判定部
距離判定部134は、距離演算部133で演算された特定点Pと掘削目標面Sとの距離Dが設定距離記憶部141から読み出した設定距離D0よりも大きいか否かを判定する機能部である。
Distance determination unit The distance determination unit 134 determines whether the distance D between the specific point P calculated by the distance calculation unit 133 and the excavation target surface S is larger than the set distance D0 read from the set distance storage unit 141. It is a functional part to do.

・速度演算部
速度演算部135は、入力部110を介して入力された圧力検出器6a,6bの信号を基に特定の油圧アクチュエータ、本例ではブームシリンダ31の動作速度V(伸縮速度)を演算する機能部である。例えば、速度演算部135には、ブームシリンダ用のコントロールバルブ41の流量特性(流通させる作動油の流量と開度の関係等)を記憶した記憶部が含まれている。コントロールバルブ41の開度は圧力検出器6a,6bで検出されたコントロールバルブ41への油圧信号の大きさと対応する関係にある。このことに基づき、コントロールバルブ41の流量特性と圧力検出器6a,6bの信号とを基にブームシリンダ31の動作速度Vが速度演算部135で演算される。なお、速度演算部135では、圧力検出器6a,6bの信号のうち大きい方を選択して演算の基礎としてブームシリンダ31の動作速度を演算する。どちらの信号を演算の基礎としたかにより、演算される動作速度Vが、ブームシリンダ31の伸長速度であるのか収縮速度であるのかが区別される。言うまでもないが、例えばブーム下げ指令用の圧力信号を検出する圧力検出器6bの信号を基に演算された動作速度Vは、ブーム下げ動作に対応するブームシリンダ31の収縮速度である。そして、ブームシリンダ31の収縮方向を動作速度Vの正方向にとり、伸長速度は負の速度として扱う。
Speed calculation unit The speed calculation unit 135 calculates the operation speed V (extension / contraction speed) of a specific hydraulic actuator, in this example, the boom cylinder 31, based on the signals of the pressure detectors 6a and 6b input via the input unit 110. It is a functional part that calculates. For example, the speed calculation unit 135 includes a storage unit that stores the flow rate characteristics of the boom cylinder control valve 41 (such as the relationship between the flow rate of hydraulic fluid to circulate and the opening degree). The opening degree of the control valve 41 has a relationship corresponding to the magnitude of the hydraulic signal to the control valve 41 detected by the pressure detectors 6a and 6b. Based on this, the operation speed V of the boom cylinder 31 is calculated by the speed calculation unit 135 based on the flow characteristics of the control valve 41 and the signals of the pressure detectors 6a and 6b. Note that the speed calculator 135 selects the larger one of the signals from the pressure detectors 6a and 6b and calculates the operating speed of the boom cylinder 31 as the basis of the calculation. Depending on which signal is the basis of the calculation, it is distinguished whether the calculated operation speed V is the extension speed or the contraction speed of the boom cylinder 31. Needless to say, for example, the operation speed V calculated based on the signal of the pressure detector 6b that detects the pressure signal for the boom lowering command is the contraction speed of the boom cylinder 31 corresponding to the boom lowering operation. The contraction direction of the boom cylinder 31 is taken as the positive direction of the operation speed V, and the extension speed is handled as a negative speed.

・速度判定部
速度判定部136は、速度演算部135で演算されたブームシリンダ31の動作速度Vが設定速度記憶部142から読み出した設定速度V0よりも大きいか否かを判定する機能部である。
Speed Determination Unit The speed determination unit 136 is a functional unit that determines whether the operating speed V of the boom cylinder 31 calculated by the speed calculation unit 135 is higher than the set speed V0 read from the set speed storage unit 142. .

・指令値決定部
指令値決定部137は、比例電磁弁61b,62a,62b,63a,63b,71a,73a,73bに対する指令信号の指令値を決定し、出力部170に出力する機能部である。指令値は、フロント制御部120から入力された制限指令値、待機指令値記憶部145から読み出した待機指令値、省電力指令値記憶部146から読み出した省電力指令値のうちからの選択により決定される。具体的には、次の第1〜第3の場合に状況を場合分けして指令信号を選択する。
(第1の場合)入力判定部131でフロント制御部120から制限指令値が入力されていると判定された場合;
(第2の場合)第1の場合及び第3の場合以外の場合;
(第3の場合)制限指令値が入力されていない場合であって、距離判定部134で特定点Pと掘削目標面Sとの距離Dが設定距離D0より大きいと判定され、かつ速度判定部136で動作速度Vが設定速度V0より小さいと判定された場合:
第1の場合には制限指令値、第2の場合には待機指令値、第3の場合には省電力指令値を指令値として選択する。
Command Value Determination Unit The command value determination unit 137 is a functional unit that determines command values of command signals for the proportional solenoid valves 61 b, 62 a, 62 b, 63 a, 63 b, 71 a, 73 a, 73 b and outputs the command values to the output unit 170. . The command value is determined by selection from the limit command value input from the front control unit 120, the standby command value read from the standby command value storage unit 145, and the power saving command value read from the power saving command value storage unit 146. Is done. Specifically, the command signal is selected by dividing the situation into the following first to third cases.
(First case) When the input determination unit 131 determines that the limit command value is input from the front control unit 120;
(Second case) Cases other than the first case and the third case;
(Third case) When the limit command value is not input, the distance determination unit 134 determines that the distance D between the specific point P and the excavation target surface S is larger than the set distance D0, and the speed determination unit If it is determined at 136 that the operating speed V is lower than the set speed V0:
The limit command value is selected as the command value in the first case, the standby command value in the second case, and the power saving command value in the third case.

・待機指令値
図6は減圧用の比例電磁弁の指令信号と開度との関係を表す特性図である。同図に示したように、減圧用の比例電磁弁(例えば比例電磁弁61b)は、電磁駆動部に入力される指令信号(本実施形態では励磁電流)が大きいほど絞り込まれて開度が減少する。i1及びi3(>i1)の間の範囲で指令値の大きさが変化すると、比例電磁弁の開度が指令信号の大きさに比例して変化する。つまり、指令値i1は比例電磁弁の開度変化を伴う範囲(以下、開度調整域と記載する)で最大開度に対応する指令値、指令値i3は開度調整域で最小開度(本実施形態ではゼロ開度)に対応する指令値である。指令値i1よりも小さい範囲は消磁状態であり、比例電磁弁の開度は最大のまま不変である。指令値i3よりも大きい範囲では、比例電磁弁の開度は最小のまま不変である。待機指令値は、比例電磁弁の最大開度及び最小開度の間で設定した中間開度に対応する励磁電流の指令値i2である。中間開度は最大開度及び最小開度の間で任意に選択することができ、例えば最大開度と最小開度の平均値が例示できる。i2は比例電磁弁毎に固有の異なる値を設定しても良い。また、待機時の指令信号の指令値をi2に設定するのは比例電磁弁61b,62a,62b,63a,63bの少なくとも1つであり、全部である必要は必ずしもない。
Standby command value FIG. 6 is a characteristic diagram showing the relationship between the command signal and the opening of the proportional solenoid valve for pressure reduction. As shown in the figure, the proportional solenoid valve for pressure reduction (for example, the proportional solenoid valve 61b) is narrowed down and the opening degree decreases as the command signal (excitation current in this embodiment) input to the electromagnetic drive unit increases. To do. When the magnitude of the command value changes in the range between i1 and i3 (> i1), the opening of the proportional solenoid valve changes in proportion to the magnitude of the command signal. That is, the command value i1 is a command value corresponding to the maximum opening in a range (hereinafter referred to as an opening adjustment region) with a change in the opening of the proportional solenoid valve, and the command value i3 is a minimum opening ( In this embodiment, the command value corresponds to zero opening). The range smaller than the command value i1 is a demagnetized state, and the opening degree of the proportional solenoid valve remains unchanged at the maximum. In the range larger than the command value i3, the opening degree of the proportional solenoid valve remains unchanged and remains unchanged. The standby command value is the command value i2 of the excitation current corresponding to the intermediate opening set between the maximum opening and the minimum opening of the proportional solenoid valve. The intermediate opening can be arbitrarily selected between the maximum opening and the minimum opening. For example, an average value of the maximum opening and the minimum opening can be exemplified. i2 may be set to a different value unique to each proportional solenoid valve. Further, the command value of the command signal during standby is set to i2 at least one of the proportional solenoid valves 61b, 62a, 62b, 63a, 63b, and not all of them are necessarily required.

・省電力指令値
図7は増圧用の比例電磁弁の指令信号と開度との関係を表す特性図である。同図に示したように、増圧用の比例電磁弁(例えば比例電磁弁71a)は、電磁駆動部に入力される指令信号(本実施形態では励磁電流)が大きいほど開度が増加する。i5及びi6(>i5)の範囲で指令信号の大きさが変化すると、比例電磁弁の開度が指令信号の大きさに比例して変化する。つまり、指令値i5は比例電磁弁の開度調整域で最小開度に対応する指令値、指令値i6は開度調整域で最大開度に対応する指令値である。指令値i5よりも小さい範囲は消磁状態であり、比例電磁弁の開度は最小のまま不変である。指令値i6よりも大きい範囲では、比例電磁弁の開度は最大のまま不変である。省電力指令値は、減圧用及び増圧用の比例電磁弁61b,62a,62b,63a,63b,71a,73a,73bの電磁駆動部に対して開度調整域で印加する励磁電流の最小値よりも低く設定した励磁電流値である。従って、減圧用の比例電磁弁61b,62a,62b,63a,63bについては、図6において指令値i1よりも小さな指令値i0(<i1)が省電力指令値として設定される。増圧用の比例電磁弁71a,73a,73bについては、図7において指令値i5よりも小さな指令値i4(<i5)が省電力指令値として設定される。省電力指令値i0,i4は、それぞれ指令値i1,i5より小さい範囲で任意に選択することができ、0(ゼロ)に設定しても良い。i0,i4は異なる値でも同じ値でも良く、比例電磁弁毎に固有のi0,i4を設定しても良い。また、消磁時の指令信号の指令値をi0又はi4に設定するのは比例電磁弁61b,62a,62b,63a,63b,71a,73a,73bの少なくとも1つであり、全部である必要は必ずしもない。
Power saving command value FIG. 7 is a characteristic diagram showing the relationship between the command signal and the opening of the proportional solenoid valve for pressure increase. As shown in the figure, the opening degree of the proportional solenoid valve for pressure increase (for example, the proportional solenoid valve 71a) increases as the command signal (excitation current in this embodiment) input to the electromagnetic drive unit increases. When the magnitude of the command signal changes in the range of i5 and i6 (> i5), the opening degree of the proportional solenoid valve changes in proportion to the magnitude of the command signal. That is, the command value i5 is a command value corresponding to the minimum opening in the opening adjustment range of the proportional solenoid valve, and the command value i6 is a command value corresponding to the maximum opening in the opening adjustment region. The range smaller than the command value i5 is a demagnetized state, and the opening degree of the proportional solenoid valve remains unchanged with the minimum. In a range larger than the command value i6, the opening degree of the proportional solenoid valve remains unchanged at the maximum. The power saving command value is based on the minimum value of the excitation current applied in the opening adjustment range to the electromagnetic drive parts of the proportional solenoid valves 61b, 62a, 62b, 63a, 63b, 71a, 73a, 73b for pressure reduction and pressure increase. The excitation current value is also set low. Therefore, for the proportional solenoid valves 61b, 62a, 62b, 63a, 63b for pressure reduction, a command value i0 (<i1) smaller than the command value i1 in FIG. 6 is set as the power saving command value. For the pressure increasing proportional solenoid valves 71a, 73a, 73b, a command value i4 (<i5) smaller than the command value i5 in FIG. 7 is set as the power saving command value. The power saving command values i0 and i4 can be arbitrarily selected within a range smaller than the command values i1 and i5, respectively, and may be set to 0 (zero). i0 and i4 may be different values or the same value, and i0 and i4 unique to each proportional solenoid valve may be set. The command value of the command signal at the time of demagnetization is set to i0 or i4 is at least one of the proportional solenoid valves 61b, 62a, 62b, 63a, 63b, 71a, 73a, 73b, and it is not always necessary Absent.

・特定点と掘削目標面との距離の演算例
図8は距離演算部によるフロント作業装置の特定点と掘削目標面との距離の演算方法の説明図である。図8ではフロント作業装置20の動作平面(ブーム21等の回動軸に直交する平面)を直交方向(ブーム21等の回動軸の延在方向)から見ている。油圧アクチュエータ31〜33については繁雑防止のため図示省略してある。
Calculation Example of Distance between Specific Point and Excavation Target Surface FIG. 8 is an explanatory diagram of a method for calculating the distance between the specific point of the front work device and the excavation target surface by the distance calculation unit. In FIG. 8, the operation plane of the front work device 20 (plane orthogonal to the rotation axis of the boom 21 etc.) is viewed from the orthogonal direction (extension direction of the rotation axis of the boom 21 etc.). The hydraulic actuators 31 to 33 are not shown in order to prevent congestion.

図8において特定点Pはバケット23の先端(爪先)の位置に設定してある。特定点Pは代表的にはバケット23の先端に設定されるが、フロント作業装置20における他部位に設定しても良い。距離演算部133には、角度検出器8a〜8cからの信号が入力部110を介して入力され、掘削目標面記憶部143から掘削目標面Sの情報が入力される。その他、地球座標系で距離Dを演算する場合には、傾斜検出器8dの検出信号、測位装置9a,9bによって取得された車体10の位置情報、及び無線機9cで受信された補正情報も入力部110を介して距離演算部133に入力される。地球座標系で距離Dを求める場合、距離演算部133では、測位装置9a,9bの位置情報を補正情報で補正して車体10の位置や向きを演算し、傾斜検出器8dの信号により車体10の傾斜を演算する。   In FIG. 8, the specific point P is set at the position of the tip (toe) of the bucket 23. The specific point P is typically set at the tip of the bucket 23, but may be set at another part of the front work device 20. Signals from the angle detectors 8 a to 8 c are input to the distance calculation unit 133 via the input unit 110, and information on the excavation target surface S is input from the excavation target surface storage unit 143. In addition, when calculating the distance D in the earth coordinate system, the detection signal of the inclination detector 8d, the position information of the vehicle body 10 acquired by the positioning devices 9a and 9b, and the correction information received by the wireless device 9c are also input. The data is input to the distance calculation unit 133 via the unit 110. When obtaining the distance D in the earth coordinate system, the distance calculation unit 133 corrects the position information of the positioning devices 9a and 9b with the correction information to calculate the position and orientation of the vehicle body 10, and uses the signal from the inclination detector 8d to calculate the vehicle body 10 Calculate the slope of.

掘削目標面Sはフロント作業装置20の動作平面との交線で定義され、車体10の位置、向き、傾斜等の情報と合わせて地球座標系で掘削目標面Sと車体10との位置関係が把握される。掘削目標面Sから上側の領域が、特定点Pの移動が是とされる掘削領域として規定される。掘削目標面Sは、例えば油圧ショベルを基準とするXY座標系における少なくとも1本の直線式で一旦規定される。XY座標系は例えばブーム21の回動支点を原点とする直交座標系であり、原点を通って上部旋回体12の旋回中心軸に平行に延びる軸をY軸(上方向が正方向)、このY軸に対して原点で直交して前方に延びる軸をX軸としている(前方向が正方向)。なお掘削目標面Sを手動設定した場合には、掘削目標面Sと車体10との位置関係は既知である。   The excavation target plane S is defined by a line of intersection with the operation plane of the front work apparatus 20, and the positional relationship between the excavation target plane S and the car body 10 is expressed in the earth coordinate system together with information such as the position, orientation, and inclination of the car body 10. Be grasped. The area above the excavation target surface S is defined as the excavation area where the movement of the specific point P is considered to be appropriate. The excavation target surface S is once defined by at least one linear expression in an XY coordinate system with a hydraulic excavator as a reference, for example. The XY coordinate system is, for example, an orthogonal coordinate system having the rotation fulcrum of the boom 21 as an origin, and an axis extending parallel to the turning center axis of the upper swing body 12 through the origin is the Y axis (upward is a positive direction). The axis that is orthogonal to the Y axis at the origin and extends forward is the X axis (the forward direction is the positive direction). When the excavation target surface S is manually set, the positional relationship between the excavation target surface S and the vehicle body 10 is known.

XY座標系で規定された掘削目標面Sは、自己を一軸(Xa軸)とする原点Oの直交座標系であるXaYa座標系で改めて規定される。言うまでもないが、Ya軸は原点OでXa軸に直交する軸である。Xa軸は前方向を正方向、Ya軸は上方向を正方向とする。   The excavation target plane S defined in the XY coordinate system is defined again in the XaYa coordinate system, which is an orthogonal coordinate system of the origin O with the self as one axis (Xa axis). Needless to say, the Ya axis is an axis at the origin O and orthogonal to the Xa axis. The Xa axis has the forward direction as the positive direction, and the Ya axis has the upward direction as the positive direction.

距離演算部133では、機体寸法記憶部144から読み出したフロント作業装置20の寸法データ(L1,L2,L3)、角度検出器8a〜8cで検出された回動角α,β,γの各値を用いてバケット特定点Pの位置を計算する。特定点Pの位置は、例えば油圧ショベルを基準とするXY座標系の座標値(X,Y)として求める。特定点Pの座標値(X,Y)は下記の式(1)と式(2)より求まる。   In the distance calculation unit 133, the dimension data (L1, L2, L3) of the front work device 20 read from the body dimension storage unit 144, and the rotation angles α, β, γ detected by the angle detectors 8a to 8c. Is used to calculate the position of the bucket specific point P. The position of the specific point P is obtained, for example, as a coordinate value (X, Y) in an XY coordinate system based on a hydraulic excavator. The coordinate value (X, Y) of the specific point P is obtained from the following equations (1) and (2).

X=L1・sinα+L2・sin(α+β)+L3・sin(α+β+γ)…(1)
Y=L1・cosα+L2・cos(α+β)+L3・cos(α+β+γ)…(2)
L1はブーム21とアーム22の回動支点間の距離、L2はアーム22とバケット23の回動支点間の距離、L3はバケット23の回動支点と特定点Pとの距離である。αはY軸(原点から上側に延びる部分)とブーム21とアーム22の回動支点を通る直線l1(原点からアーム22の回動支点側に延びる部分)との挟角である。βは直線l1(アーム22の回動支点から原点と反対側に延びる部分)とアーム22とバケット23の回動支点を通る直線l2(アーム22の回動支点からバケット23の回動支点側に延びる部分)との挟角である。γは直線l2(バケット23の回動支点からアーム22の回動支点と反対側に延びる部分)と特定点Pを通る直線l3との挟角である。
X = L1 · sin α + L2 · sin (α + β) + L3 · sin (α + β + γ) (1)
Y = L 1 · cos α + L 2 · cos (α + β) + L 3 · cos (α + β + γ) (2)
L1 is the distance between the pivot fulcrum of the boom 21 and the arm 22, L2 is the distance between the pivot fulcrum of the arm 22 and the bucket 23, and L3 is the distance between the pivot fulcrum of the bucket 23 and the specific point P. α is the included angle between the Y axis (the portion extending upward from the origin) and the straight line 11 passing through the rotation fulcrum of the boom 21 and the arm 22 (the portion extending from the origin toward the rotation fulcrum of the arm 22). β is a straight line l1 (a portion extending from the rotation fulcrum of the arm 22 to the side opposite to the origin) and a straight line l2 passing through the rotation fulcrum of the arm 22 and the bucket 23 (from the rotation fulcrum of the arm 22 to the rotation fulcrum of the bucket 23). And the included angle. γ is an included angle between the straight line 12 (the portion extending from the rotation fulcrum of the bucket 23 to the side opposite to the rotation fulcrum of the arm 22) and the straight line 13 passing through the specific point P.

距離演算部133は、以上のようにXY座標系で規定した特定点Pの座標値(X,Y)をXaYa座標系の座標値(Xa,Ya)に変換する。こうして求められた特定点PのYaの値が、特定点Pと掘削目標面Sとの距離Dの値である。距離Dは、特定点Pを通って掘削目標面Sに直交する直線と掘削目標面Sとの交点から特定点Pまでの距離であり、Yaの値の正負を区別する(つまり掘削領域で距離Dは正の値となり、掘削目標面Sより下側の領域では負の値となる)。   The distance calculation unit 133 converts the coordinate value (X, Y) of the specific point P defined in the XY coordinate system as described above into the coordinate value (Xa, Ya) of the XaYa coordinate system. The Ya value of the specific point P thus obtained is the value of the distance D between the specific point P and the excavation target surface S. The distance D is a distance from the intersection of the straight line perpendicular to the excavation target surface S through the specific point P and the excavation target surface S to the specific point P, and distinguishes between positive and negative values of Ya (that is, the distance in the excavation region). D becomes a positive value, and becomes a negative value in the region below the excavation target surface S).

3.動作
まず、指令値制御部130の処理を考慮から外してレバー操作に対する油圧アクチュエータの基本的な動作を説明する。
3. Operation First, the basic operation of the hydraulic actuator with respect to lever operation will be described by taking the processing of the command value control unit 130 into consideration.

3−1.フロント制御の有効時
例えば操作レバー装置51でブーム下げ操作が行われた場合、ブーム下げ指令用の信号出力弁51bが操作量に応じて開き、パイロットライン51b1を介してブームシリンダ用のコントロールバルブ41の油圧駆動部46に油圧信号が入力される。これによりブームシリンダ31が収縮し、ブーム下げ動作が実行される。フロント制御の機能が入り状態の場合、バケット23の掘削目標面との距離や下降速度によっては、フロント制御部120から出力される制限指令値により比例電磁弁61bの開度が抑えられ、油圧信号の最大値が制限される。比例電磁弁61bの開度で規定される制限値を超えている場合、油圧信号はパイロットライン51b1を流通する過程で比例電磁弁61bにより制限値に減圧される。その結果、操作量に応じた本来の速度よりもブーム下げ動作が減速され、掘削目標面よりも下側にバケット23が進入することが抑制される。他のパイロットラインに圧力信号を出力する操作(アームクラウド、アームダンプ、バケットクラウド、バケットダンプの各操作)についても同様である。
3-1. When the front control is valid For example, when a boom lowering operation is performed with the operation lever device 51, the boom lowering command signal output valve 51b opens according to the operation amount, and the boom cylinder control valve 41 is connected via the pilot line 51b1. The hydraulic signal is input to the hydraulic drive unit 46. Thereby, the boom cylinder 31 contracts and the boom lowering operation is executed. When the front control function is on, depending on the distance from the excavation target surface of the bucket 23 and the descending speed, the opening degree of the proportional solenoid valve 61b is suppressed by the limit command value output from the front control unit 120, and the hydraulic signal The maximum value of is limited. When the limit value defined by the opening degree of the proportional solenoid valve 61b is exceeded, the hydraulic pressure signal is reduced to the limit value by the proportional solenoid valve 61b in the process of flowing through the pilot line 51b1. As a result, the boom lowering operation is decelerated from the original speed corresponding to the operation amount, and the bucket 23 is prevented from entering below the excavation target surface. The same applies to operations for outputting pressure signals to other pilot lines (operations of arm cloud, arm dump, bucket cloud, and bucket dump).

3−2.フロント制御の無効時
例えば操作レバー装置51でブーム下げ操作が行われた場合、ブーム下げ指令用の信号出力弁51bが操作量に応じて開く。フロント制御機能が切り状態の場合、バケット23の位置等で比例電磁弁61bの開度は変化せず、操作レバー装置51の操作量に対応してブームシリンダ用のコントロールバルブ41の油圧駆動部46に圧力信号が入力される。これにより、比例電磁弁61bの開度変化の影響を受けることなく、単にレバー操作に応じてブーム下げ動作が実行される。他のパイロットラインに圧力信号を出力する操作(アームクラウド、アームダンプ、バケットクラウド、バケットダンプの各操作)についても同様である。
3-2. When front control is disabled For example, when a boom lowering operation is performed with the operation lever device 51, a signal output valve 51b for a boom lowering command is opened according to the operation amount. When the front control function is in the off state, the opening degree of the proportional solenoid valve 61b does not change depending on the position of the bucket 23, etc., and the hydraulic drive unit 46 of the boom cylinder control valve 41 corresponds to the operation amount of the operation lever device 51. A pressure signal is input to. Thereby, the boom lowering operation is executed simply in response to the lever operation without being affected by the change in the opening degree of the proportional solenoid valve 61b. The same applies to operations for outputting pressure signals to other pilot lines (operations of arm cloud, arm dump, bucket cloud, and bucket dump).

3−3.指令値制御部の処理手順
図9は指令値制御部による指令値の決定手順を表すフローチャートである。運転中、指令値制御部130は図9の手順(ステップS101〜S107)を所定の処理サイクル(例えば0.1s)で繰り返し実行している。
3-3. Processing Procedure of Command Value Control Unit FIG. 9 is a flowchart showing a procedure for determining a command value by the command value control unit. During operation, the command value control unit 130 repeatedly executes the procedure of FIG. 9 (steps S101 to S107) in a predetermined processing cycle (for example, 0.1 s).

・ステップS101→S102
指令値制御部130は図9の手順を開始すると、まずステップS101で入力部110を介して、角度検出器8a〜8c、圧力検出器6a,6bの各信号を距離演算部133に入力する。この例では掘削目標面Sと機体との位置関係は既知の情報として説明するが、前述したように地球座標系で機体と掘削目標面Sの位置関係を演算する場合には、合わせて測位装置9a,9bや無線機9c、傾斜検出器8dの信号も入力する。
Steps S101 → S102
When the procedure of FIG. 9 is started, the command value control unit 130 first inputs the signals of the angle detectors 8a to 8c and the pressure detectors 6a and 6b to the distance calculation unit 133 via the input unit 110 in step S101. In this example, the positional relationship between the excavation target surface S and the airframe will be described as known information. However, as described above, when calculating the positional relationship between the airframe and the excavation target surface S in the earth coordinate system, a positioning device is also used. Signals from 9a and 9b, the wireless device 9c, and the inclination detector 8d are also input.

続くステップS102では、指令値演算部130は、現在のサイクルにおいてフロント制御部120から制限指令値が入力されているかどうかを入力判定部131で判定する。制限指令値が入力されている場合には入力有との情報を表す判定信号が、入力されていない場合には入力無との情報を表す判定信号が、入力判定部131から指令値決定部137に出力される。   In subsequent step S102, the command value calculation unit 130 determines whether or not the limit command value is input from the front control unit 120 in the current cycle by the input determination unit 131. When the limit command value is input, the determination signal indicating the presence of input is received, and when the limit command value is not input, the determination signal indicating the information of no input is input from the input determination unit 131 to the command value determination unit 137. Is output.

・ステップS102→S103
制限指令値の入力があると入力判定部131で判定された場合、指令値制御部130はステップS102からステップS103に手順を移す。制限指令値が入力される状況では、掘削目標面Sと特定点Pとの距離Dは設定距離D0以下である。ステップS103では、入力判定部131から制限指令値の入力有の判定信号を受け、指令値決定部137でフロント制御部120からの制限指令値が指令値として選択されて出力部170に出力される。この場合、制限指令値の大きさの指令信号が出力部170から出力され、対応する比例電磁弁の電磁駆動部に出力される。ステップS103の手順を終えたら、指令値制御部130は図9の手順を一旦終了し、次のサイクルを開始してステップS101の処理を実行する。
Step S102 → S103
When the input determination unit 131 determines that the limit command value is input, the command value control unit 130 moves the procedure from step S102 to step S103. In a situation where the limit command value is input, the distance D between the excavation target surface S and the specific point P is equal to or less than the set distance D0. In step S <b> 103, a determination signal indicating that the limit command value is input is received from the input determination unit 131, and the limit command value from the front control unit 120 is selected as the command value by the command value determination unit 137 and is output to the output unit 170. . In this case, a command signal having a magnitude of the limit command value is output from the output unit 170 and is output to the electromagnetic drive unit of the corresponding proportional solenoid valve. When the procedure of step S103 is completed, the command value control unit 130 once ends the procedure of FIG. 9, starts the next cycle, and executes the process of step S101.

・ステップS102→S104→S105→S106
制限指令値の入力がないと入力判定部131で判定された場合、指令値制御部130はステップS102からステップS104に手順を移す。ステップS104では、距離演算部133で掘削目標面Sと特定点Pとの距離Dが、速度演算部135でブームシリンダ31の動作速度Vが演算される。演算された距離Dは距離演算部133から距離判定部134に入力され、動作速度Vは速度演算部135から速度判定部136に入力される。
Steps S102 → S104 → S105 → S106
When the input determination unit 131 determines that no limit command value is input, the command value control unit 130 moves the procedure from step S102 to step S104. In step S104, the distance calculation unit 133 calculates the distance D between the excavation target surface S and the specific point P, and the speed calculation unit 135 calculates the operating speed V of the boom cylinder 31. The calculated distance D is input from the distance calculation unit 133 to the distance determination unit 134, and the operation speed V is input from the speed calculation unit 135 to the speed determination unit 136.

ステップS104の手順を終えると、指令値制御部130はステップS105に手順を移す。ステップS105では、設定距離記憶部141から読み出した設定距離D0よりも距離Dが大きいかどうかが距離判定部134で判定される。設定距離D0は正の値で距離Dの正負も前述したように区別されるので、ここでは特定点Pが掘削領域内にあって掘削目標面Sから設定距離D0より離れているかが判定される。距離判定部134の判定結果は、D,D0の大小関係を表す判定信号として指令値決定部137に入力される。同時に、ステップS105では、設定速度記憶部142から読み出した設定速度V0よりも動作速度Vが小さいかどうかが速度判定部136で判定される。設定速度V0は正の値で動作速度Vの正負も前述したように区別されるので、ここではブームシリンダ31が設定速度V0を超える速度で収縮していないかが判定される。速度判定部136の判定結果は、V,V0の大小関係を表す判定信号として指令値決定部137に入力される。   When the procedure of step S104 is completed, the command value control unit 130 moves the procedure to step S105. In step S105, the distance determination unit 134 determines whether the distance D is greater than the set distance D0 read from the set distance storage unit 141. Since the set distance D0 is a positive value and the sign of the distance D is also distinguished as described above, it is determined here whether the specific point P is in the excavation area and is farther from the excavation target surface S than the set distance D0. . The determination result of the distance determination unit 134 is input to the command value determination unit 137 as a determination signal representing the magnitude relationship between D and D0. At the same time, in step S105, the speed determination unit 136 determines whether or not the operation speed V is lower than the set speed V0 read from the set speed storage unit 142. Since the set speed V0 is a positive value and the sign of the operating speed V is also distinguished as described above, it is determined here whether the boom cylinder 31 is not contracted at a speed exceeding the set speed V0. The determination result of the speed determination unit 136 is input to the command value determination unit 137 as a determination signal indicating the magnitude relationship between V and V0.

ステップS105の判定の結果、D>D0でかつV<V0の場合、指令値制御部130はステップS106に手順を移す。ステップS106では、入力判定部131、距離判定部134及び速度判定部136の判定信号を基に、省電力指令値記憶部146から読み出した省電力指令値が指令値決定部137で指令値として選択されて出力部170に出力される。この場合、省電力指令値の大きさの指令信号が出力部170から出力され、各比例電磁弁は消磁状態となる。ステップS106の手順を終えたら、指令値制御部130は図9の手順を一旦終了し、次のサイクルを開始してステップS101の処理を実行する。   As a result of the determination in step S105, when D> D0 and V <V0, the command value control unit 130 moves the procedure to step S106. In step S106, based on the determination signals of the input determination unit 131, the distance determination unit 134, and the speed determination unit 136, the power saving command value read from the power saving command value storage unit 146 is selected as the command value by the command value determination unit 137. And output to the output unit 170. In this case, a command signal having the magnitude of the power saving command value is output from the output unit 170, and each proportional solenoid valve is in a demagnetized state. When the procedure of step S106 is completed, the command value control unit 130 ends the procedure of FIG. 9 once, starts the next cycle, and executes the process of step S101.

・ステップS102→S104→S105→S107
ステップS102,S104,S105の手順を実行し、D>D0でかつV<V0の条件が満たされない場合、指令値制御部130はステップS105からステップS107に手順を移す。ステップS107では、入力判定部131、距離判定部134及び速度判定部136の判定信号を基に、待機指令値記憶部145から読み出した待機指令値が指令値決定部137で指令値として選択されて出力部170に出力される。この場合、待機指令値の大きさの指令信号が出力部170から出力され、各比例電磁弁は中間開度で待機した状態となる。ステップS107の手順を終えたら、指令値制御部130は図9の手順を一旦終了し、次のサイクルを開始してステップS101の処理を実行する。
Steps S102 → S104 → S105 → S107
When the procedures of steps S102, S104, and S105 are executed and the condition of D> D0 and V <V0 is not satisfied, the command value control unit 130 moves the procedure from step S105 to step S107. In step S107, the standby command value read from the standby command value storage unit 145 is selected as the command value by the command value determination unit 137 based on the determination signals from the input determination unit 131, the distance determination unit 134, and the speed determination unit 136. The data is output to the output unit 170. In this case, a command signal having the magnitude of the standby command value is output from the output unit 170, and each proportional solenoid valve is in a standby state at an intermediate opening. When the procedure of step S107 is completed, the command value control unit 130 once ends the procedure of FIG. 9, starts the next cycle, and executes the process of step S101.

4.効果
4−1.省電力化
本実施形態では、特定点Pが掘削目標面Sから設定距離D0を超えて離れていて、ブームシリンダ31が設定速度V0を超える速度で収縮していない場合、減圧用及び増圧用の比例電磁弁(比例電磁弁61b,71a等)に省電力指令値の指令信号を出力する。つまり掘削目標面Sからバケット23が遠く、フロント作業装置20の動作状況を考慮しても直ちにバケット23が掘削領域から外れる恐れがないような場合、省電力指令値の指令信号を出力して比例電磁弁を消磁させる。図6及び図7で説明したように、省電力指令値(i0,i4)は開度調整域で最小の指令値(i1,i5)よりも更に小さい値である。これにより、消磁に対応する指令信号の指令値を開度調整域の最小値に設定した場合に比べて、特定点Pが掘削目標面Sから一定以上離れていてフロント制御用の比例電磁弁が制御されることがない場面に比例電磁弁に流す励磁電流を抑えることができる。従って、本実施形態によれば消費電力を抑制してエネルギー効率を向上させることができる。
4). Effect 4-1. In this embodiment, when the specific point P is separated from the excavation target surface S by more than the set distance D0 and the boom cylinder 31 is not contracted at a speed exceeding the set speed V0, the pressure reduction and pressure increase A power saving command value command signal is output to the proportional solenoid valves (proportional solenoid valves 61b, 71a, etc.). That is, when the bucket 23 is far from the excavation target surface S and the bucket 23 is not likely to be immediately removed from the excavation area even if the operation state of the front work device 20 is taken into consideration, the command signal of the power saving command value is output to be proportional. Demagnetize the solenoid valve. As described with reference to FIGS. 6 and 7, the power saving command value (i0, i4) is smaller than the minimum command value (i1, i5) in the opening adjustment region. Thereby, compared with the case where the command value of the command signal corresponding to demagnetization is set to the minimum value of the opening adjustment range, the specific point P is more than a certain distance from the excavation target surface S, and the proportional solenoid valve for front control is The exciting current that flows through the proportional solenoid valve in a scene that is not controlled can be suppressed. Therefore, according to this embodiment, power consumption can be suppressed and energy efficiency can be improved.

4−2.応答性低下の抑制
本実施形態では、フロント制御部120で制限指令値が生成されない場面で比例電磁弁(比例電磁弁61b等)を次の制限指令値の入力に備えて待機させておくとき、待機指令値の指令信号を出力することで比例電磁弁を中間開度にしておく。この状態でフロント制御部120から制限指令値が入力されたとしても、比例電磁弁のスプールの移動距離は、最大でも比例電磁弁を中間開度から最大開度又は最小開度にする距離である。これにより比例電磁弁を最小開度にする位置から最大開度にする位置まで一気にスプールを駆動させる場面がなくなり、平均して操作に対する応答性を向上させることができる。従って、操作に対する応答性の低下を抑制することができ、ひいてはフロント作業装置20の動作精度の低下を抑制することができる。
4-2. In the present embodiment, when the front controller 120 does not generate a limit command value, when a proportional solenoid valve (such as the proportional solenoid valve 61b) is kept waiting for input of the next limit command value, The proportional solenoid valve is set to an intermediate opening by outputting a command signal for the standby command value. Even if a limit command value is input from the front control unit 120 in this state, the movement distance of the spool of the proportional solenoid valve is a distance from the intermediate opening to the maximum opening or the minimum opening at the maximum. . As a result, there is no scene where the spool is driven at a stroke from the position where the proportional solenoid valve is set to the minimum opening to the position where the proportional opening is set to the maximum opening. Therefore, it is possible to suppress a decrease in responsiveness to the operation, and consequently, it is possible to suppress a decrease in the operation accuracy of the front work device 20.

5.その他
上記実施形態では、フロント制御部120で制限指令値が生成されていない場合に比例電磁弁を中間開度にする場合を説明した。しかし、待機指令値の大きさの設定は、比例電磁弁(比例電磁弁61b,71a等)を消磁させるための指令値を開度調整域の最小値よりも低く設定する主旨には直接関係がない。従って、待機指令値はi2ではなく、例えば図6のi1やi3等であっても良い。
5. Others In the above-described embodiment, the case where the proportional solenoid valve is set to the intermediate opening degree when the limit command value is not generated by the front control unit 120 has been described. However, the setting of the standby command value is directly related to the purpose of setting the command value for demagnetizing the proportional solenoid valves (proportional solenoid valves 61b, 71a, etc.) lower than the minimum value of the opening adjustment range. Absent. Accordingly, the standby command value is not i2, but may be, for example, i1 or i3 in FIG.

また、D>D0でかつV<V0の場合にステップS105で条件が満たされ、指令信号の値が省電力指令値に設定されるようにした場合を例示した。しかし、動作速度Vに関する条件(V<V0)は省略しても良い。つまり、フロント制御部120で制限指令値が生成されない場合、単純にD>D0であれば指令信号の値を省電力指令値とし、D≦D0であれば指令信号の値を待機指令値とするようにしても良い。この場合でも、指令信号の値を制限指令値、省電力指令値、待機指令値から選択でき、処理の簡略化のメリットが得られると共に、設定速度記憶部142、速度演算部135、速度判定部136も省略し得る。   Further, the case where the condition is satisfied in step S105 when D> D0 and V <V0 is set, and the value of the command signal is set to the power saving command value is illustrated. However, the condition regarding the operating speed V (V <V0) may be omitted. That is, when the limit command value is not generated by the front control unit 120, simply if D> D0, the value of the command signal is the power saving command value, and if D ≦ D0, the value of the command signal is the standby command value. You may do it. Even in this case, the value of the command signal can be selected from the limit command value, the power saving command value, and the standby command value, and the merit of simplification of processing can be obtained, and the set speed storage unit 142, the speed calculation unit 135, the speed determination unit 136 may also be omitted.

上記実施形態ではブームシリンダ31の伸縮速度を油圧アクチュエータの動作速度Vとして演算する場合を例に挙げて説明したが、アームシリンダ32やバケットシリンダ33の伸縮速度を動作速度VとしてステップS105の判定に用いても良い。勿論、油圧アクチュエータ31−33のうち複数を選択してその動作速度Vを加味する構成としても良い。また、一又は複数の油圧アクチュエータの動作速度Vから特定点Pの移動速度を演算し、掘削目標面Sに垂直な成分を抽出して掘削領域における特定点Pの掘削目標面Sへの接近速度を演算することができる。単に油圧アクチュエータの動作速度Vを考慮するのではなく、これを特定点Pの掘削目標面Sへの接近速度に変換して判断の基礎とすることも考えられる。   In the above embodiment, the case where the expansion / contraction speed of the boom cylinder 31 is calculated as the operation speed V of the hydraulic actuator has been described as an example. However, the expansion / contraction speed of the arm cylinder 32 or the bucket cylinder 33 is set as the operation speed V. It may be used. Of course, a configuration may be adopted in which a plurality of hydraulic actuators 31-33 are selected and their operating speed V is taken into account. Further, the moving speed of the specific point P is calculated from the operating speed V of one or a plurality of hydraulic actuators, the component perpendicular to the excavation target surface S is extracted, and the approach speed of the specific point P to the excavation target surface S in the excavation area. Can be calculated. Instead of simply considering the operating speed V of the hydraulic actuator, it may be considered that this is converted to the approach speed of the specific point P to the excavation target surface S and used as a basis for judgment.

なお、距離演算部133や速度演算部135に相当する機能部はフロント制御部120にも備えられ得る。その場合には、フロント制御部120で演算された距離Dや動作速度Vを指令値制御部130の距離判定部134や速度判定部136に入力するように構成しても良い。   Note that functional units corresponding to the distance calculation unit 133 and the speed calculation unit 135 may be included in the front control unit 120. In that case, the distance D and the operation speed V calculated by the front control unit 120 may be input to the distance determination unit 134 and the speed determination unit 136 of the command value control unit 130.

また、フロント制御用に減圧用の比例電磁弁61b,62a,62b,63a,63b及び増圧用の比例電磁弁71a,73a,73bを設けた場合を例示して説明したが、これら全てが必要なわけでは必ずしもない。これらのうち少なくとも1つ(例えばブーム下げ指令用の油圧信号を減圧する比例電磁弁61bが)あればフロント制御の一種が実行され得る。   Moreover, although the case where the proportional solenoid valves 61b, 62a, 62b, 63a, 63b for pressure reduction and the proportional solenoid valves 71a, 73a, 73b for pressure increase are provided for front control has been described as an example, all of these are necessary. Not necessarily. If at least one of these (for example, there is a proportional solenoid valve 61b for reducing the hydraulic pressure signal for boom lowering instruction), a kind of front control can be executed.

また、油圧アクチュエータの動作速度Vを圧力信号の大きさを基に演算する場合を例に挙げて説明したが、例えば角度検出器8a〜8cの信号の変化率を基にしても油圧アクチュエータの動作速度Vを求めることができる。例えば角度検出器8aの信号の変化率を基にしてブームシリンダ31の伸縮速度を求めることができる。油圧アクチュエータ31〜33のストローク量を検出するストローク検出器やブーム21、アーム22及びバケット23の傾斜角を検出する傾斜角検出器を利用しても油圧アクチュエータの動作速度Vを求め得る。   Further, the case where the operation speed V of the hydraulic actuator is calculated based on the magnitude of the pressure signal has been described as an example, but the operation of the hydraulic actuator is also performed based on, for example, the rate of change of the signals of the angle detectors 8a to 8c. The speed V can be obtained. For example, the expansion / contraction speed of the boom cylinder 31 can be obtained based on the rate of change of the signal of the angle detector 8a. The operation speed V of the hydraulic actuator can also be obtained using a stroke detector that detects the stroke amount of the hydraulic actuators 31 to 33 and an inclination angle detector that detects the inclination angles of the boom 21, arm 22, and bucket 23.

また、原動機17にエンジンを用い、エンジンで油圧ポンプ36等を駆動する一般的な油圧ショベルを例に挙げて説明したが、エンジン及び電動機を原動機として油圧ポンプ36等を駆動するハイブリッド式の油圧ショベルにも本発明は適用可能である。その他、電動機を原動機として油圧ポンプを駆動する電動式の油圧ショベル等にも本発明は適用可能である。   Further, a general hydraulic excavator that uses an engine as the prime mover 17 and drives the hydraulic pump 36 and the like by the engine has been described as an example. However, a hybrid hydraulic excavator that drives the hydraulic pump 36 and the like using the engine and the electric motor as a prime mover has been described. In addition, the present invention is applicable. In addition, the present invention can be applied to an electric excavator that drives a hydraulic pump using an electric motor as a prime mover.

8a〜8c…角度検出器(姿勢検出器)、10…車体、20…フロント作業装置、31…ブームシリンダ(油圧アクチュエータ)、32…アームシリンダ(油圧アクチュエータ)、33…バケットシリンダ(油圧アクチュエータ)、34…旋回モータ(油圧アクチュエータ)、36…油圧ポンプ、37…パイロットポンプ、37a…ポンプライン、41〜44…コントロールバルブ、51〜54…操作レバー装置、51a1,51a2,51b1,52a1,52b1,53a1,53a2,53b1,53b2,54a1,54b1…パイロットライン、61b,62a,62b,63a,63b…減圧用の比例電磁弁、71a,73a,73b…増圧用の比例電磁弁、100…コントローラユニット、120…フロント制御部、131…入力判定部、133…距離演算部、134…距離判定部、137…指令値決定部、142…設定速度記憶部、145…待機指令値記憶部、146…省電力指令値記憶部、170…出力部、P…フロント作業装置の特定点、S…特定点と掘削目標面との距離 8a to 8c ... Angle detector (attitude detector), 10 ... Vehicle body, 20 ... Front working device, 31 ... Boom cylinder (hydraulic actuator), 32 ... Arm cylinder (hydraulic actuator), 33 ... Bucket cylinder (hydraulic actuator), 34 ... Swivel motor (hydraulic actuator), 36 ... hydraulic pump, 37 ... pilot pump, 37a ... pump line, 41-44 ... control valve, 51-54 ... operating lever device, 51a1, 51a2, 51b1, 52a1, 52b1, 53a1 , 53a2, 53b1, 53b2, 54a1, 54b1 ... pilot line, 61b, 62a, 62b, 63a, 63b ... proportional solenoid valve for pressure reduction, 71a, 73a, 73b ... proportional solenoid valve for pressure increase, 100 ... controller unit, 120 ... Front controller 131 ... Force determination unit, 133 ... distance calculation unit, 134 ... distance determination unit, 137 ... command value determination unit, 142 ... set speed storage unit, 145 ... standby command value storage unit, 146 ... power saving command value storage unit, 170 ... output Part, P ... specific point of front working device, S ... distance between specific point and excavation target surface

Claims (1)

車体、前記車体に設けたフロント作業装置、前記フロント作業装置を駆動する複数の油圧アクチュエータ、前記フロント作業装置の姿勢を検出する姿勢検出器、前記油圧アクチュエータを駆動する作動油を吐出する油圧ポンプ、前記油圧ポンプから対応する油圧アクチュエータに供給される作動油の流れを制御する複数のコントロールバルブ、対応する油圧アクチュエータの動作を指示する油圧信号を操作に応じて生成する操作レバー装置、前記操作レバー装置に作動油を供給するパイロットポンプ、前記操作レバー装置及び対応するコントロールバルブの油圧駆動部を接続する複数のパイロットライン、前記パイロットポンプ及びコントロールバルブの油圧駆動部を接続する複数のポンプライン、前記複数のパイロットラインのうち少なくとも1つに設けた減圧用の比例電磁弁、前記複数のポンプラインのうち少なくとも1つに設けた増圧用の比例電磁弁、並びに前記姿勢検出器の検出信号を基に前記比例電磁弁を制御して前記フロント作業装置の動作を制限する制限指令値を演算するフロント制御部を有するコントローラを備えた作業機械において、
前記コントローラは、
前記減圧用及び増圧用の比例電磁弁の電磁駆動部に対して開度調整域で印加する励磁電流の最小値よりも低く設定した励磁電流である省電力指令値を記憶した省電力指令値記憶部と、
前記姿勢検出器の検出信号を基に前記フロント作業装置の特定点と掘削目標面との距離を演算する距離演算部と、
前記特定点と掘削目標面との距離について予め定めた設定距離を記憶した設定距離記憶部と、
前記特定点と掘削目標面との距離が前記設定距離よりも大きいか否かを判定する距離判定部と、
前記操作レバー装置の油圧信号の圧力又は前記姿勢検出器の検出信号を基に前記油圧アクチュエータの動作速度を演算する速度演算部と、
前記油圧アクチュエータの動作速度について予め定めた設定速度を記憶した設定速度記憶部と、
前記速度演算部で演算された前記油圧アクチュエータの動作速度が前記設定速度よりも大きいか否かを判定する速度判定部と、
前記距離判定部で前記特定点と掘削目標面との距離が前記設定距離より大きいと判定され、かつ前記速度判定部で前記油圧アクチュエータの動作速度が前記設定速度より小さいと判定された場合、前記省電力指令値記憶部から読み出した前記省電力指令値を前記比例電磁弁に対する指令値として決定する指令値決定部と、
前記指令値決定部で決定した前記指令値を基に前記減圧用及び増圧用の比例電磁弁のうちの少なくとも1つに指令信号を出力する出力部とを備えた作業機械。
A vehicle body, a front working device provided on the vehicle body, a plurality of hydraulic actuators that drive the front working device, a posture detector that detects a posture of the front working device, a hydraulic pump that discharges hydraulic fluid that drives the hydraulic actuator, A plurality of control valves for controlling the flow of hydraulic oil supplied from the hydraulic pump to the corresponding hydraulic actuator, an operation lever device for generating a hydraulic signal instructing the operation of the corresponding hydraulic actuator according to the operation, and the operation lever device A pilot pump that supplies hydraulic oil to the control lever, a plurality of pilot lines that connect the hydraulic drive portions of the control lever device and the corresponding control valve, a plurality of pump lines that connect the hydraulic drive portions of the pilot pump and the control valve, Less of the pilot line The proportional solenoid valve for pressure reduction provided in one, the proportional solenoid valve for pressure increase provided in at least one of the plurality of pump lines, and the proportional solenoid valve based on the detection signal of the attitude detector In a work machine including a controller having a front control unit that calculates a restriction command value that restricts the operation of the front work device,
The controller is
Power-saving command value storage that stores a power-saving command value that is an excitation current set lower than the minimum value of the excitation current applied in the opening adjustment region to the electromagnetic drive unit of the proportional solenoid valve for pressure reduction and pressure increase And
A distance calculation unit that calculates the distance between the specific point of the front work device and the excavation target surface based on the detection signal of the posture detector;
A set distance storage unit storing a preset set distance for the distance between the specific point and the excavation target surface;
A distance determination unit that determines whether a distance between the specific point and the excavation target surface is larger than the set distance;
A speed calculator that calculates the operating speed of the hydraulic actuator based on the pressure of the hydraulic signal of the operating lever device or the detection signal of the attitude detector;
A set speed storage unit that stores a preset set speed for the operating speed of the hydraulic actuator;
A speed determination unit that determines whether or not the operation speed of the hydraulic actuator calculated by the speed calculation unit is greater than the set speed;
When the distance determination unit determines that the distance between the specific point and the excavation target surface is greater than the set distance , and the speed determination unit determines that the operation speed of the hydraulic actuator is less than the set speed , A command value determining unit that determines the power saving command value read from the power saving command value storage unit as a command value for the proportional solenoid valve;
A work machine comprising: an output unit that outputs a command signal to at least one of the pressure reducing and pressure increasing proportional solenoid valves based on the command value determined by the command value determining unit.
JP2016127048A 2016-06-27 2016-06-27 Work machine Active JP6588393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016127048A JP6588393B2 (en) 2016-06-27 2016-06-27 Work machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016127048A JP6588393B2 (en) 2016-06-27 2016-06-27 Work machine

Publications (2)

Publication Number Publication Date
JP2018003284A JP2018003284A (en) 2018-01-11
JP6588393B2 true JP6588393B2 (en) 2019-10-09

Family

ID=60948737

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016127048A Active JP6588393B2 (en) 2016-06-27 2016-06-27 Work machine

Country Status (1)

Country Link
JP (1) JP6588393B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7175141B2 (en) * 2018-08-31 2022-11-18 ナブテスコ株式会社 HYDRAULIC CIRCUIT AND CONTROL VALVE MANUFACTURING METHOD

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3091667B2 (en) * 1995-06-09 2000-09-25 日立建機株式会社 Excavation control device for construction machinery
JP3027529B2 (en) * 1995-12-11 2000-04-04 住友建機株式会社 Interference prevention equipment for construction machinery, etc.
JP3466371B2 (en) * 1996-03-21 2003-11-10 日立建機株式会社 Construction machine interference prevention equipment
JP2000352076A (en) * 1999-06-10 2000-12-19 Hitachi Constr Mach Co Ltd Working machine control device for construction machine
JP5341134B2 (en) * 2011-05-25 2013-11-13 日立建機株式会社 Hydraulic work machine
CN104619922B (en) * 2014-09-10 2017-04-26 株式会社小松制作所 Utility vehicle
JP6554444B2 (en) * 2016-06-09 2019-07-31 日立建機株式会社 Work machine

Also Published As

Publication number Publication date
JP2018003284A (en) 2018-01-11

Similar Documents

Publication Publication Date Title
KR101887276B1 (en) Hydraulic control device for construction machine
WO2017212709A1 (en) Work machine
KR102028414B1 (en) Working machine
US7162869B2 (en) Hydraulic system for a work machine
WO2018092582A1 (en) Work machine
US11118327B2 (en) Work machine
JP2019052472A (en) Work machine
JP6615055B2 (en) Work machine
WO2019012701A1 (en) Work machine and control method of work machine
KR102588223B1 (en) working machine
CN114555957A (en) Regeneration device, hydraulic drive system provided with regeneration device, and control device for hydraulic drive system
JP6257879B2 (en) Excavator
WO2021059749A1 (en) Work machine
JP6588393B2 (en) Work machine
JP2024025818A (en) excavator
JP6591370B2 (en) Hydraulic control equipment for construction machinery
JP6511415B2 (en) Work machine
EP4381141A1 (en) Control of a hydraulic system of a construction machine
JP6964106B2 (en) Hydraulic circuit of construction machinery
WO2019012700A1 (en) Work machine and control method for work machine
JP2023117113A (en) Hydraulic drive device and construction machine including the same
JP2021095950A (en) Hydraulic circuit for construction machinery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180705

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190320

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190409

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190531

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190910

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190912

R150 Certificate of patent or registration of utility model

Ref document number: 6588393

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150