JP6398862B2 - Wire harness manufacturing method, manufacturing system, and management apparatus - Google Patents

Wire harness manufacturing method, manufacturing system, and management apparatus Download PDF

Info

Publication number
JP6398862B2
JP6398862B2 JP2015098624A JP2015098624A JP6398862B2 JP 6398862 B2 JP6398862 B2 JP 6398862B2 JP 2015098624 A JP2015098624 A JP 2015098624A JP 2015098624 A JP2015098624 A JP 2015098624A JP 6398862 B2 JP6398862 B2 JP 6398862B2
Authority
JP
Japan
Prior art keywords
wire harness
image data
wire
harness manufacturing
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015098624A
Other languages
Japanese (ja)
Other versions
JP2016213158A (en
Inventor
川瀬 賢司
賢司 川瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Metals Ltd
Original Assignee
Hitachi Metals Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Metals Ltd filed Critical Hitachi Metals Ltd
Priority to JP2015098624A priority Critical patent/JP6398862B2/en
Publication of JP2016213158A publication Critical patent/JP2016213158A/en
Application granted granted Critical
Publication of JP6398862B2 publication Critical patent/JP6398862B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)
  • Supply And Installment Of Electrical Components (AREA)
  • Insulated Conductors (AREA)

Description

本発明は、ワイヤーハーネスの製造方法、製造システム及び管理装置に関する。   The present invention relates to a method for manufacturing a wire harness, a manufacturing system, and a management apparatus.

ワイヤーハーネスの組立ては、一般的には、組立用図板にワイヤーハーネスの原寸図を貼り付けて布線板を作製し、その布線板に布線用治具を取り付けたものを用いている。原寸図には、組立ての作業手順や付属部品の取付指示等の作業指示が示されており、作業者はその作業指示に従って電線を布線し、布線した電線や電線束の所定位置に付属部品を取り付けてワイヤーハーネスの組立てを行う。   For the assembly of the wire harness, generally, a wiring board is prepared by pasting the full size diagram of the wire harness on the assembly board, and a wiring board is attached to the wiring board. . The full-scale drawing shows work instructions such as assembly work procedures and attachment instructions, etc., and the operator lays the wires according to the work instructions and attaches them to the predetermined positions of the wired wires and bundles of wires. Attach the parts and assemble the wire harness.

しかし、設計変更に応じて原寸図を貼り替える必要があることから、そのような作業を不要にしたワイヤーハーネス組立用図板装置が提案されている(例えば、特許文献1参照)。   However, since it is necessary to paste the original drawing according to the design change, a wire harness assembling board device that eliminates such work has been proposed (for example, see Patent Document 1).

このワイヤーハーネス組立用図板装置は、ワイヤーハーネスの組立てに必要な各種治具が配設可能な布線板と、布線板に取り付けられ、布線される電線を受け止める組立用治具と、ワイヤーハーネスの組立工程の画像を布線板の表面側から見えるように布線板に表示する表示手段とを備える。   This wire harness assembling drawing board device includes a wiring board on which various jigs necessary for assembling the wire harness can be disposed, an assembly jig that is attached to the wiring board and receives the wired wires, Display means for displaying an image of the assembly process of the wire harness on the wiring board so as to be visible from the surface side of the wiring board.

ワイヤーハーネスの組立工程の画像は、電線の布線工程、付属部品の取付工程、及びテープ巻き工程の3つの工程に応じて切り換えられる。   The image of the assembly process of the wire harness is switched according to the three processes of the wiring process of the electric wire, the attachment process of the accessory parts, and the tape winding process.

特開2000−195352号公報JP 2000-195352 A

しかし、従来のワイヤーハーネス組立用図板装置は、電線の布線工程内の作業工程に応じてワイヤーハーネスの組立工程の画像を切り換えるものではないため、長さが近似した電線を布線する場合に、電線や布線場所を間違えるおそれがある。また、組立用治具の取付位置は、組立工程の画像に含まれていないため、組立用治具の取付位置を誤るおそれがある。また、組立用治具を布線板に取り付ける際、布線板に穴を開けて組立用治具を穴に差し込んだのでは、布線板を傷つけたり、組立用治具を破損させるおそれがあり、取付作業も容易ではない。   However, the conventional wire harness assembly drawing board device does not switch the image of the assembly process of the wire harness according to the work process in the wiring process of the electrical wire. In addition, there is a risk of mistakes in the location of wires and wiring. Further, since the mounting position of the assembly jig is not included in the image of the assembly process, there is a possibility that the mounting position of the assembly jig is erroneous. Also, when attaching the assembly jig to the wiring board, if a hole is made in the wiring board and the assembly jig is inserted into the hole, the wiring board may be damaged or the assembly jig may be damaged. Yes, installation work is not easy.

一方、鉄道車両や航空機等の移動体は、安全に運行する必要があることから、信頼性の高いワイヤーハーネスが求められている。また、自動車業界では、車両開発期間の短縮に迅速に対応可能な高い生産性も求められている。   On the other hand, since mobile bodies, such as a railway vehicle and an aircraft, need to operate | move safely, a highly reliable wire harness is calculated | required. In the automobile industry, high productivity that can quickly respond to shortening of the vehicle development period is also required.

ワイヤーハーネスを製造する企業は、電線の組立順序や分岐位置等を独自に管理しているため、同じワイヤーハーネスを製造するとしても、電線の組立順序が異なる結果、電線を束ねたときの太さや捻じれ具合が異なってくる。これは電線の端部の位置ズレとなって現れる。このような場合、電線の両端にコネクタを接続する際に一部の電線がコネクタに届かないといった不都合が生じる。これを回避するために電線を長めにしておき、コネクタを接続する際に電線を切断して長さを調整したり、短い電線に合わせてコネクタを接続し、長めの電線を弛ませるという調整が発生する。このため、ワイヤーハーネス間で太さや長さのバラツキが生じ、信頼性の低下を招くおそれがある。   Since companies that manufacture wire harnesses independently manage the assembly order and branching position of the wires, even if the same wire harness is manufactured, the assembly order of the wires is different, resulting in the thickness and Twisting is different. This appears as a misalignment of the end of the wire. In such a case, when connecting a connector to the both ends of an electric wire, the problem that a part of electric wire does not reach a connector arises. To avoid this, adjust the length of the wires so that they can be adjusted by cutting the wires when connecting the connectors, or by connecting the connectors to the short wires and loosening the longer wires. Occur. For this reason, variations in thickness and length occur between the wire harnesses, which may lead to a decrease in reliability.

そこで、本発明の目的は、信頼性の高いワイヤーハーネスを高い生産性で製造することが可能なワイヤーハーネスの製造方法、製造システム及び管理装置を提供することにある。   Then, the objective of this invention is providing the manufacturing method, manufacturing system, and management apparatus of a wire harness which can manufacture a highly reliable wire harness with high productivity.

[1]ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置を用いて、移動体に用いられる複数の前記ワイヤーハーネスを製造する方法であって、
前記複数のワイヤーハーネスに対応した前記画像データを前記複数のワイヤーハーネス製造装置に提示するステップと、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とするステップと、
を含むワイヤーハーネス製造方法。
[2]前記画像データを提示するステップは、前記複数のワイヤーハーネスを全長に応じて複数の組に分け、前記複数の組に対応した前記画像データを前記複数の組に対応した前記複数のワイヤーハーネス製造装置に提示する、
前記[1]に記載のワイヤーハーネス製造方法。
[3]ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置と、
移動体に用いられる複数の前記ワイヤーハーネスに対応した前記画像データを前記複数のワイヤーハーネス製造装置に提示する提示手段と、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とする認証手段と、
を備えたワイヤーハーネス製造システム。
[4]前記提示手段は、前記複数のワイヤーハーネスを全長に応じて複数の組に分け、前記複数の組に対応した前記画像データを前記複数の組に対応した前記複数のワイヤーハーネス製造装置に提示する、
前記[3]に記載のワイヤーハーネス製造システム。
[5]ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置にネットワークを介して接続されたワイヤーハーネス管理装置であって、
移動体に用いられる複数の前記ワイヤーハーネスに対応した前記画像データを前記ネットワークを介して前記複数のワイヤーハーネス製造装置に提示する提示手段と、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とする認証手段と、
を備えたワイヤーハーネス管理装置。
[1] A plurality of wires used for a moving body using a plurality of wire harness manufacturing apparatuses that display image data corresponding to an assembly process of a wire harness on a display unit by switching a screen according to the progress of the assembly process. A method of manufacturing a harness comprising:
Presenting the image data corresponding to the plurality of wire harnesses to the plurality of wire harness manufacturing apparatuses;
Receiving an authentication request from an operator of the wire harness manufacturing apparatus, and enabling the display of the image data on the display unit when authentication for the operator is established;
A method for manufacturing a wire harness.
[2] In the step of presenting the image data, the plurality of wire harnesses are divided into a plurality of groups according to a total length, and the image data corresponding to the plurality of groups is the plurality of wires corresponding to the plurality of groups. Present to harness manufacturing equipment,
The wire harness manufacturing method as described in said [1].
[3] A plurality of wire harness manufacturing apparatuses that display the image data corresponding to the assembly process of the wire harness on the display unit by switching the screen according to the progress of the assembly process;
Presenting means for presenting the image data corresponding to the plurality of wire harnesses used for the moving body to the plurality of wire harness manufacturing apparatuses;
An authentication unit that accepts an authentication request from an operator of the wire harness manufacturing apparatus and enables the display of the image data on the display unit when authentication for the operator is established;
Wire harness manufacturing system equipped with.
[4] The presenting means divides the plurality of wire harnesses into a plurality of sets according to a total length, and supplies the image data corresponding to the plurality of sets to the plurality of wire harness manufacturing apparatuses corresponding to the plurality of sets. Present,
The wire harness manufacturing system according to [3].
[5] A wire harness management apparatus connected via a network to a plurality of wire harness manufacturing apparatuses that display image data corresponding to the assembly process of the wire harness on the display unit by switching the screen according to the progress of the assembly process. There,
Presenting means for presenting the image data corresponding to the plurality of wire harnesses used for the moving body to the plurality of wire harness manufacturing apparatuses via the network;
An authentication unit that accepts an authentication request from an operator of the wire harness manufacturing apparatus and enables the display of the image data on the display unit when authentication for the operator is established;
Wire harness management device with

本発明によれば、信頼性の高いワイヤーハーネスを高い生産性で製造することが可能になる。   According to the present invention, a highly reliable wire harness can be manufactured with high productivity.

図1は、本発明の実施の形態に係るワイヤーハーネス製造システムの概略の構成例を示すブロック図である。FIG. 1 is a block diagram showing a schematic configuration example of a wire harness manufacturing system according to an embodiment of the present invention. 図2は、本発明の第1の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。FIG. 2 is a cross-sectional view showing a schematic configuration example of the wire harness manufacturing apparatus according to the first embodiment of the present invention. 図3は、管理装置の制御系の一例を示すブロック図である。FIG. 3 is a block diagram illustrating an example of a control system of the management apparatus. 図4は、プロジェクタの制御系の一例を示すブロック図である。FIG. 4 is a block diagram illustrating an example of a control system of the projector. 図5は、遠隔操作器の構成の一例を示すブロック図である。FIG. 5 is a block diagram illustrating an example of the configuration of the remote controller. 図6は、組立用治具を示し、(a)は、スクリーンへの取り付け前を示す正面図、(b)は、(a)の平面図、(c)は、スクリーンへの取り付け後を示す部分断面図である。6A and 6B show an assembling jig, FIG. 6A is a front view showing the state before attachment to the screen, FIG. 6B is a plan view of FIG. 6A, and FIG. It is a fragmentary sectional view. 図7Aは、1ページ目の投影画像の一例を示す図である。FIG. 7A is a diagram illustrating an example of a projected image of the first page. 図7Bは、2ページ目の投影画像の一例を示す図である。FIG. 7B is a diagram showing an example of the projected image of the second page. 図7Cは、3ページ目の投影画像の一例を示す図である。FIG. 7C is a diagram illustrating an example of the projected image of the third page. 図7Dは、4ページ目の投影画像の一例を示す図である。FIG. 7D is a diagram illustrating an example of a projected image of the fourth page. 図7Eは、5ページ目の投影画像の一例を示す図である。FIG. 7E is a diagram illustrating an example of a projected image of the fifth page. 図8(a)は、スクリーンの変形例1を示す要部平面図、図8(b)は、スクリーンの変形例2を示す要部断面図である。FIG. 8A is a main part plan view showing a first modification of the screen, and FIG. 8B is a main part sectional view showing a second modification of the screen. 図9は、本発明の第2の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。FIG. 9 is a cross-sectional view showing a schematic configuration example of the wire harness manufacturing apparatus according to the second embodiment of the present invention. 図10は、第2の実施の形態に係る管理装置の制御系の一例を示すブロック図である。FIG. 10 is a block diagram illustrating an example of a control system of the management apparatus according to the second embodiment. 図11は、本発明の第3の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。FIG. 11: is sectional drawing which shows the example of a schematic structure of the wire harness manufacturing apparatus which concerns on the 3rd Embodiment of this invention.

以下、本発明の実施の形態について図面を参照して説明する。なお、各図中、実質的に同一の機能を有する構成要素については、同一の符号を付してその重複した説明を省略する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, in each figure, about the component which has the substantially same function, the same code | symbol is attached | subjected and the duplicate description is abbreviate | omitted.

[実施の形態]
図1は、本発明の実施の形態に係るワイヤーハーネス製造システムの概略の構成例を示すブロック図である。
[Embodiment]
FIG. 1 is a block diagram showing a schematic configuration example of a wire harness manufacturing system according to an embodiment of the present invention.

このワイヤーハーネス製造システム100は、ワイヤーハーネス製造方法が適用されたものであり、サーバ装置200と、サーバ装置200にインターネット等のネットワーク300を介して接続された複数のワイヤーハーネス製造装置1a、1b、1c・・・(これらを総称するときは「ワイヤーハーネス製造装置1」という。)とを有して概略構成されている。ここで、サーバ装置は、ワイヤーハーネス管理装置の一例である。   This wire harness manufacturing system 100 is applied with a wire harness manufacturing method, and includes a server device 200 and a plurality of wire harness manufacturing devices 1a, 1b connected to the server device 200 via a network 300 such as the Internet. 1c (generally referred to as “wire harness manufacturing apparatus 1”). Here, the server device is an example of a wire harness management device.

ワイヤーハーネス製造装置1は、ワイヤーハーネスの組立工程に対応した画像データを組立工程の進行に応じて画面を切り替えて後述する表示部63に表示するものである。また、複数のワイヤーハーネス製造装置1は、例えば、それぞれが異なるワイヤーハーネス製造業者にレンタルされる。なお、同一のワイヤーハーネス製造業者に2台以上のワイヤーハーネス製造装置1をレンタルしてもよい。   The wire harness manufacturing apparatus 1 displays image data corresponding to the assembly process of the wire harness on the display unit 63 described later by switching the screen according to the progress of the assembly process. Moreover, the some wire harness manufacturing apparatus 1 is rented to the wire harness manufacturer from which each differs, for example. In addition, you may rent two or more wire harness manufacturing apparatuses 1 to the same wire harness manufacturer.

(サーバ装置の構成)
サーバ装置200は、ワイヤーハーネス製造装置1との間で双方向通信を行い、ワイヤーハーネス製造装置1からワイヤーハーネスの履歴情報を取得する。
(Configuration of server device)
The server apparatus 200 performs two-way communication with the wire harness manufacturing apparatus 1 and acquires history information of the wire harness from the wire harness manufacturing apparatus 1.

サーバ装置200は、サーバ装置200の各部及びワイヤーハーネス製造システム100全体を制御する制御部210と、各種の情報を記憶する記憶部220と、ネットワーク300に接続された通信部230とを備える。   The server device 200 includes a control unit 210 that controls each unit of the server device 200 and the entire wire harness manufacturing system 100, a storage unit 220 that stores various types of information, and a communication unit 230 connected to the network 300.

制御部210は、CPU(Central Processing Unit)等によって構成され、記憶部220に記憶されたプログラム221に従って動作することにより、提示手段、認証手段等として機能する。   The control unit 210 is configured by a CPU (Central Processing Unit) or the like, and functions as a presentation unit, an authentication unit, and the like by operating according to a program 221 stored in the storage unit 220.

記憶部220は、ROM(Read Only Memory)、RAM(Random Access Memory)、ハードディスク等から構成され、制御部210のCPUのプログラム221、1つの移動体を構成する複数のワイヤーハーネス組立品a、b、c・・・を製造するためのワイヤーハーネス組立品画像データ222a、222b、222c、・・・(これらを総称するときは「ワイヤーハーネス組立品画像データ222」という。)、認証情報223等を記憶している。各ワイヤーハーネス組立品画像データ222及びワイヤーハーネス組立品には、ワイヤーハーネス組立品を識別するワイヤーハーネス組立品ID(識別情報)が付与されている。認証情報223は、ワイヤーハーネス製造装置1を操作する権限が与えられた操作者のユーザIDが登録されている。   The storage unit 220 includes a ROM (Read Only Memory), a RAM (Random Access Memory), a hard disk, and the like. The CPU program 221 of the control unit 210, and a plurality of wire harness assemblies a and b that constitute one moving body. , C... For wire harness assembly image data 222 a, 222 b, 222 c,... (Referred to collectively as “wire harness assembly image data 222”), authentication information 223, and the like. I remember it. Each wire harness assembly image data 222 and the wire harness assembly are provided with a wire harness assembly ID (identification information) for identifying the wire harness assembly. In the authentication information 223, the user ID of the operator who is authorized to operate the wire harness manufacturing apparatus 1 is registered.

ここで「移動体」は、本実施の形態では鉄道車両であるが、自動車、バス等の陸上車両や航空機等の他の移動体でもよい。また、ワイヤーハーネス組立品画像データ222は、画像データの一例である。また、「1つの移動体」は、複数の車両が連結された鉄道車両の場合、個々の車両をいう。   Here, the “moving body” is a railway vehicle in the present embodiment, but it may be a land vehicle such as an automobile or a bus, or another moving body such as an aircraft. The wire harness assembly image data 222 is an example of image data. In addition, “one moving body” refers to an individual vehicle in the case of a railway vehicle in which a plurality of vehicles are connected.

制御部210の提示手段は、移動体に用いられる複数のワイヤーハーネスに対応したワイヤーハーネス組立品画像データ222を、ネットワーク300を介して接続された複数のワイヤーハーネス製造装置1に提示する。本明細書において「画像データを提示する」には、保存させるために画像データを供給する場合と、保存させずに閲覧のみさせるために画像データを提示する場合の両方の意味を含む。   The presenting unit of the control unit 210 presents the wire harness assembly image data 222 corresponding to the plurality of wire harnesses used for the moving body to the plurality of wire harness manufacturing apparatuses 1 connected via the network 300. In the present specification, “presenting image data” includes both the meaning of supplying image data for storage and the case of presenting image data for browsing without saving.

制御部210の認証手段は、ワイヤーハーネス製造装置1の操作者から認証要求を受け付けたとき、操作者に対する認証が成立するか否かを判断し、操作者に対する認証が成立したとき、当該操作者のワイヤーハーネス製造装置1に対する操作を受け付けし、表示部へのワイヤーハーネス組立品画像データ222の表示を可能とする認証処理を行う。すなわち、ワイヤーハーネス製造装置1からユーザIDがネットワーク300を介して送られてくると、そのユーザIDが記憶部220に記憶されている認証情報223に存在しているか否かを判断し、存在していれば認証が成立し、存在していなければ、認証が不成立となり、認証結果(成立/不成立)をネットワーク300を介してワイヤーハーネス製造装置1に送信する。   When the authentication means of the control unit 210 receives an authentication request from the operator of the wire harness manufacturing apparatus 1, it determines whether authentication for the operator is established, and when the authentication for the operator is established, the operator The operation for the wire harness manufacturing apparatus 1 is received, and an authentication process that enables the display of the wire harness assembly image data 222 on the display unit is performed. That is, when a user ID is sent from the wire harness manufacturing apparatus 1 via the network 300, it is determined whether or not the user ID exists in the authentication information 223 stored in the storage unit 220. If it is, the authentication is established, and if it does not exist, the authentication is not established, and the authentication result (established / not established) is transmitted to the wire harness manufacturing apparatus 1 via the network 300.

ワイヤーハーネス製造装置1の後述する制御部は、サーバ装置200から認証成立の認証結果が送信された場合にのみ当該操作者のワイヤーハーネス製造装置1に対する操作を受け付けし、表示部にワイヤーハーネス組立品画像データ222を表示する。   The control unit, which will be described later, of the wire harness manufacturing apparatus 1 accepts the operator's operation on the wire harness manufacturing apparatus 1 only when the authentication result of authentication establishment is transmitted from the server device 200, and the wire harness assembly is displayed on the display unit. The image data 222 is displayed.

[第1の実施の形態]
図2は、本発明の第1の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。
[First Embodiment]
FIG. 2 is a cross-sectional view showing a schematic configuration example of the wire harness manufacturing apparatus according to the first embodiment of the present invention.

(ワイヤーハーネス製造装置全体の構成)
このワイヤーハーネス製造装置1は、スクリーン2と、スクリーン2を支持する筐体3と、筐体3内に配置されたミラー4と、同じく筐体3内に配置され、投影画像をミラー4を介してスクリーン2の裏面2bに投影するプロジェクタ5と、ワイヤーハーネスの組立を管理する管理装置6と、プロジェクタ5を遠隔操作する遠隔操作器7とを備える。
(Configuration of the entire wire harness manufacturing device)
The wire harness manufacturing apparatus 1 includes a screen 2, a housing 3 that supports the screen 2, a mirror 4 that is disposed in the housing 3, and a housing 4 that is also disposed in the housing 3. A projector 5 that projects onto the back surface 2b of the screen 2, a management device 6 that manages the assembly of the wire harness, and a remote controller 7 that remotely operates the projector 5.

ここで、スクリーン2及びプロジェクタ5の後述する投影手段50は、表示部の一例である。また、「ワイヤーハーネス」とは、複数の電線を束にし、各電線の両端部にプリント基板や機器に接続するためのコネクタ又は端子を有するものをいう。「ワイヤーハーネスの組立工程」は、例えば、組立用治具取付工程、電線を布線する工程、及び電線の両端にコネクタを取り付ける工程を含むハーネス布線工程、布線したワイヤーハーネスをバンドで結束するバンド取付工程とから構成されている。なお、工程はこれらに限られない。また、「ワイヤーハーネス組立品」は、ワイヤーハーネスの組立工程を経て組み立てられたものをいうこともある。   Here, the projection unit 50 described later of the screen 2 and the projector 5 is an example of a display unit. In addition, the “wire harness” means a bundle of a plurality of electric wires, and a connector or a terminal for connecting to a printed circuit board or a device at both ends of each electric wire. The “wire harness assembly process” includes, for example, a harness wiring process including an assembly jig mounting process, a process of wiring an electric wire, and a process of mounting connectors on both ends of the electric wire, and binding the wired wire harness with a band And a band attaching process. In addition, a process is not restricted to these. In addition, the “wire harness assembly” may refer to an assembly assembled through a wire harness assembly process.

スクリーン2は、例えば、アクリル板、ガラス板等の透明板を用いることができる。また、スクリーン2の表面2aは、例えば、組立用治具10が負圧によって吸着できるように平滑な面になっており、裏面2bは、例えば、投影画像が表面2aから視認できるように光散乱面となっている。なお、スクリーン2は、背面投影型のものであれば、特に限定されない。例えば、透明板の裏面に光散乱シートを貼り付けてもよい。   For the screen 2, for example, a transparent plate such as an acrylic plate or a glass plate can be used. Further, the surface 2a of the screen 2 is a smooth surface so that the assembly jig 10 can be adsorbed by negative pressure, for example, and the back surface 2b is light-scattered so that the projected image can be viewed from the surface 2a, for example. It is a surface. The screen 2 is not particularly limited as long as it is a rear projection type. For example, a light scattering sheet may be attached to the back surface of the transparent plate.

プロジェクタ5は、管理装置6の通信部64から投影画像データを受け取り、その投影画像データをメモリ58に記憶し、遠隔操作器7からの開始信号、ページ送り信号、ページ戻し信号、終了信号等に基づいて、投影画像の投影の開始、投影画像の送り又は戻し、投影の終了等を行うものである。   The projector 5 receives the projection image data from the communication unit 64 of the management device 6, stores the projection image data in the memory 58, and uses it as a start signal, page feed signal, page return signal, end signal, etc. from the remote controller 7. Based on this, the projection of the projection image is started, the projection image is sent or returned, the projection is terminated, and the like.

管理装置6は、例えば、パーソナルコンピュータ(PC)により実現される。管理装置6の詳細の構成は後述する。   The management device 6 is realized by a personal computer (PC), for example. The detailed configuration of the management device 6 will be described later.

遠隔操作器7は、プロジェクタ5を制御するための制御信号を送信する機能、バーコードを読み取る機能、及び読み取った2つのバーコードが一致するか否かの判定機能、及び判定結果を表示する機能を有する。遠隔操作器7の詳細の構成は後述する。   The remote controller 7 has a function of transmitting a control signal for controlling the projector 5, a function of reading a bar code, a function of determining whether or not two read bar codes match, and a function of displaying a determination result Have The detailed configuration of the remote controller 7 will be described later.

(管理装置の構成)
図3は、管理装置6の制御系の一例を示すブロック図である。管理装置6は、CPU等によって構成され、ワイヤーハーネス製造装置1の各部を制御する制御部60と、各種の情報を記憶する記憶部61と、キーボード、マウス等で実現される入力部62と、液晶ディスプレイ等で実現される表示部63と、プロジェクタ5、遠隔操作器7、サーバ装置200等の外部装置と通信する通信部64とを備える。
(Management device configuration)
FIG. 3 is a block diagram illustrating an example of a control system of the management apparatus 6. The management device 6 includes a CPU and the like, and includes a control unit 60 that controls each unit of the wire harness manufacturing apparatus 1, a storage unit 61 that stores various types of information, an input unit 62 that is realized by a keyboard, a mouse, and the like. A display unit 63 realized by a liquid crystal display or the like, and a communication unit 64 that communicates with an external device such as the projector 5, the remote controller 7, and the server device 200 are provided.

記憶部61は、ROM、RAM、ハードディスク等から構成され、CPUのプログラム610、投影画像データ611、管理データ612等を記憶している。なお、本実施の形態では、サーバ装置200が保持するワイヤーハーネス組立品画像データ222は、ワイヤーハーネス製造装置1が保持する投影画像データ611に対応しているものとする。   The storage unit 61 includes a ROM, a RAM, a hard disk, and the like, and stores a CPU program 610, projection image data 611, management data 612, and the like. In the present embodiment, it is assumed that the wire harness assembly image data 222 held by the server apparatus 200 corresponds to the projection image data 611 held by the wire harness manufacturing apparatus 1.

制御部60のCPUは、プログラム610に従って動作し、管理装置6の各部、及びワイヤーハーネス製造装置1全体を制御する。   The CPU of the control unit 60 operates according to the program 610 and controls each unit of the management device 6 and the entire wire harness manufacturing apparatus 1.

投影画像データ611は、ワイヤーハーネス組立品IDに対応し、組立工程及び組立工程内の細部の作業工程に対応した複数のページから構成されている。また、投影画像データ611は、スクリーン2の表面2aに負圧によって吸着可能な組立用治具10の位置を示す治具画像を含む、また、投影画像データ611は、スクリーン2に投影されたときに、ワイヤーハーネスの原寸図と等倍、かつ、歪みのない正方形又は長方形で表示されるように予め補正されている。投影画像データ611には、工程名、工程の内容をイメージで表示する画像情報、工程の作業内容を文字で表示する文字情報等が含まれる。   The projection image data 611 is composed of a plurality of pages corresponding to the wire harness assembly ID and corresponding to the assembly process and the detailed work process in the assembly process. Further, the projection image data 611 includes a jig image indicating the position of the assembly jig 10 that can be attracted to the surface 2 a of the screen 2 by negative pressure, and the projection image data 611 is projected onto the screen 2. In addition, it is corrected in advance so as to be displayed as a square or a rectangle which is the same size as the original drawing of the wire harness and has no distortion. The projection image data 611 includes a process name, image information for displaying the contents of the process as an image, character information for displaying the work contents of the process as characters, and the like.

管理データ612は、例えば、操作者としての作業者を識別する作業者ID(識別情報)、ワイヤーハーネス組立品ID、作業開始日時(例えば、遠隔操作器7から開始信号が送信された日時)、作業終了日時(例えば、遠隔操作器7から終了信号が送信された日時)、コネクタのバーコードに関する判定結果等が互いに関係付けられて履歴情報として記憶部61に記憶される。ここで、コネクタのバーコードは、コネクタ識別情報の一例である。コネクタ識別情報としては、バーコード等の一次元コードに限られず、QRコード(登録商標)、PDF417、Data Matrix、Maxi Code等の二次元コード、独自コード等の機械読取り可能なコードや、ドットパターン等のパターンでもよい。また、目的に応じて複数種のコードを組み合わせてもよい。   The management data 612 includes, for example, a worker ID (identification information) for identifying a worker as an operator, a wire harness assembly ID, a work start date and time (for example, a date and time when a start signal is transmitted from the remote controller 7), The work end date and time (for example, the date and time when the end signal is transmitted from the remote controller 7), the determination result regarding the barcode of the connector, and the like are associated with each other and stored in the storage unit 61 as history information. Here, the barcode of the connector is an example of connector identification information. The connector identification information is not limited to a one-dimensional code such as a barcode, but a machine-readable code such as a QR code (registered trademark), two-dimensional code such as PDF417, Data Matrix, Maxi Code, or a unique code, or a dot pattern Or a pattern such as A plurality of types of codes may be combined according to the purpose.

制御部60のCPUは、通信部64及びネットワーク300を介してサーバ装置200と双方向通信を行い、自己のワイヤーハーネス製造装置1に提示されたワイヤーハーネス組立品画像データ222を投影画像データ611として記憶部61に記憶する。また、制御部60のCPUは、予め定められたタイミングで記憶部61に記憶された履歴情報を通信部64及びネットワーク300を介してサーバ装置200に送信する。   The CPU of the control unit 60 performs two-way communication with the server device 200 via the communication unit 64 and the network 300, and uses the wire harness assembly image data 222 presented to the own wire harness manufacturing device 1 as the projection image data 611. Store in the storage unit 61. Further, the CPU of the control unit 60 transmits history information stored in the storage unit 61 to the server device 200 via the communication unit 64 and the network 300 at a predetermined timing.

(プロジェクタの構成)
図4は、プロジェクタ5の制御系の一例を示すブロック図である。プロジェクタ5は、投影画像を投影する投影手段50と、CPU等によって構成され、プロジェクタ5の各部を制御する制御部57と、管理装置6から送信された投影画像データ611を記憶するメモリ58とを備える。
(Projector configuration)
FIG. 4 is a block diagram illustrating an example of a control system of the projector 5. The projector 5 includes a projection unit 50 that projects a projection image, a CPU, and the like, and includes a control unit 57 that controls each unit of the projector 5 and a memory 58 that stores the projection image data 611 transmitted from the management device 6. Prepare.

投影手段50は、赤色光、緑色光、青色光をそれぞれ出射する3つのLED光源51と、各LED光源51から出射された赤色光、緑色光、青色光を受けて赤色画像光、緑色画像光、青色画像光をそれぞれ生成するR、G、B用の3つの液晶パネル52と、LED光源51を駆動する光源駆動部53と、液晶パネル52を駆動する液晶パネル駆動部54と、3つの液晶パネル52により生成された赤色画像光、緑色画像光、青色画像光を合成する合成光学系55と、合成光学系55により合成された投影画像をミラー4を介してスクリーン2に投影する投影レンズ56とを備える。   The projection unit 50 receives three LED light sources 51 that respectively emit red light, green light, and blue light, and receives red light, green light, and blue light emitted from each LED light source 51 to receive red image light and green image light. , Three R, G, and B liquid crystal panels 52 that respectively generate blue image light, a light source driver 53 that drives the LED light source 51, a liquid crystal panel driver 54 that drives the liquid crystal panel 52, and three liquid crystals A combining optical system 55 that combines the red image light, the green image light, and the blue image light generated by the panel 52, and a projection lens 56 that projects the projection image combined by the combining optical system 55 onto the screen 2 via the mirror 4. With.

プロジェクタ5の制御部57は、管理装置6から送信された投影画像データを受け取ると、その投影画像データをメモリ58に記憶する。また、制御部57は、遠隔操作器7からの開始信号に基づいて、1ページ目の投影画像データをメモリ58から読み出し、その投影画像データに基づく投影画像をスクリーン2に投影させる。また、制御部57は、遠隔操作器7からのページ送り信号又はページ戻し信号に基づいて、対応するページの投影画像データに基づく投影画像をスクリーン2に投影させる。   When receiving the projection image data transmitted from the management device 6, the control unit 57 of the projector 5 stores the projection image data in the memory 58. Further, the control unit 57 reads the projection image data of the first page from the memory 58 based on the start signal from the remote controller 7 and projects the projection image based on the projection image data onto the screen 2. Further, the control unit 57 projects a projection image based on the projection image data of the corresponding page on the screen 2 based on the page turning signal or the page returning signal from the remote controller 7.

(遠隔操作器の構成)
図5は、遠隔操作器7の構成の一例を示すブロック図である。遠隔操作器7は、CPU等によって構成され、遠隔操作器7の各部を制御する制御部70と、投影開始を指示する開始信号を発生する開始ボタン71a、ページ送りを指示するページ送り信号を発生する送りボタン71b、ページ戻しを指示するページ戻し信号を発生する戻しボタン71c、及び投影終了を指示する終了信号を発生する終了ボタン71d等の各種のボタンと、テンキー72と、バーコードを光学的に読み取る読取部73と、読取部73によって読み取られた、コネクタに付加されたバーコードと投影画像に表示されたバーコードとが一致するか否かの判定を行う判定部74と、判定部74の判定結果を表示する判定結果表示部75と、制御部70により判定結果を管理装置6に送信する通信部76とを備える。
(Configuration of remote controller)
FIG. 5 is a block diagram illustrating an example of the configuration of the remote controller 7. The remote controller 7 includes a CPU and the like, and generates a control unit 70 for controlling each part of the remote controller 7, a start button 71 a for generating a start signal for instructing projection start, and a page feed signal for instructing page feed. Various buttons such as a feed button 71b to perform, a return button 71c to generate a page return signal for instructing page return, and an end button 71d to generate an end signal to instruct projection termination, a numeric keypad 72, and a bar code optically. , A determination unit 74 that determines whether or not the barcode added to the connector and the barcode displayed on the projected image matches the barcode read by the reading unit 73, and the determination unit 74. The determination result display unit 75 that displays the determination result and the communication unit 76 that transmits the determination result to the management device 6 by the control unit 70 are provided.

判定結果表示部75は、両者のバーコードが一致したときは、例えば「ピンポーン」という一致したこと示す音を発生し、両者のバーコードが不一致のときは、例えば「ブブー」という一致しなかったことを示す音を発生してもよい。また、判定結果表示部75は、両者のバーコードが一致したときは、例えば緑色のランプを点灯させ、両者のバーコードが不一致のときは、例えば赤色のランプを点灯させてもよい。さらに、音と色の両方で判定結果を表示してもよい。   When the two barcodes match, the determination result display unit 75 generates a sound indicating, for example, “ping pawn”, and when the two barcodes do not match, the determination result display unit 75 does not match “buboo”, for example. A sound indicating that may be generated. The determination result display unit 75 may turn on, for example, a green lamp when both barcodes match, and turn on a red lamp, for example, when both barcodes do not match. Furthermore, the determination result may be displayed by both sound and color.

(組立用治具の構成)
図6は、組立用治具10を示し、(a)は、スクリーン2への取り付け前を示す正面図、(b)は、(a)の平面図、(c)は、スクリーン2への取り付け後を示す部分断面図である。
(Configuration of assembly jig)
6A and 6B show the assembling jig 10, wherein FIG. 6A is a front view showing the state before attachment to the screen 2, FIG. 6B is a plan view of FIG. 6A, and FIG. It is a fragmentary sectional view showing the back.

組立用治具10は、ドーム状の本体11と、本体11の内側に配置された吸着盤12と、レバー部13と、支軸14を中心にレバー部13を回転可能に支持するスライド軸15と、スライド軸15の先端に設けられ、スライド軸15を吸着盤12に固定する座部16とを備える。   The assembling jig 10 includes a dome-shaped main body 11, a suction disk 12 disposed inside the main body 11, a lever portion 13, and a slide shaft 15 that rotatably supports the lever portion 13 around a support shaft 14. And a seat 16 that is provided at the tip of the slide shaft 15 and fixes the slide shaft 15 to the suction disk 12.

本体11は、その中央にスライド軸15が貫通して上下方向にスライド可能な開口11aが形成されている。   The main body 11 is formed with an opening 11a that is slidable in the vertical direction through the slide shaft 15 at the center thereof.

レバー部13は、電線又はワイヤーハーネスを支持する一対の支持片130と、一対の支持片130に接続され、レバー部13の回転中心となる支点部131とを備える。支点部131には、カム面131aが形成されている。カム面131aは、図6(a)に示す状態では、本体11の上面に非接触状態となっており、レバー部13を図6(c)に示すように回転させると、カム面131aが本体11の上面に接触し、スライド軸15を上方に引き上げる。スライド軸15が上方に引き上げられると、吸着盤12の中央部が上方に持ち上げられ、吸着盤12の内側の空間が増加して負圧となり、組立用治具10がスクリーン2の表面2aに吸着される。   The lever portion 13 includes a pair of support pieces 130 that support an electric wire or a wire harness, and a fulcrum portion 131 that is connected to the pair of support pieces 130 and serves as a rotation center of the lever portion 13. The fulcrum part 131 is formed with a cam surface 131a. In the state shown in FIG. 6A, the cam surface 131a is not in contact with the upper surface of the main body 11. When the lever portion 13 is rotated as shown in FIG. 11 is brought into contact with the upper surface of the slider 11, and the slide shaft 15 is pulled upward. When the slide shaft 15 is pulled upward, the central portion of the suction disk 12 is lifted upward, the space inside the suction disk 12 is increased to a negative pressure, and the assembly jig 10 is attracted to the surface 2 a of the screen 2. Is done.

本体11、レバー部13、支軸14、スライド軸15及び座部16は、例えば樹脂又は金属から形成されている。吸着盤12は、例えばゴム等の弾性部材から形成されている。   The main body 11, the lever portion 13, the support shaft 14, the slide shaft 15, and the seat portion 16 are made of, for example, resin or metal. The suction disk 12 is made of an elastic member such as rubber.

(ワイヤーハーネスの製造方法)
次に、ワイヤーハーネスの製造方法の一例について説明する。ワイヤーハーネス製造装置1を用いたワイヤーハーネスの組立に先だって、サーバ装置200からワイヤーハーネス組立品画像データ222をネットワーク300を介して各ワイヤーハーネス製造装置1に送信する。
(Wire harness manufacturing method)
Next, an example of a method for manufacturing a wire harness will be described. Prior to the assembly of the wire harness using the wire harness manufacturing apparatus 1, the wire harness assembly image data 222 is transmitted from the server apparatus 200 to each wire harness manufacturing apparatus 1 via the network 300.

(1)第1の製造方式の場合
この第1の製造方式は、例えば、1つの車両がワイヤーハーネスA、B、Cから構成され、3つのワイヤーハーネス製造装置1a、1b、1cを用いて2つの車両分のワイヤーハーネスを製造する場合に、各ワイヤーハーネス製造装置1a〜1cは、同じ種類のワイヤーハーネスを製造する方式である。
(1) In the case of the first manufacturing method In this first manufacturing method, for example, one vehicle is composed of wire harnesses A, B, and C, and two wire harness manufacturing apparatuses 1a, 1b, and 1c are used. When manufacturing the wire harness for one vehicle, each wire harness manufacturing apparatus 1a-1c is a system which manufactures the same kind of wire harness.

ワイヤーハーネス製造装置1aにワイヤーハーネスA用のワイヤーハーネス組立品画像データ222aを送信し、ワイヤーハーネス製造装置1bにワイヤーハーネスB用のワイヤーハーネス組立品画像データ222bを送信し、ワイヤーハーネス製造装置1cにワイヤーハーネスC用のワイヤーハーネス組立品画像データ222cを送信する。   The wire harness assembly image data 222a for the wire harness A is transmitted to the wire harness manufacturing apparatus 1a, the wire harness assembly image data 222b for the wire harness B is transmitted to the wire harness manufacturing apparatus 1b, and the wire harness manufacturing apparatus 1c is transmitted. The wire harness assembly image data 222c for the wire harness C is transmitted.

ワイヤーハーネス製造装置1aは、ワイヤーハーネス組立品画像データ222aに基づいてワイヤーハーネスAを2本製造し、ワイヤーハーネス製造装置1bは、ワイヤーハーネス組立品画像データ222bに基づいてワイヤーハーネスBを2本製造し、ワイヤーハーネス製造装置1cは、ワイヤーハーネス組立品画像データ222cに基づいてワイヤーハーネスCを2本製造する。   The wire harness manufacturing apparatus 1a manufactures two wire harnesses A based on the wire harness assembly image data 222a, and the wire harness manufacturing apparatus 1b manufactures two wire harnesses B based on the wire harness assembly image data 222b. And the wire harness manufacturing apparatus 1c manufactures two wire harnesses C based on the wire harness assembly image data 222c.

(2)第2の製造方式の場合
この第2の製造方式は、例えば、1つの車両がワイヤーハーネスA、B、Cから構成され、2つのワイヤーハーネス製造装置1a、1bを用いて2つの車両分のワイヤーハーネスを製造する場合に、各ワイヤーハーネス製造装置1a、1bは、1つの車両分のワイヤーハーネスを製造する方式である。
(2) In the case of the second manufacturing method In this second manufacturing method, for example, one vehicle is composed of wire harnesses A, B, and C, and two vehicles are manufactured using two wire harness manufacturing apparatuses 1a and 1b. When manufacturing a wire harness for a minute, each wire harness manufacturing apparatus 1a, 1b is a method for manufacturing a wire harness for one vehicle.

ワイヤーハーネス製造装置1aにワイヤーハーネスA、B、C用のワイヤーハーネス組立品画像データ222a、222b、222cを送信し、ワイヤーハーネス製造装置1bにワイヤーハーネスA、B、C用のワイヤーハーネス組立品画像データ222a、222b、222cを送信する。   Wire harness assembly image data 222a, 222b, and 222c for wire harnesses A, B, and C are transmitted to the wire harness manufacturing apparatus 1a, and wire harness assembly images for the wire harnesses A, B, and C are transmitted to the wire harness manufacturing apparatus 1b. Data 222a, 222b, 222c is transmitted.

ワイヤーハーネス製造装置1aは、ワイヤーハーネス組立品画像データ222a〜222cに基づいてワイヤーハーネスA、B、Cを各1本製造する。ワイヤーハーネス製造装置1bは、ワイヤーハーネス製造装置1aと同様に、ワイヤーハーネス組立品画像データ222a〜222cに基づいてワイヤーハーネスA、B、Cを各本製造する。   The wire harness manufacturing apparatus 1a manufactures one each of the wire harnesses A, B, and C based on the wire harness assembly image data 222a to 222c. Similarly to the wire harness manufacturing apparatus 1a, the wire harness manufacturing apparatus 1b manufactures each of the wire harnesses A, B, and C based on the wire harness assembly image data 222a to 222c.

(組立方法)
次に、ワイヤーハーネス製造装置1を用いたワイヤーハーネス組立品の組立方法の一例について図7A〜図7Eを参照して説明する。図7A〜図7Eは、スクリーン2を表側から見た投影画像の一例を示す図である。なお、布線工程が3つのワイヤーハーネスの布線工程から構成されている場合について以下に説明する。
(Assembly method)
Next, an example of a method for assembling a wire harness assembly using the wire harness manufacturing apparatus 1 will be described with reference to FIGS. 7A to 7E. 7A to 7E are diagrams illustrating examples of projected images when the screen 2 is viewed from the front side. In addition, the case where the wiring process is comprised from the wiring process of three wire harnesses is demonstrated below.

操作者としての管理者は、管理装置6の入力部62を操作してユーザIDを入力する。管理装置6の制御部60は、入力されたユーザIDとともに認証要求をネットワーク300を介してサーバ装置200に送信する。サーバ装置200の制御部210の認証手段は、操作者に対する認証が成立するか否かを判断し、操作者に対する認証が成立したとき、成立の認証結果をネットワーク300を介してワイヤーハーネス製造装置1に送信する。ワイヤーハーネス製造装置1の制御部60は、その後の当該管理者の操作を受け付ける。   An administrator as an operator operates the input unit 62 of the management device 6 and inputs a user ID. The control unit 60 of the management apparatus 6 transmits an authentication request together with the input user ID to the server apparatus 200 via the network 300. The authentication unit of the control unit 210 of the server device 200 determines whether or not the authentication for the operator is established. When the authentication for the operator is established, the authentication result of the establishment is sent via the network 300 to the wire harness manufacturing apparatus 1. Send to. The control unit 60 of the wire harness manufacturing apparatus 1 accepts subsequent operations of the manager.

管理者は、管理装置6の入力部62を操作してワイヤーハーネス識別情報を入力する。
制御部60は、入力部62に入力されたワイヤーハーネス識別情報に対応する投影画像データを記憶部61から読み出し、プロジェクタ5に送信する。
The administrator operates the input unit 62 of the management device 6 and inputs the wire harness identification information.
The control unit 60 reads projection image data corresponding to the wire harness identification information input to the input unit 62 from the storage unit 61 and transmits the projection image data to the projector 5.

プロジェクタ5の制御部57は、管理装置6から送信された投影画像データをメモリ58に記憶する。作業者は、遠隔操作器7のテンキー72を操作して作業者を識別する作業者IDを入力する。続いて作業者は、遠隔操作器7の開始ボタン71aを操作して投影開始を指示する。遠隔操作器7の制御部70は、作業者IDを管理装置6に送信し、開始信号をプロジェクタ5に送信する。管理装置6の制御部60は、遠隔操作器7から送信された作業者IDを管理データ612として記憶部61に記憶する。プロジェクタ5の制御部57は、遠隔操作器7からの開始信号に基づいて投影を開始する。すなわち、制御部57は、1ページ目の投影画像データをメモリ58から読み出し、投影手段50を制御して1ページ目の投影画像データに基づく投影画像をスクリーン2に投影させる。   The control unit 57 of the projector 5 stores the projection image data transmitted from the management device 6 in the memory 58. The worker operates the numeric keypad 72 of the remote controller 7 and inputs a worker ID for identifying the worker. Subsequently, the operator operates the start button 71a of the remote controller 7 to instruct the start of projection. The control unit 70 of the remote controller 7 transmits the worker ID to the management device 6 and transmits a start signal to the projector 5. The control unit 60 of the management device 6 stores the worker ID transmitted from the remote controller 7 in the storage unit 61 as management data 612. The control unit 57 of the projector 5 starts projection based on the start signal from the remote controller 7. That is, the control unit 57 reads the projection image data of the first page from the memory 58 and controls the projection unit 50 to project the projection image based on the projection image data of the first page on the screen 2.

(1)組立用治具取付工程
図7Aは、1ページ目の「組立用治具取付」工程の投影画像の一例を示す図である。同図に示す投影画像20には、「組立用治具取付」の工程名20aと、組立用治具10の取付位置を示す組立用治具10の治具画像21と、電線の布線位置を示す布線指示線22とが表示されている。このとき、治具画像21がハイライト表示されてもよい。
(1) Assembly Jig Attaching Process FIG. 7A is a diagram showing an example of a projected image of the “assembly jig installation” process on the first page. The projection image 20 shown in FIG. 3 includes a process name 20a of “attachment of assembly jig”, a jig image 21 of the assembly jig 10 indicating the attachment position of the assembly jig 10, and a wiring position of the electric wire. A wiring instruction line 22 is displayed. At this time, the jig image 21 may be highlighted.

作業者は、投影された投影画像20の工程名20aの「組立用治具取付」を確認し、スクリーン2に投影された治具画像21の位置に組立用治具10を取り付ける。作業者は、組立用治具10の取付作業が終わると、遠隔操作器7の送りボタン71bを操作する。遠隔操作器7の制御部70は、送りボタン71bの操作に基づいてページ送り信号をプロジェクタ5に送信する。   The operator confirms “attachment of assembly jig” in the process name 20 a of the projected image 20 and attaches the assembly jig 10 to the position of the jig image 21 projected on the screen 2. The operator operates the feed button 71b of the remote controller 7 after the assembly work of the assembly jig 10 is completed. The control unit 70 of the remote controller 7 transmits a page feed signal to the projector 5 based on the operation of the feed button 71b.

(2)ハーネス1の布線工程
プロジェクタ5の制御部57は、遠隔操作器7からのページ送り信号に基づいて2ページ目の投影画像データをメモリ58から読み出し、投影手段50を制御して2ページ目の投影画像データに基づく投影画像をスクリーン2に投影させる。
(2) Wiring process of harness 1 The control unit 57 of the projector 5 reads the projection image data of the second page from the memory 58 based on the page feed signal from the remote controller 7 and controls the projection means 50 to 2 A projection image based on the projection image data of the page is projected on the screen 2.

図7Bは、2ページ目の「ハーネス1布線」工程の投影画像を示す図である。同図に示す投影画像20には、図7Aと同様の「ハーネス1布線」の工程名20a、治具画像21、布線指示線22の他に、電線画像23a、コネクタ型式及びバーコード27a、27bを含むコネクタ画像24a、24bが表示されている。このとき、電線画像23a及びコネクタ画像24a、24bがハイライト表示されてもよい。なお、布線工程では、電線の仕様(型式、色、長さ等9が投影画像に表示されている(以下の布線工程でも同じ。)。   FIG. 7B is a diagram illustrating a projected image of the “harness 1 wiring” process on the second page. The projected image 20 shown in the figure includes a process name 20a, a jig image 21, and a wiring instruction line 22 of “harness 1 wiring” similar to FIG. 7A, an electric wire image 23a, a connector model, and a barcode 27a. , 27b including connector images 24a, 24b are displayed. At this time, the electric wire image 23a and the connector images 24a and 24b may be highlighted. In the wiring process, the specifications of the electric wire (model, color, length, etc. 9 are displayed in the projection image (the same applies to the following wiring processes).

作業者は、投影された投影画像20の工程名20aの「ハーネス1布線」を確認し、電線画像23aと色が同系色で長さがほぼ同じ電線を選び、選んだ電線を組立用治具10の一対の支持片130間を通る電線画像23a上に配置する。   The operator confirms the “harness 1 wiring” of the process name 20a of the projected image 20, selects an electric wire having the same color and the same length as the electric wire image 23a, and selects the selected electric wire for assembly. It arrange | positions on the electric wire image 23a which passes between between a pair of support pieces 130 of the tool 10. FIG.

次に、その電線の両端にコネクタ画像24a、24bに対応するコネクタを接続する。このとき、作業者は、コネクタに付加されたコネクタ番号がコネクタ画像24a、24bに表示されているコネクタ番号と一致することを確認した後、コネクタを接続する。具体的には、遠隔操作器7の読取部73でコネクタ側及びコネクタ画像24a、24b側のそれぞれのコネクタ番号に併記されているバーコードを読み取る。判定部74は、両者が一致しているか否かを判定し、判定結果表示部75は、判定結果を表示して作業者に知らせる。また、遠隔操作器7の制御部70は、判定結果を通信部76を介して管理装置6に送信する。管理装置6の制御部60は、判定結果を通信部64を介して受信し、その判定結果を工程名とともに履歴情報として管理データ612に記憶する。バーコードの読取、判定結果の表示、履歴情報の記憶は、以下のハーネスの布線工程でも同じように行われる。   Next, connectors corresponding to the connector images 24a and 24b are connected to both ends of the electric wire. At this time, the worker confirms that the connector number added to the connector matches the connector number displayed in the connector images 24a and 24b, and then connects the connector. Specifically, the reading unit 73 of the remote controller 7 reads the barcodes written on the connector numbers on the connector side and the connector images 24a, 24b side. The determination unit 74 determines whether or not both match, and the determination result display unit 75 displays the determination result and notifies the operator. In addition, the control unit 70 of the remote controller 7 transmits the determination result to the management device 6 via the communication unit 76. The control unit 60 of the management device 6 receives the determination result via the communication unit 64 and stores the determination result in the management data 612 as history information together with the process name. Bar code reading, determination result display, and history information storage are performed in the same manner in the harness wiring process described below.

以上のようにしてハーネス1の布線が終わる。作業者は、ハーネス1の布線が終わると、遠隔操作器7の送りボタン71bを操作する。遠隔操作器7の制御部70は、送りボタン71bの操作に基づいてページ送り信号をプロジェクタ5に送信する。   The wiring of the harness 1 is completed as described above. When the wiring of the harness 1 is finished, the operator operates the feed button 71b of the remote controller 7. The control unit 70 of the remote controller 7 transmits a page feed signal to the projector 5 based on the operation of the feed button 71b.

(3)ハーネス2の布線工程
プロジェクタ5の制御部57は、遠隔操作器7からのページ送り信号に基づいて3ページ目の投影画像データをメモリ58から読み出し、投影手段50を制御して3ページ目の投影画像データに基づく投影画像をスクリーン2に投影させる。
(3) Wiring process of harness 2 The control unit 57 of the projector 5 reads out the projection image data of the third page from the memory 58 based on the page feed signal from the remote controller 7, and controls the projection means 50 to A projection image based on the projection image data of the page is projected on the screen 2.

図7Cは、3ページ目の「ハーネス2布線」工程の投影画像を示す図である。同図に示す投影画像20には、図7Aと同様の「ハーネス2布線」の工程名20a、治具画像21、布線指示線22の他に、電線画像23b、23c、コネクタ型式及びバーコード27c〜27eを含むコネクタ画像24c、24d、24eが表示され、さらにテープを表してテープ画像25が表示されている。このとき、電線画像23b、23c、コネクタ画像24a〜24e及びテープ画像25がハイライト表示されてもよく、テープ画像25のみがハイライト表示されてもよい。なお、ハーネス1の画像は表示されていない。   FIG. 7C is a diagram illustrating a projection image of the “harness 2 wiring” process on the third page. The projected image 20 shown in the figure includes the process name 20a of the “harness 2 wiring” similar to FIG. 7A, the jig image 21, and the wiring instruction line 22, as well as the electric wire images 23b and 23c, the connector type and the bar. Connector images 24c, 24d, and 24e including codes 27c to 27e are displayed, and a tape image 25 is displayed to represent the tape. At this time, the wire images 23b and 23c, the connector images 24a to 24e, and the tape image 25 may be highlighted, or only the tape image 25 may be highlighted. Note that the image of the harness 1 is not displayed.

作業者は、投影された投影画像20の工程名20aの「ハーネス2布線」を確認し、2本の電線画像23b、23cのそれぞれと色が同系色で長さがほぼ同じ2本の電線を選び、選んだ2本の電線を組立用治具10の一対の支持片130間を通る電線画像23b、23c上に配置する。   The operator confirms “harness 2 wiring” of the process name 20a of the projected image 20, and two electric wires having the same color and the same length as the two electric wire images 23b and 23c. The two selected electric wires are arranged on the electric wire images 23b and 23c passing between the pair of support pieces 130 of the assembling jig 10.

次に、2本の電線の両端にコネクタ画像24c、24d、24eに対応するコネクタを接続する。このとき、作業者は、コネクタに付加されたコネクタ番号がコネクタ画像24c、24d、24eに表示されているコネクタ番号と一致することを確認した後、コネクタを接続する。次に、テープ画像25が表示されている複数の位置にテープを巻き付けて電線を束ねる。なお、テープの巻き付け作業は、後の工程、例えば電線を束ねる工程で行ってもよい。   Next, connectors corresponding to the connector images 24c, 24d, and 24e are connected to both ends of the two electric wires. At this time, the operator confirms that the connector number added to the connector matches the connector number displayed in the connector images 24c, 24d, and 24e, and then connects the connector. Next, the tape is wound around a plurality of positions where the tape image 25 is displayed, and the electric wires are bundled. The tape winding operation may be performed in a later process, for example, a process of bundling electric wires.

以上のようにしてハーネス2の布線が終わる。作業者は、ハーネス2の布線が終わると、遠隔操作器7の送りボタン71bを操作する。遠隔操作器7の制御部70は、送りボタン71bの操作に基づいてページ送り信号をプロジェクタ5に送信する。   The wiring of the harness 2 is completed as described above. When the wiring of the harness 2 is finished, the operator operates the feed button 71b of the remote controller 7. The control unit 70 of the remote controller 7 transmits a page feed signal to the projector 5 based on the operation of the feed button 71b.

(4)ハーネス3の布線工程
プロジェクタ5の制御部57は、遠隔操作器7からのページ送り信号に基づいて4ページ目の投影画像データをメモリ58から読み出し、投影手段50を制御して4ページ目の投影画像データに基づく投影画像をスクリーン2に投影させる。
(4) Wiring process of harness 3 The control unit 57 of the projector 5 reads out the projection image data of the fourth page from the memory 58 based on the page feed signal from the remote controller 7, and controls the projection means 50 to A projection image based on the projection image data of the page is projected on the screen 2.

図7Dは、4ページ目の「ハーネス3布線」工程の投影画像を示す図である。同図に示す投影画像20には、図7Aと同様の「ハーネス3布線」の工程名20a、治具画像21、布線指示線22の他に、電線画像23d、コネクタ型式及びバーコード27f、27gを含むコネクタ画像24f、24gが表示されている。このとき、電線画像23d及びコネクタ画像24f、24gがハイライト表示されてもよい。なお、ハーネス1、2の画像は表示されていない。   FIG. 7D is a diagram illustrating a projection image of the “harness 3 wiring” process on the fourth page. The projected image 20 shown in the figure includes a wire name 23d, a connector type, and a barcode 27f in addition to the process name 20a of the “harness 3 wiring” similar to FIG. , 27g including connector images 24g and 24g are displayed. At this time, the electric wire image 23d and the connector images 24f and 24g may be highlighted. The images of the harnesses 1 and 2 are not displayed.

作業者は、投影された投影画像20の工程名20aの「ハーネス3布線」に従い、電線画像23dと色が同系色で長さがほぼ同じ電線を選び、選んだ電線を組立用治具10の一対の支持片130間を通る電線画像23d上に配置する。   The operator selects an electric wire having the same color and the same color as the electric wire image 23d in accordance with the “harness 3 wiring” of the process name 20a of the projected image 20, and the selected electric wire is assembled into the assembly jig 10. It arrange | positions on the electric wire image 23d which passes between between a pair of support pieces 130 of.

次に、電線の両端にコネクタ画像24f、24gに対応するコネクタを接続する。このとき、作業者は、コネクタに付加されたコネクタ番号がコネクタ画像24f、24gに表示されているコネクタ番号と一致することを確認した後、コネクタを接続する。   Next, connectors corresponding to the connector images 24f and 24g are connected to both ends of the electric wire. At this time, after confirming that the connector number added to the connector matches the connector number displayed in the connector images 24f and 24g, the operator connects the connector.

以上のようにしてハーネス3の布線が終わる。作業者は、ハーネス3の布線が終わると、遠隔操作器7の送りボタン71bを操作する。遠隔操作器7の制御部70は、送りボタン71bの操作に基づいてページ送り信号をプロジェクタ5に送信する。   The wiring of the harness 3 is completed as described above. When the wiring of the harness 3 is finished, the operator operates the feed button 71b of the remote controller 7. The control unit 70 of the remote controller 7 transmits a page feed signal to the projector 5 based on the operation of the feed button 71b.

(5)電線を束ねる工程
プロジェクタ5の制御部57は、遠隔操作器7からのページ送り信号に基づいて5ページ目の投影画像データをメモリ58から読み出し、投影手段50を制御して5ページ目の投影画像データに基づく投影画像をスクリーン2に投影させる。
(5) The step of bundling the electric wires The control unit 57 of the projector 5 reads the projection image data of the fifth page from the memory 58 based on the page feed signal from the remote controller 7, and controls the projection means 50 to control the fifth page. A projected image based on the projected image data is projected on the screen 2.

図7Eは、5ページ目の「電線を束ねる」工程の投影画像を示す図である。同図に示す投影画像20には、図7Aと同様の「電線を束ねる」の工程名20a、治具画像21の他に、全てのハーネス1〜3の電線画像23a〜23d、コネクタ画像24a〜24gが表示され、さらにスリット入りチューブを表したチューブ画像26が表示されている。なお、チューブ画像26は、目立つようにハイライト表示されてもよい。   FIG. 7E is a diagram showing a projected image of the process of “bundling electric wires” on the fifth page. In the projected image 20 shown in the figure, in addition to the process name 20a “bundling electric wires” and the jig image 21 similar to FIG. 7A, the electric wire images 23a to 23d of all the harnesses 1 to 3 and connector images 24a to 24a 24g is displayed, and a tube image 26 representing a slitted tube is further displayed. Note that the tube image 26 may be highlighted so as to stand out.

作業者は、投影された投影画像20の工程名20aの「電線を束ねる」を確認し、チューブ画像26の位置でスリット入りのチューブにより電線を束ねる。   The operator confirms “bundling electric wires” in the process name 20 a of the projected image 20, and bundles the electric wires with a slit tube at the position of the tube image 26.

以上のようにしてワイヤーハーネス組立品が完成する。作業者は、ワイヤーハーネス組立品が完成すると、遠隔操作器7の終了ボタン71dを操作する。遠隔操作器7は、終了ボタン71dの操作に基づいて終了信号をプロジェクタ5に送信する。   The wire harness assembly is completed as described above. When the wire harness assembly is completed, the operator operates the end button 71d of the remote controller 7. The remote controller 7 transmits an end signal to the projector 5 based on the operation of the end button 71d.

プロジェクタ5の制御部57は、遠隔操作器7からの終了信号に基づいて、メモリ58に記憶されている投影画像データを消去する。   The control unit 57 of the projector 5 erases the projection image data stored in the memory 58 based on the end signal from the remote controller 7.

(第1の実施の形態の作用、効果)
第1の実施の形態によれば、以下の作用、効果を奏する。
(a)電線の布線工程内の作業工程に応じてワイヤーハーネスの組立工程の画像を切り換えるため、電線や布線場所を間違えるおそれが少なくなる。
(b)組立用治具の取付位置は、投影画像に表示されるため、組立用治具の取付位置を誤るおそれが少なくなる。
(c)組立用治具を吸着によりスクリーンに取り付けるため、スクリーンを傷つけたり、組立用治具を破損させるおそれが少なくなり、取付作業が容易になる。
(d)したがって、電線やワイヤーハーネスを支持する組立用治具の取付ミスを含む作業ミスが少なくなる。
(e)スクリーン2に投影画像を投影させているので、スクリーン2として比較的強度の高いものを用いることができる。
(f)ワイヤーハーネスの組立工程を画像によって視覚的に表示しているので、作業ミスが減り、信頼性の高いワイヤーハーネスを製造することができる。
(g)1つの移動体を構成するワイヤーハーネスを複数のワイヤーハーネス製造装置に分散して製造しているので、高い生産性でワイヤーハーネスを製造することができる。
(h)統一した電線の布線工程を経てワイヤーハーネスを製造しているので、同じワイヤーハーネスを分けて製造したとしてもワイヤーハーネスの太さや長さのバラツキが少ない品質の安定した信頼性の高いワイヤーハーネスを製造することができる。
(Operation and effect of the first embodiment)
According to the first embodiment, the following operations and effects are achieved.
(A) Since the image of the assembly process of the wire harness is switched in accordance with the work process in the wiring process of the electric wire, there is less possibility that the electric wire and the wiring place are mistaken.
(B) Since the mounting position of the assembly jig is displayed in the projection image, there is less possibility of erroneous mounting positions of the assembly jig.
(C) Since the assembling jig is attached to the screen by suction, the possibility of damaging the screen or damaging the assembling jig is reduced, and the attaching operation is facilitated.
(D) Therefore, work errors including mistakes in mounting the assembly jig for supporting the electric wires and wire harnesses are reduced.
(E) Since the projected image is projected on the screen 2, a relatively high strength screen 2 can be used.
(F) Since the assembly process of the wire harness is visually displayed as an image, work mistakes are reduced and a highly reliable wire harness can be manufactured.
(G) Since the wire harness which comprises one moving body is disperse | distributing and manufactured to several wire harness manufacturing apparatuses, a wire harness can be manufactured with high productivity.
(H) Since the wire harness is manufactured through a unified wiring process, even if the same wire harness is manufactured separately, there is little variation in the thickness and length of the wire harness and the quality is stable and reliable. A wire harness can be manufactured.

次に、第1の実施の形態の変形例を説明する。   Next, a modification of the first embodiment will be described.

[変形例1]
上記実施の形態では、組立用治具として、負圧によってスクリーンの表面に吸着するものについて説明したが、スクリーンは、組立用治具が磁力によってスクリーンの表面に磁気吸着する性質を有するものを用いてもよい。
[Modification 1]
In the above-described embodiment, the assembling jig has been described as being attracted to the surface of the screen by negative pressure. May be.

図8(a)は、スクリーンの変形例1を示す要部平面図である。磁気吸着する性質を有するスクリーン2としては、図8(a)に示すように、金属線2cを格子状に配置したものを用いてもよい。この場合、組立用治具は、例えば、回転可能に設けられた永久磁石と、永久磁石を回転させて磁力をオン、オフさせるツマミとを備えたものを用いことができる。そして、組立用治具をスクリーン2の表面2aに吸着させる場合は、ツマミを回転させて磁力をオンにする。組立用治具をスクリーン2から外す場合は、ツマミを回転させて磁力をオフにする。なお、永久磁石の代わりに電磁石を用いてもよい。また、変形例1を他の実施の形態に適用してもよい。   FIG. 8A is a main part plan view showing a first modification of the screen. As the screen 2 having the property of being magnetically attracted, as shown in FIG. 8A, a screen in which metal wires 2c are arranged in a lattice shape may be used. In this case, the assembling jig can be, for example, one provided with a permanent magnet that is rotatably provided and a knob that turns the permanent magnet on and off to turn on the magnetic force. When the assembly jig is attracted to the surface 2a of the screen 2, the knob is rotated to turn on the magnetic force. When removing the assembly jig from the screen 2, the knob is rotated to turn off the magnetic force. An electromagnet may be used instead of the permanent magnet. Moreover, you may apply the modification 1 to other embodiment.

[変形例2]
図8(b)は、スクリーンの変形例2を示す要部平面図である。図8(b)に示すように、磁性粉2cを含有する透明シート2dをスクリーン2の表面2aに形成したものを用いてもよい。この場合の組立用治具は、変形例1と同じものを用いる。なお、変形例2を他の実施の形態に適用してもよい。
[Modification 2]
FIG. 8B is a main part plan view showing a second modification of the screen. As shown in FIG. 8 (b), a transparent sheet 2d containing magnetic powder 2c formed on the surface 2a of the screen 2 may be used. The assembly jig in this case is the same as that of the first modification. Note that Modification 2 may be applied to other embodiments.

[変形例3]
上記実施の形態では、組立工程毎に投影画像データを用意したが、投影画像データ611は、組立工程毎に投影するオブジェクト(テキスト含む)を変えてもよい。また、大分類の工程はページごとに、小分類の工程はオブジェクトごとに画像を切り替えてもよい。なお、変形例3を他の実施の形態に適用してもよい。
[Modification 3]
In the above embodiment, projection image data is prepared for each assembly process, but the projection image data 611 may change an object (including text) to be projected for each assembly process. In addition, the large classification process may be switched for each page, and the small classification process may be switched for each object. Note that Modification 3 may be applied to other embodiments.

[変形例4]
上記実施の形態では、遠隔操作器7からのページ送り信号に基づいて投影画像を切り替えていたが、予め定められた時間ごとに投影画像を切り替えて表示するようにプロジェクタ5を制御してもよい。なお、変形例4を他の実施の形態に適用してもよい。
[Modification 4]
In the above-described embodiment, the projection image is switched based on the page turning signal from the remote controller 7. However, the projector 5 may be controlled so that the projection image is switched and displayed at predetermined time intervals. . Modification 4 may be applied to other embodiments.

[第2の実施の形態]
図9は、本発明の第2の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。第1の実施の形態では、表示部として、スクリーン2とプロジェクタ5を用いたが、第2の実施の形態は、タッチパネルディスプレイ12を用いたものであり、他は第1の実施の形態と同様に構成されている。
[Second Embodiment]
FIG. 9 is a cross-sectional view showing a schematic configuration example of the wire harness manufacturing apparatus according to the second embodiment of the present invention. In the first embodiment, the screen 2 and the projector 5 are used as the display unit. However, in the second embodiment, the touch panel display 12 is used, and the others are the same as in the first embodiment. It is configured.

本実施の形態のワイヤーハーネス製造装置1は、タッチパネルディスプレイ12と、タッチパネルディスプレイ12を支持する筐体3と、タッチパネルディスプレイ12を制御する管理装置6と、管理装置6に接続された遠隔操作器7とを備える。なお、タッチパネルディスプレイ12は、表示部又は表示入力部の一例である。   The wire harness manufacturing apparatus 1 of the present embodiment includes a touch panel display 12, a housing 3 that supports the touch panel display 12, a management device 6 that controls the touch panel display 12, and a remote controller 7 that is connected to the management device 6. With. The touch panel display 12 is an example of a display unit or a display input unit.

タッチパネルディスプレイ12は、画像の表示及び画像の編集情報等の入力が可能に構成されている。すなわち、タッチパネルディスプレイ12は、画像を表示するディスプレイの表面側にタッチパネルを配置し、タッチパネルに手、指、ペン等で情報を入力できるように構成されている。また、タッチパネルディスプレイ12の表面12aには、第1の実施の形態と同様に組立用治具10が取り付け可能になっている。なお、タッチパネルディスプレイ12の表面12aの側に透明板を配置し、その透明板の表面に組立用治具10を取り付けてもよい。この構成によれば、タッチパネルディスプレイ12の表面の強度が低い場合でも組立用治具10の取付けが可能になる。   The touch panel display 12 is configured to be able to display an image and input image editing information. That is, the touch panel display 12 is configured such that a touch panel is disposed on the surface side of a display that displays an image, and information can be input to the touch panel with a hand, a finger, a pen, or the like. Further, an assembly jig 10 can be attached to the surface 12a of the touch panel display 12 as in the first embodiment. A transparent plate may be arranged on the surface 12a side of the touch panel display 12, and the assembly jig 10 may be attached to the surface of the transparent plate. According to this configuration, the assembly jig 10 can be attached even when the strength of the surface of the touch panel display 12 is low.

遠隔操作器7は、第1の実施の形態と同様のものであるが、開始ボタン71a、送りボタン71b、戻しボタン71c、終了ボタン71d、テンキー72の機能をタッチパネルディスプレイ12に表示する画像に持たせてもよい。これにより、開始ボタン71a、送りボタン71b、戻しボタン71c、終了ボタン71d、テンキー72を省くことができ、遠隔操作器7の小型化を図れる。   The remote controller 7 is the same as that of the first embodiment, but has an image displayed on the touch panel display 12 with functions of a start button 71a, a feed button 71b, a return button 71c, an end button 71d, and a numeric keypad 72. It may be allowed. Thereby, the start button 71a, the feed button 71b, the return button 71c, the end button 71d, and the numeric keypad 72 can be omitted, and the remote controller 7 can be downsized.

図10は、第2の実施の形態に係る管理装置6の制御系の一例を示すブロック図である。管理装置6は、第1の実施の形態と同様に、制御部60、記憶部61、入力部62、表示部63及び通信部64を備える。通信部64にタッチパネルディスプレイ12が接続されている。   FIG. 10 is a block diagram illustrating an example of a control system of the management apparatus 6 according to the second embodiment. The management device 6 includes a control unit 60, a storage unit 61, an input unit 62, a display unit 63, and a communication unit 64, as in the first embodiment. The touch panel display 12 is connected to the communication unit 64.

記憶部61は、ROM、RAM、ハードディスク等から構成され、CPUのプログラム610、投影画像データ611と同様に構成された画像データ611a、管理データ612等を記憶している。なお、本実施の形態では、サーバ装置200が保持するワイヤーハーネス組立品画像データ222は、ワイヤーハーネス製造装置1が保持する画像データ611aに対応しているものとする。   The storage unit 61 includes a ROM, a RAM, a hard disk, and the like, and stores image data 611a, management data 612, and the like that are configured in the same manner as the CPU program 610 and the projection image data 611. In the present embodiment, it is assumed that the wire harness assembly image data 222 held by the server apparatus 200 corresponds to the image data 611a held by the wire harness manufacturing apparatus 1.

制御部60のCPUは、通信部64及びネットワーク300を介してサーバ装置200と双方向通信を行い、自己のワイヤーハーネス製造装置1に提示されたワイヤーハーネス組立品画像データ222を画像データ611aとして記憶部61に記憶する。また、制御部60のCPUは、予め定められたタイミングで記憶部61に記憶された履歴情報又は編集情報を通信部64及びネットワーク300を介してサーバ装置200に送信する。   The CPU of the control unit 60 performs two-way communication with the server device 200 via the communication unit 64 and the network 300, and stores the wire harness assembly image data 222 presented to the own wire harness manufacturing device 1 as the image data 611a. Store in the unit 61. Further, the CPU of the control unit 60 transmits history information or editing information stored in the storage unit 61 to the server apparatus 200 via the communication unit 64 and the network 300 at a predetermined timing.

サーバ装置200の制御部210のCPUは、プログラム221に従って動作することにより、編集手段として動作する。編集手段は、タッチパネルディスプレイ12に入力され、ワイヤーハーネス製造装置1から送信された編集情報に基づいて記憶部220が記憶するワイヤーハーネス組立品画像データ222を編集する。   The CPU of the control unit 210 of the server apparatus 200 operates as an editing unit by operating according to the program 221. The editing unit edits the wire harness assembly image data 222 stored in the storage unit 220 based on the editing information input from the touch panel display 12 and transmitted from the wire harness manufacturing apparatus 1.

(第2の実施の形態の作用、効果)
第2の実施の形態によれば、第1の実施の形態と同様に上記(a)〜(d)の作用、効果を奏するとともに、編集情報をサーバ装置200に送信することにより、サーバ装置200側で画像データを編集することができる。また、第1の実施の形態と比べて表示部を小型にできる。
(Operation and effect of the second embodiment)
According to the second embodiment, similar to the first embodiment, the operations and effects of the above (a) to (d) are exhibited, and the editing information is transmitted to the server device 200, whereby the server device 200. The image data can be edited on the side. In addition, the display unit can be made smaller than in the first embodiment.

なお、第2の実施の形態の組立工程に対応したワイヤーハーネス組立品画像データ222の代わりに組立工程に対応した仮図面データをサーバ装置200の記憶部220に記憶しておき、仮図面データをサーバ装置200から各ワイヤーハーネス製造装置1に提示してもよい。作業者がタッチパネルディスプレイ12に表示された画像に対しワイヤーハーネスを沿わせながら、タッチペン、電子ペン等を用いて仮図面の編集情報の入力を行うと、管理装置6の制御部60が入力された編集情報をサーバ装置200に送信し、サーバ装置200の制御部210の編集手段が編集情報に基づいて、記憶部220が記憶する仮図面データを編集してワイヤーハーネス組立品画像データ222を生成する。ここで、「仮図面データ」とは、ワイヤーハーネスの布線位置を示す図面情報、及びハーネス組立作業を指示する文字情報を含むものをいう。   The temporary drawing data corresponding to the assembly process is stored in the storage unit 220 of the server device 200 instead of the wire harness assembly image data 222 corresponding to the assembly process of the second embodiment, and the temporary drawing data is stored. You may show to each wire harness manufacturing apparatus 1 from the server apparatus 200. FIG. When an operator inputs editing information of a temporary drawing using a touch pen, an electronic pen or the like while keeping the wire harness along the image displayed on the touch panel display 12, the control unit 60 of the management device 6 is input. The editing information is transmitted to the server device 200, and the editing means of the control unit 210 of the server device 200 edits the temporary drawing data stored in the storage unit 220 based on the editing information to generate the wire harness assembly image data 222. . Here, “temporary drawing data” refers to data including drawing information indicating the wiring position of the wire harness and character information instructing the harness assembling work.

[第3の実施の形態]
図11は、本発明の第3の実施の形態に係るワイヤーハーネス製造装置の概略の構成例を示す断面図である。第2の実施の形態では、1つの管理装置6に1つのタッチパネルディスプレイ12及び遠隔操作器7を接続したが、本実施の形態は、1つの管理装置6に複数のタッチパネルディスプレイ12及び遠隔操作器7を直接又はインターネット等のネットワークを介して接続したものである。
[Third Embodiment]
FIG. 11: is sectional drawing which shows the example of a schematic structure of the wire harness manufacturing apparatus which concerns on the 3rd Embodiment of this invention. In the second embodiment, one touch panel display 12 and the remote controller 7 are connected to one management apparatus 6. However, in the present embodiment, a plurality of touch panel displays 12 and a remote controller are connected to one management apparatus 6. 7 are connected directly or via a network such as the Internet.

本実施の形態によれば、以下の作用、効果を奏する。
(a)同一のワイヤーハーネス組立品、又は異なるワイヤーハーネス組立品を複数の作業者に同時に作製することができる。
(b)管理装置6は、各工程の開始時間及び終了時間が作業者ごとに分かるので、どこの作業者が遅れているかを把握することができ、その遅れている作業者の所の人数を増やして応援することができる。また、1つのワイヤーハーネスの製造業者が複数のタッチパネルディスプレイ12を用いることにより、生産性の向上をより一層図ることができる。
According to the present embodiment, the following operations and effects are achieved.
(A) The same wire harness assembly or different wire harness assemblies can be simultaneously prepared for a plurality of workers.
(B) Since the management device 6 knows the start time and end time of each process for each worker, it can grasp which worker is delayed, and the number of workers at the delayed worker can be determined. You can support them by increasing them. Further, when a single wire harness manufacturer uses a plurality of touch panel displays 12, productivity can be further improved.

なお、複数のタッチパネルディスプレイ12を横に並べておき、1つのワイヤーハーネス組立品用の画像を分割して複数のタッチパネルディスプレイ12に表示してもよい。この場合、タッチパネルディスプレイ12間の隙間は無い方が好ましい。   A plurality of touch panel displays 12 may be arranged side by side, and an image for one wire harness assembly may be divided and displayed on the plurality of touch panel displays 12. In this case, it is preferable that there is no gap between the touch panel displays 12.

[他の変形例]
なお、本発明の実施の形態は、上記各実施の形態に限定されず、本発明の要旨を逸脱しない範囲内において種々な実施の形態が可能である。上記各実施の形態では、ハーネス1の布線工程、ハーネス2の布線工程、ハーネス3の布工程は、それぞれ画像を切り替えたが、全てのハーネスを明るさを落として表示しておき、当該ハーネスに関係する箇所のみを明るく表示するなどの当該ハーネスに関係する箇所が目立つようにハイライト表示等の強調表示をしてもよい。
[Other variations]
The embodiments of the present invention are not limited to the above-described embodiments, and various embodiments are possible without departing from the scope of the present invention. In each said embodiment, although the wiring process of the harness 1, the wiring process of the harness 2, and the wiring process of the harness 3 each switched the image, all the harnesses were displayed by reducing brightness, the said Highlighting such as highlighting may be performed so that only the portion related to the harness is displayed brightly, such as the portion related to the harness is conspicuous.

また、本発明の実施の形態の構成要素の一部を本発明の要旨を逸脱しない範囲内において省いてもよい。例えば、遠隔操作器7を用いずに管理装置6から画像の切り替えを行ってもよい。また、第1の実施の形態において、投影画像をミラーを介さずにスクリーンに直接投影してもよい。さらに、投影画像を複数のミラーを介してスクリーンに投影してもよい。これにより薄型化が図れる。   Moreover, you may omit a part of component of embodiment of this invention in the range which does not deviate from the summary of this invention. For example, images may be switched from the management device 6 without using the remote controller 7. In the first embodiment, the projected image may be directly projected on the screen without using a mirror. Furthermore, the projected image may be projected on a screen via a plurality of mirrors. Thereby, thickness reduction can be achieved.

また、ワイヤーハーネス組立品画像データをワイヤーハーネス製造装置に提示する際、1つの移動体を構成する複数のワイヤーハーネスを全長に応じて複数の組に分け、複数の組に対応したワイヤーハーネス組立品画像データを複数の組に対応した複数のワイヤーハーネス製造装置に提示してもよい。   In addition, when presenting wire harness assembly image data to the wire harness manufacturing apparatus, a plurality of wire harnesses constituting one moving body is divided into a plurality of sets according to the total length, and the wire harness assemblies corresponding to the plurality of sets The image data may be presented to a plurality of wire harness manufacturing apparatuses corresponding to a plurality of sets.

また、上記実施の形態では、ワイヤーハーネス組立品画像データや仮図面データをネットワーク300経由でワイヤーハーネス製造装置1に提示したが、USBメモリ、CD−ROM等の記録媒体を介してワイヤーハーネス製造装置1に提示してもよい。   Moreover, in the said embodiment, although the wire harness assembly image data and provisional drawing data were shown to the wire harness manufacturing apparatus 1 via the network 300, a wire harness manufacturing apparatus via recording media, such as USB memory and CD-ROM, was shown. 1 may be presented.

また、上記実施の形態では、編集情報をネットワーク300経由でサーバ装置200に提供したが、USBメモリ、CD−ROM等の記録媒体を介してサーバ装置200に提供してもよい。   In the above embodiment, the editing information is provided to the server apparatus 200 via the network 300. However, the editing information may be provided to the server apparatus 200 via a recording medium such as a USB memory or a CD-ROM.

また、電線に組立順序を示す番号等による順序情報を付加してもよい。   Moreover, you may add the order information by the number etc. which show an assembly order to an electric wire.

また、上記実施の形態では、サーバ装置200側で認証処理を行ったが、ワイヤーハーネス製造装置1側に認証情報を保持させてワイヤーハーネス製造装置1側、例えば、管理装置6の制御部60又は遠隔操作器7の制御部70が認証処理を行ってもよい。   Moreover, in the said embodiment, although the authentication process was performed by the server apparatus 200 side, authentication information is hold | maintained at the wire harness manufacturing apparatus 1 side, for example, the control part 60 of the management apparatus 6, or the control part 60 or the management apparatus 6 side. The control unit 70 of the remote controller 7 may perform authentication processing.

上記実施の形態では、認証対象者を管理者として説明したが、作業者でもよい。また、管理者を省いて作業者が管理者の業務も行ってもよい。   In the above embodiment, the person to be authenticated is described as an administrator, but it may be an operator. Alternatively, the administrator may be omitted and the operator may perform the administrator's work.

上記実施の形態では、ワイヤーハーネス製造装置1をハードディスクを有するものとして説明したが、ハードディスクを持たないものでもよい。この場合のワイヤーハーネス製造装置は、サーバ装置200から提示された画面データを1ページごとに表示部に表示して閲覧する。ワイヤーハーネス製造装置にハードディスクを持たせないことにより、画像データの流出による情報漏洩を防ぐことができる。   In the said embodiment, although the wire harness manufacturing apparatus 1 was demonstrated as having a hard disk, you may not have a hard disk. The wire harness manufacturing apparatus in this case displays the screen data presented from the server apparatus 200 on the display unit for each page and browses the screen data. By not providing the wire harness manufacturing apparatus with a hard disk, information leakage due to outflow of image data can be prevented.

また、本発明の要旨を変更しない範囲内で、上記実施の形態の組立工程において、工程の追加、削除、変更、入替え等が可能である。   In addition, within the scope of the present invention, it is possible to add, delete, change, and replace processes in the assembly process according to the above embodiment.

また、本発明の要旨を変更しない範囲内で、各実施の形態の構成要素を任意に組み合わせることができる。例えば、第2及び第3の実施の形態では、編集情報等を入力する手段として、タッチパネルディスプレイ12を用いたが、第1の実施の形態のスクリーン2に対してインタラクディブペンのようにポインティング光(例えば赤外線、レーザ光)を照射し、その照射点の座標をカメラで検出するポインティングデバイスを用いることができる。また、第1の実施の形態のスクリーン2に対して電子ペンのスクリーン2上の位置を検出して編集情報等を入力するようにしてもよい。そのような方式として、超音波式(電子ペンが発信する超音波をセンサが受ける)、赤外線式(電子ペンが出力する赤外線をセンサが受ける)、カメラ式(電子ペンの座標を特定するための特別な模様が薄く印刷されている半透明シートを使用する)等を用いることができる。   In addition, the constituent elements of the respective embodiments can be arbitrarily combined within the scope not changing the gist of the present invention. For example, in the second and third embodiments, the touch panel display 12 is used as means for inputting editing information and the like. However, a pointing light like an interactive pen is used with respect to the screen 2 of the first embodiment. A pointing device that irradiates (for example, infrared rays or laser light) and detects the coordinates of the irradiation point with a camera can be used. Also, editing information or the like may be input by detecting the position of the electronic pen on the screen 2 with respect to the screen 2 of the first embodiment. As such a method, an ultrasonic type (the sensor receives the ultrasonic wave transmitted by the electronic pen), an infrared type (the sensor receives the infrared ray output from the electronic pen), a camera type (for specifying the coordinates of the electronic pen) A translucent sheet on which a special pattern is thinly printed) can be used.

本発明は、鉄道車両用ハーネス、自動車用ハーネス、航空機用ハーネス、医療用ハーネス、機器内ハーネス等に適用可能である。   The present invention is applicable to railway vehicle harnesses, automobile harnesses, aircraft harnesses, medical harnesses, in-device harnesses, and the like.

1、1a、1b、1c…ワイヤーハーネス製造装置、2…スクリーン、2a…表面、
2b…裏面、2c…金属線、2c…磁性粉、2d…透明シート、
20…投影画像、
20a…工程名、21…治具画像、22…布線指示線、
23a〜23d…電線画像、24a〜24g…コネクタ画像、25…テープ画像、
26…チューブ画像、27a〜27g…バーコード
3…筐体、4…ミラー、
5…プロジェクタ、
50…投影手段、51…LED光源、52…液晶パネル、53…光源駆動部、
54…液晶パネル駆動部、55…合成光学系、56…投影レンズ、57…制御部、
58…メモリ、
10…組立用治具、
11…本体、11a…開口、12…吸着盤、13…レバー部、14…支軸、
15…スライド軸、16…座部、130…支持片、131…支点部、131a…カム面、
6…管理装置、
60…制御部、61…記憶部、62…入力部、63…表示部、610…プログラム、
611…投影画像データ、612…管理データ、
7…遠隔操作器、
70…制御部、71a…開始ボタン、71b…送りボタン、71c…戻しボタン、
71d…終了ボタン、72…テンキー、73…読取部、74…判定部、
75…判定結果表示部、76…通信部
100…ワイヤーハーネス製造システム、200…サーバ装置、210…制御部、
220…記憶部、221…プログラム、
222、222a、222b、222c…ワイヤーハーネス組立品画像データ、
223…認証情報、230…通信部、300…ネットワーク
1, 1a, 1b, 1c ... wire harness manufacturing apparatus, 2 ... screen, 2a ... surface,
2b ... back surface, 2c ... metal wire, 2c ... magnetic powder, 2d ... transparent sheet,
20 ... projected image,
20a ... Process name, 21 ... Jig image, 22 ... Wiring instruction line,
23a-23d ... Electric wire image, 24a-24g ... Connector image, 25 ... Tape image,
26 ... Tube image, 27a-27g ... Barcode 3 ... Housing, 4 ... Mirror,
5. Projector,
50 ... Projection means, 51 ... LED light source, 52 ... Liquid crystal panel, 53 ... Light source drive unit,
54 ... Liquid crystal panel drive unit, 55 ... Synthetic optical system, 56 ... Projection lens, 57 ... Control unit,
58 ... Memory,
10 ... Assembly jig,
DESCRIPTION OF SYMBOLS 11 ... Main body, 11a ... Opening, 12 ... Suction board, 13 ... Lever part, 14 ... Spindle,
DESCRIPTION OF SYMBOLS 15 ... Slide shaft, 16 ... Seat part, 130 ... Supporting piece, 131 ... Supporting point part, 131a ... Cam surface,
6 ... management device,
60 ... Control unit, 61 ... Storage unit, 62 ... Input unit, 63 ... Display unit, 610 ... Program,
611 ... projection image data, 612 ... management data,
7 ... Remote controller,
70 ... Control unit, 71a ... Start button, 71b ... Send button, 71c ... Return button,
71d ... End button, 72 ... Numeric keypad, 73 ... Reading unit, 74 ... Determining unit,
75 ... Determination result display unit, 76 ... Communication unit 100 ... Wire harness manufacturing system, 200 ... Server device, 210 ... Control unit,
220 ... storage unit, 221 ... program,
222, 222a, 222b, 222c ... wire harness assembly image data,
223 ... Authentication information, 230 ... Communication unit, 300 ... Network

Claims (3)

ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置を用いて、移動体に用いられる複数の前記ワイヤーハーネスを製造する方法であって、
前記複数のワイヤーハーネスに対応した前記画像データを前記複数のワイヤーハーネス製造装置に提示するステップと、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とするステップと、
を含み、
前記画像データを提示するステップは、前記複数のワイヤーハーネスを全長に応じて複数の組に分け、前記複数の組に対応した前記画像データを前記複数の組に対応した前記複数のワイヤーハーネス製造装置に提示する、
ワイヤーハーネス製造方法。
Manufacture a plurality of wire harnesses used for a moving body using a plurality of wire harness manufacturing apparatuses that display image data corresponding to the assembly process of the wire harnesses on a display unit by switching a screen according to the progress of the assembly process. A way to
Presenting the image data corresponding to the plurality of wire harnesses to the plurality of wire harness manufacturing apparatuses;
Receiving an authentication request from an operator of the wire harness manufacturing apparatus, and enabling the display of the image data on the display unit when authentication for the operator is established;
Only including,
In the step of presenting the image data, the plurality of wire harnesses are divided into a plurality of sets according to a total length, and the image data corresponding to the plurality of sets is the plurality of wire harness manufacturing apparatuses corresponding to the plurality of sets. To present
Wire harness manufacturing method.
ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置と、
移動体に用いられる複数の前記ワイヤーハーネスに対応した前記画像データを前記複数のワイヤーハーネス製造装置に提示する提示手段と、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とする認証手段と、
を備え
前記提示手段は、前記複数のワイヤーハーネスを全長に応じて複数の組に分け、前記複数の組に対応した前記画像データを前記複数の組に対応した前記複数のワイヤーハーネス製造装置に提示する、
ワイヤーハーネス製造システム。
A plurality of wire harness manufacturing apparatuses that display the image data corresponding to the assembly process of the wire harness on the display unit by switching the screen according to the progress of the assembly process;
Presenting means for presenting the image data corresponding to the plurality of wire harnesses used for the moving body to the plurality of wire harness manufacturing apparatuses;
An authentication unit that accepts an authentication request from an operator of the wire harness manufacturing apparatus and enables the display of the image data on the display unit when authentication for the operator is established;
Equipped with a,
The presenting means divides the plurality of wire harnesses into a plurality of sets according to a total length, and presents the image data corresponding to the plurality of sets to the plurality of wire harness manufacturing apparatuses corresponding to the plurality of sets.
Wire harness manufacturing system.
ワイヤーハーネスの組立工程に対応した画像データを前記組立工程の進行に応じて画面を切り替えて表示部に表示する複数のワイヤーハーネス製造装置にネットワークを介して接続されたワイヤーハーネス管理装置であって、
移動体に用いられる複数の前記ワイヤーハーネスに対応した前記画像データを前記ネットワークを介して前記複数のワイヤーハーネス製造装置に提示する提示手段と、
前記ワイヤーハーネス製造装置の操作者から認証要求を受け付けし、前記操作者に対する認証が成立したとき、前記表示部への前記画像データの表示を可能とする認証手段と、
を備え
前記提示手段は、前記複数のワイヤーハーネスを全長に応じて複数の組に分け、前記複数の組に対応した前記画像データを前記複数の組に対応した前記複数のワイヤーハーネス製造装置に提示する、
ワイヤーハーネス管理装置。
A wire harness management apparatus connected via a network to a plurality of wire harness manufacturing apparatuses that display image data corresponding to the assembly process of the wire harness on the display unit by switching the screen according to the progress of the assembly process,
Presenting means for presenting the image data corresponding to the plurality of wire harnesses used for the moving body to the plurality of wire harness manufacturing apparatuses via the network;
An authentication unit that accepts an authentication request from an operator of the wire harness manufacturing apparatus and enables the display of the image data on the display unit when authentication for the operator is established;
Equipped with a,
The presenting means divides the plurality of wire harnesses into a plurality of sets according to a total length, and presents the image data corresponding to the plurality of sets to the plurality of wire harness manufacturing apparatuses corresponding to the plurality of sets.
Wire harness management device.
JP2015098624A 2015-05-13 2015-05-13 Wire harness manufacturing method, manufacturing system, and management apparatus Active JP6398862B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015098624A JP6398862B2 (en) 2015-05-13 2015-05-13 Wire harness manufacturing method, manufacturing system, and management apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015098624A JP6398862B2 (en) 2015-05-13 2015-05-13 Wire harness manufacturing method, manufacturing system, and management apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2018162343A Division JP6425155B1 (en) 2018-08-31 2018-08-31 Wire harness manufacturing system and wire harness manufacturing method

Publications (2)

Publication Number Publication Date
JP2016213158A JP2016213158A (en) 2016-12-15
JP6398862B2 true JP6398862B2 (en) 2018-10-03

Family

ID=57549921

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015098624A Active JP6398862B2 (en) 2015-05-13 2015-05-13 Wire harness manufacturing method, manufacturing system, and management apparatus

Country Status (1)

Country Link
JP (1) JP6398862B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6569423B2 (en) * 2015-09-24 2019-09-04 日立金属株式会社 Wire harness design method and design apparatus
KR102361765B1 (en) 2016-10-31 2022-02-10 스미토모 덴키 고교 가부시키가이샤 Aluminum alloy wire, aluminum alloy stranded wire, sheathed wire, and terminal-mounted wire
US20200082320A1 (en) * 2017-06-05 2020-03-12 Mitsubishi Electric Corporation Wire harness assembly work instruction device, and wire harness assembly work instruction method
JP7221038B2 (en) * 2018-12-10 2023-02-13 大和ハウス工業株式会社 FASTENING INSPECTION SYSTEM AND FASTENING INSPECTION METHOD
JP7228095B2 (en) * 2019-03-05 2023-02-24 株式会社プロテリアル Wire harness manufacturing support device and manufacturing support method
RS63767B1 (en) 2019-03-06 2022-12-30 Komax Holding Ag Computer-implemented method for monitoring a plurality of cable processing machines and monitoring system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006167829A (en) * 2004-12-14 2006-06-29 Chuo Electronics Co Ltd Assembling work apparatus
FR3005375B1 (en) * 2013-05-06 2017-01-13 Laselec SUPPORT FOR THE PRODUCTION OF CABLES HARNESS

Also Published As

Publication number Publication date
JP2016213158A (en) 2016-12-15

Similar Documents

Publication Publication Date Title
JP6398862B2 (en) Wire harness manufacturing method, manufacturing system, and management apparatus
JP6639010B2 (en) Method and apparatus for designing wire harness
JP6369428B2 (en) Inspection method of wire harness assembly
JP6020777B1 (en) Wire harness wiring work program
CN107924668B (en) Projection type display device
JP6369758B2 (en) Wire harness manufacturing method and manufacturing apparatus
JP2016526255A (en) Cable harness production support
JP6489457B2 (en) Manufacturing method of wire harness
JP6425155B1 (en) Wire harness manufacturing system and wire harness manufacturing method
JP6739904B2 (en) Method for creating projected image data of wire harness and wire harness manufacturing apparatus
JP6684044B2 (en) Wire harness manufacturing equipment
JP6369762B2 (en) Wire harness manufacturing equipment
JP6459768B2 (en) Ordering method and ordering device for wire harness components
JP2016162662A (en) Wire harness manufacturing method and apparatus
JP6369757B2 (en) Wire harness manufacturing method and manufacturing apparatus
JP2019040881A (en) Wire harness production device and wire harness production method
JP6500503B2 (en) Method of manufacturing wire harness assembly
JP6424679B2 (en) Method and apparatus for manufacturing wire harness
JP6684045B2 (en) Wire harness manufacturing method and manufacturing apparatus
JP2017069137A (en) Wire harness production device
JP6540855B2 (en) Wire harness manufacturing apparatus and wire harness manufacturing method
JP6569423B2 (en) Wire harness design method and design apparatus
JP2020035760A (en) Wire harness manufacturing arrangement
JP2017054640A (en) Wire harness production device
JP2016053790A (en) Production control system, mobile terminal for production control, and production control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170810

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180327

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180529

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180807

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180820

R150 Certificate of patent or registration of utility model

Ref document number: 6398862

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350