JP6171205B2 - Power supply device, inspection device, and optimization method of power supply device - Google Patents

Power supply device, inspection device, and optimization method of power supply device Download PDF

Info

Publication number
JP6171205B2
JP6171205B2 JP2015550516A JP2015550516A JP6171205B2 JP 6171205 B2 JP6171205 B2 JP 6171205B2 JP 2015550516 A JP2015550516 A JP 2015550516A JP 2015550516 A JP2015550516 A JP 2015550516A JP 6171205 B2 JP6171205 B2 JP 6171205B2
Authority
JP
Japan
Prior art keywords
dead time
power supply
supply device
time
output current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015550516A
Other languages
Japanese (ja)
Other versions
JPWO2015079573A1 (en
Inventor
甲之輔 新田
甲之輔 新田
浩二 若林
浩二 若林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shindengen Electric Manufacturing Co Ltd
Original Assignee
Shindengen Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shindengen Electric Manufacturing Co Ltd filed Critical Shindengen Electric Manufacturing Co Ltd
Publication of JPWO2015079573A1 publication Critical patent/JPWO2015079573A1/en
Application granted granted Critical
Publication of JP6171205B2 publication Critical patent/JP6171205B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33569Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements
    • H02M3/33576Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements having at least one active switching element at the secondary side of an isolation transformer
    • H02M3/33592Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements having at least one active switching element at the secondary side of an isolation transformer having a synchronous rectifier circuit or a synchronous freewheeling circuit at the secondary side of an isolation transformer
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/38Means for preventing simultaneous conduction of switches
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33569Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements
    • H02M3/33573Full-bridge at primary side of an isolation transformer
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M1/00Details of apparatus for conversion
    • H02M1/0003Details of control, feedback or regulation circuits
    • H02M1/0009Devices or circuits for detecting current in a converter
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/01Resonant DC/DC converters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33507Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters
    • H02M3/33515Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only with automatic control of the output voltage or current, e.g. flyback converters with digital control
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M3/00Conversion of dc power input into dc power output
    • H02M3/22Conversion of dc power input into dc power output with intermediate conversion into ac
    • H02M3/24Conversion of dc power input into dc power output with intermediate conversion into ac by static converters
    • H02M3/28Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac
    • H02M3/325Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal
    • H02M3/335Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only
    • H02M3/33569Conversion of dc power input into dc power output with intermediate conversion into ac by static converters using discharge tubes with control electrode or semiconductor devices with control electrode to produce the intermediate ac using devices of a triode or a transistor type requiring continuous application of a control signal using semiconductor devices only having several active switching elements
    • H02M3/33571Half-bridge at primary side of an isolation transformer
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/10Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Dc-Dc Converters (AREA)

Description

本発明は、電源装置、検査装置、及び電源装置の最適化方法に関する。   The present invention relates to a power supply device, an inspection device, and a method for optimizing a power supply device.

一次側回路と二次側回路との間を絶縁するトランスと、このトランスの一次巻線に流れる電流の方向を切り換えて駆動するスイッチング回路と、二次側巻線に誘起される電圧を整流する整流回路と、を備えるスイッチング方式の電源装置がある。
上記スイッチング回路は、例えば、2個のスイッチング素子(例えば、MOSFET)を直列に接続したハーフブリッジ回路を2個並列にしたフルブリッジ回路で構成される。このフルブリッジ回路において、電流を供給する側のスイッチング素子と電流が供給される側のスイッチング素子とが同時にオン状態になると、貫通電流が流れてスイッチング素子が破壊される可能性がある。電源装置では、2つのスイッチング素子が同時にオン状態になることを防止するために、同時に2つのスイッチング素子をオフ状態にする期間がデッドタイム(非重畳時間)として設けられている。
A transformer that insulates between the primary side circuit and the secondary side circuit, a switching circuit that switches and drives the direction of the current flowing through the primary winding of the transformer, and rectifies the voltage induced in the secondary side winding There is a switching-type power supply device including a rectifier circuit.
The switching circuit is constituted by a full bridge circuit in which two half bridge circuits in which two switching elements (for example, MOSFETs) are connected in series are arranged in parallel. In this full-bridge circuit, if the switching element on the current supply side and the switching element on the current supply side are turned on at the same time, a through current may flow and the switching element may be destroyed. In the power supply device, in order to prevent the two switching elements from being turned on at the same time, a period in which the two switching elements are turned off at the same time is provided as a dead time (non-overlapping time).

このデッドタイムにおいて、スイッチング素子がスイッチング動作を行う際に、パワーロス(スイッチングロスとも呼ばれる。)が発生する。このデッドタイムに発生するパワーロスを低減するために、特許文献1では、スイッチを駆動するPWM(Pulse Width Modulation;パルス幅変調)信号における負荷時間率に比例する値を用いて、パワーロスの変化を推定してデッドタイムを調整することが提案されている。また、特許文献2には、デッドタイムに付随する電力損失を最小にする際のノイズとなる計測誤差などの影響を低減することが提案されている。特許文献1及び2に記載の技術では、電源装置が、デッドタイムを調整するためのパラメータを測定する測定回路を有し、測定した結果に応じてデッドタイムを調整している。   In this dead time, a power loss (also referred to as switching loss) occurs when the switching element performs a switching operation. In order to reduce the power loss that occurs during this dead time, Patent Document 1 estimates the change in power loss using a value proportional to the load time ratio in a PWM (Pulse Width Modulation) signal that drives the switch. It has been proposed to adjust the dead time. Further, Patent Document 2 proposes reducing the influence of a measurement error that becomes noise when minimizing the power loss accompanying the dead time. In the techniques described in Patent Documents 1 and 2, the power supply device includes a measurement circuit that measures a parameter for adjusting the dead time, and adjusts the dead time according to the measurement result.

特表2007−535286号公報Special table 2007-535286 gazette 特表2009−515498号公報Special table 2009-515498 gazette

しかしながら、上記デッドタイムに起因して発生するパワーロスは、デッドタイムに応じて変化する。そのため、このデッドタイムは、パワーロスが最も小さくなる最適なデッドタイムに調整されることが望まれる。しかしながら、最適なデッドタイムは、ドライブ回路の遅延時間のバラツキや、スイッチング素子ごとのオンオフ特性のバラツキに影響される。このため、電源装置では、実際に組み立てられた製品ごとにデッドタイムを補正することが必要になる。   However, the power loss caused by the dead time changes according to the dead time. Therefore, it is desired that this dead time is adjusted to an optimum dead time that minimizes the power loss. However, the optimum dead time is affected by variations in the delay time of the drive circuit and on-off characteristics for each switching element. For this reason, in the power supply device, it is necessary to correct the dead time for each actually assembled product.

特許文献1及び2に記載の技術において、製品毎のデッドタイムを補正しようとすると、電源装置に、負荷時間率に比例する値や電力損失の測定回路と、デッドタイムを決定する回路とを、製品毎に備える必要がある。このため、回路構成が複雑となり、その分、コストの上昇を招くという問題があった。   In the technologies described in Patent Documents 1 and 2, when trying to correct the dead time for each product, the power supply device includes a value proportional to the load time ratio and a power loss measuring circuit, and a circuit for determining the dead time. It is necessary to prepare for each product. For this reason, there is a problem in that the circuit configuration becomes complicated and the cost increases accordingly.

本発明は、上記の問題点に鑑みてなされたものであって、新たな回路を製品の内部に追加することなく、電力変換効率が最大になる最適デッドタイムを製品毎に設定できる、電源装置、検査装置、及び電源装置の最適化方法を提供することを目的とする。   The present invention has been made in view of the above-described problems, and a power supply device that can set an optimum dead time for maximizing power conversion efficiency for each product without adding a new circuit inside the product. An object of the present invention is to provide an optimization method for an inspection device and a power supply device.

上記目的を達成するため、本発明の一態様に係る電源装置は、スイッチング回路を構成するスイッチング素子の第1デッドタイムを記憶する記憶部と、入力電流の測定結果に基づいて設定された第2デッドタイムの情報を外部入力する取得部と、前記記憶部に記憶された前記第1デッドタイムを前記取得部が取得した前記第2デッドタイムに書き換える書換部と、前記記憶部に記憶された前記第2デッドタイムに応じて前記スイッチング素子を制御する制御部と、を備え、前記第2デッドタイムは、電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記記憶部に記憶された前記第1デッドタイムが変化させられたときに、前記電源装置の入力電流が最も少なくなる値であって、前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、
前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とすることを特徴とする。
In order to achieve the above object, a power supply device according to an aspect of the present invention includes a storage unit that stores a first dead time of a switching element that forms a switching circuit, and a second unit that is set based on a measurement result of an input current. An acquisition unit for externally inputting dead time information, a rewriting unit for rewriting the first dead time stored in the storage unit with the second dead time acquired by the acquisition unit, and the storage unit stored in the storage unit A control unit that controls the switching element in accordance with a second dead time, wherein the second dead time includes an input voltage to the power supply device, an output voltage from the power supply device, and an output current from the power supply device. When the first dead time stored in the storage unit is changed in a state where the power is kept constant, the input current of the power supply device is the smallest value, The serial first dead time, when the positive and negative direction is varied as a unit time for a predetermined time, the first dead time when the input current of the power supply is minimized and the value of the second dead time The first output current, which is the output current from the power supply device kept constant, is changed to a second output current having a different current value, and a second dead time corresponding to the second output current is determined. When the second dead time corresponding to the first output current is obtained, the second dead time is changed when the first dead time is changed in either the positive direction or the negative direction with a predetermined time as a unit time. Based on information that indicates whether
When the first dead time is changed in the direction indicated by the information with a predetermined time as a unit time, the first dead time when the input current of the power supply device becomes the smallest corresponds to the second output current. It is characterized by a dead time value .

本発明の一態様に係る検査装置は、スイッチング回路のスイッチング素子の第1デッドタイムが、外部入力されるデッドタイムの情報により変更可能な電源装置に対して、前記第1デッドタイムを変更するように指示して前記電源装置の入力電流を計測する測定部と、前記測定部により計測された入力電流の測定値に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する判定部と、前記第2デッドタイムの情報を前記電源装置に通知して、前記電源装置において前記第1デッドタイムを前記第2デッドタイムに設定させる書込部と、を備え、前記測定部は、前記電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記電源装置に対して、前記第1デッドタイムを変更するように指示して電力変換効率を計測し、最も電力変換効率が高くなるデッドタイムを第2デッドタイムと判定し、前記判定部は、前記測定部により計測された入力電流の測定値に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムとして判定し、前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とすることを特徴とする。 An inspection apparatus according to an aspect of the present invention is configured to change the first dead time for a power supply device in which a first dead time of a switching element of a switching circuit can be changed by information on an externally input dead time. And measuring the input current of the power supply device and determining the dead time when the input current is the shortest as the second dead time based on the measured value of the input current measured by the measuring unit A determination unit configured to notify the power supply device of the information on the second dead time, and the writing unit configured to set the first dead time to the second dead time in the power supply device. Is a state in which the input voltage to the power supply device, the output voltage from the power supply device, and the output current from the power supply device are kept constant with respect to the power supply device. The power conversion efficiency is measured by instructing to change the dead time, the dead time at which the power conversion efficiency is highest is determined as the second dead time, and the determination unit determines the input current measured by the measurement unit. Based on the measured value, the dead time when the input current becomes the smallest is determined as the second dead time, and when the first dead time is changed between the positive direction and the negative direction with a predetermined time as a unit time, The first dead time when the input current of the power supply device becomes the smallest is the second dead time value, and the first output current, which is the output current from the power supply apparatus kept constant, is the current value. When the second dead time corresponding to the second output current is determined instead of the second output current having a different value, the first dead time is determined when the second dead time corresponding to the first output current is obtained. The first dead time is calculated based on the information indicating whether the second dead time can be obtained when the predetermined time is changed as a unit time in either the positive direction or the negative direction. When the predetermined time is changed as a unit time in the indicated direction, the first dead time when the input current of the power supply device becomes the smallest is set as the value of the second dead time corresponding to the second output current. To do.

本発明の一態様に係る電源装置の最適化方法は、電源装置のスイッチング回路を構成するスイッチング素子のデッドタイムを検査装置により最適化する電源装置の最適化方法であって、前記電源装置が、第1デッドタイムを前記検査装置からの指示により変更する手順を含み、前記検査装置が、前記電源装置に対して、前記第1デッドタイムを変更させるように指示するとともに、前記電源装置の入力電流を測定する手順と、前記検査装置が、前記入力電流の測定結果に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する手順と、前記検査装置が、前記第2デッドタイムの情報を前記電源装置に通知して、前記電源装置において、前記第1デッドタイムを前記第2デッドタイムに設定させる手順と、を含み、前記第2デッドタイムは、前記電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記第1デッドタイムが変化させられたとき、前記電源装置の電力変換効率が最も高くなる値であって、前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とすることを特徴とする。 A method for optimizing a power supply device according to one aspect of the present invention is an optimization method for a power supply device that optimizes a dead time of a switching element that constitutes a switching circuit of the power supply device by using an inspection device, and the power supply device includes: Including a procedure of changing a first dead time according to an instruction from the inspection apparatus, wherein the inspection apparatus instructs the power supply apparatus to change the first dead time, and an input current of the power supply apparatus A procedure for determining the dead time when the input current is minimized based on the measurement result of the input current as a second dead time, and the inspection device comprises the second A step of notifying the power supply device of dead time information and causing the power supply device to set the first dead time to the second dead time. The second dead time is changed while the input voltage to the power supply device, the output voltage from the power supply device, and the output current from the power supply device are kept constant. The power conversion efficiency of the power supply device is the highest value, and when the first dead time is changed between the positive direction and the negative direction for a predetermined time as a unit time, the input current of the power supply device is The first dead time when the time is the shortest is the second dead time, and the first output current, which is the output current from the power supply device kept constant, is the second output current with a different current value. Instead, when determining the second dead time corresponding to the second output current, when the second dead time corresponding to the first output current is obtained, the first dead time is set to either the positive direction or the negative direction. In the direction of When the first dead time is changed in the direction indicated by the information with the predetermined time as the unit time based on the information indicating whether the second dead time has been obtained when the interval is changed as the unit time The first dead time when the input current of the power supply device is minimized is a value of the second dead time corresponding to the second output current .

本発明によれば、新たな回路を製品の内部に追加することなく、電力変換効率が最大になる最適デッドタイムを製品毎に設定できる。   According to the present invention, the optimum dead time that maximizes the power conversion efficiency can be set for each product without adding a new circuit inside the product.

本発明の第1実施形態に係る電源装置及び検査装置の概略構成を示す機能ブロック図である。It is a functional block diagram which shows schematic structure of the power supply device and test | inspection apparatus which concern on 1st Embodiment of this invention. 最適デッドタイムの設定動作の概要を示す説明図である。It is explanatory drawing which shows the outline | summary of the setting operation of optimal dead time. 電源装置の構成例を示す構成図である。It is a block diagram which shows the structural example of a power supply device. 第3電流検出回路の構成例を示す構成図である。It is a block diagram which shows the structural example of a 3rd electric current detection circuit. 第3電流検出回路の動作を説明するための波形図である。It is a wave form chart for explaining operation of the 3rd current detection circuit. スイッチング素子Q1からQ4のゲート信号の波形を示すタイムチャートである。It is a time chart which shows the waveform of the gate signal of switching element Q1 to Q4. 記憶部に記憶されるデッドタイムテーブルの例を示す説明図である。It is explanatory drawing which shows the example of the dead time table memorize | stored in a memory | storage part. デットタイムがDT1である場合のスイッチング素子のドレイン・ソース間電圧Vdsの例を示す波形図である。It is a wave form diagram which shows the example of the drain-source voltage Vds of a switching element in case the dead time is DT1. デッドタイムがDT2である場合のスイッチング素子のドレイン・ソース間電圧Vdsの例を示す波形図である。It is a wave form diagram which shows the example of the drain-source voltage Vds of a switching element in case dead time is DT2. デッドタイムがDT3である場合のスイッチング素子のドレイン・ソース間電圧Vdsの例を示す波形図である。It is a wave form diagram which shows the example of the drain-source voltage Vds of a switching element in case dead time is DT3. デッドタイムを変化させた場合の電力変換効率の測定例を示す説明図である。It is explanatory drawing which shows the example of a measurement of the power conversion efficiency at the time of changing dead time. デッドタイムを変化させた場合の電力変換効率の変化を示すグラフである。It is a graph which shows the change of the power conversion efficiency at the time of changing dead time. スイッチング素子の特性のバラツキによる電力変換効率の変化の例を示すグラフである。It is a graph which shows the example of the change of the power conversion efficiency by the variation in the characteristic of a switching element. 最適デッドタイムの設定処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the setting process of the optimal dead time. 本発明の第2実施形態に係る電源装置の構成例を示す構成図である。It is a block diagram which shows the structural example of the power supply device which concerns on 2nd Embodiment of this invention. 本発明の第3実施形態に係る電源装置の構成例を示す構成図である。It is a block diagram which shows the structural example of the power supply device which concerns on 3rd Embodiment of this invention.

以下、本発明の実施の形態を、添付図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

[第1実施形態]
図1は、本発明の第1実施形態に係る電源装置1及び検査装置2の概略構成を示す機能ブロック図である。この図において、電源装置1は、入力される直流電圧を、所定の直流電圧に変換して出力するDC/DCコンバータであり、本発明に直接に関係する部分のみを示している。
この図1に示す電源装置1及び検査装置2は、電源装置1のフルブリッジ回路20内のスイッチ素子がスイッチング動作を行う場合に、スイッチング素子のデッドタイムを変化させると電力変換効率が変化することを利用する。検査装置2は、電源装置1にスイッチング素子のデッドタイムを変化させるように指示し、このデッドタイムの変化に応じた電力変換効率の変化を測定する。検査装置2は、測定結果に基づいて、電力変換効率が最大になるときのデッドタイムを最適デッドタイム(第2デッドタイム)と判定し、この最適デッドタイムの情報を電源装置1に通知する。電源装置1は、検査装置2から通知された最適デッドタイムを記憶部30に記憶する。
なお、電力変換効率は、入力電力と出力電力との電力比で表され、例えば、
電力変換効率=出力電圧×出力電流/(入力電圧×入力電流)、の式で示される。
[First Embodiment]
FIG. 1 is a functional block diagram showing a schematic configuration of the power supply device 1 and the inspection device 2 according to the first embodiment of the present invention. In this figure, the power supply device 1 is a DC / DC converter that converts an input DC voltage into a predetermined DC voltage and outputs the DC voltage, and only the portion directly related to the present invention is shown.
In the power supply device 1 and the inspection device 2 shown in FIG. 1, when the switching element in the full bridge circuit 20 of the power supply device 1 performs a switching operation, the power conversion efficiency changes when the dead time of the switching element is changed. Is used. The inspection device 2 instructs the power supply device 1 to change the dead time of the switching element, and measures the change in the power conversion efficiency according to the change in the dead time. The inspection device 2 determines the dead time when the power conversion efficiency is maximized based on the measurement result as the optimum dead time (second dead time), and notifies the power supply device 1 of information on the optimum dead time. The power supply device 1 stores the optimum dead time notified from the inspection device 2 in the storage unit 30.
The power conversion efficiency is expressed as a power ratio between input power and output power.
Power conversion efficiency = output voltage × output current / (input voltage × input current).

この図1に示すように、電源装置1は、処理ユニット10、ドライブ回路11、フルブリッジ回路20、及び記憶部30を備えている。また、電源装置1には、この電源装置1における入出力電流と入出力電圧を計測する検査装置2が接続されている。   As shown in FIG. 1, the power supply device 1 includes a processing unit 10, a drive circuit 11, a full bridge circuit 20, and a storage unit 30. The power supply device 1 is connected to an inspection device 2 that measures input / output currents and input / output voltages in the power supply device 1.

処理ユニット10は、電源装置1の全体の動作を制御する制御装置である。この処理ユニット10は、制御部101、取得部102、及び書換部103を備える(詳細は後述する)。この処理ユニット10は、CPU(Central Processing Unit;中央演算処理装置)、ROM(Read Only Memory)、RAM(Random Access Memory)、A/D変換器(ADC;アナログ−デジタル変換器)、カウンタ等を有するマイクロコントローラや、マイクロコンピュータ、DSP(Digital Signal Processor)等で構成されている。処理ユニット10は、専用のハードウェアにより実現されるものであってもよい。   The processing unit 10 is a control device that controls the overall operation of the power supply device 1. The processing unit 10 includes a control unit 101, an acquisition unit 102, and a rewrite unit 103 (details will be described later). This processing unit 10 includes a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), an A / D converter (ADC; analog-digital converter), a counter, and the like. And a microcomputer, a DSP (Digital Signal Processor), and the like. The processing unit 10 may be realized by dedicated hardware.

ドライブ回路11は、制御部101が出力するオンオフ制御信号CNTから、フルブリッジ回路20が備えるスイッチング素子Q1からQ4を駆動するためのゲート信号G1からG4を生成する。
フルブリッジ回路20は、例えば、後述する図3に示すように、4つのスイッチング素子Q1からQ4で構成されるブリッジ回路である(詳細は後述する)。
記憶部30は、フルブリッジ回路20のスイッチング素子Q1からQ4のデッドタイム(第1デッドタイム)のデータを、出力電流値に関連づけて記憶する。例えば、後述する図6に示すように、記憶部30には、電源装置1の出力電流Ioの値に関連づけられたデッドタイムのデータが、デッドタイムテーブル31の形式で記憶されている。
The drive circuit 11 generates gate signals G1 to G4 for driving the switching elements Q1 to Q4 included in the full bridge circuit 20 from the on / off control signal CNT output from the control unit 101.
The full bridge circuit 20 is, for example, a bridge circuit composed of four switching elements Q1 to Q4 as shown in FIG. 3 described later (details will be described later).
The storage unit 30 stores dead time (first dead time) data of the switching elements Q1 to Q4 of the full bridge circuit 20 in association with the output current value. For example, as shown in FIG. 6 to be described later, the storage unit 30 stores dead time data associated with the value of the output current Io of the power supply device 1 in the form of a dead time table 31.

次に、処理ユニット10が備える各機能部について説明する。
制御部101は、電源装置1の出力電圧が一定の電圧になるように、フルブリッジ回路20のスイッチング素子Q1からQ4のスイッチング動作を制御するオンオフ制御信号CNTを生成する。このオンオフ制御信号CNTは、例えばPWM(Pulse Width Modulation;パルス幅変調)信号である。
また、制御部101は、上記オンオフ制御信号CNTを生成する際に、記憶部30に記憶されたデッドタイムテーブル31を参照し、このデッドタイムテーブル31に記憶されたデッドタイムに基づいてオンオフ制御信号CNTを生成する。
Next, each functional unit included in the processing unit 10 will be described.
The control unit 101 generates an on / off control signal CNT for controlling the switching operation of the switching elements Q1 to Q4 of the full bridge circuit 20 so that the output voltage of the power supply device 1 becomes a constant voltage. The on / off control signal CNT is, for example, a PWM (Pulse Width Modulation) signal.
Further, when generating the on / off control signal CNT, the control unit 101 refers to the dead time table 31 stored in the storage unit 30 and based on the dead time stored in the dead time table 31. CNT is generated.

取得部102は、検査装置2からデッドタイムの変更指示の情報を受信する。この変更指示には、変更後の新たなデッドタイムを表す情報が含まれている。取得部102は、検査装置2から受信したデッドタイムの変更指示の情報を書換部103に通知する。
書換部103は、取得部102から得られたデッドタイムの変更指示に基づいて、記憶部30のデッドタイムテーブル31に記憶されたデッドタイム(第1デッドタイム)のデータを、取得部102が取得した最適デッドタイム(第2デッドタイム)に書き換える。例えば、書換部103は、デッドタイムの変更指示に基づいて、すでに記録されたデッドタイムを増減するようにデータを書き換える。また、書換部103は、検査装置2において最適デッドタイムが判定された場合に、この最適デッドタイムの情報を、取得部102を介して取得し、デッドタイムテーブル31を最適デッドタイムのデータに書き換える。
The acquisition unit 102 receives information on a dead time change instruction from the inspection apparatus 2. This change instruction includes information indicating a new dead time after the change. The acquisition unit 102 notifies the rewriting unit 103 of the dead time change instruction information received from the inspection apparatus 2.
The rewriting unit 103 acquires the dead time (first dead time) data stored in the dead time table 31 of the storage unit 30 based on the dead time change instruction obtained from the acquiring unit 102. The optimum dead time (second dead time) is rewritten. For example, the rewrite unit 103 rewrites the data so as to increase or decrease the already recorded dead time based on the dead time change instruction. Further, when the optimum dead time is determined in the inspection apparatus 2, the rewrite unit 103 obtains information on the optimum dead time via the obtaining unit 102 and rewrites the dead time table 31 with data of the optimum dead time. .

また、検査装置2は、測定部201、判定部202、書込部203、及び記憶部204を備えている。この検査装置2は、例えばテスタである。
この検査装置2において、測定部201は、電源装置1の入出力電流と入出力電圧とを計測し、電源装置1における電力変換効率を測定する。この電源装置1における電力変換効率を測定する場合に、測定部201は、電源装置1の処理ユニット10に対して、フルブリッジ回路20におけるデッドタイムを変化させるように指示し、このデッドタイムの変化に応じて変わる電源装置1の電力変換効率を測定する。
判定部202は、測定部201が測定した電力変換効率の値に基づいて、電力変換効率が最大になるときのデッドタイムを最適デッドタイムと判定する。
Further, the inspection apparatus 2 includes a measurement unit 201, a determination unit 202, a writing unit 203, and a storage unit 204. The inspection device 2 is a tester, for example.
In the inspection device 2, the measurement unit 201 measures the input / output current and the input / output voltage of the power supply device 1 and measures the power conversion efficiency in the power supply device 1. When measuring the power conversion efficiency in the power supply device 1, the measuring unit 201 instructs the processing unit 10 of the power supply device 1 to change the dead time in the full bridge circuit 20, and changes in the dead time. The power conversion efficiency of the power supply device 1 that changes in accordance with is measured.
Based on the value of the power conversion efficiency measured by the measurement unit 201, the determination unit 202 determines the dead time when the power conversion efficiency is maximized as the optimum dead time.

書込部203は、判定部202により判定された最適デッドタイムの情報を取得部102に通知する。   The writing unit 203 notifies the acquisition unit 102 of information on the optimum dead time determined by the determination unit 202.

記憶部204は、測定部201により測定された電力変換効率の測定値を記憶する。記憶部204は、電源装置1の記憶部30に記憶されたデッドタイムテーブル31が予め記憶されていてもよい。また、検査装置2は、記憶部30に記憶されたデッドタイムテーブル31のデータを読み取り、読み取ったデッドタイムテーブル31のデータを記憶してよい。   The storage unit 204 stores the measured value of the power conversion efficiency measured by the measurement unit 201. In the storage unit 204, the dead time table 31 stored in the storage unit 30 of the power supply device 1 may be stored in advance. Further, the inspection apparatus 2 may read the data of the dead time table 31 stored in the storage unit 30 and store the read data of the dead time table 31.

次に、図2は、最適デッドタイムの設定動作の概要を示す説明図である。以下、図2を参照して、上記構成の電源装置1における最適デッドタイムの設定動作について説明する。
図2に示すように、電源装置1の入力側に、入力電圧Vinを測定する電圧計5と、入力電流Iinを測定する電流計6とが接続される。また、電源装置1の出力側に、出力電圧Voutを測定する電圧計7と、出力電流Ioを測定する電流計8とが接続される。
Next, FIG. 2 is an explanatory diagram showing an outline of the setting operation of the optimum dead time. Hereinafter, the setting operation of the optimum dead time in the power supply device 1 having the above configuration will be described with reference to FIG.
As shown in FIG. 2, a voltmeter 5 for measuring the input voltage Vin and an ammeter 6 for measuring the input current Iin are connected to the input side of the power supply device 1. Further, a voltmeter 7 for measuring the output voltage Vout and an ammeter 8 for measuring the output current Io are connected to the output side of the power supply device 1.

そして、第1の手順として、検査装置2は、入力電圧Vin、出力電流Io、出力電圧Voutが一定になるように設定する。ここで、検査装置2は、出力電圧Vout、出力電流Io、入力電圧Vinが一定であれば、測定した入力電流Iinと、上式とに基づいて算出した電力変換効率の変化を測定できる。   As a first procedure, the inspection apparatus 2 sets the input voltage Vin, the output current Io, and the output voltage Vout to be constant. Here, if the output voltage Vout, the output current Io, and the input voltage Vin are constant, the inspection device 2 can measure the change in the power conversion efficiency calculated based on the measured input current Iin and the above equation.

第2の手順として、検査装置2は、電源装置1に指示して、記憶部30内のデッドタイムテーブル31に記憶されたデッドタイムを、基準デッドタイムから増加方向及び減少方向に変化させるように書き換えるとともに、入力電流Iinを計測して、このデッドタイムの変化に応じた電力変換効率の変化を測定する。
例えば、後述する図9Aに示すように、デッドタイムを基準デッドタイムから±3ΔTに変化させて、電力変換効率を測定する。なお、ΔTは、クロック信号に基づく時間である。
As a second procedure, the inspection apparatus 2 instructs the power supply apparatus 1 to change the dead time stored in the dead time table 31 in the storage unit 30 from the reference dead time to an increasing direction and a decreasing direction. At the same time, the input current Iin is measured, and the change in power conversion efficiency corresponding to the change in dead time is measured.
For example, as shown in FIG. 9A described later, the power conversion efficiency is measured by changing the dead time from the reference dead time to ± 3ΔT. Note that ΔT is a time based on the clock signal.

ここで、基準デッドタイムは、デッドタイムの調整開始前に、予めデッドタイムテーブル31に記憶されているデッドタイムである。なお、基準デッドタイムは、複数の電源装置1のそれぞれのドライブ回路11の遅延時間のバラツキと、スイッチング素子Q1からQ4の特性のバラツキを考慮して設定される。この基準デッドタイムは、平均的なデッドタイムに基づいて、最適なデッドタイムであると推定されるデッドタイムである。   Here, the reference dead time is a dead time stored in advance in the dead time table 31 before the adjustment of the dead time is started. The reference dead time is set in consideration of variations in delay times of the drive circuits 11 of the plurality of power supply devices 1 and variations in characteristics of the switching elements Q1 to Q4. This reference dead time is a dead time estimated to be an optimum dead time based on an average dead time.

第3の手順として、検査装置2では、電力変換効率が最も高くなるデッドタイム、すなわち、検査装置2は、入力電流Iinが一番低くなるデッドタイムを最適デッドタイムと判定する。この手順において、検査装置2は、最適デッドタイムの情報を電源装置1に通知し、電源装置1は、現在の出力電流Ioに対応する最適デッドタイムをデッドタイムテーブル31に上書きする。
そして、検査装置2は、出力電流Ioを異なる幾つかの電流値に変化させて、上記第2の手順と第3の手順とを繰り返し実行し、それぞれの電流値に応じて、デッドタイムテーブル31に記憶されたデッドタイムのデータを最適デッドタイムに補正する。
As a third procedure, in the inspection device 2, the dead time when the power conversion efficiency is highest, that is, the inspection device 2 determines the dead time when the input current Iin is lowest as the optimum dead time. In this procedure, the inspection device 2 notifies the power supply device 1 of information on the optimum dead time, and the power supply device 1 overwrites the dead time table 31 with the optimum dead time corresponding to the current output current Io.
Then, the inspection apparatus 2 changes the output current Io to several different current values, repeatedly executes the second procedure and the third procedure, and the dead time table 31 according to each current value. The dead time data stored in is corrected to the optimum dead time.

なお、基準デッドタイムが最適デッドタイムにより補正される量は、異なる出力電流Ioの値に対して同じ傾向になることが多い。なお、同じ傾向とは、第1の出力電流Ioのとき、最適なデッドタイムが基準デッドタイムに対して正方向に変化させた値である場合、他の出力電流Ioにおいても最適なデッドタイムは基準デッドタイムに対して正方向に変化させた値になる傾向である。この場合は、1つの出力電流Ioから得られた補正量により、デッドタイムテーブル31に記憶されたデッドタイムの全体のデータを補正してもよい。   Note that the amount by which the reference dead time is corrected by the optimum dead time tends to be the same for different values of the output current Io. The same tendency means that when the optimum dead time is a value that is changed in the positive direction with respect to the reference dead time at the first output current Io, the optimum dead time at other output currents Io is It tends to be a value changed in the positive direction with respect to the reference dead time. In this case, the entire dead time data stored in the dead time table 31 may be corrected by the correction amount obtained from one output current Io.

このように、検査装置2は、電力変換効率が最も大きくなる最適デッドタイムを決定し、この決定した最適デッドタイムを電源装置1の記憶部30に上書きする。これにより、本実施形態の電源装置1は、デッドタイムを測定するための測定回路や最適デッドタイムを判定する回路を製品の内部に追加することなく、製品毎に最適なデッドタイムを個別に設定することができる。   In this way, the inspection device 2 determines the optimum dead time that maximizes the power conversion efficiency, and overwrites the determined optimum dead time in the storage unit 30 of the power supply device 1. Thereby, the power supply device 1 of this embodiment sets the optimal dead time for each product individually without adding a measurement circuit for measuring the dead time or a circuit for determining the optimal dead time to the inside of the product. can do.

図3は、電源装置1の構成例を示す構成図である。この図3に示す電源装置1は、直流電源21から入力される直流電圧Vinを、所定の定電圧の直流電圧Voutに変換するDC/DCコンバータである。図3に示すように、電源装置1は、一次側回路40、同期整流回路60、電流検出回路70、処理ユニット10、ドライブ回路11を備える。この電源装置1は、トランス50により一次側回路と二次側回路との間を絶縁するように構成されており、一次巻線51は、この一次巻線51を駆動するフルブリッジ回路20に接続されている。また、電源装置1には、負荷装置80が接続される。   FIG. 3 is a configuration diagram illustrating a configuration example of the power supply device 1. The power supply device 1 shown in FIG. 3 is a DC / DC converter that converts the DC voltage Vin input from the DC power supply 21 into a DC voltage Vout having a predetermined constant voltage. As shown in FIG. 3, the power supply device 1 includes a primary side circuit 40, a synchronous rectification circuit 60, a current detection circuit 70, a processing unit 10, and a drive circuit 11. The power supply device 1 is configured to insulate between a primary side circuit and a secondary side circuit by a transformer 50, and the primary winding 51 is connected to the full bridge circuit 20 that drives the primary winding 51. Has been. A load device 80 is connected to the power supply device 1.

一次側回路40は、一次巻線51、電流検出用トランス54の一次巻線55、フルブリッジ回路20、コンデンサC1、直流電源21、及び第1電流検出回路を備える。
フルブリッジ回路20は、一次巻線51を駆動するブリッジ回路であり、例えば、MOSFET(Metal Oxide Semiconductor Field Effect Transistor)を用いた4つのスイッチング素子、すなわち、スイッチング素子Q1、スイッチング素子Q2、スイッチング素子Q3、及びスイッチング素子Q4で構成されている。このスイッチング素子Q1からQ4のそれぞれには、ボディーダイオードD1からD4(以下、「ボディーダイオード」を、単に「ダイオード」とも呼ぶ。)が並列に接続されている。つまり、スイッチング素子Q1からQ4のそれぞれは、ドレイン側に、対応するダイオードD1からD4のカソード端子が接続され、ソース側にアノード端子が接続されるボディーダイオードD1からD4を備えている。
The primary circuit 40 includes a primary winding 51, a primary winding 55 of a current detection transformer 54, a full bridge circuit 20, a capacitor C1, a DC power source 21, and a first current detection circuit.
The full bridge circuit 20 is a bridge circuit that drives the primary winding 51, and includes, for example, four switching elements using MOSFETs (Metal Oxide Field Effect Transistors), that is, a switching element Q1, a switching element Q2, and a switching element Q3. And a switching element Q4. To each of the switching elements Q1 to Q4, body diodes D1 to D4 (hereinafter, “body diode” is also simply referred to as “diode”) are connected in parallel. In other words, each of the switching elements Q1 to Q4 includes body diodes D1 to D4 having cathodes of corresponding diodes D1 to D4 connected to the drain side and anode terminals connected to the source side.

このフルブリッジ回路20において、電流を供給する側のスイッチング素子Q1及びQ3のドレインは、直流電源21の正電圧側の電源線Vin+に接続され、電流が供給される側のスイッチング素子Q2及びQ4のソースは、直流電源21の負電圧側の電源線Vin−に接続されている。なお、直流電源21には、ノイズ吸収用のコンデンサC1が並列に接続されている。   In the full bridge circuit 20, the drains of the switching elements Q1 and Q3 on the current supply side are connected to the power supply line Vin + on the positive voltage side of the DC power supply 21, and the switching elements Q2 and Q4 on the current supply side are connected. The source is connected to the power supply line Vin− on the negative voltage side of the DC power supply 21. The DC power source 21 is connected in parallel with a noise absorbing capacitor C1.

そして、スイッチング素子Q1のソースとスイッチング素子Q2のドレインとの接続点には、一次巻線51の一方の端子aが接続されている。
また、スイッチング素子Q3のソースとスイッチング素子Q4のドレインとの接続点には、一次巻線55の一方の端子kに接続される。一次巻線55の他方の端子gは、一次巻線51の他方の端子bに接続されている。スイッチング素子Q1からQ4それぞれのゲートに信号G1からG4が、処理ユニット10からドライブ回路11を介して供給される。
これにより、電源装置1は、一次巻線51をフルブリッジ回路20により駆動するとともに、一次巻線51に流れる電流を電流検出用トランス54により計測することができる。
One terminal a of the primary winding 51 is connected to a connection point between the source of the switching element Q1 and the drain of the switching element Q2.
Further, a connection point between the source of the switching element Q3 and the drain of the switching element Q4 is connected to one terminal k of the primary winding 55. The other terminal g of the primary winding 55 is connected to the other terminal b of the primary winding 51. Signals G1 to G4 are supplied from the processing unit 10 via the drive circuit 11 to the gates of the switching elements Q1 to Q4, respectively.
Thereby, the power supply device 1 can drive the primary winding 51 by the full bridge circuit 20 and measure the current flowing through the primary winding 51 by the current detection transformer 54.

なお、このフルブリッジ回路20は、一次巻線51のリーケージインダクタンス(漏れインダクタンス)と、スイッチング素子Q1からQ4のキャパシタンス成分(寄生容量)とにより、スイッチング素子Q1からQ4のオン状態とオフ状態との過渡状態にだけ共振作用を利用する部分共振型のフルブリッジ回路として構成されている。つまり、制御部101は、スイッチング素子Q1からQ4の寄生容量に蓄積される電荷ができるだけ小さくなるタイミングで、スイッチング素子Q1及びQ4、あるいはスイッチング素子Q2及びQ3をオンにすることにより、スイッチング素子Q1からQ4におけるスイッチング損失を低減するようにしている。なお、スイッチング素子Q1からQ4におけるキャパシタンス成分は、ドレイン・ソース間の容量とゲート・ドレイン間の容量との和である。   The full bridge circuit 20 has an ON state and an OFF state of the switching elements Q1 to Q4 by a leakage inductance (leakage inductance) of the primary winding 51 and a capacitance component (parasitic capacitance) of the switching elements Q1 to Q4. It is configured as a partial resonance type full bridge circuit that uses the resonance action only in a transient state. That is, the control unit 101 turns on the switching elements Q1 and Q4 or the switching elements Q2 and Q3 at a timing when the charge accumulated in the parasitic capacitances of the switching elements Q1 to Q4 becomes as small as possible. The switching loss in Q4 is reduced. Note that the capacitance component in the switching elements Q1 to Q4 is the sum of the capacitance between the drain and the source and the capacitance between the gate and the drain.

そして、フルブリッジ回路20内のスイッチング素子Q1からQ4のそれぞれのゲートには、ドライブ回路11から出力されるゲート信号G1からG4が供給される。これによりスイッチング素子Q1からQ4がオン状態とオフ状態と制御される。このゲート信号G1からG4は、処理ユニット10内の制御部101から出力されるオンオフ制御信号CNT(PWM信号)に基づいて生成される信号である。
このドライブ回路11は、後述する同期整流スイッチ回路61内のスイッチング素子Q5及びQ6をオン状態とオフ状態とに制御するゲート信号G5及びG6も生成する。このゲート信号G5及びG6は、処理ユニット10内の制御部101から出力されるオンオフ制御信号CNTに基づいて生成される信号である。
The gate signals G1 to G4 output from the drive circuit 11 are supplied to the gates of the switching elements Q1 to Q4 in the full bridge circuit 20, respectively. Thereby, switching elements Q1 to Q4 are controlled to be in an on state and an off state. The gate signals G1 to G4 are signals generated based on the on / off control signal CNT (PWM signal) output from the control unit 101 in the processing unit 10.
The drive circuit 11 also generates gate signals G5 and G6 for controlling switching elements Q5 and Q6 in a synchronous rectification switch circuit 61, which will be described later, to an on state and an off state. The gate signals G5 and G6 are signals generated based on the on / off control signal CNT output from the control unit 101 in the processing unit 10.

ドライブ回路11は、スイッチング素子Q1からQ4をオン状態とオフ状態とに制御する場合に、スイッチング素子Q1及びQ4がオン状態でかつスイッチング素子Q2及びQ3がオフ状態である期間と、スイッチング素子Q1及びQ4がオフ状態でかつスイッチング素子Q2及びQ3がオン状態である期間とが交互に到来するゲート信号を生成する。これにより、一次巻線51の一端から他端に向けて電流が流れ、また、一次巻線51の他端から一端に向けて電流が流れる。一次巻線51に方向の異なる電流が交互に流れると、二次巻線52、53には、誘起電圧V1、及びV2が発生する。   When the drive circuit 11 controls the switching elements Q1 to Q4 to be in an on state and an off state, the drive circuit 11 has a period in which the switching elements Q1 and Q4 are in an on state and the switching elements Q2 and Q3 are in an off state, A gate signal is generated in which Q4 is in an off state and switching elements Q2 and Q3 are in an on state alternately. Thereby, a current flows from one end of the primary winding 51 toward the other end, and a current flows from the other end of the primary winding 51 toward the one end. When currents having different directions flow alternately in the primary winding 51, induced voltages V1 and V2 are generated in the secondary windings 52 and 53, respectively.

一次側回路40には、電源線Vin+を介してフルブリッジ回路20に流れる電流を計測するための第1電流検出回路22が設けられている。この第1電流検出回路22は、スイッチング素子Q1からQ4の過電流を防ぐための電流検出回路である。この第1電流検出回路22の検出結果に基づいて、処理ユニット10は、電源線Vin+を介してフルブリッジ回路20に所定値以上の過電流が流れたことが検出された場合に、スイッチング素子Q1からQ4を瞬時にオフ状態にするようにドライブ回路11に指示し、スイッチング素子Q1からQ4が過電流により破壊されることを防いでいる。   The primary side circuit 40 is provided with a first current detection circuit 22 for measuring a current flowing through the full bridge circuit 20 through the power supply line Vin +. The first current detection circuit 22 is a current detection circuit for preventing an overcurrent of the switching elements Q1 to Q4. Based on the detection result of the first current detection circuit 22, the processing unit 10 detects that an overcurrent of a predetermined value or more has flowed through the full bridge circuit 20 via the power line Vin +. To instruct the drive circuit 11 to turn off Q4 instantaneously to prevent the switching elements Q1 to Q4 from being destroyed by an overcurrent.

一次巻線51と一次巻線55とには一次側回路40のフルブリッジ回路20が接続される。二次巻線52及び53には、この二次巻線52及び53に誘起される電圧を全波整流する同期整流回路60が接続される。電流検出用トランス54の二次巻線56には、電流検出回路70が接続される。   The full bridge circuit 20 of the primary side circuit 40 is connected to the primary winding 51 and the primary winding 55. The secondary windings 52 and 53 are connected to a synchronous rectification circuit 60 that full-wave rectifies the voltage induced in the secondary windings 52 and 53. A current detection circuit 70 is connected to the secondary winding 56 of the current detection transformer 54.

次に、二次巻線側の同期整流回路60の構成について説明する。
同期整流回路60は、二次巻線52及び53、同期整流スイッチ回路61、整流平滑回路(チョークコイルL11とコンデンサC11)、第2電流検出回路62を備える。同期整流回路60は、二次巻線52及び53に誘起される電圧V1、V2(誘導起電力)を全波整流して直流電圧に変換する。
この同期整流回路60において、同期整流スイッチ回路61を構成するスイッチング素子Q5及びQ6は、制御部101によりオン状態とオフ状態とのタイミングが制御され、二次巻線52及び53に誘起される電圧V1、V2を同期整流する。同期整流回路60は、同期整流した直流電圧をチョークコイルL11とコンデンサC11で平滑化し、出力端子Out1とOut2を介して、負荷装置80に電力を供給する。
負荷装置80は、例えば、ランプや、モータや、或いは、バッテリ等である。
Next, the configuration of the synchronous rectifier circuit 60 on the secondary winding side will be described.
The synchronous rectification circuit 60 includes secondary windings 52 and 53, a synchronous rectification switch circuit 61, a rectification smoothing circuit (choke coil L11 and capacitor C11), and a second current detection circuit 62. The synchronous rectifier circuit 60 performs full-wave rectification on the voltages V1 and V2 (inductive electromotive force) induced in the secondary windings 52 and 53, and converts them into a DC voltage.
In the synchronous rectifier circuit 60, the switching elements Q5 and Q6 constituting the synchronous rectifier switch circuit 61 are controlled by the control unit 101 to control the timing between the on state and the off state, and are induced in the secondary windings 52 and 53. V1 and V2 are synchronously rectified. The synchronous rectification circuit 60 smoothes the synchronously rectified DC voltage with the choke coil L11 and the capacitor C11, and supplies power to the load device 80 via the output terminals Out1 and Out2.
The load device 80 is, for example, a lamp, a motor, a battery, or the like.

同期整流スイッチ回路61のスイッチング素子Q5及びQ6は、例えばMOSFETで構成されている。そして、スイッチング素子Q5及びQ6のそれぞれには、ボディーダイオードD5及びD6が並列に接続されている。つまり、スイッチング素子Q5及びQ6のそれぞれは、ドレイン側に対応するダイオードD5及びD6のカソード端子が接続され、ソース側にアノード端子が接続される。   The switching elements Q5 and Q6 of the synchronous rectification switch circuit 61 are configured by, for example, MOSFETs. Body diodes D5 and D6 are connected in parallel to switching elements Q5 and Q6, respectively. That is, each of the switching elements Q5 and Q6 is connected to the cathode terminals of the diodes D5 and D6 corresponding to the drain side and to the anode terminal on the source side.

上記同期整流回路60において、トランス50の二次巻線のセンタータップ、つまり、二次巻線52及び53の接続点の端子dは、チョークコイルL11の一端に接続され、チョークコイルL11の他端は、コンデンサC11の正電圧側の電極に接続されるとともに、正電圧側の出力端子Out1に接続されている。
また、二次巻線52の端子cには、同期整流スイッチ回路61内のスイッチング素子Q6のドレインが接続され、スイッチング素子Q6のソースは、基準電位線GNDを介して、基準電位側の出力端子Out2に接続されている。
また、二次巻線53の端子eには、同期整流スイッチ回路61内のスイッチング素子Q5のドレインが接続され、スイッチング素子Q5のソースは、基準電位線GNDを介して出力端子Out2に接続されている。
In the synchronous rectifier circuit 60, the center tap of the secondary winding of the transformer 50, that is, the terminal d of the connection point of the secondary windings 52 and 53 is connected to one end of the choke coil L11 and the other end of the choke coil L11. Are connected to the positive voltage side electrode of the capacitor C11 and to the positive voltage side output terminal Out1.
The terminal c of the secondary winding 52 is connected to the drain of the switching element Q6 in the synchronous rectification switch circuit 61. The source of the switching element Q6 is connected to the output terminal on the reference potential side via the reference potential line GND. Connected to Out2.
The terminal e of the secondary winding 53 is connected to the drain of the switching element Q5 in the synchronous rectification switch circuit 61, and the source of the switching element Q5 is connected to the output terminal Out2 via the reference potential line GND. Yes.

上記構成において、処理ユニット10は、二次巻線52、53に電圧V2、V3が誘起されるタイミングに同期して、スイッチング素子Q5及びQ6のオン状態とオフ状態とのタイミングを制御する。このように、スイッチング素子Q5及びQ6をオン状態とオフ状態と制御することにより、ダイオードD5及びD6の順方向電圧Vfにより発生する電力損失を低減することができる。   In the above configuration, the processing unit 10 controls the timing of the switching elements Q5 and Q6 between the on state and the off state in synchronization with the timing at which the voltages V2 and V3 are induced in the secondary windings 52 and 53. As described above, by controlling the switching elements Q5 and Q6 between the on state and the off state, it is possible to reduce the power loss caused by the forward voltage Vf of the diodes D5 and D6.

また、同期整流回路60には、スイッチング素子Q5(或は、スイッチング素子Q5及びQ6の両方)に流れる電流を計測する第2電流検出回路62が設けられている。第2電流検出回路62は、計測したスイッチング素子Q5(或は、スイッチング素子Q5及びQ6の両方)に流れる電流を示す信号を処理ユニット10に出力する。   The synchronous rectifier circuit 60 is provided with a second current detection circuit 62 that measures a current flowing through the switching element Q5 (or both of the switching elements Q5 and Q6). The second current detection circuit 62 outputs a signal indicating the current flowing through the measured switching element Q5 (or both of the switching elements Q5 and Q6) to the processing unit 10.

次に、電流検出回路70について説明する。
電流検出回路70は、電流検出用トランス54の二次巻線56、整流回路71、ダイオード72、分圧回路73、及び第3電流検出回路74を備える。
ここで、一次巻線51、二次巻線52、53は、トランス50を構成し、一次巻線55、二次巻線56は、電流検出用トランス54を構成する。
Next, the current detection circuit 70 will be described.
The current detection circuit 70 includes a secondary winding 56 of a current detection transformer 54, a rectifier circuit 71, a diode 72, a voltage dividing circuit 73, and a third current detection circuit 74.
Here, the primary winding 51 and the secondary windings 52 and 53 constitute a transformer 50, and the primary winding 55 and the secondary winding 56 constitute a current detection transformer 54.

本実施形態の電源装置1では、電流検出用トランス54と電流検出回路70とを用いて、一次巻線51に流れる電流を検出することにより、出力電流Ioを間接的に検出するように構成されている。これは、同期整流回路60のチョークコイルL11に直列に電流検出用トランスを挿入して出力電流Ioを検出する場合、例えば、100Aを超えるような出力電流Ioを検出する場合には、電流検出用トランスの検出値にノイズが重畳することがあり、また、発熱の問題が発生する可能性がある。そこで、一次巻線51に流れる一次側電流を電流検出用トランス54で検出することにより、出力電流Ioを検出している。なお、同期整流回路60内で出力電流Ioを検出してもよい。   The power supply device 1 according to the present embodiment is configured to indirectly detect the output current Io by detecting the current flowing through the primary winding 51 using the current detection transformer 54 and the current detection circuit 70. ing. This is because when a current detection transformer is inserted in series with the choke coil L11 of the synchronous rectifier circuit 60 to detect the output current Io, for example, when an output current Io exceeding 100 A is detected, Noise may be superimposed on the detected value of the transformer, and a problem of heat generation may occur. Therefore, the output current Io is detected by detecting the primary current flowing in the primary winding 51 with the current detecting transformer 54. Note that the output current Io may be detected in the synchronous rectifier circuit 60.

電流検出回路70は、電流検出用トランス54の二次巻線56の端子m,nに接続される整流回路71と、ダイオード72と分圧回路73と、第3電流検出回路74と、を有している。ダイオード72のアノードは、整流回路71の一方の端子に接続され、カソードは分圧回路73に接続される。分圧回路73は、分圧した結果を表す信号S1を処理ユニット10に出力する。第3電流検出回路74の一端は、整流回路71の一方の端子に接続され、検出した結果を表す信号S2を処理ユニット10に出力する。   The current detection circuit 70 includes a rectifier circuit 71 connected to the terminals m and n of the secondary winding 56 of the current detection transformer 54, a diode 72, a voltage dividing circuit 73, and a third current detection circuit 74. doing. The anode of the diode 72 is connected to one terminal of the rectifier circuit 71, and the cathode is connected to the voltage dividing circuit 73. The voltage dividing circuit 73 outputs a signal S1 representing the divided result to the processing unit 10. One end of the third current detection circuit 74 is connected to one terminal of the rectifier circuit 71, and outputs a signal S2 representing the detection result to the processing unit 10.

整流回路71は、ダイオードブリッジ回路で構成される全波整流回路である。分圧回路73は、抵抗分圧回路で構成されている。ダイオード72と分圧回路73とで構成される回路は、整流回路71から出力される電流Ictの還流ループを形成する。この分圧回路73から処理ユニット10に出力される信号S1は、例えば、スイッチング素子Q1からQ4の過電流保護用の信号として用いることができる。
ダイオード72は、後述する第3電流検出回路74のダイオード741において生じるVf(順方向の電圧降下分)を補償するための電圧補償用のダイオードである。
The rectifier circuit 71 is a full-wave rectifier circuit configured by a diode bridge circuit. The voltage dividing circuit 73 is configured by a resistance voltage dividing circuit. A circuit composed of the diode 72 and the voltage dividing circuit 73 forms a return loop of the current Ict output from the rectifier circuit 71. The signal S1 output from the voltage dividing circuit 73 to the processing unit 10 can be used as, for example, a signal for overcurrent protection of the switching elements Q1 to Q4.
The diode 72 is a voltage compensating diode for compensating for Vf (a forward voltage drop) generated in a diode 741 of a third current detection circuit 74 described later.

第3電流検出回路74は、電流検出用トランス54の二次巻線56から整流回路71を介して出力される電流Ictにより、出力電流Ioを間接的に検出する。
図4Aは、第3電流検出回路74の構成例を示す構成図である。この図4Aに示すように、第3電流検出回路74は、ダイオード741を介して電流Ictにより充電されるコンデンサ742と、コンデンサ742の両端の電圧を検出するための分圧用の抵抗器743、744と、ノイズ吸収用のコンデンサ745と、抵抗器746と、で構成されている。
The third current detection circuit 74 indirectly detects the output current Io from the current Ict output from the secondary winding 56 of the current detection transformer 54 via the rectifier circuit 71.
FIG. 4A is a configuration diagram illustrating a configuration example of the third current detection circuit 74. As shown in FIG. 4A, the third current detection circuit 74 includes a capacitor 742 that is charged by a current Ict through a diode 741, and resistors 743 and 744 for voltage division for detecting the voltage across the capacitor 742. And a noise absorbing capacitor 745 and a resistor 746.

ダイオード741のアノードは、第3電流検出回路74の入力端子である。ダイオード741のカソードは、抵抗器743の一端とコンデンサ742の一端とに接続される。ダイオード741は、電流のピークを検出する働きをする。   The anode of the diode 741 is an input terminal of the third current detection circuit 74. The cathode of the diode 741 is connected to one end of the resistor 743 and one end of the capacitor 742. The diode 741 serves to detect a current peak.

抵抗器743の他端は、抵抗器744の一端とコンデンサ745の一端と抵抗器746の一端とに接続される。
コンデンサ742の他端、抵抗器744の他端、及びコンデンサ745の他端は、接地される。
コンデンサ742、コンデンサ745、抵抗器743、抵抗器744、及び抵抗器746によって、所望の応答速度で電流を検出する回路が構成される。
抵抗器746の他端は、処理ユニット10のADC110に接続される。
The other end of the resistor 743 is connected to one end of the resistor 744, one end of the capacitor 745, and one end of the resistor 746.
The other end of the capacitor 742, the other end of the resistor 744, and the other end of the capacitor 745 are grounded.
The capacitor 742, the capacitor 745, the resistor 743, the resistor 744, and the resistor 746 constitute a circuit that detects current at a desired response speed.
The other end of the resistor 746 is connected to the ADC 110 of the processing unit 10.

また、図4Bは、第3電流検出回路74の動作を説明するための波形図である。図4Bにおいて、横軸は時刻、縦軸は電圧と電流である。
第3電流検出回路74において、図4Bに示す全波整流波形の電流Ictが、整流回路71から第3電流検出回路74に向けて流れると、電流Ictにより第3電流検出回路74のコンデンサ742が充電される。そして、この電流Ictにより充電されるコンデンサ742の両端の電圧Vctは、図4Bに示すように、平滑された電圧波形となる。この電圧Vctは、抵抗器743、744により分圧され、抵抗器744と抵抗器743の接続点N1には、処理ユニット10内のA/D変換器(ADC)110の入力電圧範囲に適合する電圧信号Vscが生成される。なお、抵抗器744には、並列にノイズ吸収用のコンデンサ745が接続されている。
FIG. 4B is a waveform diagram for explaining the operation of the third current detection circuit 74. In FIG. 4B, the horizontal axis represents time, and the vertical axis represents voltage and current.
In the third current detection circuit 74, when the current Ict having the full-wave rectification waveform shown in FIG. 4B flows from the rectification circuit 71 toward the third current detection circuit 74, the capacitor 742 of the third current detection circuit 74 is caused by the current Ict. Charged. The voltage Vct across the capacitor 742 charged by this current Ict has a smoothed voltage waveform as shown in FIG. 4B. This voltage Vct is divided by resistors 743 and 744, and a connection point N 1 between the resistors 744 and 743 conforms to an input voltage range of the A / D converter (ADC) 110 in the processing unit 10. A voltage signal Vsc is generated. The resistor 744 is connected with a noise absorbing capacitor 745 in parallel.

そして、この電圧信号Vscは、抵抗器746を介して、信号S2として、処理ユニット10内のA/D変換器110に入力される。A/D変換器110は、信号S2をA/D変換し、このA/D変換したデジタル値の信号を、制御部101に入力する。
このように、電流検出回路70では、一次巻線51に流れる電流を検出することにより、出力電流Ioを間接的に検出することができる
The voltage signal Vsc is input to the A / D converter 110 in the processing unit 10 as a signal S2 via the resistor 746. The A / D converter 110 performs A / D conversion on the signal S <b> 2 and inputs a digital value signal obtained by the A / D conversion to the control unit 101.
As described above, the current detection circuit 70 can indirectly detect the output current Io by detecting the current flowing through the primary winding 51.

上記構成の電源装置1において、処理ユニット10内の制御部101は、ドライブ回路11を介して、フルブリッジ回路20内のスイッチング素子Q1からQ4のそれぞれにゲート信号G1からG4を供給する。つまり、制御部101は、不図示の出力電圧検出回路により、出力電圧Voutを検出し、この出力電圧Voutが一定になるように、スイッチング素子Q1からQ4のオン状態とオフ状態とのタイミング(デューティ比)を制御する。
また、制御部101は、ドライブ回路11を介して、同期整流スイッチ回路61内のスイッチング素子Q5及びQ6のそれぞれにゲート信号G5及びG6を供給する。つまり、制御部101は、スイッチング素子Q5及びQ6のオン状態とオフ状態とのタイミングを制御することにより、スイッチング素子Q5及びQ6に同期整流を行わせる。
In the power supply device 1 configured as described above, the control unit 101 in the processing unit 10 supplies the gate signals G1 to G4 to the switching elements Q1 to Q4 in the full bridge circuit 20 via the drive circuit 11, respectively. That is, the control unit 101 detects the output voltage Vout by an output voltage detection circuit (not shown), and the timing (duty) between the ON state and the OFF state of the switching elements Q1 to Q4 so that the output voltage Vout becomes constant. Ratio).
In addition, the control unit 101 supplies gate signals G5 and G6 to the switching elements Q5 and Q6 in the synchronous rectification switch circuit 61 via the drive circuit 11, respectively. That is, the control unit 101 controls the switching elements Q5 and Q6 to perform synchronous rectification by controlling the timing between the ON state and the OFF state of the switching elements Q5 and Q6.

そして、制御部101は、スイッチング素子Q1からQ4のオン状態とオフ状態とのタイミングを制御する場合に、上アーム側のスイッチング素子と、下アーム側のスイッチング素子とが同時にオン状態にすると貫通電流が流れてスイッチング素子が破壊される恐れがあるため、これを回避するために、同時に2つのスイッチング素子がオフ状態にする期間をデッドタイムとして設けている。   When the control unit 101 controls the timing between the ON state and the OFF state of the switching elements Q1 to Q4, if the switching element on the upper arm side and the switching element on the lower arm side are simultaneously turned on, the through current In order to avoid this, the period during which the two switching elements are turned off at the same time is provided as a dead time.

図5は、スイッチング素子Q1からQ4のゲート信号の波形を示すタイムチャートである。この図5では、横軸に時間tを示し、縦軸に、スイッチング素子Q1のゲート信号G1の波形と、スイッチング素子Q2のゲート信号G2の波形と、スイッチング素子Q3のゲート信号G3の波形と、スイッチング素子Q4のゲート信号G4の波形と、一次巻線51に印加される電圧波形と、を並べて示している。なお、各ゲート信号が、ハイ信号(H)の場合に、当該ゲート信号に対応するスイッチング素子がオン状態になり、ロー信号(L)の場合に、当該ゲート信号に対応するスイッチング素子がオフ状態になる。   FIG. 5 is a time chart showing the waveforms of the gate signals of the switching elements Q1 to Q4. In FIG. 5, the horizontal axis indicates time t, and the vertical axis indicates the waveform of the gate signal G1 of the switching element Q1, the waveform of the gate signal G2 of the switching element Q2, and the waveform of the gate signal G3 of the switching element Q3. The waveform of the gate signal G4 of the switching element Q4 and the voltage waveform applied to the primary winding 51 are shown side by side. When each gate signal is a high signal (H), the switching element corresponding to the gate signal is turned on. When the gate signal is a low signal (L), the switching element corresponding to the gate signal is turned off. become.

この図5において、時刻t0では、スイッチング素子Q1及びQ3がオフ状態にあり、スイッチング素子Q2及びQ4がオン状態にある。つまり、時刻t0において、スイッチング素子Q2及びQ4により、一次巻線51に流れる電流を還流させている状態にある。
そして、時刻t0の後の時刻t1において、制御部101は、ゲート信号G4をLにしてスイッチング素子Q4をオフ状態にし、この時刻t1から所定のデッドタイムDT34を経過した時刻t2において、ゲート信号G3をHにしてスイッチング素子Q3をオン状態にする。これは、スイッチング素子Q4をオフ状態にした後に、スイッチング素子Q3を直ちにオン状態にすると、スイッチング素子Q4のターンオフタイムによる動作遅れにより、スイッチング素子Q3とスイッチング素子Q4により貫通電流が流れるためである。これを回避するために、デッドタイムDT34を設ける。
In FIG. 5, at time t0, switching elements Q1 and Q3 are in an off state, and switching elements Q2 and Q4 are in an on state. That is, at time t0, the current flowing through the primary winding 51 is returned by the switching elements Q2 and Q4.
At time t1 after time t0, the control unit 101 sets the gate signal G4 to L to turn off the switching element Q4, and at time t2 when a predetermined dead time DT34 has elapsed from this time t1, the gate signal G3. Is set to H to turn on the switching element Q3. This is because if the switching element Q3 is immediately turned on after the switching element Q4 is turned off, a through current flows through the switching element Q3 and the switching element Q4 due to an operation delay due to the turn-off time of the switching element Q4. In order to avoid this, a dead time DT34 is provided.

そして、時刻t2の後の時刻t3において、制御部101は、ゲート信号G2をLにしてスイッチング素子Q2をオフ状態にする。つまり、時刻t2から時刻t3までの期間において、一次巻線51に負極性の電圧が印加される。なお、ここで、負極性の電圧とは、一次巻線51の端子bの電位が、端子aの電位よりも高い状態を表す。   Then, at time t3 after time t2, the control unit 101 sets the gate signal G2 to L and turns off the switching element Q2. That is, a negative voltage is applied to the primary winding 51 during the period from time t2 to time t3. Here, the negative voltage represents a state in which the potential of the terminal b of the primary winding 51 is higher than the potential of the terminal a.

続いて、時刻t3においてスイッチング素子Q2がオフ状態になった後、所定のデッドタイムDT12が経過した時刻t4において、制御部101は、ゲート信号G1をHにしてスイッチング素子Q1をオン状態にする。つまり、スイッチング素子Q2をオフ状態にした後に、スイッチング素子Q1を直ちにオン状態にすると、スイッチング素子Q2のターンオフタイムによる動作遅れにより、スイッチング素子Q1とスイッチング素子Q2に貫通電流が流れる恐れがある。これを回避するために、デッドタイムDT12を設ける。   Subsequently, after the switching element Q2 is turned off at time t3, at time t4 when a predetermined dead time DT12 has elapsed, the control unit 101 sets the gate signal G1 to H to turn on the switching element Q1. That is, if the switching element Q1 is immediately turned on after the switching element Q2 is turned off, a through current may flow through the switching element Q1 and the switching element Q2 due to an operation delay due to the turn-off time of the switching element Q2. In order to avoid this, a dead time DT12 is provided.

そして、時刻t4の後の時刻t5において、制御部101は、ゲート信号G3をLにしてスイッチング素子Q3をオフ状態にする。従って、時刻t4から時刻t5の間は、スイッチング素子Q1及びQ3がオン状態になり、スイッチング素子Q1及びQ3により、一次巻線51に流れる電流を還流させている状態になる。   Then, at time t5 after time t4, the control unit 101 sets the gate signal G3 to L and turns off the switching element Q3. Therefore, between the time t4 and the time t5, the switching elements Q1 and Q3 are turned on, and the current flowing through the primary winding 51 is recirculated by the switching elements Q1 and Q3.

続いて、時刻t5においてスイッチング素子Q3がオフ状態になった後、所定のデッドタイムDT34が経過した時刻t6において、制御部101は、ゲート信号G4をHにしてスイッチング素子Q4をオン状態にする。つまり、スイッチング素子Q3をオフ状態にした後に、スイッチング素子Q4を直ちにオン状態にすると、スイッチング素子Q3のターンオフタイムによる動作遅れにより、スイッチング素子Q3及びQ4に貫通電流が流れる恐れがある。これを回避するために、デッドタイムDT34を設ける。   Subsequently, after the switching element Q3 is turned off at time t5, at time t6 when a predetermined dead time DT34 has elapsed, the control unit 101 sets the gate signal G4 to H to turn on the switching element Q4. That is, if the switching element Q4 is immediately turned on after the switching element Q3 is turned off, a through current may flow through the switching elements Q3 and Q4 due to an operation delay due to the turn-off time of the switching element Q3. In order to avoid this, a dead time DT34 is provided.

そして、時刻t6の後の時刻t7において、制御部101は、ゲート信号G1をLにしてスイッチング素子Q1をオフ状態にする。つまり、時刻t6から時刻t7までの期間において、一次巻線51に正極性の電圧が印加される。なお、ここで、正極性の電圧とは、一次巻線51の端子aの電位が、端子bの電位よりも高い状態を意味している。   Then, at time t7 after time t6, the control unit 101 sets the gate signal G1 to L and turns off the switching element Q1. That is, a positive voltage is applied to the primary winding 51 during the period from time t6 to time t7. Here, the positive voltage means that the potential of the terminal a of the primary winding 51 is higher than the potential of the terminal b.

続いて、時刻t7においてスイッチング素子Q1がオフ状態になった後、所定のデッドタイムDT12が経過した時刻t8において、制御部101は、ゲート信号G2をHにしてスイッチング素子Q2をオン状態にする。つまり、スイッチング素子Q1をオフ状態にした後に、スイッチング素子Q2を直ちにオン状態にすると、スイッチング素子Q1のターンオフタイムによる動作遅れにより、スイッチング素子Q1及びQ2に貫通電流が流れる恐れがある。これを回避するために、デッドタイムDT12を設ける。   Subsequently, after the switching element Q1 is turned off at time t7, at time t8 when a predetermined dead time DT12 has elapsed, the control unit 101 sets the gate signal G2 to H to turn on the switching element Q2. That is, if the switching element Q2 is immediately turned on after the switching element Q1 is turned off, a through current may flow through the switching elements Q1 and Q2 due to an operation delay due to the turn-off time of the switching element Q1. In order to avoid this, a dead time DT12 is provided.

そして、時刻t8の後の時刻t9において、制御部101は、ゲート信号G4をLにしてスイッチング素子Q4をオフ状態にする。つまり、時刻t8から時刻t9までの期間は、スイッチング素子Q2及びQ4がオン状態になり、スイッチング素子Q2及びQ4により、一次巻線51に流れる電流を還流させている状態になる。
その後の時刻t9以降の動作は、上述した時刻t1以降の動作が繰り返される。
なお、図5に示す位相シフト量Δは、上アーム側のスイッチング素子Q1のゲート信号G1と、上アーム側のスイッチング素子Q3のゲート信号G3との、位相差を示している。
Then, at time t9 after time t8, the control unit 101 sets the gate signal G4 to L and turns off the switching element Q4. That is, during the period from time t8 to time t9, the switching elements Q2 and Q4 are turned on, and the current flowing through the primary winding 51 is returned by the switching elements Q2 and Q4.
Subsequent operations after time t9 are repeated after the above-described time t1.
5 indicates a phase difference between the gate signal G1 of the switching element Q1 on the upper arm side and the gate signal G3 of the switching element Q3 on the upper arm side.

また、図6は、記憶部30に記憶されるデッドタイムテーブル31の例を示す説明図である。この図6に示すように、記憶部30には、デッドタイムのデータがテーブルの形式で記憶されている。つまり、フルブリッジ回路20を構成するスイッチング素子のデッドタイムDT12とデッドタイムDT34とが、電源装置1の出力電流Ioに関連づけられてテーブルの形式で記憶されている。制御部101は、電源装置1の出力電流Ioの大きさに応じて、図6に示すデッドタイムテーブル31を参照する。
なお、このデッドタイムテーブル31は、記憶部30内において、EEPROM(Electrically Erasable Programmable Read−Only Memory)に記憶されている。
FIG. 6 is an explanatory diagram showing an example of the dead time table 31 stored in the storage unit 30. As shown in FIG. 6, the storage unit 30 stores dead time data in the form of a table. That is, the dead time DT12 and the dead time DT34 of the switching elements constituting the full bridge circuit 20 are stored in the form of a table in association with the output current Io of the power supply device 1. The control unit 101 refers to the dead time table 31 illustrated in FIG. 6 according to the magnitude of the output current Io of the power supply device 1.
The dead time table 31 is stored in an EEPROM (Electrically Erasable Programmable Read-Only Memory) in the storage unit 30.

また、デッドタイムテーブル31に記憶されるデッドタイムの初期値のデータは、例えば、ドライブ回路11の遅延時間のバラツキの平均値と、スイッチング素子Q1からQ4の特性のバラツキの平均値とに対応して、最適デッドタイムとして推定される値を用いることができる。この初期値のデータは、出力電流値ゼロ(0)、Io1、Io2、Io3、Io4、Io5,Io6ごとに設定される値である。つまり、デッドタイムテーブル31に記憶される初期値のデータは、ドライブ回路11の遅延時間と、スイッチング素子Q1からQ4の特性とが上記平均値に一致する場合に、最適なデッドタイムとなる。   Further, the initial value data of the dead time stored in the dead time table 31 corresponds to, for example, an average value of variations in delay time of the drive circuit 11 and an average value of variations in characteristics of the switching elements Q1 to Q4. Thus, a value estimated as the optimum dead time can be used. This initial value data is a value set for each output current value zero (0), Io1, Io2, Io3, Io4, Io5, and Io6. That is, the initial value data stored in the dead time table 31 is the optimum dead time when the delay time of the drive circuit 11 and the characteristics of the switching elements Q1 to Q4 coincide with the average value.

そして、制御部101は、例えば、出力電流Ioの値がIo3の場合に、デッドタイムDT12として、デッドタイムdt4を選択し、また、デッドタイムDT34として、デッドタイムdt4’を選択する。そして、制御部101は、図3に示したゲート信号G1からG4を生成する場合に、デッドタイムdt4及びデッドタイムdt4’を用いて、ゲート信号G1からG4を生成する。   For example, when the value of the output current Io is Io3, the control unit 101 selects the dead time dt4 as the dead time DT12, and selects the dead time dt4 'as the dead time DT34. When the control unit 101 generates the gate signals G1 to G4 shown in FIG. 3, the control unit 101 generates the gate signals G1 to G4 using the dead time dt4 and the dead time dt4 '.

また、図7A〜図7Cは、デッドタイムがDT1、DT2、DT3の場合におけるスイッチング素子のドレイン・ソース間電圧Vdsの例を示す波形図である。ただし、DT1<DT2<DT3である。この波形図は、例えば、スイッチング素子Q2のドレイン・ソース間電圧Vdsの波形の例である。図7AはデットタイムがDT1である場合の波形であり、図7BはデッドタイムがDT2である場合の波形であり、図7CはデッドタイムがDT3である場合の波形である。図7A〜図7Cにおいて、横軸は時刻、縦軸は電圧である。
この波形図に示すように、スイッチング素子Q2のドレイン・ソース間電圧は、オン状態にあるゼロ電圧に近い値から、オフ状態の電圧Voffに上昇する際に、部分共振波形となる。このため、スイッチング素子Q2をどの時点でスイッチングを行うかにより、スイッチング素子Q2のターンオフ時のスイッチングロス(スイッチング損失)が変化する。つまり、デッドタイムDTを変化させることにより波形が変化し、この波形の変化に伴い、スイッチングロスが変化する。他のスイッチング素子についても同様である。
7A to 7C are waveform diagrams showing examples of the drain-source voltage Vds of the switching element when the dead times are DT1, DT2, and DT3. However, DT1 <DT2 <DT3. This waveform diagram is an example of the waveform of the drain-source voltage Vds of the switching element Q2, for example. 7A shows a waveform when the dead time is DT1, FIG. 7B shows a waveform when the dead time is DT2, and FIG. 7C shows a waveform when the dead time is DT3. 7A to 7C, the horizontal axis represents time, and the vertical axis represents voltage.
As shown in this waveform diagram, when the drain-source voltage of the switching element Q2 rises from a value close to zero voltage in the on state to a voltage Voff in the off state, it becomes a partial resonance waveform. For this reason, the switching loss (switching loss) when the switching element Q2 is turned off varies depending on when the switching element Q2 is switched. That is, the waveform changes by changing the dead time DT, and the switching loss changes as the waveform changes. The same applies to other switching elements.

例えば、図8は、デッドタイムを変化させた場合の電力変換効率の測定例を示す説明図である。
この図8は、前述の図2に示すように、電源装置1の入力側に電圧計5と電流計6とを配置し、電源装置1の出力側に電圧計7と電流計8とを配置する。そして、基準となるデッドタイム(基準デッドタイム)を、+方向(時間を延ばす方向)と、−方向(時間を短くする方向)とに、所定の時間ΔTを単位時間として変化させる。
For example, FIG. 8 is an explanatory diagram illustrating a measurement example of the power conversion efficiency when the dead time is changed.
8, the voltmeter 5 and the ammeter 6 are arranged on the input side of the power supply device 1 and the voltmeter 7 and the ammeter 8 are arranged on the output side of the power supply device 1 as shown in FIG. To do. Then, the reference dead time (reference dead time) is changed in the + direction (the direction in which the time is extended) and the − direction (the direction in which the time is shortened) as a predetermined time ΔT.

この図8に示す例では、出力電流Ioが一定の条件の基で、基準となるデッドタイムを0とし、デッドタイムを、基準デッドタイムから+方向に、+3(基準デッドタイム+3×ΔT)まで変化させ、−方向に、−3(基準デッドタイム−3×ΔT)まで変化させている。そして、検査装置2は、デッドタイムの時間幅に応じて変化する電力変換効率eを計測する。この図8に示す例では、デッドタイムが「0(基準デッドタイム)」の場合に、最も高い電力変換効率e11.4となり、デッドタイムが「+3(基準デッドタイム+3×ΔT)」の場合に、電力変換効率が最も低くなる。   In the example shown in FIG. 8, the reference dead time is set to 0 under the condition that the output current Io is constant, and the dead time is +3 (reference dead time + 3 × ΔT) in the positive direction from the reference dead time. It is changed to −3 (reference dead time−3 × ΔT) in the − direction. And the inspection apparatus 2 measures the power conversion efficiency e which changes according to the time width of a dead time. In the example shown in FIG. 8, when the dead time is “0 (reference dead time)”, the highest power conversion efficiency e11.4 is obtained, and when the dead time is “+3 (reference dead time + 3 × ΔT)”. The power conversion efficiency is the lowest.

図9Aは、デッドタイムを変化させた場合の電力変換効率の変化を示すグラフであり、図8に示した電力変換効率eの測定結果をグラフで示した図ある。
この図9Aでは、横軸に、デッドタイムの変化を示し、縦軸に電力変換効率のレベルを示している。この図9では、基準となるデッドタイムを0とし、この基準となるデッドタイムを、+方向と、−方向とに、所定の時間ΔTを単位時間として変化させた場合の電力変換効率の変化特性を示している。また、縦軸において、符号e1からe12は、電力変換効率のレベルを示している。
この図9Aの特性曲線A1に示すように、デッドタイムを変化させることにより、電力変換効率が変化し、この例では、デッドタイムがゼロ(0)、つまり、デッドタイムが基準デッドタイムである場合に、電力変換効率が最高になる。
FIG. 9A is a graph showing a change in power conversion efficiency when the dead time is changed, and is a graph showing the measurement result of the power conversion efficiency e shown in FIG.
In FIG. 9A, the horizontal axis indicates the change in dead time, and the vertical axis indicates the level of power conversion efficiency. In FIG. 9, the change characteristic of the power conversion efficiency when the reference dead time is set to 0 and the reference dead time is changed in the + direction and the − direction by a predetermined time ΔT as a unit time. Is shown. On the vertical axis, the symbols e1 to e12 indicate the level of power conversion efficiency.
As shown in the characteristic curve A1 in FIG. 9A, the power conversion efficiency changes by changing the dead time. In this example, the dead time is zero (0), that is, the dead time is the reference dead time. In addition, the power conversion efficiency is maximized.

一方、ドライブ回路11の遅延時間のバラツキや、スイッチング素子Q1からQ4の特性のバラツキにより、デッドタイムに対する電力変換効率の特性が変化する。図9Bは、スイッチング素子の特性のバラツキによる電力変換効率の変化の例を示すグラフである。
この図9Bの特性曲線B1に示すように、デッドタイムが+1(基準デッドタイム+ΔT)の時に、電力変換効率が最高の効率になることがある。
On the other hand, the characteristics of the power conversion efficiency with respect to the dead time change due to variations in the delay time of the drive circuit 11 and variations in the characteristics of the switching elements Q1 to Q4. FIG. 9B is a graph showing an example of changes in power conversion efficiency due to variations in characteristics of switching elements.
As shown in the characteristic curve B1 of FIG. 9B, when the dead time is +1 (reference dead time + ΔT), the power conversion efficiency may be the highest.

このような場合、検査装置2は、「基準デッドタイム+ΔT」のデッドタイムを、電力変換効率eが最大となる最適デッドタイムと判定し、この最適デッドタイムと、この最適デッドタイムが適用される出力電流値の情報とを、電源装置1に送信する。電源装置1は、検査装置2から受信した最適デッドタイムと出力電流値の情報に基づいて、記憶部30内のデッドタイムテーブル31を最適デッドタイムのデータに書き換える。
なお、デッドタイムには、図5に示すように、デッドタイムDT12とデッドタイムDT34の2種類があり、上記最適デッドタイムの設定は、各出力電流Ioの値に応じて、デッドタイムDT12とデッドタイムDT34のそれぞれについて設定される。
In such a case, the inspection apparatus 2 determines that the dead time of “reference dead time + ΔT” is the optimum dead time that maximizes the power conversion efficiency e, and this optimum dead time and this optimum dead time are applied. Information on the output current value is transmitted to the power supply device 1. The power supply device 1 rewrites the dead time table 31 in the storage unit 30 with the data of the optimum dead time based on the information of the optimum dead time and output current value received from the inspection device 2.
As shown in FIG. 5, there are two types of dead time, dead time DT12 and dead time DT34. The optimum dead time is set according to the value of each output current Io. It is set for each of the times DT34.

また、図10は、最適デッドタイムの設定処理の流れを示すフローチャートである。この図10は、上述した電源装置1と検査装置2とにおける最適デッドタイムの設定処理の流れを、フローチャートで示したものである。
なお、デッドタイムには、図5に示したように、デッドタイムDT12と、デッドタイムDT34の2種類があるが、デッドタイムDT12とデッドタイムDT34のそれぞれについて、最適デッドタイムの設定処理が行われる。ここで、デッドタイムDT12とデッドタイムDT34についての最適デッドタイムの設定の順番は、何れが先であってもよく、例えば、デッドタイムDT12を設定した後に、デッドタイムDT34の設定を行う。
FIG. 10 is a flowchart showing the flow of the optimum dead time setting process. FIG. 10 is a flowchart showing the flow of the optimum dead time setting process in the power supply device 1 and the inspection device 2 described above.
As shown in FIG. 5, there are two types of dead time, dead time DT12 and dead time DT34, and optimum dead time setting processing is performed for each of dead time DT12 and dead time DT34. . Here, the order of setting the optimum dead time for the dead time DT12 and the dead time DT34 may be any first. For example, after setting the dead time DT12, the dead time DT34 is set.

また、図2で説明したように、検査装置2により最適デッドタイムを判定する場合、電源装置1の入力電圧Vinと、出力電圧Voutと、出力電流Ioとが一定になるように設定して、入電流が最小になる場合のデッドタイムを、最適デッドタイムとして判定する簡易な方法がある。
この図10で示す例は、図2で説明した簡易な方法とは異なり、検査装置2が、電源装置1の入力電圧Vinと、出力電圧Voutと、出力電流Ioと、入力電流Iinを取得して電力変換効率を測定し、この測定結果に基づいて最適デッドタイムを判定する例を示している。
Further, as described with reference to FIG. 2, when determining the optimum dead time by the inspection device 2, the input voltage Vin, the output voltage Vout, and the output current Io of the power supply device 1 are set to be constant, There is a simple method for determining the dead time when the input current is minimized as the optimum dead time.
In the example shown in FIG. 10, unlike the simple method described in FIG. 2, the inspection device 2 acquires the input voltage Vin, the output voltage Vout, the output current Io, and the input current Iin of the power supply device 1. In this example, the power conversion efficiency is measured, and the optimum dead time is determined based on the measurement result.

以下、図10を参照して、最適デッドタイムの設定処理の手順について説明する。
なお、図2に示すように、電源装置1の入力側に、入力電圧Vinを測定する電圧計5と、入力電流Iinを測定する電流計6とが予め配置され、また、電源装置1の出力側に、出力電圧Voutを測定する電圧計7と、出力電流Ioを測定する電流計8とが予め配置されているものとする。
Hereinafter, the procedure for setting the optimum dead time will be described with reference to FIG.
As shown in FIG. 2, a voltmeter 5 that measures the input voltage Vin and an ammeter 6 that measures the input current Iin are arranged in advance on the input side of the power supply device 1, and the output of the power supply device 1 It is assumed that a voltmeter 7 for measuring the output voltage Vout and an ammeter 8 for measuring the output current Io are arranged in advance on the side.

まず、最初に、電源装置1及び検査装置2は、入力電圧Vinと、出力電圧Voutと、出力電流Ioとが一定になるように設定する(ステップS110)。例えば、負荷装置80として、電子負荷装置を用いて、出力電流Ioが一定になるようにする。
電源装置1の制御部101は、出力電流Ioに応じたデッドタイムを、デッドタイムテーブル31から読み出し、ドライブ回路11を介して、ゲート信号G1からG4を生成する。なお、この最適デッドタイムの設定処理の開始の時点において、デッドタイムは、基準デッドタイムとなる。
First, the power supply device 1 and the inspection device 2 set the input voltage Vin, the output voltage Vout, and the output current Io to be constant (step S110). For example, an electronic load device is used as the load device 80 so that the output current Io is constant.
The control unit 101 of the power supply device 1 reads a dead time corresponding to the output current Io from the dead time table 31 and generates gate signals G1 to G4 via the drive circuit 11. Note that at the start of the optimum dead time setting process, the dead time becomes the reference dead time.

続いて、検査装置2は、入力電圧Vinと、出力電圧Voutと、出力電流Ioと、入力電流Iinと、を取得し、基準デッドタイムにおける電力変換効率を算出し、この電力変換効率のデータを記憶部204に記憶する(ステップS120)。
続いて、検査装置2は、デッドタイムを現在のデッドタイムを増加方向に+1(ΔT増加)するように電源装置1に指示する(ステップS130)。このステップS130の処理が最初に行われる場合、デッドタイムは、「基準デッドタイム+1×ΔT」となる。
続いて、電源装置1は、検査装置2からの指示に基づいて、現在のデッドタイムを+1(ΔT増加)した新たなデッドタイムをデッドタイムテーブル31に記憶して、デッドタイムを変更する。電源装置1の制御部101は、この変更されたデッドタイムに基づいて、ゲート信号G1からG4を生成し、スイッチング素子Q1からQ4を駆動する(ステップS140)。
Subsequently, the inspection apparatus 2 acquires the input voltage Vin, the output voltage Vout, the output current Io, and the input current Iin, calculates the power conversion efficiency in the reference dead time, and uses the data of the power conversion efficiency as the data. It memorize | stores in the memory | storage part 204 (step S120).
Subsequently, the inspection apparatus 2 instructs the power supply apparatus 1 to increase the current dead time by +1 (ΔT increase) in the increasing direction of the current dead time (step S130). When the process of step S130 is performed first, the dead time is “reference dead time + 1 × ΔT”.
Subsequently, based on an instruction from the inspection device 2, the power supply device 1 stores a new dead time obtained by adding +1 (ΔT increase) to the current dead time in the dead time table 31, and changes the dead time. Based on the changed dead time, the control unit 101 of the power supply device 1 generates the gate signals G1 to G4 and drives the switching elements Q1 to Q4 (step S140).

続いて、検査装置2は、入力電圧Vinと、出力電圧Voutと、出力電流Ioと、入力電流Iinと、を取得し、電力変換効率を算出し、この電力変換効率のデータを記憶部204に記憶する(ステップS150)。
続いて、検査装置2は、デッドタイムを+3(基準デッドタイム+3×ΔT)まで変更したか否かを判定する(ステップS160)。そして、ステップS160の判定処理において、デッドタイムを+3まで変更していないと判定された場合(ステップS160:NO)、検査装置2は、ステップS130の処理に戻り、デッドタイムの変更と、電力変換効率の計測処理とを継続する。
Subsequently, the inspection apparatus 2 acquires the input voltage Vin, the output voltage Vout, the output current Io, and the input current Iin, calculates the power conversion efficiency, and stores the power conversion efficiency data in the storage unit 204. Store (step S150).
Subsequently, the inspection apparatus 2 determines whether or not the dead time has been changed to +3 (reference dead time + 3 × ΔT) (step S160). If it is determined in the determination process in step S160 that the dead time has not been changed to +3 (step S160: NO), the inspection apparatus 2 returns to the process in step S130 to change the dead time and perform power conversion. Continue the efficiency measurement process.

一方、ステップS160の判定処理において、デッドタイムを+3まで変更したと判定された場合(ステップS160:YES)、検査装置2は、ステップS170の処理に移行する。
そして、検査装置2は、デッドタイムを−1にする(ステップS170)。また、検査装置2は、ステップS200において−3ではないと判定された場合、デッドタイムを−1だけ減算する。例えば、デッドタイムが−1の場合、この処理によってデッドタイムは、−2になる。
続いて、電源装置1は、−1にしたデッドタイムまたは1減算したデッドタイムをデッドタイムテーブル31に記憶して、デッドタイムを変更する。電源装置1は、この変更されたデッドタイムに基づいて、ゲート信号G1からG4を生成し、スイッチング素子Q1からQ4を駆動する(ステップS180)。
On the other hand, in the determination process of step S160, when it is determined that the dead time has been changed to +3 (step S160: YES), the inspection apparatus 2 proceeds to the process of step S170.
Then, the inspection device 2 sets the dead time to −1 (step S170). Moreover, when it determines with it being not -3 in step S200, the inspection apparatus 2 subtracts -1 by dead time. For example, when the dead time is -1, the dead time becomes -2 by this process.
Subsequently, the power supply device 1 stores the dead time set to -1 or the dead time obtained by subtracting 1 in the dead time table 31 to change the dead time. The power supply device 1 generates the gate signals G1 to G4 based on the changed dead time, and drives the switching elements Q1 to Q4 (step S180).

続いて、検査装置2は、入力電圧Vinと、出力電圧Voutと、出力電流Ioと、入力電流Iinと、を取得し、電力変換効率を算出し、この電力変換効率のデータを記憶部204に記憶する(ステップS190)。
続いて、検査装置2は、デッドタイムを−3(基準デッドタイム−3×ΔT)まで変更したか否かを判定する(ステップS200)。そして、ステップS200の判定処理において、デッドタイムを−3まで変更していないと判定された場合(ステップS200:NO)、検査装置2は、ステップS170の処理に戻り、デッドタイムの変更と、電力変換効率の計測処理とを継続する。
Subsequently, the inspection apparatus 2 acquires the input voltage Vin, the output voltage Vout, the output current Io, and the input current Iin, calculates the power conversion efficiency, and stores the power conversion efficiency data in the storage unit 204. Store (step S190).
Subsequently, the inspection apparatus 2 determines whether or not the dead time has been changed to −3 (reference dead time−3 × ΔT) (step S200). If it is determined in the determination process in step S200 that the dead time has not been changed to −3 (step S200: NO), the inspection apparatus 2 returns to the process in step S170, and changes the dead time and the power. Continue the conversion efficiency measurement process.

一方、ステップS200の判定処理において、デッドタイムを−3まで変更したと判定された場合(ステップS200:YES)、検査装置2は、ステップS210の処理に移行する。
そして、検査装置2は、デッドタイムを基準デッドタイムから±3方向に変化させて計測した電力変換効率のデータに基づいて、電力変換効率が最も高くなるデッドタイムを判定する。つまり、検査装置2は、入力電流Iinが一番低くなるデッドタイムを最適デッドタイムと判定する(ステップS210)。
続いて、検査装置2は、最適デッドタイムの情報を電源装置1に通知する(ステップS220)。
続いて、電源装置1は、検査装置2から通知された最適デッドタイムを、記憶部30内のデッドタイムテーブル31に書き込む(ステップS230)。
そして、このステップS230の処理を実行した後に、電源装置1と検査装置2とは、このPCS40の最適デッドタイムの設定処理を終える。
On the other hand, in the determination process of step S200, when it is determined that the dead time has been changed to −3 (step S200: YES), the inspection apparatus 2 proceeds to the process of step S210.
And the inspection apparatus 2 determines the dead time when the power conversion efficiency becomes the highest based on the data of the power conversion efficiency measured by changing the dead time in the ± 3 direction from the reference dead time. That is, the inspection apparatus 2 determines that the dead time when the input current Iin is the lowest is the optimum dead time (step S210).
Subsequently, the inspection apparatus 2 notifies the power supply apparatus 1 of information on the optimum dead time (step S220).
Subsequently, the power supply device 1 writes the optimum dead time notified from the inspection device 2 in the dead time table 31 in the storage unit 30 (step S230).
Then, after executing the process of step S230, the power supply apparatus 1 and the inspection apparatus 2 finish the setting process of the optimum dead time of the PCS 40.

そして、検査装置2は、上記ステップS110からS230までの処理を、異なる幾つかの出力電流Ioに対して繰り返し実行し、それぞれの電流値に応じた最適デッドタイムを判定して電源装置1に通知する。
電源装置1は、検査装置2から取得した最適デッドタイムをデッドタイムテーブル31に書き込むことにより、デッドタイムテーブル31に最適デッドタイムを設定する。
Then, the inspection device 2 repeatedly performs the processing from step S110 to S230 for several different output currents Io, determines the optimum dead time according to each current value, and notifies the power supply device 1 of the determination. To do.
The power supply device 1 sets the optimum dead time in the dead time table 31 by writing the optimum dead time acquired from the inspection device 2 into the dead time table 31.

なお、検査装置2は、異なる幾つかの出力電流Ioに対してデッドタイムの補正を行う場合に、測定対象となる1つ目の出力電流Ioに対応するデッドタイムを決定するとき、デッドタイムを正負の方向の何れの方向に変化させたときに電力変換効率が最も大きくなったかを記憶してもよい。例えば、デッドタイムを正方向に変化させたときに電力変換効率が最も大きくなると判定された場合、検査装置2は、2つ目の出力電流に対するデッドタイムを決定する際に、正方向からデッドタイムを変化させ、電力変換効率が下がり始め、ピークを迎えたことが検出された時点でデッドタイムの調整を終了してもよい。   When the inspection device 2 corrects the dead time for several different output currents Io, the dead time is determined when determining the dead time corresponding to the first output current Io to be measured. You may memorize | store whether the power conversion efficiency became the largest when it changed to which direction of the positive / negative direction. For example, when it is determined that the power conversion efficiency is maximized when the dead time is changed in the positive direction, the inspection apparatus 2 determines the dead time from the positive direction when determining the dead time for the second output current. The dead time adjustment may be terminated when it is detected that the power conversion efficiency starts to decrease and the peak is detected.

[第2実施形態]
図3に示した電源装置1では、一次巻線51に流れる電流を、電流検出用トランス54と電流検出回路70とを用いて検出することにより、出力電流Ioを間接的に測定している。勿論、出力電流Ioは、同期整流回路60内に電流検出回路を設けて検出してもよい。
[Second Embodiment]
In the power supply device 1 shown in FIG. 3, the output current Io is indirectly measured by detecting the current flowing through the primary winding 51 using the current detection transformer 54 and the current detection circuit 70. Of course, the output current Io may be detected by providing a current detection circuit in the synchronous rectification circuit 60.

図11は、本発明の第2実施形態に係る電源装置1Aの構成例を示す構成図である。
この図11に示す電源装置1Aは、図3に示す電源装置1と比較すると、図3に示す一次巻線51側の電流検出用トランス54と、電流検出回路70とを除外し、代わりに、同期整流回路60内に、電流検出用トランス63と、出力電流検出回路64とを新たに追加した点が構成上で異なる。また、図3に示す第1電流検出回路22と、第2電流検出回路62とを省略した点が構成上で異なる。
他の構成は、図3に示す電源装置1と同様である。このため、同一の構成部分には同一の符号を付し、重複する説明は省略する。
FIG. 11 is a configuration diagram showing a configuration example of a power supply device 1A according to the second embodiment of the present invention.
Compared with the power supply device 1 shown in FIG. 3, the power supply device 1A shown in FIG. 11 excludes the current detection transformer 54 and the current detection circuit 70 on the primary winding 51 side shown in FIG. The point that the current detection transformer 63 and the output current detection circuit 64 are newly added in the synchronous rectification circuit 60 is different in configuration. Further, the configuration differs in that the first current detection circuit 22 and the second current detection circuit 62 shown in FIG. 3 are omitted.
Other configurations are the same as those of the power supply device 1 shown in FIG. For this reason, the same code | symbol is attached | subjected to the same component and the overlapping description is abbreviate | omitted.

この図11に示す電源装置1Aでは、チョークコイルL11と出力端子Out1との間に電流検出用トランス63を挿入し、この電流検出用トランス63により、電源装置1Aから負荷装置80に流れる出力電流Ioを検出する。
電流検出用トランス63の二次側には、二次巻線側に流れる電流の還流ループを形成するとともに、出力電流Ioの電流値を検出するための出力電流検出回路64が接続されている。この出力電流検出回路64には、例えば、図4に示した第3電流検出回路74と同様な回路が内蔵されており、出力電流検出回路64により検出された電流信号Isが、処理ユニット10に入力される。
そして、上記電源装置1Aにおける最適デッドタイムの設定動作は、出力電流Ioを同期整流回路60内の電流検出用トランス63で検出する点を除いて、第1実施形態の電源装置1と同様にして行われる。このため、重複する説明は、省略する。
このように、第2実施形態の電源装置1Aでは、出力端子Out1から負荷装置80に流れる出力電流Ioを直接検出することにより、出力電流Ioの値に応じた最適デッドタイムを設定することができる。
In the power supply device 1A shown in FIG. 11, a current detection transformer 63 is inserted between the choke coil L11 and the output terminal Out1, and the output current Io flowing from the power supply device 1A to the load device 80 by the current detection transformer 63. Is detected.
On the secondary side of the current detection transformer 63, an output current detection circuit 64 for detecting a current value of the output current Io is formed while a circulation loop of a current flowing on the secondary winding side is formed. For example, the output current detection circuit 64 includes a circuit similar to the third current detection circuit 74 shown in FIG. 4, and the current signal Is detected by the output current detection circuit 64 is sent to the processing unit 10. Entered.
The optimum dead time setting operation in the power supply device 1A is the same as that of the power supply device 1 of the first embodiment except that the output current Io is detected by the current detection transformer 63 in the synchronous rectifier circuit 60. Done. For this reason, the overlapping description is omitted.
Thus, in the power supply device 1A of the second embodiment, the optimum dead time can be set according to the value of the output current Io by directly detecting the output current Io flowing from the output terminal Out1 to the load device 80. .

[第3実施形態]
上述した第1実施形態及び第2実施形態では、一次巻線51をフルブリッジ回路20で駆動する例について説明したが、本発明は、一次巻線51を、ハーフブリッジ回路で駆動する場合においても、効果的に適用できるものである。
[Third Embodiment]
In the first and second embodiments described above, the example in which the primary winding 51 is driven by the full bridge circuit 20 has been described. However, the present invention can be applied to the case where the primary winding 51 is driven by a half bridge circuit. Can be applied effectively.

図12は、本発明の第3実施形態に係る電源装置1Bの構成例を示す構成図である。
この図12に示すハーフブリッジ回路20Aを備える電源装置1Bの回路構成は、一般的によく知られたものである。このハーフブリッジ回路20Aは、スイッチング素子Q1及びQ2を交互にオン状態、オフ状態し、コンデンサC2、C3に蓄積された電荷により、一次巻線51を駆動する。そして、二次巻線52、53に誘起される電圧を、同期整流回路60(或いは、ダイオード整流回路)により全波整流し、チョークコイルL11を介して負荷装置80に給電する。
そして、このハーフブリッジ回路20Aでは、スイッチング素子Q1及びQ2の出力容量と、トランス50のリーケージインダクタンス(漏れインダクタンス)とを共振させることにより、スイッチング素子Q1及びQ2を零電圧近くでスイッチングし、スイッチング素子Q1及びQ2のスイッチングロスを低減している。
FIG. 12 is a configuration diagram showing a configuration example of a power supply device 1B according to the third embodiment of the present invention.
The circuit configuration of the power supply device 1B including the half bridge circuit 20A shown in FIG. 12 is generally well known. The half-bridge circuit 20A alternately turns on and off the switching elements Q1 and Q2, and drives the primary winding 51 with the electric charges accumulated in the capacitors C2 and C3. Then, the voltage induced in the secondary windings 52 and 53 is full-wave rectified by the synchronous rectifier circuit 60 (or the diode rectifier circuit) and supplied to the load device 80 via the choke coil L11.
In the half-bridge circuit 20A, the switching elements Q1 and Q2 are switched near zero voltage by resonating the output capacitances of the switching elements Q1 and Q2 and the leakage inductance of the transformer 50. The switching loss of Q1 and Q2 is reduced.

上記構成において、スイッチング素子Q1及びQ2のオン状態とオフ状態との遷移期間に、スイッチング素子Q1及びQ2が同時にオフ状態になるデッドタイムを設けている。このデッドタイムにおいては、上述した第1実施形態のフルブリッジ回路20の場合と同様に、スイッチングロスが発生する。
このスイッチングロスを低減するために、検査装置2は、第1実施形態の電源装置1と同様な方法により最適デッドタイムを判定して、電源装置1B内の記憶部30に最適デッドタイムを設定する。
これにより、トランス50に一次側にハーフブリッジ回路20Aを用いた電源装置1Bにおいても、最適なデッドタイムを設定することができる。
In the above configuration, a dead time during which the switching elements Q1 and Q2 are simultaneously turned off is provided in the transition period between the on state and the off state of the switching elements Q1 and Q2. In this dead time, a switching loss occurs as in the case of the full bridge circuit 20 of the first embodiment described above.
In order to reduce this switching loss, the inspection apparatus 2 determines the optimum dead time by the same method as the power supply apparatus 1 of the first embodiment, and sets the optimum dead time in the storage unit 30 in the power supply apparatus 1B. .
Thereby, also in the power supply device 1B using the half bridge circuit 20A on the primary side in the transformer 50, an optimal dead time can be set.

また、本発明の電源装置は、フォワ−ド型のDC−DCコンバ−タ装置に於いて、主スイッチング素子のスイッチング時に部分共振作用を利用して、スイッチング時の損失の発生を低減する場合にも効果的に適用できるものである。
さらに、本発明の電源装置は、プッシュプル型のDC/DCコンバータ装置にも効果的に適用できるものである。
The power supply device of the present invention is a forward-type DC-DC converter device that uses a partial resonance action at the time of switching of the main switching element to reduce the occurrence of loss during switching. Can also be effectively applied.
Furthermore, the power supply device of the present invention can be effectively applied to a push-pull type DC / DC converter device.

なお、ここで、本発明と上記実施形態との対応関係について補足して説明する。上記実施形態において、本発明における電源装置は、電源装置1、電源装置1A、又は、電源装置1Bが対応する。また、本発明における第1デッドタイムは、記憶部30のデッドタイムテーブル31に記憶されるデータであって、最適デッドタイムに書き換えられる前のデッドタイムのデータが対応する。また、第2デッドタイムは、検査装置2により判定された最適デッドタイムが対応し、記憶部30のデッドタイムテーブル31は、最終的に、この最適デッドタイムに書き換えられる。
また、本発明におけるスイッチング回路は、フルブリッジ回路20又はハーフブリッジ回路20Aが対応し、本発明におけるスイッチング素子は、例えば、フルブリッジ回路20内のスイッチング素子Q1からQ4が対応する。
Here, the correspondence relationship between the present invention and the above embodiment will be supplementarily described. In the above-described embodiment, the power supply device according to the present invention corresponds to the power supply device 1, the power supply device 1A, or the power supply device 1B. Further, the first dead time in the present invention is data stored in the dead time table 31 of the storage unit 30, and corresponds to data of the dead time before being rewritten to the optimum dead time. Further, the second dead time corresponds to the optimum dead time determined by the inspection apparatus 2, and the dead time table 31 of the storage unit 30 is finally rewritten to this optimum dead time.
The switching circuit in the present invention corresponds to the full bridge circuit 20 or the half bridge circuit 20A, and the switching elements in the present invention correspond to, for example, the switching elements Q1 to Q4 in the full bridge circuit 20.

(1)そして、上記実施形態において、電源装置1は、スイッチング回路(フルブリッジ回路20)を構成するスイッチング素子(Q1からQ4)の第1デッドタイムを記憶する記憶部30と、入力電流の測定結果に基づいて設定された第2デッドタイムの情報を外部入力する取得部102と、記憶部30に記憶された第1デッドタイムを取得部102が取得した第2デッドタイムに書き換える書換部103と、記憶部30に記憶された第2デッドタイムに応じてスイッチング素子(Q1からQ4)を制御する制御部101と、を備える。
このような構成の電源装置1では、入力電流の測定結果に基づいて設定された第2デッドタイム(最適デッドタイム)を外部から取得し、記憶部30に記憶された第1デッドタイムのデータを第2デッドタイムに書き換える。制御部101は、第2デッドタイムに応じてスイッチング素子を制御する。
これにより、電源装置1は、入力電流を測定するための回路やデッドタイムを決定する新たな回路を製品の内部に追加することなく、入力電流が最も少なくなる第2デッドタイム(最適デッドタイム)を製品毎に設定できる。
(1) In the above embodiment, the power supply device 1 includes the storage unit 30 that stores the first dead time of the switching elements (Q1 to Q4) that constitute the switching circuit (full bridge circuit 20), and the measurement of the input current. An acquisition unit 102 that externally inputs information on the second dead time set based on the result, and a rewriting unit 103 that rewrites the first dead time stored in the storage unit 30 to the second dead time acquired by the acquisition unit 102. The control unit 101 controls the switching elements (Q1 to Q4) according to the second dead time stored in the storage unit 30.
In the power supply device 1 having such a configuration, the second dead time (optimum dead time) set based on the measurement result of the input current is acquired from the outside, and the first dead time data stored in the storage unit 30 is obtained. Rewrite to the second dead time. The control unit 101 controls the switching element according to the second dead time.
As a result, the power supply device 1 has a second dead time (optimum dead time) in which the input current is minimized without adding a circuit for measuring the input current or a new circuit for determining the dead time. Can be set for each product.

(2)上記実施形態において、取得部102は、電力変換効率の測定結果に基づいて設定された第2デッドタイムの情報を外部入力する。
このような構成の電源装置1では、電力変換効率の測定結果に基づいて設定された第2デッドタイム(最適デッドタイム)を外部から取得し、記憶部30に記憶された第1デッドタイムのデータを第2デッドタイムに書き換える。制御部101は、第2デッドタイムに応じてスイッチング素子を制御する。
これにより、電源装置1は、電力変換効率を測定するための回路やデッドタイムを決定する回路を製品の内部に追加することなく、電力変換効率が最大になる第2デッドタイム(最適デッドタイム)を製品毎に設定できる。
(2) In the above embodiment, the acquisition unit 102 externally inputs information on the second dead time set based on the measurement result of the power conversion efficiency.
In the power supply device 1 having such a configuration, the second dead time (optimum dead time) set based on the measurement result of the power conversion efficiency is acquired from the outside, and the first dead time data stored in the storage unit 30 To the second dead time. The control unit 101 controls the switching element according to the second dead time.
As a result, the power supply device 1 has a second dead time (optimum dead time) at which the power conversion efficiency is maximized without adding a circuit for measuring the power conversion efficiency and a circuit for determining the dead time inside the product. Can be set for each product.

(3)上記実施形態において、取得部102は、第2デッドタイムを取得する際に、入出力電流と入出力電圧に基づいて第2デッドタイムを判定するデッドタイム設定部(検査装置2)から、第2デッドタイムを入力する。
このような構成の電源装置1であれば、デッドタイム設定部(検査装置2)が、電源装置1の入出力電流と入出力電圧に基づいて第2デッドタイムを判定し、電源装置1の取得部102は、デッドタイム設定部(検査装置2)から第2デッドタイムの情報を取得して、この第2デッドタイムを記憶部30に記憶する。
これにより、デッドタイム設定部(検査装置2)は、電力変換効率が最大になる第2デッドタイム(最適デッドタイム)を、電源装置1の入出力電流と入出力電圧に基づいて決定し、電源装置1は、この第2デッドタイムの情報をデッドタイム設定部(検査装置2)から取得して記憶部30に記憶することができる。
(3) In the above embodiment, the acquisition unit 102 obtains the second dead time from the dead time setting unit (inspection apparatus 2) that determines the second dead time based on the input / output current and the input / output voltage. The second dead time is input.
In the power supply device 1 having such a configuration, the dead time setting unit (inspection device 2) determines the second dead time based on the input / output current and the input / output voltage of the power supply device 1, and obtains the power supply device 1. The unit 102 acquires information on the second dead time from the dead time setting unit (inspection apparatus 2), and stores the second dead time in the storage unit 30.
Thus, the dead time setting unit (inspection device 2) determines the second dead time (optimum dead time) at which the power conversion efficiency is maximized based on the input / output current and the input / output voltage of the power supply device 1, and the power supply The device 1 can acquire the information on the second dead time from the dead time setting unit (inspection device 2) and store it in the storage unit 30.

(4)また、上記実施形態の電源装置1において、第2デッドタイム(最適デッドタイム)は、電源装置1への入力電圧Vin、電源装置1からの出力電圧Vout、及び電源装置1からの出力電流Ioを一定に保った状態で、記憶部30に記憶された第1デッドタイムが変化させられたときに、電源装置1の入力電流Iinが最も少なくなる値である。
このような構成の電源装置1あれば、電源装置1の入力電圧Vin、電源装置1からの出力電圧Vout、及び電源装置1からの出力電流Ioを一定に保った状態で、デッドタイムを変化させて、入力電流Iinを測定する。そして、電源装置1は、入力電流が最も少なくなるときのデッドタイムである第2デッドタイム(最適デッドタイム)の情報を、取得部102により取得し、この第2デッドタイムを記憶部30に記憶する。
これにより、電源装置1は、入力電圧Vin、出力電圧Vout、及び出力電流Ioを一定に保った状態で、入力電流Iinが最も少なくなるときのデッドタイムを、第2デッドタイム(最適デッドタイム)を取得部102により取得し、記憶部30に記憶することができる。
(4) In the power supply device 1 of the above embodiment, the second dead time (optimum dead time) is the input voltage Vin to the power supply device 1, the output voltage Vout from the power supply device 1, and the output from the power supply device 1. When the first dead time stored in the storage unit 30 is changed in a state where the current Io is kept constant, the input current Iin of the power supply device 1 is a value that becomes the smallest.
With the power supply device 1 having such a configuration, the dead time is changed while the input voltage Vin of the power supply device 1, the output voltage Vout from the power supply device 1, and the output current Io from the power supply device 1 are kept constant. Then, the input current Iin is measured. Then, the power supply device 1 acquires information on the second dead time (optimal dead time), which is a dead time when the input current becomes the smallest, by the acquisition unit 102 and stores the second dead time in the storage unit 30. To do.
As a result, the power supply device 1 sets the dead time when the input current Iin is minimized while maintaining the input voltage Vin, the output voltage Vout, and the output current Io to be the second dead time (optimum dead time). Can be acquired by the acquisition unit 102 and stored in the storage unit 30.

(5)また、本発明の電源装置において、記憶部30には、出力電流と第1デッドタイムとの関係が、出力電流毎に記憶され、書換部103は、記憶部30に記憶された出力電流毎の第1デッドタイムを、取得部102が取得した出力電流毎の第2デッドタイムにそれぞれ書き換える。
このような構成の電源装置であれば、記憶部30には、出力電流と第1デッドタイムとの関係が、出力電流毎に記憶される。そして、電源装置1は、取得部102により、出力電流毎の第2デッドタイムの情報を取得し、記憶部30に記憶された出力電流毎の第1デッドタイムを、取得部102が取得した出力電流毎の第2デッドタイムにそれぞれ書き換える。
これにより、電源装置1は、出力電流毎に、第2デッドタイム(最適デッドタイム)を設定することができる。
(5) Further, in the power supply device of the present invention, the storage unit 30 stores the relationship between the output current and the first dead time for each output current, and the rewrite unit 103 outputs the output stored in the storage unit 30. The first dead time for each current is rewritten to the second dead time for each output current acquired by the acquisition unit 102.
In the power supply device having such a configuration, the storage unit 30 stores the relationship between the output current and the first dead time for each output current. And the power supply device 1 acquires the information of the 2nd dead time for every output current by the acquisition part 102, and the output from which the acquisition part 102 acquired the 1st dead time for every output current memorize | stored in the memory | storage part 30. Rewrite to the second dead time for each current.
Thereby, the power supply device 1 can set the second dead time (optimum dead time) for each output current.

(6)また、本発明の電源装置において、前記スイッチング素子は、ハーフブリッジ回路又はフルブリッジ回路を構成する素子である。
このような構成の電源装置であれば、ハーフブリッジ回路又はフルブリッジ回路を構成するスイッチング素子に対して、電力変換効率を最大にする第2デッドタイム(最適デッドタイム)を設定することができる。
(6) Moreover, in the power supply device of the present invention, the switching element is an element constituting a half bridge circuit or a full bridge circuit.
If it is a power supply device of such a structure, the 2nd dead time (optimal dead time) which maximizes power conversion efficiency can be set with respect to the switching element which comprises a half bridge circuit or a full bridge circuit.

(7)また、本発明の電源装置1において、ハーフブリッジ回路又はフルブリッジ回路(フルブリッジ回路20)において、スイッチング素子(Q1からQ4)は、部分共振作用を利用してスイッチングされる。
このような構成の電源装置1であれば、部分共振型のフルブリッジ回路又はハーフブリッジ回路を構成するスイッチング素子(Q1からQ4)に対して、電力変換効率を最大にする第2デッドタイム(最適デッドタイム)を設定することができる。
(7) Moreover, in the power supply device 1 of the present invention, in the half-bridge circuit or the full-bridge circuit (full-bridge circuit 20), the switching elements (Q1 to Q4) are switched using a partial resonance action.
With the power supply device 1 having such a configuration, the second dead time (optimum) for maximizing the power conversion efficiency with respect to the switching elements (Q1 to Q4) constituting the partial resonance type full bridge circuit or half bridge circuit. Dead time) can be set.

(8)また、本発明の検査装置2は、スイッチング回路(フルブリッジ回路20)のスイッチング素子(Q1からQ4)の第1デッドタイムが、外部入力されるデッドタイムの情報により変更可能な電源装置1に対して、第1デッドタイムを変更するように指示して電源装置の入力電流を計測する測定部201と、測定部201により計測された入力電流の測定値に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する判定部202と、第2デッドタイムの情報を電源装置1に通知して、電源装置1において第1デッドタイムを第2デッドタイムに設定させる書込部203と、を備える。
このような構成の検査装置2では、電源装置1に対して、第1デッドタイムを変更するように指示して、スイッチング素子(Q1からQ4)のデッドタイムを変更させながら、電源装置1の入力電流を計測する。そして、検査装置2は、入力電流の測定結果に基づいて、入力電流が最も少なくなるデッドタイムを、第2デッドタイム(最適デッドタイム)と判定する。そして、検査装置2は、このデッドタイムの情報を電源装置1に通知して、電源装置1において第1デッドタイムを第2デッドタイムに設定させる。
これにより、検査装置2は、電源装置1のスイッチング回路(フルブリッジ回路20)のスイッチング素子(Q1からQ4)のデッドタイムを変更させながら、入力電流を測定して、第2デッドタイム(最適デッドタイム)を判定することができる。そして、検査装置2は、この第2デッドタイムを電源装置1に通知して、記憶部30に記憶させることができる。
このため、電源装置1は、入力電流を測定するための新たな回路やデッドタイムを決定する回路を製品の内部に追加することなく、入力電流が最も少なくなる第2デッドタイム(最適デッドタイム)を製品毎に設定することができる。
(8) Moreover, the inspection apparatus 2 of the present invention is a power supply apparatus in which the first dead time of the switching elements (Q1 to Q4) of the switching circuit (full bridge circuit 20) can be changed by information on dead time input from the outside. 1, the measurement unit 201 that instructs to change the first dead time and measures the input current of the power supply device, and the input current is the most based on the measured value of the input current measured by the measurement unit 201 The determination unit 202 that determines the dead time when the dead time is reduced as the second dead time, and notifies the power supply apparatus 1 of the information on the second dead time, and causes the power supply apparatus 1 to set the first dead time as the second dead time. And a writing unit 203.
In the inspection apparatus 2 having such a configuration, the power supply apparatus 1 is instructed to change the first dead time, and the input of the power supply apparatus 1 is changed while changing the dead time of the switching elements (Q1 to Q4). Measure current. And the inspection apparatus 2 determines the dead time when the input current is the smallest as the second dead time (optimal dead time) based on the measurement result of the input current. Then, the inspection apparatus 2 notifies the power supply apparatus 1 of the dead time information, and causes the power supply apparatus 1 to set the first dead time to the second dead time.
As a result, the inspection device 2 measures the input current while changing the dead time of the switching elements (Q1 to Q4) of the switching circuit (full bridge circuit 20) of the power supply device 1, and the second dead time (optimum dead time). Time). Then, the inspection apparatus 2 can notify the power supply apparatus 1 of the second dead time and store it in the storage unit 30.
For this reason, the power supply device 1 has the second dead time (optimum dead time) in which the input current is minimized without adding a new circuit for measuring the input current or a circuit for determining the dead time inside the product. Can be set for each product.

(9)また、本発明の検査装置2において、測定部201は、電源装置1への入力電圧、電源装置1からの出力電圧、及び電源装置1からの出力電流を一定に保った状態で、電源装置1に対して、第1デッドタイムを変更するように指示して電力変換効率を計測し、判定部202は、測定部201により計測された入力電流の測定値に基づいて、電力変換効率が最も高くなるときのデッドタイムを第2デッドタイムとして判定する。
このような構成の検査装置であれば、検査装置は、電源装置への入力電圧、電源装置からの出力電圧、及び電源装置からの出力電流を一定に保った状態で、電源装置に対して第1デッドタイムを変更するように指示して電力変換効率を計測し、電源装置の電力変換効率が最も高くなるときのデッドタイムを第2デッドタイムとして判定する。
これにより、検査装置は、電力変換効率を測定することにより、第2デッドタイム(最適デッドタイム)を、容易に判定することができる。
(9) In the inspection apparatus 2 of the present invention, the measurement unit 201 maintains a constant input voltage to the power supply apparatus 1, output voltage from the power supply apparatus 1, and output current from the power supply apparatus 1. The power conversion device is instructed to change the first dead time to measure the power conversion efficiency, and the determination unit 202 determines the power conversion efficiency based on the measured value of the input current measured by the measurement unit 201. Is determined as the second dead time.
In the case of the inspection device having such a configuration, the inspection device performs the first operation with respect to the power supply device while keeping the input voltage to the power supply device, the output voltage from the power supply device, and the output current from the power supply device constant. The power conversion efficiency is measured by instructing to change one dead time, and the dead time when the power conversion efficiency of the power supply device becomes the highest is determined as the second dead time.
Thereby, the inspection apparatus can easily determine the second dead time (optimum dead time) by measuring the power conversion efficiency.

(10)また、本発明の電源装置1の最適化方法は、電源装置1のスイッチング回路(フルブリッジ回路20)を構成するスイッチング素子(Q1からQ4)のデッドタイムを検査装置2により最適化する電源装置1の最適化方法であって、電源装置1が、第1デッドタイムを検査装置2からの指示により変更する手順を含み、検査装置2が、電源装置1に対して、第1デッドタイムを変更させるように指示するとともに、電源装置1の入力電流を測定する手順と、検査装置2が、入力電流の測定結果に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する手順と、検査装置2が、第2デッドタイムの情報を電源装置1に通知して、電源装置1において、第1デッドタイムを第2デッドタイムに設定させる手順と、を含むことを特徴とする。
このような電源装置1の最適化方法であれば、検査装置2は、スイッチング素子(Q1からQ4)の第1デッドタイムが変更可能な電源装置1に対して、第1デッドタイムを変更するように指示して電源装置1の入力電流を測定する。そして、検査装置2は、この入力電流の測定結果に基づいて、入力電流が最も少なくなる第2デッドタイム(最適デッドタイム)を判定する。そして、検査装置2は、第2デッドタイムの情報を電源装置1に送信して、電源装置1において第1デッドタイムを第2デッドタイムに設定させる。
これにより、電源装置1は、入力電流を測定するための回路やデッドタイムを決定する新たな回路を製品の内部に追加することなく、力電流が最も少なくなる最適デッドタイムを製品毎に設定できる。
(10) Further, the optimization method of the power supply device 1 according to the present invention optimizes the dead time of the switching elements (Q1 to Q4) constituting the switching circuit (full bridge circuit 20) of the power supply device 1 by the inspection device 2. A method for optimizing a power supply apparatus 1 includes a procedure in which the power supply apparatus 1 changes a first dead time according to an instruction from the inspection apparatus 2, and the inspection apparatus 2 has a first dead time with respect to the power supply apparatus 1. And a procedure for measuring the input current of the power supply device 1 and the inspection device 2 determines the second dead time when the input current is minimized based on the measurement result of the input current. And the inspection apparatus 2 notifies the power supply apparatus 1 of the information on the second dead time, and causes the power supply apparatus 1 to set the first dead time to the second dead time. Characterized in that it comprises a forward, a.
With such an optimization method of the power supply device 1, the inspection device 2 changes the first dead time with respect to the power supply device 1 in which the first dead time of the switching elements (Q1 to Q4) can be changed. To measure the input current of the power supply device 1. Then, the inspection apparatus 2 determines a second dead time (optimum dead time) at which the input current is minimized based on the measurement result of the input current. Then, the inspection device 2 transmits information on the second dead time to the power supply device 1 and causes the power supply device 1 to set the first dead time to the second dead time.
Thereby, the power supply device 1 can set the optimum dead time for which the force current is minimized for each product without adding a circuit for measuring the input current and a new circuit for determining the dead time to the inside of the product. .

(11)また、本発明の電源装置1の最適化方法は、第2デッドタイムは、電源装置1への入力電圧、電源装置1からの出力電圧、及び電源装置1からの出力電流を一定に保った状態で、第1デッドタイムが変化させられたとき、電源装置1の入力電流が最も少なくなる値である。
このような電源装置1の最適化方法であれば、検査装置2は、電源装置1への入力電圧、電源装置1からの出力電圧、及び電源装置1からの出力電流を一定に保った状態で、デッドタイムを変化させる。そして、検査装置2は、入力電流が最も少なくなるときのデッドタイムを第2デッドタイム(最適デッドタイム)と判定する。
これにより、検査装置2は、入力電流を測定することにより、電源装置1の最適デッドタイム(第2デッドタイム)を容易に判定することができる。
(11) Further, according to the optimization method of the power supply device 1 of the present invention, the input voltage to the power supply device 1, the output voltage from the power supply device 1, and the output current from the power supply device 1 are constant during the second dead time. In this state, when the first dead time is changed, the input current of the power supply device 1 is the smallest value.
With such an optimization method for the power supply device 1, the inspection device 2 maintains a constant input voltage to the power supply device 1, output voltage from the power supply device 1, and output current from the power supply device 1. , Change the dead time. Then, the inspection device 2 determines that the dead time when the input current becomes the smallest is the second dead time (optimum dead time).
Thereby, the test | inspection apparatus 2 can determine the optimal dead time (2nd dead time) of the power supply device 1 easily by measuring input current.

(12)また、電源装置1の最適化方法において、検査装置2が、第1の出力電流に対する第2デッドタイムを決定したとき、第1デッドタイムを変化させた正負方向を示す情報に基づいて第2の出力電流に対する第2デッドタイムを決定する手順を含む。
このような電源装置1の最適化方法であれば、検査装置2は、異なる幾つかの出力電流に対してデッドタイムの補正を行う場合に、測定対象となる1つ目の出力電流に対応するデッドタイムを決定するとき、デッドタイムを正負の方向の何れの方向に変化させたときに、入力電流が最も少なくなった、または電力変換効率が最も大きくなったかを記憶する。例えば、デッドタイムを正方向に変化させたときに電力変換効率が最も大きくなると判定された場合、検査装置2は、2つ目の出力電流に対するデッドタイムを決定する際に、正方向からデッドタイムを変化させ、電力変換効率が下がり始め、ピークを迎えたことが検出された時点でデッドタイムの調整を終了する。
これにより、検査装置2は、幾つかの出力電流に対してデッドタイムの補正を行う場合に、迅速に第2デッドタイム(最適デッドタイム)を判定することができる。
(12) Moreover, in the optimization method of the power supply device 1, when the inspection device 2 determines the second dead time for the first output current, based on the information indicating the positive / negative direction in which the first dead time is changed. Determining a second dead time for the second output current.
With such an optimization method of the power supply device 1, the inspection device 2 corresponds to the first output current to be measured when the dead time is corrected for several different output currents. When determining the dead time, it is stored whether the input current is the smallest or the power conversion efficiency is the largest when the dead time is changed in any of the positive and negative directions. For example, when it is determined that the power conversion efficiency is maximized when the dead time is changed in the positive direction, the inspection apparatus 2 determines the dead time from the positive direction when determining the dead time for the second output current. When the power conversion efficiency starts to decrease and the peak is detected, the dead time adjustment is terminated.
Thereby, the test | inspection apparatus 2 can determine a 2nd dead time (optimal dead time) rapidly, when correcting dead time with respect to some output current.

以上、本発明の実施の形態について説明したが、本発明の電源装置1は、上述の図示例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。   As mentioned above, although embodiment of this invention was described, the power supply device 1 of this invention is not limited only to the above-mentioned example of illustration, A various change can be added in the range which does not deviate from the summary of this invention. Of course.

なお、上述した電源装置1,1A,1Bにおける処理ユニット10、制御部101、及び検査装置2は専用のハードウェアにより実現されるものであってもよく、また、各機能部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することによりその機能を実現させるものであってもよい。
すなわち、上述の処理ユニット10、及び検査装置2に、CPU、ROM、及びRAM等を有するマイクロコントローラやマイクロコンピュータ等のコンピュータシステムを搭載し、CPUが、ソフトウェアプログラムを読み込み実行することにより、処理ユニット10の一部又は全部の処理機能を実現してもよい。
Note that the processing unit 10, the control unit 101, and the inspection device 2 in the power supply devices 1, 1A, and 1B described above may be realized by dedicated hardware, and realize the functions of the respective functional units. The program may be recorded on a computer-readable recording medium, the program recorded on the recording medium may be read into a computer system and executed to realize the function.
That is, the processing unit 10 and the inspection apparatus 2 are equipped with a computer system such as a microcontroller or a microcomputer having a CPU, a ROM, a RAM, and the like, and the CPU reads and executes a software program. A part or all of the processing functions of 10 may be realized.

1,1A,1B・・・電源装置、2・・・検査装置、
10・・・処理ユニット、11・・・ドライブ回路、
20・・・フルブリッジ回路、
20A・・・ハーフブリッジ回路、21・・・直流電源、
30・・・記憶部、31・・・デッドタイムテーブル
40・・・一次側回路、50・・・トランス、51・・・一次巻線、
52,53・・・二次巻線、54・・・電流検出用トランス、
60・・・同期整流回路、61・・・同期整流スイッチ回路、
70・・・電流検出回路、74・・・第3電流検出回路、80・・・負荷装置、
101・・・制御部、102・・・取得部、103・・・書換部、
201・・・測定部、202・・・判定部、
203・・・書込部、204・・・記憶部、
Q1,Q2,Q3,Q4,Q5,Q6・・・スイッチング素子
1, 1A, 1B ... power supply device, 2 ... inspection device,
10 ... processing unit, 11 ... drive circuit,
20: Full bridge circuit,
20A ... half bridge circuit, 21 ... DC power supply,
30 ... Storage unit, 31 ... Dead time table 40 ... Primary circuit, 50 ... Transformer, 51 ... Primary winding,
52, 53 ... secondary winding, 54 ... current detection transformer,
60 ... synchronous rectification circuit, 61 ... synchronous rectification switch circuit,
70 ... Current detection circuit, 74 ... Third current detection circuit, 80 ... Load device,
101 ... Control unit, 102 ... Acquisition unit, 103 ... Rewrite unit,
201 ... measurement unit, 202 ... determination unit,
203 ... writing unit, 204 ... storage unit,
Q1, Q2, Q3, Q4, Q5, Q6 ... Switching elements

Claims (7)

スイッチング回路を構成するスイッチング素子の第1デッドタイムを記憶する記憶部と、
入力電流の測定結果に基づいて設定された第2デッドタイムの情報を外部入力する取得部と、
前記記憶部に記憶された前記第1デッドタイムを前記取得部が取得した前記第2デッドタイムに書き換える書換部と、
前記記憶部に記憶された前記第2デッドタイムに応じて前記スイッチング素子を制御する制御部と、
を備え、
前記第2デッドタイムは、電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記記憶部に記憶された前記第1デッドタイムが変化させられたときに、前記電源装置の入力電流が最も少なくなる値であって、
前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、
前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、
前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、
前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とする
ことを特徴とする電源装置。
A storage unit for storing a first dead time of a switching element constituting the switching circuit;
An acquisition unit for externally inputting second dead time information set based on the measurement result of the input current;
A rewriting unit for rewriting the first dead time stored in the storage unit with the second dead time acquired by the acquisition unit;
A control unit that controls the switching element according to the second dead time stored in the storage unit;
With
The second dead time is the first dead time stored in the storage unit while the input voltage to the power supply device, the output voltage from the power supply device, and the output current from the power supply device are kept constant. Is the value at which the input current of the power supply device is the smallest when
The first dead time, when the positive and negative direction is varied as a unit time for a predetermined time, the first dead time when the input current of the power supply is minimized and the value of the second dead time ,
When determining the second dead time corresponding to the second output current by changing the first output current, which is the output current from the power supply device kept constant, to the second output current having a different current value ,
When the second dead time corresponding to the first output current is obtained, the second dead time is obtained when the first dead time is changed in either the positive direction or the negative direction with a predetermined time as a unit time. Based on information that indicates whether
When the first dead time is changed in the direction indicated by the information with a predetermined time as a unit time, the first dead time when the input current of the power supply device becomes the smallest corresponds to the second output current. A power supply device having a dead time value .
前記取得部は、前記第2デッドタイムを取得する際に、
入出力電流と入出力電圧に基づいて前記第2デッドタイムを判定するデッドタイム設定部から、前記第2デッドタイムを入力する
ことを特徴とする請求項に記載の電源装置。
When the acquisition unit acquires the second dead time,
The power supply device according to claim 1, characterized in that the dead time setting unit determines the second dead time based on the output current and the output voltage, and inputs the second dead time.
前記記憶部には、前記出力電流と前記第1デッドタイムとの関係が、出力電流毎に記憶され、
前記書換部は、前記記憶部に記憶された出力電流毎の前記第1デッドタイムを、前記取得部が取得した出力電流毎の前記第2デッドタイムにそれぞれ書き換える
ことを特徴とする請求項1に記載の電源装置。
In the storage unit, the relationship between the output current and the first dead time is stored for each output current,
The rewriting unit rewrites the first dead time for each output current stored in the storage unit to the second dead time for each output current acquired by the acquisition unit, respectively. The power supply described.
前記スイッチング素子は、
フルブリッジ回路またはハーフブリッジ回路を構成する素子である
ことを特徴とする請求項1から請求項のいずれか1項に記載の電源装置。
The switching element is
The power supply device according to any one of claims 1 to 3, characterized in that the element constituting the full bridge circuit or half-bridge circuit.
前記ハーフブリッジ回路又はフルブリッジ回路において、
前記スイッチング素子は、部分共振作用を利用してスイッチングされる
ことを特徴とする請求項に記載の電源装置。
In the half bridge circuit or the full bridge circuit,
The power supply device according to claim 4 , wherein the switching element is switched using a partial resonance action.
スイッチング回路のスイッチング素子の第1デッドタイムが、外部入力されるデッドタイムの情報により変更可能な電源装置に対して、前記第1デッドタイムを変更するように指示して前記電源装置の入力電流を計測する測定部と、
前記測定部により計測された入力電流の測定値に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する判定部と、
前記第2デッドタイムの情報を前記電源装置に通知して、前記電源装置において前記第1デッドタイムを前記第2デッドタイムに設定させる書込部と、
を備え、
前記測定部は、前記電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記電源装置に対して、前記第1デッドタイムを変更するように指示して電力変換効率を計測し、最も電力変換効率が高くなるデッドタイムを第2デッドタイムと判定し、
前記判定部は、前記測定部により計測された入力電流の測定値に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムとして判定し、
前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、
前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、
前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、
前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とする
ことを特徴とする検査装置。
Instructing the power supply device that the first dead time of the switching element of the switching circuit can be changed according to the information of the dead time inputted externally to change the first dead time, and changing the input current of the power supply device A measuring unit to measure,
Based on the measured value of the input current measured by the measurement unit, a determination unit that determines the dead time when the input current is the smallest as the second dead time;
A writing unit for notifying the power supply device of information on the second dead time, and setting the first dead time to the second dead time in the power supply device;
With
The measurement unit sets the first dead time for the power supply device while maintaining a constant input voltage to the power supply device, an output voltage from the power supply device, and an output current from the power supply device. Instruct to change, measure the power conversion efficiency, determine the dead time when the power conversion efficiency is the highest as the second dead time,
The determination unit determines the dead time when the input current is the smallest as the second dead time based on the measured value of the input current measured by the measurement unit,
The first dead time, when the positive and negative direction is varied as a unit time for a predetermined time, the first dead time when the input current of the power supply is minimized and the value of the second dead time ,
When determining the second dead time corresponding to the second output current by changing the first output current, which is the output current from the power supply device kept constant, to the second output current having a different current value ,
When the second dead time corresponding to the first output current is obtained, the second dead time is obtained when the first dead time is changed in either the positive direction or the negative direction with a predetermined time as a unit time. Based on information that indicates whether
When the first dead time is changed in the direction indicated by the information with a predetermined time as a unit time, the first dead time when the input current of the power supply device becomes the smallest corresponds to the second output current. An inspection apparatus characterized by a dead time value .
電源装置のスイッチング回路を構成するスイッチング素子のデッドタイムを検査装置により最適化する電源装置の最適化方法であって、
前記電源装置が、第1デッドタイムを前記検査装置からの指示により変更する手順を含み、
前記検査装置が、前記電源装置に対して、前記第1デッドタイムを変更させるように指示するとともに、前記電源装置の入力電流を測定する手順と、
前記検査装置が、前記入力電流の測定結果に基づいて、最も入力電流が少なくなるときのデッドタイムを第2デッドタイムと判定する手順と、
前記検査装置が、前記第2デッドタイムの情報を前記電源装置に通知して、前記電源装置において、前記第1デッドタイムを前記第2デッドタイムに設定させる手順と、
を含み、
前記第2デッドタイムは、
前記電源装置への入力電圧、前記電源装置からの出力電圧、及び前記電源装置からの出力電流を一定に保った状態で、前記第1デッドタイムが変化させられたとき、前記電源装置の電力変換効率が最も高くなる値であって、
前記第1デッドタイムを、正方向と負方向とに所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2デッドタイムの値とし、
前記一定に保たれた前記電源装置からの出力電流である第1出力電流を、電流値の値が異なる第2出力電流に変えて、第2出力電流に対応する第2デッドタイムを決定する際、
前記第1出力電流に対応する第2デッドタイムを求めたときに、第1デッドタイムを正方向と負方向のいずれの方向に所定時間を単位時間として変化させたときに第2デッドタイムを求めることができたかを示す情報に基づいて、
前記第1デッドタイムを、前記情報の示す方向に所定時間を単位時間として変化させたとき、前記電源装置の入力電流が最も少なくなるときの第1デッドタイムを第2出力電流に対応する第2デッドタイムの値とする
ことを特徴とする電源装置の最適化方法。
A power supply device optimization method for optimizing a dead time of a switching element constituting a switching circuit of a power supply device by an inspection device,
The power supply device includes a procedure for changing a first dead time according to an instruction from the inspection device,
The inspection device instructs the power supply device to change the first dead time, and measures the input current of the power supply device;
A procedure in which the inspection apparatus determines, based on the measurement result of the input current, a dead time when the input current is the smallest as a second dead time;
The inspection apparatus notifies the power supply apparatus of the information on the second dead time, and the power supply apparatus sets the first dead time to the second dead time.
Including
The second dead time is
When the first dead time is changed while the input voltage to the power supply device, the output voltage from the power supply device, and the output current from the power supply device are kept constant, the power conversion of the power supply device Which is the most efficient value,
The first dead time, when the positive and negative direction is varied as a unit time for a predetermined time, the first dead time when the input current of the power supply is minimized and the value of the second dead time ,
When determining the second dead time corresponding to the second output current by changing the first output current, which is the output current from the power supply device kept constant, to the second output current having a different current value ,
When the second dead time corresponding to the first output current is obtained, the second dead time is obtained when the first dead time is changed in either the positive direction or the negative direction with a predetermined time as a unit time. Based on information that indicates whether
When the first dead time is changed in the direction indicated by the information with a predetermined time as a unit time, the first dead time when the input current of the power supply device becomes the smallest corresponds to the second output current. A method for optimizing a power supply device, characterized in that a dead time value is set .
JP2015550516A 2013-11-29 2013-11-29 Power supply device, inspection device, and optimization method of power supply device Active JP6171205B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/082240 WO2015079573A1 (en) 2013-11-29 2013-11-29 Power-supply device, inspection device, and optimization method for power-supply device

Publications (2)

Publication Number Publication Date
JPWO2015079573A1 JPWO2015079573A1 (en) 2017-03-16
JP6171205B2 true JP6171205B2 (en) 2017-08-09

Family

ID=53198558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015550516A Active JP6171205B2 (en) 2013-11-29 2013-11-29 Power supply device, inspection device, and optimization method of power supply device

Country Status (2)

Country Link
JP (1) JP6171205B2 (en)
WO (1) WO2015079573A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017010134A1 (en) * 2015-07-13 2017-01-19 シャープ株式会社 Power conversion device and control method therefor
JP6662151B2 (en) * 2016-03-31 2020-03-11 住友電気工業株式会社 DC / DC converter, computer program, and method of controlling DC / DC converter
DE102019204280A1 (en) 2019-03-27 2020-10-01 Zf Friedrichshafen Ag Control unit for determining a dead time for power electronic switches
JP7409169B2 (en) * 2019-06-18 2024-01-09 株式会社オートネットワーク技術研究所 Isolated DC/DC converter

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003125588A (en) * 2001-10-12 2003-04-25 Mitsubishi Electric Corp Power converter
JP2003174773A (en) * 2001-12-04 2003-06-20 Matsuda Micronics Corp Power supply
JP3706852B2 (en) * 2002-10-17 2005-10-19 Tdk株式会社 Switching power supply
US20050281058A1 (en) * 2004-06-21 2005-12-22 Issa Batarseh Dynamic optimization of efficiency using dead time and FET drive control
US7098640B2 (en) * 2004-07-06 2006-08-29 International Rectifier Corporation Method and apparatus for intelligently setting dead time
US7589506B2 (en) * 2005-11-03 2009-09-15 International Rectifier Corporation Signal-to-noise improvement for power loss minimizing dead time
JP2009011045A (en) * 2007-06-27 2009-01-15 Nec Electronics Corp Switching regulator and direct-current voltage conversion method
JP2013062952A (en) * 2011-09-13 2013-04-04 Ricoh Co Ltd Switching circuit, electronic circuit and switching method
JP5930700B2 (en) * 2011-12-21 2016-06-08 株式会社日立情報通信エンジニアリング Switching power supply device and control method thereof

Also Published As

Publication number Publication date
JPWO2015079573A1 (en) 2017-03-16
WO2015079573A1 (en) 2015-06-04

Similar Documents

Publication Publication Date Title
JP5950635B2 (en) Power supply device and image forming apparatus
JP5453508B2 (en) Isolated flyback converter with efficient light load operation
US10892687B2 (en) Asymmetric power converter, power converters, and operating power converters
US10008945B2 (en) Switching power supply device
US9979271B2 (en) Power converter with zero-voltage switching control
JP6932633B2 (en) Switching power supply
JP6171205B2 (en) Power supply device, inspection device, and optimization method of power supply device
JP2018198509A (en) Control apparatus
JP5195849B2 (en) DC-DC converter
JP2011130577A (en) Dc power supply unit
JP2015122946A (en) Synchronous rectifier and method for controlling the same
JP5241571B2 (en) Switching power supply
JP2003244953A (en) Dc-dc converter
US9627988B2 (en) Switch control circuit and resonant converter including the same
US20160285358A1 (en) Power factor correction circuit
JP2010252610A (en) Dc-dc converter
JP7102265B2 (en) Switching power supply and switching power supply control circuit
JP6015947B2 (en) Switching power supply device and control method thereof
JP6080326B2 (en) Power supply device, inspection device, and optimization method of power supply device
JP4167811B2 (en) Switching power supply
JP2014119354A (en) Current detection circuit
JP2017147851A (en) Electric power conversion system
JP2016059182A (en) Switching power supply unit
JP2022531634A (en) Resonant inverter and conversion method
JP4370844B2 (en) DC converter

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170216

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20170328

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170501

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20170508

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170609

R150 Certificate of patent or registration of utility model

Ref document number: 6171205

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150