JP6153481B2 - Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig - Google Patents

Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig Download PDF

Info

Publication number
JP6153481B2
JP6153481B2 JP2014022301A JP2014022301A JP6153481B2 JP 6153481 B2 JP6153481 B2 JP 6153481B2 JP 2014022301 A JP2014022301 A JP 2014022301A JP 2014022301 A JP2014022301 A JP 2014022301A JP 6153481 B2 JP6153481 B2 JP 6153481B2
Authority
JP
Japan
Prior art keywords
bottom plate
jig
plate
existing tank
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014022301A
Other languages
Japanese (ja)
Other versions
JP2015147610A (en
Inventor
利晴 松原
利晴 松原
Original Assignee
Jfeプラントエンジ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeプラントエンジ株式会社 filed Critical Jfeプラントエンジ株式会社
Priority to JP2014022301A priority Critical patent/JP6153481B2/en
Publication of JP2015147610A publication Critical patent/JP2015147610A/en
Application granted granted Critical
Publication of JP6153481B2 publication Critical patent/JP6153481B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

本発明は、既設タンク底板取替用冶具及び、該冶具を用いた既設タンクの底板取替方法に関する。   The present invention relates to an existing tank bottom plate replacement jig and a method of replacing an existing tank bottom plate using the jig.

石油等を屋外にて貯留するための平底円筒型タンク(既設タンク)においては、経年劣化によって底板の交換が必要になる場合がある。底板の交換は、一般的には、既設タンクを構成する胴板と底板とを分離させ、胴板をジャッキアップさせて切り離した底板と新底板とを交換し、ジャッキダウンさせて新底板と胴板とを溶接するという方法が取られている。
このようなものとして、例えば特許文献1に「タンク底板の取替え方法」が開示されている。
特許文献1の方法は、胴板の外周面にジャッキ座を取り付けて該ジャッキ座をジャッキで押し上げることで、胴板を昇降させるようにしている(特許文献1の請求項1参照)。
In a flat bottom cylindrical tank (existing tank) for storing oil or the like outdoors, it may be necessary to replace the bottom plate due to deterioration over time. To replace the bottom plate, generally, the body plate and the bottom plate constituting the existing tank are separated, the body plate is jacked up, the separated bottom plate and the new bottom plate are replaced, and the bottom plate is jacked down to be replaced with the new bottom plate and the body plate. The method of welding the plate is taken.
As such, for example, Patent Document 1 discloses a “tank bottom plate replacement method”.
In the method of Patent Literature 1, a jack seat is attached to the outer peripheral surface of the trunk plate, and the jack seat is pushed up by the jack to raise and lower the trunk plate (see claim 1 of Patent Literature 1).

特開2003−182790号公報JP 2003-182790 A

しかしながら、特許文献1の方法では、胴板の昇降中において、胴板は単にジャッキで支持されているだけであるため、胴板に昇降中に風などの外力が加われば、周方向に移動して位置がずれる虞れがあり、安定的に昇降させることができないという問題がある。   However, in the method of Patent Document 1, since the body plate is simply supported by a jack during the raising and lowering of the body plate, if an external force such as wind is applied to the body plate during the elevation, the body plate moves in the circumferential direction. There is a problem that the position may be shifted, and there is a problem that it cannot be moved up and down stably.

本発明は、かかる問題点を解決するためになされたものであり、胴板を安定して昇降させることのできる既設タンク底板取替用冶具及び、該冶具を用いた既設タンクの底板取替方法を提供することを目的としている。   The present invention has been made to solve such a problem, and an existing tank bottom plate replacement jig capable of stably raising and lowering a trunk plate, and a method of replacing an existing tank bottom plate using the jig. The purpose is to provide.

(1)本発明に係る既設タンク底板取替用冶具は、底板を切り離した既設タンクの胴板外周に補強リングを取り付けて、該補強リングをジャッキアップすることによって前記胴板を昇降させて、前記切り離した底板を新底板に交換する既設タンクの底板取替方法に用いる既設タンク底板取替用冶具であって、
前記胴板をジャッキアップするジャッキアップ冶具と、強風対策用固定冶具を有し、
前記ジャッキアップ冶具が、前記既設タンクの近傍に立設可能な2本のポストと、該2本のポストに上下方向に移動可能に取り付けられると共に前記補強リングを支持可能な補強リング支持部材と、前記2本のポストの間に配置されて前記補強リング支持部材をジャッキアップするジャッキとを備えてなり、
前記強風対策用固定冶具が、前記胴板がジャッキアップされる過程において前記既設タンクの基礎ブラケットをガイドする2本のガイド柱と、該2本のガイド柱に設けられて該ガイド柱を基礎ボルトに固定するためのガイド柱固定部と、前記基礎ボルトに連結されると共に前記胴板が所定の位置にジャッキアップされたときに前記基礎ブラケットを固定する固定用ボルトとを備えてなることを特徴とするものである。
(1) The existing tank bottom plate replacement jig according to the present invention attaches a reinforcing ring to the outer periphery of the trunk plate of the existing tank with the bottom plate cut off, and raises and lowers the trunk plate by jacking up the reinforcing ring. An existing tank bottom plate replacement jig used in a method for replacing a bottom plate of an existing tank that replaces the separated bottom plate with a new bottom plate,
A jack-up jig for jacking up the body plate, and a fixing jig for strong wind countermeasures,
The jack-up jig, two posts that can be erected in the vicinity of the existing tank, a reinforcing ring support member that is attached to the two posts so as to be movable in the vertical direction and can support the reinforcing ring; Ri Na and a jack for jacking up the reinforcing ring supporting member is arranged between the two posts,
The strong wind countermeasure fixing jig is provided with two guide pillars for guiding the foundation bracket of the existing tank in the process of jacking up the body plate, and the two guide pillars are used as the foundation bolts. A guide post fixing portion for fixing to the base bolt, and a fixing bolt connected to the foundation bolt and for fixing the foundation bracket when the body plate is jacked up at a predetermined position. It is what.

(2)また、上記(1)に記載のものにおいて、前記ジャッキアップ冶具は、前記2本のポストに亘るように設置されたジャッキを載置するジャッキ載置台を有し、前記ジャッキは前記ジャッキ載置台に載置されていることを特徴とするものである。 (2) Further, in the above (1), the jack-up jig has a jack mounting table for mounting a jack installed so as to extend over the two posts, and the jack is the jack. It is characterized by being mounted on a mounting table.

(3)また、上記(1)又は(2)に記載のものにおいて、前記ジャッキ載置台は前記ポストに対する上下方向の設置位置を変更できることを特徴とするものである。 (3) Further, in the above (1) or (2), the jack mounting table is characterized in that the installation position in the vertical direction with respect to the post can be changed.

(4)また、上記(1)乃至(3)のいずれかに記載のものにおいて、前記補強リング支持部材は、前記2本のポストに上下方向移動可能に取り付けられたポストガイドと、該ポストガイドに着脱可能に取り付けられて前記補強リングを支持するタンク側ブラケットを備えてなることを特徴とするものである。 (4) Further, in any of the above (1) to (3), the reinforcing ring support member includes a post guide attached to the two posts so as to be movable in the vertical direction, and the post guide. And a tank-side bracket that is detachably attached to support the reinforcing ring.

(5)また、上記(1)乃至(4)のいずれかに記載のものにおいて、前記ジャッキアップ冶具は、前記補強リング支持部材を前記ポストの所定位置に固定可能に構成されていることを特徴とするものである。 (5) Moreover, in the thing in any one of said (1) thru | or (4), the said jackup jig is comprised so that the said reinforcement ring support member can be fixed to the predetermined position of the said post | mailbox. It is what.

(6)また、本発明に係る既設タンクの底板取替方法は、上記(1)記載の既設タンク底板取替用冶具を用いた既設タンクの底板取替方法であって、
底板を前記既設タンクの胴板から切り離す底板切り離し工程と、
前記既設タンクの胴板外周に補強リングを取り付ける補強リング取付工程と、
少なくとも3個の前記既設タンク底板取替用冶具を前記胴板外周近傍に配置して、前記補強リングに前記補強リング支持部材の一部を前記補強リングに当接させるようにジャッキアップ冶具を設置するジャッキアップ冶具設置工程と、
前記ジャッキアップ冶具で前記補強リングを上方に押し上げることによって前記胴板を所定の高さに上昇させる第1胴板上昇工程と、
該第1胴板上昇工程で所定の高さに上昇した前記胴板近傍に強風対策用固定冶具を配置して、該強風対策用固定冶具のガイド柱を基礎ボルトに固定するガイド柱固定工程と、
前記ジャッキアップ冶具によって前記胴板を、さらに上昇させる第2胴板上昇工程と、
該第2胴板上昇工程によって上昇した前記既設タンクの基礎ブラケットを、前記基礎ボルトに連結された固定用ボルトによって固定する基礎ブラケット固定工程と、
前記底板を取り除く底板除去工程と、
新底板を設置する新底板設置工程と、
前記強風対策用固定冶具を除去して、前記胴板を下降させる胴板下降工程と、
前記胴板に前記新底板を接合する新底板接合工程とを備えたことを特徴とするものである
(6) Moreover, the existing tank bottom plate replacement method according to the present invention is an existing tank bottom plate replacement method using the existing tank bottom plate replacement jig described in (1) above.
A bottom plate separating step of separating the bottom plate from the body plate of the existing tank;
A reinforcing ring attaching step of attaching a reinforcing ring to the outer periphery of the body plate of the existing tank;
At least three existing tank bottom plate replacement jigs are arranged in the vicinity of the outer periphery of the body plate, and a jackup jig is installed on the reinforcing ring so that a part of the reinforcing ring support member abuts the reinforcing ring. Jack-up jig installation process to perform,
A first trunk plate raising step of raising the trunk plate to a predetermined height by pushing the reinforcing ring upward with the jack-up jig;
A guide column fixing step of disposing a fixing tool for strong wind measures in the vicinity of the shell plate raised to a predetermined height in the first step of raising the first shell plate, and fixing a guide column of the fixing tool for strong wind measures to a foundation bolt; ,
A second body plate raising step for further raising the body plate by the jack-up jig;
A foundation bracket fixing step of fixing the foundation bracket of the existing tank raised by the second body plate raising step by a fixing bolt connected to the foundation bolt;
A bottom plate removing step of removing the bottom plate;
A new bottom plate installation process for installing a new bottom plate;
Removing the strong wind countermeasure fixing jig and lowering the body plate,
And a new bottom plate joining step for joining the new bottom plate to the body plate .

(7)本発明に係る強風対策用固定冶具は、底板を切り離した既設タンクの胴板外周に補強リングを取り付けて、該補強リングをジャッキアップすることによって前記胴板を昇降させて、前記切り離した底板を新底板に交換する既設タンクの底板取替方法に用いる強風対策用固定冶具であって、(7) The fixing tool for a strong wind countermeasure according to the present invention attaches a reinforcing ring to the outer periphery of the body plate of the existing tank from which the bottom plate is separated, and raises and lowers the body plate by jacking up the reinforcing ring to separate the separation plate. A fixing tool for strong wind measures used in the method of replacing the bottom plate of the existing tank that replaces the bottom plate with a new bottom plate,
前記胴板がジャッキアップされる過程において前記既設タンクの基礎ブラケットをガイドする2本のガイド柱と、該2本のガイド柱に設けられて該ガイド柱を基礎ボルトに固定するためのガイド柱固定部と、前記基礎ボルトに連結されると共に前記胴板が所定の位置にジャッキアップされたときに前記基礎ブラケットを固定する固定用ボルトとを備えたことを特徴とするものである。  Two guide pillars for guiding the foundation bracket of the existing tank in the process of jacking up the body plate, and guide pillar fixing provided on the two guide pillars for fixing the guide pillar to the foundation bolt And a fixing bolt that is connected to the foundation bolt and fixes the foundation bracket when the body plate is jacked up at a predetermined position.

本発明においては、胴板をジャッキアップするジャッキアップ冶具を有し、該ジャッキアップ冶具が、既設タンクの近傍に立設可能な2本のポストと、該2本のポストに上下方向に移動可能に取り付けられると共に補強リングを支持可能な補強リング支持部材と、2本のポストの間に配置されて補強リング支持部材をジャッキアップするジャッキとを備えていることにより、補強リング支持部材が2本のポストによってガイドされながら上下動するため、胴板が昇降中に周方向に移動することを防止し、胴板を安定して昇降させることができる。   In the present invention, there is a jack-up jig for jacking up the body plate, and the jack-up jig can be moved up and down on the two posts that can stand upright in the vicinity of the existing tank. A reinforcing ring supporting member that can be attached to the reinforcing ring and can support the reinforcing ring, and a jack that is disposed between the two posts and jacks up the reinforcing ring supporting member, thereby providing two reinforcing ring supporting members. Since the body plate moves up and down while being guided by the post, it is possible to prevent the body plate from moving in the circumferential direction during lifting and lowering, and the body plate can be moved up and down stably.

本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具の正面図である。It is a front view of the jack-up jig of the existing tank bottom board replacement jig which concerns on one embodiment of this invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具の側面図である。It is a side view of the jack-up jig of the existing tank bottom board replacement jig which concerns on one embodiment of this invention. 図1のA−A矢視断面図である。It is AA arrow sectional drawing of FIG. 図2のB−B矢視断面図である。It is a BB arrow sectional view of Drawing 2. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具のポストガイドの正面図である。It is a front view of the post guide of the jack-up jig of the existing tank bottom plate replacement jig according to the embodiment of the present invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具のポストガイドの一部断面を含む側面図である。It is a side view including a partial cross section of the post guide of the jack-up jig of the existing tank bottom plate replacement jig according to the embodiment of the present invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具のタンク側ブラケットの正面図である。It is a front view of the tank side bracket of the jackup jig of the existing tank bottom plate replacement jig according to one embodiment of the present invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具のタンク側ブラケットの側面図である。It is a side view of the tank side bracket of the jackup jig of the existing tank bottom plate replacement jig according to the embodiment of the present invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具のジャッキアップ冶具のタンク側ブラケットの平面図である。It is a top view of the tank side bracket of the jackup jig of the existing tank bottom board replacement jig which concerns on one embodiment of this invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その1)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 1). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その2)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 2). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その3)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 3). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その4)。It is explanatory drawing of the existing tank bottom plate replacement | purification method using the existing tank bottom plate replacement jig which concerns on one embodiment of this invention (the 4). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その5)。It is explanatory drawing (the 5) of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention. 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その6)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 6). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その7)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 7). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その8)。It is explanatory drawing of the existing tank bottom plate replacement | purification method using the existing tank bottom plate replacement jig which concerns on one embodiment of this invention (the 8). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その9)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 9). 本発明の一実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法の説明図である(その10)。It is explanatory drawing of the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig which concerns on one embodiment of this invention (the 10). 本発明の一実施の形態に係る既設タンク底板取替用冶具を設置した既設タンクの平面図である。It is a top view of the existing tank which installed the jig for the existing tank bottom board replacement | exchange which concerns on one embodiment of this invention. 本発明の他の実施の形態に係る既設タンク底板取替用冶具の強風対策用固定冶具の設置状態における正面図である。It is a front view in the installation state of the fixing tool for a strong wind countermeasure of the existing tank bottom board replacement jig which concerns on other embodiment of this invention. 本発明の他の実施の形態に係る既設タンク底板取替用冶具の強風対策用固定冶具の設置状態における平面図である。It is a top view in the installation state of the fixing tool for a strong wind countermeasure of the existing tank bottom board replacement jig which concerns on other embodiment of this invention. 図21のC−C矢視断面図である。It is CC sectional view taken on the line of FIG. 本発明の他の実施の形態に係る既設タンク底板取替用冶具の強風対策用固定冶具のガイド柱の正面図である。It is a front view of the guide pillar of the fixing jig for a strong wind countermeasure of the existing tank bottom board replacement jig which concerns on other embodiment of this invention. 本発明の他の実施の形態に係る既設タンク底板取替用冶具の強風対策用固定冶具のガイド柱の平面図である。It is a top view of the guide pillar of the fixing tool for a strong wind countermeasure of the existing tank bottom board replacement jig which concerns on other embodiment of this invention. 本発明の他の実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法における、強風対策用固定冶具の取付方法の説明図である(その1)。It is explanatory drawing of the attachment method of the fixing jig for a strong wind countermeasure in the existing tank bottom board replacement method using the existing tank bottom board replacement jig which concerns on other embodiment of this invention (the 1). 本発明の他の実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法における、強風対策用固定冶具の取付方法の説明図である(その2)。It is explanatory drawing of the attachment method of the fixing jig for a strong wind countermeasure in the existing tank bottom board replacement method using the existing tank bottom board replacement jig which concerns on other embodiment of this invention (the 2). 本発明の他の実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法における、強風対策用固定冶具の取付方法の説明図である(その3)。It is explanatory drawing of the attachment method of the fixing jig for a strong wind countermeasure in the existing tank bottom board replacement | exchange method using the existing tank bottom board replacement jig | tool which concerns on other embodiment of this invention (the 3). 本発明の他の実施の形態に係る既設タンク底板取替用冶具を用いた既設タンクの底板取替方法における、強風対策用固定冶具の取付方法の説明図である(その4)。It is explanatory drawing of the attachment method of the fixing jig for a strong wind countermeasure in the bottom plate replacement method of the existing tank using the existing tank bottom plate replacement jig which concerns on other embodiment of this invention (the 4). 本発明の他の実施の形態に係る既設タンク底板取替用冶具を設置した既設タンクの平面図である。It is a top view of the existing tank which installed the jig for the existing tank bottom board replacement | exchange which concerns on other embodiment of this invention.

本発明に係る既設タンク底板取替用冶具は、ジャッキアップ冶具1で構成されているものと、これに加えて強風対策用固定冶具51を有するものとの2つの形態がある。
以下において、実施の形態1でジャッキアップ冶具1について説明し、実施の形態2で強風対策用固定冶具51について説明する。
The existing tank bottom plate replacement jig according to the present invention has two forms: one constituted by the jack-up jig 1 and one having the strong wind countermeasure fixing jig 51 in addition to this.
In the following, the jackup jig 1 will be described in the first embodiment, and the fixing tool 51 for countermeasure against strong wind will be described in the second embodiment.

[実施の形態1]
ジャッキアップ冶具1は、図1〜3に示すように、既設タンク3の近傍に立設可能な2本のポスト5と、該2本のポスト5に上下方向に移動可能に取り付けられると共に補強リング7(図2、図4、図11〜図19参照)を支持可能な補強リング支持部材9と、2本のポスト5の間に配置されて補強リング支持部材9をジャッキアップするジャッキ11と、ジャッキ11を載置するジャッキ載置台13を備えている。
ジャッキアップ冶具1は、上記のように複数の部品によって構成され現地において組立てて設置するようになっている。それ故、各部品を個別に運ぶことができるので、人力によって設置可能になっている。
以下、ジャッキアップ冶具1の各構成を詳細に説明する。
[Embodiment 1]
As shown in FIGS. 1 to 3, the jack-up jig 1 includes two posts 5 that can be erected in the vicinity of the existing tank 3, and are attached to the two posts 5 so as to be movable in the vertical direction and a reinforcing ring. 7 (see FIG. 2, FIG. 4, FIG. 11 to FIG. 19), and a jack 11 disposed between two posts 5 to jack up the reinforcing ring support member 9; A jack mounting table 13 on which the jack 11 is mounted is provided.
The jack-up jig 1 is composed of a plurality of parts as described above, and is assembled and installed on site. Therefore, since each part can be carried individually, it can be installed manually.
Hereinafter, each structure of the jackup jig 1 will be described in detail.

<ポスト>
ポスト5は、図1〜図3に示すように、例えば角型鋼管からなり、土台6に立設して用いられる。ポスト5には、正面から背面にかけて貫通する貫通孔5aが長手方向に所定間隔で複数設けられている。
ポスト5は、ポスト5がポストガイド15をガイドする柱としての役割を有しており、そのために、安定的に立設させる必要がある。この点については後述する。
<Post>
As shown in FIGS. 1 to 3, the post 5 is made of, for example, a square steel pipe, and is used standing on a base 6. The post 5 is provided with a plurality of through holes 5a penetrating from the front side to the back side at predetermined intervals in the longitudinal direction.
The post 5 has a role as a post for the post 5 to guide the post guide 15, and therefore, it is necessary to stably stand the post 5. This point will be described later.

<補強リング支持部材>
補強リング支持部材9は、図2に示すように、2本のポスト5に上下方向移動可能に取り付けられたポストガイド15と、ポストガイド15に着脱可能に取り付けられて補強リング7を支持するタンク側ブラケット17を備えている。
以下に、ポストガイド15とタンク側ブラケット17について詳細に説明する。
<Reinforcing ring support member>
As shown in FIG. 2, the reinforcing ring support member 9 includes a post guide 15 attached to the two posts 5 so as to be movable in the vertical direction, and a tank that is detachably attached to the post guide 15 and supports the reinforcing ring 7. A side bracket 17 is provided.
Hereinafter, the post guide 15 and the tank side bracket 17 will be described in detail.

≪ポストガイド≫
ポストガイド15は、4枚の板を筒状に組み合わせてなるポストガイド本体部19と、ポストガイド本体部19の両側に固定されてポスト5が挿入可能(図3参照)なガイド管21と、ポストガイド15を設置する際に把持するための取手部23とを有している。
ポストガイド本体部19の底部にはジャッキ11からの押上荷重を受けるジャッキ受板25が設けられている。ジャッキ受板25には図1、図3、図5、図6に示すように、補強リブ27が設けられている。
ポストガイド本体部19を構成する側板は、図2、図3、図6に示すように、背面側に張り出しており、この張出部29にはタンク側ブラケット17を取り付けるためボルト孔29aが設けられている。なお、図2においては、ボルトで締結しているボルト孔29aを黒丸で示している。
≪Post guide≫
The post guide 15 includes a post guide main body portion 19 formed by combining four plates into a cylindrical shape, a guide tube 21 that is fixed to both sides of the post guide main body portion 19 and into which the post 5 can be inserted (see FIG. 3), It has a handle 23 for gripping when the post guide 15 is installed.
A jack receiving plate 25 that receives a push-up load from the jack 11 is provided at the bottom of the post guide main body 19. The jack receiving plate 25 is provided with reinforcing ribs 27 as shown in FIGS. 1, 3, 5, and 6.
As shown in FIGS. 2, 3, and 6, the side plate constituting the post guide main body portion 19 is projected to the back side, and the projecting portion 29 is provided with a bolt hole 29 a for attaching the tank side bracket 17. It has been. In FIG. 2, the bolt holes 29a fastened with bolts are indicated by black circles.

ガイド管21には、ストッパーピン33が挿入される挿入孔21aが複数設けられており、挿入孔21aと貫通孔5aの位置を合せてストッパーピン33を挿入することで、ポストガイド15の上下方向位置が固定される。なお、使用する貫通孔5aや挿入孔21aを変更することで、ポスト5に対する上下方向位置を所望の位置に設定できる。
なお、図1においては、ストッパーピン33を黒丸で示している。
The guide tube 21 is provided with a plurality of insertion holes 21a into which the stopper pins 33 are inserted. By inserting the stopper pins 33 by aligning the positions of the insertion holes 21a and the through holes 5a, the vertical direction of the post guide 15 is increased. The position is fixed. In addition, the up-down direction position with respect to the post | mailbox 5 can be set to a desired position by changing the through-hole 5a and the insertion hole 21a to be used.
In FIG. 1, the stopper pin 33 is indicated by a black circle.

≪タンク側ブラケット≫
タンク側ブラケット17は、図7に示すように、2本の支柱35と、2本の35に亘って取り付けられた板材37とを有している。
支柱35は、例えば、図3に示すように断面略コ字状の溝形鋼(チャンネル)が用いられる。
板材37には、タンク側ブラケット17の正面側に張り出して、ポストガイド15と連結するための連結板39が設けられている。連結板39はボルト孔39aを有している。
≪Tank side bracket≫
As shown in FIG. 7, the tank side bracket 17 has two support columns 35 and a plate member 37 attached over the two 35.
For example, as shown in FIG. 3, a grooved steel (channel) having a substantially U-shaped cross section is used for the support 35.
The plate member 37 is provided with a connecting plate 39 that projects from the front side of the tank side bracket 17 and is connected to the post guide 15. The connecting plate 39 has a bolt hole 39a.

支柱35の上部及び下部には図8に示すように、タンク側ブラケット17が胴板3aへ取り付けられた状態における上下方向位置を調整する調整プレート41を取り付けるためのボルト孔35aが設けられている。
調整プレート41の取付状態を図2、図4、図9に示す。これらの図に示すように、調整プレート41を支柱35の上端または下端からはみ出すような大きさにすることで、タンク側ブラケット17の胴板3aに対する上下方向位置を微調整することができる。こうすることで、他のジャッキアップ冶具1との間で高さを調整でき、一部のジャッキアップ冶具1に荷重が集中することを防止できる。なお、図2においては、ボルトで締結しているボルト孔35aを黒丸で示している。
As shown in FIG. 8, bolt holes 35 a for attaching an adjustment plate 41 that adjusts the vertical position in a state where the tank side bracket 17 is attached to the body plate 3 a are provided in the upper and lower portions of the column 35. .
The attached state of the adjustment plate 41 is shown in FIGS. As shown in these drawings, the vertical position of the tank side bracket 17 with respect to the body plate 3a can be finely adjusted by setting the adjustment plate 41 so as to protrude from the upper end or the lower end of the column 35. By carrying out like this, height can be adjusted between the other jackup jigs 1, and it can prevent that a load concentrates on a part of jackup jigs 1. FIG. In FIG. 2, the bolt hole 35a fastened with a bolt is indicated by a black circle.

<ジャッキ載置台>
ジャッキ載置台13は、2本のポスト5に亘るようにしてストッパーピン33によってポスト5に設置可能になっている(図1及び図2参照)。このように、ジャッキ載置台13にジャッキ11が載置されることで、昇降中にジャッキ11にかかる胴板3a等の荷重をポスト5で支持するようになっている。そのため、ポスト5は、胴板3aの昇降中は地面に強く押し付けられるため固定しなくても安定的に立設させることができる。なお、ジャッキ11を直接地面に置く場合はポスト5を固定することが望ましい。
また、ジャッキ載置台13が2本のポスト5に亘るように設置されているので、荷重がかかることで両ポスト5が一体となり、この点においてもポスト5を安定して立設させることができる。
なお、ジャッキ載置台13の高さは、使用する貫通孔5aを選択することで段階的に調整可能になっており、ジャッキストロークに応じて高さ調整できる。
<Jack mounting table>
The jack mounting table 13 can be installed on the post 5 by the stopper pin 33 so as to extend over the two posts 5 (see FIGS. 1 and 2). As described above, the jack 11 is placed on the jack placing table 13, so that the post 5 supports the load of the body plate 3 a and the like applied to the jack 11 during the elevation. Therefore, since the post 5 is strongly pressed against the ground while the body plate 3a is raised and lowered, the post 5 can be stably erected without being fixed. When the jack 11 is placed directly on the ground, it is desirable to fix the post 5.
In addition, since the jack mounting table 13 is installed so as to extend over the two posts 5, both the posts 5 are integrated with each other when a load is applied. Also in this respect, the posts 5 can be erected stably. .
In addition, the height of the jack mounting base 13 can be adjusted stepwise by selecting the through-hole 5a to be used, and the height can be adjusted according to the jack stroke.

<ジャッキ>
ジャッキ11は、市販のジャーナルジャッキ等が用いられる。
<Jack>
As the jack 11, a commercially available journal jack or the like is used.

以上のように構成された本実施の形態に係る既設タンク底板取替用冶具(ジャッキアップ冶具1)を用いた既設タンクの底板取替方法(以下、単に「底板取替方法」という)を、ジャッキアップ冶具1の動作と共に説明する。
本実施の形態に係る底板取替方法は、底板3bを既設タンク3の胴板3aから切り離す底板切り離し工程と、既設タンク3の胴板3a外周に補強リング7を取り付ける補強リング取付工程と、少なくとも3個の既設タンク底板取替用冶具を胴板3a外周近傍に配置して、補強リング7に補強リング支持部材9の一部を補強リング7に当接させるようにジャッキアップ冶具1を設置するジャッキアップ冶具設置工程と、ジャッキアップ冶具1によって補強リング7を上方に押し上げることによって胴板3aを上昇させる胴板上昇工程と、底板3bを取り除く底板除去工程と、新底板を設置する新底板設置工程と、胴板3aを下降させる胴板下降工程と、新底板と胴板3aを接合する新底板接合工程とを備えている。
以下、各工程を図10〜図20に基づいて、他の図を適宜参照しながら詳細に説明する。
An existing tank bottom plate replacement method (hereinafter simply referred to as “bottom plate replacement method”) using the existing tank bottom plate replacement jig (jack-up jig 1) according to the present embodiment configured as described above, The operation of the jack-up jig 1 will be described.
The bottom plate replacement method according to the present embodiment includes a bottom plate separation step of separating the bottom plate 3b from the trunk plate 3a of the existing tank 3, a reinforcement ring attachment step of attaching the reinforcement ring 7 to the outer periphery of the trunk plate 3a of the existing tank 3, Three existing tank bottom plate replacement jigs are arranged in the vicinity of the outer periphery of the trunk plate 3a, and the jackup jig 1 is installed so that a part of the reinforcing ring support member 9 is brought into contact with the reinforcing ring 7 on the reinforcing ring 7. Jack-up jig installation step, body plate raising step for raising the body plate 3a by pushing the reinforcing ring 7 upward by the jack-up jig 1, bottom plate removal step for removing the bottom plate 3b, and new bottom plate installation for installing the new bottom plate A step, a body plate lowering step for lowering the body plate 3a, and a new bottom plate joining step for joining the new bottom plate and the body plate 3a.
Hereinafter, each process will be described in detail with reference to FIGS.

<底板切り離し工程>
底板切り離し工程は、底板3bを既設タンク3(図10参照)の胴板3aから切り離す工程である。なお、図10は、既設タンク3の内部構造が分かるように、一部を破砕して図示している。図10において、切り離し位置を二点鎖線で示している。
切り離しは胴板3aから所定の距離だけ離れた位置で行い、底板3b(アニュラ板が設置されている場合は、アニュラ板)が胴板3aに円環状に残るようにする(図10、図27参照)ことが望ましく、このようにすることでジャッキアップ時の胴板3aの剛性を確保することができる。
なお、既設タンク3内に敷設している加熱管等は、予め吊り上げる等して作業の妨げにならないようにしておく。
<Bottom plate cutting process>
The bottom plate separating step is a step of separating the bottom plate 3b from the body plate 3a of the existing tank 3 (see FIG. 10). Note that FIG. 10 is a partially broken view so that the internal structure of the existing tank 3 can be understood. In FIG. 10, the separation position is indicated by a two-dot chain line.
Separation is performed at a position away from the body plate 3a by a predetermined distance so that the bottom plate 3b (annular plate when an annular plate is installed) remains in an annular shape on the body plate 3a (FIGS. 10 and 27). It is desirable to ensure the rigidity of the trunk plate 3a when jacking up.
It should be noted that the heating pipe or the like laid in the existing tank 3 is lifted in advance so as not to hinder the work.

<補強リング取付工程>
補強リング取付工程は、既設タンク3の胴板3a外周に補強リング7を取り付ける工程である。
補強リング7は、例えば断面略コ字状の溝形鋼からなるものであり、ジャッキアップ時にタンクの重さを支持するためのものを上側に取り付け、冶具の重さを支持するためのものを下側に取り付ける(図11参照)。なお、下側に取り付けるものは全周に亘るリング状でなくともよく、図11に示すように所定の長さがあればよい。
補強リング7の取り付けは、補強リング7を胴板3a外周に沿わせるように配置し、この補強リング7にU字型冶具43の2つの片部が跨るように被せて胴板3aに溶接し、溶接されたU字型冶具43と補強リング7との隙間に楔45(楔)を打ち込むことで行われる(図4参照)。なお、図11〜図19においては楔45の図示を省略している。
<Reinforcing ring installation process>
The reinforcing ring attaching step is a step of attaching the reinforcing ring 7 to the outer periphery of the trunk plate 3 a of the existing tank 3.
The reinforcing ring 7 is made of, for example, a groove-shaped steel having a substantially U-shaped cross section, and is attached to the upper side for supporting the weight of the tank when jacking up, and for supporting the weight of the jig. Attach to the lower side (see FIG. 11). In addition, what is attached to the lower side does not need to be a ring shape over the entire circumference, and it is sufficient if it has a predetermined length as shown in FIG.
The reinforcing ring 7 is attached by placing the reinforcing ring 7 along the outer periphery of the body plate 3a and covering the reinforcing ring 7 so that the two pieces of the U-shaped jig 43 straddle the base plate 3a. This is done by driving a wedge 45 into the gap between the welded U-shaped jig 43 and the reinforcing ring 7 (see FIG. 4). In addition, illustration of the wedge 45 is abbreviate | omitted in FIGS.

<ジャッキアップ冶具設置工程>
ジャッキアップ冶具設置工程は、少なくとも3個の既設タンク底板取替用冶具を胴板3a外周近傍に配置して、補強リング7に補強リング支持部材9の一部を補強リング7に当接させるようにジャッキアップ冶具1を設置する工程である。
少なくとも3個としたのは既設タンク3を安定的に昇降させるためであり、既設タンク3の大きさによって適宜数を増加して設置する。本実施の形態では6個配置するものとし、設置方法はいずれの場合も同様であるので6個のうちの1個に着目して以下の説明を行う。
<Jack-up jig installation process>
In the jack-up jig installation step, at least three existing tank bottom plate replacement jigs are arranged in the vicinity of the outer periphery of the body plate 3a so that a part of the reinforcing ring support member 9 is brought into contact with the reinforcing ring 7 on the reinforcing ring 7. It is the process of installing the jack-up jig 1 in the.
The reason why the number of the existing tanks 3 is at least three is that the existing tanks 3 can be moved up and down stably. In this embodiment, it is assumed that six are arranged, and the installation method is the same in any case. Therefore, the following description will be given focusing on one of the six.

ジャッキアップ冶具1の設置は、まずタンク側ブラケット17を、上下の補強リング7の間に配置し(図12参照)、支柱35をU字型冶具43と楔45によって胴板3aに固定する(図13、図4参照)。支柱35の上下には、図4に示すように、端部から所定量はみ出す大きさの調整プレート41を予め取り付けておき、タンク側ブラケット17と補強リング7の間に隙間が生じないようにする。このようにすることで、一部のジャッキアップ冶具1に荷重が集中することなく、全てのジャッキアップ冶具1で均等に胴板荷重を支持できる。なお、図12〜図19においては調整プレート41の図示を省略している。   In order to install the jack-up jig 1, first, the tank side bracket 17 is disposed between the upper and lower reinforcing rings 7 (see FIG. 12), and the column 35 is fixed to the trunk plate 3 a by the U-shaped jig 43 and the wedge 45 ( (Refer FIG. 13, FIG. 4). As shown in FIG. 4, an adjustment plate 41 having a size that protrudes from the end portion is attached in advance to the upper and lower sides of the support column 35 so that no gap is generated between the tank side bracket 17 and the reinforcing ring 7. . By doing so, the load on the trunk plate can be evenly supported by all the jack-up jigs 1 without the load being concentrated on a part of the jack-up jigs 1. In addition, illustration of the adjustment plate 41 is abbreviate | omitted in FIGS.

次に、タンク側ブラケット17にポストガイド15をボルトで取り付ける(図14、図2、図3参照)。
次いで、土台6を設置し、ポストガイド15のガイド管21にポスト5を挿入して土台6にポスト5を立設させる(図15参照)。
次いで、ジャッキ載置台13を設置し、ジャッキ11をジャッキ載置台13に載置する(図16参照)。
このように、ジャッキアップ冶具1は、複数の部品を組み立てることで設置される。
以上のような設置を6か所で行う(図20参照)。なお、図20においては、ジャッキアップ冶具1を簡略化して四角で図示している。
Next, the post guide 15 is attached to the tank side bracket 17 with bolts (see FIGS. 14, 2, and 3).
Next, the base 6 is installed, the post 5 is inserted into the guide tube 21 of the post guide 15 and the post 5 is erected on the base 6 (see FIG. 15).
Next, the jack mounting table 13 is installed, and the jack 11 is mounted on the jack mounting table 13 (see FIG. 16).
Thus, the jack-up jig 1 is installed by assembling a plurality of parts.
The above installation is performed at six locations (see FIG. 20). In FIG. 20, the jack-up jig 1 is simplified and shown as a square.

<胴板上昇工程>
胴板上昇工程は、ジャッキアップ冶具1によって補強リング7を上方に押し上げることによって胴板3aを上昇させる工程である(図17参照)。
各ジャッキ11に人を配置して一斉にジャッキアップを行う。このとき、底板3bの一部が円環状に周板に取りついているので、胴板3aが変形することを防止できる。
ポストガイド15はポスト5にガイドされながら上昇するため、胴板3aの周方向のズレを抑えることができる。
ジャッキアップ量はポスト5の貫通孔5aとガイド管21の挿入孔21aとが連通するようにし、ストッパーピン33を挿入してポストガイド15の上下方向位置を固定する(図18参照)。このとき、胴板3aに残した底板3bがある場合、これも切除する。
なお、この状態においてはジャッキ11を外しておいてもよい。また、上昇した既設タンク3の下には適宜角材47等を配置して安定性を高めることが望ましい(図19参照)。
<Drum plate raising process>
The trunk plate raising step is a step of raising the trunk plate 3a by pushing up the reinforcing ring 7 with the jack-up jig 1 (see FIG. 17).
A person is assigned to each jack 11 to jack up all at once. At this time, since a part of the bottom plate 3b is attached to the peripheral plate in an annular shape, the body plate 3a can be prevented from being deformed.
Since the post guide 15 rises while being guided by the post 5, the circumferential displacement of the body plate 3a can be suppressed.
The jack-up amount is such that the through hole 5a of the post 5 communicates with the insertion hole 21a of the guide tube 21, and the stopper pin 33 is inserted to fix the vertical position of the post guide 15 (see FIG. 18). At this time, if there is a bottom plate 3b left on the body plate 3a, this is also cut off.
In this state, the jack 11 may be removed. In addition, it is desirable to place a square member 47 or the like under the raised existing tank 3 as appropriate to enhance stability (see FIG. 19).

<底板除去工程>
底板除去工程は、底板切り離し工程で切り離した底板3bを取り除く工程である。
<Bottom plate removal process>
The bottom plate removing step is a step of removing the bottom plate 3b cut in the bottom plate cutting step.

<新底板設置工程>
新底板設置工程は、新底板を設置する工程である。アニュラ板が必要な場合はアニュラ板も設置する。
<New bottom plate installation process>
The new bottom plate installation process is a process of installing a new bottom plate. If an annular plate is required, install an annular plate.

<胴板下降工程>
胴板下降工程は、胴板3aを下降させる工程である。
下降させる手順は、上昇させる手順を逆にして行う。具体的には、ジャッキを利かせた状態でストッパーピン33を取り外し、配置した角材47等を取り除く。そして各ジャッキ11を一斉にジャッキダウンして胴板3aを下降させる。
下降後は、ジャッキアップ冶具1及び補強リング7を取り外す。
<Drum plate lowering process>
The trunk plate lowering step is a step of lowering the trunk plate 3a.
The descending procedure is performed by reversing the ascending procedure. Specifically, the stopper pin 33 is removed while the jack is applied, and the arranged square member 47 and the like are removed. Then, the jacks 11 are jacked down at the same time to lower the body plate 3a.
After descending, the jack-up jig 1 and the reinforcing ring 7 are removed.

<新底板接合工程>
新底板接合工程は、新底板と胴板3aを接合する工程である。
<New bottom plate joining process>
The new bottom plate joining step is a step of joining the new bottom plate and the body plate 3a.

以上のように、本実施の形態においては、ジャッキアップ冶具1が、既設タンク3の近傍に立設可能な2本のポスト5と、該2本のポスト5に上下方向に移動可能に取り付けられると共に補強リング7を支持可能な補強リング支持部材9と、2本のポスト5の間に配置されて補強リング支持部材9をジャッキアップするジャッキ11とを備えていることにより、補強リング支持部材9が2本のポスト5によってガイドされながら上下動するので、胴板3aが昇降中に周方向に移動することを防止し、胴板3aを安定して昇降させることができる。   As described above, in the present embodiment, the jack-up jig 1 is attached to the two posts 5 that can be erected in the vicinity of the existing tank 3 and to be movable in the vertical direction on the two posts 5. And a reinforcing ring support member 9 capable of supporting the reinforcing ring 7 and a jack 11 disposed between the two posts 5 to jack up the reinforcing ring support member 9. Is moved up and down while being guided by the two posts 5, it is possible to prevent the trunk plate 3 a from moving in the circumferential direction during raising and lowering, and to raise and lower the trunk plate 3 a stably.

[実施の形態2]
上記実施の形態1では、胴板3aをジャッキアップする際のジャッキアップ冶具1について説明したが、本実施の形態ではジャッキアップの途中から用いる強風対策用固定冶具51について図26〜図30に基づいて説明する。
既設タンク3は、屋外に設置されるものであるため風等で位置がずれないように、既設タンク3を基礎53に固定する必要がある。そのために、既設タンク3は、外周下部に基礎53に固定するための複数の基礎ブラケット55を有しており、設置状態においては、基礎ブラケット55が基礎53に固定された基礎ボルト57に固定されている(図26参照)。なお、図26〜図29は基礎ブラケット55の中央を通る立断面図である。
一方、既設タンク3が持ち上げられている状態においては、既設タンク3と基礎53の間から風が内部に入り込むため、通常より風の影響を受けやすくなっており、既設タンク3を固定していなければ、胴板3aの昇降が不安定になる。そこで本実施の形態では、強風対策用固定冶具51を取り付けて、胴板3aの昇降中の安定化を図るものである。
以下に、強風対策用固定冶具51について説明する。
[Embodiment 2]
In the first embodiment, the jack-up jig 1 when jacking up the trunk plate 3a has been described. In the present embodiment, the strong wind countermeasure fixing jig 51 used in the middle of jack-up is based on FIGS. I will explain.
Since the existing tank 3 is installed outdoors, it is necessary to fix the existing tank 3 to the foundation 53 so that the position does not shift due to wind or the like. For this purpose, the existing tank 3 has a plurality of foundation brackets 55 for fixing to the foundation 53 at the lower outer periphery, and the foundation bracket 55 is fixed to a foundation bolt 57 fixed to the foundation 53 in the installed state. (See FIG. 26). 26 to 29 are elevational sectional views passing through the center of the foundation bracket 55.
On the other hand, in the state where the existing tank 3 is lifted, the wind enters the inside from between the existing tank 3 and the foundation 53, so that it is more susceptible to the wind than usual, and the existing tank 3 must be fixed. In this case, the raising and lowering of the trunk plate 3a becomes unstable. Therefore, in the present embodiment, a fixing tool 51 for strong wind countermeasures is attached to stabilize the body plate 3a during ascending and descending.
Below, the fixing tool 51 for a strong wind countermeasure is demonstrated.

強風対策用固定冶具51は、上記の基礎ボルト57と基礎ブラケット55を利用して既設タンク3を基礎53に固定するものであり、図21〜図25に示すように、胴板3aがジャッキアップされる過程において既設タンク3の基礎ブラケット55をガイドする2本のガイド柱59と、2本のガイド柱59に設けられてガイド柱59を基礎ボルト57に固定するためのガイド柱固定部61と、基礎ボルト57に連結されると共に胴板3aが所定の位置にジャッキアップされたときに基礎ブラケット55を固定する固定用ボルト63とを備えている。
以下、各構成について図21〜図25に基づいて詳細に説明する。
The strong wind countermeasure fixing jig 51 fixes the existing tank 3 to the foundation 53 using the foundation bolt 57 and the foundation bracket 55, and the body plate 3a is jacked up as shown in FIGS. In the process, two guide pillars 59 for guiding the foundation bracket 55 of the existing tank 3, and a guide pillar fixing portion 61 provided on the two guide pillars 59 for fixing the guide pillar 59 to the foundation bolt 57, And a fixing bolt 63 for fixing the base bracket 55 when the body plate 3a is jacked up to a predetermined position.
Hereinafter, each configuration will be described in detail with reference to FIGS.

<ガイド柱>
ガイド柱59は、図21に示すように、基礎ブラケット55を両側から挟むように配置され、既設タンク3が上昇する際に、基礎ブラケット55をガイドするためのものである。
ガイド柱59は基礎ブラケット55が入る程度の間隔で基底板65に立設されている。基底板65の中央には図23に示すように、基礎ボルト57が背面側から挿入可能なU字溝部65aが設けられている。
ガイド柱59の側面には、強風対策用固定冶具51の設置の際に使用する取手部67が設けられている。
<Guide pillar>
As shown in FIG. 21, the guide column 59 is disposed so as to sandwich the foundation bracket 55 from both sides, and guides the foundation bracket 55 when the existing tank 3 rises.
The guide pillars 59 are erected on the base plate 65 at intervals such that the base bracket 55 is inserted. At the center of the base plate 65, as shown in FIG. 23, a U-shaped groove portion 65a into which the foundation bolt 57 can be inserted from the back side is provided.
On the side surface of the guide column 59, a handle portion 67 that is used when installing the fixing jig 51 for measures against strong wind is provided.

<ガイド柱固定部>
ガイド柱固定部61は、板状からなり両ガイド柱59に跨って溶接されている。ガイド柱固定部61の中央には図25に示す通り、U字溝部61aが設けられており、基底板65と同様に基礎ボルト57が背面側から挿入可能になっている。
ガイド柱固定部61の高さは、U字溝部61aに基礎ボルト57が挿入された状態で、基礎ボルト57の上端が突き出す高さに設定されており、ナットを用いてガイド柱59を基礎ボルト57に固定することができる。
<Guide post fixing part>
The guide column fixing part 61 has a plate shape and is welded across both guide columns 59. As shown in FIG. 25, a U-shaped groove 61 a is provided at the center of the guide column fixing portion 61, and the base bolt 57 can be inserted from the back side in the same manner as the base plate 65.
The height of the guide column fixing portion 61 is set to a height at which the upper end of the foundation bolt 57 protrudes in a state where the foundation bolt 57 is inserted into the U-shaped groove portion 61a. 57 can be fixed.

<固定用ボルト>
固定用ボルト63は、既設タンク3が持ち上げられている間、基礎ブラケット55を固定するためのものであり、基礎ボルト57に長ナット69で連結して用いられる。
<Fixing bolt>
The fixing bolt 63 is for fixing the foundation bracket 55 while the existing tank 3 is being lifted, and is used by being connected to the foundation bolt 57 with a long nut 69.

以上のように構成された強風対策用固定冶具51と、上記実施の形態1で説明したジャッキアップ冶具1とを用いた底板取替方法を、強風対策用固定冶具51に着目して説明する。
本実施の形態に係る底板取替方法は、底板切り離し工程と、補強リング取付工程と、ジャッキアップ冶具設置工程と、ジャッキアップ冶具1で補強リング7を上方に押し上げることによって胴板3aを所定の高さに上昇させる第1胴板上昇工程と、第1胴板上昇工程で所定の高さに上昇した胴板3a近傍に強風対策用固定冶具51を配置して、強風対策用固定冶具51のガイド柱59を基礎ボルト57に固定するガイド柱固定工程と、ジャッキアップ冶具1によって胴板3aを、さらに上昇させる第2胴板上昇工程と、第2胴板上昇工程によって上昇した既設タンク3の基礎ブラケット55を、基礎ボルト57に連結された固定用ボルト63によって固定する基礎ブラケット固定工程と、底板除去工程と、新底板設置工程と、強風対策用固定冶具51を除去して、胴板3aを下降させる胴板下降工程と、新底板接合工程とを備えている。
A bottom plate replacement method using the strong wind countermeasure fixing jig 51 configured as described above and the jackup jig 1 described in the first embodiment will be described focusing on the strong wind countermeasure fixing jig 51.
The bottom plate replacement method according to the present embodiment includes a bottom plate cutting step, a reinforcing ring attaching step, a jack-up jig installation step, and a jack-up jig 1 that pushes up the reinforcing ring 7 upward to move the body plate 3a to a predetermined position. A strong wind countermeasure fixing jig 51 is disposed in the vicinity of the first shell plate raising step for raising the height and the trunk plate 3a raised to a predetermined height in the first trunk plate raising step. The guide column fixing step of fixing the guide column 59 to the foundation bolt 57, the second barrel plate raising step for further raising the trunk plate 3a by the jack-up jig 1, and the existing tank 3 raised by the second trunk plate raising step Foundation bracket fixing process for fixing the foundation bracket 55 with a fixing bolt 63 connected to the foundation bolt 57, a bottom plate removing process, a new bottom plate installation process, and fixing for strong wind countermeasures The ingredients 51 to remove, and includes a shell plate lowering step of lowering the shell plate 3a, a new bottom plate bonding step.

上記の各工程のうち、底板切り離し工程、補強リング取付工程、ジャッキアップ冶具設置工程、底板除去工程、新底板設置工程、新底板接合工程は、実施の形態1と同様であるのでその説明を省略し、第1胴板上昇工程、ガイド柱固定工程、第2胴板上昇工程、基礎ブラケット固定工程、胴板下降工程について以下に詳細に説明する。   Of the above steps, the bottom plate separating step, the reinforcing ring mounting step, the jack-up jig installation step, the bottom plate removal step, the new bottom plate installation step, and the new bottom plate joining step are the same as those in the first embodiment, and the description thereof is omitted. The first body plate raising step, the guide column fixing step, the second body plate raising step, the foundation bracket fixing step, and the body plate lowering step will be described in detail below.

<第1胴板上昇工程>
第1胴板上昇工程は、ジャッキアップ冶具1で補強リング7を上方に押し上げることによって胴板3aを所定の高さh1(図27参照)に上昇させる工程である。
高さh1は、ガイド柱固定工程で強風対策用固定冶具51の設置する際に、基礎ブラケット55が強風対策用固定冶具51に干渉しない高さであればよい。
<First body plate raising process>
The first body plate raising step is a step of raising the body plate 3a to a predetermined height h 1 (see FIG. 27) by pushing the reinforcing ring 7 upward with the jack-up jig 1.
The height h 1 may be a height at which the foundation bracket 55 does not interfere with the strong wind countermeasure fixing jig 51 when the strong wind countermeasure fixing jig 51 is installed in the guide column fixing process.

<ガイド柱固定工程>
ガイド柱固定工程は、第1胴板上昇工程で所定の高さに上昇した胴板3a近傍に強風対策用固定冶具51を配置して、強風対策用固定冶具51のガイド柱59を基礎ボルト57に固定する工程である。
強風対策用固定冶具51の配置は、図27に示すように基底板65の位置を決めて基礎ボルト57の正面側から胴板3a側に倒すようにして行う。このとき、ガイド柱固定部61のU字溝部61a及び基底板65のU字溝部65aに基礎ボルト57が挿入される。このように、強風対策用固定冶具51は基礎ボルト57に干渉させることなく、容易に配置が可能である。
配置後は、ガイド柱固定部61をナットで基礎ボルト57に固定することで、強風対策用固定冶具51が固定される。
<Guide column fixing process>
In the guide column fixing step, the strong wind countermeasure fixing jig 51 is arranged in the vicinity of the trunk plate 3a raised to a predetermined height in the first trunk plate raising step, and the guide column 59 of the strong wind countermeasure fixing jig 51 is attached to the foundation bolt 57. It is the process of fixing to.
As shown in FIG. 27, the strong wind countermeasure fixing jig 51 is arranged such that the position of the base plate 65 is determined and the base plate 57 is tilted from the front side to the body plate 3a side. At this time, the foundation bolt 57 is inserted into the U-shaped groove portion 61 a of the guide column fixing portion 61 and the U-shaped groove portion 65 a of the base plate 65. In this manner, the strong wind countermeasure fixing jig 51 can be easily arranged without interfering with the foundation bolt 57.
After the arrangement, the strong wind countermeasure fixing jig 51 is fixed by fixing the guide column fixing portion 61 to the foundation bolt 57 with a nut.

<第2胴板上昇工程>
第2胴板上昇工程は、ジャッキアップ冶具1によって胴板3aを、さらに所定の高さh2(図28参照)まで上昇させる工程である。
このとき、基礎ブラケット55はガイド柱59によってガイドされながら上昇し、ジャッキアップ冶具1と共に、胴板3aの周方向の移動を抑える効果を奏する。
<Second body plate raising process>
The second body plate raising step is a step of further raising the body plate 3a to a predetermined height h 2 (see FIG. 28) by the jack-up jig 1.
At this time, the foundation bracket 55 rises while being guided by the guide column 59, and has an effect of suppressing the circumferential movement of the body plate 3 a together with the jackup jig 1.

<基礎ブラケット固定工程>
基礎ブラケット固定工程は、第2胴板上昇工程によって高さh2まで上昇した既設タンク3の基礎ブラケット55を、基礎ボルト57に連結された固定用ボルト63によって固定する工程である。
固定用ボルト63は長ナット69によって基礎ボルト57に連結し、この固定用ボルト63に基礎ブラケット55をナットで固定する。こうすることで、既設タンク3が強風対策用固定冶具51を介して基礎53に固定される。
なお、ガイド柱59と基礎ブラケット55の上面とに跨る連結部材71を溶接することで(図21、図22参照)、ガイド柱59と基礎ブラケット55を連結するのが望ましい。
また、ガイド柱59に跨って繋ぎ材73(図21、図22、図29参照)を溶接し、冶具を補強することが望ましい。
<Base bracket fixing process>
The foundation bracket fixing step is a step of fixing the foundation bracket 55 of the existing tank 3 that has been raised to the height h 2 by the second trunk plate raising step, with the fixing bolt 63 connected to the foundation bolt 57.
The fixing bolt 63 is connected to the foundation bolt 57 by a long nut 69, and the foundation bracket 55 is fixed to the fixing bolt 63 with a nut. By doing so, the existing tank 3 is fixed to the foundation 53 via the fixing tool 51 for measures against strong wind.
In addition, it is desirable to connect the guide column 59 and the foundation bracket 55 by welding the connection member 71 straddling the guide pillar 59 and the upper surface of the foundation bracket 55 (see FIGS. 21 and 22).
Further, it is desirable to reinforce the jig by welding the connecting material 73 (see FIGS. 21, 22, and 29) across the guide column 59.

強風対策用固定冶具51の配置例として、12か所に配置したものを図30に示す。
以上のように既設タンク3が基礎53に固定されるため、既設タンク3の昇降時に強風が吹いても、既設タンク3が転倒したり滑動したりすることがなく、安全に作業をすることができる。
FIG. 30 shows an example of arrangement of the fixing jig 51 for measures against strong winds arranged at 12 locations.
Since the existing tank 3 is fixed to the foundation 53 as described above, even if a strong wind blows when the existing tank 3 is raised or lowered, the existing tank 3 does not fall down or slide, and can be operated safely. it can.

<胴板下降工程>
胴板下降工程は、強風対策用固定冶具51を除去してから、ジャッキダウンして胴板3aを下降させる工程である。下降させる手順は、実施の形態1と同様である。下降後は、ジャッキアップ冶具1及び補強リング7を取り外す。
<Drum plate lowering process>
The trunk plate lowering step is a step of removing the strong wind countermeasure fixing jig 51 and then jacking down to lower the trunk plate 3a. The procedure for lowering is the same as in the first embodiment. After descending, the jack-up jig 1 and the reinforcing ring 7 are removed.

以上のように、本実施の形態においては、強風対策用固定冶具51で既設タンク3を基礎53に固定することにより、安全に作業可能となり、また既設タンク3が損傷することがない。   As described above, in the present embodiment, the existing tank 3 is fixed to the base 53 with the strong wind countermeasure fixing jig 51, so that it is possible to work safely and the existing tank 3 is not damaged.

1 ジャッキアップ冶具
3 既設タンク
3a 胴板
3b 底板
5 ポスト
5a 貫通孔
6 土台
7 補強リング
9 補強リング支持部材
11 ジャッキ
13 ジャッキ載置台
15 ポストガイド
17 タンク側ブラケット
19 ポストガイド本体部
21 ガイド管
21a 挿入孔
23 取手部
25 ジャッキ受板
27 補強リブ
29 張出部
29a ボルト孔
33 ストッパーピン
35 支柱
35a ボルト孔
37 板材
39 連結板
39a ボルト孔
41 調整プレート
43 U字型冶具
45 楔
47 角材
51 強風対策用固定冶具
53 基礎
55 基礎ブラケット
57 基礎ボルト
59 ガイド柱
61 ガイド柱固定部
61a U字溝部
63 固定用ボルト
65 基底板
65a U字溝部
67 取手部
69 長ナット
71 連結部材
73 繋ぎ材
DESCRIPTION OF SYMBOLS 1 Jack up jig | tool 3 Existing tank 3a Body plate 3b Bottom plate 5 Post 5a Through-hole 6 Base 7 Reinforcement ring 9 Reinforcement ring support member 11 Jack 13 Jack mounting base 15 Post guide 17 Tank side bracket 19 Post guide main body 21 Guide pipe 21a Insertion Hole 23 Handle part 25 Jack receiving plate 27 Reinforcement rib 29 Overhang part 29a Bolt hole 33 Stopper pin 35 Post 35a Bolt hole 37 Plate material 39 Connecting plate 39a Bolt hole 41 Adjustment plate 43 U-shaped jig 45 Wedge 47 Square material 51 For strong wind measures Fixing jig 53 Foundation 55 Foundation bracket 57 Foundation bolt 59 Guide column 61 Guide column fixing portion 61a U-shaped groove portion 63 Fixing bolt 65 Base plate 65a U-shaped groove portion 67 Handle portion 69 Long nut 71 Connecting member 73 Connecting material

Claims (7)

底板を切り離した既設タンクの胴板外周に補強リングを取り付けて、該補強リングをジャッキアップすることによって前記胴板を昇降させて、前記切り離した底板を新底板に交換する既設タンクの底板取替方法に用いる既設タンク底板取替用冶具であって、
前記胴板をジャッキアップするジャッキアップ冶具と、強風対策用固定冶具を有し、
前記ジャッキアップ冶具が、前記既設タンクの近傍に立設可能な2本のポストと、該2本のポストに上下方向に移動可能に取り付けられると共に前記補強リングを支持可能な補強リング支持部材と、前記2本のポストの間に配置されて前記補強リング支持部材をジャッキアップするジャッキとを備えてなり、
前記強風対策用固定冶具が、前記胴板がジャッキアップされる過程において前記既設タンクの基礎ブラケットをガイドする2本のガイド柱と、該2本のガイド柱に設けられて該ガイド柱を基礎ボルトに固定するためのガイド柱固定部と、前記基礎ボルトに連結されると共に前記胴板が所定の位置にジャッキアップされたときに前記基礎ブラケットを固定する固定用ボルトとを備えてなることを特徴とする既設タンク底板取替用冶具。
Replacing the existing tank bottom plate by attaching a reinforcing ring to the outer periphery of the shell plate of the existing tank with the bottom plate removed, and raising and lowering the shell plate by jacking up the reinforcing ring, and replacing the separated bottom plate with a new bottom plate An existing tank bottom plate replacement jig used in the method,
A jack-up jig for jacking up the body plate, and a fixing jig for strong wind countermeasures,
The jack-up jig, two posts that can be erected in the vicinity of the existing tank, a reinforcing ring support member that is attached to the two posts so as to be movable in the vertical direction and can support the reinforcing ring; Ri Na and a jack for jacking up the reinforcing ring supporting member is arranged between the two posts,
The strong wind countermeasure fixing jig is provided with two guide pillars for guiding the foundation bracket of the existing tank in the process of jacking up the body plate, and the two guide pillars are used as the foundation bolts. A guide post fixing portion for fixing to the base bolt, and a fixing bolt connected to the foundation bolt and for fixing the foundation bracket when the body plate is jacked up at a predetermined position. An existing tank bottom plate replacement jig.
前記ジャッキアップ冶具は、前記2本のポストに亘るように設置されたジャッキを載置するジャッキ載置台を有し、前記ジャッキは前記ジャッキ載置台に載置されていることを特徴とする請求項1記載の既設タンク底板取替用冶具。   The jack-up jig has a jack mounting table for mounting a jack installed across the two posts, and the jack is mounted on the jack mounting table. The existing tank bottom plate replacement jig according to 1. 前記ジャッキ載置台は前記ポストに対する上下方向の設置位置を変更できることを特徴とする請求項1又は2に記載の既設タンク底板取替用冶具。   3. The existing tank bottom plate replacement jig according to claim 1, wherein the jack mounting table can change a vertical installation position with respect to the post. 4. 前記補強リング支持部材は、前記2本のポストに上下方向移動可能に取り付けられたポストガイドと、該ポストガイドに着脱可能に取り付けられて前記補強リングを支持するタンク側ブラケットを備えてなることを特徴とする請求項1乃至3のいずれか一項に記載の既設タンク底板取替用冶具。   The reinforcing ring support member includes a post guide attached to the two posts so as to be movable in a vertical direction, and a tank side bracket that is detachably attached to the post guide and supports the reinforcing ring. The existing tank bottom plate replacement jig according to any one of claims 1 to 3. 前記ジャッキアップ冶具は、前記補強リング支持部材を前記ポストの所定位置に固定可能に構成されていることを特徴とする請求項1乃至4のいずれか一項に記載の既設タンク底板取替用冶具。   5. The existing tank bottom plate replacement jig according to claim 1, wherein the jack-up jig is configured to be able to fix the reinforcing ring support member to a predetermined position of the post. . 請求項1記載の既設タンク底板取替用冶具を用いた既設タンクの底板取替方法であって、
底板を前記既設タンクの胴板から切り離す底板切り離し工程と、
前記既設タンクの胴板外周に補強リングを取り付ける補強リング取付工程と、
少なくとも3個の前記既設タンク底板取替用冶具を前記胴板外周近傍に配置して、前記補強リングに前記補強リング支持部材の一部を前記補強リングに当接させるようにジャッキアップ冶具を設置するジャッキアップ冶具設置工程と、
前記ジャッキアップ冶具で前記補強リングを上方に押し上げることによって前記胴板を所定の高さに上昇させる第1胴板上昇工程と、
該第1胴板上昇工程で所定の高さに上昇した前記胴板近傍に強風対策用固定冶具を配置して、該強風対策用固定冶具のガイド柱を基礎ボルトに固定するガイド柱固定工程と、
前記ジャッキアップ冶具によって前記胴板を、さらに上昇させる第2胴板上昇工程と、
該第2胴板上昇工程によって上昇した前記既設タンクの基礎ブラケットを、前記基礎ボルトに連結された固定用ボルトによって固定する基礎ブラケット固定工程と、
前記底板を取り除く底板除去工程と、
新底板を設置する新底板設置工程と、
前記強風対策用固定冶具を除去して、前記胴板を下降させる胴板下降工程と、
前記胴板に前記新底板を接合する新底板接合工程とを備えたことを特徴とする既設タンクの底板取替方法。
An existing tank bottom plate replacement method using the existing tank bottom plate replacement jig according to claim 1,
A bottom plate separating step of separating the bottom plate from the body plate of the existing tank;
A reinforcing ring attaching step of attaching a reinforcing ring to the outer periphery of the body plate of the existing tank;
At least three existing tank bottom plate replacement jigs are arranged in the vicinity of the outer periphery of the body plate, and a jackup jig is installed on the reinforcing ring so that a part of the reinforcing ring support member abuts the reinforcing ring. Jack-up jig installation process to perform,
A first trunk plate raising step of raising the trunk plate to a predetermined height by pushing the reinforcing ring upward with the jack-up jig;
A guide column fixing step of disposing a fixing tool for strong wind measures in the vicinity of the shell plate raised to a predetermined height in the first step of raising the first shell plate, and fixing a guide column of the fixing tool for strong wind measures to a foundation bolt; ,
A second body plate raising step for further raising the body plate by the jack-up jig;
A foundation bracket fixing step of fixing the foundation bracket of the existing tank raised by the second body plate raising step by a fixing bolt connected to the foundation bolt;
A bottom plate removing step of removing the bottom plate;
A new bottom plate installation process for installing a new bottom plate;
Removing the strong wind countermeasure fixing jig and lowering the body plate,
A method for replacing the bottom plate of an existing tank, comprising: a new bottom plate joining step for joining the new bottom plate to the body plate.
底板を切り離した既設タンクの胴板外周に補強リングを取り付けて、該補強リングをジャッキアップすることによって前記胴板を昇降させて、前記切り離した底板を新底板に交換する既設タンクの底板取替方法に用いる強風対策用固定冶具であって、
前記胴板がジャッキアップされる過程において前記既設タンクの基礎ブラケットをガイドする2本のガイド柱と、該2本のガイド柱に設けられて該ガイド柱を基礎ボルトに固定するためのガイド柱固定部と、前記基礎ボルトに連結されると共に前記胴板が所定の位置にジャッキアップされたときに前記基礎ブラケットを固定する固定用ボルトとを備えたことを特徴とする強風対策用固定冶具。
Replacing the existing tank bottom plate by attaching a reinforcing ring to the outer periphery of the shell plate of the existing tank with the bottom plate removed, and raising and lowering the shell plate by jacking up the reinforcing ring, and replacing the separated bottom plate with a new bottom plate A fixing tool for strong wind measures used in the method,
Two guide pillars for guiding the foundation bracket of the existing tank in the process of jacking up the body plate, and guide pillar fixing provided on the two guide pillars for fixing the guide pillar to the foundation bolt And a fixing bolt for fixing the foundation bracket when the body plate is jacked up at a predetermined position and connected to the foundation bolt.
JP2014022301A 2014-02-07 2014-02-07 Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig Active JP6153481B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014022301A JP6153481B2 (en) 2014-02-07 2014-02-07 Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014022301A JP6153481B2 (en) 2014-02-07 2014-02-07 Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig

Publications (2)

Publication Number Publication Date
JP2015147610A JP2015147610A (en) 2015-08-20
JP6153481B2 true JP6153481B2 (en) 2017-06-28

Family

ID=53891347

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014022301A Active JP6153481B2 (en) 2014-02-07 2014-02-07 Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig

Country Status (1)

Country Link
JP (1) JP6153481B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4720727Y1 (en) * 1968-10-30 1972-07-11
JPS5461756A (en) * 1977-10-25 1979-05-18 Toyo Kakouki Kk Jack up apparatus for tank
JPS58123889U (en) * 1982-02-16 1983-08-23 三重機械鉄工株式会社 Tank lifting device
JPS60179598A (en) * 1984-02-24 1985-09-13 Kawasaki Heavy Ind Ltd Cylindrical tank with side plate stiffener and assembling method thereof
JP3747420B2 (en) * 1996-08-22 2006-02-22 株式会社石井鐵工所 Dismantling repair method for the upper part of cylindrical wall
JP2003182790A (en) * 2001-12-17 2003-07-03 Takata Corp Method of replacing tank bottom plate

Also Published As

Publication number Publication date
JP2015147610A (en) 2015-08-20

Similar Documents

Publication Publication Date Title
EP2305840B1 (en) Method for constructing and repairing body of blast furnace
JP5596834B1 (en) Gas holder repair method
JP6277158B2 (en) Traveling heavy lifting device
JP6153481B2 (en) Existing tank bottom plate replacement jig, existing tank bottom plate replacement method using the jig, and strong wind countermeasure fixing jig
KR102045022B1 (en) Vessel block support device and Method for using the same
KR200492471Y1 (en) Supporting device for ship block
JP5921263B2 (en) Reinforcing bar erection device and method
JP6239313B2 (en) Tubing device
JP6018865B2 (en) Construction method of cylindrical tank
JP5419003B2 (en) Construction method of storage tank jack and floating roof storage tank
JP4429784B2 (en) How to install underwater structures
KR200437112Y1 (en) Apparatus of lug fixing for vessel
KR20130117171A (en) Cone mounting method of top side deck
JP6208523B2 (en) Construction method of vertical cylindrical water tank
CN205464966U (en) Heavy rim welding jig
WO2017043622A1 (en) Cylindrical tank construction method
CN216947221U (en) Electrolytic tank assembling device and combined equipment
KR20130119189A (en) Can supplying apparatus for jacking system of ocean platform
KR20130004110U (en) support device for a high weight welding machine
CN216426654U (en) Large-scale gas chamber installation operation platform
JP2018178481A (en) Temporary support and roof frame construction method
CN213387598U (en) Supporting device applied to jacking of large equipment on sea
JP5510863B2 (en) Floating roof dismantling construction method for floating roof storage tank
CN201940422U (en) Double-memorial arch adjusting device
KR20130119191A (en) Combination guide apparatus for ocean platform

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161025

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170530

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170530

R150 Certificate of patent or registration of utility model

Ref document number: 6153481

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250