JP6089051B2 - Installation method of electrodes for cathodic protection - Google Patents

Installation method of electrodes for cathodic protection Download PDF

Info

Publication number
JP6089051B2
JP6089051B2 JP2015020151A JP2015020151A JP6089051B2 JP 6089051 B2 JP6089051 B2 JP 6089051B2 JP 2015020151 A JP2015020151 A JP 2015020151A JP 2015020151 A JP2015020151 A JP 2015020151A JP 6089051 B2 JP6089051 B2 JP 6089051B2
Authority
JP
Japan
Prior art keywords
mortar
electrode
placing
mold member
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015020151A
Other languages
Japanese (ja)
Other versions
JP2016141866A (en
Inventor
真悟 中島
真悟 中島
良美 松居
良美 松居
成城 齋藤
成城 齋藤
英一郎 黒岩
英一郎 黒岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Estech Corp
Original Assignee
Estech Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Estech Corp filed Critical Estech Corp
Priority to JP2015020151A priority Critical patent/JP6089051B2/en
Publication of JP2016141866A publication Critical patent/JP2016141866A/en
Application granted granted Critical
Publication of JP6089051B2 publication Critical patent/JP6089051B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、鉄筋コンクリート構造物に、鉄筋の腐食を防止するための電気防食用電極を設置するための設置方法に関する。   The present invention relates to an installation method for installing an anticorrosion electrode for preventing corrosion of a reinforcing bar in a reinforced concrete structure.

鉄筋コンクリート構造物は、設置場所によっては、塩害等により埋設されている鉄筋とともに表面側のコンクリートも劣化する。そうなると、鉄筋コンクリート構造物の表面側の修復(以下、「断面修復」と称する)が必要になる。断面修復の際には、鉄筋の腐食を防止するための電気防食用電極(電気防食用帯状陽極)を、修復用のモルタルに埋設することがある。   Depending on the location of the reinforced concrete structure, the concrete on the surface side deteriorates as well as the reinforcing bars embedded due to salt damage. In such a case, it is necessary to repair the surface side of the reinforced concrete structure (hereinafter referred to as “cross-sectional repair”). At the time of cross-sectional repair, an electrode for preventing corrosion (a strip-like anode for preventing corrosion) for preventing corrosion of the reinforcing bar may be embedded in the mortar for restoration.

電気防食用電極の設置は、次のようにして行われる。すなわち、鉄筋コンクリート構造物の表面のコンクリートを必要な面積だけはつり取って鉄筋を露出させ、露出させた鉄筋の錆取り作業(ケレン)を行い、錆取りされた鉄筋を覆うように、モルタルを設定厚みとなるよう打設する。そしてモルタル硬化後に、電気防食用電極の設置予定部位を切削して設置溝を形成し、設置溝の底面に沿って電気防食用電極を倣わせた状態で、設置溝にモルタルで埋める。   The electrode for cathodic protection is installed as follows. In other words, the concrete on the surface of the reinforced concrete structure is lifted up to the required area to expose the reinforcing bars, and the exposed reinforcing bars are rusted (keren), and the mortar is set to a thickness that covers the rusted reinforcing bars Make a placement. Then, after the mortar is hardened, the installation site of the electrode for anticorrosion is cut to form an installation groove, and the electrode for anticorrosion is made to follow the bottom surface of the installation groove, and the installation groove is filled with mortar.

また、既設の鉄筋コンクリート構造物の表面側に電気防食用電極を設置する方法として、下記特許文献1に記載の技術が提案されている。特許文献1の技術は、鉄筋コンクリート構造物において、電気防食用電極の設置予定部位を切削して設置溝を形成し、設置溝の底面に沿って電気防食用電極を倣わせた状態で設置溝をモルタルで埋めるというものである。   Moreover, the technique of the following patent document 1 is proposed as a method of installing the electrode for cathodic protection on the surface side of the existing reinforced concrete structure. In the technique of Patent Document 1, in an reinforced concrete structure, an installation groove is formed by cutting a site where an electrode for electrode protection is to be installed, and the electrode for anticorrosion is imitated along the bottom surface of the installation groove. It is to fill with mortar.

特開2012−214824号公報JP 2012-214824 A

上記従来の技術において、断面修復に伴って電気防食用電極を設置する場合でも、断面修復を伴わずに電気防食用電極を設置する場合でも、電気防食用電極が設置される設置溝を切削して加工するという作業が伴う。そして切削は、モルタル(コンクリート)に対して行うので粉塵が発生してしまい、作業環境の悪化が指摘される。   In the above-mentioned conventional technology, even when the electrode for anticorrosion is installed along with the restoration of the cross section or when the electrode for anticorrosion is installed without the restoration of the cross section, the installation groove where the electrode for anticorrosion is installed is cut. The work of processing is accompanied. And since cutting is performed with respect to mortar (concrete), dust will generate | occur | produce and it will point out the deterioration of a working environment.

そこで本発明は、上記課題に鑑み、作業環境の悪化を抑制しつつ電気防食用電極の設置ができる電気防食用電極の設置方法の提供を目的とする。   Then, in view of the said subject, this invention aims at provision of the installation method of the electrode for anticorrosion which can install the electrode for anticorrosion, suppressing the deterioration of a working environment.

本発明の電気防食用電極の設置方法は、コンクリートをはつるはつり工程と、電気防食用電極の設置のための凹部の型となる型部材をコンクリートのはつり面から所定の距離だけ離間する位置に保持させる保持工程と、コンクリートのはつり面に対しモルタルを打設する打設工程と、硬化後のモルタルから型部材を取外すことでモルタルに形成される凹部に電気防食用電極を設置する設置工程とを順に備え、前記打設工程は、第一打設工程と第二打設工程とを備え、前記第一打設工程は、電気防食用電極の設置位置の目処となるようコンクリートのはつり面にモルタルを打設する工程であり、前記保持工程は、第一打設工程によって打設されたモルタルの天端面に前記型部材を保持させる工程であり、前記第二打設工程は、保持工程で保持された型部材が没するよう、第一打設工程で打設されたモルタルに重ねてモルタルを打設する工程であることを特徴としている。
The method for installing the electrode for electrocorrosion protection according to the present invention includes a step of hanging concrete and a mold member serving as a recess for installing the electrode for anticorrosion at a position spaced apart from the surface of the concrete by a predetermined distance. a holding step of holding, co and pouring step of pouring the mortar to chipping surface of Nkurito installation step of installing a sacrificial electrode in the recess formed in the mortar by removing the mold member from the mortar after curing In order, the placing step includes a first placing step and a second placing step, and the first placing step is a suspension surface of the concrete so as to be a place for the position of the electrode for cathodic protection. The holding step is a step of holding the mold member on the top end surface of the mortar placed in the first placing step, and the second placing step is a holding step. Held in Mold member so submerged, are characterized by a step of pouring the mortar to overlap the pouring by mortar in about the first shot設工.

上記電気防食用電極の設置方法では、コンクリートをはつり、電気防食用電極の設置のための凹部の型となる型部材をコンクリートのはつり面から所定の距離だけ離間する位置に保持させた状態で、コンクリートのはつり面に対し型部材が没する厚みにモルタルを打設し、硬化後のモルタルから型部材を取外してモルタルに残留する凹部に電気防食用電極を設置することにより、電気防食用電極を設置するための凹部を、コンクリートを切削して形成するといった作業がないことから粉塵の発生がなく、したがって作業環境の悪化を抑制しつつ電気防食用電極の設置ができる。また、上記電気防食用電極の設置方法では、第一打設工程でコンクリートのはつり面に対して打設されたモルタルを基準に型部材を保持するので型部材を設定位置に近い位置で位置決めできるため、型部材を正確に位置決めし易く、モルタルは第一打設工程と第二打設工程とに分けて打設するので、一度で全てのモルタルを打設する場合に比べて、打設するモルタルの厚みが調整し易い。
In the method for installing the electrode for electrocorrosion protection, the concrete is suspended, and the mold member that becomes the mold of the recess for installing the electrode for electrocorrosion protection is held at a position separated from the surface of the concrete by a predetermined distance, Placing the mortar to a thickness at which the mold member sinks against the hanging surface of the concrete, removing the mold member from the cured mortar, and installing the electrode for anticorrosion in the recess remaining in the mortar. Since there is no work of forming the recess for installation by cutting concrete, there is no generation of dust, and therefore the electrode for anticorrosion can be installed while suppressing deterioration of the work environment. Further, in the above-described method for installing the electrode for anticorrosion, since the mold member is held based on the mortar cast on the concrete suspension surface in the first placing process, the mold member can be positioned at a position close to the set position. Therefore, it is easy to position the mold member accurately, and the mortar is placed in the first placing step and the second placing step, so that the placement is performed as compared with the case where all the mortars are placed at once. Easy to adjust mortar thickness.

本発明の電気防食用電極の設置方法では、前記はつり工程は、既設の鉄筋コンクリート構造物において、その表面側に配置された鉄筋を露出させ、露出させた鉄筋の錆を除去する作業を含む工程を採用できる。   In the method for installing an electrode for cathodic protection according to the present invention, the suspending step includes a step of exposing a reinforcing bar disposed on the surface side of an existing reinforced concrete structure and removing rust of the exposed reinforcing bar. Can be adopted.

上記電気防食用電極の設置方法では、コンクリートをはつった後に、露出させた鉄筋の錆を除去することで、鉄筋を確実に、電気防食用電極の対極の電極として用いることができる。   In the above-described method for installing the electrode for anticorrosion, the reinforcing bar can be reliably used as a counter electrode of the electrode for anticorrosion by removing the rust of the exposed reinforcing bar after the concrete is put on.

本発明の電気防食用電極の設置方法では、前記打設工程は、吹付けによってモルタルを打設する工程として採用できる。   In the installation method of the electrode for anticorrosion of the present invention, the placing step can be adopted as a step of placing mortar by spraying.

上記電気防食用電極の設置方法では、グラウトによるモルタルの打設に比べて容易な作業となり、しかもモルタルの厚みを調整し易い。   The above-mentioned method for installing the electrode for anticorrosion is an easy operation compared to the placement of mortar by grout, and the thickness of the mortar can be easily adjusted.

本発明の電気防食用電極の設置方法によれば、作業環境の悪化を抑制しつつ電気防食用電極の設置ができる。   According to the method for installing an electrode for anticorrosion of the present invention, it is possible to install the electrode for anticorrosion while suppressing deterioration of the working environment.

図1(a)は、本発明の一実施形態を表す電気防食用電極の設置方法のはつり工程の説明図、(b)は同じく設計厚み表示工程の説明図、(c)は同じく第一打設工程の説明図、(d)は同じく墨打工程の説明図である。FIG. 1A is an explanatory view of a hanging process of an electrode protection electrode installation method representing one embodiment of the present invention, FIG. 1B is an explanatory view of a design thickness display process, and FIG. Explanatory drawing of an installation process, (d) is explanatory drawing of an inking process similarly. 同じく糸張工程の説明図である。It is explanatory drawing of a yarn tension process similarly. 同じく挿入部材の全体構成を表した説明図である。It is explanatory drawing showing the whole structure of the insertion member similarly. 図4(a)は、同じく型部材設置工程の説明図(断面図)、(b)は説明図(正面図)である。4A is an explanatory view (sectional view) of the mold member installation step, and FIG. 4B is an explanatory view (front view). 図5(a)は、同じく図4(b)におけるX−X線断面矢視図、図5(b)は、同じく図4(b)におけるY−Y線断面矢視図である。5A is a sectional view taken along line XX in FIG. 4B, and FIG. 5B is a sectional view taken along line YY in FIG. 4B. 図6(a)(b)(c)は、同じく順に第二打設工程の説明図である。6 (a), 6 (b), and 6 (c) are explanatory views of the second placing step in the same order. 図7(a)(b)は、同じく順に型部材取外工程の説明図である。FIGS. 7A and 7B are explanatory views of the mold member removing process in the same order. 図8(a)(b)(c)は、同じく順に電極設置工程の説明図である。FIGS. 8A, 8B, and 8C are explanatory views of the electrode installation process in the same order.

以下、本発明の一実施形態に係る電気防食用電極の設置方法(以下、単に「電極設置方法」と称する)を、図面を参照しつつ説明する。本実施形態に係る電極設置方法では、既設の鉄筋コンクリート構造物(以下、単に「構造物」と称する)Aにおいて、塩害等により腐食した構造物Aの鉄筋R、およびその外側の表面コンクリート部Cを断面修復する際に、併せて電気防食用電極(以下「電極」と称する)Eを設置するようにしている。   Hereinafter, a method for installing an electrode for cathodic protection according to an embodiment of the present invention (hereinafter simply referred to as “electrode installation method”) will be described with reference to the drawings. In the electrode installation method according to the present embodiment, in an existing reinforced concrete structure (hereinafter, simply referred to as “structure”) A, the reinforcing bar R of the structure A corroded by salt damage or the like, and the surface concrete portion C outside thereof are used. When repairing the cross section, an electrode for electrode protection (hereinafter referred to as “electrode”) E is also installed.

本実施形態に係る電極設置方法は、次の(1)〜(9)の工程を備える。すなわち、
(1).はつり工程…N1
(2).設計厚み表示工程…N2
(3).第一打設工程…N3
(4).墨打工程…N4
(5).糸張工程…N5
(6).型部材設置工程…N6
(7).第二打設工程…N7
(8).型部材取外工程…N8
(9).電極設置工程…N9
を備える電極設置方法である。
The electrode installation method according to the present embodiment includes the following steps (1) to (9). That is,
(1). Hanger process ... N1
(2). Design thickness display process ... N2
(3). First placement process ... N3
(4). Inking process ... N4
(5). Yarn tension process ... N5
(6). Mold member installation process ... N6
(7). Second placing step ... N7
(8). Mold member removal process ... N8
(9). Electrode installation process ... N9
It is an electrode installation method provided with.

電極設置方法は、(1).はつり工程N1から(9).電極設置工程N9へ順次行われる工程であり、以下、各工程を具体的に説明する。なお、上記各工程は、作業者が必要に応じた工具等を用いて行うものである。   The electrode installation method is (1). From the suspension step N1 to (9). These steps are sequentially performed to the electrode installation step N9, and each step will be specifically described below. In addition, each said process is performed using the tool etc. as needed by the operator.

(1).〔はつり工程〕
〔はつり工程N1〕は、塩害等により腐食した表面コンクリート部Cをはつることで、構造物Aの表面側の腐食した鉄筋Rを露出させる工程である。図1(a)では、便宜上、構造物Aの一部の表面コンクリート部Cをはつる場合を示している。しかしながら、同図に破線で示すように、現場に応じて構造物Aの一面全部の表面コンクリート部Cをはつる場合もある。
(1). [Hassing process]
[Hanging step N1] is a step of exposing the corroded reinforcing bar R on the surface side of the structure A by holding the surface concrete portion C corroded by salt damage or the like. FIG. 1A shows a case where a part of the surface concrete portion C of the structure A is hung for convenience. However, as indicated by a broken line in the figure, the entire surface concrete portion C of one surface of the structure A may be hung depending on the site.

〔はつり工程N1〕では、表面側の鉄筋Rが露出するまで表面コンクリート部Cをはつることで、はつり面C1を形成する。〔はつり工程N1〕は、露出させた鉄筋Rの錆を除去する(ケレンする)、錆除去作業を含むものとする。錆の除去は、ワイヤーブラシやサンダー等を用いて行われる。   In [Hanging Step N1], the surface concrete portion C is hung until the rebar R on the surface side is exposed, thereby forming a hanger surface C1. [Hanging process N1] includes a rust removing operation of removing (swelling) rust of the exposed reinforcing bars R. Rust removal is performed using a wire brush or a sander.

(2).〔設計厚み表示工程〕
〔設計厚み表示工程N2〕は、設定された基準面を設定する工程である。この基準面は、後述する第二モルタルm2(図6、7参照)によって最終的に形成される第二モルタルm2の天端面m2aに面一の面でもあり、構造物Aの本来の表面位置A1に相当する。図1(b)に示すように、基準面は、杆状部材1を用いてその天端面1aとして設定する。杆状部材1としては特に限定されるものではないが、本実施形態では、発泡スチロール製の杆状部材1を用いており、角柱状で所定長さに形成されている。そして、杆状部材1を、〔はつり工程N1〕で得られたはつり面C1に対し、垂直方向に沿うよう立設する。
(2). [Design thickness display process]
[Design thickness display step N2] is a step of setting a set reference plane. This reference plane is also a plane flush with the top end face m2a of the second mortar m2 that is finally formed by the second mortar m2 (see FIGS. 6 and 7) to be described later, and the original surface position A1 of the structure A It corresponds to. As shown in FIG. 1B, the reference plane is set as the top end face 1 a using the hook-shaped member 1. Although it does not specifically limit as the bowl-shaped member 1, in this embodiment, the bowl-shaped member 1 made from a polystyrene foam is used, and it is formed in square pillar shape and predetermined length. Then, the bowl-shaped member 1 is erected along the vertical direction with respect to the suspension surface C1 obtained in [the suspension step N1].

杆状部材1の天端面1aから所定距離(例えば、35mm)だけはつり面C1側に移動した位置には、設定位置用目印2が施されている。設定位置用目印2は、後に詳述する挿入部材3の底面の位置に相当する位置に施されている。杆状部材1は、表面コンクリート部Cをはつった面積や距離に応じて必要本数用いられ、互いに等間隔だけ置いて配置されることが好ましい。なお、杆状部材1をはつり面C1に対して垂直方向に沿うよう立設するためには、接着剤等を用いて、はつり面C1や鉄筋Rに固定することが考えられる。   A set position mark 2 is provided at a position moved to the suspension surface C1 side by a predetermined distance (for example, 35 mm) from the top end surface 1a of the bowl-shaped member 1. The setting position mark 2 is provided at a position corresponding to the position of the bottom surface of the insertion member 3 to be described in detail later. The required number of the hook-shaped members 1 is used according to the area and distance of the surface concrete portion C, and it is preferable that the hook-shaped members 1 are arranged at equal intervals. In order to erect the hook-shaped member 1 along the vertical direction with respect to the suspension surface C1, it is conceivable to fix it to the suspension surface C1 or the reinforcing bar R using an adhesive or the like.

(3).〔第一打設工程〕
〔第一打設工程N3〕は、図1(c)に示すように、はつり面C1に対し、第一モルタルm1を打設する工程である。第一モルタルm1の打設は、吹付ノズルからの吹付けによって行われる。吹付けるモルタルは、乾式モルタル、湿式モルタルの何れでもよいが、本実施形態では乾式モルタルが用いられる。乾式モルタルは吹付けにより、設定位置用目印2の高さ位置まで打設される。設定位置用目印2の高さ位置まで打設された第一モルタルm1の天端面m1aは、後に詳述するように、陽極である帯状の電極Eの設置位置(設置高さ)の目処として用いられる。なお、電極Eとして、チタン製のリボンメッシュが用いられる。吹付けられた第一モルタルm1の天端面m1aは、定規ずりされ、鏝等を用いて均される。
(3). [First placement process]
[First placement step N3] is a step of placing the first mortar m1 on the suspension surface C1, as shown in FIG. 1 (c). The first mortar m1 is placed by spraying from a spray nozzle. The sprayed mortar may be either a dry mortar or a wet mortar, but in the present embodiment, a dry mortar is used. The dry mortar is driven to the height position of the setting position mark 2 by spraying. The top end surface m1a of the first mortar m1 that is placed up to the height position of the setting position mark 2 is used as a target for the installation position (installation height) of the strip-shaped electrode E that is an anode, as will be described in detail later. It is done. As the electrode E, a ribbon mesh made of titanium is used. The top end face m1a of the sprayed first mortar m1 is ruled and leveled using a scissors or the like.

(4).〔墨打ち工程〕
〔墨打工程N4〕は、〔第一打設工程N3〕で得られた第一モルタルm1が硬化した後、その天端面m1aに、図1(d)に示すように墨m1bを打つ工程である。墨m1bを打つ位置および長手方向距離は、帯状の電極Eを伸ばして付設する位置に相当する。このため墨m1bは、はつり面C1の面方向に沿って施される。墨m1bは、断面修復の面積に応じて、すなわち設置する電極Eの枚数に応じて、複数条打たれる。
(4). [Inking process]
[Inking process N4] is a process in which, after the first mortar m1 obtained in [First placing process N3] is hardened, the ink m1b is applied to the top end face m1a as shown in FIG. 1 (d). is there. The position where the ink m1b is hit and the distance in the longitudinal direction correspond to the position where the belt-like electrode E is extended and attached. For this reason, the ink m1b is applied along the surface direction of the hanging surface C1. The black ink m1b is beaten a plurality of times according to the area of the cross-sectional repair, that is, according to the number of electrodes E to be installed.

(5).〔糸張り工程〕
〔糸張工程N5〕は、図2に示すように、〔墨打工程N4〕によって施された墨m1bに倣って、且つ墨m1bから離れた(浮いた)位置に糸4を張る工程である。〔糸張工程N5〕では、墨m1bの位置に一致するよう、且つ所定間隔置き(例えば10m間隔置き)に糸張用コンクリートビス5がねじ込まれ、これら糸張用コンクリートビス5に、糸4が掛けられる。
(5). [Thread tension process]
[Yarn tension step N5] is a step of tensioning the yarn 4 at a position that follows (and floats) from the ink m1b and follows the ink m1b applied by the [inking step N4] as shown in FIG. . In the [yarn tensioning step N5], the thread tension concrete screws 5 are screwed in at predetermined intervals (for example, at intervals of 10 m) so as to coincide with the positions of the ink m1b. It is hung.

糸4は、糸張用コンクリートビス5上にあって、第一モルタルm1の天端面m1aから、前記所定距離(例えば、35mm)だけ離間した位置に配置される。この糸4の高さ位置が、後述する型部材6の天端面である広幅面6aの設定位置であり、第一モルタルm1の天端面m1aに対する広幅面6aの高さ位置である。   The thread 4 is on the thread tension concrete screw 5 and is disposed at a position separated from the top end face m1a of the first mortar m1 by the predetermined distance (for example, 35 mm). The height position of the thread 4 is a setting position of the wide surface 6a which is a top end surface of the mold member 6 described later, and is the height position of the wide surface 6a with respect to the top end surface m1a of the first mortar m1.

(6).〔型部材設置工程〕
〔型部材設置工程N6〕は、〔糸張工程N5〕で張られた糸4と、〔墨打工程N4〕で施した墨m1bとの間に、図3に示すような型部材(「面木」とも称される)6を設置する工程である。
(6). [Mold member installation process]
In the [mold member installation step N6], a mold member (“surface” shown in FIG. 3) is disposed between the yarn 4 stretched in the [yarn tensioning process N5] and the black m1b applied in the [blacking process N4]. 6) (also called “tree”).

前記挿入部材3は、型部材6と伸縮材7とから構成されている。型部材6は硬質材から形成され、弾性的に伸縮可能な伸縮材7と一体的に構成されている。この場合、型部材6は、長手方向断面が台形状で長尺(例えば、糸張用コンクリートビス5の間の長さ)に形成されている。型部材6には、木材や発泡樹脂等が用いられる。型部材6の狭幅面6bが伸縮材7に貼着されることで、型部材6と伸縮材7とが一体的に構成されている。伸縮材7は、長手方向断面が正方形状に形成されている。伸縮材7は、アスファルト系材料であるエラスタイト(登録商標)により形成されている。   The insertion member 3 includes a mold member 6 and an elastic material 7. The mold member 6 is formed of a hard material, and is configured integrally with an elastic material 7 that can elastically expand and contract. In this case, the mold member 6 is formed in a long shape (for example, the length between the thread tension concrete screws 5) with a trapezoidal cross section in the longitudinal direction. The mold member 6 is made of wood, foamed resin, or the like. The mold member 6 and the stretchable material 7 are integrally formed by sticking the narrow surface 6 b of the mold member 6 to the stretchable material 7. The stretchable material 7 has a longitudinal section formed in a square shape. The elastic material 7 is made of elastite (registered trademark), which is an asphalt material.

図4(b)に示すように、伸縮材7は、型部材6に対し所定間隔置きに配置されている。この所定間隔は、後述する固定用コンクリートビス8(図4、5参照)が配置される間隔である。型部材6と伸縮材7を合わせた挿入部材3全体の高さは、第一モルタルm1の天端面m1aから糸4までの距離よりもわずかに高く設定しておくことが好ましい。すなわち、墨m1bを打った天端面m1aと糸4との間に、伸縮材7を天端面m1a側にして挿入部材3を設置すると、図4(a)に示すように、直線状に張られた糸4が、挿入部材3の型部材6によって、第一モルタルm1の天端面m1aに対してわずかに持ち上げられる。   As shown in FIG. 4B, the stretchable material 7 is arranged at predetermined intervals with respect to the mold member 6. This predetermined space | interval is a space | interval in which the concrete screw 8 (refer FIG. 4, 5) for fixation mentioned later is arrange | positioned. The total height of the insertion member 3 including the mold member 6 and the elastic member 7 is preferably set slightly higher than the distance from the top end surface m1a of the first mortar m1 to the yarn 4. That is, when the insertion member 3 is installed between the top end surface m1a on which the ink m1b is struck and the thread 4, with the stretchable material 7 set on the top end surface m1a side, as shown in FIG. The thread 4 is slightly lifted by the mold member 6 of the insertion member 3 with respect to the top end face m1a of the first mortar m1.

〔型部材設置工程N6〕は、保持工程をさらに含んでいる。該保持工程は、図4(b)に示すように、前記固定用コンクリートビス8を、伸縮材7に対応する位置において挿入部材3に螺入することで、挿入部材3を第一モルタルm1の天端面m1aに保持固定する工程である。固定用コンクリートビス8は、糸張用コンクリートビス5とは別であり、糸張用コンクリートビス5の間に配置されるものである。   [Mold member installation step N6] further includes a holding step. In the holding step, as shown in FIG. 4 (b), the fixing concrete screw 8 is screwed into the insertion member 3 at a position corresponding to the stretchable material 7, thereby inserting the insertion member 3 into the first mortar m1. This is a step of holding and fixing to the top end surface m1a. The fixing concrete screw 8 is different from the thread tension concrete screw 5 and is disposed between the thread tension concrete screws 5.

〔型部材設置工程N6〕は、締付工程をさらに含んでいる。締付工程は、図5(a)(b)に示すように、挿入部材3によって持ち上げられた糸4が直線状になるまで、すなわち直線状に復元するまで、固定用コンクリートビス8を第一モルタルm1に螺入して型部材6を設置する工程である。固定用コンクリートビス8が第一モルタルm1に螺入されるのに伴い、伸縮材7が型部材6によって押圧されて、伸縮材7の高さが減少するから、型部材6の天端面である広幅面6aの位置を、第一モルタルm1の天端面m1aから直線状に張られた糸4の高さとすることができる。   [Mold member installation step N6] further includes a tightening step. As shown in FIGS. 5 (a) and 5 (b), the fastening process is performed by first fixing the concrete screw 8 for fixing until the thread 4 lifted by the insertion member 3 becomes linear, that is, until the thread 4 is restored to linear. In this step, the mold member 6 is installed by screwing into the mortar m1. As the fixing concrete screw 8 is screwed into the first mortar m1, the elastic member 7 is pressed by the die member 6 and the height of the elastic member 7 is reduced. The position of the wide surface 6a can be set to the height of the yarn 4 stretched linearly from the top end surface m1a of the first mortar m1.

型部材6の広幅面6aから伸縮材7の底面7aまでの距離、すなわち、挿入部材3全体の高さは、例えば、40mmに設定しておく。具体的には、型部材6の高さを20mm、伸縮材7の高さを20mmに設定しておく。そして、固定用コンクリートビス8の螺入によって伸縮材7の高さが15mm程度まで潰される場合を例示できる。このように、容易に変形しない型部材6とともに容易に弾性変形可能な伸縮材7を用い、伸縮材7の高さを減少させるようにすることで、第一モルタルm1の天端面m1aから型部材6の広幅面6aまでの距離を変更でき、したがって、例えば天端面m1aの位置の精度が正確でなくても、その天端面m1の位置に応じて、広幅面6aを正確な位置に調節することができる。なお、型部材6の広幅面6aの位置を、第一モルタルm1の天端面m1aから直線状に張られた糸4の高さ位置にした後は、糸張用コンクリートビス5および糸4は取外す。   The distance from the wide surface 6a of the mold member 6 to the bottom surface 7a of the elastic member 7, that is, the height of the entire insertion member 3 is set to 40 mm, for example. Specifically, the height of the mold member 6 is set to 20 mm, and the height of the stretchable material 7 is set to 20 mm. And the case where the height of the expansion-contraction material 7 is crushed to about 15 mm by screwing in the concrete screw 8 for fixation can be illustrated. Thus, by using the elastic member 7 that can be easily elastically deformed together with the mold member 6 that is not easily deformed, and reducing the height of the elastic material 7, the mold member can be removed from the top end face m1a of the first mortar m1. 6 can change the distance to the wide surface 6a. Therefore, for example, even if the accuracy of the position of the top end surface m1a is not accurate, the wide surface 6a is adjusted to an accurate position according to the position of the top end surface m1. Can do. In addition, after the position of the wide surface 6a of the mold member 6 is set to the height position of the thread 4 stretched linearly from the top end surface m1a of the first mortar m1, the thread tension concrete screw 5 and the thread 4 are removed. .

(7).〔第二打設工程〕
〔第二打設工程N7〕は、図6(a)(b)に示すように、前記保持工程で保持された型部材6が没するよう、〔第一打設工程N3〕で打設された第一モルタルm1に重ねて第二モルタルm2を打設する工程である。
(7). [Second placement process]
As shown in FIGS. 6 (a) and 6 (b), [second placing step N7] is placed in [first placing step N3] so that the mold member 6 held in the holding step is submerged. This is a step of placing the second mortar m2 over the first mortar m1.

第二モルタルm2の打設は、第一モルタルm1の打設と同様、吹付ノズルからの吹付けによって行われる。吹付けるモルタルは、乾式モルタル、湿式モルタルの何れでもよいが、本実施形態では乾式モルタルが用いられる。ここで、型部材6が没するとは、型部材6の広幅面6a以外の面である狭幅面6b、側面6c,6cが埋められる状態である。   The placement of the second mortar m2 is performed by spraying from the spray nozzle, similarly to the placement of the first mortar m1. The sprayed mortar may be either a dry mortar or a wet mortar, but in the present embodiment, a dry mortar is used. Here, the die member 6 is in a state in which the narrow surface 6b and the side surfaces 6c and 6c, which are surfaces other than the wide surface 6a, are filled.

伸縮材7は型部材6に対して第一モルタルm1側にあるから、第一モルタルm1に重ねて第二モルタルm2を打設すると、伸縮材7の全体が第二モルタルm2に埋められる。また、伸縮材7は、型部材6に対し所定間隔置きに配置されていて、その間は空間であるから、該空間にも第二モルタルm2が充填される。この場合、吹付ノズルを必要方向に移動させて吹付けるようにすれば、前記空間が第二モルタルm2により容易に充填される。   Since the elastic material 7 is on the first mortar m1 side with respect to the mold member 6, when the second mortar m2 is placed over the first mortar m1, the entire elastic material 7 is buried in the second mortar m2. Moreover, since the elastic material 7 is arrange | positioned with predetermined space | interval with respect to the type | mold member 6, and between that is a space, this space is also filled with the 2nd mortar m2. In this case, if the spray nozzle is moved in the required direction for spraying, the space is easily filled with the second mortar m2.

〔第二打設工程N7〕は、第二モルタルm2の天端面m2aを均す均し工程を含んでいる。上記したように吹付けて打設された第二モルタルm2は、図6(b)(c)に示すように、定規9による定規ずりで余分な第二モルタルm2が除去され、鏝10を用いて均される。   [Second placing step N7] includes a leveling step of leveling the top end surface m2a of the second mortar m2. As shown in FIGS. 6 (b) and 6 (c), the second mortar m <b> 2 sprayed and placed as described above is removed with the ruler 9 to remove the excess second mortar m <b> 2. To be leveled.

(8).〔型部材取外し工程〕
〔型部材取外工程N8〕は、図7に示すように、挿入部材3を第二モルタルm2から取外す工程である。第二モルタルm2の硬化後に、固定用コンクリートビス8を取外し、挿入部材3を第二モルタルm2から引き剥がすようにして取外す。挿入部材3を第二モルタルm2から取外すには、例えばバール、ドライバー、カワスキ等が用いられる。このようにすることで、第二モルタルm2の天端面m2aに挿入部材3の外形形状に応じた凹部11が形成される。
(8). [Mold member removal process]
[The mold member removing step N8] is a step of removing the insertion member 3 from the second mortar m2, as shown in FIG. After the second mortar m2 is cured, the fixing concrete screw 8 is removed, and the insertion member 3 is detached from the second mortar m2. In order to remove the insertion member 3 from the second mortar m2, for example, a bar, a screwdriver, a Kawasuki or the like is used. By doing in this way, the recessed part 11 according to the external shape of the insertion member 3 is formed in the top end surface m2a of the 2nd mortar m2.

詳述すれば、図7(b)に示すように、凹部11は、奥側(第一モルタルm1側)にあって、伸縮材7の外形に応じた奥側凹部11aと、第二モルタルm2の天端面m2a側の天端側凹部11bとを備えている。伸縮材7は間欠的に配置されていることから、奥側凹部11aもまた、間欠的に形成されている。型部材6は長尺に形成されているから、天端側凹部11bもまた、長尺に形成されている。なお、奥側凹部11aおよび天端側凹部11bは、連設されている。   Specifically, as shown in FIG. 7B, the recess 11 is on the back side (first mortar m1 side), and the back side recess 11a corresponding to the outer shape of the stretchable material 7 and the second mortar m2. And a top end side recess 11b on the top end face m2a side. Since the elastic material 7 is disposed intermittently, the back side recess 11a is also formed intermittently. Since the mold member 6 is formed in a long shape, the top end side recess 11b is also formed in a long shape. In addition, the back side recessed part 11a and the top end side recessed part 11b are provided in a row.

(9).〔電極設置工程〕
〔電極設置工程N9〕は、凹部11に電極Eを設置する工程である。はじめに、図8(a)に示すように、凹部11の底に、第三モルタルm3を敷く。この場合の第三モルタルm3は、接着性の高いものが好ましい。一例として、商品名:エルガードモルタルRMが用いられる。
(9). [Electrode installation process]
[Electrode installation step N9] is a step of installing the electrode E in the recess 11. First, as shown in FIG. 8A, the third mortar m3 is laid on the bottom of the recess 11. In this case, the third mortar m3 preferably has high adhesiveness. As an example, trade name: Elgard Mortar RM is used.

なお、第三モルタルm3は、奥側凹部11aにも充填されたうえで、凹部11の底に塗布される。第三モルタルm3の塗布が終了すれば、図8(b)に示すように、電極Eを直ちに凹部11の長手方向に倣うように、第三モルタルm3に取付ける。すなわち、第一モルタルm1の天端面m1aを電極Eの設置位置(設置高さ)の目処として用いる。そして、第三モルタルm3が硬化したら、図8(c)に示すように、第四モルタルm4を凹部11に充填し、第四モルタルm4の表面仕上げをする。第四モルタルm4の一例として、商品名:エルガードモルタルSPが用いられる。   The third mortar m3 is applied to the bottom of the recess 11 after filling the back recess 11a. When the application of the third mortar m3 is completed, the electrode E is attached to the third mortar m3 so as to immediately follow the longitudinal direction of the recess 11 as shown in FIG. That is, the top end surface m1a of the first mortar m1 is used as a target for the installation position (installation height) of the electrode E. And if the 3rd mortar m3 hardens | cures, as shown in FIG.8 (c), the 4th mortar m4 will be filled into the recessed part 11, and the surface finish of the 4th mortar m4 will be carried out. As an example of the fourth mortar m4, trade name: Elgard Mortar SP is used.

以上のようにして電極Eを構造物Aに設置するようにすれば、凹部11を形成するためにモルタルを切削する必要がないことから、切削に伴う粉塵の発生がなく、作業者は良好な環境のなかで、電極Eを構造物Aに設置することができる。また、第一モルタルm1、第二モルタルm2を吹付けにより打設するようにしたことにより、従来のように、塩害等により腐食した表面コンクリート部Cをはつった後にモルタルで修復し、モルタルの硬化後に凹部を切削により形成する場合に比べて、断面修復のための作業や、電極Eの設置作業が楽になるとともに、施工時間の短縮化を図ることができる。   If the electrode E is installed in the structure A as described above, it is not necessary to cut the mortar to form the recess 11, so that no dust is generated due to the cutting, and the worker is good. The electrode E can be installed on the structure A in the environment. In addition, by placing the first mortar m1 and the second mortar m2 by spraying, the surface concrete portion C corroded by salt damage or the like is applied and then restored by the mortar, Compared to the case where the concave portion is formed by cutting after curing, the work for repairing the cross section and the installation work for the electrode E are facilitated, and the construction time can be shortened.

本発明は、上記実施形態に限定されない。上記実施形態では、断面修復のために、第一モルタルm1、第二モルタルm2の吹付けを分けるように、経時的に用いた。これは、モルタルを〔第一打設工程〕と〔第二打設工程〕とを経時的に分けて打設することで、作業のし易さを図る方法である。しかしながら、場合によっては、はつり面C1に対し、モルタルを分けずに一度の打設工程で吹付けて、断面修復をすることも可能である。この場合では、型部材は、はつり面C1や露出させた鉄筋Rに、図示しない保持部材を介して保持させるようにする。そして、モルタルの硬化後に、型部材をモルタルから取外し、型部材を取外すことによって形成される凹部に、電極を設置することができる。   The present invention is not limited to the above embodiment. In the said embodiment, it used over time so that spraying of the 1st mortar m1 and the 2nd mortar m2 might be divided for cross-sectional repair. In this method, the mortar is placed by dividing the [first placing step] and the [second placing step] over time, thereby facilitating work. However, in some cases, it is possible to repair the cross section by spraying the hanging surface C1 with a single placing process without dividing the mortar. In this case, the mold member is held on the hanging surface C1 or the exposed rebar R via a holding member (not shown). And after hardening of mortar, an electrode can be installed in a crevice formed by removing a mold member from mortar and removing a mold member.

なお、上記実施形態では、断面台形状の型部材を用いたがこれに限定されるものではなく、硬化したモルタルから容易に取外すことができ、電極を設置できる断面形状であれば、例えば断面正方形、あるいは半円形状や半楕円形状であってもよい。   In the above embodiment, a trapezoidal cross-section mold member is used, but the present invention is not limited to this, and any cross-sectional shape that can be easily removed from the cured mortar and can be installed with an electrode, for example, has a square cross section. Alternatively, it may be semicircular or semielliptical.

1…杆状部材、1a…天端面、2…設定位置用目印、3…挿入部材、4…糸、5…糸張用コンクリートビス、6…型部材、7…伸縮材、8…固定用コンクリートビス、11…凹部、11a…奥側凹部、11b…天端側凹部、A…構造物、A1…表面位置、C1…はつり面、E…電極、m1…第一モルタル、m1a…天端面、m1b…墨、m2…第二モルタル、m2a…天端面、N1…はつり工程、N2…設計厚み表示工程、N3…第一打設工程、N4…墨打工程、N5…糸張工程、N6…型部材設置工程、N7…第二打設工程、N8…型部材取外工程、N9…電極設置工程、R…鉄筋   DESCRIPTION OF SYMBOLS 1 ... Saddle-shaped member, 1a ... Top end surface, 2 ... Mark for setting position, 3 ... Insertion member, 4 ... Thread, 5 ... Concrete screw for tension, 6 ... Mold member, 7 ... Stretch material, 8 ... Concrete for fixation Screws, 11 ... recesses, 11a ... back side recesses, 11b ... top end side recesses, A ... structure, A1 ... surface position, C1 ... lifting surface, E ... electrode, m1 ... first mortar, m1a ... top end surface, m1b ... black, m2 ... second mortar, m2a ... top end face, N1 ... lifting process, N2 ... design thickness display process, N3 ... first placing process, N4 ... blacking process, N5 ... yarn tensioning process, N6 ... mold member Installation step, N7 ... second placement step, N8 ... mold member removal step, N9 ... electrode installation step, R ... rebar

Claims (3)

コンクリートをはつるはつり工程と、電気防食用電極の設置のための凹部の型となる型部材をコンクリートのはつり面から所定の距離だけ離間する位置に保持させる保持工程と、コンクリートのはつり面に対しモルタルを打設する打設工程と、硬化後のモルタルから型部材を取外すことでモルタルに形成される凹部に電気防食用電極を設置する設置工程とを順に備え
前記打設工程は、第一打設工程と第二打設工程とを備え、
前記第一打設工程は、電気防食用電極の設置位置の目処となるようコンクリートのはつり面にモルタルを打設する工程であり、
前記保持工程は、第一打設工程によって打設されたモルタルの天端面に前記型部材を保持させる工程であり、
前記第二打設工程は、保持工程で保持された型部材が没するよう、第一打設工程で打設されたモルタルに重ねてモルタルを打設する工程であることを特徴とする電気防食用電極の設置方法。
Hatsuru the concrete and hanging step, the mold become mold member recess for the installation of the sacrificial electrode and the holding step of holding in a position away from the chipping surface of the concrete by a predetermined distance, the chipping surface of the concrete comprising a pouring step of pouring the mortar against, the recess formed in the mortar by removing the mold member from the mortar after curing and installing step of installing a sacrificial electrode in sequence,
The placing process includes a first placing process and a second placing process,
The first placing step is a step of placing a mortar on the hanging surface of the concrete so as to be a target of the installation position of the electrode for anticorrosion,
The holding step is a step of holding the mold member on the top end surface of the mortar placed by the first placing step,
The second placing step is a step of placing a mortar on the mortar placed in the first placing step so that the mold member held in the holding step is submerged. How to install edible electrodes.
前記はつり工程は、既設の鉄筋コンクリート構造物において、その表面側に配置された鉄筋を露出させ、露出させた鉄筋の錆を除去する作業を含む請求項1記載の電気防食用電極の設置方法。   2. The method of installing an electrode for anticorrosion according to claim 1, wherein the suspending step includes an operation of exposing a reinforcing bar disposed on a surface side of an existing reinforced concrete structure and removing rust of the exposed reinforcing bar. 前記打設工程は、吹付けによってモルタルを打設する工程である請求項1または請求項2記載の電気防食用電極の設置方法。
The punching setting step, the installation method according to claim 1 or claim 2 Symbol placement of sacrificial electrode is a step of pouring the mortar by spraying.
JP2015020151A 2015-02-04 2015-02-04 Installation method of electrodes for cathodic protection Active JP6089051B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015020151A JP6089051B2 (en) 2015-02-04 2015-02-04 Installation method of electrodes for cathodic protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015020151A JP6089051B2 (en) 2015-02-04 2015-02-04 Installation method of electrodes for cathodic protection

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2017004151A Division JP6387124B2 (en) 2017-01-13 2017-01-13 Installation method of electrodes for cathodic protection

Publications (2)

Publication Number Publication Date
JP2016141866A JP2016141866A (en) 2016-08-08
JP6089051B2 true JP6089051B2 (en) 2017-03-01

Family

ID=56569914

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015020151A Active JP6089051B2 (en) 2015-02-04 2015-02-04 Installation method of electrodes for cathodic protection

Country Status (1)

Country Link
JP (1) JP6089051B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235571A (en) * 2021-04-09 2021-08-10 桂林理工大学 Method for manufacturing corrosion-resistant UHPC steel pipe composite pile foundation

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002371390A (en) * 2001-06-18 2002-12-26 Nakabohtec Corrosion Protecting Co Ltd Method for installing electrode for cathodic protection of concrete structure
JP2005240382A (en) * 2004-02-25 2005-09-08 Hiroshima Kasei Ltd Lower face repairing method for concrete structure
JP2005256132A (en) * 2004-03-15 2005-09-22 Nakabohtec Corrosion Protecting Co Ltd Method for installing electrode for cathodic protection to concrete structure
JP4910200B2 (en) * 2009-06-29 2012-04-04 パシフィックコンサルタンツ株式会社 Sectional repair method for concrete structures
JP5798877B2 (en) * 2011-10-13 2015-10-21 三井住友建設株式会社 Electrical protection method for bridge girder edge

Also Published As

Publication number Publication date
JP2016141866A (en) 2016-08-08

Similar Documents

Publication Publication Date Title
JP6370729B2 (en) Road bridge protective fence installation method
US8844224B2 (en) Utility dowel bracket
JP6259807B2 (en) Road bridge guard fence and its installation method
JP6089051B2 (en) Installation method of electrodes for cathodic protection
JP6387124B2 (en) Installation method of electrodes for cathodic protection
JP6473670B2 (en) Structural restoration method
US8887449B2 (en) Benchmark marking tool and benchmark marking method
JP5822379B2 (en) Repair method for hollow slab
JP2007113267A (en) Level construction method for floor surface concrete and level display device
JP2008133664A (en) New inducing joint structure
JP6220997B1 (en) Installation method of electrodes for cathodic protection
JP7003363B2 (en) Spray thickness guide structure and reinforcement method with spray mortar
CN110725197A (en) Beam end or bridge head concrete structure with embedded part embedded specially for expansion joint and its application
KR20080062484A (en) Equal plastering for facilities and equalizing plaster reinforcement method using the same
JP2001073552A (en) Cement paste stop member for concrete form
JP6031274B2 (en) Installation method of anode material for cathodic protection
KR200294806Y1 (en) Reinforcing device for concrete construction
JP2018150785A (en) Formwork fixing material (separator cap)
JP7336909B2 (en) Method for manufacturing precast concrete panels
KR200291118Y1 (en) Water-Stops with Wings of fix
KR200418000Y1 (en) A location fixing device for aluminum form
JP4894478B2 (en) Exterior wall panel repair method and panel reinforcement hardware
KR100979120B1 (en) A reinforcing devices for structure
JP2011196115A (en) Trowel, and slope reinforcing construction method and slope reinforcing structure using the same
KR100850404B1 (en) Grouting reinforcement panel for concrete structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161118

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170206

R150 Certificate of patent or registration of utility model

Ref document number: 6089051

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250