JP6087651B2 - Cutting a metal structure with a diamond wire saw - Google Patents

Cutting a metal structure with a diamond wire saw Download PDF

Info

Publication number
JP6087651B2
JP6087651B2 JP2013024817A JP2013024817A JP6087651B2 JP 6087651 B2 JP6087651 B2 JP 6087651B2 JP 2013024817 A JP2013024817 A JP 2013024817A JP 2013024817 A JP2013024817 A JP 2013024817A JP 6087651 B2 JP6087651 B2 JP 6087651B2
Authority
JP
Japan
Prior art keywords
wire saw
diamond wire
cutting
pulley
metal structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013024817A
Other languages
Japanese (ja)
Other versions
JP2014151411A (en
Inventor
裕文 笹森
裕文 笹森
Original Assignee
第一ダイヤモンド工事株式会社
株式会社タイザン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 第一ダイヤモンド工事株式会社, 株式会社タイザン filed Critical 第一ダイヤモンド工事株式会社
Priority to JP2013024817A priority Critical patent/JP6087651B2/en
Publication of JP2014151411A publication Critical patent/JP2014151411A/en
Application granted granted Critical
Publication of JP6087651B2 publication Critical patent/JP6087651B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、ダイヤモンドワイヤーソーによる金属製構造物の切断方法に関する。   The present invention relates to a method for cutting a metal structure with a diamond wire saw.

従来、ワイヤーソーを用いた切断方法として、コンクリート構造物を切断する方法が知られている(例えば、特許文献1参照)。この切断方法により、例えばコンクリート構造物である躯体を切断する場合には、プーリーを介して躯体に周回した無端状のダイヤモンドワイヤーソーを、躯体から離間する方向に走行可能な台に載置された駆動プーリーに捲回し、駆動プーリーを回転させながら台を移動させてダイヤモンドワイヤーソーに張力を加えつつ躯体を切断する。   Conventionally, a method of cutting a concrete structure is known as a cutting method using a wire saw (see, for example, Patent Document 1). By this cutting method, for example, when cutting a housing that is a concrete structure, an endless diamond wire saw that circulates around the housing via a pulley was placed on a stand that can travel in a direction away from the housing. Winding around the drive pulley, moving the table while rotating the drive pulley, cutting the housing while applying tension to the diamond wire saw.

登録実用新案第2520310号公報Registered Utility Model No. 25203310

近年、コンクリート構造物ばかりでなく、例えば、船舶などの金属製構造物を切断することが要望されている。このような金属製構造物は、鋼板等により構成されており、コンクリート構造物と相違して、内部に中空部を有しているので、ダイヤモンドワイヤーソーに張力を加えつつ切断すると、大きな力が作用することにより、金属製構造物が変形して切断し難いという課題がある。また、金属製構造物の変形により、切断した鋼板のエッジに挟まれた状態でダイヤモンドワイヤーソーに大きな力が作用すると、ダイヤモンドワイヤーソーが損傷を受けて切れ具合が悪くなる、或いは、破断するなどして、交換を余儀なくされるおそれがあるという課題がある。   In recent years, there has been a demand for cutting not only concrete structures but also metal structures such as ships. Such a metal structure is composed of a steel plate or the like, and unlike a concrete structure, it has a hollow portion inside, so when a diamond wire saw is cut while applying tension, a large force is generated. There exists a subject that a metal structure deform | transforms and it is hard to cut | disconnect by acting. In addition, when a large force acts on the diamond wire saw while being sandwiched between the edges of the cut steel plate due to deformation of the metal structure, the diamond wire saw is damaged and the cutting condition becomes worse, or it breaks. Then, there is a problem that there is a risk of being forced to exchange.

本発明は上記従来の課題に鑑みて創案されたものであって、ダイヤモンドワイヤーソーによって金属製構造物を容易に切断することが可能なダイヤモンドワイヤーソーによる金属製構造物の切断方法を提供することを目的とする。   The present invention has been made in view of the above-described conventional problems, and provides a method for cutting a metal structure with a diamond wire saw that can easily cut the metal structure with a diamond wire saw. With the goal.

本発明にかかるダイヤモンドワイヤーソーによる切断方法は、重機が有する起伏式ブームの先端に備えられたプーリーと、切断の対象となる金属製構造物の外周とにワイヤーソーマシンにより駆動されるダイヤモンドワイヤーソーを巻き掛ける巻き掛け工程と、前記金属製構造物との接触部から2方向に延びる前記ダイヤモンドワイヤーソーがなす角度が、前記金属製構造物の切断時に直角以上となるように、前記起伏式ブームを操作することにより、前記プーリーの位置を作業の進捗に合わせて移動させて、前記ダイヤモンドワイヤーソーを切断方向に循環させて前記金属製構造物を切断する切断工程と、を含むことを特徴とする。
The diamond wire saw cutting method according to the present invention is a diamond wire saw driven by a wire saw machine on a pulley provided at the tip of a hoisting boom of a heavy machine and an outer periphery of a metal structure to be cut. And the undulating boom so that the angle formed by the diamond wire saw extending in two directions from the contact portion with the metal structure is equal to or greater than a right angle when the metal structure is cut. Cutting the metal structure by cutting the metal structure by moving the position of the pulley in accordance with the progress of the work and circulating the diamond wire saw in the cutting direction. To do.

切断中の前記金属製構造物の切り口には、当該切り口の空隙が狭まることを防止するスペーサを介在させることを特徴とする。   A spacer that prevents the gap of the cut end from narrowing is interposed in the cut end of the metal structure being cut.

前記金属製構造物の切断が完了する前に、前記ダイヤモンドワイヤーソーを交換する場合には、交換前の外径より小さな外径の前記ダイヤモンドワイヤーソーと交換することを特徴とする。   When exchanging the diamond wire saw before the cutting of the metal structure is completed, the diamond wire saw is replaced with the diamond wire saw having an outer diameter smaller than the outer diameter before the replacement.

本発明にかかるダイヤモンドワイヤーソーによる金属製構造物の切断方法にあっては、ダイヤモンドワイヤーソーを用いて金属製構造物を容易に切断することができる。   In the method for cutting a metal structure using the diamond wire saw according to the present invention, the metal structure can be easily cut using the diamond wire saw.

本発明に係るダイヤモンドワイヤーソーによる金属製構造物の切断方法の好適な一実施形態を示す、地上の船舶を切断する作業を説明する図である。It is a figure explaining the operation | work which cut | disconnects a ship on the ground which shows suitable one Embodiment of the cutting method of the metal structure by the diamond wire saw which concerns on this invention. 図1に示した切断作業に際し、切り口に楔を打ち込んで切断する様子を示す斜視図である。It is a perspective view which shows a mode that a wedge is driven into a cut end and cut | disconnects in the case of the cutting operation | work shown in FIG. 本発明に係るダイヤモンドワイヤーソーによる金属製構造物の切断方法の他の実施形態を示す、水中においてダイヤモンドワイヤーソーにより船舶を切断する作業を説明する平面図である。It is a top view explaining the operation | work which cut | disconnects a ship with a diamond wire saw in water which shows other embodiment of the cutting method of the metal structure by the diamond wire saw which concerns on this invention. 図3に示した切断作業の様子を説明する側面図である。It is a side view explaining the mode of the cutting operation | work shown in FIG.

以下に、本発明にかかるダイヤモンドワイヤーソーによる金属製構造物の切断方法の好適な実施形態を、金属製構造物として、船舶を地上にて切断する作業を例に挙げ、添付図面を参照して詳細に説明する。本実施形態では、船舶を船幅方向に切断するようにしている。図1は、本実施形態に係るダイヤモンドワイヤーソーによる金属製構造物の切断方法により、地上の船舶を切断する作業を説明する図である。   In the following, a preferred embodiment of a method for cutting a metal structure with a diamond wire saw according to the present invention is described as an example of a work for cutting a ship on the ground as a metal structure, with reference to the accompanying drawings. This will be described in detail. In this embodiment, the ship is cut in the ship width direction. FIG. 1 is a diagram for explaining an operation of cutting a ship on the ground by a method for cutting a metal structure using a diamond wire saw according to the present embodiment.

図1に示すように、ダイヤモンドワイヤーソー1による切断の対象となる船舶2は、地面3に配置された台座4上に安定させて載置されている。すなわち、船舶2と地面3との間に空隙Sを設けておく。そして、船舶2においてダイヤモンドワイヤーソー1が掛け回される位置には台座4は配置されていない。   As shown in FIG. 1, a ship 2 to be cut by a diamond wire saw 1 is stably placed on a pedestal 4 disposed on the ground 3. That is, a gap S is provided between the ship 2 and the ground 3. And the base 4 is not arrange | positioned in the position where the diamond wire saw 1 is wound around in the ship 2. FIG.

台座4上に配置された船舶2の上方には、切断方向に船舶2を跨ぐように門型フレーム5が設置されている。フレームは、門型の形態に限らず、L字型など、どのような形態であってもよい。船舶2及び門型フレーム5の側方には、切断方向の延長上に、ダイヤモンドワイヤーソー1を駆動するワイヤーソーマシン6が配置されている。   A portal frame 5 is installed above the ship 2 arranged on the pedestal 4 so as to straddle the ship 2 in the cutting direction. The frame is not limited to the gate shape, and may have any shape such as an L shape. A wire saw machine 6 that drives the diamond wire saw 1 is disposed on the side of the ship 2 and the gate-type frame 5 on the extension of the cutting direction.

ワイヤーソーマシン6は、無端状のダイヤモンドワイヤーソー1が巻き付けられる駆動プーリー7が船舶2側に向けられて配置されている。ワイヤーソーマシン6は、切断方向に沿って移動可能に設けられている。   In the wire saw machine 6, a drive pulley 7 around which an endless diamond wire saw 1 is wound is arranged facing the ship 2 side. The wire saw machine 6 is provided so as to be movable along the cutting direction.

また、ワイヤーソーマシン6には、駆動プーリー7より船舶2側に、ダイヤモンドワイヤーソー1をガイドするガイドプーリー8が、上下方向に互に間隔を隔てて2つ設けられている。   Further, the wire saw machine 6 is provided with two guide pulleys 8 for guiding the diamond wire saw 1 on the side of the ship 2 from the drive pulley 7 with an interval in the vertical direction.

門型フレーム5は、切断方向において船舶2を挟み、船舶2と間隔を隔てて地面3に立設された2本の柱部材9、10と、2本の柱部材9、10の上端部間に架け渡されて固定された横材11と、を有している。横材11は、船舶2の上方に間隔を隔てて、ほぼ水平な状態にて柱部材9、10に固定されている。   The gate-type frame 5 sandwiches the ship 2 in the cutting direction and is provided between the two column members 9 and 10 erected on the ground 3 with a space from the ship 2 and between the upper ends of the two column members 9 and 10. And a cross member 11 that is stretched over and fixed. The cross member 11 is fixed to the column members 9 and 10 in a substantially horizontal state with an interval above the ship 2.

また、門型フレーム5には、ダイヤモンドワイヤーソー1が巻き掛けられてガイドされる複数のプーリー12a、13a、14a、15aが設けられている。各々のプーリー12a、13a、14a、15aは、いずれも門型フレーム5の外側に配置されている。   The portal frame 5 is provided with a plurality of pulleys 12a, 13a, 14a, 15a on which the diamond wire saw 1 is wound and guided. Each of the pulleys 12 a, 13 a, 14 a, and 15 a is disposed outside the portal frame 5.

柱部材9、10には各々1つずつ、柱部材9、10に沿って、プーリー12a、13aを上下方向に移動可能とする上下動プーリーユニット12、13が取り付けられている。   Vertically moving pulley units 12 and 13 are attached to the column members 9 and 10 so that the pulleys 12a and 13a can be moved in the vertical direction along the column members 9 and 10, respectively.

横材11には、4つのプーリー14a、15aを有する2つのプーリーユニット14、15が設けられている。プーリーユニット14,15のうち、一方は横材11の一方の端部11a側に固定された固定プーリーユニット14であり、他方は、横材11の他方の端部11bから固定プーリーユニット14に近接する位置まで水平方向に移動可能に取り付けられた移動プーリーユニット15である。   The cross member 11 is provided with two pulley units 14 and 15 having four pulleys 14a and 15a. One of the pulley units 14 and 15 is a fixed pulley unit 14 fixed to one end 11 a side of the cross member 11, and the other is close to the fixed pulley unit 14 from the other end 11 b of the cross member 11. It is the movement pulley unit 15 attached so that it could move to a horizontal direction to the position to perform.

固定プーリーユニット14及び移動プーリーユニット15は、切断作業の進捗に伴って変化するダイヤモンドワイヤーソー1の送り出しまたは巻き付け方向の変化や、切断対象及び作業現場に合わせて対応できるように汎用性を備えるべく、4つのプーリー14a、15aを有しているが、これに限るものではない。   The fixed pulley unit 14 and the movable pulley unit 15 should be versatile so that they can respond to changes in the feeding or winding direction of the diamond wire saw 1 that changes with the progress of the cutting work, and the cutting object and work site. Although it has four pulleys 14a and 15a, it is not restricted to this.

これら上下動プーリーユニット12、13、固定プーリーユニット14及び移動プーリーユニット15の各プーリー12a、13a、14a、15aは、門型フレーム5と干渉しないように、当該門型フレーム5から船舶2の全長方向へ迫り出すように配置されるとともに、各プーリー12a、13a、14a、15aに巻き掛けられるダイヤモンドワイヤーソー1が各プーリー12a、13a、14a、15aにて屈曲されつつ隣り合うプーリー12a、13a、14a、15a間では直線状に緊張されるように門型フレーム5に設けられている。   The pulleys 12 a, 13 a, 14 a, 15 a of the vertically moving pulley units 12, 13, the fixed pulley unit 14, and the moving pulley unit 15 are arranged from the portal frame 5 to the full length of the ship 2 so as not to interfere with the portal frame 5. The pulleys 12a, 13a, adjacent to each other while the diamond wire saw 1 that is arranged so as to protrude in the direction and is bent around each pulley 12a, 13a, 14a, 15a is bent by each pulley 12a, 13a, 14a, 15a, Between the gates 14a and 15a, the portal frame 5 is provided so as to be linearly tensioned.

また、ワイヤーソーマシン6は、駆動プーリー7及びガイドプーリー8と、門型フレーム5の各プーリー12a、13a、14a、15aとが、互に隣り合うプーリー7、8、12a、13a、14a、15a間で直線状に緊張されるように、設置されている。すなわち、門型フレーム5の各プーリー12a、13a、14a、15a、ワイヤーソーマシン6の駆動プーリー7及びガイドプーリー8は、切断方向に沿う同一平面内にてダイヤモンドワイヤーソー1が循環するように配置されている。   Further, the wire saw machine 6 includes a driving pulley 7 and a guide pulley 8, and pulleys 12 a, 13 a, 14 a, and 15 a of the portal frame 5, and pulleys 7, 8, 12 a, 13 a, 14 a, and 15 a that are adjacent to each other. It is installed so that it is tensioned linearly between them. That is, each pulley 12a, 13a, 14a, 15a of the portal frame 5 and the drive pulley 7 and the guide pulley 8 of the wire saw machine 6 are arranged so that the diamond wire saw 1 circulates in the same plane along the cutting direction. Has been.

本実施形態のダイヤモンドワイヤーソー1による金属製構造物の切断方法では、まず、切断対象となる船舶2を、台座4上に安定させて載置する。   In the cutting method of the metal structure by the diamond wire saw 1 of this embodiment, first, the ship 2 to be cut is stably placed on the pedestal 4.

次に、船舶2の上方から門型フレーム5を設置する(フレーム設置工程)。このとき、ワイヤーソーマシン6を船舶2の側方に配置し、門型フレーム5の各プーリー12a、13a、14a、15aとワイヤーソーマシン6の駆動プーリー7及びガイドプーリー8との位置が合うように配置する。また、門型フレーム5は、固定プーリーユニット14が、切断方向においてワイヤーソーマシン6側に位置するように設置する。   Next, the portal frame 5 is installed from above the ship 2 (frame installation process). At this time, the wire saw machine 6 is arranged on the side of the ship 2 so that the pulleys 12a, 13a, 14a, 15a of the portal frame 5 and the drive pulley 7 and the guide pulley 8 of the wire saw machine 6 are aligned. To place. The portal frame 5 is installed such that the fixed pulley unit 14 is positioned on the wire saw machine 6 side in the cutting direction.

次に、ワイヤーソーマシン6の駆動プーリー7に巻き掛けられているダイヤモンドワイヤーソー1を、上側ガイドプーリー8から、固定プーリーユニット14のプーリー14a、移動プーリーユニット15のプーリー15a、ワイヤーソーマシン6と反対側の柱部材9に設けられた上下動プーリーユニット(奥側上下動プーリーユニット)12のプーリー12a、ワイヤーソーマシン6側の柱部材10に設けられた上下動プーリーユニット(手前側上下動プーリー)13のプーリー13a、下側ガイドプーリー8の順に巻き掛ける(巻き掛け工程)。   Next, the diamond wire saw 1 wound around the drive pulley 7 of the wire saw machine 6 is moved from the upper guide pulley 8 to the pulley 14a of the fixed pulley unit 14, the pulley 15a of the moving pulley unit 15, and the wire saw machine 6. A pulley 12a of a vertically moving pulley unit (backward vertically moving pulley unit) 12 provided on the opposite column member 9 and a vertically moving pulley unit (front side vertically moving pulley) provided on the column member 10 on the wire saw machine 6 side. ) 13 pulley 13a and lower guide pulley 8 are wound in this order (winding step).

このとき、2本の柱部材9、10に各々設けられた上下動プーリーユニット12、13のプーリー12a、13a間で船舶2の下部外周とダイヤモンドワイヤーソー1とが接触するように巻き掛ける。また、このとき、船舶2と接触している部分から2方向に延びるダイヤモンドワイヤーソー1がなす角度、すなわち、各上下動プーリーユニット12、13のプーリー12a、13aとの間に張られたダイヤモンドワイヤーソー1がなす角度が直角以上となるように上下動プーリーユニット12、13のプーリー12a、13aを配置する。   At this time, it winds so that the lower outer periphery of the ship 2 and the diamond wire saw 1 may contact between the pulleys 12a and 13a of the vertically moving pulley units 12 and 13 provided on the two column members 9 and 10, respectively. At this time, the angle formed by the diamond wire saw 1 extending in two directions from the portion in contact with the ship 2, that is, the diamond wire stretched between the pulleys 12 a and 13 a of the vertical movement pulley units 12 and 13. The pulleys 12a and 13a of the vertically moving pulley units 12 and 13 are arranged so that the angle formed by the saw 1 becomes a right angle or more.

次に、駆動プーリー7を回転させながらワイヤーソーマシン6を船舶2から離れる方向に移動させることにより、ダイヤモンドワイヤーソー1に張力を加えつつ船舶2を切断する(切断工程)。船舶2の切断にあたっては、切断作業の進捗に伴って、奥側上下動プーリーユニット12のプーリー12aを上下方向のいずれかに、手前側上下動プーリーユニット13のプーリー13aを上方に、移動プーリーユニット15のプーリー15aを固定プーリーユニット14側に移動させることにより、船舶2と接触している位置から各上下動プーリーユニット12、13のプーリー12a、13aに張られたダイヤモンドワイヤーソー1がなす角度が直角以上となる状態を保って切断作業を進めていく。   Next, the ship 2 is cut while applying tension to the diamond wire saw 1 by moving the wire saw machine 6 in a direction away from the ship 2 while rotating the driving pulley 7 (cutting step). When cutting the ship 2, as the cutting operation progresses, the pulley 12a of the rear vertical pulley unit 12 is moved in either the vertical direction, the pulley 13a of the front vertical pulley unit 13 is moved upward, and the moving pulley unit By moving the 15 pulleys 15a to the fixed pulley unit 14 side, the angle formed by the diamond wire saw 1 stretched on the pulleys 12a and 13a of the vertically moving pulley units 12 and 13 from the position in contact with the ship 2 is increased. The cutting work will proceed while maintaining a right angle or more.

図2は、切り口に楔を打ち込んで切断する様子を示す斜視図である。切断作業を進めるにあたっては、図2に示すように、既に切断した切り口16が、船舶2の変形により狭まらないように、切り口16をなして互いに間隔を隔てる部位間にスペーサを介在させる。例えば、切り口16に楔17を打ち込こんで切り口16の幅が狭まらないように間隔を維持した状態で切断作業を継続する。   FIG. 2 is a perspective view showing a state in which a wedge is driven into a cut end and cut. In proceeding with the cutting operation, as shown in FIG. 2, spacers are interposed between the portions that are separated from each other by forming the cut 16 so that the cut 16 that has already been cut does not narrow due to deformation of the ship 2. For example, the cutting operation is continued in a state where the interval is maintained so that the wedge 17 is driven into the cut 16 and the width of the cut 16 is not narrowed.

また、切断作業中に、ダイヤモンドワイヤーソー1が破断または摩耗により交換が必要となった場合には、交換前の直径より小さな直径のダイヤモンドワイヤーソー1に交換して切断作業を継続する。これは、新しいダイヤモンドワイヤーソー1を交換する際には、それまでの切断作業により摩耗等したダイヤモンドワイヤーソー1の直径が未使用時より細くなっているので、交換前のダイヤモンドワイヤーソー1と同じであって未使用のものに交換してしまうと、既に切断されている位置まで交換後の新しいダイヤモンドワイヤーソー1を挿入することができず、作業効率が悪いからである。   Further, when the diamond wire saw 1 needs to be replaced due to breakage or wear during the cutting operation, the diamond wire saw 1 is replaced with a diamond wire saw 1 having a diameter smaller than that before the replacement, and the cutting operation is continued. This is because, when replacing a new diamond wire saw 1, the diameter of the diamond wire saw 1 that has been worn away by the previous cutting operation is thinner than when not in use, so it is the same as the diamond wire saw 1 before replacement. If it is replaced with an unused one, the new diamond wire saw 1 after replacement cannot be inserted to the already cut position, and the work efficiency is poor.

本実施形態のダイヤモンドワイヤーソー1による金属製構造物の切断方法によれば、門型フレーム5に設けられたプーリー12a、13a、14a、15aに巻き掛けたダイヤモンドワイヤーソー1にて船舶2を切断するので、船舶2の形状に拘わらず所定の角度にてダイヤモンドワイヤーソー1を船舶2に巻き掛けて切断することができる。このため、船舶2の一部分のみに応力を集中させることなく切断することができるので、船舶2の変形を抑えて容易に切断することができる。   According to the method for cutting a metal structure with the diamond wire saw 1 of this embodiment, the ship 2 is cut with the diamond wire saw 1 wound around the pulleys 12 a, 13 a, 14 a, and 15 a provided on the portal frame 5. Therefore, the diamond wire saw 1 can be wound around the ship 2 and cut at a predetermined angle regardless of the shape of the ship 2. For this reason, since it can cut, without concentrating stress on only a part of ship 2, it can cut easily, suppressing a deformation of ship 2.

また切断時には、移動プーリーユニット15のプーリー15aと各上下動プーリーユニット12、13のプーリー12a、13aとを移動させて、船舶2と接触している位置から各上下動プーリーユニット12、13のプーリー12a、13aに張られたダイヤモンドワイヤーソー1がなす角度が直角以上となる状態を保っているので、より応力集中を抑えて切断作業を進めることができる。   At the time of cutting, the pulley 15a of the moving pulley unit 15 and the pulleys 12a and 13a of the vertical movement pulley units 12 and 13 are moved so that the pulleys of the vertical movement pulley units 12 and 13 are moved from the position in contact with the ship 2. Since the angle formed by the diamond wire saw 1 stretched on 12a and 13a is maintained at a right angle or more, the cutting operation can be performed while suppressing the stress concentration.

また、切断作業時には、既に切断した切り口16に楔17を打ち込んで、切り口16の間隔が保たれるようにするので、切り口16によりダイヤモンドワイヤーソー1が挟まれず、押圧されることもないので、ダイヤモンドワイヤーソー1が過剰に摩耗する、或いは、破断することを防止できる。   Further, during the cutting operation, the wedge 17 is driven into the already cut cut 16 so that the interval between the cuts 16 is maintained, so that the diamond wire saw 1 is not sandwiched or pressed by the cut 16, so It is possible to prevent the diamond wire saw 1 from being excessively worn or broken.

上記実施形態においては、地上にて門型フレーム5を用いて切断する例について説明したが、これに限るものではない。   In the said embodiment, although the example cut | disconnected using the portal frame 5 on the ground was demonstrated, it is not restricted to this.

図3は、他の実施形態として、水中においてダイヤモンドワイヤーソーにより船舶を切断する作業を説明する平面図であり、図4は、図3に示した切断作業の様子を説明する側面図である。以下の説明において、上記実施形態と同一部分には同一符号を付し、その説明を省略する。   FIG. 3 is a plan view illustrating an operation of cutting a ship with a diamond wire saw in water as another embodiment, and FIG. 4 is a side view illustrating the state of the cutting operation illustrated in FIG. 3. In the following description, the same parts as those in the above embodiment are denoted by the same reference numerals, and the description thereof is omitted.

図3及び図4に示すように、例えば、水中にて船舶2を切断する場合には、クレーンヤード18上に配置したクレーン19により、切断対象となる船舶2を、クレーンヤード18に沿わせるとともに近接させて配置して切断作業を実施する。   As shown in FIGS. 3 and 4, for example, when the ship 2 is cut underwater, the ship 19 to be cut is placed along the crane yard 18 by the crane 19 disposed on the crane yard 18. Perform cutting work by placing them close together.

クレーンヤード18側にワイヤーソーマシン6を配置し、切断対象となる船舶2を挟んでクレーンヤード18と反対側に配置した台船20に起伏式ブーム21を備えた重機としてのバックホウ22を配置する。   A wire saw machine 6 is arranged on the crane yard 18 side, and a backhoe 22 as a heavy machine having a hoisting boom 21 is arranged on a trolley 20 arranged on the opposite side of the crane yard 18 across the ship 2 to be cut. .

バックホウ22の起伏式ブーム21の先端側にはプーリー21aが設けられている。そして、ワイヤーソーマシン6の駆動プーリー7とバックホウ22のプーリー21aとが船舶2の切断方向に沿う直線状に位置するように配置する。   A pulley 21 a is provided on the tip side of the hoisting boom 21 of the backhoe 22. And it arrange | positions so that the drive pulley 7 of the wire saw machine 6 and the pulley 21a of the backhoe 22 may be located in the linear form along the cutting direction of the ship 2. FIG.

船舶2の上部2aおよびクレーンヤード18側の船舶2の側部2bには、切断方向に沿って、プーリー12a,14a,15aが設けられたフレーム23、24を固定しておく。船舶2の上部2aのフレーム23には、上述した門型フレーム5の横材11に設けられたプーリーユニット14、15と同様に、移動プーリーユニット15と固定プーリーユニット14とが設けられている。   Frames 23 and 24 provided with pulleys 12a, 14a, and 15a are fixed to the upper portion 2a of the ship 2 and the side portion 2b of the ship 2 on the crane yard 18 side along the cutting direction. A moving pulley unit 15 and a fixed pulley unit 14 are provided on the frame 23 of the upper portion 2a of the ship 2 in the same manner as the pulley units 14 and 15 provided on the cross member 11 of the portal frame 5 described above.

船舶2の側部2bのフレーム24には、上述した門型フレーム5の柱部材9と同様に上下動プーリーユニット12が設けられている。また、水面25から陸上に上がるダイヤモンドワイヤーソー1を保護する保護プーリー26も設けられている。このとき、船舶2の上部2a及び船舶2の側部2bのフレーム23、24及びバックホウ22の各プーリー12a、14a、15a、21aと、ワイヤーソーマシン6に設けられている駆動プーリー7及びガイドプーリー8及び保護プーリー26は、切断方向に沿う同一平面内にてダイヤモンドワイヤーソー1が循環するように配置されている。   A vertically moving pulley unit 12 is provided on the frame 24 of the side portion 2 b of the ship 2 in the same manner as the pillar member 9 of the portal frame 5 described above. A protective pulley 26 is also provided to protect the diamond wire saw 1 rising from the water surface 25 to the land. At this time, the pulleys 12a, 14a, 15a, 21a of the frames 23, 24 and the backhoe 22 of the upper part 2a of the ship 2 and the side part 2b of the ship 2, the drive pulley 7 and the guide pulley provided in the wire saw machine 6 8 and the protective pulley 26 are arranged so that the diamond wire saw 1 circulates in the same plane along the cutting direction.

そして、船舶2を切断する際には、駆動プーリー7に巻き掛けられているダイヤモンドワイヤーソー1を、船舶2の上部2a及び船舶2の側部2bのフレーム23、24、バックホウ22に設けられた各プーリー12a、14a、15a、21aと、ガイドプーリー8、保護プーリー26を介して、船舶2の外周に循環するように巻き掛ける(巻き掛け工程)。   When the ship 2 is cut, the diamond wire saw 1 wound around the drive pulley 7 is provided on the frames 23 and 24 and the backhoe 22 of the upper part 2a of the ship 2 and the side part 2b of the ship 2. It winds so that it may circulate on the outer periphery of the ship 2 through each pulley 12a, 14a, 15a, 21a, the guide pulley 8, and the protection pulley 26 (winding process).

その後、ダイヤモンドワイヤーソー1を循環させて船舶2の切断を開始し、作業の進捗に合わせて船舶2の上部2a及び船舶2の側部2bのフレーム23、24に設けられたプーリー12a、15aを移動させるとともにバックホウ22の起伏式ブーム21を動作させて先端のプーリー21aを移動させる(切断工程)。   Thereafter, the diamond wire saw 1 is circulated to start the cutting of the ship 2, and pulleys 12 a and 15 a provided on the frames 23 and 24 of the upper part 2 a of the ship 2 and the side part 2 b of the ship 2 according to the progress of the work. While moving, the hoisting boom 21 of the backhoe 22 is operated to move the pulley 21a at the tip (cutting step).

これにより、船舶2と接触している位置と上下動プーリーユニット12のプーリー12aおよびバックホウ22に設けられたプーリー21aとの間に張られたダイヤモンドワイヤーソー1がなす角度が直角以上となる状態を保って切断作業を進めていく。   As a result, the angle formed by the diamond wire saw 1 stretched between the position in contact with the ship 2 and the pulley 12a of the vertically moving pulley unit 12 and the pulley 21a provided on the backhoe 22 becomes a right angle or more. Keep cutting and proceed.

本実施形態のダイヤモンドワイヤーソー1による金属製構造物の切断方法によれば、水中であっても、容易に船舶2を切断することができる。また、船舶2に対してワイヤーソーマシン6の反対側にて、ダイヤモンドワイヤーソー1を案内するプーリー21aをバックホウ22が有する起伏式ブーム21の先端に設けたので、起伏式ブーム21を動作させることにより、容易にプーリー21aの位置を変更することができる。このため、船舶2の一部のみに応力を集中させることなく、切断時における船舶2の変形を抑えて容易に切断することができる。   According to the method for cutting a metal structure with the diamond wire saw 1 of the present embodiment, the ship 2 can be easily cut even underwater. Further, since the pulley 21a for guiding the diamond wire saw 1 is provided at the tip of the hoisting boom 21 of the backhoe 22 on the opposite side of the wire saw machine 6 with respect to the ship 2, the hoisting boom 21 is operated. Thus, the position of the pulley 21a can be easily changed. For this reason, without concentrating stress only on a part of the ship 2, it is possible to easily cut it while suppressing deformation of the ship 2 at the time of cutting.

上記実施形態においては、金属製構造物を船舶としたが、これに限らず、例えば、電車や自動車などの車両や航空機等であっても構わない。   In the above embodiment, the metal structure is a ship. However, the present invention is not limited to this, and for example, a vehicle such as a train or an automobile, an aircraft, or the like may be used.

1 ダイヤモンドワイヤーソー
2 船舶
2a 船舶の上部
2b 船舶の側部
3 地面
4 台座
5 門型フレーム
6 ワイヤーソーマシン
7 駆動プーリー
8 ガイドプーリー
9 柱部材
10 柱部材
11 横材
11a 横材の一方の端部
11b 横材の他方の端部
12 上下動プーリーユニット(奥側上下動プーリーユニット)
12a プーリー
13 上下動プーリーユニット(手前側上下動プーリーユニット)
13a プーリー
14 固定プーリーユニット
14a プーリー
15 移動プーリーユニット
15a プーリー
16 切り口
17 楔
18 クレーンヤード
19 クレーン
20 台船
21 起伏式ブーム
21a プーリー
22 バックホウ
23 フレーム
24 フレーム
25 水面
26 保護プーリー
S 空隙
DESCRIPTION OF SYMBOLS 1 Diamond wire saw 2 Ship 2a Ship upper part 2b Ship side 3 Ground 4 Base 5 Gate frame 6 Wire saw machine 7 Drive pulley 8 Guide pulley 9 Column member 10 Column member 11 Cross member 11a One end of the cross member 11b The other end 12 of the cross member Vertically moving pulley unit (back side vertically moving pulley unit)
12a Pulley 13 Vertical movement pulley unit (Front vertical movement pulley unit)
13a Pulley 14 Fixed pulley unit 14a Pulley 15 Moving pulley unit 15a Pulley 16 Cut 17 Wedge 18 Crane yard 19 Crane 20 Cargo ship 21 Relief boom 21a Pulley 22 Backhoe 23 Frame 24 Frame 25 Water surface 26 Protective pulley S Gap

Claims (3)

重機が有する起伏式ブームの先端に備えられたプーリーと、切断の対象となる金属製構造物の外周とにワイヤーソーマシンにより駆動されるダイヤモンドワイヤーソーを巻き掛ける巻き掛け工程と、
前記金属製構造物との接触部から2方向に延びる前記ダイヤモンドワイヤーソーがなす角度が、前記金属製構造物の切断時に直角以上となるように、前記起伏式ブームを操作することにより、前記プーリーの位置を作業の進捗に合わせて移動させて、前記ダイヤモンドワイヤーソーを切断方向に循環させて前記金属製構造物を切断する切断工程と、
を含むことを特徴とするダイヤモンドワイヤーソーによる金属製構造物の切断方法。
A winding step of winding a diamond wire saw driven by a wire saw machine around a pulley provided at a tip of a hoisting boom included in a heavy machine and an outer periphery of a metal structure to be cut;
The pulley is operated by operating the hoisting boom so that an angle formed by the diamond wire saw extending in two directions from a contact portion with the metal structure is equal to or greater than a right angle when the metal structure is cut. A cutting step of cutting the metal structure by circulating the position of the diamond wire saw in the cutting direction by moving the position according to the progress of the work,
A method for cutting a metal structure with a diamond wire saw.
切断中の前記金属製構造物の切り口には、当該切り口の空隙が狭まることを防止するスペーサを介在させることを特徴とする請求項1に記載のダイヤモンドワイヤーソーによる金属製構造物の切断方法。 2. The method for cutting a metal structure with a diamond wire saw according to claim 1 , wherein a spacer for preventing the gap of the cut end from being narrowed is interposed in the cut end of the metal structure being cut. 前記金属製構造物の切断が完了する前に、前記ダイヤモンドワイヤーソーを交換する場合には、交換前の外径より小さな外径の前記ダイヤモンドワイヤーソーと交換することを特徴とする請求項1または2に記載のダイヤモンドワイヤーソーによる金属製構造物の切断方法。 Before cutting of the metal structure is completed, when replacing the diamond wire saw, according to claim 1, characterized in that exchanged with the diamond wire saw of smaller outer diameter than the outer diameter before exchange or A method for cutting a metal structure with the diamond wire saw according to 2 .
JP2013024817A 2013-02-12 2013-02-12 Cutting a metal structure with a diamond wire saw Active JP6087651B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013024817A JP6087651B2 (en) 2013-02-12 2013-02-12 Cutting a metal structure with a diamond wire saw

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013024817A JP6087651B2 (en) 2013-02-12 2013-02-12 Cutting a metal structure with a diamond wire saw

Publications (2)

Publication Number Publication Date
JP2014151411A JP2014151411A (en) 2014-08-25
JP6087651B2 true JP6087651B2 (en) 2017-03-01

Family

ID=51573795

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013024817A Active JP6087651B2 (en) 2013-02-12 2013-02-12 Cutting a metal structure with a diamond wire saw

Country Status (1)

Country Link
JP (1) JP6087651B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018043304A (en) * 2016-09-13 2018-03-22 川崎重工業株式会社 Cutting method and cutting system of metal-containing material
CN109648143A (en) * 2019-01-25 2019-04-19 福州天石源超硬材料工具有限公司 A kind of diamond-wire saw cutting process of blast furnace residual iron

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0790545B2 (en) * 1990-12-19 1995-10-04 大阪ダイヤモンド工業株式会社 Cutting method with wire saw
JP3016713B2 (en) * 1995-05-10 2000-03-06 株式会社コンセック Cutting method for reinforced concrete structures
JPH10258423A (en) * 1997-03-21 1998-09-29 Concrete Kooring Kk Meth0d for horizontally cutting concrete construction in water
JP4381784B2 (en) * 2003-11-26 2009-12-09 株式会社 エイブル Demolition device
EP2363340A1 (en) * 2010-02-24 2011-09-07 Smit Nederland B.V. Method and installation for making a cut in a shipwreck

Also Published As

Publication number Publication date
JP2014151411A (en) 2014-08-25

Similar Documents

Publication Publication Date Title
KR20150039498A (en) Apparatus for cutting stone of bridge type
JP6087651B2 (en) Cutting a metal structure with a diamond wire saw
US11148215B2 (en) Magazine wire saw
JP3652938B2 (en) Diamond wire sawing equipment
JP2015033752A (en) Wire saw
JP6715678B2 (en) Cutting device and floor slab cutting method
CN109208938B (en) Directional nondestructive static cutting demolition processing method for reinforced concrete slab
JP6738533B2 (en) Dismantling method of concrete members
JP2019505441A (en) Vehicle maintenance dock
JP2018145797A (en) Floor slab cutting device
JP7306627B2 (en) Carriage with rail feeder
JP2017052223A (en) Wire saw device
JP5736561B1 (en) Horizontal cutting removal method of expansion joint
CN203437745U (en) Double-upright metal band sawing machine
CN110424280A (en) Cushion cap cutter device and ship for cutting cushion cap
JP7042626B2 (en) Turn-turning device
CN113863304A (en) Device for quickly cutting pile head of CFG pile cap by earth model method
CN202318601U (en) Stone cutting machine
CN103817812B (en) The evolution method of silicon ingot, brilliant holder
JP5865042B2 (en) Cutting machine
JP5817285B2 (en) Cutting apparatus, cutting method, and structure dismantling method
JP3163379U (en) Factory equipment with wheel assemblies
CN215589654U (en) Diamond wire saw guider
JP4711236B2 (en) Band saw type cutting device and cutting method using band saw type cutting device
JP7423689B2 (en) Structural member cutting equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151224

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161025

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170202

R150 Certificate of patent or registration of utility model

Ref document number: 6087651

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250