JP5749022B2 - Method and system for updating plant monitoring system - Google Patents

Method and system for updating plant monitoring system Download PDF

Info

Publication number
JP5749022B2
JP5749022B2 JP2011003129A JP2011003129A JP5749022B2 JP 5749022 B2 JP5749022 B2 JP 5749022B2 JP 2011003129 A JP2011003129 A JP 2011003129A JP 2011003129 A JP2011003129 A JP 2011003129A JP 5749022 B2 JP5749022 B2 JP 5749022B2
Authority
JP
Japan
Prior art keywords
pio
new
existing
unit
virtual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011003129A
Other languages
Japanese (ja)
Other versions
JP2012146070A (en
Inventor
松岡 秀明
秀明 松岡
正喜 福島
正喜 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2011003129A priority Critical patent/JP5749022B2/en
Publication of JP2012146070A publication Critical patent/JP2012146070A/en
Application granted granted Critical
Publication of JP5749022B2 publication Critical patent/JP5749022B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は原子力プラント等に用いられるプラント監視システムの更新方法及び更新システムに関する。   The present invention relates to an updating method and an updating system for a plant monitoring system used in a nuclear power plant or the like.

原子力プラント等に用いられるプラント監視システムを更新する場合、従来はプラント監視システムの筐体も含め一括して更新していた(特許文献1)。
このような従来のプラント監視システムの更新方法を図5を参照して説明する。
When updating a plant monitoring system used in a nuclear power plant or the like, conventionally, the plant monitoring system including the casing of the plant monitoring system has been updated in a lump (Patent Document 1).
A method for updating such a conventional plant monitoring system will be described with reference to FIG.

図5は、プラント監視システム更新前後の構成を示している。プラント監視システムはプロセスデータを入出力する複数の既設PIO盤(プロセス信号入出力盤)18と、警報処理・表示処理を行う既設計算機15で構成される。既設PIO盤18は、コントローラ及びリレー等により構成された既設PIO装置10と端子台18bが収納され、既設PIO装置10と端子台18bは既設配線18cにより接続されている。既設PIO盤18の端子台18bは、現場機器間ケーブル13を介してポンプ等の現場機器12に接続され、既設PIO装置10は既設ネットワーク16を介して既設計算機15と接続されている。   FIG. 5 shows a configuration before and after updating the plant monitoring system. The plant monitoring system includes a plurality of existing PIO boards (process signal input / output boards) 18 for inputting / outputting process data and an existing computer 15 for performing alarm processing / display processing. The existing PIO board 18 houses the existing PIO device 10 and the terminal block 18b configured by a controller, a relay, and the like, and the existing PIO device 10 and the terminal block 18b are connected by an existing wiring 18c. The terminal block 18 b of the existing PIO board 18 is connected to the field device 12 such as a pump via the field device cable 13, and the existing PIO device 10 is connected to the existing computer 15 via the existing network 16.

プラント監視システムの更新時は、既設計算機15の既設サーバ15a及び既設クライアント15bに接続している既設ネットワーク16ケーブルを外し、既設計算機15を撤去する。同時に既設計算機15の撤去と合わせて、既設PIO盤18と現場機器12を接続している現場機器間ケーブル13と、既設計算機15と接続している既設ネットワーク16ケーブルを外し、既設PIO盤18を撤去する。   When updating the plant monitoring system, the existing network 16 cable connected to the existing server 15a and the existing client 15b of the existing computer 15 is disconnected, and the existing computer 15 is removed. At the same time, in conjunction with the removal of the existing computer 15, the on-site equipment cable 13 connecting the existing PIO board 18 and the on-site equipment 12 and the existing network 16 cable connected to the existing computer 15 are removed, and the existing PIO board 18 is removed. Remove.

したがって、既設計算機15の既設サーバ15a及び既設クライアント15bと接続している既設ネットワーク16ケーブルを外した時点から、警報処理・表示処理等のプラント監視機能が喪失する。   Therefore, plant monitoring functions such as alarm processing and display processing are lost from the time when the existing network 16 cable connected to the existing server 15a and the existing client 15b of the existing computer 15 is disconnected.

既設計算機15の撤去が完了すると、新設計算機1を搬入し、新設サーバ1aと、新設クライアント1bを新設ネットワーク17に接続する。既設PIO盤18の既設PIO装置10を撤去後に新設PIO盤19の新設PIO装置5と新設端子台19bを搬入し、新設PIO装置5と新設端子台19bを新設配線19cによって接続する。そして、新設PIO盤19に現場機器12を接続している現場機器間ケーブル13を接続し、新設PIO装置5に新設ネートワーク17を接続する。この時点では、新設計算機1は試験を行っていないため、プラント監視機能は喪失したままとなっている。   When the removal of the existing computer 15 is completed, the new computer 1 is carried in, and the new server 1 a and the new client 1 b are connected to the new network 17. After the existing PIO device 10 of the existing PIO board 18 is removed, the new PIO device 5 and the new terminal block 19b of the new PIO board 19 are loaded, and the new PIO device 5 and the new terminal block 19b are connected by the new wiring 19c. Then, the inter-site equipment cable 13 connecting the on-site equipment 12 is connected to the new PIO board 19, and the new installed work 17 is connected to the new PIO device 5. At this point, since the new computer 1 has not been tested, the plant monitoring function remains lost.

新設計算機1の警報処理・表示処理機能等のプラント監視機能確認試験は、新設PIO盤19から試験員がネットワーク受信信号を模擬し、新設ネットワーク17を介して新設計算機1の新設サーバと新設クライアント伝送確認試験を実施している。また、新設PIO盤19と現場機器12との接続確認試験は、試験員が現場機器12から入力信号模擬を行い、新設PIO盤19にて別の試験員が入力信号確認を行うことにより実施している。これらの試験が完了すると、新設PIO盤19のプロセスデータ入力が開始され、更新が完了する。   The plant monitoring function confirmation test such as the alarm processing / display processing function of the new computer 1 is conducted by a tester simulating a network reception signal from the new PIO board 19 and transmitted to the new server and new client of the new computer 1 via the new network 17. A confirmation test is being conducted. In addition, the connection confirmation test between the new PIO board 19 and the field device 12 is performed by a tester simulating an input signal from the field device 12 and another tester confirming the input signal on the new PIO board 19. ing. When these tests are completed, the process data input of the new PIO board 19 is started and the update is completed.

このように、プラント監視システム更新に伴い、既設計算機15の既設サーバ15a及び既設クライアント15bと接続している既設ネットワーク16ケーブル及び既設PIO盤18から現場機器間ケーブル13を外した時点から、搬入した新設計算機1及び新設PIO盤19の試験が完了するまでの長い時間、監視表示プロセスデータ入力機能が停止し、プラント監視機能も喪失した状態となっている。   Thus, along with the plant monitoring system update, the existing network 16 cable connected to the existing server 15a and the existing client 15b of the existing computer 15 and the existing PIO board 18 were disconnected from the on-site equipment cable 13 and then carried in. The monitoring display process data input function is stopped and the plant monitoring function is lost for a long time until the test of the new computer 1 and the new PIO board 19 is completed.

また、新設計算機の試験は、既設計算機のネットワークケーブルや現場機器間ケーブルの取り外しと、既設計算機の撤去と、既設PIOの撤去と、新設計算機の搬入と、新設PIO盤の搬入と、現場機器間ケーブルやネットワークケーブルの接続後に実施する必要があり、プラント監視システム更新開始から新設計算機の試験までには長い時間を要している。   In addition, the test of the new computer is performed by removing the network cable of the existing computer and the cable between field devices, removing the existing computer, removing the existing PIO, carrying in the new computer, carrying in the new PIO board, and between the field devices. This must be done after connecting the cable and network cable, and it takes a long time from the start of the plant monitoring system update to the test of the new computer.

さらに、プラント監視システムの計算機であるサーバとクライアントは、一括更新を行うまでの期間、プラント運転に合わせて常に正常に稼動する必要があるため、長期保守や修理が可能な計算機を選定しなければならない。プラント監視システムに適用される計算機の保守期間は、PIO装置の更新期間を基準に15年程度が求められている。   Furthermore, the servers and clients that are computers of the plant monitoring system must always operate normally in accordance with the plant operation until the batch update is performed. Therefore, computers that can perform long-term maintenance and repair must be selected. Don't be. The maintenance period of the computer applied to the plant monitoring system is required to be about 15 years based on the update period of the PIO device.

一方、近年、計算機の部品の長期維持や保守が難しくなり、プラント監視システムの更新手法において、PIO装置は更新しないで、クライアント計算機やサーバ計算機だけを更新する方法も提案されている。この更新方法について、図6を参照して説明する。   On the other hand, in recent years, it has become difficult to maintain and maintain computer parts for a long period of time, and a method for updating only a client computer or a server computer without updating a PIO device has been proposed in a method for updating a plant monitoring system. This update method will be described with reference to FIG.

プラント監視システム更新時は、既設計算機15の既設サーバ15a及び既設クライアント15bと接続している既設ネットワーク16からケーブルを外し、既設計算機15を撤去する。プラント監視機能は、既設計算機15を既設ネットワーク16とのケーブルを外した時点から機能喪失する。既設計算機15の撤去が完了すると、ゲートウェイ計算機50と新設計算機1を搬入し、新設サーバ1aと、新設クライアント1bを新設ネットワーク17に接続する。   When updating the plant monitoring system, the cable is removed from the existing network 16 connected to the existing server 15a and the existing client 15b of the existing computer 15, and the existing computer 15 is removed. The plant monitoring function is lost when the existing computer 15 is disconnected from the existing network 16. When the removal of the existing computer 15 is completed, the gateway computer 50 and the new computer 1 are carried in, and the new server 1a and the new client 1b are connected to the new network 17.

ゲートウェイ計算機50は、既設PIO盤18が接続されている既設ネットワーク16と、新設計算機1が接続されている新設ネットワーク17に接続される。この時点では、ゲートウェイ計算機50と新設計算機1は試験を行っていないため、プラント監視機能は喪失したままとなっている。   The gateway computer 50 is connected to the existing network 16 to which the existing PIO board 18 is connected and the new network 17 to which the new computer 1 is connected. At this time, since the gateway computer 50 and the new computer 1 are not tested, the plant monitoring function remains lost.

新設計算機1のプラント監視機能の確認試験は、既設PIO盤18から試験員が模擬ネットワーク受信信号を入力し、ゲートウェイ計算機50と新設ネットワーク17を介して新設計算機1の新設サーバと新設クライアント伝送確認試験を実施している。ゲートウェイ計算機50は、既設PIO通信手段50aにて既設PIO盤18からプロセスデータを受信し、受信したプロセスデータは既設PIO変換手段50bにて、新設計算機で処理するデータ形式、データ並びに変換され、新設計算機通信手段50cから新設ネットワーク17を介して新設計算機1の新設サーバと新設クライアントに送信する。
これらの試験が完了すると、既設PIO盤18のプロセスデータが新設計算機1に入力が開始され、更新が完了する。
In the confirmation test of the plant monitoring function of the new computer 1, a tester inputs a simulated network reception signal from the existing PIO board 18, and a new server and new client transmission confirmation test of the new computer 1 via the gateway computer 50 and the new network 17 Has been implemented. The gateway computer 50 receives process data from the existing PIO board 18 by the existing PIO communication means 50a, and the received process data is converted by the existing PIO conversion means 50b by the data format and data to be processed by the new computer. The data is transmitted from the computer communication means 50 c to the new server and new client of the new computer 1 via the new network 17.
When these tests are completed, the process data of the existing PIO board 18 is started to be input to the new computer 1 and the update is completed.

上述のとおり、プラント監視システム更新に伴い、既設計算機15の既設サーバ15a及び既設クライアント15bと接続している既設ネットワーク16からケーブルを外した時点から、搬入した新設計算機1及びゲートウェイ計算機50の試験が完了するまでの長い時間、監視表示プロセスデータの入力機能が停止し、プラント監視機能も喪失した状態となっている。また、新設計算機の試験は、既設計算機のネットワークケーブルや外線ケーブルの取り外しと、既設計算機の撤去と、新設計算機とゲートウェイ計算機の搬入とネットワークケーブルの接続後に実施する必要があり、プラント監視システム更新開始から新設計算機の試験までには長い時間を要している。   As described above, the test of the new computer 1 and the gateway computer 50 carried in from the time when the cable is disconnected from the existing network 16 connected to the existing server 15a and the existing client 15b of the existing computer 15 with the plant monitoring system update. For a long time until completion, the monitoring display process data input function is stopped and the plant monitoring function is also lost. The test of the new computer must be performed after removing the network cable and external cable of the existing computer, removing the existing computer, bringing in the new computer and gateway computer, and connecting the network cable. It takes a long time to test a new computer.

新設計算機1の表示性能、データ記録などの更新前の監視機能性能を実現するために既設PIO盤18がゲートウェイ計算機50に送信するプロセスデータ送信処理とゲートウェイ計算機50が変換処理したプロセスデータを新設計算機1に送信するまでの一連の処理時間は、更新前の既設計算機15のプロセスデータ受信周期と同等以上の周期を実現する必要がある。このため、既設PIO盤18のプロセスデータ送信周期を短くする設定変更と短い周期のプロセスデータ受信処理可能な計算機をゲートウェイ計算機50として使用する必要がある。   In order to realize the display function of the new computer 1 and the monitoring function performance before the update such as data recording, the process data transmission processing that the existing PIO board 18 transmits to the gateway computer 50 and the process data converted by the gateway computer 50 are newly installed. The series of processing time until transmission to 1 needs to realize a period equal to or longer than the process data reception period of the existing computer 15 before the update. For this reason, it is necessary to use, as the gateway computer 50, a computer that can change the setting for shortening the process data transmission cycle of the existing PIO board 18 and can receive process data with a short cycle.

特開2006−234696号公報JP 2006-234696 A

上述した従来のプラント監視システムの更新方法の課題について以下に詳しく説明する。
まず、第1に、プラント監視システムの一括更新時は、既設計算機を停止し、既設PIO盤の外線ケーブルを外した時点から、新設計算機と新設PIO盤を設置し、新設PIO盤からの入力試験が完了するまでの長い間、プロセスデータ入力機能とプラント監視機能の喪失が発生するため、プロセスデータ入力機能とプラント監視機能が停止している期間中、プロセスデータ入力機能が停止したデータを運転員による手記録や警報判定を代替する等の仮運用が必要となっている。
The problem of the above-described conventional plant monitoring system update method will be described in detail below.
First, at the time of batch update of the plant monitoring system, stop the existing computer, disconnect the existing PIO board external cable, install the new computer and the new PIO board, and test the input from the new PIO board. Since the process data input function and the plant monitoring function are lost for a long time until the process is completed, the process data input function and the plant monitoring function are stopped during the period when the process data input function and the plant monitoring function are stopped. Temporary operations such as substituting for manual records and alarm judgments are required.

第2に、プラント監視システムの新設計算機だけを更新する手法においても、一括更新より工事規模が小さくなるが既設計算機を停止し、既設計算機を既設ネットワークケーブルから外した時点から、新設計算機とゲートウェイ計算機を設置し、既設PIO盤からの入力試験が完了するまでの長い間、プロセスデータ入力機能とプラント監視機能の喪失が発生するため、プロセスデータ入力機能とプラント監視機能が停止している期間中、プロセスデータ入力機能が停止したデータを運転員による手記録や警報判定を代替する等の仮運用が必要となっている。   Secondly, even in the method of updating only the new computer of the plant monitoring system, the construction scale is smaller than the batch update, but the existing computer is stopped and the existing computer is disconnected from the existing network cable. Since the loss of the process data input function and the plant monitoring function occurs for a long time until the input test from the existing PIO board is completed, the process data input function and the plant monitoring function are stopped. Temporary operations such as substituting manual records and alarm judgments by operators for data where the process data input function has stopped are necessary.

第3に、既設PIOが接続されている既設ネットワークと新設計算機を接続するゲートウェイ計算機がプラント監視システムの構成機器として追加設置が必要である。さらにプラント監視システムの新設計算機から段階的に更新する場合は、既設PIOを新設PIOに更新する都度、ゲートウェイ計算機の新設計算機にプロセスデータを送信する処理手段の改造と確認試験が必要になるため、期間中はプロセスデータ入力機能が停止し、運転員によるプロセスデータの手記録や警報判定を代替する等の仮運用が必要となる。   Thirdly, a gateway computer that connects an existing network to which an existing PIO is connected and a new computer needs to be additionally installed as a component device of the plant monitoring system. Furthermore, when updating from the new computer of the plant monitoring system in stages, every time the existing PIO is updated to the new PIO, it is necessary to remodel the processing means that sends the process data to the new computer of the gateway computer and a confirmation test. During the period, the process data input function stops, and temporary operations such as replacing the process data manually recorded by the operator and alarm judgment are required.

本発明は上記課題を解決するためのなされたもので、プラント監視システムの更新中でもプロセスデータ入力機能とプラント監視機能を維持しつつ、更新後のプラント監視機能の試験時間を大幅に短縮することができるプラント監視システムの更新方法及び更新システムを提供することを目的とする。   The present invention has been made to solve the above-described problems, and can greatly reduce the test time of the updated plant monitoring function while maintaining the process data input function and the plant monitoring function even during the update of the plant monitoring system. An object of the present invention is to provide an update method and an update system for a plant monitoring system.

上記課題を解決するために、本発明に係るプラント監視システムの更新方法は、プラントのプロセスデータが入出力される複数のPIO装置と、前記PIO装置から入力されたプロセスデータを処理することによりプラント監視を行う計算機とを有するプラント監視システムの更新方法において、既設計算機を、仮想既設計算機部と仮想新設計算機部を有する新設計算機に更新するステップと、少なくとも1つの既設PIO装置を新設PIO装置に順次更新するステップと、既設PIO装置及び/又は新設PIO装置から入力されたプロセスデータを前記仮想既設計算機部と仮想新設計算機部に送信するステップと、前記仮想既設計算機部において既設PIO装置から入力されたプロセスデータを処理することによりプラント監視を行うステップと、前記仮想新設計算機部において前記既設PIO装置及び新設PIO装置から入力されたプロセスデータを処理することによりプラントの監視を行うステップと、を有することを特徴とする。 In order to solve the above-mentioned problems, a method for updating a plant monitoring system according to the present invention includes a plurality of PIO devices to which plant process data is input and output, and a process by processing process data input from the PIO devices. In a method for updating a plant monitoring system having a computer for monitoring, a step of updating an existing computer to a new computer having a virtual existing computer unit and a virtual new computer unit, and at least one existing PIO device to the new PIO device sequentially A step of updating, a step of transmitting process data input from the existing PIO device and / or the new PIO device to the virtual existing computer unit and the virtual new computer unit, and an input from the existing PIO device in the virtual existing computer unit Steps to monitor the plant by processing process data And having a flop, and a step of monitoring the plant by processing the process data input from the existing PIO device及beauty New provision PIO device in the virtual newly computing unit.

また、本発明に係るプラント監視システムの更新方法は、プラントのプロセスデータが入出力される複数のPIO装置と、前記PIO装置から入力されたプロセスデータを処理することによりプラント監視を行う計算機とを有するプラント監視システムの更新方法において、既設計算機を、仮想既設計算機部と仮想新設計算機部を有する新設計算機に更新するステップと、少なくとも1つの既設PIO装置を、仮想既設PIO部と仮想新設PIO部を有する新設PIO装置に更新するステップと、現場機器から入力されたプロセスデータを前記仮想既設PIO部と仮想新設PIO部に送信するステップと、前記仮想既設PIO部において前記プロセスデータを処理するステップと、前記仮想新設PIO部において前記プロセスデータを処理するステップと、前記仮想既設PIO部と仮想新設PIO部で処理された処理結果のいずれかを選択し前記新設計算機に送信するステップと、を有することを特徴とする。   Moreover, the update method of the plant monitoring system according to the present invention includes a plurality of PIO devices that input and output plant process data, and a computer that performs plant monitoring by processing the process data input from the PIO devices. In a method for updating a plant monitoring system, a step of updating an existing computer to a new computer having a virtual existing computer unit and a virtual new computer unit, at least one existing PIO device, a virtual existing PIO unit and a virtual new PIO unit are provided. Updating the newly installed PIO device, transmitting process data input from field equipment to the virtual existing PIO unit and the virtual newly installed PIO unit, processing the process data in the virtual existing PIO unit, Process the process data in the virtual PIO unit A step, and having the steps of: transmitting the selected one of the virtual existing PIO unit a virtual new PIO unit treated with processed result to the new computer.

また、本発明に係るプラント監視システムの更新システムは、プラントのプロセスデータが入出力される複数の既設PIO装置の少なくとも1つを新設PIO装置に更新し、プロセスデータを処理することによりプラント監視を行う既設計算機を新設計算機に更新するプラント監視システムの更新システムにおいて、前記新設計算機は、前記既設PIO装置及び新設PIO装置からのプロセスデータが入力される仮想既設計算機部と仮想新設計算機部を有し、前記既設計算機部は、前記プロセスデータを処理することによりプラント監視を行う仮想既設計算機アプリケーションを有し、前記新設計算機部は、前記プロセスデータを処理することによりプラント監視を行う仮想新設計算機アプリケーションを有することを特徴とする。 The updating system of the plant monitoring system according to the present invention, a plant monitoring by the plant process data is updated to the new PIO device at least one of the plurality of existing PIO device to be output, processing the process data in updating system of the plant monitoring system for updating an existing computer in the new computer to perform, the new computer, the existing PIO device及beauty and virtual existing computer unit which processes data is input from the newly established PIO device virtual new computer unit The existing computer unit has a virtual existing computer application for monitoring the plant by processing the process data, and the new computer unit is a virtual newly installed for monitoring the plant by processing the process data. It has a computer application.

また、本発明に係るプラント監視システムの更新システムは、プラントのプロセスデータが入出力される複数の既設PIO装置の少なくとも1つを新設PIO装置に更新し、前記プロセスデータを処理することによりプラント監視を行う既設計算機を新設計算機に更新するプラント監視システムの更新システムにおいて、前記新設PIO装置は、現場機器からのプロセスデータが入力される仮想既設PIO部と仮想新設PIO部を有し、前記既設PIO部は前記プロセスデータを処理する仮想既設PIO部アプリケーションを有し、前記新設PIO部は前記プロセスデータを処理する仮想新設PIO部アプリケーションを有し、前記新設PIO部は前記仮想既設PIO部と仮想新設PIO部で処理された処理結果のいずれかを選択し前記新設計算機に送信する送信データ選択処理部を有することを特徴とする。   Further, the update system for a plant monitoring system according to the present invention updates a plant monitoring data by updating at least one of a plurality of existing PIO devices to / from which plant process data is input / output to a new PIO device and processing the process data. In the update system of the plant monitoring system that updates the existing computer that performs the process to the new computer, the new PIO device has a virtual existing PIO unit and a virtual new PIO unit to which process data from field equipment is input, and the existing PIO unit A virtual existing PIO unit application that processes the process data, the new PIO unit includes a virtual new PIO unit application that processes the process data, and the new PIO unit includes the virtual existing PIO unit and the virtual new PIO unit Select one of the processing results processed by the PIO unit And having a transmission data selection unit that transmits the calculated machine.

本発明によれば、プラント監視システムの更新中でもプロセスデータ入力機能とプラント監視機能を維持するとともに、更新後のプラント監視機能の試験時間を大幅に短縮することができる。   According to the present invention, the process data input function and the plant monitoring function can be maintained even during the update of the plant monitoring system, and the test time of the updated plant monitoring function can be greatly shortened.

第1の実施形態に係るプラント監視システムの更新方法を示すブロック図。The block diagram which shows the update method of the plant monitoring system which concerns on 1st Embodiment. 第2の実施形態に係るプラント監視システムの更新方法を示すブロック図。The block diagram which shows the update method of the plant monitoring system which concerns on 2nd Embodiment. 第3の実施形態に係るプラント監視システムの更新方法を示すブロック図。The block diagram which shows the update method of the plant monitoring system which concerns on 3rd Embodiment. 第4の実施形態に係るプラント監視システムの更新方法を示すブロック図。The block diagram which shows the update method of the plant monitoring system which concerns on 4th Embodiment. 従来のプラント監視システムの更新方法を示すブロック図。The block diagram which shows the update method of the conventional plant monitoring system. 従来のプラント監視システムの他の更新方法を示すブロック図。The block diagram which shows the other update method of the conventional plant monitoring system.

以下に、本発明に係るプラント監視システムの更新方法及び更新システムの実施形態について、図面を参照して説明する。
[第1の実施形態]
第1の実施形態に係るプラント監視システムの更新方法及び更新システムを図1により説明する。
DESCRIPTION OF EMBODIMENTS Embodiments of a plant monitoring system updating method and updating system according to the present invention will be described below with reference to the drawings.
[First Embodiment]
The plant monitoring system updating method and updating system according to the first embodiment will be described with reference to FIG.

(構成)
第1の実施形態に係るプラント監視システムの更新方法では、まず、既設計算機を新設計算機1に更新し、次に、プロセスデータを入力する複数の既設PIO装置(プロセス信号入出力装置)10を順次新設PIO装置5に更新する。
(Constitution)
In the plant monitoring system updating method according to the first embodiment, first, an existing computer is updated to a new computer 1, and then a plurality of existing PIO devices (process signal input / output devices) 10 for inputting process data are sequentially added. Update to the new PIO device 5.

既設PIO装置10は、現場機器間ケーブル13を接続する既設PIOケーブル接続部11、既設PIO装置OS10b、既設PIO装置アプリケーション10aから構成され、ネットワーク14にて新設計算機1と接続されている。   The existing PIO device 10 includes an existing PIO cable connection unit 11 that connects the on-site equipment cable 13, an existing PIO device OS 10 b, and an existing PIO device application 10 a, and is connected to the new computer 1 via the network 14.

新設計算機1は、既設PIO装置10のプロセスデータを最新のプラント監視機能向けに変換処理を行う仮想新設計算機部2と、既設PIO装置10のプロセスデータを受信し既設計算機部と同様のプラント監視を行う仮想既設計算機部3と、仮想新設計算機部2と仮想既設計算機部3を新設計算機1で並行処理させるための新設計算機仮想化ソフトウェア4とから構成される。   The new computer 1 receives the process data of the existing PIO device 10 and the virtual new computer unit 2 that converts the process data of the existing PIO device 10 for the latest plant monitoring function, and performs the same plant monitoring as the existing computer unit. A virtual existing computer unit 3 to be executed, and a new computer virtualization software 4 for causing the new computer 1 to process the virtual existing computer unit 2 and the virtual existing computer unit 3 in parallel.

新設計算機1の仮想新設計算機部2は、仮想新設計算機OS2bと仮想新設計算機アプリケーション2aから構成され、仮想新設計算機アプリケーション2aはデータ受信処理部2a−1、既設データ判定処理部2a―2、データ変換処理部2a−3、新設警報処理部2a−4、新設表示処理部2a−5から構成される。   The newly established computer unit 2 of the newly installed computer 1 is composed of a newly established computer OS 2b and a newly established computer application 2a. The newly established computer application 2a includes a data reception processing unit 2a-1, an existing data determination processing unit 2a-2, and data conversion. It comprises a processing unit 2a-3, a new alarm processing unit 2a-4, and a new display processing unit 2a-5.

仮想既設計算機部3は、仮想既設計算機OS3b、仮想既設計算機アプリケーション3aから構成され、仮想既設計算機アプリケーション3aはデータ受信処理部3a−1、既設警報処理部3a−2、既設表示処理部3a−3から構成される。   The virtual existing computer unit 3 includes a virtual existing computer OS 3b and a virtual existing computer application 3a. The virtual existing computer application 3a includes a data reception processing unit 3a-1, an existing alarm processing unit 3a-2, and an existing display processing unit 3a-3. Consists of

(作用)
このように構成された監視システムの更新方法において、新設計算機1は、既設PIO装置10がネットワーク14を介して送信するプロセスデータ14aを新設計算機仮想化ソフトウェア4が受信する。新設計算機仮想化ソフトウェア4は受信したプロセスデータ14aを仮想新設計算機部2と仮想既設計算機部3の両方に受け渡す。
(Function)
In the monitoring system update method configured as described above, the new computer 1 receives the process data 14 a transmitted from the existing PIO device 10 via the network 14 by the new computer virtualization software 4. The new computer virtualization software 4 delivers the received process data 14 a to both the virtual new computer unit 2 and the virtual existing computer unit 3.

仮想新設計算機部2は、仮想新設計算機OS2bがプロセスデータ14aを仮想新設計算機アプリケーション2aに渡す。仮想新設計算機アプリケーション2aでは、既設データ判定処理2a−2はデータ受信処理部2a−1を介して受信したプロセスデータ14aが既設PIO装置10から送信されたプロセスデータか新設PIO装置19から送信されたプロセスデータかを判定する。   In the virtual new computer unit 2, the virtual new computer OS2b passes the process data 14a to the virtual new computer application 2a. In the virtual new computer application 2a, in the existing data determination processing 2a-2, the process data 14a received via the data reception processing unit 2a-1 is the process data transmitted from the existing PIO device 10 or transmitted from the new PIO device 19. Determine whether it is process data.

既設PIO装置10からのプロセスデータの場合には、データ変換処理部2a−3はプロセスデータ14aを新設警報処理・新設表示処理可能な新設PIO装置形式に変換する。一方、新設PIO装置19からのプロセスデータの場合には変換処理を行わない。   In the case of process data from the existing PIO device 10, the data conversion processing unit 2a-3 converts the process data 14a into a new PIO device format capable of new alarm processing and new display processing. On the other hand, in the case of process data from the newly installed PIO device 19, no conversion process is performed.

新設PIO装置5からのプロセスデータ14aは、新設警報処理部2a−4及び新設表示処理部2a−5にて処理し、結果を表示装置等の出力機器に出力する。
PIO装置が1台も更新されない間は、仮想新設計算機部2は、全ての既設PIO装置のプロセスデータを新設PIO装置形式のデータに変換して警報処理・表示処理が行われる。
Process data 14a from the new PIO device 5 is processed by the new alarm processing unit 2a-4 and the new display processing unit 2a-5, and the result is output to an output device such as a display device.
While no PIO device is updated, the virtual new computer unit 2 converts the process data of all existing PIO devices into data of the new PIO device format and performs alarm processing / display processing.

仮想既設計算機部3は、仮想既設計算機OS3bがプロセスデータ14aを仮想既設計算機アプリケーション3aに渡して処理を行う。仮想既設計算機アプリケーション3aでは、既設PIO装置10のプロセスデータ14aの受信処理から警報処理・表示処理等のプラント監視機能をそのまま備えており、データ受信処理部3a−1でプロセスデータ14aを受信し、既設PIO装置10のプロセスデータ14aを既設警報処理部3a−2及び既設表示処理部3a−3にて処理し、結果を表示装置等の出力機器に出力する。   In the virtual existing computer unit 3, the virtual existing computer OS 3b passes the process data 14a to the virtual existing computer application 3a for processing. The virtual existing computer application 3a is provided with the plant monitoring functions such as the alarm processing / display processing from the reception processing of the process data 14a of the existing PIO device 10 as it is, and the process data 14a is received by the data reception processing unit 3a-1, The process data 14a of the existing PIO device 10 is processed by the existing alarm processing unit 3a-2 and the existing display processing unit 3a-3, and the result is output to an output device such as a display device.

このように、プラント監視システムを構成する計算機を先行して更新し、その後PIO装置を更新するような場合において、新設計算機に仮想既設計算機の機能と仮想新設計算機の機能を持たせることにより、既設及び新設PIO装置に対する警報処理・表示処理等のプラント監視を同時に実施することが可能となる。   Thus, in the case where the computer constituting the plant monitoring system is updated in advance and then the PIO device is updated, the new computer has the functions of the virtual existing computer and the function of the virtual new computer. In addition, plant monitoring such as alarm processing and display processing for the newly installed PIO device can be performed simultaneously.

なお、既設PIO装置10を全て新設PIO装置5に更新する場合以外に、一部の既設PIO装置10を更新せずにそのまま継続使用する場合もある。そのような場合でも、本実施形態の新設計算機1は新設及び既設PIO装置に対しプラント監視機能を確実に果たすことができる。   In addition to the case where all the existing PIO devices 10 are updated to the new PIO devices 5, some existing PIO devices 10 may be used continuously without being updated. Even in such a case, the new computer 1 of the present embodiment can reliably perform the plant monitoring function for the new and existing PIO devices.

(効果)
以上説明したように、本第1の実施形態によれば、プラント監視システムを構成する計算機を先行して更新する場合、新設計算機で既設及び新設PIO装置の警報処理・表示処理等のプラント監視処理を同時に実施することができる。これにより、新設計算機のプラント監視結果と既設計算機のプラント監視結果を比較試験により確認できるため、新設計算機搬入、ケーブル接続後に実施されるプラント監視機能の試験時間を大幅に短縮することができる。
(effect)
As described above, according to the first embodiment, when a computer constituting the plant monitoring system is updated in advance, plant monitoring processing such as alarm processing / display processing of existing and new PIO devices in the new computer is performed. Can be carried out simultaneously. As a result, the plant monitoring result of the new computer and the plant monitoring result of the existing computer can be confirmed by the comparison test, so that the test time of the plant monitoring function implemented after the new computer is carried in and connected to the cable can be greatly shortened.

また、新設計算機は既設計算機の警報処理・表示機能を備えているため、プラント運転中に新設計算機の更新を行い、新設計算機の仮想新設計算機部のプロセスデータ受信処理、警報処理・表示処理の試験中は、運転員は仮想既設計算機部の処理結果でプロセスデータの確認が可能となるため、プラント運転中でも更新を開始することができ、プラントの定期検査期間が短い場合でもプラント監視システムの更新を行うことができる。   In addition, since the new computer has the alarm processing / display function of the existing computer, the new computer is updated during plant operation, and the process data reception processing, alarm processing / display processing test of the virtual new computer section of the new computer is performed. During the operation, the operator can check the process data based on the processing results of the virtual existing computer section, so the update can be started even during plant operation, and the plant monitoring system can be updated even when the periodic inspection period of the plant is short. It can be carried out.

さらに、既設PIO装置と新設計算機の間にプロセスデータ変換処理を行うゲートウェイ計算機を必要としないため、新たな計算機やネットワークの追加を軽減することができるため工事作業も短縮され更新にかかる費用を抑制することができる。   In addition, since a gateway computer that performs process data conversion processing is not required between the existing PIO device and the new computer, the addition of new computers and networks can be reduced, so construction work is shortened and the cost of renewal is reduced. can do.

[第2の実施形態]
第2の実施形態に係る監視システムの更新方法及び更新システムを、図2により説明する。
(構成)
本第2の実施形態に係る更新方法では、第1の実施形態の新設計算機1に、既設PIO装置10のプロセスデータ14aを仮想新設計算機2でプロセスデータ変換を行った処理結果と警報処理結果を記録する新設データ記録部2cを付加するとともに、仮想既設計算機部3にも既設PIO装置から受信するプロセスデータの警報処理結果を記録する既設データ記録部3cを付加し、さらに新設計算機1に新設データ記録部2cと既設データ記録部3cとを比較し、プロセスデータ及び警報処理結果の整合性を判定する新設既設データ比較処理部20を備えたことを特徴としている。
[Second Embodiment]
A monitoring system updating method and updating system according to the second embodiment will be described with reference to FIG.
(Constitution)
In the update method according to the second embodiment, the processing result obtained by converting the process data 14a of the existing PIO device 10 into the process data 14a in the virtual new computer 2 and the alarm processing result are added to the new computer 1 of the first embodiment. A new data recording unit 2c for recording is added, and an existing data recording unit 3c for recording the alarm processing result of the process data received from the existing PIO device is added to the virtual existing computer unit 3, and the new data is added to the new computer 1. The recording unit 2c and the existing data recording unit 3c are compared, and a new existing data comparison processing unit 20 that determines the consistency between the process data and the alarm processing result is provided.

(作用)
このように構成された監視システムの更新方法において、新設計算機1は、既設PIO装置10がネットワーク14を介して送信するプロセスデータ14aを新設計算機仮想化ソフトウェア4が受信すると、新設計算機仮想化ソフトウェア4は受信したプロセスデータ14aを仮想新設計算機部2と仮想既設計算機部3に同じデータを受け渡す。
(Function)
In the updating method of the monitoring system configured as described above, when the new computer virtualization software 4 receives the process data 14 a transmitted from the existing PIO device 10 via the network 14, the new computer 1 receives the new computer virtualization software 4. Passes the received process data 14a to the virtual newly installed computer unit 2 and the virtual existing computer unit 3.

仮想新設計算機部2では、仮想新設計算機OS2bがプロセスデータ14aを仮想新設計算機アプリケーション2aに渡す。仮想新設計算機アプリケーション2aでは、データ受信処理部2a−1でプロセスデータ14aを受信し、既設データ判定処理部2a−2で受信したデータが既設PIO装置10から送信されたプロセスデータか新設PIO装置5から送信されたプロセスデータかを判定する。   In the virtual new computer unit 2, the virtual new computer OS2b passes the process data 14a to the virtual new computer application 2a. In the virtual new computer application 2a, the data reception processing unit 2a-1 receives the process data 14a, and the data received by the existing data determination processing unit 2a-2 is the process data transmitted from the existing PIO device 10 or the new PIO device 5 It is determined whether it is process data transmitted from.

判定の結果、既設PIO装置10からのプロセスデータの場合には、新設警報処理・新設表示処理可能な新設PIO装置形式にデータ変換処理部2a−3で変換し、新設データ記録部2cに変換後のプロセスデータを記録する。続いて、新設PIO装置形式のプロセスデータは、新設警報処理部2a−4にて警報判定処理を行い、その結果を新設データ記録部2cに記録する。   As a result of the determination, in the case of process data from the existing PIO device 10, the data conversion processing unit 2a-3 converts the data into a new PIO device format capable of new alarm processing and new display processing, and after conversion to the new data recording unit 2c Record process data. Subsequently, the new PIO device format process data is subjected to an alarm determination process in the new alarm processing unit 2a-4, and the result is recorded in the new data recording unit 2c.

仮想既設計算機部3は、仮想既設計算機OS3bがプロセスデータ14aを仮想既設計算機アプリケーション3aに渡して処理を行う。仮想既設計算機アプリケーション3aでは、データ受信処理部3a−1でプロセスデータ14aを受信し、既設データ記録部3cに記録する。続いて、既設警報処理部3a−2ではプロセスデータの警報判定処理を行い、その結果を既設データ記録部3cに記録する。   In the virtual existing computer unit 3, the virtual existing computer OS 3b passes the process data 14a to the virtual existing computer application 3a for processing. In the virtual existing computer application 3a, the data reception processing unit 3a-1 receives the process data 14a and records it in the existing data recording unit 3c. Subsequently, the existing alarm processing unit 3a-2 performs process data alarm determination processing and records the result in the existing data recording unit 3c.

新設計算機1の新設既設データ比較処理部20は、仮想新設計算機部2の新設データ記録部2cと仮想既設計算機部3の既設データ記録部3cに時系列に記録されたプロセスデータと警報結果データを時刻基準で整合性の比較判定を行う。プロセスデータの比較は、一つの時間断面でプロセスデータと警報結果を比較する判定方法と連続した時刻でプロセスデータと警報結果を比較判定する方法を備えている。また、比較結果はプロセスデータ単位に一致または、不一致をレポートとして出力し、新設計算機1の更新処理の妥当性の評価を行う。   The newly installed existing data comparison processing unit 20 of the newly installed computer 1 stores the process data and the alarm result data recorded in time series in the newly installed data recording unit 2c of the newly installed virtual computer unit 2 and the existing data recording unit 3c of the newly installed virtual computer unit 3. Compare and judge consistency on a time basis. The process data comparison includes a determination method for comparing the process data and the alarm result in one time section and a method for comparing and determining the process data and the alarm result at successive times. Further, the comparison result is output as a report indicating whether or not the process data unit matches, and the validity of the update processing of the new computer 1 is evaluated.

(効果)
以上説明したように、本第2の実施形態によれば、プラント監視システムを構成する計算機を先行して更新する場合、新設計算機のプロセスデータ受信変換データ、警報処理結果と既設計算機のプロセスデータ受信データ、警報処理結果を時系列に記録したデータとを比較判定することができるため、試験エビデンス採取作業の省力化が可能になるため試験時間を大幅に短縮することができる。
また、プロセスデータ及び警報結果の変化を一定時間のパターンデータとして比較することが可能であるため、新設計算機の試験精度を向上させることができる。
(effect)
As described above, according to the second embodiment, when the computer constituting the plant monitoring system is updated in advance, the process data reception conversion data of the new computer, the alarm processing result, and the process data reception of the existing computer are received. Since data and alarm processing results can be compared and determined in time series, the labor for collecting test evidence can be saved, and the test time can be greatly shortened.
In addition, since it is possible to compare changes in process data and alarm results as pattern data for a certain period of time, it is possible to improve the test accuracy of the new computer.

[第3の実施形態]
第3の実施形態に係る監視システムの更新方法及び更新システムを図3により説明する。
(構成)
本第3の実施形態に係る更新方法では、プロセスデータを入力するPIO装置は、更新した新設PIO装置5と継続使用する既設PIO装置10があり、警報処理・表示処理等のプラント監視を行う新設計算機1で構成される。
[Third Embodiment]
A monitoring system update method and update system according to a third embodiment will be described with reference to FIG.
(Constitution)
In the update method according to the third embodiment, the PIO device that inputs process data includes the updated new PIO device 5 and the existing PIO device 10 that is continuously used, and is a new facility that performs plant monitoring such as alarm processing and display processing. Consists of a computer 1.

既設PIO装置10は、現場機器間ケーブル13を接続する既設PIOケーブル接続部11、既設PIO装置OS10b、既設PIO装置アプリケーション10aから構成され、ネットワーク14にて新設計算機1と接続されている。   The existing PIO device 10 includes an existing PIO cable connection unit 11 that connects the on-site equipment cable 13, an existing PIO device OS 10 b, and an existing PIO device application 10 a, and is connected to the new computer 1 via the network 14.

新設PIO装置5は、現場機器間ケーブル13を接続する新設PIOケーブル接続部9、仮想新設PIO部6、仮想既設PIO部7、仮想新設PIO部6と仮想既設PIO部7を新設PIO装置5で並行処理させるための新設PIO装置仮想化ソフトウェア8から構成され、ネットワーク14にて新設計算機1と接続されている。   The new PIO device 5 includes a new PIO cable connection unit 9, a virtual new PIO unit 6, a virtual existing PIO unit 7, a virtual new PIO unit 6, and a virtual existing PIO unit 7 that connect the on-site equipment cable 13. A new PIO device virtualization software 8 for performing parallel processing is connected to the new computer 1 via a network 14.

新設PIO装置5の仮想新設PIO部6は、仮想新設PIO部OS6b、仮想新設PIO部アプリケーション6aから構成される。
また、仮想既設PIO部7は、仮想既設PIO部OS7b、仮想既設PIO装置アプリケーション7aから構成され、既設PIO装置の機能をそのまま備える。
The virtual new PIO unit 6 of the new PIO device 5 includes a virtual new PIO unit OS 6b and a virtual new PIO unit application 6a.
The virtual existing PIO unit 7 includes a virtual existing PIO unit OS 7b and a virtual existing PIO device application 7a, and has the functions of the existing PIO device as they are.

新設計算機1は、既設PIO装置10のプロセスデータを最新の警報処理・表示機能を有するプラント監視機能向けのデータ変換処理を備える仮想新設計算機部2、既設計算機の既設PIO装置のプロセスデータ受信から警報処理・表示処理をそのまま備える仮想既設計算機部3、仮想新設計算機部2と仮想既設計算機部3を新設計算機1で並行処理させるための新設計算機仮想化ソフトウェア4から構成され、ネットワーク14と接続して新設PIO装置5と既設PIO装置10からプロセスデータを受信する。   The new computer 1 is a virtual new computer unit 2 having a data conversion process for the plant monitoring function having the latest alarm processing / display function for the process data of the existing PIO device 10, and an alarm from the process data reception of the existing PIO device of the existing computer A virtual existing computer unit 3 having processing / display processing as it is, a virtual new computer unit 2 and a new computer virtualization software 4 for causing the new computer 1 to process the virtual existing computer unit 3 in parallel are connected to the network 14. Process data is received from the new PIO device 5 and the existing PIO device 10.

新設計算機1の仮想新設計算機部2は、仮想新設計算機OS2b、仮想新設計算機アプリケーション2aから構成される。
また、仮想既設計算機部3は、仮想既設計算機OS3b、仮想既設計算機アプリケーション3aから構成される。
The virtual new computer unit 2 of the new computer 1 includes a virtual new computer OS 2b and a virtual new computer application 2a.
The virtual existing computer unit 3 includes a virtual existing computer OS 3b and a virtual existing computer application 3a.

(作用)
このように構成された監視システムの更新方法において、新設PIO装置5は、現場機器間ケーブル13を介して、新設PIO装置ケーブル接続部9に接続された現場機器12の入力を、新設PIO装置仮想化ソフトウェア8が受信する。新設PIO装置仮想化ソフトウェア8は現場機器12の入力を仮想新設PIO部6と仮想既設PIO部7に同じデータを受け渡す。
(Function)
In the updating method of the monitoring system configured as described above, the new PIO device 5 receives the input of the field device 12 connected to the new PIO device cable connection unit 9 via the field device cable 13, and the new PIO device virtual Software 8 receives. The new PIO device virtualization software 8 passes the same data from the field device 12 to the virtual new PIO unit 6 and the virtual existing PIO unit 7.

仮想新設PIO部6は、仮想新設PIO部OS6bが現場機器12の入力を仮想新設PIO部アプリケーション6aに渡す。仮想新設PIO部アプリケーション6aでは、データ入力処理部6a−1で現場機器12の入力を処理し、入力不良判定処理部6a−2で入力した信号が正常であるか否か判定を行い、工学値変換処理部6a−3で入力した信号を工学値に変換し、データ送信処理部6a−4でネットワーク14に送信するデータを作成する。   In the virtual new PIO unit 6, the virtual new PIO unit OS 6b passes the input of the field device 12 to the virtual new PIO unit application 6a. In the virtual new PIO unit application 6a, the data input processing unit 6a-1 processes the input of the field device 12, and the input failure determination processing unit 6a-2 determines whether or not the signal input is normal. The signal input by the conversion processing unit 6a-3 is converted into an engineering value, and data to be transmitted to the network 14 is created by the data transmission processing unit 6a-4.

仮想既設PIO部7は、仮想既設PIO部OS7bが現場機器12の入力を仮想既設PIO部アプリケーション7aに渡す。仮想既設PIO部アプリケーション7aでは、既設PIO装置のデータ入力からデータ送信までの処理をそのまま備えており、データ入力処理部7a−1で現場機器12の入力を処理し、入力不良判定処理部7a−2で入力した信号が正常であるか否か判定を行い、工学値変換処理部7a−3で入力した信号を工学値に変換し、データ送信処理部7a−4でネットワーク14に送信するデータを作成する。   In the virtual existing PIO unit 7, the virtual existing PIO unit OS 7b passes the input of the field device 12 to the virtual existing PIO unit application 7a. The virtual existing PIO unit application 7a includes the processing from data input to data transmission of the existing PIO device as it is. The data input processing unit 7a-1 processes the input of the field device 12, and the input failure determination processing unit 7a- 2 determines whether the signal input is normal, converts the signal input by the engineering value conversion processing unit 7a-3 into an engineering value, and transmits data to the network 14 by the data transmission processing unit 7a-4. create.

送信データ選択処理部30は、仮想新設PIO部6の送信データと、仮想既設PIO部7の送信データの両方を入力し、どちらのデータをネットワーク14にプロセスデータ14aとして送信するかを選択することができる。   The transmission data selection processing unit 30 inputs both the transmission data of the virtual newly installed PIO unit 6 and the transmission data of the virtual existing PIO unit 7, and selects which data is to be transmitted to the network 14 as the process data 14a. Can do.

プラント監視システムを構成する計算機を新設計算機1に更新した後に、PIO装置を更新する場合、新設PIO装置5で更新前の既設PIO装置の入力不良判定処理・工学値変換処理と更新後の入力不良判定・工学値変換処理を同時に実施し、それぞれの処理結果を得ることが可能であり、新設PIO装置と既設PIO装置のどちらのデータを新設計算機1に送信するかを選択可能としている。   When updating the PIO device after updating the computer constituting the plant monitoring system to the new computer 1, the new PIO device 5 uses the existing PIO device before the input failure determination processing / engineering value conversion processing and the input failure after the update. The determination / engineering value conversion process can be performed simultaneously to obtain the results of each process, and it is possible to select which data of the newly installed PIO device or the existing PIO device is transmitted to the newly installed computer 1.

(効果)
以上説明したように、本第3の実施形態によれば、プラント監視システムを構成する計算機を新設計算機1に更新した後に、PIO装置を更新する場合、新設PIO装置で更新後のPIO装置の入力不良判定・工学値変換処理結果と、更新前のPIO装置の入力不良判定・工学値変換処理結果が同時に得ることが可能であるため、新設PIO装置の入力不良判定・工学値変換処理結果と既設PIO装置の処理結果との比較による確認が可能となり、計算機更新時の新設PIO装置への外線ケーブル接続から新設PIO装置の入力不良判定・工学値変換処理の試験完了までの時間を短縮することができる。
(effect)
As described above, according to the third embodiment, when the PIO device is updated after updating the computer constituting the plant monitoring system to the new computer 1, the input of the PIO device updated by the new PIO device is performed. Since it is possible to obtain the failure determination / engineering value conversion processing result and the input failure determination / engineering value conversion processing result of the PIO device before the update at the same time, the input failure determination / engineering value conversion processing result of the newly installed PIO device and the existing Confirmation by comparison with the processing result of the PIO device is possible, and the time from the connection of the external cable to the new PIO device at the time of the computer update to the completion of the test of the input failure judgment and engineering value conversion processing of the new PIO device can be shortened it can.

また、既設PIO装置の入力不良判定・工学値変換処理を備えているため、新設PIO装置の入力不良判定・工学値変換処理の試験中は、運転員は仮設既設PIO部の処理結果でプロセスデータの確認が可能となるため、プロセスデータの確認ができないのは既設PIO装置から新設PIO装置への現場機器間ケーブルの接続変更作業の間だけであり、システム停止期間を短縮することができる。   In addition, since the input failure determination / engineering value conversion process of the existing PIO device is provided, during the test of the input failure determination / engineering value conversion processing of the newly installed PIO device, the operator can process the process data by the processing result of the temporary existing PIO unit. Therefore, the process data cannot be confirmed only during the operation of changing the connection of the cable between field devices from the existing PIO device to the new PIO device, and the system stop period can be shortened.

[第4の実施形態]
第4の実施形態に係る監視システムの更新システム及び更新システムを図4により説明する。
(構成)
本第4の実施形態に係る更新ステムでは、新設PIO装置5おいて、仮想新設PIO部6に入力不良判定処理結果と工学値変換処理結果を記録する新設データ記録部6cを付加し、仮想既設PIO部7にも入力不良判定処理結果と工学値変換処理結果を記録する既設データ記録部7cを付加し、さらに新設PIO装置5に新設データ記録部6cと既設データ記録部7cとを比較し、入力不良処理結果と工学値変換処理結果の整合性を判定する新設既設データ比較処理40を備えている。
[Fourth Embodiment]
An updating system and an updating system of the monitoring system according to the fourth embodiment will be described with reference to FIG.
(Constitution)
In the update system according to the fourth embodiment, in the new PIO device 5, a new data recording unit 6c for recording the input failure determination processing result and the engineering value conversion processing result is added to the virtual new PIO unit 6, and a virtual existing PIO device 5 is added. An existing data recording unit 7c for recording the input failure determination processing result and the engineering value conversion processing result is also added to the PIO unit 7, and the new data recording unit 6c and the existing data recording unit 7c are compared with the new PIO device 5, A new existing data comparison process 40 for determining the consistency between the input failure processing result and the engineering value conversion processing result is provided.

(作用)
このように構成された監視システムの更新方法において、新設PIO装置5は、現場機器間ケーブル13を介して、新設PIO装置ケーブル接続部9に接続された現場機器12の入力を、新設PIO装置仮想化ソフトウェア8が受信する。新設PIO装置仮想化ソフトウェア8は現場機器12の入力を仮想新設PIO部6と仮想既設PIO部7に同じデータを受け渡す。
(Function)
In the updating method of the monitoring system configured as described above, the new PIO device 5 receives the input of the field device 12 connected to the new PIO device cable connection unit 9 via the field device cable 13, and the new PIO device virtual Software 8 receives. The new PIO device virtualization software 8 passes the same data from the field device 12 to the virtual new PIO unit 6 and the virtual existing PIO unit 7.

仮想新設PIO部6は、仮想新設PIO部OS6bが現場機器12の入力を仮想新設PIO部アプリケーション6aに渡す。仮想新設PIO部アプリケーション6aでは、データ入力処理部6a−1で現場機器12の入力を処理し、入力不良判定処理部6a−2で入力した信号が正常であるか否か判定を行い、新設データ記録部6cに処理結果を記録する。続いて工学値変換処理部6a−3で入力した信号を工学値に変換し、変換結果を新設データ記録部6cに記録する。   In the virtual new PIO unit 6, the virtual new PIO unit OS 6b passes the input of the field device 12 to the virtual new PIO unit application 6a. In the virtual newly installed PIO unit application 6a, the data input processing unit 6a-1 processes the input of the field device 12, determines whether or not the signal input by the input failure determination processing unit 6a-2 is normal, and sets the new data The processing result is recorded in the recording unit 6c. Subsequently, the signal input by the engineering value conversion processing unit 6a-3 is converted into an engineering value, and the conversion result is recorded in the new data recording unit 6c.

仮想既設PIO部7は、仮想既設PIO部OS7bが現場機器12の入力を仮想既設PIO部アプリケーション7aに渡す。仮想既設PIO部アプリケーション7aでは、データ入力処理部7a−1で現場機器12の入力を処理し、入力不良判定処理部7a−2で入力した信号が正常であるか否か判定を行い、新設データ記録部7cに処理結果を記録する。続いて工学値変換処理部7a−3で入力した信号を工学値に変換し、変換結果を新設データ記録部7cに記録する。   In the virtual existing PIO unit 7, the virtual existing PIO unit OS 7b passes the input of the field device 12 to the virtual existing PIO unit application 7a. In the virtual existing PIO unit application 7a, the data input processing unit 7a-1 processes the input of the field device 12 and determines whether or not the signal input by the input failure determination processing unit 7a-2 is normal. The processing result is recorded in the recording unit 7c. Subsequently, the signal input by the engineering value conversion processing unit 7a-3 is converted into an engineering value, and the conversion result is recorded in the new data recording unit 7c.

新設PIO装置5の新設既設データ比較処理部40は、仮想新設PIO部6の新設データ記録部6cと仮想既設PIO部7の既設データ記録部7cに時系列に記録された入力不良判定処理結果と工学値変換処理結果を時刻基準で整合性の比較判定を行う。プロセスデータの入力不良判定結果及び工学値変換結果の比較は、一つの時間断面でプロセスデータ単位に入力不良判定結果及び工学値変換結果を比較する判定方法と連続した時刻でプロセスデータ単位に入力不良判定結果及び工学値変換結果を比較判定する方法を備えている。また、比較結果はプロセスデータ単位に入力不良及び工学値の一致または、不一致をレポートとして出力し、新設PIO装置の更新処理の妥当性の評価を可能にする。   The new existing data comparison processing unit 40 of the new PIO device 5 includes the input failure determination processing results recorded in time series in the new data recording unit 6c of the virtual new PIO unit 6 and the existing data recording unit 7c of the virtual existing PIO unit 7. The engineering value conversion processing result is compared and judged for consistency on the basis of time. The comparison of the process data input failure judgment result and the engineering value conversion result is compared with the judgment method that compares the input failure judgment result and the engineering value conversion result in the process data unit in one time section. A method of comparing and determining the determination result and the engineering value conversion result is provided. In addition, the comparison result outputs, as a report, whether or not the input failure and the engineering value match or do not match in the process data unit, thereby enabling evaluation of the validity of the update process of the new PIO device.

(効果)
以上説明したように、本第4の実施形態によれば、プラント監視システムを構成する計算機を新設計算機1に更新した後に、PIO装置を更新する場合、新設PIO装置の入力不良判定・工学値変換処理結果と既設PIO装置の入力不良判定・工学値変換処理結果をプロセスデータ単位に時系列に記録したデータで比較判定ができるため、試験エビデンス採取作業の省力化が可能になるため試験時間を短縮することができる。
(effect)
As described above, according to the fourth embodiment, when the PIO device is updated after the computer constituting the plant monitoring system is updated to the new computer 1, input failure determination / engineering value conversion of the new PIO device is performed. Test results can be saved by comparing the processing results and the input failure determination / engineering value conversion processing results of existing PIO devices with data recorded in chronological order in process data units, thus reducing the test time. can do.

また、入力不良判定・工学値変換処理結果をプロセスデータ単位に、変化を一定時間のパターンデータとして比較することが可能であるため、新設PIO装置の試験精度が向上できる。   Further, since it is possible to compare the input defect determination / engineering value conversion processing result as pattern data for a certain time in units of process data, the test accuracy of the newly installed PIO device can be improved.

以上、本発明の実施形態を説明したが、これらの実施形態は例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、組み合わせ、置き換え、変更を行うことができる。また、これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。   As mentioned above, although embodiment of this invention was described, these embodiment is shown as an example and is not intending limiting the range of invention. These novel embodiments can be implemented in various other forms, and various omissions, combinations, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

1…新設計算機、1a…新設サーバ、1b…新設クライアント、2…仮想新設計算機部2a…仮想新設計算機アプリケーション、2b…仮想新設計算機OS、2c…新設データ記録部、3…仮想既設計算機部、3a…仮想既設計算機アプリケーション、3b…仮想既設計算機OS、3c…既設データ記録部、4…新設計算機仮想化ソフトウェア、5…新設PIO部、6…仮想新設PIO部、6a…仮想新設PIO部アプリケーション、6a−1…データ入力処理、6a−2…入力不良判定処理、6a−3…工学値変換処理、6a−4…データ送信処理、6b…仮想新設PIO部OS、7…仮想既設PIO部、7a…仮想既設PIO部アプリケーション、7a−1…データ入力処理、7a−2…入力不良判定処理、7a−3…工学値変換処理、7a−4…データ送信処理、7b…仮想既設PIO部OS、8…新設PIO装置仮想化ソフトウェア、9…新設PIO装置ケーブル接続部、10…既設PIO装置、10a…既設PIO装置アプリケーション、10b…既設PIO装置OS、11…既設PIO装置ケーブル接続部、12…現場機器、13…現場機器間ケーブル、14…ネットワーク、14a…プロセスデータ15…既設計算機、15a…既設サーバ、15b…既設クライアント、16…既設ネットワーク、17…新設ネットワーク、18…既設PIO盤、18b…端子台、18c…気設配線、19…新設PIO盤、19b…新設端子台、19c…新設配線、20…新設既設データ比較処理、30…送信データ選択処理、40…新設既設データ比較処理、50…ゲートウェイ計算機、50a…既設PIO通信手段、50b…既設PIOデータ変換手段、50c…新設計算機通信手段。   DESCRIPTION OF SYMBOLS 1 ... New computer, 1a ... New server, 1b ... New client, 2 ... Virtual new computer part 2a ... Virtual new computer application, 2b ... Virtual new computer OS, 2c ... New data recording part, 3 ... Virtual existing computer part, 3a ... Virtual existing computer application, 3b ... Virtual existing computer OS, 3c ... Existing data recording unit, 4 ... New computer virtualization software, 5 ... New PIO unit, 6 ... Virtual new PIO unit, 6a ... Virtual new PIO unit application, 6a -1 ... Data input process, 6a-2 ... Input failure determination process, 6a-3 ... Engineering value conversion process, 6a-4 ... Data transmission process, 6b ... Virtual newly installed PIO unit OS, 7 ... Virtual existing PIO unit, 7a ... Virtual existing PIO section application, 7a-1 ... data input processing, 7a-2 ... input failure determination processing, 7a-3 ... engineering value conversion processing, a-4 ... data transmission processing, 7b ... virtual existing PIO unit OS, 8 ... new PIO device virtualization software, 9 ... new PIO device cable connection unit, 10 ... existing PIO device, 10a ... existing PIO device application, 10b ... existing PIO device OS, 11 ... existing PIO device cable connection part, 12 ... field device, 13 ... cable between field devices, 14 ... network, 14a ... process data 15 ... existing computer, 15a ... existing server, 15b ... existing client, 16 ... Existing network, 17 ... New network, 18 ... Existing PIO board, 18b ... Terminal block, 18c ... Electrical wiring, 19 ... New PIO board, 19b ... New terminal block, 19c ... New wiring, 20 ... New existing data comparison processing, 30 ... Transmission data selection processing, 40 ... New existing data comparison processing, 50 ... Gateway total Machine, 50a ... existing PIO communication means, 50b ... existing PIO data converter, 50c ... new computer communication means.

Claims (7)

プラントのプロセスデータが入出力される複数のPIO装置と、前記PIO装置から入力されたプロセスデータを処理することによりプラント監視を行う計算機とを有するプラント監視システムの更新方法において、
既設計算機を、仮想既設計算機部と仮想新設計算機部を有する新設計算機に更新するステップと、
少なくとも1つの既設PIO装置を新設PIO装置に順次更新するステップと、
既設PIO装置及び/又は新設PIO装置から入力されたプロセスデータを前記仮想既設計算機部と仮想新設計算機部に送信するステップと、
前記仮想既設計算機部において既設PIO装置から入力されたプロセスデータを処理することによりプラント監視を行うステップと、
前記仮想新設計算機部において前記既設PIO装置及び新設PIO装置から入力されたプロセスデータを処理することによりプラントの監視を行うステップと、
を有することを特徴とするプラント監視システムの更新方法。
In a method for updating a plant monitoring system, comprising: a plurality of PIO devices for inputting / outputting plant process data; and a computer for performing plant monitoring by processing the process data input from the PIO devices.
Updating an existing computer to a new computer having a virtual existing computer unit and a virtual new computer unit;
Sequentially updating at least one existing PIO device to a new PIO device;
Transmitting process data input from an existing PIO device and / or a new PIO device to the virtual existing computer unit and the virtual new computer unit;
Performing plant monitoring by processing process data input from an existing PIO device in the virtual existing computer unit;
Performing a monitoring of the plant by treating process data that is input from the existing PIO device及beauty New provision PIO device in the virtual newly computing unit,
A method for updating a plant monitoring system, comprising:
前記仮想新設計算機部においてプロセスデータが既設PIO装置から入力されたプロセスデータである場合、当該プロセスデータを新設PIO装置のデータ方式に変換するステップをさらに有することを特徴とする請求項1記載のプラント監視システムの更新方法。   2. The plant according to claim 1, further comprising a step of converting the process data into a data system of the new PIO device when the process data is process data input from an existing PIO device in the virtual new computer unit. 3. How to update the monitoring system. 前記新設計算機は、前記仮想既設計算機部と仮想新設計算機部で処理されたプラント監視結果の比較試験を行うステップをさらに有することを特徴とする請求項1又は2記載のプラント監視システムの更新方法。   The method for updating a plant monitoring system according to claim 1, wherein the new computer further includes a step of performing a comparison test of the plant monitoring results processed by the virtual existing computer unit and the virtual new computer unit. プラントのプロセスデータが入出力される複数のPIO装置と、前記PIO装置から入力されたプロセスデータを処理することによりプラント監視を行う計算機とを有するプラント監視システムの更新方法において、
既設計算機を、仮想既設計算機部と仮想新設計算機部を有する新設計算機に更新するステップと、
少なくとも1つの既設PIO装置を、仮想既設PIO部と仮想新設PIO部を有する新設PIO装置に更新するステップと、
現場機器から入力されたプロセスデータを前記仮想既設PIO部と仮想新設PIO部に送信するステップと、
前記仮想既設PIO部において前記プロセスデータを処理するステップと、
前記仮想新設PIO部において前記プロセスデータを処理するステップと、
前記仮想既設PIO部と仮想新設PIO部で処理された処理結果のいずれかを選択し前記新設計算機に送信するステップと、
を有することを特徴とするプラント監視システムの更新方法。
In a method for updating a plant monitoring system, comprising: a plurality of PIO devices for inputting / outputting plant process data; and a computer for performing plant monitoring by processing the process data input from the PIO devices.
Updating an existing computer to a new computer having a virtual existing computer unit and a virtual new computer unit;
Updating at least one existing PIO device to a new PIO device having a virtual existing PIO unit and a virtual new PIO unit;
Transmitting process data input from field equipment to the virtual existing PIO unit and the virtual newly installed PIO unit;
Processing the process data in the virtual existing PIO unit;
Processing the process data in the virtual newly installed PIO unit;
Selecting any one of the processing results processed in the virtual existing PIO unit and the virtual new PIO unit and transmitting the selected result to the new computer;
A method for updating a plant monitoring system, comprising:
前記新設PIO装置は、前記仮想既設PIO部と仮想新設PIO部で処理された処理結果の比較試験を行うステップをさらに有することを特徴とする請求項4記載のプラント監視システムの更新方法。   The plant monitoring system updating method according to claim 4, wherein the new PIO device further includes a step of performing a comparison test of processing results processed by the virtual existing PIO unit and the virtual new PIO unit. プラントのプロセスデータが入出力される複数の既設PIO装置の少なくとも1つを新設PIO装置に更新し、プロセスデータを処理することによりプラント監視を行う既設計算機を新設計算機に更新するプラント監視システムの更新システムにおいて、
前記新設計算機は、前記既設PIO装置及び新設PIO装置からのプロセスデータが入力される仮想既設計算機部と仮想新設計算機部を有し、前記既設計算機部は、前記既設PIO装置からのプロセスデータを処理することによりプラント監視を行う仮想既設計算機アプリケーションを有し、前記新設計算機部は、前記既設PIO装置及び前記新設PIO装置からのプロセスデータを処理することによりプラント監視を行う仮想新設計算機アプリケーションを有することを特徴とするプラント監視システムの更新システム。
Updating a plant monitoring system that updates at least one of a plurality of existing PIO devices to / from which plant process data is input / output to a new PIO device, and updates the existing computer that performs plant monitoring by processing the process data to the new computer In the system,
The new computer has a virtual existing computer unit and a virtual new computer unit to which process data from the existing PIO device and the new PIO device are input, and the existing computer unit processes process data from the existing PIO device. A virtual existing computer application for performing plant monitoring, and the new computer unit having a virtual new computer application for performing plant monitoring by processing process data from the existing PIO device and the new PIO device. A plant monitoring system update system characterized by
プラントのプロセスデータが入出力される複数の既設PIO装置の少なくとも1つを新設PIO装置に更新し、前記プロセスデータを処理することによりプラント監視を行う既設計算機を新設計算機に更新するプラント監視システムの更新システムにおいて、
前記新設PIO装置は、現場機器からのプロセスデータが入力される仮想既設PIO部と仮想新設PIO部を有し、前記既設PIO部は前記プロセスデータを処理する仮想既設PIO部アプリケーションを有し、前記新設PIO部は前記プロセスデータを処理する仮想新設PIO部アプリケーションを有し、前記新設PIO部は前記仮想既設PIO部と仮想新設PIO部で処理された処理結果のいずれかを選択し前記新設計算機に送信する送信データ選択処理部を有することを特徴とするプラント監視システムの更新システム。
A plant monitoring system in which at least one of a plurality of existing PIO devices to which plant process data is input and output is updated to a new PIO device, and an existing computer that performs plant monitoring by processing the process data is updated to a new computer. In the update system,
The new PIO device has a virtual existing PIO unit and a virtual new PIO unit to which process data from field equipment is input, and the existing PIO unit has a virtual existing PIO unit application for processing the process data, The new PIO unit has a virtual new PIO unit application for processing the process data, and the new PIO unit selects one of the processing results processed by the virtual existing PIO unit and the virtual new PIO unit, and sends it to the new computer. An update system for a plant monitoring system, comprising a transmission data selection processing unit for transmission.
JP2011003129A 2011-01-11 2011-01-11 Method and system for updating plant monitoring system Active JP5749022B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011003129A JP5749022B2 (en) 2011-01-11 2011-01-11 Method and system for updating plant monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011003129A JP5749022B2 (en) 2011-01-11 2011-01-11 Method and system for updating plant monitoring system

Publications (2)

Publication Number Publication Date
JP2012146070A JP2012146070A (en) 2012-08-02
JP5749022B2 true JP5749022B2 (en) 2015-07-15

Family

ID=46789581

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011003129A Active JP5749022B2 (en) 2011-01-11 2011-01-11 Method and system for updating plant monitoring system

Country Status (1)

Country Link
JP (1) JP5749022B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5660082B2 (en) * 2012-07-03 2015-01-28 横河電機株式会社 Process control apparatus and system

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3595139B2 (en) * 1997-12-11 2004-12-02 Jfeスチール株式会社 Control program test run auxiliary device and control program test run method
JP2001067118A (en) * 1999-08-26 2001-03-16 Toshiba Corp Plant data management device
JP2001337715A (en) * 2000-05-29 2001-12-07 Hitachi Ltd Plant operation monitoring computer system
JP2003091310A (en) * 2001-09-17 2003-03-28 Toshiba Corp Supervisory control system
JP2004133783A (en) * 2002-10-11 2004-04-30 Yaskawa Electric Corp Method for updating main controller
JP2005267297A (en) * 2004-03-19 2005-09-29 Yaskawa Electric Corp Plc update method
JP2009064094A (en) * 2007-09-04 2009-03-26 Hitachi High-Tech Control Systems Corp Process monitor control system
JP4579307B2 (en) * 2008-04-14 2010-11-10 東芝三菱電機産業システム株式会社 Method for updating plant control device
JP5225152B2 (en) * 2009-02-26 2013-07-03 株式会社東芝 Plant monitoring system and plant monitoring method
JP5304331B2 (en) * 2009-03-05 2013-10-02 東芝三菱電機産業システム株式会社 Plant monitoring and control system transition device

Also Published As

Publication number Publication date
JP2012146070A (en) 2012-08-02

Similar Documents

Publication Publication Date Title
KR102036218B1 (en) Elevator remote maintenance support system, and elevator remote maintenance support method
JP5749022B2 (en) Method and system for updating plant monitoring system
CN111551809A (en) Synchronous whole-group automatic testing method and system for secondary system of intelligent substation
EP3335085A1 (en) Control system and method for operating a control system with real control and virtual control
JP2017182414A (en) Failure prediction device, failure prediction method, and failure prediction program
CN110506240B (en) Engineering support system, engineering support method, server device, storage medium, client device, and client program
US9274515B2 (en) Systems and methods for recording data associated with the operation of foundation fieldbus devices
Niedermaier et al. Cort: A communication robustness testbed for industrial control system components
JP2018067145A (en) Repair system, server, terminal device, repair method and program
CN115685908A (en) Electric welding machine welding monitoring method and system based on Internet of things
CN104699593A (en) Computer software diagnosis method based on UNIX operating system
US20200012272A1 (en) Playback simulation test system
CN104699572A (en) Computer hardware diagnosis method based on UNIX operating system
JP2013164656A (en) Update method of plant monitoring control system, maintenance method of plant monitoring control system and plant monitoring control system
JP4791980B2 (en) Plant monitoring and control device
CN113924532A (en) Method and system for monitoring condition of drive
CN104933523A (en) Test monitoring method for power distribution terminal
EP4273701A1 (en) A method for validating an upgraded version of wind turbine control software
JP5017315B2 (en) Device replacement method for power generation monitoring and control system
JP2009053795A (en) Production control system
CN110569047A (en) method for remotely updating human-computer interface based on detachable communication module
CN114429782A (en) Solid state disk fault diagnosis method, device, equipment and medium
JP2019045906A (en) Engineering support system, engineering support method, client device, and client program
CN112488337B (en) Intelligent auxiliary overhaul flow analysis method and system
JP7301593B2 (en) Supervisory control device and supervisory control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130719

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140326

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140422

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140620

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141125

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150414

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150513

R151 Written notification of patent or utility model registration

Ref document number: 5749022

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151