JP5718578B2 - Steel hanger - Google Patents

Steel hanger Download PDF

Info

Publication number
JP5718578B2
JP5718578B2 JP2010059343A JP2010059343A JP5718578B2 JP 5718578 B2 JP5718578 B2 JP 5718578B2 JP 2010059343 A JP2010059343 A JP 2010059343A JP 2010059343 A JP2010059343 A JP 2010059343A JP 5718578 B2 JP5718578 B2 JP 5718578B2
Authority
JP
Japan
Prior art keywords
main body
steel
pair
link
lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010059343A
Other languages
Japanese (ja)
Other versions
JP2011190082A (en
Inventor
八州男 古川
八州男 古川
中山 太一
太一 中山
博巳 深川
博巳 深川
信治 津山
信治 津山
光成 今田
光成 今田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP2010059343A priority Critical patent/JP5718578B2/en
Publication of JP2011190082A publication Critical patent/JP2011190082A/en
Application granted granted Critical
Publication of JP5718578B2 publication Critical patent/JP5718578B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

本発明は、型鋼を吊り上げて移送する作業に使用する装置に関するものである。   The present invention relates to an apparatus used for the work of lifting and transferring a steel mold.

従来、H型鋼やI型鋼などの型鋼を吊り上げて移送する場合、作業中における型鋼の滑り落ちを防止するために、型鋼の表面に吊りピースを溶接し、この吊りピースにワイヤロープを巻き掛けてクレーン等で吊り上げ、移送していた(例えば特許文献1の図1)。   Conventionally, when a steel mold such as an H-shaped steel or an I-shaped steel is lifted and transported, a hanging piece is welded to the surface of the shaped steel and a wire rope is wrapped around the hanging piece in order to prevent slippage of the shaped steel during work. It was lifted and transferred by a crane or the like (for example, FIG. 1 of Patent Document 1).

しかしながら、前記の作業では、型鋼への吊りピースの溶接と、作業終了後の吊りピースのガス切断が必要であり、余分な手間がかかるのと共に、吊りピースの型鋼表面への溶接により、型鋼の機械的性質が劣化するという問題がある。   However, in the above work, it is necessary to weld the suspension piece to the mold steel, and to cut the gas of the suspension piece after the work is completed, and it takes extra time and welding the suspension piece to the surface of the mold steel. There is a problem that the mechanical properties deteriorate.

特開平7−76486号公報JP-A-7-76486

本発明が解決しようとする問題点は、特許文献1で提案された型鋼の吊り装置を使用した作業の場合、型鋼への吊りピースの溶接と作業終了後の吊りピースのガス切断が必要であるのと共に、前記溶接により型鋼の機械的性質が劣化するという点である。   The problem to be solved by the present invention is that, in the case of work using the mold steel suspension device proposed in Patent Document 1, welding of the suspension piece to the mold steel and gas cutting of the suspension piece after completion of the work are necessary. In addition, the mechanical properties of the die steel are deteriorated by the welding.

本発明の型鋼の吊り装置は、
吊り作業の前後に余分な手間をかけず、かつ、吊り上げる型鋼の機械的性質を劣化させることがないようにするために、
クレーンにより、型鋼を両端から把持して吊り上げる装置であって、
両側部に中央に向かう長孔を設けた本体と、
この本体の、一方側部の長孔に一方のリンクの一方端部が、他方側部の長孔に他方のリンクの一方端部が、それぞれの長孔に沿う移動自在に取付けられた一対のリンクと、
これら一対のリンクの他方端部を回転自在に連結し、クレーンによる吊り上げ時にクレーンのフックに引掛けられるシャックルと、
前記本体の中央部にそれぞれの一方端部を回転自在に取付けると共に、他方端部は前記一方のリンクと他方のリンクの中央部にそれぞれ回転自在に取付けた一対の中間リンクと、
前記一対のリンクのそれぞれの一方端部に取付けられ、それぞれの長孔に沿う移動が自在な一対の可動アームと、
前記一対の中間リンクの、一方の中間リンクの他方端部と同軸に一方端部が回転自在に取付けられ、他方端部側には他方の中間リンクの他方端部の移動を案内する長孔を設けた開放レバーと、
前記本体の一方端上部に基端が回転自在に取付けられ、クレーンにより吊り上げられた時に可動アームの本体の長孔に沿う接近移動に伴い、先端側が前記基端を支点として自重により回転し、前記接近移動する一対の可動アームのうちの一方の可動アームの前記本体の一方端側に当たり板が嵌入した状態で固定されて前記一対の可動アームが互いに離れる方向に移動することを阻止する開放調整レバーと、
を備えたことを最も主要な特徴としている。
The hanging apparatus for steel mold of the present invention is
In order not to spend extra time before and after the lifting work and to prevent the mechanical properties of the steel to be lifted from deteriorating,
A device that grips and lifts the shape steel from both ends with a crane,
A body with a long hole toward the center on both sides,
One end of one link is attached to the long hole on one side of the main body, and one end of the other link is attached to the long hole on the other side so as to be movable along the respective long holes. Link,
A shackle that is rotatably connected to the other end of the pair of links, and is hooked to a crane hook when the crane is lifted;
A pair of intermediate links each having one end rotatably attached to the center of the main body and the other end rotatably attached to the center of the one link and the other link,
A pair of movable arms attached to one end of each of the pair of links and freely movable along the respective long holes;
One end of the pair of intermediate links is rotatably mounted coaxially with the other end of one of the intermediate links, and an elongated hole for guiding the movement of the other end of the other intermediate link is formed on the other end. An open lever provided,
A base end is rotatably attached to one upper end of the main body, and the tip side rotates by its own weight with the base end as a fulcrum as it moves closer along the elongated hole of the main body of the movable arm when lifted by a crane, Opening adjustment that prevents the pair of movable arms from moving away from each other by being fixed in a state in which a contact plate is fitted to one end side of the main body of one of the pair of movable arms that move close to each other. Lever,
The main feature is that it has

本発明の型鋼の吊り装置は、クレーンのフックをシャックルに引掛けて吊り上げると、一対のリンクの一方端部が本体の長孔に案内されて接近移動して一対の可動アームで型鋼を両側から挟む。その際、可動アームの移動に伴い、開放調整レバーが自重によって一方の可動アームの本体の一方端側に当たり板が嵌入して固定されるので、本体を降下させた場合でも一対の可動アームが離反移動するのを防止できる。 When the crane is hooked on the shackle and lifted, the end of the pair of links of the present invention is guided by the elongated holes of the main body and moved toward the main body from both sides. Pinch. At that time, with the movement of the movable arm, the opening control lever is fixed by fitting the contact plate at one end of one of the movable arm body by its own weight Runode, the pair of movable arms even when lowering the main body It can prevent moving away.

本発明の型鋼の吊り装置を構成する開放調整レバーを、一方の可動アームの本体の一方端側に嵌入する当り板が、レバー本体に対する取付け位置の調整が可能なように構成した場合は、型鋼の幅に応じて、レバー本体に対する当り板の取付け位置を調節すれば、複数の幅の型鋼の吊り上げに対応できる。   When the opening adjustment lever that constitutes the suspension device of the steel mold of the present invention is configured so that the contact plate that fits into one end side of the main body of one movable arm can adjust the mounting position with respect to the lever main body, By adjusting the mounting position of the contact plate with respect to the lever body in accordance with the width of the steel plate, it is possible to cope with lifting of steel plates having a plurality of widths.

また、本発明の型鋼の吊り装置を構成する開放レバーの長孔の、本体の他方端部側に凸孔部を設けた構成とした場合は、他方の中間リンクの他方端部を他方のリンクの中央部に回転自在に取付けている軸部材を前記凸孔部に差し込めば、一対のリンク、中間リンク及び可動アームを互いに離間させたままで、型鋼に着床できる。   Moreover, when it is set as the structure which provided the convex hole part in the other end part side of the main body of the long hole of the open lever which comprises the hanging apparatus of the shape steel of this invention, the other end part of the other intermediate link is made into the other link. If the shaft member rotatably attached to the center portion of the shaft is inserted into the convex hole portion, the pair of links, the intermediate link, and the movable arm can be landed on the mold steel while being separated from each other.

また、本発明の型鋼の吊り装置の本体の中央部に一方端を固定したダンパーを設け、本体の吊り上げ時に型鋼を両側から保持するように接近移動する一対の可動アームがダンパーの他方端に接触してダンパーを圧縮するようにしておけば、移送位置で下ろした際、ダンパーの付勢力によって可動アームがダンパーの他方端から離れるので、保持した型鋼を自然に開放できる。すなわち、本体の吊り上げ時に型鋼を両側から保持した後に一方のリンクと他方のリンクとの成す角度が小さくなりすぎた場合に生じる開放レバーのロック状態を防止できる。   In addition, a damper having one end fixed at the center of the main body of the die steel suspension device of the present invention is provided, and a pair of movable arms that move closer to hold the die steel from both sides when the main body is lifted contact the other end of the damper. If the damper is compressed in this way, when it is lowered at the transfer position, the movable arm is separated from the other end of the damper by the biasing force of the damper, so that the held steel can be released naturally. That is, it is possible to prevent the unlocked lever from being locked when the angle formed between one link and the other link becomes too small after the steel mold is held from both sides when the main body is lifted.

本発明では、型鋼を吊り上げて移送する作業を、その前後に余分な手間をかけず、かつ、吊り上げて移送する型鋼の機械的性質を劣化させることなく、安全に行うことができる。   In the present invention, the work of lifting and transferring the mold steel can be safely performed without extra effort before and after the work and without deteriorating the mechanical properties of the steel mold that is lifted and transferred.

本発明の型鋼の吊り装置の一例を示す斜視図である。It is a perspective view which shows an example of the hanging apparatus of the shape steel of this invention. 図1の正面図である。It is a front view of FIG. (a)〜(d)は本発明装置を用いた型鋼の吊り上げ・移送作業を、順を追って説明する図である。(A)-(d) is a figure explaining the lifting / transfer operation | work of the shape steel using this invention apparatus later on.

本発明では、作業の前後に余分な手間をかけず、かつ、型鋼の機械的性質を劣化させることがないようにするという目的を、可動アームの移動に伴い、開放調整レバーが自重によって一方の可動アームの本体の一方端側に当たり板が嵌入して固定されることで実現した。 The purpose of the present invention is to avoid the extra effort before and after the work and to prevent the mechanical properties of the steel mold from being deteriorated. per plate was realized by Rukoto is fixed fitted to one end of the body of the movable arm.

以下、図1〜図3を用いて本発明を詳細に説明する。
図1及び図2は本発明の型鋼の吊り装置の一例を示した図である。
Hereinafter, the present invention will be described in detail with reference to FIGS.
FIG.1 and FIG.2 is the figure which showed an example of the hanging apparatus of the shape steel of this invention.

図1及び図2において、1は、クレーンによって吊り上げられた際に、型鋼Aを両端から把持して吊り上げる、本発明の型鋼の吊り装置であり、以下のような構成と成されている。   1 and 2, reference numeral 1 denotes a mold steel suspension device according to the present invention, which, when lifted by a crane, grips and lifts the mold steel A from both ends, and has the following configuration.

2は本体であり、例えば2枚の横長の板状部材2aを所定の間隔を存して固定形成され、その両側部に中央に向かう長孔2b、2cを設けている。そして、この本体2の、一方側部の長孔2bに一方のリンク3aの一方端部3aaが、他方側部の長孔2cに他方のリンク3bの一方端部3baが、それぞれの長孔2b、2cに沿って移動が自在なように取付けられている。なお、4は一対のリンク3a、3bの一方端部3aa、3baを本体2の長孔2b、2cに沿う移動自在に取付ける軸部材である。   Reference numeral 2 denotes a main body. For example, two horizontally long plate-like members 2a are fixedly formed at a predetermined interval, and long holes 2b and 2c toward the center are provided on both sides thereof. In the main body 2, one end 3aa of one link 3a is inserted into the long hole 2b on one side, and one end 3ba of the other link 3b is connected to the long hole 2c on the other side, respectively. 2c is attached so as to be movable along 2c. Reference numeral 4 denotes a shaft member for movably attaching one end portions 3aa, 3ba of the pair of links 3a, 3b along the long holes 2b, 2c of the main body 2.

5は、クレーンによる吊り上げ時にクレーンのフックに引掛けられるシャックルであり、このシャックル5に、前記一対のリンク3a、3bの他方端部3ab、3bbを、軸部材6を用いて回転が自在なように連結している。   Reference numeral 5 denotes a shackle that is hooked to a crane hook when the crane is lifted, and the other end portions 3ab and 3bb of the pair of links 3a and 3b can be rotated to the shackle 5 by using a shaft member 6. It is linked to.

7a、7bは、前記本体2の中央部にそれぞれの一方端部7aa、7baを、軸部材8を介して回転自在に取付けた一対の中間リンクである。そして、それぞれの中間リンク7a、7bの他方端部7ab、7bbは、前記一方のリンク3aと他方のリンク3bの中央部に、それぞれ軸部材9を介して回転自在に取付けられている。   Reference numerals 7 a and 7 b denote a pair of intermediate links in which one end portions 7 aa and 7 ba are rotatably attached to the central portion of the main body 2 via a shaft member 8. The other end portions 7ab and 7bb of the respective intermediate links 7a and 7b are rotatably attached to the central portions of the one link 3a and the other link 3b via shaft members 9, respectively.

以上の構成により、シャックル5にクレーンのフックに引掛けて吊り上げると、一対のリンク3a、3bの一方端部3aa、3baは本体2の長孔2b、2cに案内されて、接近移動することになる。反対に、吊り上げ状態から、地上に下ろすと、一対のリンク3a、3bの一方端部3aa、3baは本体2の長孔2b、2cに案内されて、離反移動することになる。   With the configuration described above, when the shackle 5 is hooked on the crane hook and lifted, the one end portions 3aa and 3ba of the pair of links 3a and 3b are guided by the elongated holes 2b and 2c of the main body 2 and moved closer to each other. Become. On the other hand, when lowered from the lifted state to the ground, the one end portions 3aa and 3ba of the pair of links 3a and 3b are guided by the long holes 2b and 2c of the main body 2 and move away.

本発明では、前記一対のリンク3a、3bの、それぞれの一方端部3aa、3baと同軸に、一対の可動アーム10a、10bを取付け、リンク3a、3bの一方端部3aa、3baの長孔2b、2cに沿う接離移動に伴って移動するようにしている。   In the present invention, a pair of movable arms 10a and 10b are attached coaxially with the respective one end portions 3aa and 3ba of the pair of links 3a and 3b, and the long holes 2b of the one end portions 3aa and 3ba of the links 3a and 3b are attached. 2c is moved along with the contact / separation movement along 2c.

図1〜図3の例では、一対の可動アーム10a、10bは、前記移動時の安定性を確保するために、前記軸部材4と所定距離離れた位置においても、軸部材11により長孔2b、2cに取付けている。   In the example of FIGS. 1 to 3, the pair of movable arms 10 a, 10 b has a long hole 2 b formed by the shaft member 11 even at a predetermined distance from the shaft member 4 in order to ensure stability during the movement. 2c.

12は、前記一方の中間リンク7aの他方端部7abを一方のリンク3aの中央部に回転自在に取付ける軸部材9と同軸に、一方端部12aを回転自在に取付けた開放レバーである。この開放レバー12の他方端部12b側には他方の中間リンク7bの他方端部7bbを他方のリンク3bの中央部に回転自在に取付ける軸部材9の移動を案内する長孔12cを設け、この長孔12cの前記本体2の他方端部側に凸孔部12ca(図3(c)(d)参照)を設けている   Reference numeral 12 denotes an opening lever in which the other end portion 7ab of the one intermediate link 7a is coaxially connected to the shaft member 9 that is rotatably attached to the center portion of the one link 3a, and the one end portion 12a is rotatably attached. On the other end 12b side of the release lever 12, a long hole 12c for guiding the movement of the shaft member 9 for rotatably mounting the other end 7bb of the other intermediate link 7b to the center of the other link 3b is provided. A convex hole portion 12ca (see FIGS. 3C and 3D) is provided on the other end side of the main body 2 of the long hole 12c.

13は、前記本体2の一方端上部に、軸部材14を介して、基端13aを回転自在に取付けた開放調整レバーである。この開放調整レバー13は、クレーンにより吊り上げられた時に可動アーム10a、10bの接近移動に伴い、先端側13bが前記基端13aを支点として自重により回転する。そして、この回転により、前記接近移動する可動アーム10a、10bのうちの一方の可動アーム10aの本体2の一方端側に嵌入する。   Reference numeral 13 denotes an opening adjustment lever in which a base end 13 a is rotatably attached to the upper end of one end of the main body 2 via a shaft member 14. When the movable arm 10a, 10b is moved close to the opening adjustment lever 13 by the crane, the distal end side 13b rotates by its own weight with the base end 13a as a fulcrum. And by this rotation, it inserts in the one end side of the main body 2 of one movable arm 10a of the movable arms 10a, 10b that move closer.

図1〜図3の例では、この開放調整レバー13として、一方の可動アーム10aの本体2の一方端側に嵌入する当り板13cの、レバー本体13dに対する取付け位置の調整が可能なように構成したものを示している。   In the example of FIGS. 1 to 3, the opening adjustment lever 13 is configured such that the attachment position of the contact plate 13 c fitted into one end side of the main body 2 of one movable arm 10 a with respect to the lever main body 13 d can be adjusted. Shows what you did.

この取付け位置を調整する構成として、図1〜図3では、レバー本体13dに所定のピッチで多数の孔13daを設ける一方、当り板13cには前記孔13daの整数倍の間隔を有した2個の取付け用孔を設けたものを示している。この構成では、これら取付け用孔を何れかの孔13daに一致させてボルト13eで固定することで取付け位置の調整が行える。   As a configuration for adjusting the mounting position, in FIGS. 1 to 3, the lever main body 13d is provided with a large number of holes 13da at a predetermined pitch, while the contact plate 13c is provided with two pieces having an interval that is an integral multiple of the holes 13da. The thing provided with the mounting hole is shown. In this configuration, the mounting position can be adjusted by aligning these mounting holes with any of the holes 13da and fixing them with the bolts 13e.

15は、本発明の型鋼の吊り装置1を吊り上げた際に、水平状態に維持するため、本体2の他方側に取り付けたバランスウェイトであり、前記開放調整レバー13と同じ重量を有している。   Reference numeral 15 denotes a balance weight attached to the other side of the main body 2 in order to maintain a horizontal state when the steel steel suspension device 1 of the present invention is lifted, and has the same weight as the opening adjustment lever 13. .

ところで、上記構成の本発明の型鋼の吊り装置1では、型鋼Aを吊り上げた後、一方のリンク3aと他方のリンク3bとの角度が大きい(例えば35°以上)場合は、移送位置に降ろした際に保持した型鋼Aを自然に開放することができる。しかしながら、前記角度が小さくなりすぎた(例えば35°未満)場合は、開放レバー12がロック状態となって保持した型鋼Aを自然に開放することができない。   By the way, in the type steel suspension device 1 of the present invention having the above-described configuration, after the type steel A is lifted, when the angle between one link 3a and the other link 3b is large (for example, 35 ° or more), it is lowered to the transfer position. The steel plate A held at the time can be released naturally. However, if the angle is too small (for example, less than 35 °), the steel plate A held by the release lever 12 in a locked state cannot be released naturally.

そこで、図1〜図3の例では、本体2の中央部にダンパー16の一方端を固定し、本体2の吊り上げ時にリンク3a、3bの角度が小さくなりすぎる場合は、移動してくる可動アーム10bがダンパー16の他方端に接触してダンパー16を圧縮するようにしている。この場合、移送位置に降ろした際には、ダンパー16の付勢力によって可動アーム10bがタンパー16の他方端から離れることになる。   Therefore, in the example of FIGS. 1 to 3, if one end of the damper 16 is fixed to the center of the main body 2 and the angle of the links 3 a and 3 b becomes too small when the main body 2 is lifted, the movable arm moves. 10 b contacts the other end of the damper 16 to compress the damper 16. In this case, when lowered to the transfer position, the movable arm 10 b is separated from the other end of the tamper 16 by the biasing force of the damper 16.

上記構成の型鋼の吊り装置1では、以下のように型鋼Aの吊り上げ作業を行う。
・型鋼Aの保持前:図3(a)
先ず、開放レバー12の凸孔部12caに軸部材9を位置させた状態で、クレーンのフックをシャックル5に引掛けて吊り上げる。この際、吊り上げ前の開放調整レバー13の当り板13cは、可動アーム10aの上面に載った状態である。また、当り板13cの位置は吊り上げる型鋼Aの幅に応じて調整されている。
In the mold steel lifting device 1 having the above-described configuration, the lifting work of the mold steel A is performed as follows.
・ Before holding steel mold A: FIG. 3 (a)
First, in a state where the shaft member 9 is positioned in the convex hole portion 12 ca of the release lever 12, the crane hook is hooked on the shackle 5 and lifted. At this time, the contact plate 13c of the opening adjustment lever 13 before lifting is in a state of being placed on the upper surface of the movable arm 10a. Further, the position of the contact plate 13c is adjusted according to the width of the steel plate A to be lifted.

・型鋼Aの保持作業:図3(b)
前記状態で、本体2を型鋼Aまで移動し、型鋼Aに着床させる。着床後は、開放レバー12を持ち上げて、凸孔部12caに位置している軸部材9を長孔12cに沿って移動が自在となるようにする。
-Holding work of the shape steel A: FIG. 3 (b)
In the state described above, the main body 2 is moved to the steel mold A and is placed on the steel mold A. After landing, the release lever 12 is lifted so that the shaft member 9 positioned in the convex hole portion 12ca can move freely along the long hole 12c.

この状態でクレーンによりシャックル5を吊り上げると、一対の可動アーム10a、10bが本体2の長孔2b、2cに案内されて接近移動し、型鋼Aを両側から保持する。同時に、開放調整レバー13の当り板13cが開放調整レバー13の重力によって自動的に回動し、一方の可動アーム10aの本体2の一方端側に嵌入する。   When the shackle 5 is lifted by the crane in this state, the pair of movable arms 10a and 10b are guided and moved toward the long holes 2b and 2c of the main body 2 to hold the steel mold A from both sides. At the same time, the contact plate 13c of the opening adjustment lever 13 automatically rotates due to the gravity of the opening adjustment lever 13, and is fitted into one end side of the main body 2 of one movable arm 10a.

このように、本発明では、作業員が開放調整レバー13を嵌入操作する必要はないが、型鋼Aの抜け落ちを防止するために、作業員が目視確認を行うことが望ましい。   As described above, in the present invention, it is not necessary for the worker to insert the release adjusting lever 13, but in order to prevent the steel plate A from falling off, it is desirable for the worker to visually check.

・型鋼Aの保持完了及び移送:図3(c)
型鋼Aをその両側から保持した状態から、さらにシャックル5を吊り上げ、本体2を吊り上げる。この吊り上げ作業中に、本体2を降下させても、開放調整レバー13の当り板13cが一方の可動アーム10aの本体2の一方端側に嵌入した状態で固定されているので、一対の可動アーム10a、10bが互いに離れることはない。
・ Completion and transfer of steel mold A: Fig. 3 (c)
The shackle 5 is further lifted from the state in which the mold steel A is held from both sides, and the main body 2 is lifted. Even if the main body 2 is lowered during the lifting operation, the contact plate 13c of the opening adjustment lever 13 is fixed in a state of being fitted to one end side of the main body 2 of the one movable arm 10a. 10a and 10b do not leave each other.

・移送完了後の型鋼Aの開放:図3(d)
吊り上げ作業の終了後、シャックル5の引張り力により、一対の可動アーム10a、10b、一対のリンク3a、3b及び一対の中間リンク7a、7bがそれぞれ互いに接近すると、長孔2b、2cに沿って軸部材9を移動させる力が拘束されて、開放レバー12がロック状態となる。
-Opening of steel mold A after completion of transfer: Fig. 3 (d)
When the pair of movable arms 10a and 10b, the pair of links 3a and 3b, and the pair of intermediate links 7a and 7b come close to each other by the pulling force of the shackle 5 after the lifting work is finished, the shafts are moved along the long holes 2b and 2c. The force for moving the member 9 is restrained, and the release lever 12 is locked.

その際、吊り上げ時に両リンク3a、3bの成す角度が例えば35°以上の場合は、作業員が開放調整レバー13を開放状態にすれば、開放レバー12はロック状態から自然に解放される(可動アーム10a、10bは自然に開放されている)ので、作業員が軸部材9を開放レバー12の凸孔部12caに位置させる。   At that time, when the angle formed by the two links 3a and 3b is 35 ° or more, for example, when the operator opens the release adjusting lever 13, the release lever 12 is naturally released from the locked state (movable). Since the arms 10 a and 10 b are naturally opened), the worker positions the shaft member 9 in the convex hole portion 12 ca of the release lever 12.

一方、吊り上げ時に両リンク3a、3bの成す角度が例えば35°未満の場合は、作業員が開放調整レバー13を開放状態にすると同時に、圧縮状態のダンパー16の付勢力により、可動アーム10bがダンパー16の他方端部から離されて、開放レバー12がロック状態から解放される。従って、これに続いて、作業員が軸部材9を開放レバー12の凸孔部12caに位置させる。   On the other hand, when the angle formed by the two links 3a and 3b is less than 35 °, for example, when the operator opens the release adjusting lever 13 and the urging force of the compressed damper 16 causes the movable arm 10b to move to the damper. The release lever 12 is released from the locked state by being separated from the other end of 16. Therefore, following this, the worker places the shaft member 9 in the convex hole portion 12 ca of the release lever 12.

最後に、本発明の吊り装置1を型鋼Aから離して、他の型鋼Aの吊り上げ作業に移る。   Finally, the suspension device 1 of the present invention is moved away from the mold steel A, and the operation of lifting another mold steel A is started.

以上説明したように、本発明の型鋼の吊り装置1では、吊りピースを型鋼Aに溶接することなく、型鋼Aの幅に応じて確実に保持して移送することができる。   As described above, in the mold steel suspension device 1 of the present invention, the suspension piece can be reliably held and transferred according to the width of the mold steel A without welding the suspension piece to the mold steel A.

本発明は、上記の例に限るものではなく、各請求項に記載の技術的思想の範疇において、適宜実施の形態を変更しても良いことは言うまでもない。   The present invention is not limited to the above examples, and it goes without saying that the embodiments may be appropriately changed within the scope of the technical idea described in each claim.

例えば、当り板13cの、レバー本体13dに対する取付け位置の調整構造は、図1〜図3に示す構造でなくても良い。また、可動アーム10a、10bの接離移動が安定して行えるものであれば、図1〜図3に示す構成でなくても良い。   For example, the adjustment structure of the attachment position of the contact plate 13c with respect to the lever main body 13d may not be the structure shown in FIGS. Moreover, the structure shown in FIGS. 1 to 3 is not necessary as long as the movable arms 10a and 10b can stably move toward and away from each other.

A 型鋼
1 型鋼の吊り装置
2 本体
2b 一方の長孔
2c 他方の長孔
3a 一方のリンク
3aa 一方端部
3ab 他方端部
3b 他方のリンク
3ba 一方端部
3bb 他方端部
5 シャックル
7a 一方の中間リンク
7aa 一方端部
7ab 他方端部
7b 他方の中間リンク
7ba 一方端部
7bb 他方端部
10a 一方の可動アーム
10b 他方の可動アーム
12 開放レバー
12a 一方端部
12b 他方端部
12c 長孔
12ca 凸孔部
13 開放調整レバー
13a 基端
13b 先端側
13c 当り板
13d レバー本体
13da 孔
13e ボルト
16 ダンパー
A type steel 1 type steel suspension device 2 main body 2b one long hole 2c other long hole 3a one link 3aa one end 3ab other end 3b other link 3ba one end 3bb other end 5 shackle 7a one intermediate link 7aa One end 7ab The other end 7b The other intermediate link 7ba One end 7bb The other end 10a One movable arm 10b The other movable arm 12 Release lever 12a One end 12b The other end 12c Long hole 12ca Convex hole 13 Opening adjustment lever 13a Base end 13b Tip side 13c Contact plate 13d Lever body 13da Hole 13e Bolt 16 Damper

Claims (4)

クレーンにより、型鋼を両端から把持して吊り上げる装置であって、
両側部に中央に向かう長孔を設けた本体と、
この本体の、一方側部の長孔に一方のリンクの一方端部が、他方側部の長孔に他方のリンクの一方端部が、それぞれの長孔に沿う移動自在に取付けられた一対のリンクと、
これら一対のリンクの他方端部を回転自在に連結し、クレーンによる吊り上げ時にクレーンのフックに引掛けられるシャックルと、
前記本体の中央部にそれぞれの一方端部を回転自在に取付けると共に、他方端部は前記一方のリンクと他方のリンクの中央部にそれぞれ回転自在に取付けた一対の中間リンクと、
前記一対のリンクのそれぞれの一方端部に取付けられ、それぞれの長孔に沿う移動が自在な一対の可動アームと、
前記一対の中間リンクの、一方の中間リンクの他方端部と同軸に一方端部が回転自在に取付けられ、他方端部側には他方の中間リンクの他方端部の移動を案内する長孔を設けた開放レバーと、
前記本体の一方端上部に基端が回転自在に取付けられ、クレーンにより吊り上げられた時に可動アームの本体の長孔に沿う接近移動に伴い、先端側が前記基端を支点として自重により回転し、前記接近移動する一対の可動アームのうちの一方の可動アームの前記本体の一方端側に当たり板が嵌入した状態で固定されて前記一対の可動アームが互いに離れる方向に移動することを阻止する開放調整レバーと、
を備えたことを特徴とする型鋼の吊り装置。
A device that grips and lifts the shape steel from both ends with a crane,
A body with a long hole toward the center on both sides,
One end of one link is attached to the long hole on one side of the main body, and one end of the other link is attached to the long hole on the other side so as to be movable along the respective long holes. Link,
A shackle that is rotatably connected to the other end of the pair of links, and is hooked to a crane hook when the crane is lifted;
A pair of intermediate links each having one end rotatably attached to the center of the main body and the other end rotatably attached to the center of the one link and the other link,
A pair of movable arms attached to one end of each of the pair of links and freely movable along the respective long holes;
One end of the pair of intermediate links is rotatably mounted coaxially with the other end of one of the intermediate links, and an elongated hole for guiding the movement of the other end of the other intermediate link is formed on the other end. An open lever provided,
A base end is rotatably attached to one upper end of the main body, and the tip side rotates by its own weight with the base end as a fulcrum as it moves closer along the elongated hole of the main body of the movable arm when lifted by a crane, Opening adjustment that prevents the pair of movable arms from moving away from each other by being fixed in a state in which a contact plate is fitted to one end side of the main body of one of the pair of movable arms that move close to each other. Lever,
A mold steel suspension device characterized by comprising:
前記開放調整レバーは、
前記一方の可動アームの前記本体の一方端側に嵌入する当り板が、レバー本体に対する取付け位置の調整が可能なように構成されたものであることを特徴とする請求項1に記載の型鋼の吊り装置。
The opening adjustment lever is
2. The die steel according to claim 1, wherein a contact plate that is fitted to one end side of the main body of the one movable arm is configured to be capable of adjusting an attachment position with respect to the lever main body. Hanging device.
前記開放レバーは、
長孔の前記本体の他方端部側に凸孔部を設けていることを特徴とする請求項1又は2に記載の型鋼の吊り装置。
The release lever is
3. The steel hanger suspension device according to claim 1, wherein a convex hole portion is provided on the other end portion side of the main body of the long hole.
前記本体の中央部に一方端が固定されたダンパーを設けたことを特徴とする請求項1〜3の何れかに記載の型鋼の吊り装置。   The suspension device for a steel pattern according to any one of claims 1 to 3, wherein a damper having one end fixed to a central portion of the main body is provided.
JP2010059343A 2010-03-16 2010-03-16 Steel hanger Active JP5718578B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010059343A JP5718578B2 (en) 2010-03-16 2010-03-16 Steel hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010059343A JP5718578B2 (en) 2010-03-16 2010-03-16 Steel hanger

Publications (2)

Publication Number Publication Date
JP2011190082A JP2011190082A (en) 2011-09-29
JP5718578B2 true JP5718578B2 (en) 2015-05-13

Family

ID=44795408

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010059343A Active JP5718578B2 (en) 2010-03-16 2010-03-16 Steel hanger

Country Status (1)

Country Link
JP (1) JP5718578B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451401A (en) * 2019-07-30 2019-11-15 中国一冶集团有限公司 A kind of fixture and its application method of handling installation kerbstone

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108545595A (en) * 2018-06-30 2018-09-18 德清县荣昌冷轧带钢有限公司 A kind of cold-strip steel lifting device
CN112938747A (en) * 2021-03-22 2021-06-11 宝武集团马钢轨交材料科技有限公司 Lifting appliance and lifting method of elastic wheel flange
CN113336086A (en) * 2021-06-18 2021-09-03 沈阳汇博热能设备有限公司 Special lifting appliance for thin-wall cylindrical component

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4885364U (en) * 1972-01-20 1973-10-17
JPS5753848Y2 (en) * 1976-05-28 1982-11-22
JPH06247679A (en) * 1993-02-26 1994-09-06 Nkk Corp Hoisting accessory for bulb plate
JP2902589B2 (en) * 1996-04-15 1999-06-07 株式会社酒井鉄工所 Hanging clamp
JP2006312530A (en) * 2005-05-09 2006-11-16 Toyota Motor Corp Suspending tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110451401A (en) * 2019-07-30 2019-11-15 中国一冶集团有限公司 A kind of fixture and its application method of handling installation kerbstone

Also Published As

Publication number Publication date
JP2011190082A (en) 2011-09-29

Similar Documents

Publication Publication Date Title
JP5718578B2 (en) Steel hanger
US7093729B2 (en) Ballasting device for a crane
JP2019502855A (en) Wind turbine blade transport frame
JP5426854B2 (en) C-shaped hook coil fall prevention device
CN201703976U (en) Thick steel pipe suspender
JP2902589B2 (en) Hanging clamp
JP4030022B1 (en) Hanging jig
US3155416A (en) Automatic leveling device for tongs
CN2923640Y (en) Clamping device capable of automatically unlocking and locking tightly
JP2008280814A (en) Apparatus for opening and closing metal lid of manhole
JP2015151259A (en) Suspender
JP6545049B2 (en) Suspension clamp in concrete
JP4089773B2 (en) Yamagata Steel Hanger
SA07280730B1 (en) A Carbon Block Stacking Crane
JP5528602B2 (en) C-shaped hook coil fall prevention device
CN108161964B (en) Automatic gripping apparatus device and intelligent truss robot with same
JP2018048007A (en) Hoisting accessory for steel plate
JP6482339B2 (en) Nipping and lifting device
JP2008273651A (en) Cargo suspending device
JP2007308289A (en) Block lifting method and device
JP5473357B2 (en) Coil suspension equipment
JPH10157969A (en) Hoisting accessory
KR20130073478A (en) Manually operated chain hoist block equipped with all-around measure thing hook
JP4795865B2 (en) Concrete block suspension
JPH0912263A (en) Roll lifter

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140121

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20140902

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141128

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20141128

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20141224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150224

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150319

R150 Certificate of patent or registration of utility model

Ref document number: 5718578

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250