JP5699422B2 - Post-installed anchor for preventing handrails from falling - Google Patents
Post-installed anchor for preventing handrails from falling Download PDFInfo
- Publication number
- JP5699422B2 JP5699422B2 JP2009164212A JP2009164212A JP5699422B2 JP 5699422 B2 JP5699422 B2 JP 5699422B2 JP 2009164212 A JP2009164212 A JP 2009164212A JP 2009164212 A JP2009164212 A JP 2009164212A JP 5699422 B2 JP5699422 B2 JP 5699422B2
- Authority
- JP
- Japan
- Prior art keywords
- handrail
- post
- handrails
- preventing
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Description
本発明はコンクリート建築物のバルコニーや廊下、屋上、階段等に設置する墜落防止手摺に関するものであるThe present invention relates to a fall-preventing handrail installed on a balcony, corridor, rooftop, stairs, etc. of a concrete building.
現在マンション等、建設現場におけるアルミ製墜落防止手摺の取り付け工法はコンクリート躯体面にハンマードリル又はダイヤモンドコアドリル等で穿孔し手摺支柱の足元部をエポキシ系接着材で固定する後付け工法が主流となってきている。At present, the installation method of aluminum fall-preventing handrails at construction sites such as condominiums is mainly the post-installation method in which holes are drilled in the concrete body surface with a hammer drill or diamond core drill and the foot of the handrail post is fixed with epoxy adhesive. Yes.
墜落防止手摺における重要な性能に耐水平荷重があるが、手摺の耐水平荷重性能を向上させるにはコンクリート躯体部分に埋め込まれる手摺支柱足元部分の断面性能を上げる必要がある。しかしながら性能向上の為の支柱断面積の増加はコンクリート躯体に対し大きく深い穴を穿孔しなければならないことを意味し手摺を施工する取り付け職人にはかなりの重労働となった。また躯体内部の配筋(鉄筋)との干渉も避けがたく生じてきた。An important performance of the fall-preventing handrail is the horizontal load resistance. In order to improve the horizontal load resistance of the handrail, it is necessary to improve the cross-sectional performance of the handrail strut foot portion embedded in the concrete frame portion. However, the increase in the cross-sectional area of the column for improving performance means that a large and deep hole must be drilled in the concrete frame, and it has become a considerable labor for the craftsman who installs the handrail. In addition, it has been difficult to avoid interference with the reinforcing bars (rebars) inside the frame.
上記課題を解決する為に図1の様な構造の支柱補強芯材を用意する。
鋼管の端部に溶接固定されている平鋼及び丸鋼部分がコンクリート躯体内部に埋設され接着される。この構造の鋼管を支柱補強芯材として用いアルミ手摺の支柱を差込みビス止め固定し立設させる。In order to solve the above problems, a strut reinforcing core material having a structure as shown in FIG.
Flat steel and round steel parts welded and fixed to the end of the steel pipe are buried and bonded inside the concrete frame. A steel pipe having this structure is used as a reinforcing column for the supporting column, and a supporting column of an aluminum handrail is inserted and fixed with a screw to stand upright.
この支柱補強芯材を用いることによりダイヤモンドコアドリル等による大きな径の穴を穿孔する必要がなくなった。躯体内部に埋設される部分を平鋼等にして極力断面係数を大きくとり手摺の耐水平荷重性能を向上させることができた。By using this strut-reinforced core material, there is no need to drill a large-diameter hole with a diamond core drill or the like. The horizontal load resistance of the handrail was improved by increasing the section modulus as much as possible by using flat steel or the like for the part embedded in the frame.
本発明の実施例を図面に従って説明する。手摺施工図に従い躯体中央付近に手摺通り芯を出し、支柱位置ごとに穿孔用穴の墨出しを行う(図2)。ハンマードリルに適当な径のドリルビットを付け、内部の配筋からのかぶり厚さ分約40〜50ミリ程度の孔を3ヶ所あける(図3)。次に穿孔した孔を崩して支柱補強材のアンカー部分が入るように大きくする(図4)。更に躯体内部の配筋と干渉しない位置にて深い穿孔をして支柱補強材のアンカー部分が入るようにする(図5)。丸鋼部分が平鋼部に比べ長くしてあるのは配筋(鉄筋)との干渉を避け必要な埋め込み深さをとる為である。配筋との干渉を避ける例(図6)。Embodiments of the present invention will be described with reference to the drawings. In accordance with the handrail construction drawing, the center of the handrail is placed near the center of the frame, and the holes for drilling are marked at each column position (Fig. 2). A drill bit of an appropriate diameter is attached to the hammer drill, and three holes with a cover thickness of about 40 to 50 mm from the internal reinforcement are drilled (Fig. 3). Next, the perforated hole is broken and enlarged so that the anchor portion of the strut reinforcement is inserted (FIG. 4). Furthermore, deep drilling is performed at a position where it does not interfere with the bar arrangement inside the frame so that the anchor portion of the column reinforcing material is inserted (FIG. 5). The reason why the round steel part is longer than the flat steel part is to avoid the interference with the reinforcing bars (reinforcing bars) and to obtain the necessary embedding depth. Example of avoiding interference with the bar arrangement (FIG. 6).
この様にして穿孔した孔に支柱補強材(図1)を立てておき(図7)、アルミ手摺本体の支柱角パイプ部を差し込んでジョイントしていく(図8)。次にくさび(図9のC)をアルミ手摺支柱と躯体上面の間に入れレベル調整と水平出し、仮固定用の控え柱(図9のD)による垂直出し後インパクトドライバーで支柱補強材にアルミ手摺本体をビス止め固定し一体にする(図9のB)。手摺支柱の足元の隙間よりエポキシ系接着剤を注入し手摺の本固定を行う(図10のG)。接着剤の硬化を確認したら仮固定用の控え柱を撤去し施工を終える。A column reinforcing material (FIG. 1) is erected in the hole thus drilled (FIG. 7), and the column corner pipe portion of the aluminum handrail body is inserted and jointed (FIG. 8). Next, insert the wedge (C in Fig. 9) between the aluminum handrail column and the upper surface of the frame and adjust the level and level it out. The handrail body is fixed with screws and integrated (B in FIG. 9). An epoxy adhesive is injected from the gap between the feet of the handrail struts, and the handrail is finally fixed (G in FIG. 10). When it is confirmed that the adhesive has hardened, the temporary fixing post is removed and the construction is completed.
1 42.7φ×2.3鋼管
2 FB−12×25
3 12φ丸鋼
W 支柱スパンの寸法
A 手摺の通り芯墨
B 手摺本体と支柱補強アンカーとを固定するビス
C レベル調整用のくさび
D 仮固定用の控え柱
E 控え柱の固定用アンカー1 42.7φ × 2.3 Steel pipe 2 FB-12 × 25
3 12φ round steel W Strut span dimension A Handrail core B Screw C to fix the handrail body and strut reinforcement anchor C Level adjustment wedge D Temporary fixing conservative column E Conservative column fixing anchor
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009164212A JP5699422B2 (en) | 2009-06-22 | 2009-06-22 | Post-installed anchor for preventing handrails from falling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009164212A JP5699422B2 (en) | 2009-06-22 | 2009-06-22 | Post-installed anchor for preventing handrails from falling |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2011001806A JP2011001806A (en) | 2011-01-06 |
JP5699422B2 true JP5699422B2 (en) | 2015-04-08 |
Family
ID=43559979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009164212A Expired - Fee Related JP5699422B2 (en) | 2009-06-22 | 2009-06-22 | Post-installed anchor for preventing handrails from falling |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5699422B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5844989B2 (en) * | 2011-04-05 | 2016-01-20 | ビニフレーム工業株式会社 | handrail |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01154951A (en) * | 1987-12-11 | 1989-06-16 | Naka Tech Lab | Erection structure of handrail strut |
JP3002859B2 (en) * | 1995-09-08 | 2000-01-24 | 白水興産株式会社 | Handrail mounting method |
JPH11270092A (en) * | 1998-03-25 | 1999-10-05 | San Rail:Kk | Attaching method for handrail |
JP2005133328A (en) * | 2003-10-28 | 2005-05-26 | Oobaru:Kk | Mounting structure of handrail support for balcony |
JP2006045842A (en) * | 2004-08-03 | 2006-02-16 | Hakusui Kosan Kk | Handrail support structure |
JP4155953B2 (en) * | 2004-08-25 | 2008-09-24 | 白水興産株式会社 | Handrail support structure |
JP2008174923A (en) * | 2007-01-17 | 2008-07-31 | Hakusui Kosan Kk | Fixing structure of support leg for floor slab |
JP4344765B2 (en) * | 2007-10-24 | 2009-10-14 | 株式会社エーアンドシーエンジニアリング | Handrail attachment device and handrail attachment method |
-
2009
- 2009-06-22 JP JP2009164212A patent/JP5699422B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2011001806A (en) | 2011-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7677522B2 (en) | Support bracket for a column | |
JP2009127231A5 (en) | ||
JP2018135678A (en) | Support column installation structure and guard fence | |
JP5725596B2 (en) | Staircase structure and its construction method | |
JP5699422B2 (en) | Post-installed anchor for preventing handrails from falling | |
KR101138499B1 (en) | Method for Head Setting of Micro-Pile and Apparatus for the Same | |
JP2006299660A (en) | Temporary receiving construction method and temporary receiving structure | |
KR200408589Y1 (en) | A substructure of post for fence | |
JP2007177559A (en) | Method for mounting handrail and its mounting structure | |
KR100763406B1 (en) | A post for fence | |
JP6923463B2 (en) | How to install precast concrete gutters and precast concrete gutters | |
CN106013568A (en) | Cast-in-place floor structure based on detachable positioning control component and construction method | |
JP3827907B2 (en) | Solid foundation construction method | |
JPH07331830A (en) | Handrail mounting method and mounting device in concrete building | |
JP3002859B2 (en) | Handrail mounting method | |
CN220058432U (en) | Mounting structure of masonry wall prefabricated part | |
JP2006138143A (en) | Block and fixing method therefor | |
KR100586487B1 (en) | The foundation instrument for a railing's pole | |
KR102154778B1 (en) | Finishing materials construction method and mounting structure for seismic reinforcement of building external structure | |
JP4155953B2 (en) | Handrail support structure | |
JP4247175B2 (en) | Seismic reinforcement structure for existing buildings | |
JP4903503B2 (en) | Seismic retrofit method | |
JP2719648B2 (en) | Pillar foundation structure and pillar pier foundation method | |
JP2010037782A (en) | Apparatus for imparting earthquake resistance to existing house | |
KR100571568B1 (en) | The veranda construction method and a cast that can easily found a railing's pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120530 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130624 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130702 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130718 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140311 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140410 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20141014 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20141006 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20141108 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20150120 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20150202 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5699422 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
LAPS | Cancellation because of no payment of annual fees |