- JP5641083B2 JP5641083B2 JP2013052439A JP2013052439A JP5641083B2 JP 5641083 B2 JP5641083 B2 JP 5641083B2 JP 2013052439 A JP2013052439 A JP 2013052439A JP 2013052439 A JP2013052439 A JP 2013052439A JP 5641083 B2 JP5641083 B2 JP 5641083B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- power control
- amount
- target
- reception
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/221—General power management systems
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Description
Claims (8)
- 複数の電力制御モードそれぞれに対して割合を設定する設定部と、
複数の前記電力制御モードそれぞれにおいて目標となり日によって異なる送受電電力量から、前記割合に従って、実際に電力制御を実行する際の目標となる目標送受電電力量を算出する目標算出部と、
前記目標送受電電力量に沿って電力制御を行う電力制御処理部と
を備える電力制御装置。 - 前記目標算出部は、前記設定部により設定される前記割合で、複数の前記電力制御モードそれぞれにおいて目標となる送受電電力量を加重平均することにより、前記目標送受電電力量を算出する
請求項1に記載の電力制御装置。 - 再生可能エネルギーを利用して発電を行う発電部において発電される発電電力、および、電力を消費する負荷に供給される需要電力を計測する電力計測部と、
過去の前記発電電力量および前記需要電力量の実績が蓄積された蓄積データに基づいて、前記発電部により発電されると予測される予測発電電力量、および、前記負荷による需要が発生すると予測される予測需要電力量を求める電力予測部と
をさらに備え、
前記電力予測部は、予測した前記予測発電電力量および前記予測需要電力量から予測送受電電力量を算出し、前記予測送受電電力量に従って、複数の前記電力制御モードそれぞれにおいて目標となる送受電電力量を設定する
請求項1に記載の電力制御装置。 - ユーザにより操作される操作端末をさらに備え、
前記設定部は、前記操作端末が有する表示部に、複数の前記電力制御モードそれぞれに指定される割合を表示し、ユーザにより、所定の前記電力制御モードに対する前記割合の増加または減少が指定されたとき、他の前記電力制御モードに対する前記割合を変化させる
請求項1に記載の電力制御装置。 - 前記設定部は、予め設定された所定数の質問内容をユーザに提示し、それらの質問内容に対する回答に従って、複数の電力制御モードに対する割合を設定する
請求項1に記載の電力制御装置。 - 複数の電力制御モードそれぞれに対して割合を設定し、
複数の前記電力制御モードそれぞれにおいて目標となり日によって異なる送受電電力量から、前記割合に従って、実際に電力制御を実行する際の目標となる目標送受電電力量を算出し、
前記目標送受電電力に沿って電力制御を行う
ステップを含む電力制御方法。 - 複数の電力制御モードそれぞれに対して割合を設定し、
複数の前記電力制御モードそれぞれにおいて目標となり日によって異なる送受電電力量から、前記割合に従って、実際に電力制御を実行する際の目標となる目標送受電電力量を算出し、
前記目標送受電電力に沿って電力制御を行う
ステップを含む電力制御処理をコンピュータに実行させるプログラム。 - 再生可能エネルギーを利用して発電を行う発電部、および、電力を消費する負荷が接続される電力制御システムにおいて、
複数の電力制御モードそれぞれに対して割合を設定する設定部と、
複数の前記電力制御モードそれぞれにおいて目標となり日によって異なる送受電電力量から、前記割合に従って、実際に電力制御を実行する際の目標となる目標送受電電力量を算出する目標算出部と、
前記目標送受電電力量に沿って電力制御を行う電力制御処理部と
を備える電力制御システム。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013052439A JP5641083B2 (ja) | 2013-03-14 | 2013-03-14 | 電力制御装置、電力制御方法、プログラム、および電力制御システム |
PCT/JP2013/072003 WO2014141499A1 (ja) | 2013-03-14 | 2013-08-16 | 電力制御装置、電力制御方法、プログラム、および電力制御システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013052439A JP5641083B2 (ja) | 2013-03-14 | 2013-03-14 | 電力制御装置、電力制御方法、プログラム、および電力制御システム |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2014180130A JP2014180130A (ja) | 2014-09-25 |
JP2014180130A5 JP2014180130A5 (ja) | 2014-11-06 |
JP5641083B2 true JP5641083B2 (ja) | 2014-12-17 |
Family
ID=51536189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013052439A Active JP5641083B2 (ja) | 2013-03-14 | 2013-03-14 | 電力制御装置、電力制御方法、プログラム、および電力制御システム |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5641083B2 (ja) |
WO (1) | WO2014141499A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106501596A (zh) * | 2015-09-03 | 2017-03-15 | Ls 产电株式会社 | 功率监视系统及其用于监视功率的方法 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6189092B2 (ja) * | 2013-06-03 | 2017-08-30 | 東北電力株式会社 | 系統用蓄電池の複数目的制御装置 |
KR101963445B1 (ko) | 2015-04-02 | 2019-07-31 | 엘에스산전 주식회사 | 전력 측정 시스템 및 이를 이용한 부하 전력 모니터링 시스템 및 그 동작 방법 |
JP6615500B2 (ja) * | 2015-06-10 | 2019-12-04 | 株式会社東芝 | 契約電力決定支援装置、契約電力決定支援方法及び契約電力決定支援プログラム |
KR101717849B1 (ko) | 2015-07-28 | 2017-03-17 | 엘에스산전 주식회사 | 전력 측정 시스템 및 이를 이용한 부하 전력 모니터링 시스템 및 그 동작 방법 |
KR101717853B1 (ko) | 2015-09-02 | 2017-03-27 | 엘에스산전 주식회사 | 전력 모니터링 시스템 및 그의 전력 모니터링 방법 |
CN105186511B (zh) * | 2015-10-14 | 2017-06-06 | 南京工程学院 | 电池储能系统参与电网二次调频控制方法 |
CN106329568B (zh) * | 2016-08-31 | 2018-10-02 | 湖北大学 | 户商型光伏发电经济调度控制系统 |
CN106451418B (zh) * | 2016-09-13 | 2019-02-05 | 清华大学 | 光伏电站的在线分群等值建模方法 |
JP7245625B2 (ja) * | 2018-09-25 | 2023-03-24 | シャープ株式会社 | 受電点電力予測装置、受電点電力予測方法、およびプログラム |
US11929621B2 (en) | 2019-04-26 | 2024-03-12 | Gs Yuasa International Ltd. | Power control apparatus, control method for power control apparatus, and distributed power generating system |
US11233404B1 (en) * | 2021-01-20 | 2022-01-25 | Baidu Usa Llc | System and methods for integrating multiple photovoltaic systems |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011091985A (ja) * | 2009-10-26 | 2011-05-06 | Panasonic Electric Works Co Ltd | 直流電力供給装置、および直流電力供給システム |
JP5773768B2 (ja) * | 2011-06-09 | 2015-09-02 | 大和ハウス工業株式会社 | 建物用電力供給システム及び建物用電力供給方法 |
-
2013
- 2013-03-14 JP JP2013052439A patent/JP5641083B2/ja active Active
- 2013-08-16 WO PCT/JP2013/072003 patent/WO2014141499A1/ja active Application Filing
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106501596A (zh) * | 2015-09-03 | 2017-03-15 | Ls 产电株式会社 | 功率监视系统及其用于监视功率的方法 |
EP3141916A1 (en) * | 2015-09-03 | 2017-03-15 | LSIS Co., Ltd. | Power monitoring system and associated method |
US10527658B2 (en) | 2015-09-03 | 2020-01-07 | Lsis Co., Ltd. | Power monitoring system and method for monitoring power thereof |
CN106501596B (zh) * | 2015-09-03 | 2020-04-14 | Ls 产电株式会社 | 功率监视系统及其用于监视功率的方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2014141499A1 (ja) | 2014-09-18 |
JP2014180130A (ja) | 2014-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5641083B2 (ja) | 電力制御装置、電力制御方法、プログラム、および電力制御システム | |
Sachan et al. | Stochastic charging of electric vehicles in smart power distribution grids | |
EP3455913B1 (en) | Systems and methods for regulating a microgrid | |
EP3054551A1 (en) | Power management device, power management method, and program | |
US20160055507A1 (en) | Forecasting market prices for management of grid-scale energy storage systems | |
JP6402550B2 (ja) | 電力制御装置、電力制御方法、プログラム、および電力制御システム | |
KR20180046174A (ko) | 신재생기반 독립형 마이크로그리드의 최적 운전을 위한 운영 시스템 및 방법 | |
KR20120112155A (ko) | 전기 부하를 예상하는 시스템 및 방법 | |
WO2015037307A1 (ja) | 蓄電制御装置、管理システム、蓄電制御方法、蓄電制御プログラム及び記録媒体 | |
US20160042369A1 (en) | Dynamic co-optimization management for grid scale energy storage system (gsess) market participation | |
WO2017170018A1 (ja) | 電力制御装置、電力制御方法、およびプログラム | |
Fattaheian-Dehkordi et al. | Electric vehicles and electric storage systems participation in provision of flexible ramp service | |
US20180137580A1 (en) | Power station system, and server for power station system | |
JP6069738B2 (ja) | 充放電制御システム、充放電制御方法、および充放電制御プログラム | |
JPWO2015019584A1 (ja) | 電力調整装置、電力調整方法、プログラム | |
JP6394211B2 (ja) | 電力制御装置、電力制御方法、プログラム、及び電力制御システム | |
JP6458415B2 (ja) | 電力制御装置、電力制御方法、プログラム、および電力制御システム | |
JP6237447B2 (ja) | 電力制御装置、電力制御方法、プログラム、および電力制御システム | |
JP6698371B2 (ja) | 電気料金管理装置、電気料金管理方法及びプログラム | |
JP2019054647A (ja) | 分散型電源制御装置、分散型電源制御システム及び分散型電源制御方法 | |
KR102018875B1 (ko) | 에너지 저장장치의 전력관리장치 및 전력관리방법 | |
Lebedev et al. | Simulation of real time electricity price based Energy Management System | |
JP5912055B2 (ja) | 制御装置及び制御方法 | |
JP6626359B2 (ja) | 電力関連情報提示装置、電気関連情報提示方法及びプログラム | |
WO2017163934A1 (ja) | 電力制御システム、制御装置、制御方法およびコンピュータプログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140801 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140801 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20140801 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20140819 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140904 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140911 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140930 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20141013 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5641083 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |