JP5545838B2 - Power control system - Google Patents

Power control system Download PDF

Info

Publication number
JP5545838B2
JP5545838B2 JP2010108910A JP2010108910A JP5545838B2 JP 5545838 B2 JP5545838 B2 JP 5545838B2 JP 2010108910 A JP2010108910 A JP 2010108910A JP 2010108910 A JP2010108910 A JP 2010108910A JP 5545838 B2 JP5545838 B2 JP 5545838B2
Authority
JP
Japan
Prior art keywords
power
control system
server
energy saving
cluster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010108910A
Other languages
Japanese (ja)
Other versions
JP2011239569A (en
Inventor
宏章 西
知久 中部
豪毅 峰
悠人 上吉
幸郎 栖原
貴弘 湯澤
祐二 渡邉
勝彦 大西
廣明 松島
清明 松岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2010108910A priority Critical patent/JP5545838B2/en
Publication of JP2011239569A publication Critical patent/JP2011239569A/en
Application granted granted Critical
Publication of JP5545838B2 publication Critical patent/JP5545838B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Description

本発明は、電力制御システムに関するものである。   The present invention relates to a power control system.

低圧電灯需要主体の一般家庭等の電力需要家において、電気事業者との電気取引契約は、契約電流の容量に応じて電気基本料金が決定され、需要家が消費した電力量の従量にしたがって電力量料金が計算される。通常、需要家が電気事業者に支払う電気料金は、この電気基本料金と電力量料金との合計となる。   For electricity consumers such as ordinary households who mainly use low piezoelectric lamps, the electricity transaction contract with an electric power company is determined according to the capacity of the contract current, and the electric power according to the amount of electricity consumed by the consumer. A volume fee is calculated. Usually, the electricity charge paid by the consumer to the electric power company is the sum of the basic electricity charge and the electricity charge.

契約電流による電気取引契約では、契約電流の容量が需要家の使用可能な最大電流となり、その値を一時的にでも超過すると、電流制限器に電力供給が遮断され、契約電流以上の電力が使用できないようになっている。そのため、消費電力の大きな機器(例えば、エアコン、ヒーター、乾燥機、ドライヤー、アイロン、電子レンジ、トースター、電磁調理器など)を一時的に同時に使用することが多くある一般家庭においては、電力供給を遮断させないために契約電流の容量に余裕を残して、必要以上に高めの容量に契約しておかなければならず、その分電気基本料金も高くなる。   In an electricity transaction contract with contract current, the capacity of the contract current becomes the maximum current that can be used by the customer, and if the value is exceeded even temporarily, the power supply to the current limiter is cut off, and power exceeding the contract current is used. I can't do it. For this reason, in general households that frequently use equipment that consumes a large amount of power (for example, air conditioners, heaters, dryers, dryers, irons, microwave ovens, toasters, electromagnetic cookers, etc.) In order not to cut off, it is necessary to leave a contract in the capacity of the contract current, and contract to a capacity higher than necessary, and the electric basic charge will be increased accordingly.

一方、電気事業者との電気取引契約は、変圧設備等を管理する管理者が高圧の電気を一括で受電する契約種別もある。この高圧一括受電による電気事業者との電気取引契約では、変圧設備の設置やその管理等に費用を要するものの、一般の契約電流による電気取引契約に比べて電気料金のうち従量にしたがって加算される電力量料金が非常に安価である。また、高圧一括受電の電気基本料金は、契約電流による電気取引契約と異なり所定時間内の消費電力量で決定されるため、所定時間内の総消費電力量が契約電力をこえなければ、一時的に超過して使用することもできるため、必要以上に高めの契約としなくてもよい。   On the other hand, there is also a contract type in which an electrical transaction contract with an electric power company receives high-voltage electricity in a lump by an administrator who manages transformer facilities and the like. In the electricity transaction contract with an electric power company using this high-voltage collective power reception, although it costs money to install and manage the transformer equipment, it is added according to the metered amount of electricity compared to the electricity transaction contract based on the general contract current. Electricity charges are very cheap. In addition, the basic electricity charge for high-voltage collective power reception is determined by the amount of power consumed within a predetermined time, unlike an electricity transaction contract with a contract current. Therefore, it is not necessary to make the contract higher than necessary.

従来、高圧一括受電による電気取引契約は、業務用電力として商業ビル等また高圧電力として工場などの電力消費の多い施設が対象となっていた。しかし、電力自由化により集合住宅全体などのクラスターを一つの高圧施設と見立てて安価な高圧電力を使用することが可能となり、マンション等の受電を管理者が一括して行い、一般家庭の各世帯に低圧に変圧後に配電する一括受電型サービスも増えてきている。しかし、この高圧一括受電による電気取引契約は、電気料金のうち電力量料金が安価である反面、電気基本料金が契約電流による電気取引契約よりも換算すると高額となるため、如何に電気基本料金を下げて電気事業者と電気取引契約を行うかが課題となる。   Conventionally, electricity transaction contracts by high-voltage collective power reception have been targeted at facilities that consume a lot of power, such as commercial buildings as commercial power and factories as high-voltage power. However, with the liberalization of electricity, it is possible to use inexpensive high-voltage power by considering a cluster such as an entire apartment house as one high-voltage facility, and the administrator collects power for condominiums etc., and each household of ordinary households In addition, collective power-receiving services that distribute power after transformation to low voltage are also increasing. However, the electricity transaction contract using high-voltage collective power reception is cheaper than the electricity charge, but the basic electricity charge is higher than the electricity transaction contract using the contract current. The issue is whether to lower the price and make an electricity transaction contract with an electric power company.

特許文献1には、各需要家の電力使用傾向から最大電流容量を把握し、電流値の可変可能なブレーカを設定することで各需要家の契約電流の容量を抑え、それにより生じた余剰電流を必要とする需要家に配分することよりクラスター全体の契約電流の容量を抑える発明が開示されている。これは、各需要家の契約電流の容量を抑えることで、クラスター全体の契約電流の容量を抑え、管理者と電気事業者との電気基本料金を下げるというものである。   In Patent Document 1, the maximum current capacity is grasped from the power usage tendency of each consumer, the capacity of contract current of each consumer is suppressed by setting a breaker whose current value can be changed, and surplus current generated thereby. An invention is disclosed in which the capacity of the contract current of the entire cluster is reduced by allocating to consumers who need it. This is to suppress the contract current capacity of each consumer, thereby reducing the contract current capacity of the entire cluster, and lowering the basic electricity charge between the manager and the electric utility.

特許文献2には、工場に設置された各種機器を対象として、契約電力の超過を回避するために、所定時間の消費電力量を予測し、予測が契約電力を上回った場合に優先順位の低い機器を停止させる発明が開示されている。これは、契約電力の超過を回避することによって、契約電力を最小限に抑え、管理者と電気事業者との電気基本料金を下げるというものである。   In Patent Literature 2, for various devices installed in a factory, in order to avoid exceeding the contract power, the power consumption amount for a predetermined time is predicted, and when the prediction exceeds the contract power, the priority is low. An invention for stopping the device is disclosed. This is to minimize the contract power by avoiding excess contract power and to reduce the basic electricity charge between the manager and the electric utility.

特開2002−159138号公報JP 2002-159138 A 特開平7−274394号公報JP 7-274394 A

しかし、特許文献1に記載された発明は、電気事業者と一般家庭等の需要家との低圧の契約電流による電気取引契約が、電気事業者から高圧受電の管理者に変わったに過ぎず、需要家が一時的にでも契約電流以上の電気を使用すれば電力供給は遮断される。そのため、一般家庭において管理者との電気取引契約は、常に高めの容量に設定しなければならないことから、各需要家の契約電流を抑える効果は少ない。さらに、特許文献1に記載された発明により配分される余剰電流は、そもそもクラスター内で一時的に、または、継続的に必要とされる電流であるから、ある需要家が契約電流を下げれば、他の需要家が契約電流を上げる、または、余剰のままとなるだけなので、クラスター全体の契約電流を抑える効果も期待できない。   However, in the invention described in Patent Document 1, the electric transaction contract by the low-voltage contract current between the electric power company and the consumer such as a general household is merely changed from the electric power company to the administrator of high-voltage power reception. Even if the customer temporarily uses electricity exceeding the contract current, the power supply is cut off. For this reason, in an ordinary household, an electric transaction contract with an administrator must always be set to a higher capacity, so that there is little effect of suppressing the contract current of each consumer. Furthermore, since the surplus current distributed by the invention described in Patent Document 1 is the current that is temporarily or continuously required in the first place, if a certain customer lowers the contract current, Since other customers only increase the contract current or remain surplus, the effect of suppressing the contract current of the entire cluster cannot be expected.

特許文献2に記載された発明は、対象が工場に設置された機器であるため、全ての機器の状態を容易に把握できるが、工場と異なり、使用する機器も多種多様な一般家庭の機器の状態を把握するのは困難であり、需要家毎の消費電力量の状態を把握することはできても、停止させるべき機器の稼動状態が不明であれば、所望の消費電力量の削減もできない。また、一般家庭への適用は、人が対象となるため曖昧であり、しかも、一般家庭毎に電力消費形態にばらつきも多く、工場の機器のように理論的に適用できるものでもない。さらに、一般家庭に適用する場合、停止させる優先順位の基準を如何に決めるかによって各需要家の公平性が損なわれるだけでなく日常生活にさえ支障をきたす恐れもある。   The invention described in Patent Document 2 is a device installed in a factory, so that the state of all devices can be easily grasped. However, unlike a factory, the devices used are a wide variety of general household devices. It is difficult to grasp the state, and even if it is possible to grasp the state of power consumption for each consumer, if the operating state of the equipment to be stopped is unknown, the desired power consumption cannot be reduced. . Moreover, the application to general households is ambiguous because it is targeted at people, and there are many variations in the form of power consumption for each general household, and it is not theoretically applicable like factory equipment. Furthermore, when applied to ordinary households, not only the fairness of each consumer is impaired depending on how to determine the priority order to be stopped, but also there is a possibility that even daily life may be hindered.

また、デジタル通信技術を組み込んだ情報家電によりホームネットワークを構築すれば一般家庭の個々の機器の状態も把握でき遠隔で制御も可能となるため、契約電力の超過を回避等して、電気基本料金を下げ得るようになる。しかし、既存の機器から情報家電への買い替え、既存の設備からホームネットワークを構築するにはコストが高く、一般家庭への普及にはまだ時間を要し、それまでの間、既存の機器等の効率的な利用が望まれる。   In addition, if a home network is constructed using information appliances incorporating digital communication technology, the status of individual devices in general households can be grasped and remotely controlled. Can be lowered. However, replacing existing equipment with information appliances and building a home network from existing equipment is expensive, and it still takes time to disseminate it to ordinary homes. Efficient use is desired.

さらに、エネルギー消費が増加傾向にあることや地球温暖化問題への対応等、一人一人が省エネの意欲を高めるとともに、省エネを強化し推進する必要性は、ますます高まっている。   Furthermore, the need to strengthen and promote energy conservation is increasing as each and every employee increases their willingness to save energy, such as in response to increasing energy consumption and global warming.

そこで、本発明は、前記問題点に鑑みてなされたものであり、高圧一括受電した電気を既存の機器、設備を利用して低コストに一般家庭等の需要家に配電し、各需要家の契約電力を抑えてクラスター全体の契約電力を抑えるとともに、契約電力の超過を回避して契約電力を最小限に抑えることで管理者と電気事業者との電気基本料金を下げ、さらに、一人一人の省エネ意識を高めて社会全体の省エネに貢献するシステムを提供することを課題とする。   Therefore, the present invention has been made in view of the above-described problems, and distributes electricity received at a high voltage to a consumer such as a general household at low cost using existing equipment and facilities. The contract power is reduced to reduce the contract power of the entire cluster, and the basic power charge between the manager and the electric power company is reduced by avoiding excess contract power and minimizing the contract power. The challenge is to provide a system that contributes to energy conservation throughout society by raising awareness of energy conservation.

このような課題を解決するために、本発明の請求項1に係る電力制御システムは、電気負荷の幾つかを停止することによって消費電力量を低減する電力制御システムであって、前記消費電力量のレベルを所定時間内の使用電力量に基づいて予測するとともに予測結果を送信するサーバと、前記サーバから送信された消費電力量のレベルに応じた電気負荷であって予め許可された電気負荷に対して停止命令を出力する端末とを備える。   In order to solve such a problem, a power control system according to claim 1 of the present invention is a power control system that reduces power consumption by stopping some of the electrical loads, and the power consumption is reduced. A server that predicts the level of power based on the amount of power used within a predetermined time and transmits a prediction result, and an electrical load that is in accordance with the level of power consumption transmitted from the server and that is permitted in advance. And a terminal that outputs a stop command.

また、本発明の請求項2に係る電力制御システムは、予測の変動に応じて、前記停止を命令した電気負荷であってレベルと対応のない電気負荷を稼働させることを特徴とする。   The power control system according to claim 2 of the present invention is characterized in that an electric load that is instructed to stop and that does not correspond to a level is operated according to a fluctuation in prediction.

また、本発明の請求項3に係る電力制御システムは、電気負荷の幾つかを停止することによって消費電力量を低減する電力制御システムであって、前記消費電力量を所定時間内の使用電力量に基づいて予測するとともに前記予測に基づいて配分する電力量を算出し、前記電力量を送信するサーバと、前記サーバから送信された電力量以上になるまで予めランク付けさられた順に前記電気負荷の電力容量を加算して停止させる電気負荷を決定し、前記決定した電気負荷の停止命令を出力する端末とを備える。   A power control system according to claim 3 of the present invention is a power control system that reduces power consumption by stopping some of the electrical loads, and uses the power consumption within a predetermined time. And calculating the amount of power to be distributed based on the prediction, the server transmitting the power amount, and the electric loads in the order ranked in advance until the amount of power transmitted from the server is greater than or equal to And a terminal for outputting an instruction to stop the determined electrical load.

また、本発明の請求項4に係る電力制御システムは、予測の変動に応じて、前記停止を命令した電気負荷であって、決定した電気負荷以外の電気負荷を稼働させることを特徴とする。   According to a fourth aspect of the present invention, there is provided a power control system that operates an electrical load other than the determined electrical load, which is an electrical load commanded to stop in accordance with a change in prediction.

また、本発明の請求項5に係る電力制御システムは、前記電気負荷に遠隔制御アダプターを取り付け、前記端末が前記遠隔制御アダプターに命令することによって前記電気負荷を停止させることを特徴とする。   The power control system according to claim 5 of the present invention is characterized in that a remote control adapter is attached to the electric load, and the electric load is stopped when the terminal instructs the remote control adapter.

また、本発明の請求項6に係る電力制御システムは、所定期間内の前記電気負荷の停止を命令する前後の前記端末における消費電力量の差の合計と、所定期間内の前記電力制御システム全体の低減した消費電力量の合計との割合に応じて前記端末における電気料金を割引くことを特徴とする。   According to a sixth aspect of the present invention, there is provided a power control system comprising: a sum of differences in power consumption at the terminal before and after instructing to stop the electric load within a predetermined period; and the entire power control system within a predetermined period. The electricity charge at the terminal is discounted according to the ratio of the reduced total power consumption.

また、本発明の請求項7に係る電力制御システムは、電気回路の幾つかを遮断することによって消費電力量を低減する電力制御システムであって、前記消費電力量のレベルを所定時間内の使用電力量に基づいて予測するとともに予測結果を送信するサーバと、前記サーバから送信された消費電力量のレベルに応じた電気回路であって予め許可された電気回路に対して遮断命令を出力する端末とを備える。   A power control system according to claim 7 of the present invention is a power control system that reduces power consumption by cutting off some of the electric circuits, and uses the level of power consumption within a predetermined time. A server that predicts based on the amount of power and transmits a prediction result, and a terminal that outputs an interruption command to a previously permitted electric circuit that is an electric circuit according to the level of power consumption transmitted from the server With.

また、本発明の請求項8に係る電力制御システムは、予測の変動に応じて、前記遮断を命令した電気回路であってレベルと対応のない電気回路を復帰させることを特徴とする。   An electric power control system according to an eighth aspect of the present invention is characterized in that an electric circuit that is instructed to shut off and returns an electric circuit that does not correspond to a level in accordance with a fluctuation in prediction.

また、本発明の請求項9に係る電力制御システムは、電気配線の幾つかを遮断することによって消費電力量を低減する電力制御システムであって、前記消費電力量を所定時間内の使用電力量に基づいて予測するとともに前記予測に基づいて配分する電力量を算出し、前記電力量を送信するサーバと、前記サーバから送信された電力量以上になるまで予めランク付けさられた順に前記電気配線の電力容量を加算して遮断させる電気配線を決定し、前記決定した電気配線の遮断命令を出力する端末とを備える。   A power control system according to a ninth aspect of the present invention is a power control system that reduces power consumption by cutting off some of the electrical wirings, wherein the power consumption is used within a predetermined time. And calculating the amount of power to be distributed based on the prediction, the server transmitting the amount of power, and the electrical wiring in the order ranked in advance until the amount of power transmitted from the server is greater than or equal to A terminal for determining an electric wiring to be cut off by adding the power capacities and outputting a command to cut off the determined electric wiring.

また、本発明の請求項10に係る電力制御システムは、予測の変動に応じて、前記遮断を命令した電気配線であって、決定した電気配線以外の電気配線を復帰させることを特徴とする。   A power control system according to a tenth aspect of the present invention is characterized in that, in response to prediction fluctuation, the electrical wiring instructed to shut off is restored to an electrical wiring other than the determined electrical wiring.

また、本発明の請求項11に係る電力制御システムは、前記電気回路、または、前記電気配線にリレーを組み込み、前記端末が前記リレーに命令することによって前記電気回路、または、前記電気配線を遮断させることを特徴とする。   Moreover, the electric power control system which concerns on Claim 11 of this invention incorporates a relay in the said electric circuit or the said electric wiring, and interrupts the said electric circuit or the said electric wiring by the said terminal commanding the said relay. It is characterized by making it.

また、本発明の請求項12に係る電力制御システムは、所定期間内の前記電気回路、または、前記電気配線の遮断を命令する前後の前記端末における消費電力量の差の合計と、所定期間内の前記電力制御システム全体の低減した消費電力量の合計との割合に応じて前記端末における電気料金を割引くことを特徴とする。   According to a twelfth aspect of the present invention, there is provided a power control system comprising: a sum of a difference in power consumption in the terminal before and after the electrical circuit within a predetermined period or the instruction to shut off the electrical wiring; The electric charge at the terminal is discounted in accordance with the ratio of the reduced total power consumption of the entire power control system.

また、本発明の請求項13に係る電力制御システムは、複数の需要家からなるクラスターの消費電力量を調整する電力制御システムであって、前記クラスター内の需要家が電気料金を支払わない場合に、前記需要家に設置されたメインブレーカーを制御して強制的に電力供給を遮断する。   A power control system according to claim 13 of the present invention is a power control system that adjusts the power consumption of a cluster composed of a plurality of consumers, and when the consumers in the cluster do not pay an electricity bill. The power supply is forcibly cut off by controlling a main breaker installed in the consumer.

また、本発明の請求項14に係る電力制御システムは、複数の需要家からなるクラスターの消費電力量を調整する電力制御システムであって、災害発生時に必要な場所に電力を集中させるために、前記需要家に設置されたメインブレーカーを制御して強制的に電力供給を遮断する。   Moreover, the power control system according to claim 14 of the present invention is a power control system that adjusts the power consumption of a cluster composed of a plurality of consumers, and in order to concentrate power in a necessary place when a disaster occurs, The main breaker installed in the consumer is controlled to forcibly cut off the power supply.

電力制御システムの概略を表すブロック図である。It is a block diagram showing the outline of a power control system.

以下、本発明の実施形態について図面を参照して説明する。   Embodiments of the present invention will be described below with reference to the drawings.

図1は、本発明の一実施例である電力制御システムの概略を表すブロック図である。図1において、管理者が管理する高圧一括受電設備210は、電気事業者から電気を受電し、受電した電気を高圧のまま、または、変圧器212によって低圧に変換してからクラスターを構成している各需要家に配電する。電気は、高圧一括受電設備210の管理者と電気事業者との間で契約した契約電力(以下、クラスター契約電力)に基づいて受電される。管理者が電気事業者に支払う電気料金は、このクラスター契約電力に応じて決定される電気基本料金とクラスターで消費した電力量の従量にしたがって計算される電力量料金との合計となる。クラスター契約電力は、クラスター内で消費できる最大の電力であり、この契約電力を超過して電力を消費した場合には、契約超過電力につき電気事業者に割高な契約超過金を支払う、または、自動的にクラスター契約電力が増加することになる。   FIG. 1 is a block diagram showing an outline of a power control system according to an embodiment of the present invention. In FIG. 1, a high-voltage collective power receiving facility 210 managed by an administrator receives electricity from an electric power company and forms a cluster after the received electricity remains at high voltage or is converted to low voltage by a transformer 212. Distribute power to each customer. Electricity is received based on contract power (hereinafter referred to as cluster contract power) contracted between the administrator of the high-voltage collective power receiving facility 210 and the electric power company. The electricity fee paid by the administrator to the electric power company is the sum of the electricity basic fee determined according to the cluster contract power and the electricity amount fee calculated according to the amount of electricity consumed in the cluster. Cluster contract power is the maximum power that can be consumed in the cluster, and if this contract power is consumed, power is paid to the power company for excess contract power or automatically. Cluster power will increase.

通常、クラスター契約電力は、30分間の消費電力量から計算されことから、クラスター内で消費できる最大電力量(以下、クラスター最大電力量)は、クラスター契約電力×0.5時間と表せる。例えば、クラスター契約電力を100kWで契約している場合、30分間のクラスター最大電力量は50kWhである。また、30分毎の開始時刻を0秒として、開始時刻からの経過時間をT秒(0≦T≦1800)、T秒経過した時のクラスター内の消費電力量の総和をW(kWh)とすると、
(W/T)×1800<クラスター最大電力量 (1)
を満たすことが、クラスター契約電力をこえない一定の基準となる。ただし、契約電流による電気取引契約と異なり、クラスター最大電力量は、30分間にクラスター内で消費する電力量の総和となるから、30分間の消費電力量がクラスター最大電力量をこえなければ、一時的にこの基準をこえてもよい。例えば、クラスター最大電力量が50kWhの場合、開始時刻からの10分間で50kWhの電力量を消費しても、残りの20分間、電力を消費しなければ、クラスター契約電力をこえることにはならない。
Normally, the cluster contract power is calculated from the power consumption amount for 30 minutes, and therefore the maximum power amount that can be consumed in the cluster (hereinafter referred to as cluster maximum power amount) can be expressed as cluster contract power × 0.5 hours. For example, when the cluster contract power is contracted at 100 kW, the maximum cluster power amount for 30 minutes is 50 kWh. Also, assuming that the start time every 30 minutes is 0 seconds, the elapsed time from the start time is T seconds (0 ≦ T ≦ 1800), and the total power consumption in the cluster when T seconds have elapsed is W (kWh). Then
(W / T) × 1800 <maximum cluster energy (1)
Satisfying this is a certain standard that does not exceed the cluster contract power. However, unlike an electricity transaction contract based on contract current, the maximum cluster energy is the sum of the energy consumed in the cluster for 30 minutes, so if the energy consumed for 30 minutes does not exceed the maximum cluster energy, This standard may be exceeded. For example, when the cluster maximum power amount is 50 kWh, even if the power amount of 50 kWh is consumed for 10 minutes from the start time, the cluster contract power will not be exceeded unless power is consumed for the remaining 20 minutes.

また、電気は、高圧一括受電設備210やクラスターの配電系統内に発電設備150を設けて発電し、発電した電気を各需要家に配電するようにしてもよい。かかる場合、クラスター契約電力をこえる電力需要を予測するときに発電設備150から電力を供給するようにしてもよく、また、発電により余った電気を売電してもよい。   In addition, electricity may be generated by providing the power generation facility 150 in the high-voltage collective power receiving facility 210 or the cluster distribution system, and the generated electricity may be distributed to each consumer. In such a case, when the power demand exceeding the cluster contract power is predicted, power may be supplied from the power generation facility 150, or surplus electricity may be sold due to power generation.

各需要家に配電された電気は、メインブレーカー100、および、サブブレーカー101を経て各需要家で使用される。メインブレーカー100は、各需要家の全ての電力の供給を遮断・復帰させる機器であり、過剰電力による配線の焼きつき等の安全を目的として、または、クラスター内の需要家が電気料金を支払わない場合にその需要家の電力供給を遮断することを目的として、もしくは、災害発生時に病院などの必要な場所に電力を集中させるために他の需要家の電力供給を遮断することを目的として、その他各需要家の全ての電力の供給を強制的に遮断・復帰させることが必要な場合に設置してもよい。サブブレーカー101は、各需要家の各部屋、コンセントや照明用などの配線をいくつか束ねた一定の区域の電力を遮断・復帰させる機器であり、過剰電力による配線の焼きつき等の安全を目的として設置されるが、後述するように、このサブブレーカー101を制御することによって、需要家の一定の区域における負荷の電力の供給を遮断・復帰させることを目的として設置してもよい。   The electricity distributed to each consumer is used by each consumer via the main breaker 100 and the sub-breaker 101. The main breaker 100 is a device that cuts off / returns the supply of all electric power of each consumer. For the purpose of safety such as seizure of wiring due to excessive power, or the consumers in the cluster do not pay the electricity bill. In other cases, the purpose is to cut off the power supply of the customer or to cut off the power supply of other customers in order to concentrate the power at a necessary place such as a hospital in the event of a disaster. It may be installed when it is necessary to forcibly cut off / return all power supply of each consumer. The sub breaker 101 is a device that cuts off and restores power in a certain area where a number of wires for each customer room, outlet, and lighting are bundled, and is intended for safety such as seizure of wiring due to excess power. However, as will be described later, the sub-breaker 101 may be controlled for the purpose of shutting off / returning the power supply of the load in a certain area of the consumer.

クラスターの各需要家に配電される電気は、高圧一括受電設備210の管理者と各需要家との間で契約した契約電力(以下、需要家契約電力)に基づいて受電される。需要家が管理者に支払う電気料金は、この需要家契約電力に応じて決定される電気基本料金と需要家が消費した電力量の従量にしたがって計算される電力量料金との合計となる。需要家契約電力は、各需要家が消費できる最大の電力であり、この契約電力を超過して電力を消費した場合には、管理者と各需要家との間で何らかの措置を自由に取り決めるようにしてもよい。例えば、管理者との間で停止することを予め設定した電気機器(以下、省エネ対象電気負荷120)の停止、および、管理者との間で遮断させることを予め設定した電気配線(以下、省エネ対象電気回路140)の遮断、または、全ての電力供給の遮断、もしくは、契約超過電力につき管理者に割高な契約超過金を支払うなどとしてもよい。   Electricity distributed to each consumer in the cluster is received based on contract power contracted between the administrator of the high-voltage collective power receiving facility 210 and each consumer (hereinafter referred to as customer contract power). The electricity charge paid by the consumer to the manager is the sum of the basic electricity charge determined according to the consumer contract power and the electricity charge calculated according to the amount of electricity consumed by the consumer. The customer contract power is the maximum power that can be consumed by each customer. If this contract power is exceeded and power is consumed, the manager and each customer are free to negotiate some measures. It may be. For example, the electrical equipment (hereinafter referred to as the energy saving target electric load 120) that is preset to stop with the administrator and the electrical wiring that is preset to be shut off with the administrator (hereinafter referred to as energy saving). The target electric circuit 140) may be cut off, or all the power supply may be cut off, or a higher contract surcharge may be paid to the administrator for the contract surplus power.

クラスター内の各需要家の需要家契約電力の総和に基づいてクラスター契約電力が決まるので、需要家契約電力は、クラスター契約電力と同期して、同様の開始時刻からの30分間の消費電力量によって計算する。この場合、需要家が30分間に消費できる最大電力量(以下、需要家最大電力量)は、需要家契約電力×0.5時間となる。また、30分毎の開始時刻を0秒として、開始時刻からの経過時間をT秒(0≦T≦1800)、T秒経過した時の需要家の消費電力量の総和をW’(kWh)とすると、
(W’/T)×1800<需要家最大電力量 (2)
を満たすことが、需要家契約電力を超過しない一定の基準となる。ただし、契約電流による電気取引契約と異なり、需要家最大電力量は、30分間に需要家が消費できる電力量の総和であるので、30分間の消費電力量が需要家最大電力量をこえなければ、一時的にこの基準をこえてもよい。
Since the cluster contract power is determined based on the sum of the customer contract power of each customer in the cluster, the customer contract power is determined by the power consumption for 30 minutes from the same start time in synchronization with the cluster contract power. calculate. In this case, the maximum amount of power that can be consumed by the consumer for 30 minutes (hereinafter referred to as the maximum amount of consumer power) is the customer contract power x 0.5 hours. Further, the start time every 30 minutes is set to 0 seconds, the elapsed time from the start time is T seconds (0 ≦ T ≦ 1800), and the total power consumption of the consumer when T seconds have elapsed is W ′ (kWh) Then,
(W ′ / T) × 1800 <maximum consumer electric energy (2)
Satisfying this is a certain standard that does not exceed customer contract power. However, unlike the electricity transaction contract based on the contract current, the customer's maximum electric energy is the sum of the electric energy that can be consumed by the customer in 30 minutes, and therefore the electric energy consumed for 30 minutes must not exceed the customer's maximum electric energy. You may temporarily exceed this standard.

このように、管理者と一般家庭等の需要家との電気取引契約を契約電流ではなく契約電力とすることによって、一時的に契約電力を超過して使用することも可能となるため余裕を残して高めの契約とする必要もないことから、結果的に各需要家の契約電力が抑えられ、それによりクラスター全体の契約電力も抑えられ、管理者と電気事業者との電気基本料金を下げることができる。   In this way, by making the electricity transaction contract between the administrator and the consumer such as a general household into contract power instead of contract current, it is possible to temporarily exceed the contract power and use it, leaving a margin. As a result, the contracted power of each consumer is reduced, thereby reducing the contracted power of the entire cluster and lowering the basic electricity bill between the manager and the electric utility. Can do.

図1おいて、エネルギーコントロールシステム(Energy Control System:以下、「ECS」)130は、各需要家、高圧一括受電設備210、および、発電設備150に設置され、ECSネット網161を介してサーバ160と単方向または双方向で通信して、端末装置または機器を制御する。各種の登録や制御の設定のためにECS130は、インターフェース、および、各需要家等の情報を保持する記憶装置を備えてもよい。   In FIG. 1, an energy control system (energy control system: hereinafter referred to as “ECS”) 130 is installed in each customer, the high-voltage collective power receiving facility 210, and the power generation facility 150, and the server 160 via the ECS network 161. Unidirectionally or bidirectionally communicates with a terminal device or device. For various registrations and control settings, the ECS 130 may include an interface and a storage device that holds information such as each customer.

サーバ160とECS130との通信は、インターネット、電話回線、有線・無線回線、電力線による通信で行われる。しかし、これらに限らず、本件発明において少なくとも各需要家においてはサーバ160からの指示を受信できればよく、また、高圧一括受電設備210においては受配電電力量をサーバ160に送信できればよく、発電設備150においては発電電力量をサーバ160に送信できるものであればよい。したがって、この要件が満たされれば、各所に設置されるECS130は、同一の機能を有する必要はなく、また、ECS130によらずに端末機器の制御が可能な場合や端末機器の制御が不要な場合は、ECS130を他の装置に代替してもよく、ECS130を省略してもよい。   Communication between the server 160 and the ECS 130 is performed via the Internet, a telephone line, a wired / wireless line, and a power line. However, the present invention is not limited thereto, and it is sufficient that at least each customer can receive an instruction from the server 160 in the present invention, and the high-voltage collective power receiving facility 210 only needs to be able to transmit the received / distributed power amount to the server 160. As long as the amount of generated power can be transmitted to the server 160, it is sufficient. Therefore, if this requirement is satisfied, the ECS 130 installed in each place does not need to have the same function, and the terminal device can be controlled without using the ECS 130, or the terminal device does not need to be controlled. The ECS 130 may be replaced with another device, or the ECS 130 may be omitted.

各需要家のECS130からサーバ160への通信は、例えば、各需要家における天候や気温等の気象情報、および、地震や火災等の緊急情報などの各需要家の環境に関する情報(以下、需要家環境情報)、各需要家の電力使用状況に関する情報(以下、需要家電力情報)、各需要家が任意に設定する省エネ目標のレベル(以下、省エネレベル)と省エネ対象電気負荷120または省エネ対象電気回路140との対応が設定された情報(以下、省エネ実践情報)、各需要家における個々の省エネ対象電気負荷120の電力容量(以下、省エネ対象電気負荷容量)や各需要家における個々の省エネ対象電気回路140により遮断される電力容量(以下、省エネ対象電気回路容量)を送信してもよい。これらの情報から、例えば、需要家環境情報からは、サーバ160が各需要家における気温の変化の様子を気象情報として得ることにより、この情報を電力需要の予測に用いることができるし、地震や火災を知らせる緊急情報がサーバ160に送信されれば、場合によりその需要家への電力供給を遮断するようにすることも可能となる。また、需要家電力情報からは、サーバ160が曜日や時間における各需要家の電力使用の傾向を得ることができ、この情報を電力需要の予測に用いることもできる。   The communication from the ECS 130 of each customer to the server 160 includes, for example, weather information such as weather and temperature at each customer, and information on the environment of each customer such as emergency information such as earthquakes and fires (hereinafter referred to as “customers”). Environmental information), information on the power usage status of each consumer (hereinafter referred to as customer power information), the level of energy saving target (hereinafter referred to as energy saving level) arbitrarily set by each customer, and the energy load 120 or energy saving target electricity Information for which correspondence with the circuit 140 is set (hereinafter referred to as energy saving practice information), the power capacity of each energy saving target electric load 120 (hereinafter referred to as energy saving target electric load capacity) in each consumer, and each energy saving target in each consumer You may transmit the electric power capacity | capacitance (henceforth energy saving object electric circuit capacity | capacitance) interrupted | blocked by the electric circuit 140. FIG. From this information, for example, from the customer environment information, the server 160 obtains the state of temperature change in each customer as weather information, so that this information can be used for prediction of power demand, If emergency information that informs of a fire is transmitted to the server 160, it is possible to cut off the power supply to the customer in some cases. In addition, from the consumer power information, the server 160 can obtain a tendency of each customer's power usage on the day of the week or time, and this information can also be used for prediction of power demand.

サーバ160は、各需要家から受信した情報および電力需要予測、高圧一括受電設備210の受配電電力量や発電設備150の発電電力量等を元に各需要家の省エネ対象電気負荷120の停止・稼動、または、省エネ対象電気回路140の遮断・復帰を制御する指示を各需要家のECS130に送信してもよい。   The server 160 stops the energy load 120 to be saved by each consumer based on the information received from each consumer and the power demand prediction, the received / distributed power amount of the high-voltage collective power receiving facility 210, the generated power amount of the power generating facility 150, and the like. An instruction for controlling operation or shut-off / return of the electric circuit 140 for energy saving may be transmitted to the ECS 130 of each consumer.

高圧一括受電設備210のECS130からサーバ160への通信は、例えば、電気事業者からの受電電力量や各需要家への配電電力量に関する情報(以下、電力取引情報)、または、高圧一括受電設備210の機器の故障や不具合に関する情報等をサーバ160に送信してもよい。サーバ160は、高圧一括受電設備210から受信した情報および電力需要予測や発電設備150の発電電力量等を元に受電電力量や配電電力量を制御する指示、または、機器の故障や不具合が遠隔制御で対処できるものであればその指示を高圧一括受電設備210のECS130に送信してもよい。   The communication from the ECS 130 of the high-voltage collective power receiving facility 210 to the server 160 is, for example, information on the amount of power received from an electric power company or the amount of power distributed to each customer (hereinafter referred to as power transaction information), or the high-voltage collective power receiving facility. Information regarding failure or malfunction of the device 210 may be transmitted to the server 160. The server 160 remotely receives instructions received from the high-voltage collective power receiving facility 210, power demand forecasts, instructions for controlling the amount of power received or distributed based on the amount of power generated by the power generation facility 150, etc. The instruction may be transmitted to the ECS 130 of the high-voltage collective power receiving facility 210 as long as it can be dealt with by the control.

発電設備150のECS130からサーバ160への通信は、例えば、発電設備150での発電電力量や各需要家への配電電力量や売電電力量、または、発電設備150の機器の故障や不具合に関する情報等をサーバ160に送信してもよい。サーバ160は、発電設備150から受信した情報および電力需要予測や高圧一括受電設備210の受電電力量等を元に発電や配電、発電電力量や売電を制御する指示、または、機器の故障や不具合が遠隔制御で対処できるものであればその指示を発電設備150のECS130に送信してもよい。   Communication from the ECS 130 of the power generation facility 150 to the server 160 is, for example, information on the amount of power generated by the power generation facility 150, the amount of power distributed to each customer, the amount of power sold, or information on a failure or malfunction of the equipment of the power generation facility 150. Or the like may be transmitted to the server 160. The server 160 instructs to control power generation and distribution, the amount of generated power and the sale of power based on the information received from the power generation facility 150, the power demand prediction, the amount of power received by the high-voltage collective power receiving facility 210, etc. If the problem can be dealt with by remote control, the instruction may be transmitted to the ECS 130 of the power generation facility 150.

図1において、サーバ160は、需要家電力情報や電力取引情報からクラスター内の消費電力量を監視して、電力需要を予測するとともに、その予測や各所に設置されたECS130からの情報を元に省エネ対象電気負荷120の停止・稼動、または、省エネ対象電気回路140の遮断・復帰等の制御を指示する。各種登録や制御設定のためにサーバ160は、インターフェース、および、各需要家等の情報を保持する記憶装置を備えてもよい。   In FIG. 1, the server 160 monitors the power consumption in the cluster from the consumer power information and the power transaction information, and predicts the power demand, and also based on the prediction and information from the ECS 130 installed in each place. Instructs control such as stopping / operation of the energy saving target electric load 120 or shutting down / returning of the energy saving target electric circuit 140. For various registrations and control settings, the server 160 may include an interface and a storage device that holds information such as each customer.

クラスター内で使用する電力需要の予測(以下、クラスター需要予測)は、クラスター最大使用電力量をこえるのを防ぐためにクラスター契約電力をこえない一定の基準となる式(1)の左辺
(W/T)×1800 (3)
から算出する。例えば、Tが600秒、Wが10kWhであれば、その30分間のクラスター需要予測は30kWhとなる。
The prediction of power demand used in the cluster (hereinafter referred to as cluster demand prediction) is the left side (W / T) of Equation (1), which is a constant criterion that does not exceed the cluster contract power in order to prevent exceeding the maximum cluster power usage. ) × 1800 (3)
Calculate from For example, if T is 600 seconds and W is 10 kWh, the 30-minute cluster demand prediction is 30 kWh.

また、この式(3)に各需要家の電力使用実績や気象条件などの情報を元に重みを付けてクラスター需要予測を算出してもよい。重みをα、β、γ・・・とすると、クラスター需要予測は、
(W/T)×1800×α×β×γ×・・・ (4)
と表せる。例えば、需要家環境情報から、晴れた夏の日中の気温が上昇傾向であるという情報を元に、エアコンの使用増が想定されるため重みαに1.2を割当たり、需要家電力情報から、クラスター内の需要家の平日の13時から17時にかけて消費電気量が減少傾向であるという情報を元に、重みβに0.9を割り当ててもよい。この場合、重みを付けないときのクラスター需要予測を30kWhとすれば、重みαとβを付けることにより32.4kWhとなる。
In addition, the cluster demand prediction may be calculated by assigning a weight to the equation (3) based on information such as the power usage record and weather conditions of each consumer. If the weights are α, β, γ, etc., the cluster demand forecast is
(W / T) × 1800 × α × β × γ × (4)
It can be expressed. For example, based on the information that the temperature during sunny summer days is rising from the customer environment information, an increase in the use of air conditioners is assumed. Therefore, 0.9 may be assigned to the weight β based on the information that the amount of electricity consumed is decreasing from 13:00 to 17:00 on weekdays of consumers in the cluster. In this case, if the cluster demand prediction without weights is 30 kWh, the weights α and β are added to be 32.4 kWh.

なお、クラスター需要予測は、リアルタイムで算出できるが、数秒毎あるいは数分毎に行ってもよい。   Although the cluster demand prediction can be calculated in real time, it may be performed every few seconds or every few minutes.

クラスター需要予測と同様の方法により、サーバ160は、需要家が使用する電力需要予測(以下、需要家需要予測)を算出してもよい。この場合、需要家需要予測は、需要家契約電力をこえない一定の基準となる式(2)の左辺
(W’/T)×1800 (5)
から算出される。
The server 160 may calculate a power demand prediction (hereinafter referred to as a consumer demand prediction) used by a consumer by a method similar to the cluster demand prediction. In this case, the consumer demand forecast is calculated based on the left side (W ′ / T) × 1800 of equation (2), which is a constant reference that does not exceed the customer contract power (5).
Is calculated from

また、各需要家の電力使用実績や気象条件などの情報を元に重みを付けた場合の需要者需要予測は、重みをα’、β’、γ’・・・とすると、
(W’/T)×1800×α’×β’×γ’×・・・ (6)
と表せる。
In addition, the consumer demand prediction in the case where weights are added based on information such as the power usage results and weather conditions of each consumer, the weights are α ′, β ′, γ ′.
(W ′ / T) × 1800 × α ′ × β ′ × γ ′ × (6)
It can be expressed.

算出された需要家需要予測は、サーバ160から各需要家のECS130に送信され、各需要家は、この需要家需要予測を参考にして省エネ実践情報の省エネレベルを選択することが可能となる。また、需要家需要予測を元に需要家契約電力の超過を予測する場合に、サーバ160、あるいは、各需要家のECS130は、自動的に省エネレベルを予め設定したレベルに変更するようにしてもよい。なお、需要家需要予測は、サーバ160ではなく各需要家のECS130が需要家電力情報や電力取引情報から算出してもよい。   The calculated consumer demand prediction is transmitted from the server 160 to the ECS 130 of each consumer, and each consumer can select the energy saving level of the energy saving practice information with reference to this consumer demand prediction. In addition, when predicting an excess of consumer contract power based on a consumer demand forecast, the server 160 or the ECS 130 of each consumer may automatically change the energy saving level to a preset level. Good. Note that the consumer demand prediction may be calculated from the consumer power information and the power transaction information by the ECS 130 of each consumer instead of the server 160.

サーバ160からの指示により各需要家のECS130は、省エネ対象電気負荷120を停止・稼動、または、省エネ対象電気回路140を遮断・復帰させる。   In response to an instruction from the server 160, the ECS 130 of each customer stops / operates the energy saving target electric load 120 or shuts down / returns the energy saving target electric circuit 140.

省エネ対象電気負荷120の停止・稼動は、例えば、省エネ対象電気負荷120の制御基盤内に遠隔制御アダプターを取り付けることによって、ECS130が個々の省エネ対象電気負荷120を制御するように構成してもよい。この場合は、個々の省エネ対象電気負荷120に遠隔制御アダプターを取り付ける必要があるが、遠隔制御アダプターは安価であり、既存の省エネ対象電気負荷120に容易に取り付けることができるので、簡便かつ低コストに各需要家の省エネ対象電気負荷120の制御を可能とする構成を構築することができる。   The stop / operation of the energy saving target electric load 120 may be configured such that the ECS 130 controls each individual energy saving target electric load 120 by attaching a remote control adapter in the control base of the energy saving target electric load 120, for example. . In this case, it is necessary to attach a remote control adapter to each individual energy saving target electric load 120. However, the remote control adapter is inexpensive and can be easily attached to the existing energy saving target electric load 120. In addition, it is possible to construct a configuration that enables control of the electric load 120 to be saved by each consumer.

省エネ対象電気回路140の遮断・復帰は、例えば、サブブレーカー101にラッチングリレーのようなリレー110を組み込むことによって、サブブレーカー101で束ねられている複数の配線に対してECS130が省エネ対象電気回路140を遮断・復帰させることで省エネ対象電気負荷120を制御するように構成してもよい。また、サブブレーカー101が束ねている複数の配線にリレー110を組み込むことによって、それぞれの配線に対してECS130が省エネ対象電気回路140を遮断・復帰させることで省エネ対象電気負荷120を制御するように構成してもよい。この構成の場合、上記のサブブレーカー101にリレー110を組み込むのに比べ、個々の配線に対してリレー110を組み込む必要があるためコストもかかるが、省エネ対象電気負荷120のより細かな制御が可能となる。省エネ対象電気回路140の遮断・復帰は、安価なリレー110を数個組み込むことで制御対象となる省エネ対象電気回路140のON/OFFができ、既存のサブブレーカー101や既存の配線設備へのリレー110の組み込みも容易であるため、簡便かつ低コストに各需要家の省エネ対象電気負荷120の制御を可能とする構成を構築することができる。   For example, by incorporating a relay 110 such as a latching relay in the sub-breaker 101, the ECS 130 is connected to the energy-saving target electric circuit 140 for a plurality of wires bundled in the sub-breaker 101. The energy saving target electric load 120 may be controlled by shutting off / returning. Further, by incorporating the relay 110 into a plurality of wires bundled by the sub-breaker 101, the ECS 130 controls the energy-saving target electric load 120 by shutting off and returning the energy-saving target electric circuit 140 to each of the wires. It may be configured. In the case of this configuration, compared to incorporating the relay 110 in the sub breaker 101 described above, it is necessary to incorporate the relay 110 for each wiring, which is costly, but finer control of the electric load 120 to be saved is possible. It becomes. To cut off / return the electric circuit 140 to be energy-saving, it is possible to turn on / off the electric circuit 140 to be controlled by incorporating several inexpensive relays 110, and to relay to the existing sub-breaker 101 or existing wiring equipment. Since 110 can be easily incorporated, it is possible to construct a configuration that allows each consumer to control the electric load 120 to be energy-saving simply and at low cost.

Figure 0005545838
Figure 0005545838

表1は、クラスター契約電力の超過レベルとクラスター需要予測割合との対応を示した一例である。表1の超過レベルに対応するクラスター需要予測割合は、クラスター最大電力量に対するクラスター需要予測の割合(クラスター需要予測/クラスター最大電力量)である。例えば、クラスター契約電力が100kW、クラスター電力需要予測が55kWhのとき、クラスター需要予測割合は110%となるから、それに対応する超過レベルは3となる。このクラスター需要予測割合が100%をこえるとクラスター契約電力を超過することになるため、超過レベルは、サーバ160が省エネ対象電気負荷120の停止や省エネ対象電気回路140の遮断を指示する基準となる。表1では、クラスター需要予測割合が100%をこえるレベル1〜3がクラスター契約電力を超過する危険なレベルとし、レベル4がクラスター契約電力を超過しない安全なレベルとしている。   Table 1 is an example showing the correspondence between the excess level of cluster contract power and the cluster demand forecast ratio. The cluster demand prediction ratio corresponding to the excess level in Table 1 is the ratio of cluster demand prediction to the cluster maximum power amount (cluster demand prediction / cluster maximum power amount). For example, when the cluster contract power is 100 kW and the cluster power demand prediction is 55 kWh, the cluster demand prediction ratio is 110%, so the excess level corresponding to it is 3. If the cluster demand prediction ratio exceeds 100%, the cluster contract power will be exceeded, so the excess level is a criterion for the server 160 to instruct the energy saving target electric load 120 to stop or the energy saving target electric circuit 140 to be cut off. . In Table 1, levels 1 to 3 in which the cluster demand prediction ratio exceeds 100% are dangerous levels exceeding the cluster contract power, and level 4 is a safe level not exceeding the cluster contract power.

Figure 0005545838
Figure 0005545838

表2は、需要家が選択した省エネ実践情報の省エネレベルと停止させる省エネ対象電気負荷120との対応を示した一例である。表2の省エネ対象電気負荷総容量は、各省エネレベルの省エネ対象電気負荷容量の総和を示す。また、省エネ対象電気負荷容量割合は、需要家契約電力に対する省エネ対象電気負荷総容量の割合(省エネ対象電気負荷総容量/需要家契約電力)を示し、表2では需要家契約電力を5kWとして省エネ対象電気負荷容量割合を算出している。例えば、エアコン1と照明1の省エネ対象電気負荷容量がそれぞれ0.8kWhと0.1kWhの場合、省エネ対象電気負荷総容量が0.9kWhとなるから、省エネ対象電気負荷容量割合は18%となり表2の10〜20%の間にあるため省エネレベルは3となる。表2では、需要家が省エネレベル1〜3を選択した場合を省エネ対象電気負荷120の停止をさせてクラスター全体の消費電力量の削減を分担するレベルとし、省エネ対象電気負荷120の停止を望まない需要家に対しては、消費電力量の削減を分担しないレベルとして省エネレベル4を選択できるようにしている。なお、需要家が選択する省エネレベルは、各需要家の電気使用状況により随時変更できるようにしてもよく、一定の期間毎に更新するようにしてもよい。   Table 2 shows an example of the correspondence between the energy saving level of the energy saving practice information selected by the consumer and the energy saving target electric load 120 to be stopped. The total energy load targeted for energy saving in Table 2 represents the sum of the energy load targeted for energy saving at each energy saving level. The energy load capacity ratio for energy saving indicates the ratio of the total energy load for energy saving to the customer contracted power (total energy load for energy saving / customer contracted power). The target electrical load capacity ratio is calculated. For example, when the energy saving target electric load capacities of the air conditioner 1 and the lighting 1 are 0.8 kWh and 0.1 kWh, respectively, the energy saving target electric load total capacity is 0.9 kWh, so the energy saving target electric load capacity ratio is 18%. The energy saving level is 3 because it is between 10 and 20% of 2. In Table 2, when the customer selects the energy saving level 1 to 3, the energy saving target electric load 120 is stopped, and the reduction of the power consumption of the entire cluster is shared, and the energy saving target electric load 120 is desired to be stopped. The energy saving level 4 can be selected for a non-consumer as a level that does not share the reduction in power consumption. The energy saving level selected by the consumer may be changed as needed depending on the electricity usage status of each consumer, and may be updated at regular intervals.

Figure 0005545838
Figure 0005545838

表3は、需要家が選択した省エネ実践情報の省エネレベルと遮断させる省エネ対象電気回路140との対応、および、省エネ対象電気回路140の遮断によって停止させる省エネ対象電気負荷120の対応を示した一例である。表3の省エネ対象電気回路総容量は、各省エネレベルの省エネ対象電気回路容量の総和を示す。また、省エネ対象電気回路容量割合は、需要家契約電力に対する省エネ対象電気回路総容量の割合(省エネ対象電気回路総容量/需要家契約電力)を示し、表3では需要家契約電力を5kWとして省エネ対象電気回路容量割合を算出している。また、省エネ対象電気回路aは、サブブレーカー101にリレー110を組み込みこんだ構成を示し、省エネ対象電気回路bは、サブブレーカー101が束ねている個々の配線にリレー110を組み込んだ構成を示す。例えば、省エネ対象電気回路a1と2(省エネ対象電気回路b1-1、1-2と2-1)の省エネ対象電気回路容量がそれぞれ0.9kWhと0.7kWhの場合、省エネ対象電気回路総容量が1.6kWhとなるから、省エネ対象電気回路容量割合は32%となり表3の10〜20%の間にあるため省エネレベルは2となる。表3では、需要家が省エネレベル1〜3を選択した場合を省エネ対象電気回路140の遮断をさせてクラスター全体の消費電力量の削減を分担するレベルとし、省エネ対象電気回路140の遮断を望まない需要家に対しては、消費電力量の削減を分担しないレベルとして省エネレベル4を選択できるようにしている。なお、需要家が選択する省エネレベルは、各需要家の電気使用状況により随時変更できるようにしてもよく、一定の期間毎に更新するようにしてもよい。   Table 3 shows an example of the correspondence between the energy saving level of the energy saving practice information selected by the consumer and the energy saving target electric circuit 140 to be cut off, and the correspondence of the energy saving target electric load 120 to be stopped when the energy saving target electric circuit 140 is cut off. It is. The total electric circuit capacity for energy saving in Table 3 represents the sum of the electric circuit capacity for energy saving at each energy saving level. The ratio of electric circuit capacity for energy saving indicates the ratio of the total capacity of electric circuit for energy saving with respect to consumer contracted power (total capacity of electric circuit for energy saving / contract power for customer). The target electric circuit capacity ratio is calculated. The energy saving target electric circuit a shows a configuration in which the relay 110 is incorporated in the sub-breaker 101, and the energy saving target electric circuit b shows a configuration in which the relay 110 is incorporated in individual wires bundled by the sub breaker 101. For example, if the energy saving target electric circuit capacities of the energy saving target electric circuits a1 and 2 (energy saving target electric circuits b1-1, 1-2, and 2-1) are 0.9 kWh and 0.7 kWh, respectively, Is 1.6 kWh, so that the energy saving target electric circuit capacity ratio is 32%, which is between 10 and 20% in Table 3, and the energy saving level is 2. In Table 3, when the customer selects the energy saving level 1 to 3, the energy saving target electric circuit 140 is cut off, and the reduction of the power consumption of the entire cluster is shared, and the energy saving target electric circuit 140 is desired to be cut off. The energy saving level 4 can be selected for a non-consumer as a level that does not share the reduction in power consumption. The energy saving level selected by the consumer may be changed as needed depending on the electricity usage status of each consumer, and may be updated at regular intervals.

サーバ160が需要家のECS130に省エネ対象電気負荷120の停止・稼動、および、省エネ対象電気回路140の遮断・復帰を指示するのは、周期的に、あるいは、表1のクラスター需要予測割合と対応する超過レベルに変動が生じるときでもよい。表1の各超過レベルの値と表2、3の各省エネレベルの値は同値として扱い、表1の超過レベルの変動に応じて、表2、3の省エネレベルに対応する省エネ対象電気負荷120を停止・稼動、および、省エネ対象電気回路140を遮断・復帰させる。これをクラスター内の各需要家が分担して行うことによって、クラスター全体の超過分の消費電力量を削減し、クラスター契約電力の超過を防ぐことが可能となる。   The server 160 instructs the ECS 130 of the customer to stop / operate the energy saving target electric load 120 and to shut down / return the energy saving target electric circuit 140 periodically or in correspondence with the cluster demand prediction ratio in Table 1. It may be when the excess level to be changed fluctuates. The value of each excess level in Table 1 and the value of each energy saving level in Tables 2 and 3 are treated as the same value, and the electric load 120 for energy saving corresponding to the energy saving level in Tables 2 and 3 according to the fluctuation of the excess level in Table 1 Is stopped / operated, and the electric circuit 140 for energy saving is shut off / returned. By sharing this with each customer in the cluster, it is possible to reduce the power consumption of the entire cluster and prevent the cluster contract power from being exceeded.

実際には、サーバ160は、表1の超過レベルの値を各需要家に定期的に一斉に送信するだけで、需要家のECS130が、その需要家が選択している省エネレベルに応じて、サーバ160から受信する値に対応する表2の省エネレベルの省エネ対象電気負荷120や表3の省エネ対象電気回路140を停止・遮断させ、受信した超過レベルと対応のない省エネ対象電気負荷120や省エネ対象電気回路140を稼動・復帰させるだけでもよい。例えば、超過レベルの変動により表1の超過レベルが4から3へシフトすると、サーバ160は、超過レベルの変動後の値である3を各需要家に送信する。ある需要家が省エネレベル2を選択している場合、それより低い超過レベルの値3を受信した需要家のECS130は、表2の省エネレベルの値3に対応するエアコン1と照明1を停止させる。続いて、表1の超過レベルが3から2にシフトして、サーバ160から超過レベルの値2の指示を受信した需要家のECS130は、表2の省エネレベルの値2に対応するエアコン1と照明1に加えて、ヒーターと電子ポットも停止させる。ただし、表1の超過レベルが需要家の選択している省エネレベル2よりも高い1にシフトして、サーバ160から超過レベルの値1の指示を需要家のECS130が受信しても、この需要家が省エネレベル2を選択しているときは、省エネレベル2より高い省エネ対象電気負荷120を停止させることはない。その後、表1の超過レベルが2から3にシフトして、サーバ160から超過レベルの値3の指示を受信した需要家のECS130は、表2の省エネレベルの値3と対応していないヒーターと電子ポットを稼動させる。続いて、表1の超過レベルが3から4にシフトすると、表2の省エネレベルの値4に対応する省エネ対象電気負荷120がないことからエアコン1と照明1も稼動させる。一方、他の需要家が省エネレベル4を選択している場合は、サーバ160からレベル1〜3の指示を受けても省エネ対象電気負荷120を停止させることはない。   In practice, the server 160 simply sends the value of the excess level in Table 1 to each customer at once, and the ECS 130 of the customer selects the energy saving level selected by the customer, The energy saving target electric load 120 of the energy saving level of Table 2 corresponding to the value received from the server 160 and the energy saving target electric circuit 140 of Table 3 are stopped and cut off, and the energy load 120 or energy saving not corresponding to the received excess level is saved. It is only necessary to operate / return the target electric circuit 140. For example, when the excess level in Table 1 is shifted from 4 to 3 due to the fluctuation of the excess level, the server 160 transmits 3 after the fluctuation of the excess level to each customer. When a certain consumer has selected the energy saving level 2, the ECS 130 of the customer who has received the lower excess level value 3 stops the air conditioner 1 and the lighting 1 corresponding to the energy saving level value 3 in Table 2. . Subsequently, the ECS 130 of the customer who has received the indication of the excess level value 2 from the server 160 when the excess level in Table 1 is shifted from 3 to 2, the air conditioner 1 corresponding to the energy saving level value 2 in Table 2 In addition to the illumination 1, the heater and the electronic pot are also stopped. However, even if the excess level in Table 1 is shifted to 1 which is higher than the energy saving level 2 selected by the consumer and the ECS 130 of the consumer receives an indication of the excess level value 1 from the server 160, this demand When the house selects the energy saving level 2, the energy saving target electric load 120 higher than the energy saving level 2 is not stopped. Thereafter, the ECS 130 of the customer who has received the indication of the excess level value 3 from the server 160 after the excess level in Table 1 is shifted from 2 to 3, the heater not corresponding to the energy saving level value 3 in Table 2 Operate the electronic pot. Subsequently, when the excess level in Table 1 is shifted from 3 to 4, there is no energy saving target electric load 120 corresponding to the energy saving level value 4 in Table 2, so that the air conditioner 1 and the lighting 1 are also operated. On the other hand, when another customer has selected the energy saving level 4, even if the level 160 is received from the server 160, the energy saving target electric load 120 is not stopped.

また、クラスター内の需要家が省エネ対象電気負荷120を使用していない、あるいは、消費電力量の削減を分担しない省エネレベルを選択している場合、サーバ160から特定のレベルの指示を受けても、この需要家において、想定通りの電力量を削減することがでず、クラスター全体でも目標とするクラスター契約電力の超過分の電力量を削減することができない。かかる場合を考慮して、表2の省エネ対象電気負荷容量割合や表3の省エネ対象電気回路容量割合は、表1のクラスター需要予測割合よりも大きく設定してするようにしてもよい。具体的には、表1の超過レベル3に対応するクラスター需要予測割合は101〜110%と設定していることから、理論的にはクラスター全体として1〜10%分の電力量を削減すればクラスター契約電力の超過を防ぐことができる。しかし、一般家庭等の需要家における電力消費は、必ずしも規則的ではなく、各省エネ対象電気負荷120の使用状態を明確に把握することは困難であり、クラスター内の需要家の電力量を想定通りに削減することができない。そのため、表2の省エネ対象電気負荷容量割合や表3の省エネ対象電気回路容量割合では、削減すべき電力量の割合を10〜20%分と大きく設定し、クラスター内の需要家が省エネ対象電気負荷120を使用していない、あるいは、消費電力量の削減を分担しない省エネレベルを選択している場合を予め見越して、その分の削減すべき電力量を他の需要家が多く負担することによって、クラスター全体として、目標とするクラスター契約電力の超過分の電力量の削減を図るようにしている。   In addition, when a customer in the cluster does not use the electrical load 120 to be saved or selects an energy saving level that does not share the reduction in power consumption, even if a specific level instruction is received from the server 160 This consumer cannot reduce the amount of power as expected, and the entire cluster cannot reduce the amount of power exceeding the target cluster contract power. In consideration of such a case, the energy saving target electric load capacity ratio in Table 2 and the energy saving target electric circuit capacity ratio in Table 3 may be set larger than the cluster demand prediction ratio in Table 1. Specifically, since the cluster demand forecast ratio corresponding to excess level 3 in Table 1 is set to 101 to 110%, theoretically, if the power amount for 1 to 10% is reduced as a whole cluster Exceeding cluster contract power can be prevented. However, the power consumption in consumers such as ordinary households is not always regular, and it is difficult to clearly grasp the usage state of each energy saving target electric load 120, and the power consumption of consumers in the cluster is as expected. Can not be reduced. Therefore, the ratio of the electric load capacity to be saved in Table 2 and the ratio of the electric circuit capacity to be saved in Table 3 is set to a large ratio of the amount of electric power to be reduced to 10 to 20%. By anticipating the case where the load 120 is not used or when the energy saving level that does not share the reduction of the power consumption is selected in advance, and other consumers bear a large amount of the power to be reduced accordingly The entire cluster is designed to reduce the amount of power that exceeds the target cluster contract power.

このように、一般家庭等の需要家に多数ある機器の幾つかを一定の消費電力量の割合で省エネレベルとしてくくり、一つ以上まとめて制御することによって、各需要家で削減できる消費電力量を容易に把握できるようにし、また、各需要家が選択した機器から停止・遮断させるレベルを必要に応じて需要家自身が適宜選択して変更できるようにすることで、画一的に扱うことができない一般家庭等の需要家の曖昧さにも柔軟に対応できるようにしている。   In this way, the power consumption that can be reduced by each consumer by controlling several of the devices that exist in many consumers such as general households at an energy saving level at a certain power consumption rate and controlling one or more at a time. Can be easily grasped, and the level of stopping and shutting off from the equipment selected by each consumer can be appropriately selected and changed as needed by the customer himself / herself. It is possible to respond flexibly to the ambiguity of consumers such as ordinary households who cannot do so.

なお、クラスター契約電力の超過を予測する場合、すでにその時点での消費電力量は、クラスター契約電力をこえていることになる。したがって、その後、省エネ対象電気負荷120の停止等によりクラスター需要予測割合を100%で維持した場合、30分間の消費電力がクラスター最大電力量をこえることになるため、クラスター需要予測割合に余裕をのこして設定するようにしてもよい。表1では、クラスター契約電力の超過を予測するレベル3を101%以上と設定しているが、例えば、91%以上と設定することによって、10%分の余裕ができ、30分間の消費電力がクラスター最大電力量をこえることを防ぐことができる。   When it is predicted that the cluster contract power will be exceeded, the power consumption at that time already exceeds the cluster contract power. Therefore, if the cluster demand forecast ratio is maintained at 100%, for example, by stopping the electrical load 120 to be saved, the power consumption for 30 minutes will exceed the maximum cluster power, so there is a margin in the cluster demand forecast ratio. May be set. In Table 1, the level 3 for predicting excess cluster contract power is set to 101% or more. For example, setting it to 91% or more provides a margin of 10% and power consumption for 30 minutes. It is possible to prevent exceeding the maximum cluster energy.

また、省エネ対象電気負荷120の停止・稼動等が頻繁に発生すると、かえって電力を消費してしまう場合や需要家が煩わしく感じることもあるため、停止させた省エネ対象電気負荷120を一定の時間経過後に稼動等させる、あるいは、クラスター需要予測の頻度を調節してサーバ160からの指示の回数を減らして、停止・稼動等が頻繁に発生しないようにしてもよい。   In addition, if the electric energy saving target load 120 is frequently stopped or operated, the electric energy may be consumed or the consumer may feel annoyed. Operation or the like later may be performed, or the frequency of cluster demand prediction may be adjusted to reduce the number of instructions from the server 160 so that stop / operation or the like does not occur frequently.

Figure 0005545838
Figure 0005545838

表4は、省エネ対象電気負荷120の省エネ対象電気負荷容量、および、ランクと省エネレベルとの関係を示した一例である。表4のランクは、省エネ対象電気負荷120を停止・稼動させる順位であり、省エネ対象電気負荷120にランクを付けることで、レベルに基づく制御より細かな制御が可能となる。   Table 4 shows an example of the energy saving target electric load capacity of the energy saving target electric load 120 and the relationship between the rank and the energy saving level. The ranks in Table 4 are orders for stopping and operating the energy saving target electrical load 120. By giving a rank to the energy saving target electrical load 120, finer control than the control based on the level is possible.

ランクに基づく省エネ対象電気負荷120の停止・稼動は、クラスター需要予測割合に目標値を設定し、クラスター需要予測割合が、設定された目標値をこえるとき、そのこえた分の電力量の削減を各需要家が分担することによって行われる。例えば、需要家が省エネレベル2を選択しているときに、サーバ160から1.5kWh分の省エネ対象電気負荷120の停止の指示を受けると、需要家のECS130は省エネレベル2以下で、上位のランクから順に1.5kWh以上となるまで省エネ対象電気負荷容量を加算して、停止させる省エネ対象電気負荷120を決定する。表4の上位のランクから、エアコン1、照明1、ヒーターの三つの省エネ対象電気負荷容量の合計が1.5kWhとなるからこの三つを停止させ、これ以上の省エネ対象電気負荷120は停止させない。続いて、サーバ160から0.5kWh分の省エネ対象電気負荷120の停止の指示を受けると、需要家のECS130は、ランクが上位のエアコン1の省エネ対象電気負荷容量が0.8kWhであり、0.5kWh以上となるから、エアコン1のみを停止させたままとし、それ以外の照明1とヒーターを稼動させる。   For the energy load 120 to be stopped / operated based on the rank, a target value is set for the cluster demand forecast ratio, and when the cluster demand forecast ratio exceeds the set target value, the amount of power that has been reduced can be reduced. It is done by each customer sharing. For example, when the customer has selected energy saving level 2, if the server 160 receives an instruction to stop the energy load 120 to be saved for 1.5 kWh, the ECS 130 of the customer is at the energy saving level 2 or lower and The energy saving target electric load capacity is added until the power load capacity is 1.5 kWh or more in order from the rank, and the energy saving target electric load 120 to be stopped is determined. From the top ranks in Table 4, the total of the three energy saving target electric load capacities of the air conditioner 1, the lighting 1, and the heater is 1.5 kWh, so that these three are stopped, and the further energy saving target electric load 120 is not stopped. . Subsequently, when receiving an instruction to stop the energy saving target electric load 120 for 0.5 kWh from the server 160, the ECS 130 of the consumer has the energy saving target electric load capacity of the air conditioner 1 having a higher rank of 0.8 kWh. Since it becomes 5 kWh or more, only the air conditioner 1 is kept stopped, and the other lighting 1 and heater are operated.

また、各需要家が分担する削減すべき電力量は、クラスター全体の削減すべき電力量からクラスター内の需要家の数、および、各需要家が選択しているレベルに応じて算出する。クラスター全体の削減すべき電力量は、設定された目標値をこえた割合にクラスター契約電力を乗算した値となるので、
(クラスター需要予測割合−目標値)×クラスター契約電力 (7)
と表せる。例えば、クラスター契約電力が100kW、クラスター需要予測割合の目標値が100%と設定されている場合、クラスター需要予測割合が105%になったときのこえた割合が5%であるからクラスター全体で削減すべき電力量は5kWhとなる。この5kWhを各需要家に均一に配分する場合は、クラスター内の需要家が10つとすると、一つの需要家が分担する電力量が0.5kWhと算出される。または、分担する電力量を各需要家が選択している省エネレベルに応じて変えてもよく、例えば、5kWhを各需要家で配分する場合、クラスター内で消費電力量の削減を分担する省エネレベル1〜3を選択している需要家の内訳を省エネレベル2が5つ、省エネレベル3が5つの場合、省エネレベル2の需要家が省エネレベル3の需要家の1.5倍の削減量を分担するとしたとき、一つの需要家が分担する電力量は、省エネレベル2を選択している需要家が0.6kWh、省エネレベル3を選択している需要家が0.4kWhと算出される。
Further, the amount of power to be shared by each consumer is calculated according to the number of consumers in the cluster and the level selected by each customer from the amount of power to be reduced in the entire cluster. The amount of power that should be reduced for the entire cluster is the value that exceeds the set target value multiplied by the cluster contract power.
(Cluster demand forecast ratio-target value) x Cluster contract power (7)
It can be expressed. For example, if the cluster contract power is 100 kW and the target value of the cluster demand forecast ratio is set to 100%, the ratio when the cluster demand forecast ratio reaches 105% is 5%, so the entire cluster should be reduced. The amount of power is 5 kWh. When this 5 kWh is uniformly distributed to each consumer, assuming that there are 10 consumers in the cluster, the amount of power shared by one consumer is calculated as 0.5 kWh. Alternatively, the amount of power to be shared may be changed according to the energy saving level selected by each consumer. For example, when 5 kWh is allocated to each customer, the energy saving level that shares the reduction of power consumption within the cluster If the energy saving level 2 is 5 and the energy saving level 3 is 5 for the customers who have selected 1 to 3, the energy saving level 2 customer is 1.5 times the amount of reduction compared to the energy saving level 3 customer. When sharing, the amount of electric power shared by one consumer is calculated as 0.6 kWh for a customer who has selected energy saving level 2 and 0.4 kWh for a customer who has selected energy saving level 3.

Figure 0005545838
Figure 0005545838

Figure 0005545838
Figure 0005545838

表5・表6は、省エネ対象電気回路140と遮断・復帰対象区域または配線、省エネ対象電気負荷120との対応、および、ランクと省エネレベルとの関係を示した一例である。表5の遮断・復帰対象区域は、省エネ対象電気回路aを組み込んだ構成において、リレー110によって省エネ対象電気回路aを開閉することで電力供給を遮断・復帰させる区域を示し、表6の遮断・復帰対象配線は、省エネ対象電気回路bを組み込んだ構成において、リレー110によって省エネ対象電気回路bを開閉することで電力供給を遮断・復帰させる配線を示す。上記の省エネ対象電気負荷120の停止・稼動と同様に、ランクに基づく省エネ対象電気回路140の遮断・復帰は、クラスター需要予測割合が、設定された目標値をこえるとき、そのこえた分の電力量の削減を各需要家が分担することによって行われる。   Tables 5 and 6 are examples showing the correspondence between the energy saving target electric circuit 140 and the block / restoration target area or wiring, the energy saving target electric load 120, and the relationship between the rank and the energy saving level. The area to be cut off / restored in Table 5 indicates an area where the power supply is cut off / returned by opening / closing the electric circuit a to be saved by the relay 110 in the configuration incorporating the electric circuit to be saved / energy-saving. The restoration target wiring indicates a wiring that cuts off / returns the power supply by opening / closing the energy saving target electric circuit b by the relay 110 in a configuration in which the energy saving target electric circuit b is incorporated. As with the above-described stop / operation of the energy-saving target electric load 120, when the cluster demand prediction ratio exceeds the set target value, the power-saving target electric circuit 140 is shut off / returned based on the rank. It is done by each customer sharing the volume reduction.

ただし、個々の省エネ対象電気負荷120を停止・稼動させるのと異なり、省エネ対象電気回路140による制御は、サブブレーカー101、および、サブブレーカー101の配線の先にある省エネ対象電気負荷120の全てが遮断・復帰される。例えば、表5の省エネ対象電気回路aの構成の場合、サブブレーカー101の一つが、寝室のコンセントへの配線と寝室の照明用への配線を束ねているとき、サーバ160から0.5kWh分の省エネ対象電気負荷120の停止が指示されると、エアコン1のみを停止させれば指示の要件を満たすが、エアコン1のみを制御することができない。この場合、エアコン1と通じている省エネ対象電気回路a1は照明1の配線も束ねているため省エネ対象電気回路a1を遮断することによって、寝室のコンセントに接続されたエアコン1だけでなく、寝室の照明1の電力供給も遮断されることになる。   However, unlike the case where the individual energy saving target electric loads 120 are stopped and operated, the control by the energy saving target electric circuit 140 is performed by the sub breaker 101 and all of the energy saving target electric loads 120 ahead of the wiring of the sub breaker 101. Shut off / return. For example, in the case of the configuration of the electric circuit a to be energy-saving shown in Table 5, when one of the sub breakers 101 bundles the wiring to the outlet of the bedroom and the wiring for the lighting of the bedroom, it is 0.5 kWh from the server 160. If an instruction to stop the energy saving target electric load 120 is given, the instruction requirement is satisfied if only the air conditioner 1 is stopped, but only the air conditioner 1 cannot be controlled. In this case, the energy saving target electric circuit a1 that communicates with the air conditioner 1 also bundles the wiring of the lighting 1. Therefore, by cutting off the energy saving target electric circuit a1, not only the air conditioner 1 connected to the bedroom outlet but also the bedroom. The power supply of the illumination 1 is also cut off.

一方、表6の省エネ対象電気回路bの構成の場合は、サブブレーカー101が束ねている各配線に対して電力供給の遮断・復帰が行えるため、寝室のコンセント、および、寝室の照明への配線が別々の配線であれば、エアコン1、および、照明1のそれぞれについて制御することができる。しかし、省エネ対象電気回路bが制御対象とする配線の先に複数の省エネ対象電気負荷120が接続されているとき、それぞれについて制御をすることはできない。例えば、省エネ対象電気回路2bが台所の一つのコンセントに通じているとき、そのコンセントにヒーターと電子ポットが接続されていれば、ランクが電子ポットよりヒーターの方が上でも、省エネ対象電気回路2bを遮断することにより、そのコンセントに接続されたヒーターと電子ポットの両方の電力供給が遮断される。   On the other hand, in the case of the configuration of the electric circuit b for energy saving shown in Table 6, the power supply can be shut off / returned to each wiring bundled by the sub-breaker 101, so that the wiring to the bedroom outlet and the bedroom lighting is possible. Can be controlled for each of the air conditioner 1 and the lighting 1. However, when a plurality of energy saving target electric loads 120 are connected to the ends of the wirings to be controlled by the energy saving target electric circuit b, it is not possible to control each of them. For example, when the electric circuit 2b targeted for energy saving is connected to one outlet in the kitchen, if the heater and the electronic pot are connected to the outlet, the electric circuit 2b targeted for energy saving even if the rank is higher than the electric pot. By shutting off, power supply to both the heater and the electronic pot connected to the outlet is cut off.

なお、クラスター内の需要家が省エネ対象電気負荷120を使用していない、あるいは、消費電力量の削減を分担しない省エネレベルを選択している場合、想定している電力量の削減ができないことから、クラスター需要予測割合を目標値まで下げることができない。かかる場合を考慮して、クラスター需要予測割合を目標値に近づけるために数回にわたってサーバ160から省エネ対象電気負荷120の停止の指示をするようにしてもよい。具体的には、サーバ160から電力量の削減を指示した後の目標値をこえた割合から、さらに、式(7)によってクラスター全体の削減すべき電力量を得て、需要家が分担する電力量を算出する。この電力量と、その前にサーバ160が指示した各需要家が分担する電力量を加算した電力量を再度、各需要家が削減すべき電力量としてサーバ160が指示する。これを繰り返すことによって、クラスター需要予測割合を目標値に近づけることができる。例えば、クラスター契約電力が100kW、クラスター需要予測割合の目標値のこえた割合が5%のとき、クラスター内の需要家が10つとすると、各需要家の分担する削減すべき電力量は0.5kWhとなる。この0.5kWhの電力量の削減をサーバ160が各需要家に指示した後の目標値をこえた割合が1%であれば、さらに、この1%分の電力量の削減を各需要家が分担する。目標値をこえた割合が1%のときの各需要家が分担する電力量は、0.1kWhとなるため、2回目のサーバ160からの指示は、1回目の指示の電力量に加算した0.6kWhとなる。また、この指示の後の目標値をこえた割合が0.2%となった場合は、さらに、この0.2%分を削減するために各需要家が分担する電力量を計算して2回目の指示の電力量に加算する。これを繰り返すことによって、クラスター需要予測割合を目標値に近づけることができる。   Note that if the customers in the cluster do not use the energy saving target electric load 120 or select an energy saving level that does not share the reduction in power consumption, the expected power consumption cannot be reduced. The cluster demand forecast ratio cannot be lowered to the target value. In consideration of such a case, the server 160 may instruct the energy saving target electrical load 120 to be stopped several times in order to bring the cluster demand prediction ratio closer to the target value. Specifically, the amount of power to be reduced for the entire cluster is obtained from the ratio exceeding the target value after instructing the reduction of the power amount from the server 160, and the power shared by the customer is obtained by the equation (7). Calculate the amount. The server 160 instructs again the amount of power obtained by adding the amount of power and the amount of power shared by each customer instructed by the server 160 as the amount of power to be reduced by each customer. By repeating this, the cluster demand prediction ratio can be brought close to the target value. For example, when the cluster contract power is 100 kW and the ratio exceeding the target value of the cluster demand forecast ratio is 5%, if there are 10 consumers in the cluster, the amount of power to be shared by each consumer is 0.5 kWh. It becomes. If the ratio exceeding the target value after the server 160 instructs each customer to reduce the amount of electric power of 0.5 kWh is 1%, each customer further reduces the electric energy by 1%. to share the load. Since the amount of power shared by each customer when the ratio exceeding the target value is 1% is 0.1 kWh, the instruction from the server 160 for the second time is 0 added to the amount of power for the first instruction. .6 kWh. In addition, when the ratio exceeding the target value after this instruction becomes 0.2%, the electric energy shared by each customer is calculated to further reduce this 0.2% by 2 Add to the electric energy of the second instruction. By repeating this, the cluster demand prediction ratio can be brought close to the target value.

需要家が表2〜6の省エネ対象電気負荷120や省エネ対象電気回路140を選択して、それぞれに対してレベルやランクを決定し、管理者が、サーバ160、あるいは、各需要家のECS130にレベルやランクを登録するが、需要家は、ECS130、あるいは、パソコンや携帯電話等からインターネットを介して登録された省エネ対象電気負荷120や省エネ対象電気回路140とレベルやランクとの組み合わせを適宜変更できるようにしてもよい。ただし、登録した省エネ対象電気負荷120や省エネ対象電気回路140が多い場合、その組み合わせのパターンは無数となることから、サーバ160、あるいは、各需要家のECS130は、例えば、適切な組み合わせを選択できるように省エネ対象電気負荷120や省エネ対象電気回路140の組み合わせをシミュレートして幾つかの選択肢を表示して需要家を補助するようにしてもよい。   The consumer selects the energy saving target electric load 120 and the energy saving target electric circuit 140 shown in Tables 2 to 6, determines the level and rank for each, and the manager selects the server 160 or the ECS 130 of each consumer. The level and rank are registered, but the customer appropriately changes the combination of the energy saving target electric load 120 and the energy saving target electric circuit 140 and the level and rank registered from the ECS 130 or a personal computer or a mobile phone via the Internet. You may be able to do it. However, when there are a large number of registered electrical loads 120 for energy saving and electrical circuits 140 for energy saving, there are an infinite number of combinations, so the server 160 or the ECS 130 of each consumer can select an appropriate combination, for example. As described above, a combination of the energy saving target electric load 120 and the energy saving target electric circuit 140 may be simulated to display some options and assist the customer.

Figure 0005545838
Figure 0005545838

表7は、表1のクラスター需要予測割合と関連付ける超過レベルの値を変更できるようにレベルに変数を設けた構成を示した一例である。表1では、超過レベルとクラスター需要予測割合との対応をクラスター契約電力が超過する場合に固定されているが、表7は、超過レベルの値を任意に変更できるようにすることで、超過レベルとクラスター需要予測割合との対応を変えることができるようにしている。これにより、クラスター契約電力の超過にかかわらず季節や曜日、時間帯等によって、省エネレベルと表2の停止させる省エネ対象電気負荷120や表3の遮断させる省エネ対象電気回路140との対応を調節することができ、必要に応じて超過レベルを下げることでクラスター全体の電力消費量を抑え、これにより社会全体の省エネに貢献することができるようになる。例えば、表7の変数xが0のとき、省エネレベル4〜6がクラスター契約電力を超過しない安全なレベルとなるが、変数xにマイナス1を入れると、それまで安全なレベルとして設定されていた省エネレベル4がクラスター契約電力を超過の危険のあるレベル3となるため、対応するクラスター需要予測割合が91%以上になるとサーバ160が省エネ対象電気負荷120等の停止を指示することになる。実際には、クラスター需要予測割合が91%程度であればクラスター契約電力の超過の危険は僅かであるが、このように、クラスター全体の消費電力の増加にともない、省エネ対象電気負荷120等を停止させるようにすることで、クラスター全体の消費電力を抑えることができ、社会全体の省エネに貢献することができる。   Table 7 is an example showing a configuration in which a variable is provided in the level so that the value of the excess level associated with the cluster demand prediction ratio in Table 1 can be changed. In Table 1, the correspondence between the excess level and the cluster demand forecast ratio is fixed when the cluster contract power exceeds, but Table 7 shows that the excess level can be changed arbitrarily by changing the value of the excess level. And the cluster demand forecast ratio can be changed. As a result, the correspondence between the energy saving level and the energy saving target electric load 120 to be stopped in Table 2 and the energy saving target electric circuit 140 to be cut off in Table 3 is adjusted according to the season, day of the week, time zone, etc. regardless of excess of the cluster contract power. It is possible to reduce the power consumption of the entire cluster by lowering the excess level as necessary, thereby contributing to energy saving for the whole society. For example, when the variable x in Table 7 is 0, the energy saving levels 4 to 6 are safe levels that do not exceed the cluster contract power, but if the variable x is set to minus 1, it has been set as a safe level until then. Since the energy saving level 4 is a level 3 at which there is a risk of exceeding the cluster contract power, when the corresponding cluster demand prediction ratio becomes 91% or more, the server 160 instructs to stop the electric load 120 to be saved. Actually, if the cluster demand forecast ratio is about 91%, the risk of exceeding the cluster contract power is negligible, but in this way, as the overall power consumption of the cluster increases, the energy load 120 to be saved is stopped. By doing so, the power consumption of the whole cluster can be suppressed, and it can contribute to the energy saving of the whole society.

一方、発電設備150で発電した電気を使用する場合には、発電量を勘案して変数xにプラスの値を入れるようにしてもよい。   On the other hand, when electricity generated by the power generation facility 150 is used, a positive value may be entered in the variable x in consideration of the amount of power generation.

クラスター内の各需要家が選択した省エネレベルに対応する省エネ対象電気負荷120の全部、または、一部を使用していないとき、あるいは、クラスター内の需要家の全部、または、一部が消費電力量の削減を分担しない省エネレベルを選択しているときは、サーバ160が省エネ対象電気負荷120の停止や省エネ対象電気回路140の遮断、もしくは、削減電力量を指示しても、クラスター全体の消費電力量が殆ど変化しない場合がある。このときクラスター需要予測も変化しないことから、表1のクラスター需要予測割合の変動も生じないので、サーバ160は同じ指示を出し続けることになる。このようにサーバ160が同じ指示を出し続けてもクラスター需要予測割合に変動が生じず、所望の消費電力量を削減できない場合には、例えば、同じ指示の回数、または、同じ指示を出し続けてから所定時間経過後に表7のレベル列のxを1ずつ減算するようにしてもよい。クラスター需要予測割合に対する超過レベルを下げることで、停止等させる省エネ対象電気負荷120を増やし、クラスター全体の消費電力量を減少させ得る。   When all or part of the energy saving target electric load 120 corresponding to the energy saving level selected by each consumer in the cluster is not used, or all or some of the consumers in the cluster consume power. When the energy saving level that does not share the amount reduction is selected, even if the server 160 stops the energy saving target electric load 120, shuts off the energy saving target electric circuit 140, or instructs the energy saving amount, the entire cluster consumption There is a case where the amount of electric power hardly changes. At this time, since the cluster demand prediction does not change, the fluctuation in the cluster demand prediction ratio in Table 1 does not occur, so the server 160 continues to issue the same instruction. In this way, even if the server 160 continues to issue the same instruction, the cluster demand prediction ratio does not change, and if the desired power consumption cannot be reduced, for example, the same instruction number or the same instruction is continuously issued. Alternatively, x in the level column of Table 7 may be subtracted by 1 after a predetermined time has elapsed. By reducing the excess level with respect to the cluster demand prediction ratio, it is possible to increase the energy saving target electric load 120 to be stopped and reduce the power consumption of the entire cluster.

需要家が管理者に支払う電気料金は、各需要家が分担した削減すべき電力量に応じて割り引くようにしてもよい。消費電力量の削減に貢献すればするほど電気料金を割り引くことでクラスター内の各需要家の省エネ意欲を高め、クラスター全体の電力消費を抑えるとともに、社会全体の省エネにも貢献する。   The electricity bill paid by the consumer to the manager may be discounted according to the amount of power to be reduced shared by each consumer. The more you contribute to the reduction of power consumption, the more you will save energy for each customer in the cluster by discounting the electricity bill, reducing the power consumption of the entire cluster and contributing to the energy saving of the whole society.

各需要家が分担した電力量の算出は、サーバ160から停止や遮断が最初に指示される直前の需要家電力情報と各指示後の需要家電力情報との差分を停止や遮断の指示が終了するまで、クラスター需要予測の変動ごとに算出するようにしてもよい。例えば、表2、3の省エネレベル1を選択している需要家の需要家電力情報が4kWのときに、超過レベルが4から1にシフトして、サーバ160からレベル1の指示がされた後の需要家電力情報が1.2kWになると、最初に停止が指示される直前の4kWとの差分が2.8kWとなるから、この指示が15分間継続すると、この需要家は、0.7kWh分の電力量を分担したことになる。続いて、超過レベルが1から3にシフトして、サーバ160からレベル3の指示を受けた後の需要家電力情報が3.1kWになると、最初に停止が指示される前の4kWとの差分が0.9kWとなるから、この指示が20分間継続すると、この需要家は、0.3kWh分の電力量を分担したことになる。次に、レベルが3から4にシフトすると、サーバ160からの停止や遮断の指示が終了するので、需要家が分担する電力量の算出も終了する。この例の場合、サーバ160から最初に停止や遮断が指示されてから終了するまでの35分間で、この需要家は、1kWh分の電力量を分担したことになる。   The calculation of the amount of power shared by each consumer is completed. The instruction to stop or shut off the difference between the customer power information immediately before stop or shut off is first instructed from the server 160 and the customer power information after each order is finished. Until it does, you may make it calculate for every fluctuation | variation of a cluster demand forecast. For example, after the customer power information of a customer who has selected energy saving level 1 in Tables 2 and 3 is 4 kW, the excess level is shifted from 4 to 1, and the server 160 gives an instruction of level 1 When the customer power information of 1.2 kW becomes 1.2 kW, the difference from 4 kW immediately before the first stop is instructed is 2.8 kW. Therefore, if this instruction continues for 15 minutes, this customer will receive 0.7 kWh. The amount of power is shared. Subsequently, when the excess level is shifted from 1 to 3 and the consumer power information after receiving the level 3 instruction from the server 160 becomes 3.1 kW, the difference from 4 kW before the first stop is instructed. Therefore, if this instruction is continued for 20 minutes, the customer has shared the amount of power for 0.3 kWh. Next, when the level is shifted from 3 to 4, the stop or shut-off instruction from the server 160 is terminated, so that the calculation of the electric energy shared by the consumer is also terminated. In the case of this example, this consumer shares the amount of power for 1 kWh in 35 minutes from when the server 160 is first instructed to stop or shut down to the end.

また、電気料金の割引は、所定期間内にクラスター全体で削減した電力量をクラスター内の需要家数で除算した値を基準値として、基準値を上回った電力量に応じて電気料金を割り引くようにしてもよい。または、基準値と各需要家が分担した電力量から割引率を算出するようにしてもよい。例えば、一ヶ月間にクラスター全体で削減した電力量を100kWh、クラスター内の需要家を20とすると、一つの需要家が平均して分担すべき電力量は5kWhとなる。この5kWhを基準値として、ある需要家が一ヶ月間に分担した電力量が8kWhであれば、基準値より3kWh分上回っているから、それに所定の値を乗算した分を電気料金から割り引くようにしてもよい。反対に、全く分担していない需要家に対しては、基準値の5kWhに所定の値を乗算した分の電気料金を上乗せするようにしてもよい。または、ある需要家が一ヶ月間に分担した電力量が10kWhであれば、基準値の2倍の電力量を分担したことになるから、割引率を2としてこの需要家の電気料金を2割り引くようにしてもよい。   In addition, the discount on electricity charges is based on the value obtained by dividing the amount of electricity reduced in the entire cluster within the specified period by the number of consumers in the cluster, and the electricity price is discounted according to the amount of electricity exceeding the reference value. It may be. Alternatively, the discount rate may be calculated from the reference value and the amount of power shared by each consumer. For example, assuming that the amount of power reduced in the entire cluster in one month is 100 kWh and the number of consumers in the cluster is 20, the amount of power that one consumer should share on average is 5 kWh. With this 5 kWh as a reference value, if the amount of power shared by a certain customer for a month is 8 kWh, it is 3 kWh higher than the reference value, so the amount multiplied by a predetermined value is discounted from the electricity bill. May be. On the contrary, for customers who do not share at all, it is possible to add an electricity bill corresponding to the reference value of 5 kWh multiplied by a predetermined value. Or, if the amount of power shared by a certain customer for one month is 10 kWh, it means that the amount of power is double the standard value, so the discount rate is set to 2 and the electricity charge of this customer is discounted by 2 You may do it.

100 メインブレーカー
101 サブブレーカー
110 リレー
120 省エネ対象電気負荷
130 ECS
140 省エネ対象電気回路
150 発電設備
160 サーバ
161 ECSネット網
210 高圧一括受電設備
212 変圧器
100 Main breaker 101 Sub breaker 110 Relay 120 Energy saving target electric load 130 ECS
140 Electricity saving target electric circuit 150 Power generation facility 160 Server 161 ECS network 210 High voltage collective power reception facility 212 Transformer

Claims (12)

電気負荷の幾つかを停止することによって消費電力量を低減する電力制御システムであって、
前記消費電力量のレベルを所定時間内の使用電力量に基づいて予測するとともに予測結果を送信するサーバと、
前記サーバから送信された消費電力量のレベルに応じた電気負荷であって予め許可された電気負荷に対して停止命令を出力する端末と、
電気事業者から電気を受電してクラスターを構成している各需要家に配電する高圧一括受電設備と、
前記高圧一括受電設備および前記各需要家に設置され、ネットワークを介して前記サーバと通信するエネルギーコントロールシステムと、
を備え、
前記需要家のエネルギーコントロールシステムから前記サーバへ、需要家電力情報、省エネ実践情報、省エネ対象電気回路容量を送信し、
前記高圧一括受電設備のエネルギーコントロールシステムからサーバへ電力取引情報を送信する電力制御システム。
A power control system that reduces power consumption by stopping some of the electrical loads,
A server that predicts the level of power consumption based on the amount of power used within a predetermined time and transmits a prediction result;
A terminal that outputs an instruction to stop an electric load that is an electric load according to the level of power consumption transmitted from the server and is permitted in advance;
A high-voltage collective power receiving facility that receives electricity from an electric power company and distributes the electricity to each customer constituting the cluster;
An energy control system installed in the high-voltage collective power receiving facility and each consumer, and communicating with the server via a network;
With
Send customer power information, energy saving practice information, energy saving target electric circuit capacity from the customer energy control system to the server,
A power control system for transmitting power transaction information from the energy control system of the high-voltage power receiving facility to a server .
予測の変動に応じて、前記停止を命令した電気負荷であってレベルと対応のない電気負荷を稼働させることを特徴とする請求項1に記載の電力制御システム。   The power control system according to claim 1, wherein an electric load that is instructed to be stopped and that does not correspond to a level is operated according to a change in prediction. 電気負荷の幾つかを停止することによって消費電力量を低減する電力制御システムであって、
前記消費電力量を所定時間内の使用電力量に基づいて予測するとともに前記予測に基づいて配分する電力量を算出し、前記電力量を送信するサーバと、
前記サーバから送信された電力量以上になるまで予めランク付けさられた順に前記電気負荷の電力容量を加算して停止させる電気負荷を決定し、前記決定した電気負荷の停止命令を出力する端末と、
電気事業者から電気を受電してクラスターを構成している各需要家に配電する高圧一括受電設備と、
前記高圧一括受電設備および前記各需要家に設置され、ネットワークを介して前記サーバと通信するエネルギーコントロールシステムと、
を備え、
前記需要家のエネルギーコントロールシステムから前記サーバへ、需要家電力情報、省エネ実践情報、省エネ対象電気回路容量を送信し、
前記高圧一括受電設備のエネルギーコントロールシステムからサーバへ電力取引情報を送信する電力制御システム。
A power control system that reduces power consumption by stopping some of the electrical loads,
A server that predicts the power consumption amount based on the power consumption amount used within a predetermined time and calculates the power amount to be distributed based on the prediction, and transmits the power amount;
A terminal that determines an electrical load to be stopped by adding the power capacity of the electrical load in an order ranked in advance until the amount of power transmitted from the server is equal to or higher, and outputs a command to stop the determined electrical load; ,
A high-voltage collective power receiving facility that receives electricity from an electric power company and distributes the electricity to each customer constituting the cluster;
An energy control system installed in the high-voltage collective power receiving facility and each consumer, and communicating with the server via a network;
With
Send customer power information, energy saving practice information, energy saving target electric circuit capacity from the customer energy control system to the server,
A power control system for transmitting power transaction information from the energy control system of the high-voltage power receiving facility to a server .
予測の変動に応じて、前記停止を命令した電気負荷であって、決定した電気負荷以外の電気負荷を稼働させることを特徴とする請求項3に記載の電力制御システム。   The power control system according to claim 3, wherein an electric load other than the determined electric load is operated in accordance with a prediction variation. 前記電気負荷に遠隔制御アダプターを取り付け、前記端末が前記遠隔制御アダプターに命令することによって前記電気負荷を停止させることを特徴とする請求項1から4の何れかに記載の電力制御システム。   The power control system according to any one of claims 1 to 4, wherein a remote control adapter is attached to the electric load, and the electric load is stopped when the terminal instructs the remote control adapter. 所定期間内の前記電気負荷の停止を命令する前後の前記端末における消費電力量の差の合計と、所定期間内の前記電力制御システム全体の低減した消費電力量の合計との割合に応じて前記端末における電気料金を割引くことを特徴とする請求項1から5の何れかに記載の電力制御システム。   According to the ratio between the total difference in power consumption in the terminal before and after commanding the stop of the electrical load within a predetermined period and the total reduction in power consumption of the entire power control system within the predetermined period The power control system according to any one of claims 1 to 5, wherein an electricity charge at a terminal is discounted. 電気回路の幾つかを遮断することによって消費電力量を低減する電力制御システムであって、
前記消費電力量のレベルを所定時間内の使用電力量に基づいて予測するとともに予測結果を送信するサーバと、
前記サーバから送信された消費電力量のレベルに応じた電気回路であって予め許可された電気回路に対して遮断命令を出力する端末と、
電気事業者から電気を受電してクラスターを構成している各需要家に配電する高圧一括受電設備と、
前記高圧一括受電設備および前記各需要家に設置され、ネットワークを介して前記サーバと通信するエネルギーコントロールシステムと、
を備え、
前記需要家のエネルギーコントロールシステムから前記サーバへ、需要家電力情報、省エネ実践情報、省エネ対象電気回路容量を送信し、
前記高圧一括受電設備のエネルギーコントロールシステムからサーバへ電力取引情報を送信する電力制御システム。
A power control system that reduces power consumption by interrupting some of the electrical circuits,
A server that predicts the level of power consumption based on the amount of power used within a predetermined time and transmits a prediction result;
A terminal that outputs a shut-off command to a previously permitted electric circuit that is an electric circuit according to the level of power consumption transmitted from the server;
A high-voltage collective power receiving facility that receives electricity from an electric power company and distributes the electricity to each customer constituting the cluster;
An energy control system installed in the high-voltage collective power receiving facility and each consumer, and communicating with the server via a network;
With
Send customer power information, energy saving practice information, energy saving target electric circuit capacity from the customer energy control system to the server,
A power control system for transmitting power transaction information from the energy control system of the high-voltage power receiving facility to a server .
予測の変動に応じて、前記遮断を命令した電気回路であってレベルと対応のない電気回路を復帰させることを特徴とする請求項7に記載の電力制御システム。   8. The electric power control system according to claim 7, wherein an electric circuit that is instructed to be cut off and that does not correspond to a level is restored according to a fluctuation in prediction. 電気配線の幾つかを遮断することによって消費電力量を低減する電力制御システムであって、
前記消費電力量を所定時間内の使用電力量に基づいて予測するとともに前記予測に基づいて配分する電力量を算出し、前記電力量を送信するサーバと、
前記サーバから送信された電力量以上になるまで予めランク付けさられた順に前記電気配線の電力容量を加算して遮断させる電気配線を決定し、前記決定した電気配線の遮断命令を出力する端末と、
電気事業者から電気を受電してクラスターを構成している各需要家に配電する高圧一括受電設備と、
前記高圧一括受電設備および前記各需要家に設置され、ネットワークを介して前記サーバと通信するエネルギーコントロールシステムと、
を備え、
前記需要家のエネルギーコントロールシステムから前記サーバへ、需要家電力情報、省エネ実践情報、省エネ対象電気回路容量を送信し、
前記高圧一括受電設備のエネルギーコントロールシステムからサーバへ電力取引情報を送信する電力制御システム。
A power control system that reduces power consumption by interrupting some of the electrical wiring,
A server that predicts the power consumption amount based on the power consumption amount used within a predetermined time and calculates the power amount to be distributed based on the prediction, and transmits the power amount;
A terminal for determining an electric wiring to be cut off by adding a power capacity of the electric wiring in an order ranked in advance until the amount of electric power transmitted from the server is equal to or higher, and outputting a command to cut off the determined electric wiring; ,
A high-voltage collective power receiving facility that receives electricity from an electric power company and distributes the electricity to each customer constituting the cluster;
An energy control system installed in the high-voltage collective power receiving facility and each consumer, and communicating with the server via a network;
With
Send customer power information, energy saving practice information, energy saving target electric circuit capacity from the customer energy control system to the server,
A power control system for transmitting power transaction information from the energy control system of the high-voltage power receiving facility to a server .
予測の変動に応じて、前記遮断を命令した電気配線であって、決定した電気配線以外の電気配線を復帰させることを特徴とする請求項9に記載の電力制御システム。   The power control system according to claim 9, wherein the electric wiring that is instructed to be cut off is returned in response to a prediction fluctuation, and the electric wiring other than the determined electric wiring is restored. 前記電気回路、または、前記電気配線にリレーを組み込み、前記端末が前記リレーに命令することによって前記電気回路、または、前記電気配線を遮断させることを特徴とする請求項7から10の何れかに記載の電力制御システム。   The relay according to any one of claims 7 to 10, wherein a relay is incorporated in the electrical circuit or the electrical wiring, and the terminal instructs the relay to interrupt the electrical circuit or the electrical wiring. The power control system described. 所定期間内の前記電気回路、または、前記電気配線の遮断を命令する前後の前記端末における消費電力量の差の合計と、所定期間内の前記電力制御システム全体の低減した消費電力量の合計との割合に応じて前記端末における電気料金を割引くことを特徴とする請求項7から11の何れかに記載の電力制御システム。   A sum of differences in power consumption in the terminal before and after commanding to shut off the electrical circuit or electrical wiring in a predetermined period, and a total of reduced power consumption in the entire power control system in a predetermined period; The power control system according to any one of claims 7 to 11, wherein an electricity charge at the terminal is discounted according to a ratio of the power consumption.
JP2010108910A 2010-05-11 2010-05-11 Power control system Expired - Fee Related JP5545838B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010108910A JP5545838B2 (en) 2010-05-11 2010-05-11 Power control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010108910A JP5545838B2 (en) 2010-05-11 2010-05-11 Power control system

Publications (2)

Publication Number Publication Date
JP2011239569A JP2011239569A (en) 2011-11-24
JP5545838B2 true JP5545838B2 (en) 2014-07-09

Family

ID=45326911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010108910A Expired - Fee Related JP5545838B2 (en) 2010-05-11 2010-05-11 Power control system

Country Status (1)

Country Link
JP (1) JP5545838B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5753456B2 (en) * 2011-07-22 2015-07-22 生活協同組合コープさっぽろ Power management server and power management processing program
JP6106904B2 (en) * 2011-12-05 2017-04-05 パナソニックIpマネジメント株式会社 Power measurement system
JP5849717B2 (en) * 2012-01-18 2016-02-03 オムロン株式会社 Electric energy monitoring device, electric energy monitoring system, electric energy monitoring method, control program, and recording medium
JP5699104B2 (en) * 2012-03-15 2015-04-08 三菱電機ビルテクノサービス株式会社 Power control system used
KR101353904B1 (en) 2012-07-26 2014-01-22 주식회사 피엠그로우 Electric vehicle charging system and method interworking with power management system
JP2014038468A (en) * 2012-08-15 2014-02-27 Toko Electric Corp Wide-area energy efficiency support device and computer program
WO2015104740A1 (en) * 2014-01-10 2015-07-16 パナソニックIpマネジメント株式会社 Control system and distribution board
JP6525642B2 (en) * 2015-03-03 2019-06-05 東京電力ホールディングス株式会社 Contract menu creation method
CN110009165A (en) * 2019-05-08 2019-07-12 国网福建省电力有限公司经济技术研究院 Prediction technique and system based on multiaddress fence area history electricity consumption

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11332098A (en) * 1998-05-20 1999-11-30 Oki Electric Ind Co Ltd Environment-preserving excess contract-power preventive power demand control
JP3869648B2 (en) * 2000-11-17 2007-01-17 三洋電機株式会社 High-voltage collective power reception and low-voltage distribution method and apartment house using the same
JP3793921B2 (en) * 2002-07-31 2006-07-05 株式会社日立製作所 Power supply service business method
JP2006158146A (en) * 2004-12-01 2006-06-15 Toko Electric Corp Supply management system for electric power
JP2007195392A (en) * 2005-12-19 2007-08-02 Fuji Electric Retail Systems Co Ltd Demand supervisory equipment
JP5114026B2 (en) * 2006-06-28 2013-01-09 三洋電機株式会社 Demand control device
JP2010075015A (en) * 2008-09-22 2010-04-02 Mitsubishi Electric Corp Demand control system for household electric appliance

Also Published As

Publication number Publication date
JP2011239569A (en) 2011-11-24

Similar Documents

Publication Publication Date Title
JP5545838B2 (en) Power control system
KR101384705B1 (en) Energy reduction
USRE46093E1 (en) Energy reduction
US20100145884A1 (en) Energy savings aggregation
US20100019574A1 (en) Energy management system for auxiliary power source
US20090018706A1 (en) Flexible electric load management system and method therefore
US20140111006A1 (en) Energy management system for auxiliary power source
WO2013069619A1 (en) Energy management device
JP6116970B2 (en) Energy management system, energy management apparatus, and energy management method
JP2016046922A (en) Energy supply/demand adjustment system, upper community energy management system, and lower community energy management system
JP5820892B2 (en) Electric power supply and demand control device and electric power supply and demand control method
JP6820677B2 (en) Power management equipment and programs
CN108369028B (en) Control device, control method of water heater, and recording medium
JP6644162B2 (en) Power management system, control device, and power management method
JP2020068555A (en) Power management system and complex housing
JP6762297B2 (en) Equipment control system and control method
Bin-Halabi et al. Interactive Energy Management System to Avoid Rolling Blackouts
JP2019046359A (en) Control system
WO2019159904A1 (en) Electric power control device, electric power control system, and electric power control method
JP2023163937A (en) Vehicle charging system of all-electric housing complex

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130510

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131025

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131218

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140509

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140509

R150 Certificate of patent or registration of utility model

Ref document number: 5545838

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees