JP5314250B2 - Reinforced concrete floor slab minority main girder bridge - Google Patents

Reinforced concrete floor slab minority main girder bridge Download PDF

Info

Publication number
JP5314250B2
JP5314250B2 JP2007020573A JP2007020573A JP5314250B2 JP 5314250 B2 JP5314250 B2 JP 5314250B2 JP 2007020573 A JP2007020573 A JP 2007020573A JP 2007020573 A JP2007020573 A JP 2007020573A JP 5314250 B2 JP5314250 B2 JP 5314250B2
Authority
JP
Japan
Prior art keywords
floor slab
reinforced concrete
concrete floor
bridge
main girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007020573A
Other languages
Japanese (ja)
Other versions
JP2008184846A (en
Inventor
研一 西山
正和 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui E&S Holdings Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Mitsui E&S Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd, Mitsui E&S Holdings Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP2007020573A priority Critical patent/JP5314250B2/en
Publication of JP2008184846A publication Critical patent/JP2008184846A/en
Application granted granted Critical
Publication of JP5314250B2 publication Critical patent/JP5314250B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、複数の主桁間に複数の横桁を橋軸方向に所定の間隔で設けると共に、前記横桁上に鉄筋コンクリート床版を設置した鉄筋コンクリート床版少数主桁橋に関する。   The present invention relates to a reinforced concrete floor slab minority main girder bridge in which a plurality of cross girders are provided at a predetermined interval in the bridge axis direction between a plurality of main girders and a reinforced concrete floor slab is installed on the cross girder.

鋼橋の設計及び施工時における合理化、或いは省力化に伴い、支間が30m〜60m程度の中支間橋梁においては、従来の多主桁橋よりも経済性に優れた構造形式として、PC床版(プレストレストコンクリート床版)や合成床版を用いた2主桁橋が採用されるようになった(例えば、非特許文献1参照。)。   With the rationalization or labor saving at the time of designing and constructing steel bridges, PC floor slabs (in the middle branch bridges with spans of 30m to 60m) are more economical than conventional multi-main girder bridges. A two-main girder bridge using a prestressed concrete floor slab or a synthetic floor slab has been adopted (for example, see Non-Patent Document 1).

PC床版2主桁橋100は、図6に示すように、2本の主桁101間にH断面またはI断面の横桁102が設けられており、その上部にPC床版103が構築されている。PC床版103は、シース104内に挿入したPC鋼材105を定着ナット106によって緊締している。そして、PC床版103上にアスファルト舗装107が施されている。   As shown in FIG. 6, the PC floor slab 2 main girder bridge 100 is provided with a cross girder 102 having an H or I cross section between two main girders 101, and a PC floor slab 103 is constructed on the upper part. ing. The PC floor slab 103 is fastened with a fixing nut 106 to a PC steel material 105 inserted into the sheath 104. An asphalt pavement 107 is provided on the PC floor slab 103.

他方、合成床版2主桁橋200は、図7に示すように、2本の主桁201間にH断面またはI断面の横桁202が設けられており、その上部に合成床版203が構築されている。そして、合成床版203上にアスファルト舗装204が施されている。   On the other hand, as shown in FIG. 7, the composite floor slab 2 main girder bridge 200 is provided with a cross beam 202 having an H cross section or an I cross section between two main girders 201, and the composite floor slab 203 is disposed on the upper part. Has been built. An asphalt pavement 204 is provided on the synthetic floor slab 203.

しかし、PC床版や合成床版は、以下のような問題も抱えている。   However, PC floor slabs and synthetic floor slabs also have the following problems.

すなわち、
(1) 2主桁橋の採用により上部工の全体工事費は、従来の多主桁橋に比べて安くなっているが、2主桁橋として採用するPC床版や合成床版自体は、従来採用されていたRC床版(鉄筋コンクリート床版)に比べて高価である。
(2) 床版の取替えが必要となった場合、PC床版や合成床版は主桁により支持されているため、2主桁橋の場合、全面交通止めが必要となる。その場合の社会的損失は、非常に大きいものとなる。また、3主桁以上の場合でも、PC床版は床版にプレストレスが導入されているため、幅員方向全幅による取替えが必要であり、全面交通止めとなる。
(3) PC床版を採用した場合、PC床版に用いるコンクリートの設計基準強度は30N/mm2 以上であるため、設計基準強度が24N/mm2 程度のRC床版に比べ、現場施工管理に十分な管理が必要であり、RC床版の施工に比較して高度な施工技術を必要とする。
(4) 箱桁構造でPC床版を使用した場合は、プレストレスロスの問題が生じるため、プレストレスの導入に当たっては十分な検討を要する。
That is,
(1) The construction cost of the superstructure is lower than that of the conventional multi-main girder bridge due to the adoption of the two main girder bridges. It is more expensive than RC slabs (reinforced concrete slabs) that have been conventionally used.
(2) When it is necessary to replace the floor slab, the PC floor slab and the composite floor slab are supported by the main girder. The social loss in that case is very large. Even in the case of three or more main girders, PC floor slabs are prestressed in the floor slabs, so replacement by the full width direction is necessary, and traffic is completely stopped.
(3) When PC floor slab is adopted, the design standard strength of concrete used for PC floor slab is 30 N / mm 2 or more. Therefore, compared with RC floor slab with design standard strength of about 24 N / mm 2 Therefore, sufficient management is required, and advanced construction technology is required compared to RC floor slab construction.
(4) When a PC floor slab is used in a box girder structure, there is a problem of prestress loss, and therefore sufficient consideration is required when introducing prestress.

そこで、床版支間を従来の桁間隔ではなく、図8に示すように、床版を支持する横桁301を従来よりも橋軸方向に密に配置して床版支間を橋軸方向とすることにより、広幅員であっても2本の主桁302でRC床版303を用いることが可能となるRC床版2主桁橋300が考えられる。   Therefore, instead of the conventional girder spacing between the floor slab supports, as shown in FIG. 8, the horizontal girders 301 that support the floor slab are arranged more densely in the bridge axis direction than in the prior art, so that the floor slab supports are in the bridge axis direction. Thus, an RC floor slab 2 main girder bridge 300 that allows the RC floor slab 303 to be used with two main girders 302 even if it is wide can be considered.

しかしながら、図9(a)に示すように、横桁301によってRC床版303を支持する場合、自動車の通過によって横桁301の上フランジ304に矢印a及び矢印bのような首振り現象が発生するので、上フランジ304と垂直補鋼材305の溶接止端部306に疲労亀裂が発生する可能性がある。また、横桁301の上フランジ304は、横桁301とRC床版303から成る断面の中立軸付近にあるので、図9(b)に示すように、横桁301の上フランジ304は、小さな応力しか作用しないことが分かっている。   However, as shown in FIG. 9A, when the RC floor slab 303 is supported by the cross beam 301, a swinging phenomenon such as arrows a and b occurs in the upper flange 304 of the cross beam 301 by passing the automobile. As a result, fatigue cracks may occur at the weld flange 306 of the upper flange 304 and the vertical reinforcing steel material 305. Since the upper flange 304 of the cross beam 301 is near the neutral axis of the cross section composed of the cross beam 301 and the RC floor slab 303, the upper flange 304 of the cross beam 301 is small as shown in FIG. It has been found that only stress acts.

他方、主桁302に対して横桁301を取り付けるに当たり、床版厚さを所定の厚さに正確に収めるには、図8に示すように、主桁302の上フランジ307と横桁301の上フランジ304の高さを合わせる必要があるので、横桁の加工度と設置精度を高くしなければならず、橋梁の建設コストを高める要因となる。   On the other hand, when attaching the cross girder 301 to the main girder 302, in order to accurately store the floor slab thickness within a predetermined thickness, as shown in FIG. Since it is necessary to match the height of the upper flange 304, it is necessary to increase the processing degree and installation accuracy of the cross beam, which increases the construction cost of the bridge.

更に、従来のRC床版は、図10に示すように、橋脚400の建設誤差、主桁302の製作誤差および架設誤差に起因する床版厚さの変動をRC床版303の下部に設けた左右一定のハンチ308,308によって吸収することが行われていた。   Further, as shown in FIG. 10, the conventional RC floor slab is provided with a variation in floor slab thickness due to the construction error of the pier 400, the manufacturing error of the main girder 302, and the installation error at the lower part of the RC floor slab 303. Absorption was performed by the constant right and left hunches 308 and 308.

しかしながら、従来のRC床版303は、上記のように、左右一定のハンチ308,308が下方に突出しているため、ハンチ用の傾斜面を有する床版底面の型枠を合板などを用いて精度よく作成するには、多大な労力と時間を必要とし、橋梁の建設コストを高める要因となった。このため、ハンチのない所謂ハンチレス床版の出現に対する要望が高まっていた。   However, since the conventional RC floor slab 303 has the left and right constant hunches 308 and 308 projecting downward as described above, the formwork on the bottom of the floor slab having an inclined surface for the haunch is accurately measured using plywood or the like. To create well, it required a lot of labor and time, and it became a factor to raise the construction cost of the bridge. For this reason, the demand for the appearance of a so-called hunchless floor slab without a hunch has been increased.

「新しい鋼橋の誕生 II 改訂版」,社団法人日本橋梁建設協会,野田清人(発行人),2004年12月,p.4“Birth of a New Steel Bridge II Revised Edition”, Japan Bridge Construction Association, Kiyoto Noda (Publisher), December 2004, p. 4

本発明は、上記のような問題を解決するためになされたものであって、本発明の第1の目的は、横桁の上フランジに発生していた疲労亀裂の問題を解消することができる鉄筋コンクリート床版少数主桁橋を提供することにある。本発明の第2の目的は、横桁の加工誤差と設置誤差を吸収できると共に、ハンチレス床版でも橋脚の建設誤差を吸収することができる鉄筋コンクリート床版少数主桁橋を提供することにある。   The present invention has been made to solve the above-described problems, and a first object of the present invention is to solve the problem of fatigue cracks occurring in the upper flange of the cross beam. It is to provide a reinforced concrete floor slab minority main girder bridge. A second object of the present invention is to provide a reinforced concrete floor slab minority main girder bridge that can absorb a processing error and an installation error of a horizontal girder and can also absorb a construction error of a bridge pier even with a hunchless floor slab.

上記課題を解決するため、請求項1に係る鉄筋コンクリート床板少数主桁橋は、複数の主桁のウェブ間に複数の横桁を橋軸直角方向に設けると共に、前記横桁によって鉄筋コンクリート床板を支持するようになした鉄筋コンクリート床板少数主桁橋において、前記主桁のウェブ間に設けた横桁を、下フランジと、該下フランジ上に立設したウェブと、該ウェブの上方に突出して鉄筋コンクリート床板内に埋設される接合部と、該接合部の上辺に沿って設けた配筋用の多数の孔により形成し、前記横桁の接合部を鉄筋コンクリート床板内に埋設させて前記横桁の接合部と鉄筋コンクリート床板とを接合させることを特徴とするものである。 In order to solve the above-mentioned problem, a reinforced concrete floor board minority main girder bridge according to claim 1 is provided with a plurality of cross beams in a direction perpendicular to the bridge axis between webs of a plurality of main girders , and supports the reinforced concrete floor board by the cross beams . In the reinforced concrete floor board minority main girder bridge constructed as described above, a reinforced concrete floor board is formed by projecting a horizontal girder provided between the webs of the main girder, a lower flange, a web standing on the lower flange, and the web. a joint is embedded within, along the upper side of the joint portion is formed by a number of holes for reinforcement provided, the crossbeam of the joint the junction of the cross beams so embedded in the reinforced concrete floor And a reinforced concrete floor board are joined .

上記の如く、請求項1に係る発明は、複数の主桁間に複数の横桁を橋軸方向に所定の間隔で設けると共に、前記横桁上に鉄筋コンクリート床版を設置した鉄筋コンクリート床版少数主桁橋において、前記横桁を、下フランジと、該下フランジ上に立設したウェブと、該ウェブの上方に延長し、かつ、前記鉄筋コンクリート床版内に埋設する接合部と、該接合部の上辺に沿って設けた多数の孔により形成したので、従来の横桁に用いられていた横桁の上フランジが省略されている。このため、従来、懸念されていた横桁の上フランジと垂直補助材の溶接止端部における疲労亀裂の発生を回避することが可能になった。   As described above, the invention according to claim 1 is the reinforced concrete floor slab minority main body in which a plurality of cross girders are provided at predetermined intervals in the bridge axis direction between the plurality of main girders and a reinforced concrete floor slab is installed on the cross girders. In the girder bridge, the horizontal girder includes a lower flange, a web erected on the lower flange, a joint extending above the web and embedded in the reinforced concrete floor slab, Since it is formed by a large number of holes provided along the upper side, the upper flange of the cross beam used in the conventional cross beam is omitted. For this reason, it has become possible to avoid the occurrence of fatigue cracks in the upper flange of the cross beam and the weld toe of the vertical auxiliary member, which has been a concern.

また、従来の横桁に用いられていた上フランジを無くすことにより、横桁の上フランジに溶殖されているスタッドジベルも省略されることになる。スタッドジベルは、ずれ止め区間によって、夫々、設計で算出された数量に順じて横桁の上フランジに個々に溶接していかねばならず、加工度の要求が高い。また、床版鉄筋との取り合いを考慮して、個々の溶接も高い精度を要するので、鋼製主桁を有する橋梁形式の鉄筋コンクリート床版との合成構造化の建設コストを高める要因となっているが、スタッドジベルを多少でも減らせることによって橋梁の建設コストを抑制することが可能となった。床版の取替えが生じた場合、本発明構造では、従来構造と異なり、床版の主鉄筋方向が、橋軸方向のため、走行レーン毎に取替えが出来、全面交通止めの必要がない。   In addition, by eliminating the upper flange used in the conventional cross beam, the stud gibber that is melted on the upper flange of the cross beam is also omitted. The stud gibber must be individually welded to the upper flange of the cross beam according to the quantity calculated in the design by the non-slip section, and the degree of workability is high. In addition, considering the relationship with floor slab reinforcement, individual welding also requires high accuracy, which is a factor that increases the construction cost of composite structuring with bridge-type reinforced concrete floor slabs having steel main girders. However, it was possible to reduce the construction cost of the bridge by reducing the number of stud gibels. When the floor slab is replaced, in the structure of the present invention, unlike the conventional structure, the direction of the main reinforcing bar of the floor slab is the direction of the bridge axis.

また、請求項1に係る発明によれば、ウェブの上方に延長した接合部が鉄筋コンクリート床版内に埋設されるので、横桁の上フランジを主桁の上フランジの高さに合わせる作業が不要になった。このため、横桁の加工度と設置精度を必要以上に高める必要がなく、橋梁の建設コストを抑制することが可能になった。   Further, according to the invention according to claim 1, since the joint portion extending above the web is embedded in the reinforced concrete slab, the work of adjusting the upper flange of the horizontal beam to the height of the upper flange of the main beam is unnecessary. Became. For this reason, it is not necessary to increase the workability and installation accuracy of the cross beams more than necessary, and it is possible to reduce the construction cost of the bridge.

また、請求項1に係る発明は、上記のように、ウェブの上方に延長した接合部が鉄筋コンクリート床版内に埋設されるので、鉄筋コンクリート床版の下面にハンチのない所謂ハンチレス型の床版であっても床版厚さを変更させることなく横桁と鉄筋コンクリート床版を接合させることができる。このため、型枠の設計、製作作業が容易になり、橋梁の建設コストを抑制することが可能になった。   In addition, the invention according to claim 1 is a so-called hunchless type floor slab in which the joint portion extending above the web is embedded in the reinforced concrete floor slab as described above, and the bottom surface of the reinforced concrete floor slab has no haunch. Even if it exists, a cross beam and a reinforced concrete slab can be joined without changing the slab thickness. For this reason, the design and manufacturing work of the formwork became easy, and the construction cost of the bridge could be suppressed.

請求項2に係る発明は、前記孔を、前記接合部に横一列に設けるので、横桁上部の板状の接合部と鉄筋コンクリート床版の機械的な結合力が前記接合部の横手方向にムラなく均一なものとなる。   In the invention according to claim 2, since the holes are provided in a row in the joint, the mechanical joint force between the plate-like joint at the upper part of the cross beam and the reinforced concrete floor slab is uneven in the transverse direction of the joint. And uniform.

請求項3に係る発明は、前記孔を、前記接合部に千鳥状に設けるので、横桁上部の板状の接合部と鉄筋コンクリート床版の機械的な結合力がより強固なものとなる。   In the invention according to claim 3, since the holes are provided in a staggered manner in the joint, the mechanical coupling force between the plate-like joint at the upper part of the cross beam and the reinforced concrete floor slab becomes stronger.

請求項4に係る発明は、前記孔内に鉄筋を橋軸方向に向けて配筋するので、鉄筋の位置決めが容易になるのみならず、鉄筋を機械的に配筋することができる。   In the invention according to claim 4, since the reinforcing bars are arranged in the hole in the direction of the bridge axis, not only the positioning of the reinforcing bars becomes easy, but also the reinforcing bars can be mechanically arranged.

以下、本発明の実施の形態を図面を用いて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1に示すように、例えば、鉄筋コンクリート床版2主桁橋10の場合は、2本の主桁11,11間に複数の横桁12を橋軸方向に所定の間隔で設けると共に、複数の横桁12によって鉄筋コンクリート床版13を支持するようになっている。この鉄筋コンクリート床版13には、アスファルト舗装14が施されている。   As shown in FIG. 1, for example, in the case of a reinforced concrete floor slab 2 main girder bridge 10, a plurality of cross beams 12 are provided between the two main girders 11, 11 at a predetermined interval in the bridge axis direction, and A reinforced concrete floor slab 13 is supported by the cross beam 12. Asphalt pavement 14 is applied to the reinforced concrete floor slab 13.

上記横桁12は、図4及び図5に示すように、下フランジ21と、この下フランジ21上に立設したウェブ22と、このウェブ22の上方に延長した接合部23と、この接合部23の上辺に沿って設けた多数の孔24により形成されている。   As shown in FIGS. 4 and 5, the cross beam 12 includes a lower flange 21, a web 22 erected on the lower flange 21, a joint 23 extending above the web 22, and the joint It is formed by a large number of holes 24 provided along the upper side of 23.

また、前記孔24は、図5に示すように、上記接合部23の上辺に沿って横一列に設けられているが、所望により、千鳥状に設けることもできる。また、上記ウェブ22と接合部23は、溶接などにより結合するのではなく、一枚の鋼板から切り出して作成することが好ましい。また、孔24の直径は、30mm〜80mm、より好ましくは50mm〜70mmの範囲が好ましく、この範囲から外れると、接合部23と鉄筋コンクリート床版13の接合力が低下する。   Moreover, although the said hole 24 is provided in the horizontal line along the upper side of the said junction part 23 as shown in FIG. 5, it can also be provided in zigzag form if desired. Moreover, it is preferable that the web 22 and the joint portion 23 are not cut by welding or the like but are cut out from a single steel plate. The diameter of the hole 24 is preferably in the range of 30 mm to 80 mm, more preferably in the range of 50 mm to 70 mm. If the diameter is out of this range, the joining force between the joint 23 and the reinforced concrete floor slab 13 is reduced.

図2(a)及び図3に示すように、上記接合部23は、鉄筋コンクリート床版13内に埋設され、鉄筋コンクリート床版13と機械的に接合している。また、上記接合部23に設けた孔24には、橋軸方向に主鉄筋15が配筋され、この主鉄筋15と交差する橋幅方向には、配力鉄筋16が配筋されている。図中、符号17は、コンクリートを示している。図2(b)に示すように、鉄筋コンクリート床版13の下面、即ち、従来の横桁の上フランジがあった位置は、応力σが小さいから横桁の上フランジを除去しても強度的な支障が発生しない。   As shown in FIGS. 2A and 3, the joint portion 23 is embedded in the reinforced concrete floor slab 13 and mechanically joined to the reinforced concrete floor slab 13. Further, in the hole 24 provided in the joint portion 23, a main reinforcing bar 15 is arranged in the bridge axis direction, and a distribution reinforcing bar 16 is arranged in the bridge width direction intersecting with the main reinforcing bar 15. In the figure, the code | symbol 17 has shown concrete. As shown in FIG. 2 (b), the lower surface of the reinforced concrete floor slab 13, that is, the position where the conventional upper girder upper flange is located is strong even if the upper girder upper flange is removed because the stress σ is small. No trouble occurs.

上記の如く、この発明は、前記横桁12を、下フランジ21と、該下フランジ21上に立設したウェブ22と、該ウェブ22の上方の延長し、かつ、前記鉄筋コンクリート床版13内に埋設する接合部23と、該接合部23の上辺に沿って設けた多数の孔24により形成したので、従来の横桁に用いられていた横桁の上フランジが省略されている。このため、従来、問題視されていた横桁の上フランジと垂直補鋼材の溶接止端部における疲労亀裂の発生を回避することが可能になる。また、従来の横桁に用いられていた上フランジを無くすことにより、横桁の上フランジに溶植されているスタッドジベルも省略されるので、橋梁の建設コストを抑制することが可能となった。   As described above, according to the present invention, the cross girder 12 includes the lower flange 21, the web 22 erected on the lower flange 21, the upper extension of the web 22, and the reinforced concrete floor slab 13. Since it is formed by the joint portion 23 to be buried and a large number of holes 24 provided along the upper side of the joint portion 23, the upper flange of the cross beam used in the conventional cross beam is omitted. For this reason, it becomes possible to avoid the occurrence of fatigue cracks at the weld toe of the upper flange of the cross beam and the vertical stiffener, which has been regarded as a problem in the past. In addition, by eliminating the upper flange that was used in the conventional cross beam, the stud gibber that has been fused to the upper flange of the cross beam is also omitted, so it was possible to reduce the construction cost of the bridge. .

他方、この発明は、上記のように、上記ウェブ22の上方に延長した孔付きの板状の接合部23を鉄筋コンクリート床版13内に埋設することにより、横桁の上フランジを主桁の上フランジの高さに合わせる作業が不要になる。このため、横桁の加工度と設置精度を必要以上に高める必要がなく、橋梁の建設コストを抑制することが可能になる。   On the other hand, according to the present invention, as described above, the plate-like joint portion 23 with a hole extending above the web 22 is embedded in the reinforced concrete floor slab 13 so that the upper flange of the horizontal beam is placed above the main beam. No need to adjust to the height of the flange. For this reason, it is not necessary to increase the processing degree and installation accuracy of the cross beam more than necessary, and it is possible to suppress the construction cost of the bridge.

また、この発明は、上記のように、上記ウェブ22の上方に延長した孔付きの板状の接合部23を鉄筋コンクリート床版13内に埋設することにより、鉄筋コンクリート床版の下面にハンチのない所謂ハンチレス型の床版であっても床版厚さを変更させることなく横桁12と鉄筋コンクリート床版13を接合させることができる。このため、型枠の設計、製作作業が容易になり、橋梁の建設コストを抑制することが可能になる。   In addition, as described above, the present invention embeds the plate-like joint portion 23 with a hole extending above the web 22 in the reinforced concrete floor slab 13 so that the lower surface of the reinforced concrete floor slab has no hunch. Even if it is a hunchless type floor slab, the cross beam 12 and the reinforced concrete floor slab 13 can be joined without changing the floor slab thickness. For this reason, it becomes easy to design and manufacture the formwork, and to suppress the construction cost of the bridge.

以上の説明では、鉄筋コンクリート床版2主桁橋の場合について説明したが、主桁が3本以上の多主桁の場合にも適用することが可能である。   In the above description, the case of a reinforced concrete floor slab 2 main girder bridge has been described, but the present invention can also be applied to a case of a multi-main girder having three or more main girder.

本発明に係る鉄筋コンクリート床版2主桁橋の一部縦断を含む斜視図である。It is a perspective view including a partial longitudinal section of a reinforced concrete floor slab 2 main girder bridge according to the present invention. (a)横桁近傍におけるRC床版の要部拡大断面図、(b)同所の応力線図である。(A) The principal part expanded sectional view of the RC floor slab near the cross beam, (b) It is a stress diagram of the same place. 図2(a)のX−X断面図である。It is XX sectional drawing of Fig.2 (a). 横桁の断面図である。It is sectional drawing of a cross beam. 横桁の正面図である。It is a front view of a horizontal beam. PC床版2主桁橋の断面図である。It is sectional drawing of PC floor slab 2 main girder bridge. 合成床版2主桁橋の断面図である。It is sectional drawing of a composite floor slab 2 main girder bridge. RC床版2主桁橋の一部断面を含む斜視図である。It is a perspective view containing the partial cross section of RC floor slab 2 main girder bridge. (a)横桁近傍におけるRC床版の要部拡大断面図、(b)同所の応力線図である。(A) The principal part expanded sectional view of the RC floor slab near the cross beam, (b) It is a stress diagram of the same place. ハンチを有するRC床版2主桁橋の一部断面を含む斜視図である。It is a perspective view containing the partial cross section of RC floor slab 2 main girder bridge which has a haunch.

符号の説明Explanation of symbols

10 鉄筋コンクリート床版2主桁橋
11 主桁
12 横桁
13 鉄筋コンクリート床版
21 横桁下フランジ
22 横桁ウェブ
23 床版と横桁との接合部
24 孔
10 Reinforced concrete floor slab 2 main girder 11 Main girder 12 Cross girder 13 Reinforced concrete floor slab 21 Horizontal girder lower flange 22 Cross girder web 23 Joint between floor slab and cross girder 24 Hole

Claims (1)

複数の主桁のウェブ間に複数の横桁を橋軸直角方向に設けると共に、前記横桁によって鉄筋コンクリート床板を支持するようになした鉄筋コンクリート床板少数主桁橋において、前記主桁のウェブ間に設けた横桁を、下フランジと、該下フランジ上に立設したウェブと、該ウェブの上方に突出して鉄筋コンクリート床板内に埋設される接合部と、該接合部の上辺に沿って設けた配筋用の多数の孔により形成し、前記横桁の接合部を鉄筋コンクリート床板内に埋設させて前記横桁の接合部と鉄筋コンクリート床板とを接合させることを特徴とする鉄筋コンクリート床板少数主桁橋。 In the reinforced concrete floor board minority main girder bridge in which a plurality of cross beams are provided between the webs of the plurality of main girders in a direction perpendicular to the bridge axis and the reinforced concrete floor board is supported by the cross beams, provided between the webs of the main girder. The cross beam is provided with a lower flange, a web erected on the lower flange, a joint projecting above the web and embedded in a reinforced concrete floor board, and an arrangement provided along the upper side of the joint. A reinforced concrete floor board minority main girder bridge, which is formed by a large number of holes for reinforcing bars, and the joint part of the cross beam is embedded in a reinforced concrete floor board to join the joint part of the cross beam and the reinforced concrete floor board.
JP2007020573A 2007-01-31 2007-01-31 Reinforced concrete floor slab minority main girder bridge Expired - Fee Related JP5314250B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007020573A JP5314250B2 (en) 2007-01-31 2007-01-31 Reinforced concrete floor slab minority main girder bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007020573A JP5314250B2 (en) 2007-01-31 2007-01-31 Reinforced concrete floor slab minority main girder bridge

Publications (2)

Publication Number Publication Date
JP2008184846A JP2008184846A (en) 2008-08-14
JP5314250B2 true JP5314250B2 (en) 2013-10-16

Family

ID=39728077

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007020573A Expired - Fee Related JP5314250B2 (en) 2007-01-31 2007-01-31 Reinforced concrete floor slab minority main girder bridge

Country Status (1)

Country Link
JP (1) JP5314250B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778663A (en) * 2019-03-20 2019-05-21 中铁二院工程集团有限责任公司 A kind of lightweight steel-concrete composite beams bridge structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0645448Y2 (en) * 1988-10-06 1994-11-24 石川島播磨重工業株式会社 Bridge structure
JP2000129631A (en) * 1998-10-29 2000-05-09 Ishikawajima Harima Heavy Ind Co Ltd Composite floor slab
JP2002013108A (en) * 2000-06-28 2002-01-18 Hitachi Zosen Corp Synthetic floor slab
JP3870054B2 (en) * 2001-10-01 2007-01-17 株式会社ダイクレ Reinforcing method for structural members
JP4348601B2 (en) * 2003-01-21 2009-10-21 株式会社Ihi Synthetic floor slab girder

Also Published As

Publication number Publication date
JP2008184846A (en) 2008-08-14

Similar Documents

Publication Publication Date Title
JP4985540B2 (en) Vertical beam system for mobile work vehicles for cantilever installation
KR100839439B1 (en) Moment connection structure combining a superstructure with substructure in the prefabricated rahmen bridge and method constructing rahmen bridge with the structure
KR100676627B1 (en) Shear reinforcement device arranged in the slab-column connection and the shear reinforcement structure using the device
KR101962788B1 (en) Temporary bridge construction method using steel girder and composite deck-plate and temporary bridge therewith
JP2007107185A (en) Structure and method for repairing and reinforcing steel bridge
US20090300861A1 (en) Dislocation preventing bolt, and longitudinal rib composite floor panel having the dislocation preventing bolt
KR101256774B1 (en) Constrcution method of end cross beam for integrating continuity of supporting portion and preventing falling down of psc girder
JP5314250B2 (en) Reinforced concrete floor slab minority main girder bridge
JP2008231688A (en) Bridge structure using composite floor slab, its construction method, and form for composite floor slab
JP2008088634A (en) Composite steel-concrete floor slab
JP2007126813A (en) Composite steel-concrete girder structure of bridge, and its construction method
KR101439947B1 (en) Bridge using girder with ring plate and bracket and bridge construction method therefor
EP3327200B1 (en) Prefabricated bridge girder
KR102226271B1 (en) Bridge Structure Using End Cut Girder
KR101300490B1 (en) Hollow girder having upper flange of different materials, and method for constructing bridge using for the same
JP6066981B2 (en) Connection structure in bridges using reinforced concrete slabs and connection method in existing bridges using reinforced concrete slabs
KR20090006512A (en) Shear reinforcement device for junctional region of slab and column
JP5047060B2 (en) Synthetic floor slab and its reinforcement method
JP4437064B2 (en) Construction method and formwork structure of concrete floor slab for composite floor slab bridge
JP2508677B2 (en) Reinforcement method of bridge reinforced concrete slab
JP4733655B2 (en) Minority main girder bridge
CN208517806U (en) A kind of combined bridge improving shear connector fatigue life
JP4355733B2 (en) Reinforced concrete floor slab minority main girder bridge
JP7092488B2 (en) Reinforcing bar members and reinforced concrete structures using reinforcing bar members
JP2007113208A (en) Longitudinal rib composite floor slab

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090310

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101018

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101026

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110719

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20111122

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120215

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20120223

A912 Removal of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20120330

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130705

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5314250

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees