JP5291643B2 - How to build a wall - Google Patents

How to build a wall Download PDF

Info

Publication number
JP5291643B2
JP5291643B2 JP2010024981A JP2010024981A JP5291643B2 JP 5291643 B2 JP5291643 B2 JP 5291643B2 JP 2010024981 A JP2010024981 A JP 2010024981A JP 2010024981 A JP2010024981 A JP 2010024981A JP 5291643 B2 JP5291643 B2 JP 5291643B2
Authority
JP
Japan
Prior art keywords
wall panel
wall
support member
temporary support
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010024981A
Other languages
Japanese (ja)
Other versions
JP2011162970A (en
Inventor
明博 安永
元貴 川口
健太 田中
憲助 樋口
康弘 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2010024981A priority Critical patent/JP5291643B2/en
Publication of JP2011162970A publication Critical patent/JP2011162970A/en
Application granted granted Critical
Publication of JP5291643B2 publication Critical patent/JP5291643B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for constructing a wall, which can shorten a construction period. <P>SOLUTION: This method for constructing the wall 1 by vertically juxtaposing a plurality of wall panels 10 includes: a step of fixing a temporary supporting member 3 to the backside of the lower wall panel 10a in such a manner as to make an upper portion protrude upward with respect to an upper end of the lower wall panel 10a; a step of installing the upper wall panel 10b on the upper end surface of the lower wall panel 10a, and of fixing a protruding portion of the temporary supporting member 3 on the backside of the upper wall panel 10; a step of positioning the upper wall panel 10b while supporting the upper wall panel 10b by the temporary supporting member 3; and a step of upward extending a permanent column 2 for supporting the lower wall panel 10a, so as to be connected to the upper wall panel 10b. <P>COPYRIGHT: (C)2011,JPO&amp;INPIT

Description

本発明は、壁の構築方法に関する。   The present invention relates to a wall construction method.

壁を構築する際にプレキャスト製の壁パネル(以下、単に「壁パネル」いう)を利用することで、施工時の手間を省略し、工期短縮化を図る場合がある(例えば、特許文献1参照)。   When building a wall, a precast wall panel (hereinafter simply referred to as “wall panel”) may be used to save time during construction and shorten the construction period (see, for example, Patent Document 1). ).

従来の壁の構築方法は、予め構築された柱や梁などの構造体に、壁パネルを接合することにより行うのが一般的である。   A conventional wall construction method is generally performed by joining a wall panel to a structure such as a pillar or a beam constructed in advance.

特開平9−256515号公報Japanese Patent Laid-Open No. 9-256515

ところが、従来の壁の構築方法は、柱若しくは梁を構築したあとに壁パネルを配設するものであるため、柱若しくは梁の施工期間(養生期間)に加えて、柱と壁パネルとの接合部の施工期間(養生期間)を確保する必要があり、工期短縮化の妨げとなっていた。   However, in the conventional wall construction method, the wall panel is arranged after the pillar or beam is constructed. Therefore, in addition to the construction period (curing period) of the pillar or beam, the connection between the pillar and the wall panel is performed. It was necessary to secure the construction period (curing period) of the department, which hindered shortening the construction period.

また、柱の施工時および柱と壁パネルとの接合部の施工時のそれぞれにおいて型枠等の仮設部材を取り付け・取り外しを行う必要があり、その作業に手間を要していた。   Moreover, it is necessary to attach / remove temporary members such as molds at the time of column construction and at the time of construction of the joint between the column and the wall panel, which requires time and effort.

本発明は、前記の問題点を解決することを目的とするものであり、工期の短縮を図ることを可能とした壁の構築方法を提供することを課題とする。   An object of the present invention is to solve the above-mentioned problems, and an object of the present invention is to provide a wall construction method that can shorten the construction period.

前記課題を解決するために、本発明の第一の壁の構築方法は、複数の壁パネルを上下左右に並設して壁を形成する方法であって、下段の壁パネルの背面に、上部が前記下段の壁パネルの上端よりも上方に突出するように仮設支持部材を固定する工程と、前記下段の壁パネルの上端面に上段の壁パネルを設置するとともに、前記上段の壁パネルの背面に前記仮設支持部材の突出部分を固定する工程と、前記仮設支持部材で前記上段の壁パネルを支えつつ、前記上段の壁パネルの位置決めを行う工程と、前記下段の壁パネルを支持する本設の柱を上方に延長して前記上段の壁パネルに接続する工程と、を備えることを特徴としている。   In order to solve the above-mentioned problem, the first wall construction method of the present invention is a method of forming a wall by arranging a plurality of wall panels in the vertical and horizontal directions, and the upper wall panel is arranged on the back of the lower wall panel. Fixing the temporary support member so as to protrude above the upper end of the lower wall panel, and installing the upper wall panel on the upper end surface of the lower wall panel, and the rear surface of the upper wall panel Fixing the projecting portion of the temporary support member to the upper surface, positioning the upper wall panel while supporting the upper wall panel with the temporary support member, and installing the temporary wall member to support the lower wall panel. And extending the column upward to connect to the upper wall panel.

かかる壁の構築方法によれば、下段の壁パネルに固定した仮設支持部材より支持した状態で上段の壁パネルの位置決めを行い、上段の壁パネルの位置決めが完了した後に柱を延長するため、壁パネルおよび柱を簡易かつ正確に設置することができ、傾斜部分や曲面部分を含むような場合においては、柱を構築した後に壁パネルを配設する従来の壁の構築方法に比べて、施工期間を短縮することが可能となる。   According to this wall construction method, the upper wall panel is positioned while being supported by the temporary support member fixed to the lower wall panel, and the pillar is extended after the positioning of the upper wall panel is completed. Panels and pillars can be installed easily and accurately, and in cases where inclined parts or curved parts are included, the construction period is longer than conventional wall construction methods in which wall panels are installed after the pillars are constructed. Can be shortened.

本発明の第二の壁の構築方法は、複数の壁パネルを上下左右に並設して壁を形成する方法であって、本設の柱の後側部分を構築する工程と、前記柱に沿って最下段の壁パネルを配置する工程と、前記柱の前側部分を構築して前記最下段の壁パネルに接続する工程と、前記最下段の壁パネルの背面に、上部が前記最下段の壁パネルの上端よりも上方に突出するように仮設支持部材を固定する工程と、前記最下段の壁パネルの上端面に上段の壁パネルを設置するとともに、前記上段の壁パネルの背面に前記仮設支持部材の突出部分を固定する工程と、前記仮設支持部材で前記上段の壁パネルを支えつつ、前記上段の壁パネルの位置決めを行う工程と、前記柱を上方に延長して前記上段の壁パネルに接続する工程と、を備えることを特徴としている。   The second wall construction method of the present invention is a method of forming a wall by arranging a plurality of wall panels side by side vertically and horizontally, and constructing a rear portion of a main pillar, A step of arranging a lowermost wall panel along, a step of constructing a front side portion of the pillar and connecting to the lowermost wall panel, a back surface of the lowermost wall panel, and an upper portion of the lowermost wall panel Fixing the temporary support member so as to protrude above the upper end of the wall panel; installing an upper wall panel on the upper end surface of the lowermost wall panel; and placing the temporary support member on the rear surface of the upper wall panel. A step of fixing the protruding portion of the support member; a step of positioning the upper wall panel while supporting the upper wall panel with the temporary support member; and an upper wall panel extending the column upward. And a step of connecting to

かかる壁の構築方法によれば、最下段の壁パネルについても、簡易かつ正確に設置することが可能となる。   According to such a wall construction method, the lowermost wall panel can be easily and accurately installed.

また、前記壁の構築方法において、前記上段の壁パネルを、左右に隣接する他の壁パネルと、その側端面同士を突き合わせた状態で配設し、前記柱を、前記壁パネル同士の突き合わせ部分の背面に接続してもよい。   Further, in the wall construction method, the upper wall panel is disposed in a state in which the other side wall panels adjacent to the left and right sides and the side end surfaces thereof are butted, and the column is a butted portion of the wall panels. You may connect to the back of the.

かかる壁の構築方法によれば、壁の表面に柱が露出することがなく、壁の表面が一定の品質を備えた壁パネルにより覆われているため、表面の特殊なデザインが施された壁の構築を簡易に施工することができる。   According to such a wall construction method, a pillar is not exposed on the surface of the wall, and the wall surface is covered with a wall panel having a certain quality. Can be constructed easily.

また、前記壁パネルの端部の背面側には切欠部が形成されていることで当該壁パネルの主筋が露出しており、前記柱に前記主筋が定着させた状態で当該柱を形成してもよい。   Further, a notch is formed on the back side of the end of the wall panel so that the main bar of the wall panel is exposed, and the column is formed in a state where the main bar is fixed to the column. Also good.

かかる壁の構築方法によれば、壁と柱との一体化を簡易に行うことが可能となり、施工性に優れている。   According to such a wall construction method, the wall and the pillar can be easily integrated, and the workability is excellent.

本発明の壁の構築方法によれば、早期かつ安価に傾斜部や曲線部を備える壁を構築することが可能となる。   According to the wall construction method of the present invention, it is possible to construct a wall having an inclined portion and a curved portion at an early stage and at a low cost.

本発明の実施の形態に係る壁を示す斜視図である。It is a perspective view which shows the wall which concerns on embodiment of this invention. (a)および(b)は、図1の壁の構築方法の各施工段階を示す斜視図である。(A) And (b) is a perspective view which shows each construction step of the construction method of the wall of FIG. (a)および(b)は、図2に続く施工段階を示す斜視図である。(A) And (b) is a perspective view which shows the construction stage following FIG. 仮設支持部材を示す図であって、(a)は側面図、(b)は上端部の拡大斜視図である。It is a figure which shows a temporary support member, Comprising: (a) is a side view, (b) is an expansion perspective view of an upper end part. (a)は足元固定金物を示す斜視図、(b)は高さ調整ボルトを示す断面図である。(A) is a perspective view which shows a foot | leg fixed metal fitting, (b) is sectional drawing which shows a height adjustment bolt. (a)および(b)は、図3に続く施工段階を示す斜視図である。(A) And (b) is a perspective view which shows the construction stage following FIG. 隣り合う壁パネル同士の突き合わせ部分を示す平面図である。It is a top view which shows the butt | matching part of adjacent wall panels. 図6に続く施工段階を示す斜視図である。It is a perspective view which shows the construction stage following FIG.

本発明の実施の形態について、図面を参照して説明する。
本実施形態では、図1に示すように、傾斜部を備えた壁1を構築する方法について説明する。
Embodiments of the present invention will be described with reference to the drawings.
In the present embodiment, as shown in FIG. 1, a method for constructing a wall 1 having an inclined portion will be described.

壁1は、複数の壁パネル10を上下に並設することにより形成されている。また、壁パネル10は、左右に隣り合う他の壁パネル10と、その側端面同士を突き合わせた状態で配置されている。   The wall 1 is formed by arranging a plurality of wall panels 10 vertically. Moreover, the wall panel 10 is arrange | positioned in the state which faced | matched the other wall panel 10 adjacent to right and left, and the side end surfaces.

壁1は、壁パネル10の左右の両端に沿って一体に形成された柱2により支持されている。
柱2は、壁パネル10の左右の突き合わせ部の背面において、両壁パネル10に跨って配設されている。
The wall 1 is supported by pillars 2 that are integrally formed along the left and right ends of the wall panel 10.
The pillar 2 is disposed across the wall panels 10 on the back of the right and left butted portions of the wall panel 10.

本実施形態の壁の構築方法は、柱構築工程と、最下段壁パネル配置工程と、接続工程と、支持部材固定工程と、壁パネル固定工程と、位置決め工程と、柱延長工程と、を備えている。   The wall construction method of the present embodiment includes a pillar construction process, a lowermost wall panel placement process, a connection process, a support member fixing process, a wall panel fixing process, a positioning process, and a column extending process. ing.

柱構築工程は、図2(a)に示すように、本設の柱2の後側部分(以下、「柱後部2a」という)を構築する工程である。   As shown in FIG. 2A, the pillar construction process is a process of constructing a rear portion of the main pillar 2 (hereinafter referred to as “post pillar 2a”).

柱後部2aは、図示しないアンカー筋を介して基礎に接続されている。また、柱後部2aは、前面からフープ筋22が突出するとともに、上端面から主筋21が突出した状態で構築する。なお、本実施形態では、柱後部2aを現場打ちコンクリートを打設することにより構築するが、柱後部2aにはプレキャスト部材を使用してもよい。   The column rear portion 2a is connected to the foundation via an anchor not shown. Further, the column rear portion 2a is constructed in a state where the hoop line 22 protrudes from the front surface and the main line 21 protrudes from the upper end surface. In this embodiment, the column rear portion 2a is constructed by placing cast-in-place concrete. However, a precast member may be used for the column rear portion 2a.

最下段壁パネル配置工程は、図2(b)に示すように、柱後部2aの前面に沿って最下段の壁パネル10を配置する工程である。   As shown in FIG. 2B, the lowermost step wall panel arranging step is a step of arranging the lowermost step wall panel 10 along the front surface of the column rear portion 2a.

本実施形態では、柱後部2aの側面に固定された仮設取付部材5を利用して、所定の位置に壁パネル10を配設する。
仮設取付部材5を構成する材料や取り付け方法は限定されるものではないが、本実施形態では山留材(隅部ピース)を使用するものとし、一方の面が壁パネル10の背面に当接するように、他方の面を柱後部2aの側面に固定する。なお、壁パネル10は、クレーン等(図示せず)の機械や、支保工等により支持した状態で柱後部2aの前方に配置してもよい。
In this embodiment, the wall panel 10 is arrange | positioned in a predetermined position using the temporary attachment member 5 fixed to the side surface of the column rear part 2a.
Although the material and the attachment method which comprise the temporary attachment member 5 are not limited, In this embodiment, a mountain retaining material (corner piece) shall be used and one surface contact | abuts the back surface of the wall panel 10. Thus, the other surface is fixed to the side surface of the column rear portion 2a. The wall panel 10 may be disposed in front of the column rear portion 2a in a state of being supported by a machine such as a crane (not shown) or a support work.

パネル10は、左右に隣接する他の壁パネル10と、その側端面を突き合わせた状態で配設する。   The panel 10 is arrange | positioned in the state which faced the other wall panel 10 adjacent to right and left, and its side end surface.

なお、壁パネル10の側端部の背面側には、切欠部11が形成されている。壁パネル10の背面側の主筋(以下「壁主筋12」という)は、この切欠部11において露出している。すなわち、壁パネル10の側端部15は本体部14よりも薄く、壁主筋12は、本体部14の側端面から突出している。   A notch 11 is formed on the back side of the side edge of the wall panel 10. The main bar on the back side of the wall panel 10 (hereinafter referred to as “wall main bar 12”) is exposed at the notch 11. That is, the side end portion 15 of the wall panel 10 is thinner than the main body portion 14, and the wall main reinforcement 12 protrudes from the side end surface of the main body portion 14.

なお、本実施形態では、壁主筋12の露出部分に対してL字状に曲げ加工が施されており、壁主筋12を背面方向(柱2側)に突出させている(図7参照 )。
壁パネル10を柱後部2aに沿って配置することにより、L字状の壁主筋12が、柱2のフープ筋22の間に挿入される。
In this embodiment, the exposed portion of the wall main bar 12 is bent in an L shape, and the wall main bar 12 protrudes in the back direction (column 2 side) (see FIG. 7).
By arranging the wall panel 10 along the column rear portion 2 a, the L-shaped wall principal bar 12 is inserted between the hoop bars 22 of the column 2.

接続工程は、図3(a)に示すように、柱2の前側部分(以下「柱前部2b」という)を構築するとともに、柱2と最下段の壁パネル10とを接続する工程である。   As shown in FIG. 3A, the connecting step is a step of constructing a front portion of the pillar 2 (hereinafter referred to as “column front part 2 b”) and connecting the pillar 2 and the lowermost wall panel 10. .

柱前部2bの構築は、柱主筋21を配筋した後、柱前部2bとともに壁パネル10の切欠部11に対してコンクリートを打設することにより行う。これにより、壁主筋12を巻き込んだ状態で柱2が形成されるため、壁パネル10と柱2との一体化が実現する。   The column front portion 2b is constructed by placing concrete to the notch portion 11 of the wall panel 10 together with the column front portion 2b after arranging the column main bars 21. Thereby, since the pillar 2 is formed in a state where the wall main reinforcing bars 12 are involved, the integration of the wall panel 10 and the pillar 2 is realized.

支持部材固定工程は、図3(b)に示すように、最下段(または下段)の壁パネル10(以下、「下壁パネル10a」という)の背面に仮設支持部材3を固定する工程である。   The support member fixing step is a step of fixing the temporary support member 3 to the back surface of the lowermost (or lower) wall panel 10 (hereinafter referred to as “lower wall panel 10a”), as shown in FIG. .

仮設支持部材3は、H形鋼により構成された部材であって、その長手方向が上下方向となるように下壁パネル10aの背面に配置した状態で固定する。   The temporary support member 3 is a member made of H-shaped steel, and is fixed in a state where the temporary support member 3 is disposed on the back surface of the lower wall panel 10a so that the longitudinal direction thereof is the vertical direction.

本実施形態の仮設支持部材3は、下壁パネル10aの高さ方向中間付近から上段の壁パネル10(以下、「上壁パネル10b」という)の中間付近にまでの到達する長さを有している(図6参照)。
仮設支持部材3は、上半分が下壁パネル10aの上端よりも上方に突出するように、下壁パネル10aに下半分を固定する。
The temporary support member 3 of the present embodiment has a length that reaches from the middle of the lower wall panel 10a in the height direction to the middle of the upper wall panel 10 (hereinafter referred to as “upper wall panel 10b”). (See FIG. 6).
The temporary support member 3 fixes the lower half to the lower wall panel 10a so that the upper half projects upward from the upper end of the lower wall panel 10a.

なお、仮設支持部材3を構成する材料はH形鋼に限定されるものではなく、例えば、溝型鋼やL形鋼等の他の鋼材やプレキャストコンクリート部材を使用してもよい。また、仮設支持部材3の長さや断面寸法も適宜設定すればよい。   In addition, the material which comprises the temporary support member 3 is not limited to H-section steel, For example, you may use other steel materials, such as channel steel and L-section steel, and a precast concrete member. Further, the length and cross-sectional dimensions of the temporary support member 3 may be set as appropriate.

仮設支持部材3には、複数のボルト孔が形成されており、このボルト孔にボルト31を挿通させて、下壁パネル10aの背面に当該ボルト31を螺合することにより固定する。このとき、仮設支持部材3と下壁パネル10aとの間には、図4(a)に示すように、調整板32が介設されており、仮設支持部材3と下壁パネル10a(壁パネル10)との間に隙間が形成されるように構成されている。
本実施形態では、ボルト31の位置に対応して調整板32を配設するが、調整板32の配置は限定されるものではない。また、調整板32は、必要に応じて配置すればよく、省略してもよい。また、仮設支持部材3の固定に使用するボルト31の本数は限定されるものではなく、適宜決定すればよい。
The temporary support member 3 is formed with a plurality of bolt holes. The bolts 31 are inserted into the bolt holes, and are fixed by screwing the bolts 31 to the back surface of the lower wall panel 10a. At this time, as shown in FIG. 4A, an adjustment plate 32 is interposed between the temporary support member 3 and the lower wall panel 10a, and the temporary support member 3 and the lower wall panel 10a (wall panel). 10), a gap is formed.
In the present embodiment, the adjustment plate 32 is disposed corresponding to the position of the bolt 31, but the arrangement of the adjustment plate 32 is not limited. Further, the adjustment plate 32 may be disposed as necessary and may be omitted. Further, the number of bolts 31 used for fixing the temporary support member 3 is not limited and may be determined as appropriate.

本実施形態では、下壁パネル10aの背面に2本の仮設支持部材3を固定する。なお、仮設支持部材3の本数は限定されるものではなく、壁パネル10の形状寸法、重量、傾き等に応じて適宜設定することが可能である。   In the present embodiment, two temporary support members 3 are fixed to the back surface of the lower wall panel 10a. The number of temporary support members 3 is not limited, and can be set as appropriate according to the shape, weight, inclination, and the like of the wall panel 10.

また、本実施形態では、図3(b)に示すように、仮設支持部材3の外側(柱2側)に沿って、足元固定金物33を固定する。
足元固定金物33は、上半部分が下壁パネル10aの上端よりも上方に突出するように、下半部分が固定されている。
Moreover, in this embodiment, as shown in FIG.3 (b), the foot | leg fixed metal fitting 33 is fixed along the outer side (column 2 side) of the temporary support member 3. As shown in FIG.
The lower half portion of the foot fixing hardware 33 is fixed such that the upper half portion projects upward from the upper end of the lower wall panel 10a.

足元固定金物33は、図5(a)に示すように、溝型鋼により構成された部材であって、その長手方向が上下方向となるように下壁パネル10aの背面に固定されている。
足元固定金物33は、下壁パネル10a上部と上壁パネル10bと下部との間に跨って配置される部材であって、仮設支持部材3よりも短い長さに構成されている。
As shown in FIG. 5A, the foot fixing hardware 33 is a member made of channel steel, and is fixed to the back surface of the lower wall panel 10a so that the longitudinal direction thereof is the vertical direction.
The foot fixing hardware 33 is a member disposed between the upper portion of the lower wall panel 10a, the upper wall panel 10b, and the lower portion, and is configured to be shorter than the temporary support member 3.

図5(a)に示すように、足元固定金物33の上半部分には、上壁パネル10bに固定するためのスリット33aが形成されている。足元固定金物33は、スリット33aを挿通するボルト31により上壁パネル10bの下部を固定する。なお、上壁パネル10bの固定は、スリット33aにより高さ調整が可能となっている。足元固定金物33には、スリット33aに代えて長孔が形成されていてもよい。また、上壁パネル10bの高さ調整を行う必要がない場合には、通常のボルト孔が形成されていてもよい。   As shown to Fig.5 (a), the slit 33a for fixing to the upper wall panel 10b is formed in the upper half part of the foot fixing metal 33. As shown in FIG. The foot fixing hardware 33 fixes the lower part of the upper wall panel 10b with a bolt 31 inserted through the slit 33a. The upper wall panel 10b can be fixed by adjusting the height by the slit 33a. A long hole may be formed in the foot fixing hardware 33 instead of the slit 33a. Moreover, when it is not necessary to adjust the height of the upper wall panel 10b, a normal bolt hole may be formed.

なお、足元固定金物33を構成する材料は溝型鋼に限定されるものではなく、例えば、L形鋼、H形鋼、平板鋼等、他の材料により構成してもよい。また、足元固定金物33の長さ寸法や断面寸法は、上壁パネル10bの下端部の固定が可能であれば、適宜設定することが可能である。また、足元固定金物33は、必要に応じて配置すればよく、省略してもよい。   In addition, the material which comprises the foot | leg fixed metal fitting 33 is not limited to channel steel, For example, you may comprise with other materials, such as L-shaped steel, H-shaped steel, and flat plate steel. Further, the length dimension and the cross-sectional dimension of the foot fixing hardware 33 can be appropriately set as long as the lower end portion of the upper wall panel 10b can be fixed. Further, the foot fixing hardware 33 may be arranged as necessary and may be omitted.

壁パネル固定工程は、図6(a)に示すように、下壁パネル10a上に、上壁パネル10bを固定する工程である。   The wall panel fixing step is a step of fixing the upper wall panel 10b on the lower wall panel 10a as shown in FIG. 6 (a).

壁パネル固定工程では、上壁パネル10bをクレーン等(図示せず)により吊持した状態で、下壁パネル10aの上端面上に配置し、当該上壁パネル10bの背面に仮設支持部材3の突出部分を固定する。
仮設支持部材3の上壁パネル10bへの固定は、図4(a)および(b)に示すように、仮設支持部材3の上端に固定された押引調整ピース34を介して行う。
In the wall panel fixing step, the upper wall panel 10b is placed on the upper end surface of the lower wall panel 10a while being suspended by a crane or the like (not shown), and the temporary support member 3 is placed on the back surface of the upper wall panel 10b. Fix the protruding part.
The temporary support member 3 is fixed to the upper wall panel 10b through a push / pull adjustment piece 34 fixed to the upper end of the temporary support member 3, as shown in FIGS. 4 (a) and 4 (b).

押引調整ピース34は、断面視L字状の金物であって、一片34aが仮設支持部材3の上端面に固定されており、他片34bが上壁パネル10bの背面に沿った状態で配設されている。
押引調整ピース34の他片34bには、スリット34cが形成されており、上壁パネル10bに埋め込まれたアンカーボルト35が挿通可能に構成されている。
The push / pull adjustment piece 34 is an L-shaped hardware in cross section, and one piece 34a is fixed to the upper end surface of the temporary support member 3, and the other piece 34b is arranged in a state along the back surface of the upper wall panel 10b. It is installed.
A slit 34c is formed in the other piece 34b of the push / pull adjustment piece 34, and an anchor bolt 35 embedded in the upper wall panel 10b can be inserted.

押引調整ピース34は、スリット34cにアンカーボルト35を挿通させるため、上壁パネル10b(アンカーボルト35)の高さが変化しても対応可能である。なお、スリット34cに代えて長孔が形成されていてもよい。   Since the push / pull adjustment piece 34 allows the anchor bolt 35 to be inserted into the slit 34c, the push / pull adjustment piece 34 can cope with a change in the height of the upper wall panel 10b (anchor bolt 35). A long hole may be formed instead of the slit 34c.

上壁パネル10bは、左右に隣接する他の上壁パネル10bと、その側端面を突き合わせた状態で配設する。   The upper wall panel 10b is disposed in a state in which the other upper wall panel 10b adjacent to the left and right faces a side end surface thereof.

このとき、壁パネル10の切欠部11から露出するL字状の壁主筋12が、柱2側に突出している。また、左右の壁パネル10同士に跨った状態のつなぎ筋12aを配筋する(図7参照)。   At this time, the L-shaped wall main bar 12 exposed from the notch 11 of the wall panel 10 protrudes to the column 2 side. Further, a connecting line 12a in a state straddling the left and right wall panels 10 is arranged (see FIG. 7).

左右に隣り合う壁パネル10b同士の突き合わせ部には、図6(a)および図7に示すように、当該突き合わせ部に形成された縦目地13に沿って止水板4を配設する。   As shown in FIG. 6A and FIG. 7, the water stop plate 4 is disposed along the vertical joint 13 formed at the abutting portion between the wall panels 10 b adjacent to each other on the left and right.

本実施形態の壁パネル10は、隣接する他の壁パネル10との突合せ面に溝が形成されており、壁パネル10同士を突き合わせた状態で、止水板4の配設が可能な配設孔が形成されている。
本実施形態では、止水板4として、セメント板を使用するが、止水板4を構成する材料は限定されるものではなく、例えばガスケットやゴム板等の樹脂性板材を使用してもよい。また、止水板4の設置方法は限定されるものではなく、適宜行えばよい。例えば、溝41を形成することなく、縦目地13に沿って壁パネル10の背面に止水板4を貼り付けてもよい。
The wall panel 10 of the present embodiment has a groove formed on the abutting surface with another adjacent wall panel 10, and the water stop plate 4 can be disposed in a state where the wall panels 10 are abutted with each other. A hole is formed.
In the present embodiment, a cement plate is used as the water stop plate 4, but the material constituting the water stop plate 4 is not limited, and for example, a resin plate such as a gasket or a rubber plate may be used. . Moreover, the installation method of the water stop board 4 is not limited, What is necessary is just to perform suitably. For example, the water stop plate 4 may be attached to the back surface of the wall panel 10 along the vertical joint 13 without forming the groove 41.

位置決め工程は、上壁パネル10bの位置決めを行う工程である。   The positioning step is a step of positioning the upper wall panel 10b.

上壁パネル10bの位置決めは、仮設支持部材3により上壁パネル10b支持するとともに足元固定金物33により上壁パネル10bの足元のずれを抑制した状態で、上壁パネル10bの倒れ角度、上端面のレベル、下壁パネル10aとの並び等を調整することにより行う。   The positioning of the upper wall panel 10b is performed in a state where the upper wall panel 10b is supported by the temporary support member 3 and the shift of the foot of the upper wall panel 10b is suppressed by the foot fixing hardware 33, and the tilt angle of the upper wall panel 10b This is done by adjusting the level and alignment with the lower wall panel 10a.

上壁パネル10bの倒れ角度の調整は、押引調整ピース34とアンカーボルト35を利用して、上壁パネル10bと仮設支持部材3との間の隙間の長さを調整することにより行う。
仮設支持部材3と下壁パネル10aとの間には、調整板32が介設されているため、壁パネル10aの上端面に配置された上壁パネル10bと仮設支持部材3との間に隙間が形成されている。そのため、押引調整ピース34をアンカーボルト35に固定する際に、ナットの回転数により、当該隙間の長さを調整し、上壁パネル10bの前後位置(倒れ角度)を調整する(図4(b)参照)。
The tilt angle of the upper wall panel 10 b is adjusted by adjusting the length of the gap between the upper wall panel 10 b and the temporary support member 3 using the push / pull adjustment piece 34 and the anchor bolt 35.
Since the adjustment plate 32 is interposed between the temporary support member 3 and the lower wall panel 10a, there is a gap between the upper wall panel 10b disposed on the upper end surface of the wall panel 10a and the temporary support member 3. Is formed. Therefore, when the push / pull adjustment piece 34 is fixed to the anchor bolt 35, the length of the gap is adjusted according to the number of rotations of the nut, and the front / rear position (falling angle) of the upper wall panel 10b is adjusted (FIG. 4 ( b)).

また、上壁パネル10bのレベル調整は、図5(b)に示すように、上壁パネル10bのか端面から突設された高さ調整ボルト16により行う。
つまり、高さ調整ボルト16を回転させることにより、上壁パネル10bからの突出長を伸縮させて、下壁パネル10aとの間隔を調整する。これにより、上壁パネル10bのレベル調整を行うことが可能となる。
Further, as shown in FIG. 5B, the level of the upper wall panel 10b is adjusted by a height adjusting bolt 16 protruding from the end surface of the upper wall panel 10b.
That is, by rotating the height adjusting bolt 16, the length of the protrusion from the upper wall panel 10b is expanded and contracted, and the distance from the lower wall panel 10a is adjusted. As a result, the level of the upper wall panel 10b can be adjusted.

柱延長工程は、図6(b)および図8に示すように、下壁パネル10aを支持する本設の柱2を上方に延長して上壁パネル10bに接続する工程である。   As shown in FIGS. 6B and 8, the column extending step is a step of extending the main column 2 supporting the lower wall panel 10a upward and connecting it to the upper wall panel 10b.

本実施形態の柱延長工程は、配筋工、型枠工、コンクリート打設工および型枠撤去工を備えている。   The column extension process of the present embodiment includes a bar arrangement, a formwork, a concrete placing work, and a formwork removal work.

配筋工では、柱2の主筋(以下、「柱主筋21」という)とフープ筋22の配筋を行う。
柱主筋21は、柱2の既設部分の上端から突出した柱主筋21に、所定の重ね継手を確保した状態で鉄筋を連結することにより延長する。
In the bar arrangement, the main reinforcement of the column 2 (hereinafter referred to as “column main reinforcement 21”) and the hoop reinforcement 22 are arranged.
The column main reinforcement 21 is extended by connecting a reinforcing bar to the column main reinforcement 21 protruding from the upper end of the existing part of the column 2 while securing a predetermined lap joint.

柱主筋21は、後工程において、柱2を延長する際に鉄筋を連結することが可能となるように、所定の重ね継手長さが確保できる長さを有している(図8参照)。さらに柱2を延長することがない場合は、柱主筋21は、柱2の上端から所定のコンクリート被りを確保することが可能となるように、柱2の上端面よりも低い高さとする。   The column main bar 21 has a length that can secure a predetermined lap joint length so that the reinforcing bar can be connected when the column 2 is extended in a subsequent process (see FIG. 8). Further, when the column 2 is not extended, the column main reinforcement 21 has a lower height than the upper end surface of the column 2 so that a predetermined concrete covering can be secured from the upper end of the column 2.

柱主筋21,21,…の周囲には、フープ筋22を配筋する。壁パネル10の切欠部11から露出した壁パネルの壁主筋12は、柱主筋21の間に入り込ませる。   A hoop line 22 is arranged around the column main bars 21, 21,. The wall main bar 12 of the wall panel exposed from the notch 11 of the wall panel 10 is inserted between the column main bars 21.

型枠工では、図7に示すように、上壁パネル10bの切欠部11と柱2となる空間とを囲むように、柱2の鉄筋(柱主筋21およびフープ筋22)の外周囲に沿って型枠23を設置する。型枠23の固定方法は限定されるものではなく、適宜行う。   In the formwork, as shown in FIG. 7, along the outer periphery of the reinforcing bars (column main bars 21 and hoop bars 22) of the columns 2 so as to surround the notches 11 of the upper wall panel 10b and the spaces to be the columns 2. The mold 23 is installed. The fixing method of the formwork 23 is not limited and is performed appropriately.

コンクリート打設工では、型枠23内にコンクリートを打設し、コンクリートに所定の強度が発現するまで養生する。
これにより、壁主筋12を巻き込んだ状態で柱2が形成されるため、壁パネル10と柱2との一体化が実現する。
In the concrete placement work, concrete is placed in the mold 23 and cured until a predetermined strength is developed in the concrete.
Thereby, since the pillar 2 is formed in a state where the wall main reinforcing bars 12 are involved, the integration of the wall panel 10 and the pillar 2 is realized.

コンクリートの養生後、所定の強度が発現したら、図8に示すように、型枠23を撤去する。   After the concrete is cured, when a predetermined strength is developed, the mold 23 is removed as shown in FIG.

支持部材固定工程、壁パネル固定工程、位置決め工程および柱延長工程を繰り返し実施することで、壁1を所望の形状に形成する。   The wall 1 is formed into a desired shape by repeatedly performing the supporting member fixing step, the wall panel fixing step, the positioning step, and the column extending step.

以上、構造物の構築方法によれば、下壁パネル10aと仮設支持部材3を利用することで、上壁パネル10bの位置決めを簡易に行うことができるため、施工性に優れている。
また、壁1が傾斜部分や曲線部分を含む場合であっても、早期かつ安価に施工を行うことができる。
As mentioned above, according to the construction method of a structure, since positioning of the upper wall panel 10b can be performed simply by utilizing the lower wall panel 10a and the temporary support member 3, it is excellent in workability.
Moreover, even if the wall 1 includes an inclined portion or a curved portion, the construction can be performed early and inexpensively.

また、柱2の施工と、柱2と壁パネル10との接合とを同時に行うことで、早期施工の実現を可能としている。
柱2は壁パネル10の背面に形成するため、壁1の表面に柱2が露出することがなく、表面が一定の品質を備えた壁パネル10により覆われた壁を形成することができる。そのため、表面の特殊なデザインが施されえた壁1の構築を簡易に施工することができる。
Moreover, the construction of the pillar 2 and the joining of the pillar 2 and the wall panel 10 are performed at the same time, thereby enabling early construction.
Since the pillar 2 is formed on the back surface of the wall panel 10, the pillar 2 is not exposed on the surface of the wall 1, and a wall covered with the wall panel 10 having a certain surface quality can be formed. Therefore, it is possible to easily construct the wall 1 on which a special design of the surface can be applied.

また、壁パネル10の突き合わせ部分には止水板4を配置しているため、柱2のコンクリート打設に伴い、縦目地13から壁1の表面にノロが流出することが防止されている。   In addition, since the water stop plate 4 is disposed at the abutting portion of the wall panel 10, it is prevented that noro flows out from the vertical joint 13 to the surface of the wall 1 with the concrete placement of the pillar 2.

以上、本発明について、好適な実施形態について説明した。しかし、本発明は、前述の各実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能であることはいうまでもない。   The preferred embodiments of the present invention have been described above. However, the present invention is not limited to the above-described embodiments, and it goes without saying that the above-described constituent elements can be appropriately changed without departing from the spirit of the present invention.

例えば、前記実施形態では、傾斜した壁を構築する場合について説明したが、壁は傾斜している必要はなく、垂直にしていてもよい。
また、本発明の壁の構築方法は、曲線部を有した壁を構築する場合に採用してもよい。
For example, in the above-described embodiment, the case where an inclined wall is constructed has been described. However, the wall does not need to be inclined and may be vertical.
Moreover, you may employ | adopt the construction method of the wall of this invention, when constructing | assembling the wall which has a curved part.

また、壁パネルの端部には、必ずしも切欠部が形成されている必要はない。
また、前記実施形態では、壁パネルの背面に柱を形成する場合について説明したが、柱と壁パネルの位置関係は前記実施形態のものに限定されるものではなく、例えば、壁パネルを柱の側面に当接させてもよい。
Moreover, the notch part does not necessarily need to be formed in the edge part of a wall panel.
In the above embodiment, the case where the pillar is formed on the back surface of the wall panel has been described. However, the positional relationship between the pillar and the wall panel is not limited to that of the above embodiment. You may make it contact | abut to a side surface.

また、前記実施形態では、各壁パネルの左右に柱を配設する場合について説明したが、壁パネルに対する柱の本数は限定されるものではない。例えば、柱を配設することなく柱パネル同士連結してもよく、柱は、必ずしも各壁パネルの両端に配設されている必要はない。   Moreover, although the said embodiment demonstrated the case where a pillar was arrange | positioned on the left and right of each wall panel, the number of the pillar with respect to a wall panel is not limited. For example, the column panels may be connected to each other without disposing the columns, and the columns are not necessarily disposed at both ends of each wall panel.

また、本実施形態では、柱2を現場施工により構築する場合について説明したが、柱2の構築(延長)方法は限定されるものではなく、例えば、プレキャスト部材を上下に連結するとともに、壁パネルと接続することにより構築してもよい。   Moreover, although this embodiment demonstrated the case where the pillar 2 was constructed | assembled by site construction, the construction (extension) method of the pillar 2 is not limited, For example, while connecting a precast member up and down, a wall panel You may build by connecting.

また、最下段の壁パネル10の構築方法は、前記の方法に限定されるものではなく、適宜構築することが可能である。   Moreover, the construction method of the lowermost wall panel 10 is not limited to the above method, and can be appropriately constructed.

1 壁
10 壁パネル
10a 下壁パネル(下段の壁パネル)
10b 上壁パネル(上段の壁パネル)
11 切欠部
12 壁主筋(主筋)
2 柱
2a 柱後部(柱の後側部分)
2b 柱前部(柱の前側部分)
3 仮設支持部材
4 止水板
1 wall 10 wall panel 10a lower wall panel (lower wall panel)
10b Upper wall panel (upper wall panel)
11 Notch 12 Wall main bar (main bar)
2 pillar 2a pillar rear part (the rear part of the pillar)
2b Column front (front side of the column)
3 Temporary support member 4 Water stop plate

Claims (4)

複数の壁パネルを上下に並設して壁を形成する壁の構築方法であって、
下段の壁パネルの背面に、上部が前記下段の壁パネルの上端よりも上方に突出するように仮設支持部材を固定する工程と、
前記下段の壁パネルの上端面に上段の壁パネルを設置するとともに、前記上段の壁パネルの背面に前記仮設支持部材の突出部分を固定する工程と、
前記仮設支持部材で前記上段の壁パネルを支えつつ、前記上段の壁パネルの位置決めを行う工程と、
前記下段の壁パネルを支持する本設の柱を上方に延長して前記上段の壁パネルに接続する工程と、
を備えることを特徴とする、壁の構築方法。
A wall construction method in which a plurality of wall panels are arranged side by side to form a wall,
Fixing the temporary support member on the back surface of the lower wall panel so that the upper part protrudes upward from the upper end of the lower wall panel;
Installing the upper wall panel on the upper end surface of the lower wall panel, and fixing the protruding portion of the temporary support member to the back surface of the upper wall panel;
A step of positioning the upper wall panel while supporting the upper wall panel with the temporary support member;
Extending the main column supporting the lower wall panel upward and connecting to the upper wall panel;
A method for constructing a wall, comprising:
複数の壁パネルを上下に並設して壁を形成する壁の構築方法であって、
本設の柱の後側部分を構築する工程と、
前記柱に沿って最下段の壁パネルを配置する工程と、
前記柱の前側部分を構築して前記最下段の壁パネルに接続する工程と、
前記最下段の壁パネルの背面に、上部が前記最下段の壁パネルの上端よりも上方に突出するように仮設支持部材を固定する工程と、
前記最下段の壁パネルの上端面に上段の壁パネルを設置するとともに、前記上段の壁パネルの背面に前記仮設支持部材の突出部分を固定する工程と、
前記仮設支持部材で前記上段の壁パネルを支えつつ、前記上段の壁パネルの位置決めを行う工程と、
前記柱を上方に延長して前記上段の壁パネルに接続する工程と、
を備えることを特徴とする、壁の構築方法。
A wall construction method in which a plurality of wall panels are arranged side by side to form a wall,
Building the rear part of the main pillar;
Arranging a bottom wall panel along the pillar;
Building the front part of the pillar and connecting it to the bottom wall panel;
Fixing the temporary support member on the back surface of the lowermost wall panel so that the upper part protrudes upward from the upper end of the lowermost wall panel;
Installing the upper wall panel on the upper end surface of the lowermost wall panel, and fixing the protruding portion of the temporary support member to the back surface of the upper wall panel;
A step of positioning the upper wall panel while supporting the upper wall panel with the temporary support member;
Extending the column upwards and connecting to the upper wall panel;
A method for constructing a wall, comprising:
前記上段の壁パネルを、左右に隣接する他の壁パネルと、その側端面同士を突き合わせた状態で配設し、
前記柱を、前記壁パネル同士の突き合わせ部分の背面に接続することを特徴とする、請求項1または請求項2に記載の壁の構築方法。
The upper wall panel is disposed in a state in which the other side wall panels adjacent to the left and right are in contact with each other.
The method for constructing a wall according to claim 1, wherein the column is connected to a back surface of a butt portion between the wall panels.
前記壁パネルの端部の背面側には切欠部が形成されていることで当該壁パネルの主筋が露出しており、前記柱に前記主筋が定着されていることを特徴とする、請求項3に記載の壁の構築方法。   The notch part is formed in the back side of the edge part of the said wall panel, the main reinforcement of the said wall panel is exposed, and the said main reinforcement is fixed to the said pillar, It is characterized by the above-mentioned. The wall construction method described in 1.
JP2010024981A 2010-02-08 2010-02-08 How to build a wall Expired - Fee Related JP5291643B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010024981A JP5291643B2 (en) 2010-02-08 2010-02-08 How to build a wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010024981A JP5291643B2 (en) 2010-02-08 2010-02-08 How to build a wall

Publications (2)

Publication Number Publication Date
JP2011162970A JP2011162970A (en) 2011-08-25
JP5291643B2 true JP5291643B2 (en) 2013-09-18

Family

ID=44593991

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010024981A Expired - Fee Related JP5291643B2 (en) 2010-02-08 2010-02-08 How to build a wall

Country Status (1)

Country Link
JP (1) JP5291643B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101664103B1 (en) * 2014-06-13 2016-10-25 한국철도기술연구원 PC Underground structure having Precast wall using Hpile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6268946A (en) * 1985-09-24 1987-03-30 株式会社フジタ Beam construction method
JPH06207441A (en) * 1992-05-29 1994-07-26 Takeshige Shimonohara Construction panel body and jointing method therefor
JPH08209653A (en) * 1994-12-05 1996-08-13 Nisso Giken:Kk Form block for civil engineering and construction building, building structure using it, and construction thereof
JPH08218523A (en) * 1995-02-14 1996-08-27 Kajima Corp Pc form construction method and pc form
JP4412572B2 (en) * 2001-02-21 2010-02-10 株式会社インバックス Exterior wall unit, concrete structure and construction method of the same structure

Also Published As

Publication number Publication date
JP2011162970A (en) 2011-08-25

Similar Documents

Publication Publication Date Title
KR101556545B1 (en) Method for constructing using a double wall Precast Concrete
KR101131679B1 (en) Splicing Method of Embedded type Baseplate with Steel Column
JP5250096B2 (en) Building structure
KR101186053B1 (en) Method of Constructing Insitu Concrete Beam Using Preinstalled Precast Concrete Slab
JP5734168B2 (en) Building structure
JP6829631B2 (en) Construction method of column base, reinforcement method of existing column base
JP2010261270A (en) Composite structure and method for constructing composite structure building
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP5291643B2 (en) How to build a wall
KR101665622B1 (en) the construction method of steel-concrete hybrid precast concrete structure
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP2006322154A (en) Foundation construction method of building
JP6368584B2 (en) Foundation construction method
KR102429445B1 (en) Shear Reinforcement Integrated with Vertical Rebars that can be Constructed with a Crane and its Installation Method
JP4026510B2 (en) Rapid construction method for PCa structures
JP6435218B2 (en) Fixing method of joint steel frame in composite structure, construction method and joint structure of joint, anchor bolt fixing jig
JP5001897B2 (en) Building construction method
JP2008115539A (en) Flat plate construction method
KR101700950B1 (en) the hybrid steel joint construction between column and beam
JP5056534B2 (en) Structure installation method for water gradient floor
JP2010216196A (en) Anchor bolt installation method for continuous footing, and anchor bolt-tool set
JP2016153559A (en) Construction method of wooden building and foundation member used for construction method
KR101675022B1 (en) the hybrid joint construction between column and beam, the hybrid joint construction between girder and beam
JP7389634B2 (en) Building construction method
JP2008150820A (en) Wall concrete, and manufacturing method and construction method therefor

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120620

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130430

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130528

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130607

R150 Certificate of patent or registration of utility model

Ref document number: 5291643

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

LAPS Cancellation because of no payment of annual fees