JP5243812B2 - Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program - Google Patents

Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program Download PDF

Info

Publication number
JP5243812B2
JP5243812B2 JP2008033816A JP2008033816A JP5243812B2 JP 5243812 B2 JP5243812 B2 JP 5243812B2 JP 2008033816 A JP2008033816 A JP 2008033816A JP 2008033816 A JP2008033816 A JP 2008033816A JP 5243812 B2 JP5243812 B2 JP 5243812B2
Authority
JP
Japan
Prior art keywords
construction plan
item
construction
items
registered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008033816A
Other languages
Japanese (ja)
Other versions
JP2009193381A (en
Inventor
成明 平岡
Original Assignee
株式会社建設施工学アカデミー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社建設施工学アカデミー filed Critical 株式会社建設施工学アカデミー
Priority to JP2008033816A priority Critical patent/JP5243812B2/en
Publication of JP2009193381A publication Critical patent/JP2009193381A/en
Application granted granted Critical
Publication of JP5243812B2 publication Critical patent/JP5243812B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は土木工事の施工計画書の作成を支援する土木工事施工計画書作成支援システム、土木工事施工計画書作成支援方法、および土木工事施工計画書作成支援プログラムに係り、特に、総合評価方式における技術提案書としての施工計画書の作成に適した土木工事施工計画書作成支援システム、土木工事施工計画書作成支援方法、および土木工事施工計画書作成支援プログラムに関する。   The present invention relates to a civil engineering / construction plan creation support system, a civil engineering / construction plan creation support method, and a civil engineering / construction plan creation support program for supporting creation of a civil engineering construction plan, and more particularly, in a comprehensive evaluation method. The present invention relates to a civil engineering construction plan creation support system, a civil engineering construction plan creation support method, and a civil engineering construction plan creation support program suitable for creating a construction plan as a technical proposal.

近年、公共工事や民間工事における施工業者の競争入札の際に、各入札業者が作成する施工計画書の内容を考慮して落札業者を決定することが広く行われている。施工計画書とは、施工業者が計画する具体的な施工計画等を記載した技術提案書であり、その施工業者の工事の品質を判断する際の指標となるものである。   2. Description of the Related Art In recent years, it has been widely performed that a successful bidder is determined in consideration of the contents of a construction plan created by each bidder in the case of competitive bidding by a contractor in public construction or private construction. The construction plan is a technical proposal that describes a specific construction plan or the like planned by a contractor, and serves as an index for judging the quality of the contractor's construction.

特に、公共工事では、工事の品質確保の観点から法整備が進められており、多くの地方公共団体が、施工計画書の内容を考慮して入札業者を総合的に評価する総合評価方式を導入している。評価の良し悪しは、落札業者の決定に大きく影響する。したがって、質の高い施工計画書を作成することは、各種施工業者にとって非常に重要な作業となっている。通常、施工計画書には、少なくとも、工種および種別(以下「工種種別」という)に対応して設定した、工事の課題、課題の設定理由、および課題を解決するための具体的な施工計画を記載することが求められている。また、施工計画は、工種種別に対応した留意判断事項について判断および調査を行い、その判断結果および調査結果に基づいて作成される必要がある。   Particularly in public works, legislation is being promoted from the viewpoint of ensuring the quality of construction, and many local governments have introduced comprehensive evaluation methods that comprehensively evaluate bidders in consideration of the contents of the construction plan. doing. The good or bad evaluation greatly affects the decision of the successful bidder. Therefore, creating a high-quality construction plan is a very important task for various contractors. The construction plan usually includes at least a construction problem, a reason for setting the problem, and a specific construction plan for solving the problem, which are set according to the work type and type (hereinafter referred to as “type of work type”). It is required to be described. In addition, it is necessary to make a construction plan based on the judgment result and the investigation result by performing judgment and investigation on the attention judgment items corresponding to the type of work.

ところで、各種工事の中で、土木工事は、工種種別の数が多く、また、工事ごとに適用される工種種別が大きく異なるという特徴がある。したがって、特に土木工事については、必要な施工計画書を作成するのに、膨大な手間と時間が掛かっていた。このような施工計画書の作成の労力を軽減するための技術の蓄積はなく、記載すべき先行技術文献情報はない。   By the way, among the various constructions, the civil engineering work has a feature that the number of work types is large and the work type applied to each work is greatly different. Therefore, especially for civil engineering work, it took enormous effort and time to prepare a necessary construction plan. There is no accumulation of technology for reducing the labor for creating such a construction plan, and there is no prior art document information to be described.

しかしながら、通常、施工計画書の提出自体は対価を得られるものではなく、また、施工計画書の提出により工事の受注が保証されるものではない。したがって、施工計画書の作成は、できるだけ少ない労力で行い、施工計画書の作成コストを抑えることが望ましい。一方で、作成にかける労力を低減した結果として低品質の施工計画書を提出すると、落札の可能性は低くなる。したがって、少ない労力で高品質な施工計画書を作成することが求められる。   However, usually, the submission of the construction plan itself does not provide compensation, and the submission of the construction plan does not guarantee an order for construction. Therefore, it is desirable to create the construction plan with as little effort as possible to reduce the cost of creating the construction plan. On the other hand, if a low-quality construction plan is submitted as a result of reducing the labor required for creation, the possibility of a successful bid is reduced. Therefore, it is required to create a high-quality construction plan with little effort.

本発明は、かかる点に鑑みてなされたものであり、少ない労力で高品質な施工計画書を作成することができる土木工事施工計画書作成支援システム、土木工事施工計画書作成支援方法、および土木工事施工計画書作成支援プログラムを提供することを目的とする。   The present invention has been made in view of the above points, and is a civil engineering construction plan creation support system, a civil engineering construction plan creation support method, and a civil engineering that can create a high-quality construction plan with a small amount of labor. The purpose is to provide a construction work plan creation support program.

本発明の一態様に係る土木工事施工計画書作成支援システムは、土木工事の工種種別を表示して登録する工種種別登録手段と、登録された工種種別に対応する留意判断項目を表示して登録する留意判断項目登録手段と、登録された工種種別および留意判断項目に対応する施工計画項目を表示して登録する施工計画登録手段と、課題項目を表示して登録する課題項目登録手段と、登録された課題項目に対応付けて、課題項目の設定理由および登録された施工計画項目の施工計画に関する文章入力を受け付けて登録する文章登録手段と、登録された課題項目と、この課題項目に対応付けられた設定理由および施工計画に基づいて、施工計画書を作成する施工計画書作成手段と、作成された施工計画書を、留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶手段とを具備する構成を採る。 The civil engineering construction plan creation support system according to one aspect of the present invention displays and registers a work type registration means for displaying and registering a work type of civil engineering, and a notice determination item corresponding to the registered work type. Attention judgment item registration means, construction plan registration means for displaying and registering construction plan items corresponding to registered work type and attention judgment items, assignment item registration means for displaying and registering assignment items, and registration Corresponding to the registered task item, the reason for setting the task item and the text registration means for receiving and registering text input related to the construction plan of the registered construction plan item, the registered task item, and the corresponding task item The construction plan creation means for creating the construction plan based on the set reason and the construction plan, and the created construction plan, the judgment judgment item, the construction plan item, and the problem A configuration having a storage means for storing at least one in association with the eye.

本発明の一態様に係る土木工事施工計画書作成支援方法は、土木工事の工種種別を表示して登録する工種種別登録工程と、登録された工種種別に対応する留意判断項目を表示して登録する留意判断項目登録工程と、登録された工種種別および留意判断項目に対応する施工計画項目を表示して登録する施工計画登録工程と、課題項目を表示して登録する課題項目登録工程と、登録された課題項目に対応付けて、課題項目の設定理由および登録された施工計画項目の施工計画に関する文章入力を受け付けて登録する文章登録工程と、登録された課題項目と、この課題項目に対応付けられた設定理由および施工計画に基づいて、施工計画書を作成する施工計画書作成工程と、作成された施工計画書を、留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶工程とを有するようにした。 The civil engineering construction plan creation support method according to one aspect of the present invention is a method of displaying and registering a work type registration process for displaying and registering a work type of civil engineering, and a notice determination item corresponding to the registered work type. Attention judgment item registration process, construction plan registration process for displaying and registering construction plan items corresponding to registered work type and attention judgment items, assignment item registration process for displaying and registering assignment items, and registration The text registration process for accepting and registering text input related to the construction reason of the task item and the construction plan of the registered construction plan item, the registered task item, and the task item The construction plan creation process for creating the construction plan based on the set reason and the construction plan, and the created construction plan, the judgment judgment items, construction plan items, and issue items And to have a storage step of storing in association with at least one.

本発明の一態様に係る土木工事施工計画書作成支援プログラムは、コンピュータに、土木工事の工種種別を表示して登録する工種種別登録処理と、登録された工種種別に対応する留意判断項目を表示して登録する留意判断項目登録処理と、登録された工種種別および留意判断項目に対応する施工計画項目を表示して登録する施工計画登録処理と、課題項目を表示して登録する課題項目登録処理と、登録された課題項目に対応付けて、課題項目の設定理由および登録された施工計画項目の施工計画に関する文章入力を受け付けて登録する文章登録処理と、登録された課題項目と、この課題項目に対応付けられた設定理由および施工計画に基づいて、施工計画書を作成する施工計画書作成処理と、作成された施工計画書を、留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶処理とを実行させるようにした。 The civil engineering work plan creation support program according to one aspect of the present invention displays, on a computer, a work type registration process for displaying and registering a work type of a civil engineering work, and a notice determination item corresponding to the registered work type Attention judgment item registration process to register, construction type registration process to display and register construction plan item corresponding to registered work type and attention judgment item, and task item registration process to display and register problem item In addition, a sentence registration process for accepting and registering a sentence input regarding the reason for setting the assignment item and the construction plan of the registered construction plan item in association with the registered assignment item, the registered assignment item, and this assignment item Based on the setting reason and construction plan associated with the construction plan, the construction plan creation process for creating the construction plan, and the created construction plan, Item, and issues items of at least one in association with a so as to execute a storage process of storing.

本発明によれば、ユーザは、登録した項目に対応して表示される項目の中から選択して登録する作業を繰り返すことにより施工計画書を作成することができるので、少ない労力で施工計画書を作成することができる。また、土木工事の工種および種別を基点として対応する項目を選択肢として順次表示し、登録内容に基づいて施工計画書を作成するので、内容に過不足の無い高品質な施工計画書を作成することができる。また、過去に作成された施工計画書を、留意判断項目、施工計画項目、および課題項目のうち対応付けが行われた項目で検索することができるので、ユーザは、参考にすべき過去の施工計画書の内容を容易に参照することができ、更に少ない労力でかつ更に高品質な施工計画書を作成することができる。   According to the present invention, the user can create a construction plan by repeating the work of selecting and registering from the items displayed corresponding to the registered items. Can be created. Also, since the corresponding items are displayed sequentially as options based on the type and type of civil engineering work, and the construction plan is created based on the registered content, a high-quality construction plan with no excess or deficiency in the content must be created. Can do. In addition, since construction plans created in the past can be searched for items that have been matched among attention judgment items, construction plan items, and task items, the user can refer to past construction plans that should be referenced. The contents of the plan can be easily referred to, and the construction plan can be created with less labor and higher quality.

以下、本発明の一実施の形態について、図面を参照して詳細に説明する。   Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

図1は、本発明の一実施の形態に係る土木工事施工計画書作成支援システムの構成を示すシステム構成図である。   FIG. 1 is a system configuration diagram showing the configuration of a civil engineering construction plan creation support system according to an embodiment of the present invention.

本実施の形態に係る土木工事施工計画書作成支援システムは、例えばパーソナルコンピュータにおいてCPU(central processing unit)のプログラム実行によりソフトウェア的に実現されるものである。図1に示す土木工事施工計画書作成支援システム100は、キーボードおよびポインティングデバイス等の入力装置(図示せず)を有しており、ユーザによる各種の選択操作および文字入力操作を受け付ける。また、土木工事施工計画書作成支援システム100は、液晶ディスプレイ等の表示装置(図示せず)を有しており、ユーザによる選択操作および文字入力操作を受け付けるための各種画面を表示する。   The civil engineering work plan creation support system according to the present embodiment is realized in software by, for example, a CPU (central processing unit) program execution in a personal computer. A civil engineering construction plan creation support system 100 shown in FIG. 1 has an input device (not shown) such as a keyboard and a pointing device, and accepts various selection operations and character input operations by a user. The civil engineering work plan creation support system 100 includes a display device (not shown) such as a liquid crystal display, and displays various screens for accepting a selection operation and a character input operation by the user.

図1において、土木工事施工計画書作成支援システム100は、情報登録用データ格納部110、項目選択部130、文章作成部140、書式データ格納部150、添付資料入力部160、計画書作成部170、情報出力部180、履歴情報格納部190を有する。   In FIG. 1, the civil engineering construction plan creation support system 100 includes an information registration data storage unit 110, an item selection unit 130, a text creation unit 140, a format data storage unit 150, an attached material input unit 160, and a plan creation unit 170. , An information output unit 180 and a history information storage unit 190.

情報登録用データ格納部110は、土木工事施工計画書(以下単に「施工計画書」という)の作成に用いられる各種項目および各種情報を予め格納している。情報登録用データ格納部110は、項目リンク情報格納部111、工種種別格納部112、カテゴリ格納部113、留意判断項目格納部114、施工計画項目格納部115、法令・基準情報格納部116、留意事項ヒント格納部117、課題項目格納部118、および質問情報格納部119を有する。   The information registration data storage unit 110 stores in advance various items and various information used for creating a civil engineering construction plan (hereinafter simply referred to as “construction plan”). The information registration data storage unit 110 includes an item link information storage unit 111, a work type storage unit 112, a category storage unit 113, a consideration determination item storage unit 114, a construction plan item storage unit 115, a law / standard information storage unit 116, and a note. The item hint storage unit 117, the assignment item storage unit 118, and the question information storage unit 119 are included.

項目リンク情報格納部111は、各種項目と各種情報とのリンク関係を規定する項目リンク情報を格納する。項目リンク情報は、ある項目が登録されたときに、その登録された項目に関連するもののみに絞って他の項目や情報をユーザに提示するための情報である。   The item link information storage unit 111 stores item link information that defines the link relationship between various items and various types of information. The item link information is information for presenting other items and information to the user only when the item is registered, and only those related to the registered item.

工種種別格納部112は、土木工事における工種および種別を格納する。   The work type storage unit 112 stores a work type and a type in civil engineering work.

カテゴリ格納部113は、工事条件を分類したカテゴリを格納する。   The category storage unit 113 stores a category in which construction conditions are classified.

留意判断項目格納部114は、土木工事に際して留意、判断および調査等をすべき事項(以下、適宜「留意事項」という)の種類を示す留意判断項目を格納する。   The attention determination item storage unit 114 stores attention determination items indicating the types of items to be noted, determined, and surveyed (hereinafter referred to as “notes” as appropriate) during civil engineering work.

施工計画項目格納部115は、土木工事における施工計画の種類を示す施工計画項目を格納する。   The construction plan item storage unit 115 stores construction plan items indicating types of construction plans in civil engineering work.

法令・基準情報格納部116は、土木工事に関連する各種の法令情報や基準書情報の種類を示す情報項目および各情報項目に対応する情報を格納する。   The law / standard information storage unit 116 stores information items indicating various types of law information and standard document information related to civil engineering work, and information corresponding to each information item.

留意事項ヒント格納部117は、留意事項の文章を作成する際のヒントとなる留意事項ヒントを格納する。   The consideration item hint storage unit 117 stores a consideration item hint that serves as a hint when creating a note item sentence.

課題項目格納部118は、土木工事に際して検討すべき課題の種類を示す課題項目を格納部する。   The task item storage unit 118 stores a task item indicating the type of task to be examined in the civil engineering work.

質問情報格納部119は、ユーザによる文章作成を促すための質問内容である質問情報を格納する。   The question information storage unit 119 stores question information which is a question content for prompting the user to create a sentence.

項目選択部130は、項目リンク情報に従って、情報登録用データ格納部110に格納された項目を選択肢として画面に表示し、ユーザにより選択された項目を施工計画書の記載項目として登録する。項目選択部130は、工事情報設定部131、留意事項確認部132、施工内容確認部133、法令・基準書確認部134、および課題項目設定部135を有する。   The item selection unit 130 displays the item stored in the information registration data storage unit 110 as an option on the screen according to the item link information, and registers the item selected by the user as a description item of the construction plan. The item selection unit 130 includes a construction information setting unit 131, a consideration item confirmation unit 132, a construction content confirmation unit 133, a law / standards document confirmation unit 134, and a task item setting unit 135.

工事情報設定部131は、土木工事ごとに、工事場所、発注者、工事コード、工種、および種別などの所定の情報(以下、適宜「工事情報」と総称する)を、ユーザ操作を受けて登録する。   The construction information setting unit 131 registers predetermined information such as a construction location, an orderer, a construction code, a construction type, and a type (hereinafter, collectively referred to as “construction information” as appropriate) in response to a user operation for each civil engineering work. To do.

留意事項確認部132は、登録された工種および種別との組み合わせ(以下「工種種別」という)に対応する留意判断項目を表示し、ユーザにより選択された留意判断項目を登録する。   The notice item confirmation unit 132 displays a notice determination item corresponding to the combination of the registered work type and type (hereinafter referred to as “work type”), and registers the notice determination item selected by the user.

施工内容確認部133は、登録された工種種別、カテゴリ、および留意判断項目に対応する施工計画項目を表示し、ユーザにより選択された施工計画項目を登録する。   The construction content confirmation unit 133 displays construction plan items corresponding to the registered work type type, category, and attention determination item, and registers the construction plan item selected by the user.

法令・基準書確認部134は、登録された工種種別、カテゴリ、留意判断項目、および施工計画項目に対応する法令情報および基準書情報の情報項目を表示し、ユーザにより情報項目が選択されたとき、選択された情報項目に対応する情報を表示する。   The law / standards confirmation unit 134 displays information items of legal information and standard information corresponding to registered work types, categories, consideration judgment items, and construction plan items, and when an information item is selected by the user The information corresponding to the selected information item is displayed.

課題項目設定部135は、課題項目を表示し、ユーザにより選択された課題項目を登録する。   The assignment item setting unit 135 displays the assignment items and registers the assignment items selected by the user.

文章作成部140は、項目選択部130で登録された項目ごとに、ユーザによる文章入力を受け付け、入力された文章を施工計画書の記載文章として登録する。文章作成部140は、留意事項作成部141、施工計画作成部142、設定理由作成部143、および文章作成補助部144を有する。   The text creation unit 140 accepts text input by the user for each item registered by the item selection unit 130, and registers the input text as written text in the construction plan. The text creation unit 140 includes a notice item creation unit 141, a construction plan creation unit 142, a setting reason creation unit 143, and a text creation assistance unit 144.

留意事項作成部141は、登録された留意判断項目ごとに、ユーザによる文章入力を受け付け、ユーザにより入力された留意事項の文章を登録する。   The notice item creation unit 141 accepts a sentence input by the user for each registered notice determination item, and registers the sentence of the notice item input by the user.

施工計画作成部142は、登録された施工計画項目ごとに、登録された課題項目に対応付けて、ユーザにより入力された施工計画の内容(以下、単に「施工計画」という)の文章を登録する。   The construction plan creation unit 142 registers, for each registered construction plan item, the text of the construction plan content (hereinafter simply referred to as “construction plan”) input by the user in association with the registered task item. .

設定理由作成部143は、登録された課題項目に対応付けて、ユーザにより入力された課題設定理由の文章を登録する。   The setting reason creation unit 143 registers the sentence of the task setting reason input by the user in association with the registered task item.

文章作成補助部144は、施工計画作成部142で施工計画の文章入力を受け付ける際に、施工計画に関する質問情報を表示して、ユーザの文章作成を補助する。また、文章作成補助部144は、設定理由作成部143で設定理由の文章入力を受け付ける際に、設定理由に関する質問情報を表示して、ユーザの文章作成を補助する。   When the construction plan creation unit 142 accepts a construction plan text input, the text creation assistance unit 144 displays question information about the construction plan and assists the user in creating the text. In addition, when the setting reason creation unit 143 accepts the text input of the setting reason, the text creation assistance unit 144 displays question information regarding the setting reason and assists the user in creating the sentence.

書式データ格納部150は、施工計画書の書式データ(以下単に「書式データ」という)を格納する。書式データは、項目選択部130で登録された項目と、文章作成部140で登録された文章と、添付資料入力部160で登録された添付資料とを用いて、どのように施工計画書を構成するかを規定するデータである。   The format data storage unit 150 stores format data of the construction plan (hereinafter simply referred to as “format data”). The format data constitutes the construction plan using the items registered by the item selection unit 130, the texts registered by the text creation unit 140, and the attached materials registered by the attachment input unit 160. It is data that defines whether to do.

添付資料入力部160は、現場写真や調査結果の画像データ等、施工計画書に添付または挿入される資料(以下「添付資料」と総称する)の入力を受け付け、入力された添付資料を登録する。   The attached material input unit 160 accepts input of materials attached to or inserted in the construction plan (hereinafter collectively referred to as “attached materials”) such as site photographs and image data of survey results, and registers the input attached materials. .

計画書作成部170は、書式データ格納部150に格納された書式データに基づき、項目選択部130で登録された項目と、文章作成部140で登録された文章と、添付資料入力部160で登録された添付資料とを用いて、施工計画書のデータを作成する。   Based on the format data stored in the format data storage unit 150, the plan creation unit 170 registers items registered by the item selection unit 130, sentences registered by the text creation unit 140, and attachments input unit 160. The data of the construction plan is created using the attached attachment.

情報出力部180は、計画書作成部170で作成された施工計画書のデータを、データ出力またはプリンタ出力する。   The information output unit 180 outputs the data of the construction plan created by the plan creation unit 170 as a data or a printer.

履歴情報格納部190は、計画書作成部170で作成された施工計画書のデータを、その施工計画書のデータの作成に用いられた工事コード、留意判断項目、施工計画項目、および課題項目に対応付けて、履歴情報として格納する。   The history information storage unit 190 converts the construction plan data created by the plan creation unit 170 into the construction code, attention determination item, construction plan item, and task item used to create the construction plan data. Correspondingly, it is stored as history information.

ここで、土木工事施工計画書作成支援システム100が取り扱う各種情報および項目リンク情報の概要について説明する。   Here, an outline of various information and item link information handled by the civil engineering construction plan creation support system 100 will be described.

図2は、土木工事施工計画書作成支援システム100が取り扱う各種情報および項目リンク情報の概要を示す図である。図2において、各矢印の方向は、項目リンク情報が規定する提示項目および提示情報の絞り込み、または入力文章の対応付けが行われる方向である。   FIG. 2 is a diagram showing an overview of various information and item link information handled by the civil engineering construction plan creation support system 100. In FIG. 2, the direction of each arrow is the direction in which the presentation items defined by the item link information and the presentation information are narrowed down or the input sentences are associated.

図2に示すように、例えば、留意判断項目は、工種種別およびカテゴリにリンクしている。これは、留意判断項目格納部114に格納された留意判断項目のうち、登録された工種種別に対応する留意判断項目や付加的に選択されたカテゴリに対応する留意判断項目以外は、原則として、施工計画書への記載が不要であるということを示す。また、施工計画項目は、工種種別、カテゴリ、および留意判断項目にリンクしている。これは、施工計画項目格納部115に格納された施工計画項目のうち、登録された工種種別および留意判断項目の組み合わせに対応する施工計画項目や付加的に選択されたカテゴリに対応する施工計画項目以外の施工計画項目は、原則として、施工計画書への記載が不要であるということを示す。   As shown in FIG. 2, for example, the attention determination item is linked to the work type and the category. As a general rule, of the attention determination items stored in the attention determination item storage unit 114, except for the attention determination items corresponding to the registered type of work and the attention determination items corresponding to additionally selected categories, Indicates that it is not necessary to write in the construction plan. In addition, the construction plan item is linked to the type of work type, the category, and the notice determination item. This is because of the construction plan items stored in the construction plan item storage unit 115, construction plan items corresponding to combinations of registered work type types and attention determination items, and construction plan items corresponding to additionally selected categories. As a general rule, items other than "" indicate that it is not necessary to write in the construction plan.

工種種別、留意判断項目、およびカテゴリを考慮しない場合、施工計画書に記載すべきと判断される可能性のある施工計画項目の数は膨大である。このような膨大な数の施工計画項目を選択肢として提示しても、ユーザがその中から必要なものを選択するのには、時間と手間が掛かる。そこで、本実施の形態に係る土木工事施工計画書作成支援システム100は、項目リンク情報に従ってユーザに提示する項目や情報を必要なものにのみ絞り込むことにより、ユーザが施工計画書を作成するのに要する時間と手間を軽減する。   When the type of work type, consideration judgment items, and categories are not considered, the number of construction plan items that may be judged to be described in the construction plan is enormous. Even if such an enormous number of construction plan items are presented as options, it takes time and effort for the user to select a necessary item from among them. Therefore, the civil engineering construction plan creation support system 100 according to the present embodiment allows the user to create a construction plan by narrowing down only items and information to be presented to the user according to the item link information. Reduce the time and effort required.

例えば、上記した施工計画項目の場合、工種種別、留意判断項目、およびカテゴリに基づいて絞り込まれ、また、留意判断項目は既に工種種別およびカテゴリに基づいて絞り込まれたものであることから、そのユーザに提示される数は大幅に低減されることになる。   For example, in the case of the construction plan items described above, the user is narrowed down based on the type of work type, the attention judgment item, and the category, and the attention judgment item is already narrowed down based on the type of work type and the category. The number presented in will be greatly reduced.

また、例えば、設定理由は、課題項目にリンクしており、課題項目ごとに対応付けて設定理由の登録が行われる。   For example, the setting reason is linked to the task item, and the setting reason is registered in association with each task item.

また、例えば、履歴情報は、工事コード、留意判断項目、施工計画項目、および課題項目にリンクしており、工事コード、留意判断項目、施工計画項目、および課題項目の1つまたは複数の組み合わせに基づいて、対応するもののみがユーザに提示される。   Further, for example, history information is linked to a construction code, a notice determination item, a construction plan item, and a task item, and is combined with one or more combinations of the construction code, the attention judgment item, the construction plan item, and the task item. Based on this, only the corresponding one is presented to the user.

項目リンク情報は、具体的には、各種項目ごとに用意された項目別マスタと、各マスタを対応付けた管理マスタとにより構成される。   The item link information is specifically composed of an item-specific master prepared for each item and a management master that associates each master.

図3および図4は、項目リンク情報の構成の一例を示す図である。項目リンク情報を構成する情報は、主に、項目別マスタと、管理マスタに分かれる。   3 and 4 are diagrams illustrating an example of the configuration of item link information. Information constituting item link information is mainly divided into item-specific masters and management masters.

図3に示すように、項目リンク情報は、項目別マスタとして、工種マスタ201、種別マスタ202、留意判断項目マスタ203、施工計画マスタ204、法令マスタ205、基準書マスタ206、カテゴリマスタ207、および課題マスタ208を含む。   As shown in FIG. 3, the item link information includes item type master 201, type master 202, attention determination item master 203, construction plan master 204, law master 205, standard document master 206, category master 207, and item master. An issue master 208 is included.

また、図4に示すように、項目リンク情報は、管理マスタとして、工種種別マスタ211、項目管理マスタ212、留意判断項目情報213、施工計画情報214、および工事支援情報215を含む。   As shown in FIG. 4, the item link information includes a work type type master 211, an item management master 212, attention determination item information 213, construction plan information 214, and construction support information 215 as management masters.

工種種別マスタ211は、工種マスタ201にリスト化された工種と、種別マスタにリスト化された種別との対応付けを規定する。   The work type classification master 211 defines the association between the work types listed in the work type master 201 and the types listed in the type master.

項目管理マスタ212は、工種種別マスタ210にリスト化された工種種別と、施工計画マスタにリスト化された施工計画項目、法令マスタ205にリスト化された法令情報と、基準書マスタ206にリスト化された基準書情報との対応付けを規定する。   The item management master 212 lists the type of work listed in the type of work type master 210, the construction plan items listed in the work plan master, the law information listed in the law master 205, and the standard document master 206. Specify the correspondence with the standard document information.

留意判断項目情報213は、カテゴリマスタ207にリスト化されたカテゴリと、留意判断項目マスタ203にリスト化された留意判断項目との対応付けを規定する。   The attention determination item information 213 defines the association between the categories listed in the category master 207 and the attention determination items listed in the attention determination item master 203.

施工計画情報214は、カテゴリマスタ207にリスト化されたカテゴリと、施工計画マスタ204にリスト化された施工計画項目との対応付けを規定する。   The construction plan information 214 defines the association between the categories listed in the category master 207 and the construction plan items listed in the construction plan master 204.

工事支援情報215は、履歴情報格納部190に格納された施工計画書の工事コードと、施工計画マスタ204にリスト化された施工計画項目と、課題マスタ208にリスト化された課題項目との対応付けを規定する。   The construction support information 215 corresponds to the construction code of the construction plan stored in the history information storage unit 190, the construction plan items listed in the construction plan master 204, and the task items listed in the task master 208. Specify the date.

図1の項目選択部130および文章作成部140は、このような構成の項目リンク情報を参照することにより、提示する項目および情報の絞り込みや、情報の対応付けを行う。   The item selection unit 130 and the text creation unit 140 in FIG. 1 refer to the item link information having such a configuration, thereby narrowing down items to be presented and information, and associating information.

このような構成の土木工事施工計画書作成支援システム100によれば、ユーザは、登録した項目に対応して表示される項目の中から選択して登録する作業を繰り返すことにより、内容に過不足の無い施工計画書を簡単に作成することができる。   According to the civil engineering / construction plan creation support system 100 having such a configuration, the user can select and register among the items displayed in correspondence with the registered items, thereby repeating the work of registering the items, so that the content is excessive or insufficient. It is possible to easily create a construction plan without any problems.

また、例えば、土木工事においては、複数の工種に同一または類似する種別が存在しており、個別に施工が行われるものの、留意事項や課題、施工計画を共通とする場合が多い。例えば、コンクリート打設は、複数の工種において実施される。このような場合に、本実施の形態の土木工事施工計画書作成支援システム100によれば、異なる工種での共通部分をまとめて扱うことができ、重複した作業を低減することができるだけでなく、記載内容の重複を低減することができる。   Also, for example, in civil engineering work, there are types that are the same or similar to a plurality of types of work, and although construction is performed individually, there are many cases where common considerations, issues, and construction plans are shared. For example, concrete placement is performed at a plurality of work types. In such a case, according to the civil engineering work plan creation support system 100 of the present embodiment, it is possible not only to be able to handle the common parts of different types of work together, and to reduce duplicate work, Duplication of description contents can be reduced.

以下、上述のように構成された土木工事施工計画書作成支援システム100の動作について説明する。   Hereinafter, the operation of the civil engineering work plan creation support system 100 configured as described above will be described.

ユーザは、土木工事施工計画書作成支援システム100が表示する各種画面によるナビゲーションを受けて、工事の設計書、特記仕様書、および数量表などの各種設計図書を参照しながら、選択・入力操作を行うことにより、施工計画書の作成を行う。   The user receives navigation through various screens displayed by the civil engineering construction plan creation support system 100, and performs selection / input operations while referring to various design documents such as construction design documents, special specifications, and quantity tables. By doing so, the construction plan is created.

まず、土木工事施工計画書作成支援システム100の動作の概要について説明する。   First, an outline of the operation of the civil engineering construction plan creation support system 100 will be described.

図5は、土木工事施工計画書作成支援システム100の動作の概要を示す図である。   FIG. 5 is a diagram showing an outline of the operation of the civil engineering construction plan creation support system 100.

土木工事施工計画書作成支援システム100は、画面の表示内容と画面遷移とにより、ユーザの業務のナビゲーションを行う。具体的には、土木工事施工計画書作成支援システム100は、図5に示すように、ユーザに対し、作業フロー確認画面で作業フローの確認をさせ(S1000)、次いで、工事情報の設定(S2000)、留意事項の確認(S3000)、施工内容の確認(S4000)、法令および基準書の確認(S5000)、施工計画の作成(S6000)、および課題の設定理由の作成(S7000)を支援する。   The civil engineering construction plan creation support system 100 performs navigation of the user's work based on the display content of the screen and the screen transition. Specifically, as shown in FIG. 5, the civil engineering / construction plan creation support system 100 allows the user to confirm the work flow on the work flow confirmation screen (S1000), and then sets the construction information (S2000). ), Confirmation of points of concern (S3000), confirmation of construction contents (S4000), confirmation of laws and standards (S5000), construction plan creation (S6000), and creation of reasons for setting issues (S7000).

具体的には、ステップS1000において、図1の項目選択部130は、作業フロー確認画面を表示して、作業を行うステップの選択を受け付ける。   Specifically, in step S1000, the item selection unit 130 of FIG. 1 displays a workflow confirmation screen and accepts selection of a step for performing work.

そして、ステップS2000において、図1の工事情報設定部131は、後述する案件登録画面において工種種別の選択を受け付け、選択された工種種別を登録する。   In step S2000, the construction information setting unit 131 in FIG. 1 accepts the selection of the work type on the case registration screen described later, and registers the selected work type.

そして、ステップS3000において、図1の留意事項確認部132は、後述する留意判断項目ページにおいて留意判断項目の選択を受け付け、選択された留意判断項目を登録する。このとき、留意事項確認部132は、項目リンク情報に基づいて、ステップS2000で登録された工種種別に対応するものを選択肢として表示する。   Then, in step S3000, the notice item confirmation unit 132 in FIG. 1 accepts selection of the notice determination item on the attention determination item page described later, and registers the selected attention determination item. At this time, based on the item link information, the notice item confirmation unit 132 displays the item corresponding to the work type registered in step S2000 as an option.

そして、ステップS4000において、図1の課題項目設定部135は、後述する課題設定ページにおいて、課題項目の選択を受け付ける。また、図1の施工内容確認部133は、施工計画項目の選択を受け付けて登録する。このとき、施工内容確認部133は、項目リンク情報に基づいて、ステップS2000で登録された工種種別およびステップS3000で登録された留意判断項目に対応するものを選択肢として表示する。   In step S4000, the assignment item setting unit 135 in FIG. 1 accepts selection of assignment items on an assignment setting page to be described later. Also, the construction content confirmation unit 133 in FIG. 1 accepts and registers the selection of construction plan items. At this time, the construction content confirmation unit 133 displays, as options, items corresponding to the type of work registered in step S2000 and the attention determination item registered in step S3000 based on the item link information.

そして、ステップS5000において、図1の法令・基準書確認部134は、後述する法令・基準書一覧ページにおいて、ステップS2000で登録された工種種別およびステップS4000で登録された施工計画項目に対応する法令情報および基準書情報の一覧を表示する。   Then, in step S5000, the law / standard document confirmation unit 134 in FIG. 1 displays the law corresponding to the work type registered in step S2000 and the construction plan item registered in step S4000 on the law / standard document list page described later. Display a list of information and standard information.

そして、ステップS6000において、図1の施工計画作成部142は、後述する施工計画詳細画面および簡易な施工計画詳細画面において、施工計画の文章入力を受け付け、入力された文章を、ステップS4000で登録された課題項目に対応付けて登録する。このとき、このとき、図1の文章作成補助部144は、適宜、後述する文章作成補助画面において、サンプル文を作成し、ユーザの文章作成を補助する。   In step S6000, the construction plan creation unit 142 in FIG. 1 accepts text input of the construction plan on a construction plan detail screen and a simple construction plan detail screen described later, and the entered text is registered in step S4000. Register in association with the task item. At this time, the sentence creation assisting unit 144 in FIG. 1 creates a sample sentence on a later-described sentence creation assisting screen as appropriate, and assists the user in creating the sentence.

そして、ステップS7000において、図1の設定理由作成部143は、簡易な施工計画詳細画面において、課題の設定理由の文章入力を受け付け、入力された文章を、ステップS4000で登録された課題項目に対応付けて登録する。   In step S7000, the setting reason creation unit 143 in FIG. 1 accepts text input of the reason for setting the task on the simple construction plan detail screen, and the input text corresponds to the task item registered in step S4000. Add and register.

このように、土木工事施工計画書作成支援システム100は、ユーザの作業をナビゲーションし、施工計画書の作成に必要な情報を順次登録する。   Thus, the civil engineering construction plan creation support system 100 navigates the user's work and sequentially registers information necessary for creating the construction plan.

次に、ユーザ操作に従って遷移する表示画面の様子を示しながら、新規に施工計画書の作成が開始されたときの土木工事施工計画書作成支援システム100の動作の一例について説明する。   Next, an example of the operation of the civil engineering construction plan creation support system 100 when creation of a new construction plan is started will be described while showing the state of a display screen that transitions according to a user operation.

図6は、案件登録画面を示す図である。図6に示す案件登録画面301は、工事コード、工事名、工事場所、工事概要、発注者等を含む工事情報の登録を受け付ける。特に、案件登録画面301は、工種種別登録欄411において工事種別を表示してユーザ選択を受け付け、登録ボタン412のクリックにより、選択された工事種別を登録する。   FIG. 6 is a diagram showing a case registration screen. 6 accepts registration of construction information including a construction code, a construction name, a construction place, a construction summary, an orderer, and the like. In particular, the project registration screen 301 displays the construction type in the construction type registration field 411, accepts the user selection, and registers the selected construction type by clicking the registration button 412.

このように、案件登録画面301では、工事コードと工事種別とを含む各種工事情報の登録が行われる。   As described above, in the case registration screen 301, various pieces of construction information including the construction code and the construction type are registered.

図7は、案件詳細画面の法令・基準書一覧ページを示す図である。案件詳細画面は、複数のページをタブの選択により切り替えて表示することができる画面であり、例えば、図3の登録ボタン412がクリックされたときに表示される。   FIG. 7 is a diagram showing a law / standard list list page of the case details screen. The item detail screen is a screen on which a plurality of pages can be switched and displayed by selecting a tab, and is displayed, for example, when the registration button 412 in FIG. 3 is clicked.

図7に示す法令・基準書一覧ページ302は、登録法令・基準書表示欄421において、登録された工種種別に対応する法令情報および基準書情報の名称を表示対象として一覧表示する。法令・基準書一覧ページ302は、削除ボタン422のクリックにより、該当する情報を一覧から削除し、情報の名称のクリックにより、該当する情報の詳細を表示する。なお、削除ボタンの機能は、以降説明する各画面および各ページで同様となっている。   The law / standard list list page 302 shown in FIG. 7 displays a list of the law information and standard document information names corresponding to the registered work types in the registered law / standard document display field 421 as a display target. The law / standard list list page 302 deletes the corresponding information from the list by clicking the delete button 422, and displays the details of the corresponding information by clicking the name of the information. The function of the delete button is the same on each screen and each page described below.

また、法令・基準書一覧ページ302は、基準書検索ボタン425のクリックにより、表示されていない情報を一覧に追加するための基準書検索画面を表示する。   Further, the law / standard document list page 302 displays a standard document search screen for adding information not displayed to the list by clicking the standard document search button 425.

図8は、基準書検索画面を示す図である。図8に示す基準書検索画面303は、カテゴリ選択欄431においてカテゴリの一覧を表示してユーザ選択を受け付け、選択されたカテゴリに対応する基準書情報の名称を、基準書表示欄432に表示候補として一覧表示する。また、基準書検索画面303は、別ページにおいて、入力キーワードによる基準書情報報検索を行い、検索された情報を、参照候補に追加する。そして、基準書検索画面303は、一覧表示した基準書情報の名称に対するユーザ選択を受け付け、追加ボタン433のクリックにより、選択された基準書情報を表示対象に追加し、図7の法令・基準書一覧ページ302に戻る。同様に、図7の法令検索ボタン424のクリックにより、法令情報の表示対象への追加が可能となっている。   FIG. 8 is a diagram showing a reference document search screen. The reference document search screen 303 shown in FIG. 8 displays a list of categories in the category selection field 431 and accepts user selection, and displays the name of the reference document information corresponding to the selected category in the reference document display field 432 as a display candidate. As a list. In addition, the standard document search screen 303 performs a standard document information report search using an input keyword on another page, and adds the searched information to the reference candidates. Then, the standard document search screen 303 accepts user selection for the name of the standard document information displayed as a list, and when the add button 433 is clicked, the selected standard document information is added to the display target. Return to the list page 302. Similarly, by clicking the law search button 424 in FIG. 7, law information can be added to the display target.

このように、法令・基準書一覧ページ302では、表示対象となる法令情報および基準書情報がリスト化される。ユーザは、法令・基準書一覧ページ302における情報の名称のクリックにより、必要に応じて参照すべき法令情報または基準書情報を簡単に参照することができる。   In this way, the law / standard document list page 302 lists the legal information and standard document information to be displayed. The user can easily refer to the law information or the standard document information to be referred to as necessary by clicking the name of the information on the law / standard document list page 302.

図9は、案件情報画面の留意判断項目ページを示す図である。図9に示す留意判断項目ページ304は、留意判断項目一覧441において、登録された工種種別に対応する留意判断項目を、登録候補として一覧表示する。留意判断項目ページ304は、要不要チェックボックス442に対するユーザのチェックを受け付け、変更ボタン443のクリックにより、チェックの入った留意判断項目を登録する。   FIG. 9 is a diagram showing a notice determination item page on the item information screen. The attention determination item page 304 illustrated in FIG. 9 displays a list of attention determination items corresponding to the registered work type types in the attention determination item list 441 as registration candidates. The attention determination item page 304 accepts the user's check on the necessity check box 442 and registers the checked attention determination item when the change button 443 is clicked.

また、留意判断項目ページ304は、変更ボタン443のクリックにより、要不要チェックボックス442にチェックの入った留意判断項目(つまり登録されている項目)が上位に配置されるように、留意判断項目一覧441をソートする。   In addition, the attention determination item page 304 displays a list of attention determination items such that the attention determination item (that is, the registered item) checked in the necessity check box 442 is arranged at the top when the change button 443 is clicked. 441 are sorted.

また、留意判断項目ページ304は、工種種別選択ボタン444または工事条件選択ボタン445のクリックにより、表示されていない留意判断項目を一覧に追加するための留意判断項目検索画面を表示する。   In addition, the attention determination item page 304 displays a attention determination item search screen for adding an attention determination item that is not displayed to the list by clicking the work type selection button 444 or the construction condition selection button 445.

図10は、留意判断項目検索画面を示す図である。図10に示す留意判断項目検索画面305は、工種種別選択欄451において工種種別を一覧表示してユーザ選択を受け付け、選択された工事種別に対応する留意判断項目を、留意判断項目表示欄452に一覧表示する。または、カテゴリ選択欄453においてカテゴリを一覧表示してユーザ選択を受け付け、選択されたカテゴリに対応する留意判断項目を、留意判断項目表示欄452に一覧表示する。また、留意判断項目検索画面305は、別ページにおいて、入力キーワードによる留意判断項目検索を行い、検索された情報を、一覧に追加する。そして、留意判断項目検索画面305は、一覧表示した留意判断項目に対するユーザ選択を受け付け、追加ボタン454のクリックにより、選択された留意判断項目を登録候補に追加し、図9の留意判断項目ページ304に戻る。   FIG. 10 is a diagram showing a notice determination item search screen. The attention determination item search screen 305 shown in FIG. 10 displays a list of work types in the work type selection field 451 and accepts user selection, and displays the attention determination items corresponding to the selected work type in the attention determination item display field 452. Display a list. Alternatively, categories are displayed in a list in the category selection field 453 to accept user selection, and attention determination items corresponding to the selected category are displayed in a list in the attention determination item display field 452. In addition, the attention determination item search screen 305 performs an attention determination item search using an input keyword on another page, and adds the searched information to the list. Then, the attention determination item search screen 305 accepts user selection of the attention determination items displayed in a list, and adds the selected attention determination item to the registration candidate by clicking an add button 454. The attention determination item page 304 in FIG. Return to.

また、図9に示す留意判断項目ページ304は、留意判断項目のクリックにより、対応する留意事項ヒントを表示して留意事項の文章を入力するための留意判断項目詳細画面を表示する。   Also, the attention determination item page 304 shown in FIG. 9 displays a attention determination item detail screen for displaying a corresponding attention item hint and inputting a note text by clicking the attention determination item.

図11は、留意判断項目詳細画面を示す図である。図11に示す留意判断項目詳細画面306は、他工事選択欄461において、同一の留意判断項目が登録された過去の工事の一覧を表示してユーザ選択を受け付け、選択された工事で登録された留意事項の文章を、履歴情報欄462に表示する。また、留意判断項目詳細画面306は、留意判断項目に対応して予め用意された留意事項ヒントを、ヒント欄463に表示する。そして、留意判断項目詳細画面306は、留意事項入力欄464において留意事項の文章のユーザ入力を受け付け、登録ボタン465のクリックにより、入力された留意事項を対応する留意判断項目に対応付けて登録する。   FIG. 11 is a diagram showing a notice determination item detail screen. The attention determination item detail screen 306 shown in FIG. 11 displays a list of past constructions in which the same attention determination item is registered in the other construction selection column 461, accepts user selection, and is registered with the selected construction. The note text is displayed in the history information column 462. In addition, the attention determination item detail screen 306 displays the attention item hint prepared in advance corresponding to the attention determination item in the hint column 463. The attention determination item detail screen 306 accepts user input of a note text in the attention item input field 464 and registers the input attention item in association with the corresponding attention determination item by clicking the registration button 465. .

図9に示す留意判断項目ページ304は、ファイル出力ボタン447のクリックにより、要不要チェックボックス442にチェックの入っている留意判断項目および留意事項をファイル出力する。   The attention determination item page 304 shown in FIG. 9 outputs, as a file, the attention determination items and the considerations that are checked in the necessity check box 442 when the file output button 447 is clicked.

このように、留意判断項目ページ304では、過去の同一の留意判断項目が登録された工事の情報やヒントを参照しながら、留意判断項目および留意事項を登録することができる。登録された留意判断項目および留意事項は、適宜プリントアウトすることができ、現地調査においても参照することができる。   As described above, the attention determination item page 304 can register the attention determination item and the attention item while referring to the construction information and hints in which the same past attention determination item is registered. The registered notice judgment items and notice items can be printed out as appropriate, and can be referred to in field surveys.

図12は、案件詳細画面の資料添付ページを示す図である。図12に示す資料添付ページ307は、追加ボタン471のクリックにより、指定された場所から追加資料を取得して所定の格納領域に格納し、その追加資料のファイル名を格納ファイル一覧472に追加する。格納ファイル一覧472に追加された資料は、添付資料として登録される。   FIG. 12 is a diagram showing a material attachment page of the case details screen. The material attachment page 307 shown in FIG. 12 acquires additional material from a specified location by clicking the add button 471 and stores it in a predetermined storage area, and adds the file name of the additional material to the storage file list 472. . The material added to the stored file list 472 is registered as an attached material.

このように、資料添付ページ307では、添付資料の登録が行われる。   As described above, the attached material is registered on the attached material page 307.

図13は、案件詳細画面の課題設定ページを示す図である。図13の課題設定ページ308は、課題項目選択欄481において、課題項目の一覧をプルダウン表示してユーザ選択を受け付ける。また、課題設定ページ308は、施工計画一覧482において、登録された工種種別、カテゴリ、および留意判断項目に対応する施工計画項目を、登録候補として一覧表示する。課題設定ページ308は、施工計画一覧482で施工計画項目を一覧表示し、施工計画項目のクリックにより、該当する施工計画項目についての施工計画の文章入力および課題項目との対応付けを行うための施工計画詳細画面を表示する。   FIG. 13 is a diagram illustrating an assignment setting page on the item detail screen. The assignment setting page 308 in FIG. 13 accepts a user selection by pulling down a list of assignment items in the assignment item selection field 481. In addition, the task setting page 308 displays a list of construction plan items corresponding to registered work type types, categories, and attention determination items in the construction plan list 482 as registration candidates. The task setting page 308 displays a list of construction plan items in the construction plan list 482, and by clicking on the construction plan item, the construction plan text input for the corresponding construction plan item and the construction for associating with the task item Display the plan details screen.

図14は、施工計画詳細画面を示す図である。図14に示す施工計画詳細画面309は、課題項目選択欄491において課題項目のユーザ選択を受け付ける。また、施工計画詳細画面309は、他工事選択欄492において、同一の施工計画項目が登録された過去の工事を一覧表示してユーザ選択を受け付け、選択された工事で登録された施工計画の文章を、履歴情報欄493に表示する。また、施工計画詳細画面309は、施工計画項目に対応して予め用意された施工計画のポイントを、ポイント欄494に表示する。そして、施工計画詳細画面309は、施工計画入力欄495(初期状態では空欄)において施工計画の文章のユーザ入力を受け付ける。すなわち、施工計画詳細画面309は、過去の施工計画の登録内容と、施工計画の文章入力欄とを、一画面に同時表示する。   FIG. 14 is a diagram showing a construction plan detail screen. The construction plan detail screen 309 shown in FIG. 14 accepts user selection of task items in the task item selection field 491. The construction plan details screen 309 displays a list of past constructions in which the same construction plan item is registered in the other construction selection column 492, accepts user selection, and the construction plan text registered for the selected construction. Is displayed in the history information column 493. Further, the construction plan detail screen 309 displays the points of the construction plan prepared in advance corresponding to the construction plan items in the point column 494. The construction plan detail screen 309 accepts user input of construction plan text in the construction plan input field 495 (blank in the initial state). In other words, the construction plan detail screen 309 displays the past construction plan registration contents and the construction plan text input field on one screen at the same time.

また、施工計画詳細画面309は、文章作成ボタン496のクリックにより、文章作成を補助するための文章作成補助画面をポップアップ表示する。   The construction plan detail screen 309 pops up a text creation assistance screen for assisting text creation when the text creation button 496 is clicked.

図15は、施工計画詳細画面309が表示する文章作成補助画面を示す図である。図15の文章作成補助画面310は、作成文章選択欄501で、文章パターンの一覧をプルダウン表示してユーザ選択を受け付ける。そして、文章作成補助画面310は、選択された文章パターンに対応する質問情報を表示して入力欄502への文字列入力を受け付け、文章作成ボタン503のクリックにより、入力された文字列を文章に組み立てて文章表示欄504に表示する。   FIG. 15 is a diagram illustrating a text creation assistance screen displayed on the construction plan detail screen 309. The sentence creation auxiliary screen 310 of FIG. 15 receives a user selection by pulling down a list of sentence patterns in the created sentence selection field 501. Then, the text creation auxiliary screen 310 displays question information corresponding to the selected text pattern, accepts a character string input to the input field 502, and clicks the text creation button 503 to convert the input text string into text. Assemble and display in the text display field 504.

図16は、文章作成補助画面310が文章の組み立てに使用するテンプレートの一例を示す図である。テンプレート710は、文章パターンに対応付けて、質問内容と、入力された文字列に付加する接続文と、文字列を文章に登場させる順序とを規定している。   FIG. 16 is a diagram illustrating an example of a template used by the sentence creation assistance screen 310 for assembling sentences. The template 710 defines a question content, a connection sentence to be added to the inputted character string, and an order in which the character string appears in the sentence in association with the sentence pattern.

文章作成補助画面310は、テンプレート710に規定された順序に従って、質問内容とこれに対応する記入欄502を配置する。そして、文章作成補助画面310は、記入欄502に記入された文字列にテンプレート710に規定された対応する接続文を付加し、テンプレート710に規定された順序で配置して、文章を自動構成する。   The text creation assistance screen 310 arranges the question contents and the corresponding entry fields 502 in accordance with the order defined in the template 710. Then, the sentence creation auxiliary screen 310 adds the corresponding connection sentence defined in the template 710 to the character string entered in the entry field 502 and arranges it in the order prescribed in the template 710 to automatically compose the sentence. .

図15の文章作成補助画面310が閉じられると、文章作成補助画面310の文章表示欄504の文章が、図14の施工計画詳細画面309の施工計画入力欄495に転記される。施工計画詳細画面309は、自動生成された施工計画入力欄495の文章であっても、その文章に対するユーザ編集を受け付けるとともに、構文チェックボタン497のクリックにより、その文章に対する構文チェックを行う。そして、文章作成補助画面310は、登録ボタン498のクリックにより、入力・編集された施工計画を、選択された課題項目に対応付けて登録する。なお、構文チェックボタンの機能は、以降説明する各画面および各ページで同様となっている。   When the text creation assistance screen 310 of FIG. 15 is closed, the text in the text display field 504 of the text creation assistance screen 310 is transferred to the construction plan input field 495 of the construction plan detail screen 309 of FIG. The construction plan detail screen 309 accepts user editing of the sentence even in the automatically generated construction plan input field 495, and performs a syntax check on the sentence by clicking the syntax check button 497. Then, the text creation auxiliary screen 310 registers the construction plan input / edited in association with the selected task item by clicking the registration button 498. The function of the syntax check button is the same on each screen and each page described below.

このように、施工計画詳細画面309では、適宜、ユーザの入力文字列をテンプレートに当て嵌めて文章を自動生成することができるので、文章作成を簡単に行うことができる。また、過去の類似する工事の情報やポイントを参照しながら施工計画を作成することができるので、必要な記載事項の漏れを防ぐことができる。また、テンプレートを使用した場合には、画一的な文章となる可能性が高くなるが、過去に作成された施工計画と比較することができるので、同一の文章とならないように文章を修正することができる。   As described above, in the construction plan detail screen 309, the sentence can be easily created because the sentence can be automatically generated by appropriately fitting the input character string of the user to the template. In addition, since it is possible to create a construction plan while referring to information and points of similar construction in the past, it is possible to prevent omission of necessary description items. In addition, when using a template, there is a high possibility that it will be a uniform text, but it can be compared with a construction plan created in the past, so correct the text so that it does not become the same text. be able to.

また、図13の課題設定ページ308は、種種別選択ボタン484または工事条件選択ボタン485のクリックにより、表示されていない施工計画項目を施工計画一覧482に追加するための、施工計画検索画面を表示する。   13 displays a construction plan search screen for adding a construction plan item that is not displayed to the construction plan list 482 by clicking the type selection button 484 or the construction condition selection button 485. To do.

図17は、施工計画検索画面を示す図である。図17に示す施工計画検索画面312は、工種種別選択欄521において工種種別を一覧表示してユーザ選択を受け付け、選択された工種種別に対応する施工計画項目を、施工計画表示欄522に登録候補として一覧表示する。または、施工計画検索画面312は、カテゴリ選択欄523においてカテゴリを一覧表示してユーザ選択を受け付け、選択されたカテゴリに対応する施工計画項目を、施工計画表示欄523に登録候補として一覧表示する。また、施工計画検索画面312は、施工計画項目のクリックにより、別画面において、同一の施工計画項目が登録された過去の工事の一覧を表示し、更に一覧から選択された工事において登録された施工計画を表示する。そして、施工計画検索画面312は、一覧表示した施工計画項目に対するユーザ選択を受け付け、追加ボタン524のクリックにより、選択された施工計画項目を登録候補に追加し、図13の課題設定ページ308に戻る。   FIG. 17 is a diagram showing a construction plan search screen. The construction plan search screen 312 shown in FIG. 17 accepts user selection by displaying a list of construction types in the construction type selection column 521, and registers construction plan items corresponding to the selected construction type in the construction plan display column 522. As a list. Alternatively, the construction plan search screen 312 displays a list of categories in the category selection field 523 and accepts user selection, and displays a list of construction plan items corresponding to the selected category as registration candidates in the construction plan display field 523. In addition, the construction plan search screen 312 displays a list of past constructions in which the same construction plan item is registered in another screen by clicking on the construction plan item, and constructions registered in the construction selected from the list. View the plan. The construction plan search screen 312 accepts user selections for the construction plan items displayed in a list, adds the selected construction plan item to the registration candidate by clicking an add button 524, and returns to the assignment setting page 308 in FIG. .

なお、課題項目としては、例えば、課題についての発注者からの指定の有無、各工種の設計数量、設計金額および主要構造物との関係、自然条件、社会条件、契約図書の内容、現地調査により把握される工事箇所の状況などから、最も適切なものがユーザによって選択される。   Note that the issue items include, for example, whether or not the issuer specifies the issue, the design quantity of each work type, the relationship between the design amount and the main structure, natural conditions, social conditions, contents of contract documents, field surveys, etc. The most appropriate one is selected by the user based on the grasped situation of the construction site.

また、施工計画は、ユーザが、選択しようとしている工法が現場状況にマッチしているかなど、設計照査により問題を提起し、課題から考えられる対策を抽出および絞り込むことにより、作成される。このとき、施工計画詳細画面309の履歴情報欄493に表示される他工事の施工計画が良いヒントとなる。   In addition, the construction plan is created by raising a problem by design verification, such as whether the construction method to be selected matches the site situation, and extracting and narrowing down possible measures from the problem. At this time, the construction plan for other construction displayed in the history information column 493 of the construction plan detail screen 309 is a good hint.

図18は、案件情報画面の簡易な施工計画ページを示す図である。図18に示す簡易な施工計画ページ313は、課題項目一覧531において、登録された課題項目を一覧表示し、課題項目のクリックにより、該当する課題項目についての文章作成を行うための簡易な施工計画詳細画面を表示する。   FIG. 18 is a diagram showing a simple construction plan page on the project information screen. A simple construction plan page 313 shown in FIG. 18 displays a list of registered task items in the task item list 531, and a simple construction plan for creating a sentence about the corresponding task item by clicking the task item. Display the details screen.

図19は、簡易な施工計画詳細画面を示す図である。図19の簡易な施工計画詳細画面314は、施工計画入力欄541(初期状態では空欄)において施工計画の文章のユーザ入力を受け付け、設定理由入力欄542(初期状態では空欄)において設定理由の文章のユーザ入力を受け付ける。また、簡易な施工計画詳細画面314は、施工計画取得ボタン543のクリックにより、課題項目に対応付けて登録した施工計画を取得し、施工計画入力欄541に転記する。   FIG. 19 is a diagram showing a simple construction plan detail screen. The simple construction plan detail screen 314 of FIG. 19 accepts user input of construction plan text in the construction plan input field 541 (blank in the initial state), and text of reason for setting in the setting reason input field 542 (blank in the initial state). Accept user input. The simple construction plan detail screen 314 obtains a construction plan registered in association with the task item by clicking on the construction plan acquisition button 543, and posts it in the construction plan input field 541.

更に、簡易な施工計画詳細画面314は、文章作成ボタン544、545のクリックにより、施工計画入力欄541および設定理由入力欄542における文章作成を補助するための文章作成補助画面を表示する。   Further, the simple construction plan detail screen 314 displays a text creation assistance screen for assisting text creation in the construction plan input field 541 and the setting reason input field 542 by clicking the text creation buttons 544 and 545.

図20は、簡易な施工計画詳細画面314が表示する設定理由入力欄542の文章作成補助画面を示す図である。図20の文章作成補助画面315は、図15の文章作成補助画面310とほぼ同様の構成となっているが、更に、表現選択欄551において、文章表現の一覧をプルダウン表示してユーザ選択を受け付ける。そして、文章作成補助画面315は、文章作成ボタン552のクリックにより、図15の文章作成補助画面310と同様に、選択された文章表現および入力された文字列を、テンプレートを用いて文章に組み立てて文章表示欄553に表示する。文章表示欄553の文章は、図19の簡易な施工計画詳細画面314の簡易な設定理由入力欄542に転記される。   FIG. 20 is a diagram showing a text creation assistance screen in the setting reason input field 542 displayed on the simple construction plan detail screen 314. The text creation assistance screen 315 in FIG. 20 has substantially the same configuration as the text creation assistance screen 310 in FIG. 15, but further, in the expression selection field 551, a list of sentence expressions is displayed in a pull-down manner to accept user selection. . Then, the text creation assistance screen 315 assembles the selected text expression and the input character string into a text using a template by clicking the text creation button 552, as in the text creation assistance screen 310 of FIG. Displayed in the text display field 553. The text in the text display field 553 is transferred to the simple setting reason input field 542 of the simple construction plan detail screen 314 in FIG.

図19の簡易な施工計画詳細画面314は、登録ボタン546のクリックにより、入力された設定理由および施工計画を対応する課題項目に対応付けて登録する。   The simple construction plan detail screen 314 of FIG. 19 registers the input setting reason and construction plan in association with corresponding task items by clicking the registration button 546.

なお、課題の設定理由は、ユーザが、問題解決のための最新技術の利用など、課題抽出からの工夫点を選定することにより、作成される。   The reason for setting the assignment is created by the user selecting a point from assignment extraction such as use of the latest technology for problem solving.

図21は、案件詳細画面の施工計画書作成ページを示す図である。図21の施工計画書作成ページ316は、課題表示欄561において、登録された課題項目を一覧表示してユーザ選択を受け付ける。そして、設定理由の出力を指定する設定理由出力チェックボックス563、および出力ファイル形式を指定するファイル形式チェックボックス564に対するユーザのチェックを受け付ける。また、施工計画書作成ページ316は、追加ボタン565のクリックにより、指定された追加資料のファイル名を取得して、そのファイル名を出力ファイル一覧566に追加する。そして、施工計画書作成ページ316は、データ出力ボタン567のクリックにより、指定された課題項目に対応付けて登録された施工計画(および設定理由)に基づいて施工計画書を作成し、作成した施工計画書を、指定された出力ファイル形式でデータ出力する。   FIG. 21 is a diagram showing a construction plan creation page on the project detail screen. The construction plan creation page 316 in FIG. 21 receives a user selection by displaying a list of registered task items in the task display field 561. Then, the user's check for the setting reason output check box 563 for designating the output of the setting reason and the file format check box 564 for designating the output file format is accepted. Further, the construction plan creation page 316 acquires the file name of the specified additional material by clicking the add button 565 and adds the file name to the output file list 566. Then, the construction plan creation page 316 creates a construction plan based on the construction plan (and setting reason) registered in association with the designated task item by clicking the data output button 567, and the created construction plan. Output the plan in the specified output file format.

図22は、上記手順により最終的に作成される施工計画書の一例を示す図である。図22に示すように、施工計画書800には、まず、出力を指定された課題項目810が配置され、続いて、課題項目810に対応付けて登録された設定理由820と、課題項目810に対応付けて登録された施工計画項目830および施工計画項目830に対応する施工計画840が配置される。   FIG. 22 is a diagram showing an example of a construction plan finally created by the above procedure. As shown in FIG. 22, in the construction plan 800, first, a task item 810 designated for output is arranged, and subsequently, a setting reason 820 registered in association with the task item 810 and a task item 810 are displayed. A construction plan item 830 registered in association with each other and a construction plan 840 corresponding to the construction plan item 830 are arranged.

一旦作成された施工計画書の内容は、後から任意に修正可能となっている。例えば、提案内容の実効性、費用、人員等を審査し、適宜修正することにより、高品質かつ実情に即した内容の施工計画書を作成することができる。   The contents of the construction plan once created can be arbitrarily modified later. For example, by examining the effectiveness, cost, personnel, etc. of the proposed content and modifying it as appropriate, it is possible to create a construction plan with high-quality and practical content.

以上説明したように、本実施の形態によれば、土木工事施工計画書作成支援システム100は、土木工事の工種種別を表示して登録し、登録された工種種別に対応する留意判断項目を表示して登録し、登録された工種種別および留意判断項目に対応する施工計画項目を表示して登録する。そして、土木工事施工計画書作成支援システム100は、課題項目を表示して登録し、登録された課題項目に対応付けて、課題項目の設定理由および登録された施工計画項目の施工計画に関する文章入力を受け付けて登録し、登録された課題項目と、この課題項目に対応付けられた設定理由および施工計画に基づいて、施工計画書を作成する。これにより、ユーザは、登録した項目に対応して表示される項目の中から選択して登録する作業を繰り返すことにより施工計画書を作成することができるので、少ない労力で施工計画書を作成することができる。また、工種種別を基点として対応する項目を選択肢として順次表示し、登録内容に基づいて施工計画書を作成するので、内容に過不足の無い高品質な施工計画書を作成することができる。   As described above, according to the present embodiment, the civil engineering work plan creation support system 100 displays and registers the work type of the civil engineering work, and displays the attention determination item corresponding to the registered work type. Then, the construction plan item corresponding to the registered work type and attention determination item is displayed and registered. Then, the civil engineering construction plan creation support system 100 displays and registers the task item, associates it with the registered task item, and inputs the text regarding the reason for setting the task item and the construction plan of the registered construction plan item. Is received and registered, and a construction plan is created based on the registered task item, the setting reason associated with the task item, and the construction plan. As a result, the user can create a construction plan by repeating the work of selecting and registering from the items displayed corresponding to the registered items, so the construction plan can be created with less effort. be able to. In addition, since the corresponding items are sequentially displayed as options based on the type of work type, and the construction plan is created based on the registered content, a high-quality construction plan with no excess or deficiency can be created.

また、本実施の形態によれば、土木工事施工計画書作成支援システム100は、作成された施工計画書を、留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する。これにより、過去に作成された施工計画書を、留意判断項目、施工計画項目、および課題項目のうち対応付けが行われた項目で検索することができ、過去に作成された施工計画書の中から、文章作成の際に参考にすべき施工計画書を検索して表示することができる。すなわち、過去に作成された情報のうち類似した情報を簡単に抽出し、参考情報として表示することや、再利用することが可能となる。   Further, according to the present embodiment, the civil engineering construction plan creation support system 100 stores the created construction plan in association with at least one of the attention determination item, the construction plan item, and the task item. . As a result, it is possible to search for construction plans created in the past by items that have been matched among the attention judgment items, construction plan items, and task items. Therefore, it is possible to search and display a construction plan document to be referred to when creating a sentence. That is, it is possible to easily extract similar information from information created in the past and display it as reference information or reuse it.

また、本実施の形態の土木工事施工計画書作成支援システム100は、ユーザが指定したタイミングで、作成中の文章と同一の種類の文章を、検索した施工計画書から抽出して表示する。これにより、ユーザは、文章作成の際に参考にすべき文章を参考にしながら、より簡単に、かつ適切な文章を入力することができる。   In addition, the civil engineering construction plan creation support system 100 of the present embodiment extracts and displays the same type of text as the text being created from the searched construction plan at the timing specified by the user. Thereby, the user can input an appropriate sentence more easily and with reference to a sentence to be referred to when creating the sentence.

なお、本実施の形態では、過去の施工計画書の内容のうち、留意事項および施工計画についてのみ入力欄と同時表示させるようにしたが、課題の設定理由についても入力欄と同時表示させるようにしてもよい。   In this embodiment, among the contents of past construction plans, only the notes and construction plans are displayed at the same time as the input field. However, the reason for setting the assignment is also displayed at the same time as the input field. May be.

本発明に係る土木工事施工計画書作成支援システム、土木工事施工計画書作成支援方法、および土木工事施工計画書作成支援プログラムは、少ない労力で高品質な施工計画書を作成することができる土木工事施工計画書作成支援システム、土木工事施工計画書作成支援方法、および土木工事施工計画書作成支援プログラムとして有用である。   The civil engineering / construction plan creation support system, the civil engineering / construction plan creation support method, and the civil engineering / construction plan creation support program according to the present invention are capable of creating a high-quality construction plan with a little effort. It is useful as a construction plan creation support system, a civil engineering construction plan creation support method, and a civil engineering construction plan creation support program.

本発明の一実施の形態に係る土木工事施工計画書作成支援システムの構成を示すシステム構成図The system block diagram which shows the structure of the civil engineering construction plan creation assistance system which concerns on one embodiment of this invention 本実施の形態に係る土木工事施工計画書作成支援システムが取り扱う各種情報および項目リンク情報の概要を示す図The figure which shows the outline | summary of the various information and item link information which the civil engineering construction plan preparation assistance system which concerns on this Embodiment handles 本実施の形態における項目リンク情報の構成のうち項目別マスタに関する部分の構成の一例を示す図The figure which shows an example of a structure of the part regarding the item-specific master among the structures of the item link information in this Embodiment. 本実施の形態における項目リンク情報の構成のうち管理マスタに関する部分の構成の一例を示す図The figure which shows an example of a structure of the part regarding a management master among the structures of the item link information in this Embodiment 本実施の形態に係る土木工事施工計画書作成支援システムの動作の概要を示す図The figure which shows the outline | summary of operation | movement of the civil engineering construction plan creation assistance system which concerns on this Embodiment 本実施の形態における案件登録画面を示す図The figure which shows the matter registration screen in this execution form 本実施の形態における法令・基準書一覧ページを示す図The figure which shows the law / standards list page in this form 本実施の形態における基準書検索画面を示す図The figure which shows the reference book search screen in this Embodiment 本実施の形態における留意判断項目ページを示す図The figure which shows the attention judgment item page in this Embodiment 本実施の形態における留意判断項目検索画面を示す図The figure which shows the attention judgment item search screen in this Embodiment 本実施の形態における留意判断項目詳細画面を示す図The figure which shows the attention judgment item detailed screen in this Embodiment 本実施の形態における資料添付ページを示す図The figure which shows the data attachment page in this Embodiment 本実施の形態における課題設定ページを示す図The figure which shows the assignment setting page in this Embodiment 本実施の形態における施工計画詳細画面を示す図The figure which shows the construction plan detailed screen in this Embodiment 本実施の形態における施工計画詳細画面が表示する文章作成補助画面を示す図The figure which shows the text preparation auxiliary | assistance screen which the construction plan detailed screen in this Embodiment displays 本実施の形態における文章の組み立てに使用されるテンプレートの一例を示す図The figure which shows an example of the template used for the assembly of the sentence in this Embodiment 本実施の形態における施工計画検索画面を示す図The figure which shows the construction plan search screen in this Embodiment 本実施の形態における簡易な施工計画ページを示す図The figure which shows the simple construction plan page in this Embodiment 本実施の形態における簡易な施工計画詳細画面を示す図The figure which shows the simple construction plan detailed screen in this Embodiment 本実施の形態における簡易な施工計画詳細画面が表示する文章作成補助画面を示す図The figure which shows the text preparation assistance screen which the simple construction plan detailed screen in this Embodiment displays 本実施の形態における施工計画書作成ページを示す図The figure which shows the construction plan creation page in this Embodiment 本実施の形態において最終的に作成される施工計画書の一例を示す図The figure which shows an example of the construction plan finally created in this Embodiment

符号の説明Explanation of symbols

100 土木工事施工計画書作成支援システム
110 情報登録用データ格納部
111 項目リンク情報格納部
112 工種種別格納部
113 カテゴリ格納部
114 留意判断項目格納部
115 施工計画項目格納部
116 法令・基準情報格納部
117 留意事項ヒント格納部
118 課題項目格納部
119 質問情報格納部
130 項目選択部
131 工事情報設定部
132 留意事項確認部
133 施工内容確認部
134 法令・基準書確認部
135 課題項目設定部
140 文章作成部
141 留意事項作成部
142 施工計画作成部
143 設定理由作成部
144 文章作成補助部
150 書式データ格納部
160 添付資料入力部
170 計画書作成部
180 情報出力部
190 履歴情報格納部

DESCRIPTION OF SYMBOLS 100 Civil engineering construction plan creation support system 110 Information registration data storage part 111 Item link information storage part 112 Work type classification storage part 113 Category storage part 114 Attention judgment item storage part 115 Construction plan item storage part 116 Legal / standard information storage part 117 Consideration item hint storage unit 118 Task item storage unit 119 Question information storage unit 130 Item selection unit 131 Construction information setting unit 132 Consideration item confirmation unit 133 Construction content confirmation unit 134 Legal / standards document confirmation unit 135 Task item setting unit 140 Text creation Part 141 Consideration preparation part 142 Construction plan creation part 143 Setting reason creation part 144 Text creation auxiliary part 150 Format data storage part 160 Attachment input part 170 Plan document creation part 180 Information output part 190 History information storage part

Claims (9)

情報の表示を行う表示手段と、
前記表示手段に表示された情報に対する選択操作を受け付ける入力手段と、
土木工事の工種種別、留意判断項目、および施工計画項目と、これら工種種別、留意判断項目、および施工計画項目の間の対応関係と、土木工事に際して検討すべき課題の種類を示す課題項目と、を予め格納する格納手段と、
工種種別を前記表示手段に表示し、前記入力手段を介して選択された工事種別を登録する工種種別登録手段と、
登録された工種種別に対応する留意判断項目を前記表示手段に表示し、前記入力手段を介して選択された留意判断項目を登録する留意判断項目登録手段と、
登録された工種種別および留意判断項目に対応する施工計画項目を前記表示手段に表示し、前記入力手段を介して選択された施行計画項目を登録する施工計画登録手段と、
課題項目を前記表示手段に表示し、前記入力手段を介して選択された課題項目を登録する課題項目登録手段と、
登録された課題項目に対応付けて登録された施工計画項目の施工計画に関する文章および登録された課題項目の設定理由に関する文章の入力操作を受け付け、入力された文章を登録する文章登録手段と、
登録された課題項目と、この課題項目に対応付けて登録された施工計画に関する文章および設定理由に関する文章に基づいて、施工計画書を作成する施工計画書作成手段と、
作成された施工計画書を、登録された留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶手段と、
を有する土木工事施工計画書作成支援システム。
Display means for displaying information;
Input means for accepting a selection operation for information displayed on the display means;
Civil engineering work types, consideration judgment items, and construction plan items, correspondence between these construction types, attention judgment items, and construction plan items, and task items that indicate the types of issues to be considered in civil engineering work, Storage means for storing in advance;
A work type registration means for displaying a work type on the display means and registering a work type selected via the input means ,
Attention determination item registration means for displaying the attention determination item corresponding to the registered work type type on the display means, and registering the attention determination item selected via the input means ;
Construction plan registration means for displaying the construction plan item corresponding to the registered work type type and the notice determination item on the display means, and registering the execution plan item selected via the input means ,
A task item registration unit for displaying a task item on the display unit and registering the task item selected via the input unit ;
In association with the registered object item, and text registration unit accepts text input operation on setting reason sentence and registered problem items related planning construction of registered construction planning items, registers the sentence entered,
A construction plan creation means for creating a construction plan based on the registered task item, a sentence related to the construction plan registered in association with this task item and a sentence regarding the reason for setting ,
Storage means for storing the created construction plan in association with at least one of the registered attention determination items, construction plan items, and task items;
Civil engineering construction plan creation support system with
前記記憶手段に記憶された施工計画書のうち、作成中の施工計画書と、留意判断項目、施工計画項目、および課題項目の1つまたは複数を同一とする施工計画書の登録内容を表示する履歴情報表示手段、を更に有する、
請求項1記載の土木工事施工計画書作成支援システム。
Among the construction plans stored in the storage means, the registered contents of the construction plan in which one or more of the construction plan being created and the attention determination item, the construction plan item, and the task item are the same are displayed. History information display means,
The civil engineering construction plan creation support system according to claim 1.
前記格納手段は、
法令情報および基準書情報と、工種種別、留意判断項目、および施工計画項目と法令情報および基準書情報との間の対応関係と、を予め格納し、
登録された工種種別、留意判断項目、および施工計画項目に対応する法令情報および/または基準書情報を表示する法令・基準書表示手段、を更に有する、
請求項1記載の土木工事施工計画書作成支援システム。
The storage means includes
Stores in advance the legal information and standard information, and the type of work, consideration items, and the correspondence between construction plan items and legal information and standard information,
It further has a law / standards display means for displaying legal information and / or standard information corresponding to the registered type of work, consideration judgment item, and construction plan item,
The civil engineering construction plan creation support system according to claim 1.
前記文章登録手段は、
質問情報を表示し、その質問情報に対応して入力された文字列を、テンプレートに当て嵌めて文章を構成する文章作成補助手段、を更に有する、
請求項1記載の土木工事施工計画書作成支援システム。
The sentence registration means includes:
A sentence creation assisting means for displaying the question information and applying the character string input corresponding to the question information to the template to compose the sentence;
The civil engineering construction plan creation support system according to claim 1.
前記文章登録手段は、
入力中の文章を表示しながら前記文章入力を受け付け、
前記履歴情報表示手段は、
前記過去の施工計画書の登録内容を、前記文章登録手段により表示される入力中の文章と一画面に同時表示する、
請求項2記載の土木工事施工計画書作成支援システム。
The sentence registration means includes:
Accept the input of the sentence while displaying the sentence being entered,
The history information display means includes
The registered contents of the past construction plan are simultaneously displayed on one screen with the text being input displayed by the text registration means.
The civil engineering construction plan creation support system according to claim 2.
質問情報を表示しつつ回答を促す画面を提示するとともに、回答として入力された文字列を文章化して表示して文章の作成を補助する第1の文章作成補助手段と、
前記第1の文章作成補助手段により文章化された文章を編集可能に表示するとともに、前記文章に関連する文章であって前記記憶手段に記憶された過去の施工計画書の一部を一画面に同時表示して文章の作成を補助する第2の文章作成補助手段と、
を有する文章作成補助手段と、を更に有する、
請求項1記載の土木工事施工計画書作成支援システム。
A first sentence creation assisting means for presenting a screen for prompting an answer while displaying the question information, and displaying the character string inputted as the answer as a sentence to assist in the creation of the sentence;
A sentence written by the first sentence creation assisting means is displayed in an editable manner, and a part of a past construction plan stored in the storage means that is related to the sentence is displayed on one screen. displayed simultaneously, and the second sentence creating auxiliary means to assist in the creation of the sentence,
A sentence creation assisting means further comprising:
The civil engineering construction plan creation support system according to claim 1.
前記格納手段は、
土木工事の工事条件と、項目留意判断項目、施工計画項目および課題項目と工事条件との間の対応関係と、を更に規定し、
工事条件を前記表示手段に表示し、表示した工事条件に対する選択を受け付ける工事条件選択手段と、
前記工事条件選択手段を介して選択された工事条件に対応する、項目留意判断項目、施工計画項目および課題項目の1つまたは複数を前記表示手段に表示し登録候補への追加を受け付ける項目追加手段、を更に有する、
請求項1記載の土木工事施工計画書作成支援システム。
The storage means includes
Further stipulate the construction conditions of civil engineering work , item attention judgment items, construction plan items, and correspondence between task items and construction conditions,
Construction condition selection means for displaying construction conditions on the display means and receiving selection for the displayed construction conditions ;
Corresponding to construction conditions said selected through the construction condition selection means, items noted determination item, one or more construction planning items and issues items displayed on the display means, the items added for accepting additional to the registration candidate Further comprising means,
The civil engineering construction plan creation support system according to claim 1.
情報の表示を行う表示手段と、前記表示手段に表示された情報に対する選択操作を受け付ける入力手段と、を備えた情報処理装置における土木工事施工計画書作成支援方法であって、
土木工事の工種種別、留意判断項目、および施工計画項目と、これら工種種別、留意判断項目、および施工計画項目の間の対応関係と、土木工事に際して検討すべき課題の種類を示す課題項目と、を予め格納する項目格納工程と、
工種種別を前記表示手段に表示し、前記入力手段を介して選択された工事種別を登録する工種種別登録工程と、
登録された工種種別に対応する留意判断項目を前記表示手段に表示し、前記入力手段を介して選択された留意判断項目を登録する留意判断項目登録工程と、
登録された工種種別および留意判断項目に対応する施工計画項目を前記表示手段に表示し、前記入力手段を介して選択された施行計画項目を登録する施工計画登録工程と、
課題項目を前記表示手段に表示し、前記入力手段を介して選択された課題項目を登録する課題項目登録工程と、
登録された課題項目に対応付けて登録された施工計画項目の施工計画に関する文章および登録された課題項目の設定理由に関する文章の入力操作を受け付け、入力された文章を登録する文章登録工程と、
登録された課題項目と、この課題項目に対応付けて登録された施工計画に関する文章および設定理由に関する文章に基づいて、施工計画書を作成する施工計画書作成工程と、
作成された施工計画書を、登録された留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶工程と、
を有する土木工事施工計画書作成支援方法。
A civil engineering construction plan creation support method in an information processing apparatus comprising: a display unit that displays information; and an input unit that receives a selection operation for information displayed on the display unit;
Civil engineering work types, consideration judgment items, and construction plan items, correspondence between these construction types, attention judgment items, and construction plan items, and task items that indicate the types of issues to be considered in civil engineering work, An item storage step for storing in advance,
A process type registration step of displaying a process type on the display means and registering a work type selected via the input means ,
Attention determination item registration step of displaying the attention determination item corresponding to the registered work type type on the display means, and registering the attention determination item selected via the input means ,
A construction plan registration step for displaying the construction plan item corresponding to the registered work type type and the notice determination item on the display means, and registering the execution plan item selected via the input means ,
A task item registration step of displaying a task item on the display means and registering a task item selected via the input means ;
In association with the registered object item, and text registration step of receiving a text input operation on setting reason sentence and registered problem items related planning construction of registered construction planning items, registers the sentence entered,
A construction plan creation process for creating a construction plan based on a registered task item, a text related to the construction plan registered in association with this task item, and a text related to the setting reason ,
A storage step of storing the created construction plan in association with at least one of the registered attention determination item, the construction plan item, and the task item;
Civil engineering construction plan creation support method with
情報の表示を行う表示手段と、前記表示手段に表示された情報に対する選択操作を受け付ける入力手段と、を備えた情報処理装置のコンピュータに、
土木工事の工種種別、留意判断項目、および施工計画項目と、これら工種種別、留意判断項目、および施工計画項目の間の対応関係と、土木工事に際して検討すべき課題の種類を示す課題項目と、を予め格納する項目格納処理と、
工種種別を前記表示手段に表示し、前記入力手段を介して選択された工事種別を登録する工種種別登録処理と、
登録された工種種別に対応する留意判断項目を前記表示手段に表示し、前記入力手段を介して選択された留意判断項目を登録する留意判断項目登録処理と、
登録された工種種別および留意判断項目に対応する施工計画項目を前記表示手段に表示し、前記入力手段を介して選択された施行計画項目を登録する施工計画登録処理と、
課題項目を前記表示手段に表示し、前記入力手段を介して選択された課題項目を登録する課題項目登録処理と、
登録された課題項目に対応付けて登録された施工計画項目の施工計画に関する文章およびこの課題項目の設定理由に関する文章の入力を受け付け、入力された文章を登録する文章登録処理と、
登録された課題項目と、この課題項目に対応付けて登録された施工計画に関する文章および設定理由に関する文章に基づいて、施工計画書を作成する施工計画書作成処理と、
作成された施工計画書を、登録された留意判断項目、施工計画項目、および課題項目の少なくとも1つに対応付けて記憶する記憶処理と、
を実行させる土木工事施工計画書作成支援プログラム。
A computer of an information processing apparatus comprising: a display unit that displays information; and an input unit that receives a selection operation for information displayed on the display unit .
Civil engineering work types, consideration judgment items, and construction plan items, correspondence between these construction types, attention judgment items, and construction plan items, and task items that indicate the types of issues to be considered in civil engineering work, An item storage process for storing in advance,
A work type registration process for displaying the work type on the display means and registering the work type selected via the input means ;
Attention determination item registration processing for displaying the attention determination item corresponding to the registered work type type on the display unit, and registering the attention determination item selected via the input unit ;
A construction plan registration process for displaying the construction plan item corresponding to the registered work type type and the notice determination item on the display means, and registering the execution plan item selected via the input means ,
A task item registration process for displaying a task item on the display means and registering the task item selected via the input means ;
In association with the registered object item, and text registration process accepts text input regarding text and setting reason for this problem items related planning construction of registered construction planning items, registers the sentence entered,
A construction plan creation process for creating a construction plan based on a registered task item, a text related to the construction plan registered in association with this task item, and a text related to the setting reason ,
A storage process for storing the created construction plan in association with at least one of the registered attention determination items, construction plan items, and task items;
A civil engineering construction plan creation support program that executes
JP2008033816A 2008-02-14 2008-02-14 Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program Expired - Fee Related JP5243812B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008033816A JP5243812B2 (en) 2008-02-14 2008-02-14 Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008033816A JP5243812B2 (en) 2008-02-14 2008-02-14 Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program

Publications (2)

Publication Number Publication Date
JP2009193381A JP2009193381A (en) 2009-08-27
JP5243812B2 true JP5243812B2 (en) 2013-07-24

Family

ID=41075328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008033816A Expired - Fee Related JP5243812B2 (en) 2008-02-14 2008-02-14 Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program

Country Status (1)

Country Link
JP (1) JP5243812B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015052855A (en) * 2013-09-05 2015-03-19 株式会社シー・エル・エー Risk assessment support system, risk assessment support method, and risk assessment support program
JP6848473B2 (en) * 2017-01-24 2021-03-24 富士ゼロックス株式会社 Information processing equipment and programs
JP7268242B2 (en) * 2020-03-18 2023-05-02 日鉄テックスエンジ株式会社 CONSTRUCTION PLAN CREATION SYSTEM, CONSTRUCTION PLAN CREATION METHOD AND PROGRAM

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003186948A (en) * 2001-12-17 2003-07-04 Takenaka Komuten Co Ltd Method for preparing operation management chart in construction work
JP2005031824A (en) * 2003-07-09 2005-02-03 Hitachi Ltd Road occupying construction information management system
JP2005038028A (en) * 2003-07-15 2005-02-10 Ohbayashi Corp Construction work plan support system and method, computer program, and computer readable recording medium
JP2006338561A (en) * 2005-06-03 2006-12-14 Hibara Corporation:Kk Construction progress management system

Also Published As

Publication number Publication date
JP2009193381A (en) 2009-08-27

Similar Documents

Publication Publication Date Title
JP5259594B2 (en) Document-centric workflow based on document content, metadata, and context
US7657831B2 (en) Creating and customizing a workflow process from a document
US20070033093A1 (en) Automated proposal development toolset
JP6120426B1 (en) Construction body 3D model management program and construction body 3D model management method
McCormick et al. IBM SPSS Modeler essentials: Effective techniques for building powerful data mining and predictive analytics solutions
US7716639B2 (en) Specification wizard
JP5243812B2 (en) Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program
JP5414400B2 (en) Civil engineering construction plan creation support system, civil engineering construction plan creation support method, and civil engineering construction plan creation support program
JP5386412B2 (en) Export control server device, export control method and program
US7283939B2 (en) Method, system and program for supporting mechanism design
CN115238662A (en) Bidding file rapid editing method and system
TW201413628A (en) Transcript parsing system
JP2007108979A (en) Project plan validity checking method and its program
Delavari et al. Business process management (BPM) education in Australia: A critical review based on content analysis
CN101414298A (en) Method for inspecting patent search result
JP2007034806A (en) Information processor and program
Hughes Understanding NEC3: Engineering and Construction Short Contract: A Practical Handbook
Ahmed et al. AL-WEFAQ Car Rental Reservation System: Car Reservation System
AU2012203180A1 (en) System and method of performing a job hazard analysis
Ong Community E-content management system
Hoffer et al. Development of a fast draping algorithm using multifactorial simulations of local shear
JP2022050654A (en) Information processing device, personnel affairs analysis assist method and program
Kennedy et al. New Methods in the History of Medicine: Streamlining Workflows to Enable Big-Data History Projects
Avery et al. Database-Driven Implementation for Future Editions of the Manual on Uniform Traffic Control Devices
JP2011215958A (en) Character input device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120920

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121030

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130402

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130405

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160412

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees