JP5231493B2 - Lining concrete demolding time judging method and demolding time judging system - Google Patents

Lining concrete demolding time judging method and demolding time judging system Download PDF

Info

Publication number
JP5231493B2
JP5231493B2 JP2010162423A JP2010162423A JP5231493B2 JP 5231493 B2 JP5231493 B2 JP 5231493B2 JP 2010162423 A JP2010162423 A JP 2010162423A JP 2010162423 A JP2010162423 A JP 2010162423A JP 5231493 B2 JP5231493 B2 JP 5231493B2
Authority
JP
Japan
Prior art keywords
temperature
concrete
lining concrete
time
demolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010162423A
Other languages
Japanese (ja)
Other versions
JP2012026734A (en
Inventor
洋志城 宇野
継彦 京免
嗣 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP2010162423A priority Critical patent/JP5231493B2/en
Publication of JP2012026734A publication Critical patent/JP2012026734A/en
Application granted granted Critical
Publication of JP5231493B2 publication Critical patent/JP5231493B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Investigating Or Analyzing Materials Using Thermal Means (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

本発明は覆工コンクリート脱型時期判定方法及び脱型時期判定システムに関し、詳しくは山岳トンネルの覆工コンクリートの強度発現を推定して脱型時期を判定する方法及びシステムに関する。   The present invention relates to a lining concrete demolding time determination method and a demolding time determination system, and more particularly to a method and system for estimating the demolding time by estimating the strength expression of lining concrete in a mountain tunnel.

山岳トンネルの覆工コンクリートの脱型時期は圧縮強度で2.0N/mm2〜3.0N/mm2程度に達していれば安全であると判断されており、当該圧縮強度に達した時点を現場養生した管理供試体による圧縮強度試験から確認して脱型作業を行うことが要求されるが、実際のトンネル現場では圧縮強度から脱型時期を決めていることは稀であり、主として、『脱型→セントル移動→セット→打設』を1サイクルとする工程を2日/1サイクルとして繰り返すこと、即ち、打設終了からの経過材齢を基準に導かれて取り決められた作業日程に基づいて脱型時期が決められていることが一般的となっている。 Demolding time of lining concrete mountain tunnel are determined to be safe if reached 2.0N / mm 2 ~3.0N / mm 2 approximately in compressive strength, when it reaches the compressive strength Although it is required to perform the demolding work after confirming from the compressive strength test with the management specimens cured on site, it is rare that the demolding time is determined from the compressive strength at the actual tunnel site. Repeating the process of “demolding → centre movement → setting → placement” as 1 cycle, 2 days / cycle, that is, based on the work schedule determined based on the age of the material from the end of placement It is common that the demolding time is determined.

この作業日程に基づいて脱型を行う工程は、この日程であれば圧縮強度が充分に確保されているという経験則に基づくものではあるが、打設したコンクリートの現実の強度発現とは関連性が全く無いことから現場環境等の変化等、想定外の打設条件の変化等が生じた際には対処できないという問題を有している。   The process of demolding based on this work schedule is based on the empirical rule that the compressive strength is sufficiently secured on this schedule, but is related to the actual strength development of the placed concrete. There is a problem that it is impossible to cope with unexpected changes in placement conditions, such as changes in the site environment.

そこで、近年のトンネル工事においては、打設したコンクリートの測定温度と同じ養生温度で供試体を作成し、この供試体の圧縮強度試験結果から打設したコンクリートの強度発現を推定して脱型時期を判定する手段(例えば、特許文献1又は2参照)等が採られている。   Therefore, in recent tunnel construction, a specimen was prepared at the same curing temperature as the measured temperature of the placed concrete, and the strength development of the placed concrete was estimated from the compressive strength test result of this specimen, and the demolding time (For example, refer to Patent Document 1 or 2).

特開平11−271301JP-A-11-271301 特開2009−002721JP 2009-002721 A

特許文献1又は2の技術では、打設コンクリートの測定温度に基づいて供試体を養生することは、施工現場での打設コンクリートの温度管理と同時に供試体の養生及び温度管理という別なる作業が付加されることであり、作業工程数が増加してしまうという問題点を有している。   In the technique of Patent Document 1 or 2, curing the specimen based on the measured temperature of the cast concrete requires separate work of curing the specimen and controlling the temperature at the same time as controlling the temperature of the cast concrete at the construction site. In addition, there is a problem that the number of work steps increases.

更に、当該技術においては、供試体の作成は打設したコンクリートの測定温度に基いて作成されることから該供試体の強度発現は打設コンクリートの後追い状態となり遅延が生じることになるだけでなく、この遅延分に圧縮強度試験に要する時間と試験結果に基づく判定に要する時間が加わるため、実際の打設コンクリートの強度発現時期と供試体の強度発現時期との時間的なズレが生じることから脱型時期が必然的に必要以上に延びてしまうという問題をも有している。   Furthermore, in this technology, since the specimen is created based on the measured temperature of the placed concrete, not only does the strength expression of the specimen become a follow-up state of the cast concrete, but a delay occurs. Because this delay adds time required for the compressive strength test and time required for the determination based on the test results, there is a time lag between the actual strength development time of the cast concrete and the strength development time of the specimen. There is also a problem that the demolding time inevitably extends more than necessary.

そこで本発明の課題は、施工作業中の作業工程数を増加させることなく確度の高い脱型時期判定が可能な覆工コンクリート脱型時期判定方法及び脱型時期判定システムを提供することにある。   Then, the subject of this invention is providing the lining concrete demolding time determination method and demolding time determination system which can perform demolding time determination with high accuracy, without increasing the number of work processes in construction work.

上記課題を解決する本発明は、下記構成を有する。   The present invention for solving the above problems has the following configuration.

1.型枠を用いて打設した覆工コンクリートの脱型時期を判定するために、
覆工コンクリートの型枠内の任意の箇所のコンクリート温度を任意の時間毎に測定し、
該測定温度から積算温度を算出し、該積算温度が任意の数値に達することで所望の圧縮強度に到達したと推定して脱型時期であると判定する覆工コンクリート脱型時期判定方法において、
覆工コンクリート打設以前に、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行い、練り上がり温度・空気量・積算温度・圧縮強度の関係から導き出された下記式(1)を予め各々用意しておき、
覆工コンクリート打設に際して、パソコンの如き演算装置に、打設に用いるコンクリートの初期温度又は受入検査時の温度を前記練り上がり温度と同等として入力すると共に該受入検査時の空気量の入力を行い、
前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリート打設に一致乃至は最も近似する条件の試験練りから導き出された前記式(1)を選択し、
打設した覆工コンクリートの前記型枠内の任意の箇所で任意の時間毎に測定されるコンクリート温度を前記演算装置に送信又は入力して積算温度を算出し、
該積算温度と前記初期温度又は受入検査時温度と前記空気量とを、選択した前記式(1)を用いて、予め設定された圧縮強度が得られる数値まで前記積算温度が達した時をもって脱型時期であると判定する構成であること
を特徴とする覆工コンクリート脱型時期判定方法。
式(1) σ=f(t0,air,M)
σ:圧縮強度(N/mm2
0:打込み温度
air:空気量
M:積算温度(D・D)
1. In order to determine the demolding time of lining concrete laid using a formwork,
Measure the concrete temperature at any point in the lining concrete formwork at any time,
In the lining concrete demolding time determination method that calculates the integrated temperature from the measured temperature, determines that the integrated temperature has reached a desired compression strength by reaching an arbitrary numerical value, and determines that it is a demolding time,
Prior to lining concrete placement, use concrete with the same composition as the concrete used for placement, perform multiple test milling with multiple levels of kneading temperature, and measure and compress the accumulated temperature for each of the multiple levels. Each of the strength tests is performed, and the following formula (1) derived from the relationship between the kneading temperature, the air amount, the accumulated temperature, and the compressive strength is prepared in advance,
When lining concrete is placed, the initial temperature of the concrete used for placement or the temperature at the time of receiving inspection is input as equivalent to the kneading temperature and the amount of air at the time of receiving inspection is input to a computing device such as a personal computer. ,
Among the formulas (1) derived from the plurality of levels of test kneading, select the formula (1) derived from the test kneading under conditions that match or most closely match the lining concrete placement,
Calculate or calculate the integrated temperature by transmitting or inputting the concrete temperature measured at any time in any place in the formwork of the lining concrete that has been laid to the arithmetic unit,
The accumulated temperature, the initial temperature or the temperature at the time of acceptance inspection, and the air amount are deselected when the accumulated temperature reaches a numerical value that provides a preset compressive strength using the selected equation (1). A method for determining the demolding timing of lining concrete, characterized in that the mold timing is determined.
Expression (1) σ = f (t 0 , air, M)
σ: Compressive strength (N / mm 2 )
t 0 : implantation temperature
air: Air volume
M: Integrated temperature (D ・ D)

2.前記練り上がり温度を冬季温度・夏季温度・中間温度の3水準とする3種類の試験練りを行うことを特徴とする上記1に記載の覆工コンクリート脱型時期判定方法。 2. 3. The method for determining the lining concrete demolding time according to 1 above, wherein three types of test kneading are performed with the kneading temperature set at three levels of winter temperature, summer temperature, and intermediate temperature.

3.コンクリート温度測定位置が、型枠内の覆工コンクリート妻部の天端部・左肩部・右肩部・左スプリングライン部・右スプリングライン部の5箇所であることを特徴とする上記1又は2に記載の覆工コンクリート脱型時期判定方法。 3. The above-mentioned 1 or 2 characterized in that the concrete temperature measurement positions are the top end portion, left shoulder portion, right shoulder portion, left spring line portion, and right spring line portion of the lining concrete wife portion in the formwork. The lining concrete demolding time judging method described in 1.

4.前記演算装置がディスプレイ画面を備え、前記の入力数値・算出数値・測定温度情報・積算温度情報・設定圧縮強度の如き各種情報が前記ディスプレイ画面に表示される構成であることを特徴とする上記1〜3のいずれかに記載の覆工コンクリート脱型時期判定方法。 4). The calculation apparatus according to claim 1, wherein the arithmetic device includes a display screen, and various types of information such as the input numerical value, the calculated numerical value, the measured temperature information, the integrated temperature information, and the set compression strength are displayed on the display screen. The lining concrete demolding time judging method according to any one of?

5.前記演算装置の入力操作部及び前記ディスプレイ画面を備えると共に施工現場である坑内に配設し、該坑内で脱型時期判定に伴う操作を行う構成であることを特徴とする上記4に記載の覆工コンクリート脱型時期判定方法。 5. 5. The cover according to claim 4, wherein the cover includes the input operation unit of the arithmetic device and the display screen, and is disposed in a mine which is a construction site, and performs an operation associated with demolding time determination in the mine. Method for determining the time for demolding concrete.

6.前記ディスプレイ画面に表示される各種情報と同様の表示が可能なディスプレイ画面を備えたパソコンを施工現場である坑内から離れた休憩所・事務所・詰所の如き坑外に配設する構成であることを特徴とする上記4又は5に記載の覆工コンクリート脱型時期判定方法。 6). A configuration in which a personal computer equipped with a display screen capable of displaying the same information as the various information displayed on the display screen is arranged outside a mine such as a resting place, an office, or a stuffing station away from the mine that is the construction site. The lining concrete demolding time determining method according to 4 or 5 above, characterized in that:

7.型枠を用いて打設した覆工コンクリートの脱型時期を判定するために、
覆工コンクリートの型枠内の任意の箇所のコンクリート温度を任意の時間毎に測定する温度センサーと、
該温度センサーによる測定温度から積算温度を算出し、該積算温度が任意の数値に達することで所望の圧縮強度に到達したと推定して脱型時期であると判定するパソコンの如き演算装置とを有する覆工コンクリート脱型時期判定システムにおいて、
覆工コンクリート打設以前に、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行い、練り上がり温度・空気量・積算温度・圧縮強度の関係から各々導き出された下記式(1)と、
覆工コンクリート打設に際して、打設に用いるコンクリートの初期温度又は受入検査時の温度を前記練り上がり温度と同等として入力すると共に該受入検査時の空気量の入力を行う前記演算装置と、を有して成り、
該演算装置が、
前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリート打設に一致乃至は最も近似する条件の試験練りから導き出された前記式(1)を選択し、
打設した覆工コンクリートの前記型枠内の任意の箇所で任意の時間毎に測定されるコンクリート温度を前記演算装置に送信又は入力して積算温度を算出し、
該積算温度と前記初期温度又は受入検査時温度と前記空気量とを、選択した前記式(1)を用いて、予め設定された圧縮強度が得られる数値まで前記積算温度が達した時をもって脱型時期であると判定する構成であること
を特徴とする覆工コンクリート脱型時期判定システム。
式(1) σ=f(t0,air,M)
σ:圧縮強度(N/mm2
0:打込み温度
air:空気量
M:積算温度(D・D)
7). In order to determine the demolding time of lining concrete laid using a formwork,
A temperature sensor that measures the concrete temperature at any point in the formwork of the lining concrete every arbitrary time;
An arithmetic device such as a personal computer that calculates the integrated temperature from the temperature measured by the temperature sensor, determines that the integrated temperature has reached a desired compression strength and reaches the desired compression strength, and determines that it is a demolding time. In the lining concrete demolding time judgment system,
Prior to lining concrete placement, use concrete with the same composition as the concrete used for placement, perform multiple test milling with multiple levels of kneading temperature, and measure and compress the accumulated temperature for each of the multiple levels. Each of the strength tests is performed, and the following formula (1) derived from the relationship between the kneading temperature, the air volume, the integrated temperature, and the compressive strength,
And an arithmetic unit that inputs the initial temperature of concrete used for placing or the temperature at the time of receiving inspection as equivalent to the kneading temperature and inputs the amount of air at the time of receiving inspection when placing lining concrete. And
The arithmetic unit is
Among the formulas (1) derived from the plurality of levels of test kneading, select the formula (1) derived from the test kneading under conditions that match or most closely match the lining concrete placement,
Calculate or calculate the integrated temperature by transmitting or inputting the concrete temperature measured at any time in any place in the formwork of the lining concrete that has been laid to the arithmetic unit,
The accumulated temperature, the initial temperature or the temperature at the time of acceptance inspection, and the air amount are deselected when the accumulated temperature reaches a numerical value that provides a preset compressive strength using the selected equation (1). A lining concrete demolding time determination system, characterized in that it is determined to be a mold time.
Expression (1) σ = f (t 0 , air, M)
σ: Compressive strength (N / mm 2 )
t 0 : implantation temperature
air: Air volume
M: Integrated temperature (D ・ D)

8.型枠内の覆工コンクリート妻部の天端部・左肩部・右肩部・左スプリングライン部・右スプリングライン部の5箇所に前記温度センサーが配置された構成であることを特徴とする上記7に記載の覆工コンクリート脱型時期判定システム。 8). The temperature sensor is arranged at five locations of the top end portion, the left shoulder portion, the right shoulder portion, the left spring line portion, and the right spring line portion of the lining concrete wife portion in the formwork, and The lining concrete demolding time judging system according to 7.

9.前記演算装置がディスプレイ画面を備え、前記の入力数値・算出数値・測定温度情報・積算温度情報・設定圧縮強度の如き各種情報が前記ディスプレイ画面に表示される構成であることを特徴とする上記7又は8に記載の覆工コンクリート脱型時期判定システム。 9. 7. The configuration according to claim 7, wherein the arithmetic device includes a display screen, and various types of information such as the input numerical value, calculated numerical value, measured temperature information, accumulated temperature information, and set compression strength are displayed on the display screen. Or the lining concrete demolding time determination system of 8.

10.前記演算装置の入力操作部及び前記ディスプレイ画面を備えると共に施工現場である坑内に配設し、該坑内で脱型時期判定に伴う操作を行う構成であることを特徴とする上記9に記載の覆工コンクリート脱型時期判定システム。 10. 10. The cover according to the above 9, characterized in that it is provided with an input operation section of the arithmetic unit and the display screen, and is disposed in a mine that is a construction site, and performs an operation associated with demolding time determination in the mine. Concrete demolding time judgment system.

11.前記ディスプレイ画面に表示される各種情報と同様の表示が可能なディスプレイ画面を備えたパソコンを施工現場である坑内から離れた休憩所・事務所・詰所の如き坑外に配設する構成であることを特徴とする上記9又は10に記載の覆工コンクリート脱型時期判定システム。 11. A configuration in which a personal computer equipped with a display screen capable of displaying the same information as the various information displayed on the display screen is arranged outside a mine such as a resting place, an office, or a stuffing station away from the mine that is the construction site. The lining concrete demolding time determination system according to the above 9 or 10, characterized in that:

請求項1又は7に示す発明によれば、施工作業中の作業工程数を増加させることなく確度の高い脱型時期判定が可能な覆工コンクリート脱型時期判定方法及び脱型時期判定システムを提供することができる。   According to the invention described in claim 1 or 7, there is provided a lining concrete demolding time judging method and a demolding time judging system capable of performing a highly accurate demolding time determination without increasing the number of work steps during construction work. can do.

特に、打設に用いるコンクリートと同配合で且つ打設条件に一致乃至は最も近似する条件の試験練りのコンクリートでの練り上がり温度・空気量・積算温度・圧縮強度の関係式を用いて、打設した覆工コンクリートの積算温度を算出することで脱型時期を判定する構成により、確度の高い脱型時期判定を行うことができる。このことは、季節によって練り上がり温度が変動するためにコンクリート打込み温度も変動し、結果的に同じ養生条件のもと積算温度を等しくしても若材齢時における圧縮強度も変動してしまうレディミクストコンクリート等を用いた施工であっても確度の高い脱型時期判定を行うことができ極めて有効である。   In particular, using the relational expression of the kneading temperature, air volume, integrated temperature, and compressive strength of the test kneaded concrete that has the same composition as the concrete used for placing and that matches or is most similar to the casting conditions, With the configuration for determining the demolding time by calculating the integrated temperature of the lining concrete provided, it is possible to perform the demolding time determination with high accuracy. This is because the temperature at which the concrete is poured varies depending on the season, so that the concrete pouring temperature also fluctuates. As a result, even if the integrated temperature is equalized under the same curing conditions, the compressive strength at young ages also varies. Even with construction using mixed concrete or the like, it is possible to make a highly accurate demolding time determination, which is extremely effective.

また施工の後追いで養生作成する供試体を用いることなく、覆工コンクリート打設以前に複数の条件での試験練りを予め行い、この試験練りのデータを用いて脱型時期判定を行う構成により、施工作業中の作業工程数の増加の問題は無い。   In addition, without using a specimen to create a curing after the construction, by performing a test kneading in a plurality of conditions before placing the lining concrete in advance, by the configuration to determine the demolding time using the data of this test kneading, There is no problem of an increase in the number of work processes during construction work.

請求項2に示す発明によれば、冬季温度・夏季温度・中間温度の3水準とする3種類の試験練りを行うことにより、冬季の打設・夏季の打設・春秋の打設の四季を通じての打設温度条件に適したデータを用いることができるので、より確度の高い脱型時期判定を行うことができる。   According to the invention described in claim 2, by performing three types of test drilling with three levels of winter temperature, summer temperature, and intermediate temperature, through the four seasons of winter placement, summer placement, and spring and autumn placement. Since the data suitable for the casting temperature condition can be used, the demolding time determination with higher accuracy can be performed.

請求項3又は8に示す発明によれば、打設した覆工コンクリート部位の内、強度発現が最も遅い部分での温度測定を基に脱型判定することにより、打設した覆工コンクリート全体の強度発現時期を誤ることが無く、安全に脱型時期判定を行うことができる。   According to the invention shown in claim 3 or 8, by demolding determination based on the temperature measurement in the portion of the cast lining concrete part where the strength development is the slowest, It is possible to safely perform the demolding time determination without mistaking the strength expression time.

請求項4又は9に示す発明によれば、脱型時期判定を行うための数値等の各種情報を視認することができるので打設した覆工コンクリートの強度発現状態を容易に確認することができる。   According to the invention described in claim 4 or 9, since various information such as numerical values for determining the demolding time can be visually recognized, the strength expression state of the laid concrete can be easily confirmed. .

請求項5又は10に示す発明によれば、施工現場内で脱型時期の判定が可能となる。従って、従来技術のように別場所にて後追いで養生作成している供試体の確認やデータ取得のための坑内と坑外との行き来を無くすことができる。   According to the invention shown in claim 5 or 10, the demolding time can be determined in the construction site. Therefore, it is possible to eliminate the traffic between the inside and outside of the mine for confirmation of the specimens that are being cured at a different place as in the prior art and for data acquisition.

請求項6又は11に示す発明によれば、休憩所・事務所・詰所での休憩中や事務仕事中等であっても脱型時期判定を行うための数値等の各種情報を視認することができるので打設した覆工コンクリートの強度発現状態を容易に確認することができる。従って、施工現場である坑内に常に人員を配置しておく必要がない。   According to the invention shown in claim 6 or 11, various information such as a numerical value for determining the demolding time can be visually recognized even during a break at a resting place, an office, a filling place, or during office work. Therefore, the strength expression state of the lining concrete laid can be confirmed easily. Therefore, it is not necessary to always arrange personnel in the mine which is the construction site.

本発明に係る覆工コンクリート脱型時期判定システムの一実施例を示す概略システム構成図Schematic system configuration diagram showing an embodiment of a lining concrete demolding time determination system according to the present invention 温度センサーの配設箇所の一例を示す概略説明図Schematic explanatory diagram showing an example of the location of the temperature sensor 演算装置のディスプレイ画面の表示例(測定開始前の画面)を示す説明図Explanatory drawing showing a display example (screen before the start of measurement) of the display screen of the arithmetic unit 演算装置のディスプレイ画面の表示例(設定入力の画面)を示す説明図Explanatory drawing showing a display example (setting input screen) of the display screen of the arithmetic unit 演算装置のディスプレイ画面の表示例(測定中の画面)を示す説明図Explanatory drawing showing a display example (screen during measurement) of the display screen of the arithmetic unit 演算装置のディスプレイ画面の表示例(測定中の画面)を示す説明図Explanatory drawing showing a display example (screen during measurement) of the display screen of the arithmetic unit 操作例の一例を示すフロー図Flow chart showing an example of operation 養生温度の径時変化を示すグラフGraph showing change in curing temperature over time 積算温度の径時変化を示すグラフGraph showing change in accumulated temperature over time

以下、本発明に係る覆工コンクリート脱型時期判定システム(以下、単に「判定システム」ということもある。)及び脱型時期判定方法(以下、単に「判定方法」ということもある。)について図1〜図6に示す添付図面に基き説明する。   Hereinafter, a lining concrete demolding time determination system (hereinafter also simply referred to as “determination system”) and a demolding time determination method (hereinafter also simply referred to as “determination method”) according to the present invention are illustrated. Description will be made based on the accompanying drawings shown in FIGS.

型枠(セントル)を用いて打設した覆工コンクリートの脱型時期を判定する判定システムは、
覆工コンクリートTの型枠内の任意の箇所のコンクリート温度を任意の時間毎に測定する温度センサー1と、
該温度センサー1による測定温度から積算温度を算出し、該積算温度が任意の数値に達することで所望の圧縮強度に到達したと推定して脱型時期であると判定するパソコンの如き演算装置2とを有して成る構成を判定システムの基本システム構成とするものである。
Judgment system to determine the demolding time of lining concrete placed using a formwork (centre)
A temperature sensor 1 for measuring the concrete temperature at an arbitrary position in the formwork of the lining concrete T every arbitrary time;
An integrated device 2 such as a personal computer that calculates the integrated temperature from the temperature measured by the temperature sensor 1 and determines that the desired compression strength has been reached when the integrated temperature reaches an arbitrary numerical value and determines that it is a demolding time. Is a basic system configuration of the determination system.

本発明の判定システムでは、当該構成に加えて、
覆工コンクリートTの打設以前に、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行い、練り上がり温度・空気量・積算温度・圧縮強度の関係から各々導き出された下記式(1)と、
覆工コンクリート1の打設に際して、打設に用いるコンクリートの初期温度又は受入検査時の温度を前記練り上がり温度と同等として入力すると共に該受入検査時の空気量の入力を行う前記演算装置2と、を有して成り、
該演算装置2が、
前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリートTの打設に一致乃至は最も近似する条件の試験練りから導き出された前記式(1)を選択し、
打設した覆工コンクリートTの前記型枠内の任意の箇所で任意の時間毎に測定されるコンクリート温度を前記演算装置2に送信又は入力して積算温度を算出し、
該積算温度と前記初期温度又は受入検査時温度と前記空気量とを、選択した前記式(1)を用いて、予め設定された圧縮強度が得られる数値まで前記積算温度が達した時をもって脱型時期であると判定する構成を有するものと成っている。
を特徴とする覆工コンクリート脱型時期判定システム。
式(1) σ=f(t0,air,M)
σ:圧縮強度(N/mm2
0:打込み温度
air:空気量
M:積算温度(D・D)
In the determination system of the present invention, in addition to the configuration,
Prior to placing the lining concrete T, a plurality of test kneadings are carried out using the same blending concrete as the concrete used for placing, and the kneading temperatures are set to a plurality of levels, and the accumulated temperature is measured for each test kneading at the plurality of levels. The following formula (1) derived from the relationship between the kneading temperature, the air volume, the integrated temperature, and the compressive strength,
When the lining concrete 1 is placed, the arithmetic device 2 for inputting the initial temperature of the concrete used for placing or the temperature at the time of receiving inspection as equivalent to the kneading temperature and inputting the air amount at the time of receiving inspection; Comprising
The arithmetic unit 2 is
Among the formulas (1) derived from the plurality of levels of test kneading, select the formula (1) derived from the test kneading under conditions that match or most closely match the placement of the lining concrete T,
The concrete temperature measured every arbitrary time in the arbitrary place in the formwork of the laid concrete lining T is transmitted or input to the arithmetic unit 2 to calculate the integrated temperature,
The accumulated temperature, the initial temperature or the temperature at the time of acceptance inspection, and the air amount are deselected when the accumulated temperature reaches a numerical value that provides a preset compressive strength using the selected equation (1). It has a configuration for determining that it is a mold time.
Lined concrete demolding time determination system characterized by
Expression (1) σ = f (t 0 , air, M)
σ: Compressive strength (N / mm 2 )
t 0 : implantation temperature
air: Air volume
M: Integrated temperature (D ・ D)

尚、本実施例においては、覆工コンクリートTの型枠であるセントルについては図示を省略したが、用いられるセントルとしてはこの種の覆工コンクリート打設に用いられる公知公用のセントルを特別の制限無く用いるものである。   In the present embodiment, the illustration of the centle which is the form of the lining concrete T is omitted. However, as the centle used, a publicly known centle used for this type of lining concrete is not limited. It is used without any problems.

本発明の判定システムにおいては、温度センサー1による温度測定位置は、図2に示すように、型枠内の覆工コンクリートTの妻部の天端部1A・左肩部1B・右肩部1C・左スプリングライン部1D・右スプリングライン部1Eの5箇所であることが好ましい。   In the determination system of the present invention, the temperature measurement position by the temperature sensor 1 is as shown in FIG. 2 in which the top end 1A, the left shoulder 1B, the right shoulder 1C, The left spring line portion 1D and the right spring line portion 1E are preferably five locations.

特に妻部の天端部1Aについては、ラップ側から打設を開始した充填コンクリートは、妻部側に移動していき、側壁部分からアーチ部分にかけて充填されていき、最後に妻部の天端部1Aに達することから、この最後に充填される天端部1Aが脱型時に最も若材齢になる部位となるため、妻部の天端部1Aにおける温度測定は欠かせないものである。即ち、脱型時期が早過ぎた場合には、天端部1Aは強度不足となって自重によるひび割れや欠落等が発生する可能性が高くなる。   In particular, with respect to the top end 1A of the wife part, the filled concrete that has started to be placed from the lap side moves toward the wife part side and is filled from the side wall part to the arch part, and finally the top end of the wife part. Since it reaches the part 1A, the top end part 1A to be filled at the end becomes a part having the youngest age at the time of demolding. Therefore, temperature measurement at the top end part 1A of the wife part is indispensable. That is, when the demolding time is too early, the top end portion 1A becomes insufficient in strength, and there is a high possibility that cracks or missing due to its own weight will occur.

また、養生期間中はコンクリートの水和発熱作用により型枠(セントル)の内部温度が上昇するが、この際に坑内温度は最高位置である天端部分が暖気の影響で最も高く、側壁部分は低くなるため、養生環境の点では最も若材齢である天端部1Aが最もよく、先に充填された側壁部分は天端部1Aよりも劣るため、温度測定は前記した妻部の天端部1Aだけでなく、側壁部分である左肩部1B・右肩部1C・左スプリングライン1D・右スプリングライン1Eについても行うことが好ましい。   Also, during the curing period, the internal temperature of the formwork (centre) rises due to the hydration heat action of the concrete. At this time, the top temperature at the top of the mine is the highest due to warm air, and the side wall is Since the top end 1A, which is the youngest age, is the best in terms of the curing environment, and the side wall portion filled first is inferior to the top end 1A, the temperature is measured at the top end of the above-mentioned wife part. It is preferable to carry out not only for the portion 1A but also for the left shoulder 1B, right shoulder 1C, left spring line 1D, and right spring line 1E, which are side walls.

以上のように、本発明においては覆工コンクリートTの妻部の5箇所において温度測定を行うことで脱型時期判定の確度を高めることができる。   As described above, in the present invention, the accuracy of the demolding time determination can be increased by measuring the temperature at the five positions of the end portion of the lining concrete T.

覆工コンクリートTの打設以前に行う試験練りとしては、練り上がり温度を冬季温度・夏季温度・中間温度の3水準とする3種類を用意することが好ましい。冬季温度・夏季温度・中間温度の3水準とする3種類の試験練りを行うことにより、冬季の打設・夏季の打設・春秋の打設の四季を通じての打設温度条件に適したデータを用いることができるので、より確度の高い脱型時期判定を行うことができる。   As test kneading to be performed before placing the lining concrete T, it is preferable to prepare three types of kneading temperatures of three levels of winter temperature, summer temperature, and intermediate temperature. By performing three types of test drilling with three levels of winter temperature, summer temperature, and intermediate temperature, data suitable for the placement temperature conditions throughout the four seasons of winter placement, summer placement, and spring and autumn placement Since it can be used, it is possible to perform demolding time determination with higher accuracy.

冬季温度・夏季温度・中間温度の具体的温度例としては、例えば、冬季温度5℃、夏季温度35℃、中間温度20℃を挙げることができるが、これらの温度については適用する施工現場が属する地域の気象情報(平均気温統計等)を参考に適宜設定することが好ましい。   Specific examples of the winter temperature / summer temperature / intermediate temperature include, for example, a winter temperature of 5 ° C., a summer temperature of 35 ° C., and an intermediate temperature of 20 ° C. The construction site to which these temperatures are applied belongs. It is preferable to set as appropriate with reference to local weather information (average temperature statistics, etc.).

温度センサー1は、この種の覆工コンクリートを含む各種コンクリート打設工事において打設コンクリートの養生温度を測定する公知公用の温度センサーを特別の制限無く用いることができ、各温度センサー1は測定される温度の読取信号等を制御する制御CPUユニット部3を介して演算装置2に測定した温度情報を送信する。   As the temperature sensor 1, a publicly known temperature sensor that measures the curing temperature of the cast concrete in various concrete placing works including this type of lining concrete can be used without any particular limitation, and each temperature sensor 1 is measured. The measured temperature information is transmitted to the arithmetic unit 2 via the control CPU unit 3 that controls the temperature reading signal and the like.

演算装置2は、ディスプレイ画面を備え、温度センサー1による測定温度情報や後述する各数値の入力、算出、各情報(測定温度情報、積算温度情報、設定圧縮強度情報等)のディスプレイ画面表示、情報の送受信・出力等の機能を司るパソコン等の演算装置であり、この種の判定システムに用いられる公知公用の測定用のパソコン等を用いることができる。   The computing device 2 includes a display screen, and inputs and calculates temperature information measured by the temperature sensor 1 and numerical values to be described later, displays the information on each screen (measured temperature information, integrated temperature information, set compression strength information, etc.), information An arithmetic device such as a personal computer that controls functions such as transmission / reception and output of a computer, and a publicly known measurement personal computer used in this type of determination system can be used.

演算装置2は、ディスプレイ画面に加えて入力操作部を備えることで設定圧縮強度の設定入力や、複数種類の試験練りの中の任意の1つの選択入力、その他の種々数値や情報の入力や選択等を行うことができ、この入力操作部及びディスプレイ画面を備えた演算装置2は施工現場である坑内に配設されることで、該坑内で脱型時期判定に伴う操作を行うことができる。   The arithmetic unit 2 includes an input operation unit in addition to the display screen, so that the setting compression strength setting input, any one selection input among a plurality of types of test tests, and other various numerical values and information input and selection The computing device 2 including the input operation unit and the display screen can be arranged in a mine that is a construction site, so that an operation associated with demolding time determination can be performed in the mine.

前記演算装置2のディスプレイ画面には、上記したように種々の数値や情報等の各種情報が表示されるが、これらの表示と同様の表示が可能なディスプレイ画面を備えたパソコンを施工現場である坑内から離れた休憩所・事務所・詰所の如き坑外に配設することが好ましい。坑内と全く同様の情報を坑外で共有可能とすることにより、休憩所・事務所・詰所等での休憩中や事務仕事中等であっても脱型時期判定を行うための数値等の各種情報を視認することができるので打設した覆工コンクリートの強度発現状態を容易に確認することができる。従って、施工現場である坑内に常に人員を配置しておく必要がなくなり、合理的な施工を行う一助となる。尚、坑内の演算装置2と坑外のパソコン5とは無線又は有線にて接続されるが、セントルの移動に伴う施工現場の移動や坑外での移動環境においても各種の情報確認の容易性等の点から無線接続を用いた接続が好ましい。   Various information such as various numerical values and information is displayed on the display screen of the arithmetic unit 2 as described above. A personal computer having a display screen that can display the same as these displays is a construction site. It is preferable to dispose outside the mine, such as a resting place, office, or station, away from the mine. By making it possible to share exactly the same information as inside the mine, various information such as numerical values for determining the demolding time even during breaks, office breaks, office work, etc. Therefore, the strength expression state of the laid concrete can be easily confirmed. Therefore, it is not necessary to always arrange personnel in the mine which is the construction site, which helps to perform rational construction. In addition, although the computing device 2 in the mine and the personal computer 5 outside the mine are connected wirelessly or by wire, it is easy to confirm various information even in the movement of the construction site accompanying the movement of the centle and the movement environment outside the mine. For example, a connection using a wireless connection is preferable.

次に、上記構成を有する判定システムを用いた判定方法について実施例に基き説明する。   Next, a determination method using the determination system having the above configuration will be described based on examples.

先ず、前述したように、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行う。複数の試験練りの各々の練り上がり温度・空気量・積算温度・圧縮強度の各数値を前記式(1)に当て嵌めることで複数の条件下での要求圧縮強度を得るに必要な積算温度を算出することができる。なお、積算温度測定は材齢24時間以内程度の範囲で行うことが好ましい。   First, as described above, using a concrete having the same composition as the concrete used for placing, performing a plurality of test kneadings with a plurality of kneading temperatures, and measuring the integrated temperature and compressive strength for each test kneading at the plurality of levels. Each test is performed. By applying the numerical values of the kneading temperature, air volume, accumulated temperature, and compressive strength of each of the plurality of test kneadings to the above formula (1), the accumulated temperature required to obtain the required compressive strength under a plurality of conditions is obtained. Can be calculated. The integrated temperature measurement is preferably performed within a range of about 24 hours in material age.

次に、覆工コンクリート打設に際して、演算装置2において判定方法のソフトを起動させて図3に示すようなディスプレイ画面を表示させ、次に当該ディスプレイ画面に基いて操作を行うことで図4に示すような入力設定画面を表示させ、実際の打設に用いるコンクリートの初期温度である打込み温度(実際には受入検査時の温度で代用していることが多い。図4の例では、「20℃」を入力。)を前記練り上がり温度と同等として入力すると共に空気量(受入検査時の空気量とする。図4の例では、「4.5%」を入力。)の入力を行う。   Next, when placing the lining concrete, the calculation device 2 starts up the determination method software to display the display screen as shown in FIG. 3, and then performs an operation based on the display screen in FIG. The input setting screen as shown is displayed, and the placement temperature (actually the temperature at the time of acceptance inspection is often used instead of the initial temperature of the concrete used for actual placement. In the example of FIG. “° C.” is input as equivalent to the above-mentioned kneading temperature, and an air amount (the air amount at the time of receiving inspection is input. In the example of FIG. 4, “4.5%” is input.) Is input.

更に、図4に示すような入力設定画面において、前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリート打設に一致乃至は最も近似する条件(季節や打設現場の環境条件から判断する。)の試験練りから導き出された前記式(1)を選択し、この選択した条件を演算装置2に入力又は選択して設定する(図4の例では、ブロック番号「1」の中間温度水準を選択)。   Further, in the input setting screen as shown in FIG. 4, among the formulas (1) derived from the plurality of levels of test drilling, the conditions that match or most approximate the lining concrete placement (season and placement site) The above formula (1) derived from the test of (1) is selected, and the selected condition is input to or selected in the arithmetic unit 2 (in the example of FIG. 4, the block number “ Select 1 ”intermediate temperature level).

更にまた、図4に示すような入力設定画面においては、脱型が可能な圧縮強度である脱型基準値(図4に示す例では、「3N/mm2」を入力。)と、圧縮強度算出を開始する積算温度の下限値である下限積算温度(図4に示す例では、「15D・D」を入力。)と、打設コンクリートの種類(図4に示す例では、例えば、プレーンコンクリート又はファイバー混入コンクリートの2種類から「プレーン」を選択。)と、積算温度を算出するための測定温度センサー1による温度測定間隔(図4に示す例では「10分」を設定。)と、を入力設定する。 Furthermore, on the input setting screen as shown in FIG. 4, a demolding reference value (in the example shown in FIG. 4, “3 N / mm 2 ” is input) that is a compressive strength that allows demolding, and a compressive strength. The lower limit integrated temperature (in the example shown in FIG. 4, “15D · D” is input in the example shown in FIG. 4) and the type of the cast concrete (in the example shown in FIG. 4, for example, plain concrete). Or, “Plain” is selected from two types of fiber-mixed concrete.) And the temperature measurement interval by the measurement temperature sensor 1 for calculating the integrated temperature (“10 minutes” is set in the example shown in FIG. 4). Set the input.

入力設定を完了することで、脱型時期判定の準備が完了する。   By completing the input setting, preparation for the demolding time determination is completed.

以上の準備が完了した後、コンクリート打設が開始され、型枠(セントル)内に充填されるコンクリートが各温度測定箇所(左スプリングライン1D及び右スプリングライン1E、左肩部1B及び右肩部1C、天端部1A)に順次到達したことを確認した時点で、演算装置2を介して制御CPUユニット部3及び温度センサー1に接続してこれらを制御する測定開始・終了操作部4をその都度操作することで脱型時期の判定を開始する。   After the above preparation is completed, concrete placement is started and the concrete filled in the formwork (centre) is moved to each temperature measurement location (left spring line 1D and right spring line 1E, left shoulder 1B and right shoulder 1C). , The measurement start / end operation unit 4 connected to the control CPU unit 3 and the temperature sensor 1 via the arithmetic unit 2 to control them is confirmed each time when the arrival at the top end 1A) is confirmed. The determination of the demolding time is started by operating.

図5に示すディスプレイ画面表示では、左スプリングライン1D及び右スプリングライン1Eへの充填コンクリートの到達が確認されたことで当該2箇所の測定が開始された状態を表示されると共に、下段の表部分に当該2箇所の「計測開始時刻」、「積算温度」、要求圧縮強度を得るに必要な積算温度までの残りの積算温度を表示する「残積算温度」等の各項目の数値が表示されている。   In the display screen display shown in FIG. 5, the state in which the measurement of the two places has been started by confirming the arrival of the filled concrete to the left spring line 1D and the right spring line 1E is displayed, and the lower table portion The numerical values of each item such as “Measurement start time”, “Integrated temperature”, and “Remaining accumulated temperature” that displays the remaining accumulated temperature up to the accumulated temperature required to obtain the required compression strength are displayed. Yes.

図6に示すディスプレイ画面表示では、左スプリングライン1D及び右スプリングライン1E、左肩部1B及び右肩部1C、天端部1Aの5箇所全ての充填コンクリートの到達が確認されたことで当該5箇所の測定が行われている状態を表示している。   In the display screen display shown in FIG. 6, the arrival of all the five filled concretes of the left spring line 1D and the right spring line 1E, the left shoulder 1B and the right shoulder 1C, and the top end 1A is confirmed. The state where the measurement is being performed is displayed.

演算装置2のディスプレイ画面表示に、5箇所の温度測定箇所の全てにおいて要求圧縮強度を得るに必要な積算温度まで達することが表示された時点で脱型可能な時期に達したと判定することができ、当該判定に基いて施工現場に対して脱型を指示することができる。施工現場では、この脱型指示に基き型枠(セントル)の移動作業が開始される。また、当該判定後、測定開始・終了操作部4を操作することで操作を終了し、判定方法のソフトを終了する。   When it is displayed on the display screen display of the arithmetic unit 2 that the integrated temperature necessary for obtaining the required compressive strength is reached in all of the five temperature measurement locations, it is determined that the time for demolding has been reached. It is possible to instruct removal from the construction site based on the determination. At the construction site, the work of moving the formwork (centre) is started based on this demolding instruction. Moreover, after the said determination, operation is complete | finished by operating the measurement start / end operation part 4, and the software of the determination method is complete | finished.

以上の操作のフロー図の一例を図7として示す。   An example of the flowchart of the above operation is shown in FIG.

以上、本発明に係る覆工コンクリート脱型時期判定方法及び脱型時期判定システムについて実施例に基き説明したが、本発明は上記実施例に限定されず、本発明の範囲内において他の態様を採ることもできる。   As mentioned above, although the lining concrete demolding time judging method and demolding time judging system concerning the present invention were explained based on the example, the present invention is not limited to the above example, and other modes are within the scope of the present invention. It can also be taken.

上記構成を有する覆工コンクリート脱型時期判定方法及び脱型時期判定システムにより、打設した覆工コンクリートの脱型時期を判定する際の具体的構成について実験例に基き説明する。   A specific configuration for determining the demolding timing of the placed lining concrete by the lining concrete demolding timing determination method and the demolding timing determination system having the above configuration will be described based on experimental examples.

下記表1に示す配合のコンクリートを用いて覆工コンクリートの打設を行った。
尚、予め覆工コンクリート打設以前にコンクリートの5℃・15℃・30℃の3種類の水準の試験練りを行い、各々測定した練り上がり温度・空気量・積算温度と要求圧縮強度の関係から前記式(1)を3種類用意した。
セメント :高炉セメントB種、密度3.05g/cm3
細骨材 :長岡市長呂産川砂と南魚沼市九日町産陸砂の混合、表乾密度2.61g/cm3、粗粒率2.75
粗骨材 :南魚沼市九日町産陸砂利、表乾密度2.67g/cm3、実績率65.0%
混和剤 :AE減水剤、主成分はリグニンスルホン酸化合物とポリオールの複合体
Fiber:ポリプロピレン繊維、密度0.92g/cm3、長さ50mm、アスペクト比85
Covering concrete was cast using concrete having the composition shown in Table 1 below.
In addition, before placing the lining concrete, test kneading of concrete at three levels of 5 ° C, 15 ° C and 30 ° C was carried out in advance, and from the relationship between the measured kneading temperature, air volume, integrated temperature and required compression strength, respectively. Three types of the formula (1) were prepared.
Cement: Blast furnace cement type B, density 3.05 g / cm 3
Fine aggregate: A mixture of Nagaro city Nagaro river sand and Minami Uonuma city Kukkamachi land sand, surface dry density 2.61 g / cm 3 , coarse grain rate 2.75
Coarse aggregate: land gravel from Kukkamachi, Minamiuonuma City, surface dry density of 2.67 g / cm 3 , actual rate of 65.0%
Admixture: AE water reducing agent, main component is a composite of lignin sulfonic acid compound and polyol Fiber: polypropylene fiber, density 0.92 g / cm 3 , length 50 mm, aspect ratio 85

次に、覆工コンクリート打設に際して、打設するコンクリートの受入れ検査時の温度が16℃であったことからこの数値を前記演算装置に入力し、当該温度条件に近い条件である前記試験練り15℃水準の前記式(1)を選択し、また同受入れ検査時の空気量が4.5%であったことからこの数値を前記演算装置に入力した。また、この覆工コンクリートの場合、脱型可能な圧縮強度は1.6N/mm2以上であることからこの数値も前記演算装置に入力した。 Next, at the time of placing the lining concrete, the temperature at the time of receiving inspection of the concrete to be placed was 16 ° C., so this numerical value is input to the arithmetic unit, and the test kneading 15 is a condition close to the temperature condition. The above equation (1) at the ° C. level was selected, and this numerical value was input to the arithmetic unit because the amount of air at the acceptance inspection was 4.5%. Further, in the case of this lining concrete, the compressive strength that can be removed is 1.6 N / mm 2 or more, so this numerical value was also input to the arithmetic unit.

覆工コンクリートの打設を開始し、打設したコンクリートが充填され、妻部の左スプリングライン及び右スプリングライン、左肩部及び右肩部、天端部へと順次到達した時点から各箇所の温度測定を開始した。   The temperature of each part starts from the time when laying concrete starts and the concrete is filled and reaches the left spring line and right spring line, left shoulder and right shoulder and top edge of the wife. Measurement started.

本実験例における覆工コンクリートでは、打設したコンクリートの圧縮強度が1.6N/mm2以上となった時点で脱型可能であることから、積算温度は17.1D・D以上という数値が導き出された。 The lining concrete in this experimental example can be demolded when the compressive strength of the cast concrete becomes 1.6 N / mm 2 or more, and therefore the integrated temperature is derived as 17.1 D · D or more. It was.

本実験例では、図8に示す養生温度の径時変化、及び図9に示す積算温度の径時変化の各グラフに示されるように、積算温度20.0D・Dの時点で脱型を行ったが、この時点での圧縮強度は2.1N/mm2以上と推定されることから、打設したコンクリートの圧縮強度が充分以上に確保された時点での脱型となったことが判る。 In this experimental example, as shown in the graphs of the change in curing temperature with time shown in FIG. 8 and the change in time with time of integrated temperature shown in FIG. 9, demolding is performed at the time of the integrated temperature of 20.0 D · D. However, since the compressive strength at this time is estimated to be 2.1 N / mm 2 or more, it can be seen that the mold is removed when the compressive strength of the placed concrete is sufficiently secured.

T 覆工コンクリート
1 温度センサー
1A 天端部
1B 左肩部
1C 右肩部
1D 左スプリングライン部
1E 右スプリングライン部
2 演算装置
3 制御CPUユニット部
4 測定開始・終了操作部
5 坑外のパソコン
T lining concrete 1 temperature sensor 1A top end 1B left shoulder 1C right shoulder 1D left spring line 1E right spring line 2 computing unit 3 control CPU unit 4 measurement start / end operation unit 5 PC outside the mine

Claims (11)

型枠を用いて打設した覆工コンクリートの脱型時期を判定するために、
覆工コンクリートの型枠内の任意の箇所のコンクリート温度を任意の時間毎に測定し、
該測定温度から積算温度を算出し、該積算温度が任意の数値に達することで所望の圧縮強度に到達したと推定して脱型時期であると判定する覆工コンクリート脱型時期判定方法において、
覆工コンクリート打設以前に、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行い、練り上がり温度・空気量・積算温度・圧縮強度の関係から導き出された下記式(1)を予め各々用意しておき、
覆工コンクリート打設に際して、パソコンの如き演算装置に、打設に用いるコンクリートの初期温度又は受入検査時の温度を前記練り上がり温度と同等として入力すると共に該受入検査時の空気量の入力を行い、
前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリート打設に一致乃至は最も近似する条件の試験練りから導き出された前記式(1)を選択し、
打設した覆工コンクリートの前記型枠内の任意の箇所で任意の時間毎に測定されるコンクリート温度を前記演算装置に送信又は入力して積算温度を算出し、
該積算温度と前記初期温度又は受入検査時温度と前記空気量とを、選択した前記式(1)を用いて、予め設定された圧縮強度が得られる数値まで前記積算温度が達した時をもって脱型時期であると判定する構成であること
を特徴とする覆工コンクリート脱型時期判定方法。
式(1) σ=f(t0,air,M)
σ:圧縮強度(N/mm2
0:打込み温度
air:空気量
M:積算温度(D・D)
In order to determine the demolding time of lining concrete laid using a formwork,
Measure the concrete temperature at any point in the lining concrete formwork at any time,
In the lining concrete demolding time determination method that calculates the integrated temperature from the measured temperature, determines that the integrated temperature has reached a desired compression strength by reaching an arbitrary numerical value, and determines that it is a demolding time,
Prior to lining concrete placement, use concrete with the same composition as the concrete used for placement, perform multiple test milling with multiple levels of kneading temperature, and measure and compress the accumulated temperature for each of the multiple levels. Each of the strength tests is performed, and the following formula (1) derived from the relationship between the kneading temperature, the air amount, the accumulated temperature, and the compressive strength is prepared in advance,
When lining concrete is placed, the initial temperature of the concrete used for placement or the temperature at the time of receiving inspection is input as equivalent to the kneading temperature and the amount of air at the time of receiving inspection is input to a computing device such as a personal computer. ,
Among the formulas (1) derived from the plurality of levels of test kneading, select the formula (1) derived from the test kneading under conditions that match or most closely match the lining concrete placement,
Calculate or calculate the integrated temperature by transmitting or inputting the concrete temperature measured at any time in any place in the formwork of the lining concrete that has been laid to the arithmetic unit,
The accumulated temperature, the initial temperature or the temperature at the time of acceptance inspection, and the air amount are deselected when the accumulated temperature reaches a numerical value that provides a preset compressive strength using the selected equation (1). A method for determining the demolding timing of lining concrete, characterized in that the mold timing is determined.
Expression (1) σ = f (t 0 , air, M)
σ: Compressive strength (N / mm 2 )
t 0 : implantation temperature
air: Air volume
M: Integrated temperature (D ・ D)
前記練り上がり温度を冬季温度・夏季温度・中間温度の3水準とする3種類の試験練りを行うことを特徴とする請求項1に記載の覆工コンクリート脱型時期判定方法。 The lining concrete demolding time determining method according to claim 1, wherein three types of test kneading are performed in which the kneading temperature is three levels of winter temperature, summer temperature, and intermediate temperature. コンクリート温度測定位置が、型枠内の覆工コンクリート妻部の天端部・左肩部・右肩部・左スプリングライン部・右スプリングライン部の5箇所であることを特徴とする請求項1又は2に記載の覆工コンクリート脱型時期判定方法。 The concrete temperature measurement positions are at five locations of the top end portion, the left shoulder portion, the right shoulder portion, the left spring line portion, and the right spring line portion of the lining concrete wife portion in the formwork. The lining concrete demolding time judging method according to 2. 前記演算装置がディスプレイ画面を備え、前記の入力数値・算出数値・測定温度情報・積算温度情報・設定圧縮強度の如き各種情報が前記ディスプレイ画面に表示される構成であることを特徴とする請求項1〜3のいずれかに記載の覆工コンクリート脱型時期判定方法。 The arithmetic unit includes a display screen, and various types of information such as the input numerical value, calculated numerical value, measured temperature information, accumulated temperature information, and set compression strength are displayed on the display screen. The lining concrete demolding time judging method according to any one of 1 to 3. 前記演算装置の入力操作部及び前記ディスプレイ画面を備えると共に施工現場である坑内に配設し、該坑内で脱型時期判定に伴う操作を行う構成であることを特徴とする請求項4に記載の覆工コンクリート脱型時期判定方法。 5. The configuration according to claim 4, wherein the operation unit includes an input operation unit and the display screen of the arithmetic device, and is disposed in a mine that is a construction site, and performs an operation associated with a demolding time determination in the mine. Method for determining when to demold concrete for lining 前記ディスプレイ画面に表示される各種情報と同様の表示が可能なディスプレイ画面を備えたパソコンを施工現場である坑内から離れた休憩所・事務所・詰所の如き坑外に配設する構成であることを特徴とする請求項4又は5に記載の覆工コンクリート脱型時期判定方法。 A configuration in which a personal computer equipped with a display screen capable of displaying the same information as the various information displayed on the display screen is arranged outside a mine such as a resting place, an office, or a stuffing station away from the mine that is the construction site. The lining concrete demolding time determination method according to claim 4 or 5, characterized in that: 型枠を用いて打設した覆工コンクリートの脱型時期を判定するために、
覆工コンクリートの型枠内の任意の箇所のコンクリート温度を任意の時間毎に測定する温度センサーと、
該温度センサーによる測定温度から積算温度を算出し、該積算温度が任意の数値に達することで所望の圧縮強度に到達したと推定して脱型時期であると判定するパソコンの如き演算装置とを有する覆工コンクリート脱型時期判定システムにおいて、
覆工コンクリート打設以前に、打設に用いるコンクリートと同配合のコンクリートを用い、練り上がり温度を複数水準とする複数の試験練りを各々行い、該複数水準の各試験練りについて積算温度測定と圧縮強度試験を各々行い、練り上がり温度・空気量・積算温度・圧縮強度の関係から各々導き出された下記式(1)と、
覆工コンクリート打設に際して、打設に用いるコンクリートの初期温度又は受入検査時の温度を前記練り上がり温度と同等として入力すると共に該受入検査時の空気量の入力を行う前記演算装置と、を有して成り、
該演算装置が、
前記複数水準の試験練りから導き出された前記式(1)の内、覆工コンクリート打設に一致乃至は最も近似する条件の試験練りから導き出された前記式(1)を選択し、
打設した覆工コンクリートの前記型枠内の任意の箇所で任意の時間毎に測定されるコンクリート温度を前記演算装置に送信又は入力して積算温度を算出し、
該積算温度と前記初期温度又は受入検査時温度と前記空気量とを、選択した前記式(1)を用いて、予め設定された圧縮強度が得られる数値まで前記積算温度が達した時をもって脱型時期であると判定する構成であること
を特徴とする覆工コンクリート脱型時期判定システム。
式(1) σ=f(t0,air,M)
σ:圧縮強度(N/mm2
0:打込み温度
air:空気量
M:積算温度(D・D)
In order to determine the demolding time of lining concrete laid using a formwork,
A temperature sensor that measures the concrete temperature at any point in the formwork of the lining concrete every arbitrary time;
An arithmetic device such as a personal computer that calculates the integrated temperature from the temperature measured by the temperature sensor, determines that the integrated temperature has reached a desired compression strength and reaches the desired compression strength, and determines that it is a demolding time. In the lining concrete demolding time judgment system,
Prior to lining concrete placement, use concrete with the same composition as the concrete used for placement, perform multiple test milling with multiple levels of kneading temperature, and measure and compress the accumulated temperature for each of the multiple levels. Each of the strength tests is performed, and the following formula (1) derived from the relationship between the kneading temperature, the air volume, the integrated temperature, and the compressive strength,
And an arithmetic unit that inputs the initial temperature of concrete used for placing or the temperature at the time of receiving inspection as equivalent to the kneading temperature and inputs the amount of air at the time of receiving inspection when placing lining concrete. And
The arithmetic unit is
Among the formulas (1) derived from the plurality of levels of test kneading, select the formula (1) derived from the test kneading under conditions that match or most closely match the lining concrete placement,
Calculate or calculate the integrated temperature by transmitting or inputting the concrete temperature measured at any time in any place in the formwork of the lining concrete that has been laid to the arithmetic unit,
The accumulated temperature, the initial temperature or the temperature at the time of acceptance inspection, and the air amount are deselected when the accumulated temperature reaches a numerical value that provides a preset compressive strength using the selected equation (1). A lining concrete demolding time determination system, characterized in that it is determined to be a mold time.
Expression (1) σ = f (t 0 , air, M)
σ: Compressive strength (N / mm 2 )
t 0 : implantation temperature
air: Air volume
M: Integrated temperature (D ・ D)
型枠内の覆工コンクリート妻部の天端部・左肩部・右肩部・左スプリングライン部・右スプリングライン部の5箇所に前記温度センサーが配置された構成であることを特徴とする請求項7に記載の覆工コンクリート脱型時期判定システム。 The temperature sensor is arranged at five locations of a top end portion, a left shoulder portion, a right shoulder portion, a left spring line portion, and a right spring line portion of a lining concrete wife portion in a mold. Item 8. The lining concrete demolding time determination system according to item 7. 前記演算装置がディスプレイ画面を備え、前記の入力数値・算出数値・測定温度情報・積算温度情報・設定圧縮強度の如き各種情報が前記ディスプレイ画面に表示される構成であることを特徴とする請求項7又は8に記載の覆工コンクリート脱型時期判定システム。 The arithmetic unit includes a display screen, and various types of information such as the input numerical value, calculated numerical value, measured temperature information, accumulated temperature information, and set compression strength are displayed on the display screen. The lining concrete demolding time determination system according to 7 or 8. 前記演算装置の入力操作部及び前記ディスプレイ画面を備えると共に施工現場である坑内に配設し、該坑内で脱型時期判定に伴う操作を行う構成であることを特徴とする請求項9に記載の覆工コンクリート脱型時期判定システム。 10. The configuration according to claim 9, wherein the operation unit includes an input operation unit and the display screen of the arithmetic device, and is disposed in a mine that is a construction site, and performs an operation associated with a demolding time determination in the mine. Lined concrete demolding time determination system. 前記ディスプレイ画面に表示される各種情報と同様の表示が可能なディスプレイ画面を備えたパソコンを施工現場である坑内から離れた休憩所・事務所・詰所の如き坑外に配設する構成であることを特徴とする請求項9又は10に記載の覆工コンクリート脱型時期判定システム。 A configuration in which a personal computer equipped with a display screen capable of displaying the same information as the various information displayed on the display screen is arranged outside a mine such as a resting place, an office, or a stuffing station away from the mine that is the construction site. The lining concrete demolding time determination system according to claim 9 or 10.
JP2010162423A 2010-07-20 2010-07-20 Lining concrete demolding time judging method and demolding time judging system Active JP5231493B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010162423A JP5231493B2 (en) 2010-07-20 2010-07-20 Lining concrete demolding time judging method and demolding time judging system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010162423A JP5231493B2 (en) 2010-07-20 2010-07-20 Lining concrete demolding time judging method and demolding time judging system

Publications (2)

Publication Number Publication Date
JP2012026734A JP2012026734A (en) 2012-02-09
JP5231493B2 true JP5231493B2 (en) 2013-07-10

Family

ID=45779867

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010162423A Active JP5231493B2 (en) 2010-07-20 2010-07-20 Lining concrete demolding time judging method and demolding time judging system

Country Status (1)

Country Link
JP (1) JP5231493B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019007141A (en) * 2017-06-20 2019-01-17 清水建設株式会社 Concrete filling detection system and filling detection method

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012242346A (en) * 2011-05-24 2012-12-10 Techno Pro Kk Strength estimation apparatus for lining concrete, system and method
JP5421413B2 (en) * 2012-03-09 2014-02-19 テクノプロ株式会社 Heating apparatus and method for lining concrete, and lining concrete construction system
JP5973308B2 (en) * 2012-10-09 2016-08-23 株式会社Just.Will Casting concrete strength management system
JP6488085B2 (en) * 2014-08-08 2019-03-20 株式会社竹中工務店 Manufacturing method of concrete molded body and manufacturing management method of concrete molded body
CN109521187B (en) * 2018-12-04 2024-04-02 中建西部建设湖南有限公司 Device and method for detecting self-shrinkage of cement paste
CN109783976B (en) * 2019-02-01 2023-03-24 武昌理工学院 Method for calculating maximum temperature tensile stress of urban door opening type floor lining concrete in construction period
CN110333263B (en) * 2019-07-10 2021-10-29 广东工业大学 Thermal resistance performance evaluation method for thermal insulation concrete
CN111577318B (en) * 2020-04-17 2021-02-26 中国海洋大学 Tunnel long-distance excavation supporting construction device suitable for model test
CN111929201B (en) * 2020-09-15 2024-09-24 中国水利水电第七工程局有限公司 Device and method for measuring on-site demoulding strength of slip-form concrete
CN117162225B (en) * 2023-11-03 2024-02-23 江苏神禹港务工程有限公司 Demoulding and forming method and system for concrete prefabricated part

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2542308B2 (en) * 1992-04-30 1996-10-09 戸田建設株式会社 Demolding instruction device for crimping concrete lining formwork device and method for judging demolding time
JP3695817B2 (en) * 1995-12-26 2005-09-14 株式会社竹中工務店 PCa board manufacturing method
JPH11271301A (en) * 1998-03-23 1999-10-08 Shimizu Corp Estimation method for compressive strength of on-the-spot placed concrete and shield driving method
JP2003279512A (en) * 2002-03-26 2003-10-02 Koji Ono Method and apparatus for estimation of compressive strength of concrete
JP2005344437A (en) * 2004-06-04 2005-12-15 Okumura Corp Concrete curing method
JP2009002721A (en) * 2007-06-20 2009-01-08 Ohmoto Gumi Co Ltd Method for determining time of demolding concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019007141A (en) * 2017-06-20 2019-01-17 清水建設株式会社 Concrete filling detection system and filling detection method

Also Published As

Publication number Publication date
JP2012026734A (en) 2012-02-09

Similar Documents

Publication Publication Date Title
JP5231493B2 (en) Lining concrete demolding time judging method and demolding time judging system
US20220180270A1 (en) Concrete Placement Sensing Using Aerial Drones
CN101781931B (en) Construction method of large-volume concrete bearing platform with one-time pouring in winter
CN102296819B (en) Construction method for mass pipe concrete without temperature reduction
EP2746764B1 (en) Method for testing setting time of cement-based material
KR102190604B1 (en) A curing method of concrete specimens and an evaluation method of early concrete solidity that is using thereof
CN102323396B (en) Solid simulation test device for mass concrete and test construction method thereof
JP6936718B2 (en) Prediction method of concrete leveling work time, prediction device and concrete construction method
Zach et al. Technology of concrete with low generation of hydration heat
JP6252856B2 (en) Prediction method and prediction device for concrete leveling time
JP6497707B2 (en) Strength estimation system for concrete demolding
CN107848886A (en) With the self-compacting concrete structure from roughening characteristic
CN103669868B (en) The recursion cross construction method of ultra-long concrete floor structure
US20240083068A1 (en) Mobile volumetric concrete-production system
KR101031149B1 (en) Validity test method about slip form lifting based on maturity
CN114263466B (en) Winter prefabrication construction temperature crack control method for well wall of well drilling in alpine region
JP6512960B2 (en) Concrete evaluation method
KR100709670B1 (en) Tunnel lining concrete construction method
KR100721265B1 (en) Tunnel lining concrete construction method
CN207553608U (en) Mass concrete controls the structure of thermal cracking
KR101342079B1 (en) Method of measuring unit water content using unit air volume in fresh concrete
DEŞİK et al. Use of weight maturity method for building concretes used in Artvin Yusufeli dam construction
CN103104097B (en) Ultra-long concrete base arrangement cancels the recursion cross construction method of temperature post-cast strip
Buys Investigation of a practical application of the Maturity Method to estimate the early-age strength of concrete
CN102979305B (en) High temperature and slding form operation method in the large environment of the temperature difference

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130319

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130321

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160329

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5231493

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150