JP5201652B2 - Laying structure of multiple cable ducts - Google Patents

Laying structure of multiple cable ducts Download PDF

Info

Publication number
JP5201652B2
JP5201652B2 JP2007125431A JP2007125431A JP5201652B2 JP 5201652 B2 JP5201652 B2 JP 5201652B2 JP 2007125431 A JP2007125431 A JP 2007125431A JP 2007125431 A JP2007125431 A JP 2007125431A JP 5201652 B2 JP5201652 B2 JP 5201652B2
Authority
JP
Japan
Prior art keywords
cable duct
duct
body part
side wall
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007125431A
Other languages
Japanese (ja)
Other versions
JP2008283779A (en
Inventor
神秀 松林
淳 臼井
Original Assignee
フジプレコン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by フジプレコン株式会社 filed Critical フジプレコン株式会社
Priority to JP2007125431A priority Critical patent/JP5201652B2/en
Publication of JP2008283779A publication Critical patent/JP2008283779A/en
Application granted granted Critical
Publication of JP5201652B2 publication Critical patent/JP5201652B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

本発明は、例えば道路、トンネル、高架型高速道路あるいは高架橋型鉄道用線路などの路面幅方向端部において側壁や高欄を利用して施工する複数ケーブルダクトの敷設構造に関するものである。   The present invention relates to a laying structure of a plurality of cable ducts that are constructed by using side walls or railings at the ends in the road surface width direction, such as roads, tunnels, elevated highways, and viaduct railway lines.

従来、例えば道路、トンネル内、高架型高速道路あるいは高架型鉄道用線路の路面幅方向端部に各種の配線ケーブルを収納するケーブルダクトが設けられ、かつ当該ケーブルダクトの施工に際しては数多くの提案がなされている。
例えば特開平6−284543号公報にはトラフ受け台の形状・寸法を変えることなく幅の異なるトラフを敷設できる配線路が提案されている等のごときである。
特開平6−284543号公開公報
Conventionally, for example, cable ducts for storing various wiring cables have been provided at the ends in the road surface width direction of roads, tunnels, elevated expressways, or elevated railway lines, and many proposals have been made when constructing the cable ducts. Has been made.
For example, Japanese Patent Application Laid-Open No. 6-284543 proposes a wiring path that can lay troughs having different widths without changing the shape and dimensions of the trough cradle.
JP-A-6-284543

かくして、本発明は、前記従来からの各種提案にさらに思考、改良を加えて創案されたものであって、施工作業が迅速に行えると共に、施工作業コストを安価にすることの出来るケーブルダクトの敷設構造を提供することを目的とするものである。
Thus, the present invention was devised by adding further thoughts and improvements to the above-described various proposals, and laying cable ducts that can perform construction work quickly and reduce construction work costs. The purpose is to provide a structure.

本発明による複数ケーブルダクトの敷設構造は、
底面幅及び底面長手方向の長さが異なる各種の断面略U字状をなすケーブルダクト本体部品と、幅及び長さが異なる各種のダクト蓋とをあらかじめ工場で、各種タイプ別に製造し、ストックされてなるケーブルダクト本体部品及びダクト蓋を用いるケーブルダクトの敷設構造であって、
前記ケーブルダクト本体部品は、底壁部及び該底壁部の幅方向両端から上部方向に立ち上がる両側の側壁とにより断面略U字状をなして構成され、
前記ケーブルダクト本体部品の底壁部には、ケーブルダクト本体部品と線路の路面上に打設されるモルタル及びケーブルダクト本体部品の固定用モルタルと一体化させる連結アンカーの施工用穴が設けられると共に、長手方向略中央には吊り上げ運搬用の吊り上げナット穴が設けられてなり、
線路部の脇に設けられた高欄をダクト側壁に兼用すると共に、該高欄のダクト側壁に蓋係止部を形成してなり、
前記ケーブルダクト内に収納される各種の配線ケーブルの数量、径の大きさに対応して、前記あらかじめ製造された各種のケーブルダクト本体部品のうち最適な底面幅のケーブルダクト本体部品が選択されるとともに、前記ケーブルダクト本体部品を線路の長手方向に向かって敷設する際には、線路直線部においては、前記底面長手方向の長さが長尺なタイプのケーブルダクト本体部品が選択され、
前記高欄のダクト側壁との対向面側には所定間隔をおいて断面略U字状をなすあらかじめ製造されたケーブルダクト本体部品を前記所定間隔の長さを変更自在にして敷設し、
前記敷設は、ケーブルダクト本体部品を、一方の側壁長手方向両上端部を把持部材で把持すると共に、前記吊り上げナット穴にボルト状吊り上げ棒を螺合し、3点吊りの状態にして吊り上げ、かつ運搬し、
吊り上げ運搬したケーブルダクト本体部品における前記連結アンカーの施工用穴に、前記ケーブルダクト本体部品の敷設箇所に、あらかじめ線路路面内に打ち込まれて突設された棒状の連結アンカーが遊嵌するよう前記ケーブルダクト本体部品を降下させ、該降下作業が簡単な位置決めとなって前記ケーブルダクト本体部品を敷設してなり、
前記蓋係止部が形成された高欄のダクト側壁及び前記ケーブルダクト本体部品の一方側側壁とにより略凹状をなす第1ダクト本体部を形成してなり、
前記ケーブルダクト本体部品の一方側側壁の上端部には前記高欄のダクト側壁に設けられた蓋係止部と略同等の高さ位置に蓋載置部が設けられ、
前記双方の蓋係止部及び蓋載置部間には、あらかじめ製造された前記ケーブルダクト本体部品の底面幅及び底面の長手方向の長さに対応した幅及び長さのダクト蓋が載置可能とされ、
かつ前記ケーブルダクト本体部品の一方側側壁と他方側側壁間には第2ダクト本体部があらかじめ形成されてなると共に、上端部には前記ダクト蓋が載置された、
ことを特徴とし、
または、
線路部の脇に設けられた高欄をダクト側壁に兼用すると共に、該高欄のダクト側壁に蓋係止部を形成してなり、
前記高欄のダクト側壁との対向面側には所定間隔をおいて、底壁部と該底壁部の一方側端部から立ち上がる側壁により形成された断面略L字状をなすあらかじめ製造されたケーブルダクト本体部品を2個、前記側壁内側が向かい合わせになるよう、前記所定間隔の長さ及び前記向かい合わせに敷設する2個のケーブルダクト本体部品間の長さを変更自在にして敷設するケーブルダクトの敷設構造であって、
前記ケーブルダクト本体部品の底壁部には、ケーブルダクト本体部品と線路の路面上に打設されるモルタル及びケーブルダクト本体部品の固定用モルタルと一体化させる連結アンカーの施工用穴が設けられると共に、長手方向略中央には吊り上げ運搬用の吊り上げナット穴が設けられてなり、
前記2個のケーブルダクト本体部品を、前記側壁の長手方向両上端部を把持部材で把持すると共に、前記吊り上げナット穴にボルト状吊り上げ棒を螺合し、3点吊りの状態にして吊り上げ、かつ運搬し、
吊り上げ運搬したケーブルダクト本体部品における前記連結アンカーの施工用穴に、前記ケーブルダクト本体部品の敷設箇所に、あらかじめ線路路面内に打ち込まれて突設された棒状の連結アンカーが遊嵌するよう前記ケーブルダクト本体部品を降下させ、該降下作業が簡単な位置決めとなって、前記2個のケーブルダクト本体部品の側壁内側が向かい合わせになるよう、かつ、2個のケーブルダクト本体部品間の長さを変更自在にして敷設し、
前記蓋係止部が形成された高欄のダクト側壁及び前記2個のケーブルダクト本体部品のうち高欄のダクト側壁寄りのケーブルダクト本体部品の一方側側壁とにより略凹状をなす第1ダクト本体部を形成してなり、
前記ケーブルダクト本体部品の一方側側壁の上端部には前記高欄のダクト側壁に設けられた蓋係止部と略同等の高さ位置に蓋載置部が設けられ、
前記双方の蓋係止部及び蓋載置部間には、あらかじめ製造されたダクト蓋が載置可能とされ、
かつ前記向かい合わせに敷設した2個のケーブルダクト本体部品間には第2ダクト本体部が形成されてなると共に、上端部には前記ダクト蓋が載置された、
ことを特徴とするものである。
The laying structure of a plurality of cable ducts according to the present invention is:
Cable duct main body parts with various U-shaped cross sections with different bottom width and bottom longitudinal length, and various types of duct lids with different widths and lengths are manufactured and stocked in advance at the factory. A cable duct laying structure using a cable duct body part and a duct lid,
The cable duct main body part is configured to have a substantially U-shaped cross section by a bottom wall portion and side walls rising from the both ends in the width direction of the bottom wall portion in the upper direction,
The bottom wall portion of the cable duct body part is provided with a mortar that is placed on the road surface of the cable duct body part and the track, and a connection anchor construction hole that is integrated with the fixing mortar of the cable duct body part. In the middle of the longitudinal direction, a lifting nut hole for lifting and transportation is provided,
The railing provided on the side of the track portion is also used as a duct side wall, and a lid locking portion is formed on the duct side wall of the railing,
Corresponding to the quantity and diameter of various wiring cables stored in the cable duct, a cable duct body part having an optimum bottom width is selected from the various cable duct body parts manufactured in advance. And, when laying the cable duct body part toward the longitudinal direction of the track, in the line straight portion, the cable duct body component of a type having a long length in the bottom surface longitudinal direction is selected,
Laying a cable duct body part that has been manufactured in advance and has a substantially U-shaped cross section at a predetermined interval on the side facing the side wall of the rail of the balustrade, the length of the predetermined interval being freely changeable,
In the laying, the cable duct main body part is lifted in a three-point suspended state by gripping both upper ends of one side wall in the longitudinal direction with a gripping member, screwing a bolt-shaped lifting rod into the lifting nut hole, and Transport,
The cable so that a rod-shaped connecting anchor that has been driven into the track surface in advance is inserted into a construction hole of the connecting anchor in the cable duct main body part that is lifted and transported, and is laid in the cable duct main body part. Lowering the duct body parts, laying the cable duct body parts as the positioning work is easy positioning,
Forming a first duct body portion having a substantially concave shape by the side wall of the rail of the rail where the lid locking portion is formed and the one side wall of the cable duct body component;
At the upper end of one side wall of the cable duct main body part, a lid mounting portion is provided at a height position substantially equal to the lid locking portion provided on the side wall of the duct,
A duct lid having a width and a length corresponding to the width of the bottom surface of the cable duct main body part and the length of the bottom surface in the longitudinal direction can be placed between the both lid engaging portions and the lid placing portion. And
And while the second duct body part is formed in advance between the one side wall and the other side wall of the cable duct body part, the duct lid is placed on the upper end part,
It is characterized by
Or
The railing provided on the side of the track portion is also used as a duct side wall, and a lid locking portion is formed on the duct side wall of the railing,
A pre-manufactured cable having a substantially L-shaped cross section formed by a bottom wall and a side wall rising from one end of the bottom wall at a predetermined interval on the side facing the side wall of the handrail duct Two duct body parts, a cable duct laid with the length of the predetermined interval and the length between the two cable duct body parts laid opposite to each other so that the inside of the side wall faces each other. The laying structure of
The bottom wall portion of the cable duct body part is provided with a mortar that is placed on the road surface of the cable duct body part and the track, and a connection anchor construction hole that is integrated with the fixing mortar of the cable duct body part. In the middle of the longitudinal direction, a lifting nut hole for lifting and transportation is provided,
The two cable duct main body parts are lifted in a three-point suspended state by gripping both upper ends in the longitudinal direction of the side wall with a gripping member, screwing a bolt-shaped lifting rod into the lifting nut hole, and Transport,
The cable so that a rod-shaped connecting anchor that has been driven into the track surface in advance is inserted into a construction hole of the connecting anchor in the cable duct main body part that is lifted and transported, and is laid in the cable duct main body part. The duct body part is lowered, and the lowering work is easily positioned so that the inner side walls of the two cable duct body parts face each other, and the length between the two cable duct body parts is increased. Lay it freely,
A first duct main body portion that is substantially concave with the side wall of the rail of the rail where the lid locking portion is formed and the one side wall of the cable duct main body part near the side wall of the rail of the two rails. Formed,
At the upper end of one side wall of the cable duct main body part, a lid mounting portion is provided at a height position substantially equal to the lid locking portion provided on the side wall of the duct,
Between the two lid locking portions and the lid mounting portion, a duct lid manufactured in advance can be placed,
In addition, a second duct body is formed between the two cable duct body parts laid face to face, and the duct lid is placed on the upper end.
It is characterized by this.

本発明によれば、施工作業が迅速に行えると共に、施工作業コストを安価にしうるケーブルダクトの施工構造を提供出来るとの効果を奏する。
According to the present invention, it is possible to provide a construction structure of a cable duct that can perform construction work quickly and can reduce the construction work cost.

以下本発明を図に示す実施例に基づいて説明する。
図1に本発明によるケーブルダクトの敷設構造を示す。
図1において、符号1は高架橋型の鉄道用線路を示し、当該高架型鉄道用線路1の幅方向両端部には各種複数のケーブル2・・・が収納されたケーブルダクト3が前記高架型鉄道用線路1の長手方向に向かって敷設される。
Hereinafter, the present invention will be described based on embodiments shown in the drawings.
FIG. 1 shows a cable duct laying structure according to the present invention.
In FIG. 1, reference numeral 1 denotes a viaduct type railway line, and a cable duct 3 in which a plurality of various cables 2... Are accommodated at both ends in the width direction of the elevated railway line 1 is the elevated railway. It is laid in the longitudinal direction of the service line 1.

なお、本発明において、高架型の鉄道線路に限定されるものではなく、一般道路などの交通路でも構わない。   In the present invention, the present invention is not limited to an elevated railway track, and may be a traffic road such as a general road.

符号4は鉄道用線路1の高欄であり、該鉄道用線路1の長手方向に向かって側壁状に設置されている。
ここで、前記高欄4は、線路幅方向両端部から、あるいは一方側の端部から上方に向かい立ち上がって形成され、かつ線路の長手方向に向かって長尺に連続して設けられている。
しかして、本発明では、ケーブルダクト3の施工に際し、前記高欄4などをケーブルダクト3の敷設により形成される第1ダクト本体部13の一方側の側壁7として利用するものとした。
Reference numeral 4 denotes a rail of the railroad track 1, which is installed in a side wall shape in the longitudinal direction of the railroad track 1.
Here, the rail 4 is formed so as to rise upward from both ends in the line width direction or from an end on one side, and is provided continuously in a long direction in the longitudinal direction of the line.
Therefore, in the present invention, when the cable duct 3 is constructed, the rail 4 or the like is used as the side wall 7 on one side of the first duct main body portion 13 formed by laying the cable duct 3.

次いで、符号5は、ケーブルダクト本体部品を示し、該ケーブルダクト本体部品5は、底壁部6及び該底壁部6の幅方向両端において上部方向に立ち上る両側の側壁7、7とによって断面略U字状をなして形成されている。
ここで、前記ケーブルダクト本体部品5及び前記ケーブルダクト本体部品5と前記高欄4間に載置されるダクト蓋8はあらかじめ工場でプレキャストコンクリート製品として形成される。
Next, reference numeral 5 denotes a cable duct main body part, and the cable duct main body part 5 is substantially cross-sectionally defined by a bottom wall portion 6 and side walls 7, 7 on both sides rising in the upper direction at both widthwise ends of the bottom wall portion 6. It is formed in a U shape.
Here, the cable duct body part 5 and the duct lid 8 placed between the cable duct body part 5 and the rail 4 are formed in advance as a precast concrete product in a factory.

このように、ケーブルダクト3を形成するために大部分の時間が費やされる前記ケーブルダクト本体部品5及び前記ダクト蓋8を形成をあらかじめプレキャストコンクリート製品としておくものとする。   Thus, the formation of the cable duct body part 5 and the duct lid 8, which take most of the time to form the cable duct 3, is preliminarily formed as a precast concrete product.

この様に構成すると、このプレキャスト製品化した前記ケーブルダクト本体部品5及び前記ダクト蓋8を大量製造して製造工場に大量にストックしておくことができ、その後必要に応じて大量に施工現場(高架型鉄道用線路1内)へ運搬、敷設することができる。   If comprised in this way, the said cable duct main-body components 5 and the said duct lid | cover 8 which were made into this precast product can be mass-produced, and can be stocked in a manufacturing factory in large quantities, and after that a lot of construction sites ( It can be transported and laid on the elevated railway line 1).

施工現場では、これら前記ケーブルダクト本体部品5及び前記ダクト蓋8を線路長手方向に順次接続してケーブルダクト3を敷設するのみで済み、大幅に施工時間が短縮でき、施工コストも安価にすることが出来る。しかも従来に比して大幅に品質も向上させることが出来るとのメリットがある。   At the construction site, it is only necessary to lay the cable duct 3 by sequentially connecting the cable duct main body part 5 and the duct lid 8 in the longitudinal direction of the line, so that the construction time can be greatly reduced and the construction cost can be reduced. I can do it. Moreover, there is a merit that the quality can be greatly improved as compared with the prior art.

また、図2乃至図4から理解されるとおり、前記ケーブルダクト本体部品5は、前記底壁部6の幅の異なる各種タイプ別で製造、ストックされ、例えば、ケーブルダクト3内に収納される各種の配線ケーブル2の数量、径の大きさ等に対応して、最適な底面幅の底壁部6を有するケーブルダクト本体部品5が選ばれ、敷設できる。
なお、前記底壁部の底面幅の長さはこれらの図のものに限定されるものではない。
Further, as understood from FIGS. 2 to 4, the cable duct main body part 5 is manufactured and stocked by various types having different widths of the bottom wall portion 6, for example, various types stored in the cable duct 3. The cable duct body component 5 having the bottom wall portion 6 having the optimum bottom width can be selected and laid according to the number of the distribution cables 2, the size of the diameter, and the like.
In addition, the length of the bottom face width of the bottom wall portion is not limited to those in these drawings.

さらに、前記ケーブルダクト本体部品5は前記底壁部6の長手方向の長さが異なる各種タイプ別でも製造、ストックされる。
例えば、施工現場において、ケーブルダクト3を前記高架型鉄道用線路1の長手方向に向かって敷設する際、線路直線部においては、前記底壁部6の長さが長尺なタイプのケーブルダクト本体部品5が選ばれ、敷設されることがある。
Further, the cable duct body component 5 is manufactured and stocked by various types in which the length of the bottom wall portion 6 in the longitudinal direction is different.
For example, when the cable duct 3 is laid in the longitudinal direction of the elevated railway line 1 at the construction site, the cable duct main body of the type in which the bottom wall portion 6 is long in the straight line portion of the track. Part 5 may be selected and laid.

なお、前記底壁部6の長さは限定されてはいない。
同様に、前記ダクト蓋8についても、前記ケーブルダクト本体部品5の各種タイプに対応した幅及び、長さのことなるものが各種タイプ別で製造、ストックされる。
The length of the bottom wall portion 6 is not limited.
Similarly, the duct lid 8 is manufactured and stocked according to various types having different widths and lengths corresponding to the various types of the cable duct main body part 5.

ここで、図2乃至図4から理解されるように、前記ケーブルダクト本体部品5の底壁部6には、線路の路面上に打設されるモルタル15やケーブルダクト本体部品5の底面に打設される固定モルタル14と一体化させる連結アンカー16の施工用穴9が設けられていると共に、長手方向略中央には吊り上げ運搬用の吊り上げナット穴10が設けられている。   Here, as understood from FIGS. 2 to 4, the bottom wall portion 6 of the cable duct body part 5 is struck on the bottom surface of the mortar 15 or the cable duct body part 5 placed on the road surface of the track. A construction hole 9 for the connecting anchor 16 integrated with the fixed mortar 14 to be provided is provided, and a lifting nut hole 10 for lifting and transporting is provided at substantially the center in the longitudinal direction.

この連結アンカー16の施工用穴9及び吊り上げ運搬用の吊り上げナット穴10の形成個数については何ら制限されるものではなく、それぞれ2個以上の複数個設けても構わないものである。
図2乃至図4に示す具体例では、連結アンカー16の施工用穴9は底壁部6の長手方向中央部に1個、また吊り上げナット穴10はやはり中央部に1個の合計2個形成してある。
The numbers of the construction holes 9 and the lifting nut holes 10 for lifting and transporting the connecting anchor 16 are not limited at all, and two or more of them may be provided.
In the specific examples shown in FIGS. 2 to 4, two construction holes 9 for the connecting anchor 16 are formed in the center portion in the longitudinal direction of the bottom wall portion 6, and two lifting nut holes 10 are also formed in the central portion. It is.

ところで、断面略U字状をなすケーブルダクト本体部品5における両側壁7、7の上端部上面は略水平に形成され、該両側壁7、7上端部上面に前記ダクト蓋8が密着して載置可能な様に蓋載置部11が形成される。 By the way, the upper surfaces of the upper ends of the side walls 7 and 7 of the cable duct body part 5 having a substantially U-shaped cross section are formed substantially horizontally, and the duct lid 8 is mounted in close contact with the upper surfaces of the both side walls 7 and 7. The lid mounting part 11 is formed so that it can be placed.

ここで、ケーブルダクト本体部品5における一方側側壁7の上端部は、当該一方側側壁7の外側面から、上方向に向かい、外側に上り勾配状の傾斜面を有して延び、該傾斜面の上端部からさらに前記上方向に垂直壁を構成し、その部分が厚みを有する膨出部として構成されてなり、前記側壁7の上端部の厚み幅が長くなるように形成されている。   Here, the upper end portion of the one side wall 7 in the cable duct body part 5 extends upward from the outer surface of the one side wall 7 and has an upward inclined surface on the outer side. Further, a vertical wall is formed in the upward direction from the upper end portion of the upper portion, and the portion is formed as a bulging portion having a thickness, and the thickness width of the upper end portion of the side wall 7 is increased.

このように側壁7の上端面の幅に厚みを有して構成することにより蓋載置部11に載置されるダクト蓋8を密着させて、安定的に支持できる。   As described above, the width of the upper end surface of the side wall 7 is configured to have a thickness so that the duct lid 8 placed on the lid placing portion 11 can be brought into close contact with and stably supported.

次に本発明の施工状態につき説明する。
線路部の脇には高欄4が設けられている。該高欄4の一部をダクトの一方側側壁7に兼用する。
ついで、前記高欄4側の側壁7との対向面側には所定の間隔をおいて断面略U字状をなすあらかじめ製造されたダクト本体部品5を前記所定間隔の長さを変更自在にして敷設する。
Next, the construction state of the present invention will be described.
A rail 4 is provided on the side of the track portion. A part of the rail 4 is also used as one side wall 7 of the duct.
Next, a pre-manufactured duct body part 5 having a substantially U-shaped cross section with a predetermined interval is laid on the side facing the side wall 7 on the rail 4 side so that the length of the predetermined interval can be changed. To do.

そして、前記蓋載置部11が形成された高欄4側の側壁7及び前記ダクト本体部品5の一方側側壁部7とにより略凹状をなす第1ダクト本体部13が形成される。
この第1ダクト本体部13の底面幅は変更自在であり、収納するケーブル2の数量やその他の要因により、幅の長さは決定される。
The first duct main body 13 having a substantially concave shape is formed by the side wall 7 on the side of the rail 4 where the lid mounting portion 11 is formed and the one side wall 7 of the duct main body part 5.
The bottom face width of the first duct main body 13 can be changed, and the length of the width is determined depending on the number of cables 2 to be accommodated and other factors.

この第1ダクト本体部13の底面幅が決定した後、ケーブルダクト本体部品5の施工用穴9を連結アンカー16に遊嵌させつつ位置決め微調整し、固定用モルタル14を打設する。この固定用モルタル14はケーブルダクト本体部品5の底面下側および第1ダクト本体部13の底面部に打設される。   After the bottom width of the first duct main body 13 is determined, positioning fine adjustment is performed while loosely fitting the construction hole 9 of the cable duct main body part 5 to the connecting anchor 16, and the fixing mortar 14 is driven. The fixing mortar 14 is placed on the lower side of the bottom surface of the cable duct main body part 5 and the bottom surface portion of the first duct main body portion 13.

そして、前記ダクト本体部品5の一方側側壁7の上端部には前記高欄4側のダクト側壁に設けられた蓋係止部11と略同等の高さ位置に蓋載置部12が設けられる。   And the lid mounting part 12 is provided in the upper end part of the one side wall 7 of the said duct main-body part 5 in the height position substantially equivalent to the lid latching | locking part 11 provided in the duct side wall of the said rail 4 side.

そして、前記双方の蓋係止部11及び蓋載置部12間には、あらかじめ製造されたダクト蓋8が密着して載置される。 A duct lid 8 manufactured in advance is placed in close contact between the two lid engaging portions 11 and the lid placing portion 12.

さらに、前記ダクト本体部品5の一方側側壁7と他方側側壁7間には第2ダクト本体部17があらかじめ形成さてなると共に、双方の側壁7,7上端部には各々蓋載置部12、12が設けられてダクト蓋8が密着して載置されるものとなる。 Further, a second duct main body portion 17 is formed in advance between the one side wall 7 and the other side wall 7 of the duct main body component 5, and a lid mounting portion 12 is provided at the upper end portions of both side walls 7, 7, respectively. 12 is provided and the duct lid 8 is placed in close contact.

なお、ダクト本体部品5の他方側側壁7上端部には、コ字状に切り欠かれた蓋係止部11を形成してもよく、この場合、高欄4側の蓋係止部11とこのダクト本体部品5側の蓋係止部11にはダクト蓋8が嵌合して載置されるものとなる。 The upper end of the other side wall 7 of the duct body part 5 may be formed with a lid locking part 11 cut out in a U-shape. In this case, the lid locking part 11 on the rail 4 side and this The duct lid 8 is fitted and placed on the lid locking portion 11 on the duct body part 5 side.

なお、高欄4の側壁7に蓋係止部11を形成する具体例につき説明する。
線路などの前記高欄4側壁7の内側において、前記蓋係止部11があらかじめ設けられていることもあるが、このようなダクト蓋8載置用の前記蓋係止部11があらかじめ設けられていないときは、施工現場において新たに前記高欄4側の側壁7内側にダクト蓋載置用の前記蓋係止部11を形成する必要がある。
In addition, the specific example which forms the cover latching | locking part 11 in the side wall 7 of the rail 4 is demonstrated.
The lid locking portion 11 may be provided in advance on the inside of the rail 4 side wall 7 such as a track, but the lid locking portion 11 for placing the duct lid 8 is provided in advance. If not, it is necessary to newly form the lid engaging portion 11 for placing the duct lid inside the side wall 7 on the railing 4 side at the construction site.

しかし、この形成作業は決して困難なものではなく、例えば長尺の角棒状部材を線路などの高欄4側壁7の内側に水平方向へ延出させて取り付ければよいのである。   However, this forming operation is never difficult. For example, a long square bar-like member may be attached to the inner side of the rail 4 side wall 7 such as a track so as to extend horizontally.

このような取り付け作業により、固定した角棒状部材の上面と、線路などの高欄4側壁7の内側面とによりダクト蓋載置用の前記蓋係止部11が容易に形成できることとなる。
そして、これら断面略L字状に凹んで形成された前記蓋係止部11と、ケーブルダクト本体部品5における、前記蓋載置部12や蓋係止部11にかけてダクト蓋8が載置されるのである。
By such an attaching operation, the lid locking portion 11 for placing the duct lid can be easily formed by the upper surface of the fixed rectangular bar-shaped member and the inner surface of the rail 4 side wall 7 such as a track.
The duct lid 8 is placed on the lid engaging portion 11 formed to be recessed in a substantially L-shaped cross section and the lid placing portion 12 or the lid engaging portion 11 in the cable duct main body part 5. It is.

また、図5及び図6から理解されるとおり、底壁部6と該底壁部6の一方側端部から立ち上がる側壁7により形成された断面略L字状をなすタイプのケーブルダクト本体部品5を2個向かい合わせに敷設することにより、前記断面略U字状のケーブルダクト本体部品5と同様、第2ダクト本体部17の形成が可能であります。   Further, as understood from FIGS. 5 and 6, the cable duct body component 5 of a type having a substantially L-shaped cross section formed by the bottom wall portion 6 and the side wall 7 rising from one end portion of the bottom wall portion 6. By laying two pieces facing each other, the second duct body 17 can be formed in the same way as the cable duct body part 5 having a substantially U-shaped cross section.

そして、図5から理解されるとおり、前記本体部品5において側壁7の上方外側面から、上端部に向かい、外側に上り勾配状の傾斜面を有し、該傾斜面の上端部からさらに前記上端部に向かい垂直壁を構成し、前記側壁7の上端面幅が厚みを有するように、膨出部が形成され、前記側壁7の上端部外側面側からフラットな上端面を形成し、かつ側壁7の上端部内側面から垂下した形状として蓋載置部12が形成される。   And, as understood from FIG. 5, the main body part 5 has an inclined surface having an upward slope from the upper outer surface of the side wall 7 toward the upper end, and on the outer side, and further the upper end from the upper end of the inclined surface. A bulging portion is formed so as to form a vertical wall facing the portion, the upper end surface width of the side wall 7 has a thickness, a flat upper end surface is formed from the outer surface side of the upper end portion of the side wall 7, and the side wall The lid mounting portion 12 is formed as a shape that hangs down from the inner surface of the upper end portion of 7.

前記蓋載置部12は前記高欄4側のダクト側壁に設けられた蓋係止部11と略同等の高さ位置に設けられ、前記蓋係止部11及び蓋載置部12間にあらかじめ製造されたダクト蓋8が密着して載置される。 The lid mounting portion 12 is provided at a height position substantially equal to the lid locking portion 11 provided on the duct side wall on the rail 4 side, and is manufactured in advance between the lid locking portion 11 and the lid mounting portion 12. The duct lid 8 is placed in close contact.

さらに、向かい合わせに敷設したことで前記一方側側壁7と他方側側壁7間には第2ダクト本体部17が形成され、双方の側壁7,7上端部には各々蓋載置部12、12が設けられ、前記蓋載置部12、12間にダクト蓋8が密着して載置されるものとなる。 Furthermore, the second duct main body portion 17 is formed between the one side wall 7 and the other side wall 7 by laying them face to face, and the lid mounting portions 12, 12 are provided at the upper ends of both the side walls 7, 7. , And the duct lid 8 is placed in close contact between the lid placing portions 12 and 12.

ここで、前記側壁7上端部には、コ字状に切り欠かれた蓋係止部11を形成してもよい。
また、図6から理解されるとおり、図に表される前記ケーブルダクト本体部品5においては前記側壁7の上端部は前記側壁7の上方内側面から、上端部に向かい外側に上り勾配状の傾斜面を有し、該傾斜面の上端部からさらに前記上面に向かい垂直壁を構成し、その垂直壁の上部に、コ字状に切り欠かれた蓋係止部11が設けられている。
Here, the upper end of the side wall 7 may be formed with a lid locking portion 11 cut out in a U-shape.
Further, as understood from FIG. 6, in the cable duct main body part 5 shown in the figure, the upper end portion of the side wall 7 is inclined upwardly from the upper inner surface of the side wall 7 toward the upper end portion and outward. A vertical wall is formed from the upper end portion of the inclined surface to the upper surface, and a lid locking portion 11 cut out in a U-shape is provided on the upper portion of the vertical wall.

なお、前記本体部品5を向かい合わせに敷設する際のケーブルダクト本体部品5、5間の所定間隔の長さは、変更が自在にしてあり、もって施工現場の状況や各種の事情によりケーブルダクト本体部品5、5間を調節できるようにし、施工作業がよりスムーズになるよう構成してある。   Note that the length of the predetermined interval between the cable duct main body parts 5 and 5 when the main body parts 5 are laid face to face can be freely changed. The space between the parts 5 and 5 can be adjusted so that the construction work becomes smoother.

ところで、本発明によるケーブルダクトの施工方法は、まず、鉄道の線路の路面幅方向端部に図1に示すようにモルタル15を打設する。   By the way, in the construction method of the cable duct according to the present invention, first, a mortar 15 is placed at the end in the road surface width direction of the railroad track as shown in FIG.

ついで、断面略U字状のケーブルダクト本体部品5を前記鉄道の線路の路面幅方向端部に敷設する。この際、上記で示したとおり、敷設現場において、最適な底面幅の底壁部6を有し、かつ最適な底面分6の長さを有するタイプのケーブルダクト本体部品5を選択すべく、あらかじめ製造、ストックされたケーブルダクト本体部品5の中から選んで、敷設される。   Next, the cable duct main body part 5 having a substantially U-shaped cross section is laid at the end in the road surface width direction of the railroad track. At this time, as shown above, in order to select the cable duct body part 5 of the type having the bottom wall portion 6 having the optimum bottom width and the optimum length of the bottom portion 6 at the laying site, The cable duct body part 5 manufactured and stocked is selected and laid.

ここで、ケーブルダクト本体部品5の吊り上げ運搬作業及び敷設作業は、吊り上げナット穴10が利用される。
すなわち、ケーブルダクト本体部品5を構成する前記側壁7の長手方向両上端部を所定の把持部材で把持すると共に、前記の吊り上げナット穴10にボルト状吊り上げ棒を螺合し、いわゆる3点吊りの状態等にして吊り上げ、かつ運搬し、所定位置に載置するのである。
Here, the lifting nut hole 10 is used for lifting and transporting and laying the cable duct body part 5.
In other words, both upper ends in the longitudinal direction of the side wall 7 constituting the cable duct body part 5 are gripped by a predetermined gripping member, and a bolt-like lifting rod is screwed into the lifting nut hole 10 so as to suspend the so-called three-point suspension. It is lifted and transported in a state or the like and placed at a predetermined position.

ケーブルダクト本体5部品の敷設箇所には、あらかじめ棒状の連結アンカー16が突設されて仮設されている。よって、吊り上げられているケーブルダクト本体部品5の前記連結アンカー16の施工用穴9に突設された前記連結アンカー16が遊嵌するように降下させれば、簡単に位置決めできて所定箇所にケーブルダクト本体部品5を敷設できるものとなる。これによりケーブルダクト本体部品5の迅速、確実な敷設が確保できるとの効果が得られる。   A bar-like connecting anchor 16 is projected in advance and temporarily installed at the laying position of the cable duct body 5 parts. Therefore, if the connection anchor 16 projecting from the construction hole 9 of the connection anchor 16 of the cable duct body part 5 being lifted is lowered so as to be loosely fitted, the cable can be easily positioned and cabled at a predetermined position. The duct body part 5 can be laid. Thereby, the effect that quick and reliable laying of the cable duct main body part 5 can be secured is obtained.

この際、前述の通り、ケーブルダクト本体部品5の敷設、施工に際し、前記高欄4一方側の側壁7として利用可能なように所定間隔をあけて敷設され、これによりまず、第1ダクト本体部13が形成される。   At this time, as described above, when the cable duct body part 5 is laid and constructed, the cable duct body part 5 is laid at a predetermined interval so that it can be used as the side wall 7 on the one side of the rail 4. Is formed.

ここで、この第1ダクト本体部13の底面幅は変更自在で、いかようにも設定できる。この第1ダクト本体部13に収納されるケーブル数など、あるいは現場の状況で決定できる。
なお、連結アンカー16の施工用穴9からは例えば固定用モルタル14を打設して、ケーブルダクト本体部品5を前記固定用モルタル14に固定するものとする。
かかる敷設作業を、路面の長手方向に向かってケーブルダクト本体部品5を繋げながら行う。
Here, the bottom face width of the first duct body 13 can be changed and can be set in any way. The number of cables stored in the first duct main body 13 or the like can be determined according to the situation at the site.
Note that, for example, a fixing mortar 14 is placed from the construction hole 9 of the connection anchor 16 to fix the cable duct body part 5 to the fixing mortar 14.
Such laying work is performed while connecting the cable duct body parts 5 in the longitudinal direction of the road surface.

そして、最終的には、前記第1ダクト本体部13及び第2ダクト本体部17内に各種のケーブル2を収納した後、ケーブルダクト蓋8を上方から載置してケーブルダクトの施工終了となる。
Finally, after the various cables 2 are stored in the first duct body 13 and the second duct body 17, the cable duct lid 8 is placed from above and the construction of the cable duct is completed. .

本発明の構成を説明する構成説明図(その1)である。BRIEF DESCRIPTION OF THE DRAWINGS It is structure explanatory drawing (the 1) explaining the structure of this invention. 本発明の構成を説明する構成説明図(その2)である。FIG. 3 is a configuration explanatory diagram (part 2) illustrating the configuration of the present invention. 本発明の構成を説明する構成説明図(その3)である。FIG. 3 is a configuration explanatory diagram (part 3) illustrating the configuration of the present invention; 本発明の構成を説明する構成説明図(その4)である。FIG. 6 is a configuration explanatory diagram (part 4) illustrating the configuration of the present invention; 本発明の構成を説明する構成説明図(その5)である。FIG. 6 is a configuration explanatory view (No. 5) illustrating the configuration of the present invention. 本発明の構成を説明する構成説明図(その6)である。FIG. 6 is a configuration explanatory view (No. 6) illustrating the configuration of the present invention.

1 鉄道用線路
2 ケーブル
3 ケーブルダクト
4 高欄
5 ケーブルダクト本体部品
6 底壁部
7 側壁
8 ダクト蓋
9 連結アンカーの施工用穴
10 吊り上げナット穴
11 蓋係止部
12 蓋載置部
13 第1ダクト本体部
14 固定モルタル
15 モルタル
16 連結アンカー
17 第2ダクト本体部
DESCRIPTION OF SYMBOLS 1 Railroad track 2 Cable 3 Cable duct 4 Hand rail 5 Cable duct main body part 6 Bottom wall part 7 Side wall 8 Duct lid 9 Connection anchor construction hole 10 Lifting nut hole 11 Lid locking part 12 Lid mounting part 13 First duct Main body 14 Fixed mortar 15 Mortar 16 Connecting anchor 17 Second duct main body

Claims (2)

底面幅及び底面長手方向の長さが異なる各種の断面略U字状をなすケーブルダクト本体部品と、幅及び長さが異なる各種のダクト蓋とをあらかじめ工場で、各種タイプ別に製造し、ストックされてなるケーブルダクト本体部品及びダクト蓋を用いるケーブルダクトの敷設構造であって、
前記ケーブルダクト本体部品は、底壁部及び該底壁部の幅方向両端から上部方向に立ち上がる両側の側壁とにより断面略U字状をなして構成され、
前記ケーブルダクト本体部品の底壁部には、ケーブルダクト本体部品と線路の路面上に打設されるモルタル及びケーブルダクト本体部品の固定用モルタルと一体化させる連結アンカーの施工用穴が設けられると共に、長手方向略中央には吊り上げ運搬用の吊り上げナット穴が設けられてなり、
線路部の脇に設けられた高欄をダクト側壁に兼用すると共に、該高欄のダクト側壁に蓋係止部を形成してなり、
前記ケーブルダクト内に収納される各種の配線ケーブルの数量、径の大きさに対応して、前記あらかじめ製造された各種のケーブルダクト本体部品のうち最適な底面幅のケーブルダクト本体部品が選択されるとともに、前記ケーブルダクト本体部品を線路の長手方向に向かって敷設する際には、線路直線部においては、前記底面長手方向の長さが長尺なタイプのケーブルダクト本体部品が選択され、
前記高欄のダクト側壁との対向面側には所定間隔をおいて断面略U字状をなすあらかじめ製造されたケーブルダクト本体部品を前記所定間隔の長さを変更自在にして敷設し、
前記敷設は、ケーブルダクト本体部品を、一方の側壁長手方向両上端部を把持部材で把持すると共に、前記吊り上げナット穴にボルト状吊り上げ棒を螺合し、3点吊りの状態にして吊り上げ、かつ運搬し、
吊り上げ運搬したケーブルダクト本体部品における前記連結アンカーの施工用穴に、前記ケーブルダクト本体部品の敷設箇所に、あらかじめ線路路面内に打ち込まれて突設された棒状の連結アンカーが遊嵌するよう前記ケーブルダクト本体部品を降下させ、該降下作業が簡単な位置決めとなって前記ケーブルダクト本体部品を敷設してなり、
前記蓋係止部が形成された高欄のダクト側壁及び前記ケーブルダクト本体部品の一方側側壁とにより略凹状をなす第1ダクト本体部を形成してなり、
前記ケーブルダクト本体部品の一方側側壁の上端部には前記高欄のダクト側壁に設けられた蓋係止部と略同等の高さ位置に蓋載置部が設けられ、
前記双方の蓋係止部及び蓋載置部間には、あらかじめ製造された前記ケーブルダクト本体部品の底面幅及び底面の長手方向の長さに対応した幅及び長さのダクト蓋が載置可能とされ、
かつ前記ケーブルダクト本体部品の一方側側壁と他方側側壁間には第2ダクト本体部があらかじめ形成されてなると共に、上端部には前記ダクト蓋が載置された、
ことを特徴とする複数ケーブルダクトの敷設構造。
Cable duct main body parts with various U-shaped cross sections with different bottom width and bottom longitudinal length, and various types of duct lids with different widths and lengths are manufactured and stocked in advance at the factory. A cable duct laying structure using a cable duct body part and a duct lid,
The cable duct main body part is configured to have a substantially U-shaped cross section by a bottom wall portion and side walls rising from the both ends in the width direction of the bottom wall portion in the upper direction,
The bottom wall portion of the cable duct body part is provided with a mortar that is placed on the road surface of the cable duct body part and the track, and a connection anchor construction hole that is integrated with the fixing mortar of the cable duct body part. In the middle of the longitudinal direction, a lifting nut hole for lifting and transportation is provided,
The railing provided on the side of the track portion is also used as a duct side wall, and a lid locking portion is formed on the duct side wall of the railing,
Corresponding to the quantity and diameter of various wiring cables stored in the cable duct, a cable duct body part having an optimum bottom width is selected from the various cable duct body parts manufactured in advance. And, when laying the cable duct body part toward the longitudinal direction of the track, in the line straight portion, the cable duct body component of a type having a long length in the bottom surface longitudinal direction is selected,
Laying a cable duct body part that has been manufactured in advance and has a substantially U-shaped cross section at a predetermined interval on the side facing the side wall of the rail of the balustrade, the length of the predetermined interval being freely changeable,
In the laying, the cable duct main body part is lifted in a three-point suspended state by gripping both upper ends of one side wall in the longitudinal direction with a gripping member, screwing a bolt-shaped lifting rod into the lifting nut hole, and Transport,
The cable so that a rod-shaped connecting anchor that has been driven into the track surface in advance is inserted into a construction hole of the connecting anchor in the cable duct main body part that is lifted and transported, and is laid in the cable duct main body part. Lowering the duct body parts, laying the cable duct body parts as the positioning work is easy positioning,
Forming a first duct body portion having a substantially concave shape by the side wall of the rail of the rail where the lid locking portion is formed and the one side wall of the cable duct body component;
At the upper end of one side wall of the cable duct main body part, a lid mounting portion is provided at a height position substantially equal to the lid locking portion provided on the side wall of the duct,
A duct lid having a width and a length corresponding to the width of the bottom surface of the cable duct main body part and the length of the bottom surface in the longitudinal direction can be placed between the both lid engaging portions and the lid placing portion. And
And while the second duct body part is formed in advance between the one side wall and the other side wall of the cable duct body part, the duct lid is placed on the upper end part,
A multi-cable duct laying structure characterized by that.
線路部の脇に設けられた高欄をダクト側壁に兼用すると共に、該高欄のダクト側壁に蓋係止部を形成してなり、
前記高欄のダクト側壁との対向面側には所定間隔をおいて、底壁部と該底壁部の一方側端部から立ち上がる側壁により形成された断面略L字状をなすあらかじめ製造されたケーブルダクト本体部品を2個、前記側壁内側が向かい合わせになるよう、前記所定間隔の長さ及び前記向かい合わせに敷設する2個のケーブルダクト本体部品間の長さを変更自在にして敷設するケーブルダクトの敷設構造であって、
前記ケーブルダクト本体部品の底壁部には、ケーブルダクト本体部品と線路の路面上に打設されるモルタル及びケーブルダクト本体部品の固定用モルタルと一体化させる連結アンカーの施工用穴が設けられると共に、長手方向略中央には吊り上げ運搬用の吊り上げナット穴が設けられてなり、
前記2個のケーブルダクト本体部品を、前記側壁の長手方向両上端部を把持部材で把持すると共に、前記吊り上げナット穴にボルト状吊り上げ棒を螺合し、3点吊りの状態にして吊り上げ、かつ運搬し、
吊り上げ運搬したケーブルダクト本体部品における前記連結アンカーの施工用穴に、前記ケーブルダクト本体部品の敷設箇所に、あらかじめ線路路面内に打ち込まれて突設された棒状の連結アンカーが遊嵌するよう前記ケーブルダクト本体部品を降下させ、該降下作業が簡単な位置決めとなって、前記2個のケーブルダクト本体部品の側壁内側が向かい合わせになるよう、かつ、2個のケーブルダクト本体部品間の長さを変更自在にして敷設し、
前記蓋係止部が形成された高欄のダクト側壁及び前記2個のケーブルダクト本体部品のうち高欄のダクト側壁寄りのケーブルダクト本体部品の一方側側壁とにより略凹状をなす第1ダクト本体部を形成してなり、
前記ケーブルダクト本体部品の一方側側壁の上端部には前記高欄のダクト側壁に設けられた蓋係止部と略同等の高さ位置に蓋載置部が設けられ、
前記双方の蓋係止部及び蓋載置部間には、あらかじめ製造されたダクト蓋が載置可能とされ、
かつ前記向かい合わせに敷設した2個のケーブルダクト本体部品間には第2ダクト本体部が形成されてなると共に、上端部には前記ダクト蓋が載置された、
ことを特徴とする複数ケーブルダクトの敷設構造。
The railing provided on the side of the track portion is also used as a duct side wall, and a lid locking portion is formed on the duct side wall of the railing,
A pre-manufactured cable having a substantially L-shaped cross section formed by a bottom wall and a side wall rising from one end of the bottom wall at a predetermined interval on the side facing the side wall of the handrail duct Two duct body parts, a cable duct laid with the length of the predetermined interval and the length between the two cable duct body parts laid opposite to each other so that the inside of the side wall faces each other. The laying structure of
The bottom wall portion of the cable duct body part is provided with a mortar that is placed on the road surface of the cable duct body part and the track, and a connection anchor construction hole that is integrated with the fixing mortar of the cable duct body part. In the middle of the longitudinal direction, a lifting nut hole for lifting and transportation is provided,
The two cable duct main body parts are lifted in a three-point suspended state by gripping both upper ends in the longitudinal direction of the side wall with a gripping member, screwing a bolt-shaped lifting rod into the lifting nut hole, and Transport,
The cable so that a rod-shaped connecting anchor that has been driven into the track surface in advance is inserted into a construction hole of the connecting anchor in the cable duct main body part that is lifted and transported, and is laid in the cable duct main body part. The duct body part is lowered, and the lowering work is easily positioned so that the inner side walls of the two cable duct body parts face each other, and the length between the two cable duct body parts is increased. Lay it freely,
A first duct main body portion that is substantially concave with the side wall of the rail of the rail where the lid locking portion is formed and the one side wall of the cable duct main body part near the side wall of the rail of the two rails. Formed,
At the upper end of one side wall of the cable duct main body part, a lid mounting portion is provided at a height position substantially equal to the lid locking portion provided on the side wall of the duct,
Between the two lid locking portions and the lid mounting portion, a duct lid manufactured in advance can be placed,
In addition, a second duct body is formed between the two cable duct body parts laid face to face, and the duct lid is placed on the upper end.
A multi-cable duct laying structure characterized by that.
JP2007125431A 2007-05-10 2007-05-10 Laying structure of multiple cable ducts Active JP5201652B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007125431A JP5201652B2 (en) 2007-05-10 2007-05-10 Laying structure of multiple cable ducts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007125431A JP5201652B2 (en) 2007-05-10 2007-05-10 Laying structure of multiple cable ducts

Publications (2)

Publication Number Publication Date
JP2008283779A JP2008283779A (en) 2008-11-20
JP5201652B2 true JP5201652B2 (en) 2013-06-05

Family

ID=40144139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007125431A Active JP5201652B2 (en) 2007-05-10 2007-05-10 Laying structure of multiple cable ducts

Country Status (1)

Country Link
JP (1) JP5201652B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7073185B2 (en) * 2018-05-14 2022-05-23 中日本高速道路株式会社 Structure of work space for wall balustrade buried pipeline, construction method and formwork used for construction
RU2684159C1 (en) * 2018-05-30 2019-04-04 Открытое Акционерное Общество "Российские Железные Дороги" System for laying cable communications on the run for a ballast-free railway track
CN110438887B (en) * 2019-08-20 2021-06-11 中国铁道科学研究院集团有限公司铁道建筑研究所 Concrete beam composite material sidewalk with cable trough below longitudinally-arranged walking plate

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734294U (en) * 1993-11-30 1995-06-23 日本ジャケット株式会社 Pipe protection duct connection device
JP3936864B2 (en) * 2001-12-28 2007-06-27 川田建設株式会社 Cable storage duct device
JP4558618B2 (en) * 2005-09-27 2010-10-06 星和電機株式会社 Wiring duct

Also Published As

Publication number Publication date
JP2008283779A (en) 2008-11-20

Similar Documents

Publication Publication Date Title
JP5201652B2 (en) Laying structure of multiple cable ducts
US6443656B1 (en) Trench forming assembly having removable pin anchoring mechanism
KR20170086361A (en) Apparatus and method for installing undergraound cable using snake vehicle
KR20150025031A (en) Deck unit installation device for footbridge bridge extension
KR101097273B1 (en) Through bridge using arch reinfocing member and construction method therefor
KR100882775B1 (en) Electric cable support in a passage of an electric power line under ground for distribution of electricity
JP4780769B2 (en) Construction structure of cable trough
KR101514220B1 (en) Method of constructing arch-type ribbon bridge and bridge using same
KR20150130099A (en) Steel and concrete composite segment for through bridge, and bridge construction method using the same
KR101783754B1 (en) Structure of cable-trench for crane type of exposed to the ground
JP5078134B2 (en) Cable duct laying structure
JP7306619B2 (en) Main pipe conveying device into sheath pipe
JP3134451U (en) Lightweight duct cover plate
KR20100003466A (en) Electric cable support in a passage of an electric power line under ground for distribution of electricity
RU57324U1 (en) TRANSMISSION SUPPORT OF LINES OF ELECTRIC TRANSMISSIONS
JP2003260962A (en) Support device for electric car cable related member in tunnel
KR100670604B1 (en) Combined duct and cable tray
CN104631496B (en) Temporary access road above a kind of ballast water tank water and the installation method of this passage
KR101428748B1 (en) A Sidewalk Enlargement Installation
JP2004190284A (en) Track vicinity paving method
KR101278924B1 (en) Sliding hinge Apparatus for setting segments of suspension bridge of impact type
KR101420626B1 (en) Structure using pre-cast panel
KR200458490Y1 (en) Mold frame for constructing concrete gutter
US20190277466A1 (en) Light Fixture Bracket
KR100779665B1 (en) Electric cable tray structure for building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100408

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110722

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120213

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120406

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120827

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121120

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20121127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130207

R150 Certificate of patent or registration of utility model

Ref document number: 5201652

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160222

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250