JP5191185B2 - Inspection guideline creation system - Google Patents

Inspection guideline creation system Download PDF

Info

Publication number
JP5191185B2
JP5191185B2 JP2007210609A JP2007210609A JP5191185B2 JP 5191185 B2 JP5191185 B2 JP 5191185B2 JP 2007210609 A JP2007210609 A JP 2007210609A JP 2007210609 A JP2007210609 A JP 2007210609A JP 5191185 B2 JP5191185 B2 JP 5191185B2
Authority
JP
Japan
Prior art keywords
inspection
plan
schedule
procedure
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007210609A
Other languages
Japanese (ja)
Other versions
JP2009043205A (en
Inventor
信二 佐久間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2007210609A priority Critical patent/JP5191185B2/en
Publication of JP2009043205A publication Critical patent/JP2009043205A/en
Application granted granted Critical
Publication of JP5191185B2 publication Critical patent/JP5191185B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Document Processing Apparatus (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、プラントの定期検査時に必要な検査要領書を作成する検査要領書作成システムに関する。   The present invention relates to an inspection procedure creation system for creating an inspection procedure required for periodic inspection of a plant.

発電プラントでは、電気工作物が技術基準に適合していることを確認するために、定期的にプラントを停止して定期事業者検査を実施している。この定期検査は、プラント毎に多数の検査を実施しており、検査項目別に検査要領書を作成する必要がある。従来、これらの検査要領書は、担当者が各機器の仕様書・手順書・図面等の膨大な資料に基づいて作成していた。   In the power plant, in order to confirm that the electric work conforms to the technical standard, the plant is periodically stopped and a periodic operator inspection is performed. In this periodic inspection, a large number of inspections are performed for each plant, and it is necessary to prepare an inspection manual for each inspection item. Conventionally, these inspection procedures have been prepared by a person in charge based on a vast amount of data such as specifications, procedures, drawings, etc. of each device.

特許文献1には、運転員の模擬操作に対する制御ロジックの応答をまとめた運転要領書を自動作成する運転要領書自動作成装置が開示されているが、定期検査時に必要な検査要領書を作成する検査要領書作成システムは知られていない。   Patent Document 1 discloses an automatic operation manual creation device that automatically creates an operation manual that summarizes the response of control logic to an operator's simulated operation, but creates an inspection manual that is necessary for periodic inspection. There is no known inspection procedure creation system.

特開平11−65640号公報Japanese Patent Laid-Open No. 11-65640

各検査要領書の作成にあたっては、検査毎に目的、対象範囲、検査方法、判定基準等が異なるために、必要情報の検索・抽出・入力作成に多大な時間と労力を要している。また、検査時に受けた指摘事項は、当該定期検査中に実施される関連する検査の検査要領書に反映させる必要があり、指摘内容の修正は迅速性と確実性が要求されている。しかし、この反映作業は、担当者が手作業で行っているために、多大の労力を要するのみならず、反映漏れを生じる恐れがあるという課題があった。   In preparing each inspection procedure, since the purpose, target range, inspection method, judgment standard, and the like are different for each inspection, much time and labor are required for searching / extracting / inputting necessary information. In addition, it is necessary to reflect the indications received at the time of inspection in the inspection manual for the related inspections to be performed during the regular inspection, and correction of the indications is required to be quick and reliable. However, since this reflection work is performed manually by the person in charge, there is a problem that not only a great deal of labor is required, but also there is a risk of reflection omission.

また、発電プラントでは、機器の重要度に応じて点検時期と点検項目を定めており、定期検査の実施時期によって検査対象が異なる。このため、検査要領書の作成時に、担当者が検査対象を確認するのに多くの時間を要するのみならず、人為的なミスを防止するために、二重、三重の確認を行う必要があり、更に多くの時間を要している。   Moreover, in the power plant, the inspection time and the inspection items are determined according to the importance of the equipment, and the inspection object varies depending on the period of the periodic inspection. For this reason, when preparing the inspection procedure, not only does it take a lot of time for the person in charge to check the inspection target, but it is also necessary to perform double or triple confirmation to prevent human error. More time is required.

そこで、本発明は、定期検査毎に対象となる検査項目の検査要領書を迅速且つ確実に作成することができる検査要領書作成システムを提供するものである。   Therefore, the present invention provides an inspection procedure creation system that can quickly and reliably create an inspection procedure for an inspection item that is a target for each periodic inspection.

本発明は、上記課題を解決するために、機器の検査対象毎に定期検査の実施時期、点検項目を記憶した点検計画データベースと、検査要領書の様式を記憶した様式データベースと、前記検査要領書に記載する事項を記憶した記載事項データベースと、前記点検計画データベースから定期検査の検査対象を抽出する検査対象抽出手段と、抽出した検査対象に対応する検査要領書の様式を前記様式データベースから取得する様式取得手段と、抽出した検査対象に対応する検査要領書の記載事項を前記記載事項データベースから取得する記載事項取得手段とからなる検査要領書作成システムを提供するものである。   In order to solve the above-mentioned problems, the present invention provides an inspection plan database that stores the period of periodic inspection for each inspection target of equipment, inspection items, a format database that stores the format of the inspection procedure, and the inspection procedure. A description item database storing items to be described, an inspection object extraction means for extracting inspection objects for periodic inspection from the inspection plan database, and a format of an inspection procedure corresponding to the extracted inspection object is acquired from the format database It is an object of the present invention to provide an inspection procedure document preparation system comprising a format acquisition unit and a description item acquisition unit that acquires the description items of the inspection procedure corresponding to the extracted inspection object from the description item database.

また、本発明の検査要領書作成システムは、定期検査時に検査要領書の記載事項を修正する記載事項修正手段を備えたものである。   Moreover, the inspection procedure manual creation system of the present invention includes a description item correcting means for correcting the description items of the inspection procedure manual at the time of periodic inspection.

また、本発明の検査要領書作成システムは、検査要領書に記載した事項が互いに関連のある複数の検査要領書を関連付けて記憶する検査要領書記憶手段を備え、前記記載事項修正手段が修正する記載事項に関連のある検査要領書を前記検査要領書記憶手段から抽出するようにしたものである。   Further, the inspection procedure creation system of the present invention includes an inspection procedure storage means for storing a plurality of inspection procedures in which items described in the inspection procedure are related to each other, and the description correction unit corrects the items. The inspection procedure manual related to the description items is extracted from the inspection procedure storage means.

また、本発明の検査要領書作成システムは、前記記載事項修正手段が、関連のある複数の検査要領書の記載事項を同時に修正するようにしたものである。   In the inspection procedure creation system according to the present invention, the description item correcting means simultaneously corrects the items described in a plurality of related inspection procedures.

また、本発明の検査要領書作成システムは、前記記載事項修正手段が、前記記載事項データベースに記憶された内容を修正するデータベース修正手段を有するものである。   Further, in the inspection procedure manual creation system of the present invention, the description item correction means includes database correction means for correcting the contents stored in the description item database.

また、本発明の検査要領書作成システムは、定期検査時の指摘事項を記憶する指摘事項記憶手段を有し、検査要領書に記載した事項と前記指摘事項の整合性をチェックするチェック手段を備えたものである。   In addition, the inspection manual creation system of the present invention has an indication item storage means for storing the indication items at the time of periodic inspection, and includes a check means for checking the consistency between the items described in the inspection procedure and the indication items. It is a thing.

また、本発明の検査要領書作成システムは、点検工事日程と検査日程を記憶する日程記憶手段を有し、点検工事が必要な機器の検査を点検工事終了後に実施するように日程を管理する日程管理手段を備えたものである。   Moreover, the inspection procedure creation system of the present invention has a schedule storage means for storing the inspection work schedule and the inspection schedule, and the schedule for managing the schedule so that the inspection of the equipment requiring the inspection work is performed after the inspection work is completed. It is equipped with management means.

また、本発明の検査要領書作成システムは、前記日程管理手段が、点検工事日程の変更に対応して検査日程を修正するようにしたものである。   Further, in the inspection procedure creation system according to the present invention, the schedule management means corrects the inspection schedule in response to the change of the inspection construction schedule.

本発明の検査要領書作成システムは、機器の検査対象毎に定期検査の実施時期、点検項目を記憶した点検計画データベースと、検査要領書の様式を記憶した様式データベースと、前記検査要領書に記載する事項を記憶した記載事項データベースと、前記点検計画データベースから定期検査の検査対象を抽出する検査対象抽出手段と、抽出した検査対象に対応する検査要領書の様式を前記様式データベースから取得する様式取得手段と、抽出した検査対象に対応する検査要領書の記載事項を前記記載事項データベースから取得する記載事項取得手段とからなる構成を有することにより、点検計画データベースから自動的に検査対象を抽出することができ、抽出した検査対象に対応する検査要領書の様式と記載事項を取得して自動的に必要な検査要領書を作成することができる。従って、定期検査毎に対象となる検査項目の検査要領書を迅速且つ確実に作成することができ、要領書作成に要する時間及び労力を削減することができる効果がある。   The inspection procedure creation system according to the present invention includes a periodical inspection implementation time and inspection plan database storing inspection items for each inspection target of the device, a format database storing the inspection procedure format, and the inspection procedure A database for storing items to be stored, an inspection object extraction means for extracting inspection objects for periodic inspections from the inspection plan database, and a form acquisition for acquiring from the form database the forms of inspection procedures corresponding to the extracted inspection objects The inspection object is automatically extracted from the inspection plan database by having a configuration comprising means and a description item acquisition means for acquiring the description items of the inspection procedure corresponding to the extracted inspection object from the description item database. Can obtain the format and description items of the inspection procedure manual corresponding to the extracted inspection target and automatically perform the necessary inspection It is possible to create a Ryosho. Therefore, it is possible to quickly and surely create the inspection procedure manual for the inspection item to be subjected to each periodic inspection, and it is possible to reduce the time and labor required to create the procedure manual.

また、本発明の検査要領書作成システムは、定期検査時に検査要領書の記載事項を修正する記載事項修正手段を備えたことにより、検査時に受けた指摘事項に基づいて検査要領書の記載事項を迅速且つ確実に修正することができる効果がある。   In addition, the inspection procedure creation system according to the present invention includes a description item correcting means for correcting the items described in the inspection procedure during the periodic inspection, so that the items described in the inspection procedure can be changed based on the indications received during the inspection. There is an effect that correction can be made quickly and reliably.

また、本発明の検査要領書作成システムは、検査要領書に記載した事項が互いに関連のある複数の検査要領書を関連付けて記憶する検査要領書記憶手段を備え、前記記載事項修正手段が修正する記載事項に関連のある検査要領書を前記検査要領書記憶手段から抽出するようにしたことにより、修正する記載事項に関連のある検査要領書の記載事項も確認して修正することができるから、検査時に受けた指摘事項を、当該定期検査中に実施される関連する検査の検査要領書にも確実に反映させることができる効果がある。   Further, the inspection procedure creation system of the present invention includes an inspection procedure storage means for storing a plurality of inspection procedures in which items described in the inspection procedure are related to each other, and the description correction unit corrects the items. By extracting the inspection procedure related to the description items from the inspection procedure storage means, it is possible to check and correct the description items of the inspection procedure related to the description items to be corrected. There is an effect that it is possible to reliably reflect the findings received at the time of inspection in the inspection manuals of related inspections performed during the periodic inspection.

また、本発明の検査要領書作成システムは、前記記載事項修正手段が、関連のある複数の検査要領書の記載事項を同時に修正するようにしたことにより、検査時に受けた指摘事項を、当該定期検査中に実施される関連する検査の検査要領書に自動的に反映させることができる効果がある。   In addition, the inspection procedure creation system of the present invention is configured so that the description item correcting means corrects the description items of a plurality of related inspection procedures at the same time so that the indication items received during the inspection are There is an effect that can be automatically reflected in the inspection procedure manual of the related inspection performed during the inspection.

また、本発明の検査要領書作成システムは、前記記載事項修正手段が、前記記載事項データベースに記憶された内容を修正するデータベース修正手段を有することにより、過去の定期検査における指摘事項を反映させた検査要領書を作成することができる効果がある。   Further, in the inspection procedure manual creation system of the present invention, the description item correction means has a database correction means for correcting the contents stored in the description item database, thereby reflecting the points indicated in the past periodic inspection. There is an effect that an inspection manual can be created.

また、本発明の検査要領書作成システムは、定期検査時の指摘事項を記憶する指摘事項記憶手段を有し、検査要領書に記載した事項と前記指摘事項の整合性をチェックするチェック手段を備えたことにより、作成した検査要領書が過去の定期検査において指摘された指摘事項を反映していることを自動的にチェックすることができ、指摘事項の反映漏れを阻止することができる効果がある。   In addition, the inspection manual creation system of the present invention has an indication item storage means for storing the indication items at the time of periodic inspection, and includes a check means for checking the consistency between the items described in the inspection procedure and the indication items. As a result, it is possible to automatically check that the created inspection manual reflects the items pointed out in past periodic inspections, and it is possible to prevent the omission of the pointed items from being reflected. .

また、本発明の検査要領書作成システムは、点検工事日程と検査日程を記憶する日程記憶手段を有し、点検工事が必要な機器の検査を点検工事終了後に実施するように日程を管理する日程管理手段を備えたことにより、点検工事日程と検査日程をリンクさせることができ、点検工事の未完了による検査の遅延を防止して、効率よく定期検査を実施することができる効果がある。   Moreover, the inspection procedure creation system of the present invention has a schedule storage means for storing the inspection work schedule and the inspection schedule, and the schedule for managing the schedule so that the inspection of the equipment requiring the inspection work is performed after the inspection work is completed. By providing the management means, it is possible to link the inspection work schedule and the inspection schedule, prevent delay of inspection due to incomplete inspection work, and efficiently perform periodic inspection.

また、本発明の検査要領書作成システムは、前記日程管理手段が、点検工事日程の変更に対応して検査日程を修正するようにしたことにより、点検工事日程が変更になった場合でも、点検工事の未完了による検査待ちの発生を防止して、効率よく定期検査を実施することができる効果がある。   Further, the inspection procedure creation system according to the present invention is configured so that the schedule management means corrects the inspection schedule corresponding to the change of the inspection construction schedule, so that the inspection construction schedule is changed even if the inspection construction schedule is changed. There is an effect that it is possible to prevent the waiting for inspection due to incomplete construction, and to carry out periodic inspection efficiently.

本発明の実施の形態を図示する実施例に基づいて説明する。
本発明に係る検査要領書作成システムは、機器の検査対象毎に定期検査の実施時期、点検項目を記憶した点検計画データベース4と、検査要領書の様式を記憶した様式データベース5と、前記検査要領書に記載する事項を記憶した記載事項データベース6と、前記点検計画データベース4から定期検査の検査対象を抽出する検査対象抽出手段1と、抽出した検査対象に対応する検査要領書の様式を前記様式データベース5から取得する様式取得手段2と、抽出した検査対象に対応する検査要領書の記載事項を前記記載事項データベース6から取得する記載事項取得手段3とから構成してある。
Embodiments of the present invention will be described based on examples shown in the drawings.
The inspection procedure creation system according to the present invention includes an inspection plan database 4 storing the period of periodic inspection and inspection items for each inspection target of the device, a format database 5 storing the format of the inspection procedure, and the inspection procedure. The description item database 6 storing items described in the certificate, the inspection object extraction means 1 for extracting the inspection object of the periodic inspection from the inspection plan database 4, and the format of the inspection procedure document corresponding to the extracted inspection object Form acquisition means 2 that is acquired from the database 5 and description item acquisition means 3 that acquires from the description item database 6 description items of the inspection procedure corresponding to the extracted inspection object.

図4に示すように、点検計画データベース4は、機器の検査対象毎に定期検査を実施する時期と点検項目を記憶してある。例えば、点検計画データベース4は、機器の重要度に応じて点検時期と点検項目を定め、定期検査を実施するように記憶してある。また、点検計画データベース4は、設備の劣化や改修に応じて定期検査を実施する時期を見直して、検査の頻度を適性に保つことができるように構成してある。   As shown in FIG. 4, the inspection plan database 4 stores the time when periodic inspection is performed and inspection items for each inspection target of equipment. For example, the inspection plan database 4 stores the inspection time and inspection items according to the importance of the equipment, and the periodic inspection is performed. In addition, the inspection plan database 4 is configured to review the timing for carrying out the periodic inspection according to the deterioration or repair of the equipment and to keep the inspection frequency appropriate.

図1に示す実施例において、検査対象抽出手段1は、図4に示す点検計画データベース4の機器の中から当該定期検査欄に丸印の付いている機器を選択し、当該定期検査の検査対象を抽出することができるようにしてある。   In the embodiment shown in FIG. 1, the inspection object extraction means 1 selects a device with a circle in the periodic inspection column from the devices in the inspection plan database 4 shown in FIG. Can be extracted.

図1に示す実施例において、様式データベース5は、検査対象を例えば安全性確保の重要度に基づいて分類し、この分類別に検査要領書の様式を記憶してある。記載事項データベース6は、図2に示すように、表紙情報データベース、検査目的データベース、検査対象範囲データベース、検査項目データベース、検査方法データベース、判定基準データベース、及び添付資料データベースから構成してあり、検査要領書の記載事項を項目別に記憶してある。また、添付資料データベースには、検査体制、検査手順、設備概要、構造図・系統図等の検査要領書に添付する資料を記憶してある。   In the embodiment shown in FIG. 1, the format database 5 classifies inspection objects based on, for example, the importance of ensuring safety, and stores the format of the inspection procedure manual for each classification. As shown in FIG. 2, the entry item database 6 is composed of a cover information database, an inspection purpose database, an inspection object range database, an inspection item database, an inspection method database, a judgment reference database, and an attached material database. The items described in the book are stored by item. In addition, the attached material database stores materials attached to the inspection procedure such as the inspection system, inspection procedure, equipment outline, structure diagram / system diagram, and the like.

図1において、100は検査要領書作成手段であり、様式取得手段2と、記載事項取得手段3から構成してある。様式取得手段2は、検査対象抽出手段1で抽出した検査対象に対応する検査要領書の様式を様式データベース5から取得する。記載事項取得手段3は、図2に示すように、この検査要領書に記載する事項を記載事項データベース6の各データベースから取得し、検査に必要な添付資料を添付資料データベースから取得して、図5に示すような検査要領書を出力することができるようにしてある。   In FIG. 1, reference numeral 100 denotes an inspection procedure document creation unit, which is composed of a form acquisition unit 2 and a description item acquisition unit 3. The form acquisition means 2 acquires the form of the inspection procedure manual corresponding to the inspection object extracted by the inspection object extraction means 1 from the form database 5. As shown in FIG. 2, the description item acquisition means 3 acquires items to be described in this inspection procedure from each database of the description item database 6 and acquires attachments necessary for the inspection from the attachment database. The inspection manual as shown in FIG. 5 can be output.

図1において、7は検査要領書記憶手段であり、検査要領書作成手段100で作成された検査要領書を記憶することができるようにしてある。図示の実施例において、検査要領書記憶手段7は、各検査要領書に記載された事項が互いに関連のある複数の検査要領書を関連付けて記憶することができるように構成してある。   In FIG. 1, reference numeral 7 denotes an inspection procedure document storage unit that can store the inspection procedure document created by the inspection procedure document creation unit 100. In the illustrated embodiment, the inspection procedure storage means 7 is configured to store a plurality of inspection procedures in which items described in each inspection procedure are associated with each other.

図1に示す実施例において、検査要領書作成システムは、指摘事項入力手段9と、指摘事項記憶手段11と、チェック手段10と、記載事項修正手段8を備えている。指摘事項入力手段9は、定期検査時に検査要領書に対して指摘された事項を端末から入力し、指摘事項記憶手段11に記憶することができるように構成してある。また、チェック手段10は、検査要領書作成手段100で作成された検査要領書に記載した事項と、過去の定期検査で指摘されて指摘事項記憶手段11に記憶された指摘事項の整合性をチェックすることができるようにしてある。   In the embodiment shown in FIG. 1, the inspection procedure document preparation system includes an indication item input unit 9, an indication item storage unit 11, a check unit 10, and a description item correction unit 8. The pointed item input means 9 is configured so that items pointed out with respect to the inspection procedure during the periodic inspection can be input from the terminal and stored in the pointed item storage unit 11. The check means 10 checks the consistency between the items described in the inspection procedure prepared by the inspection procedure preparation unit 100 and the indications pointed out in the past periodic inspection and stored in the indication storage unit 11. You can do that.

記載事項修正手段8は、指摘事項入力手段9で入力した指摘事項に基づいて、当該定期検査時に検査要領書の記載事項を修正することができるようにしてある。また、記載事項修正手段8は、検査時に指摘されて修正する記載事項に関連のある検査要領書を検査要領書記憶手段7から抽出する関連要領書抽出機能を備え、関連のある検査要領書の記載事項を修正することができるように構成してある。なお、記載事項修正手段8は、関連のある複数の検査要領書の記載事項を同時に修正することができるようにしてあることが好ましい。   The description item correction means 8 can correct the description items of the inspection procedure based on the indication items input by the indication item input means 9 during the periodic inspection. Further, the description item correcting means 8 has a related procedure extraction function for extracting from the inspection procedure storage means 7 an inspection procedure related to the description item pointed out and corrected at the time of inspection, It is configured so that the items described can be corrected. It should be noted that the description item correcting means 8 is preferably configured to be able to correct the description items of a plurality of related inspection procedures at the same time.

また、記載事項修正手段8は、記載事項データベース6に記憶された内容を修正するデータベース修正手段を有し、該当するデータベースの記載事項を修正して、今後作成される検査要領書に指摘事項を反映することができるようにしてある。   Moreover, the description item correction means 8 has a database correction means for correcting the contents stored in the description item database 6, corrects the description items of the corresponding database, and puts the indicated items in the inspection manual to be created in the future. It can be reflected.

図3に示す実施例において、検査要領書作成システムは、点検工事日程と検査日程を記憶する日程記憶手段15と、点検工事が必要な機器の検査を点検工事終了後に実施するように日程を管理する日程管理手段を備えている。   In the embodiment shown in FIG. 3, the inspection procedure creation system manages the schedule so that the inspection storage schedule and the inspection schedule and the schedule storage means 15 for storing the inspection schedule and the inspection of the equipment requiring the inspection construction are performed after the inspection construction is completed. A schedule management means is provided.

図3に示す実施例において、日程管理手段は、点検計画データベース4に基づいて必要な点検工事の計画を作成する点検工事計画作成手段12と、点検計画データベース4に基づいて当該定期検査で実施される検査の計画を作成する検査計画作成手段13とから構成してある。日程記憶手段15は、点検工事計画作成手段12で作成された点検工事計画の日程と、検査計画作成手段13で作成された検査計画の日程を記憶することができるようにしてある。   In the embodiment shown in FIG. 3, the schedule management means is implemented by the inspection work plan creation means 12 for creating a necessary inspection work plan based on the inspection plan database 4 and the periodic inspection based on the inspection plan database 4. And an inspection plan creation means 13 for creating an inspection plan. The schedule storage means 15 can store the schedule of the inspection work plan created by the inspection work plan creation means 12 and the schedule of the inspection plan created by the inspection plan creation means 13.

検査計画作成手段13は、日程記憶手段15に記憶された点検工事計画の日程を取得し、点検工事が必要な機器の検査を点検工事終了後に実施することができるように検査計画を作成するように構成してある。   The inspection plan creation means 13 acquires the schedule of the inspection work plan stored in the schedule storage means 15 and creates the inspection plan so that the inspection of the equipment requiring inspection work can be carried out after the inspection work is completed. It is configured.

また、日程管理手段は、計画修正手段14を備えている。計画修正手段14は、点検工事日程が変更になった場合に点検工事計画を修正することができ、この点検工事日程の変更に対応して検査日程を修正することができるように構成してある。
また、日程記憶手段15には検査工程表出力手段16を設けてあり、検査工程表を印刷したり、作業現場の端末に表示させたりすることができるようにしてある。
The schedule management means includes a plan correction means 14. The plan correction means 14 is configured to be able to correct the inspection work plan when the inspection work schedule is changed, and to correct the inspection schedule in response to the change of the inspection work schedule. .
Further, the schedule storage means 15 is provided with an inspection process table output means 16 so that the inspection process table can be printed or displayed on a terminal at the work site.

本発明に係る検査要領書作成システムの一実施例を示す構成図。The block diagram which shows one Example of the test procedure preparation system which concerns on this invention. その一実施例の細部を示す構成図。The block diagram which shows the detail of the one Example. 日程管理手段の一実施例を示す構成図。The block diagram which shows one Example of a schedule management means. 点検計画データベースの一実施例を示す図。The figure which shows one Example of an inspection plan database. 検査要領書の出力例を示す図。The figure which shows the output example of a test procedure manual.

符号の説明Explanation of symbols

1 検査対象抽出手段
2 様式取得手段
3 記載事項取得手段
4 点検計画データベース
5 様式データベース
6 記載事項データベース
7 検査要領書記憶手段
8 記載事項修正手段
9 指摘事項入力手段
10 チェック手段
11 指摘事項記憶手段
12 点検工事計画作成手段
13 検査計画作成手段
14 計画修正手段
15 日程記憶手段
16 検査工程表出力手段
100 検査要領書作成手段
DESCRIPTION OF SYMBOLS 1 Inspection object extraction means 2 Format acquisition means 3 Description item acquisition means 4 Inspection plan database 5 Format database 6 Description item database 7 Inspection procedure document storage means 8 Description item correction means 9 Point matter input means 10 Check means 11 Point matter storage means 12 Inspection work plan creation means 13 Inspection plan creation means 14 Plan correction means 15 Schedule storage means 16 Inspection process chart output means 100 Inspection procedure creation means

Claims (7)

機器の検査対象毎に定期検査の実施時期、点検項目を記憶した点検計画データベースと、検査対象の分類別に検査要領書の様式データを記憶した様式データベースと、前記検査要領書に記載する記載事項データを項目別に記憶した記載事項データベースと、
前記点検計画データベースから定期検査の実施時期である検査対象を抽出する検査対象抽出手段と、
前記検査対象抽出手段で抽出した検査対象の分類に対応する検査要領書の様式データを前記様式データベースから取得する様式取得手段と、前記抽出した検査対象に対応する検査要領書の記載事項データを前記記載事項データベースから取得する記載事項取得手段とからなる検査要領書作成手段と、を有すると共に、
前記点検計画データベースに記憶された定期検査の実施時期、点検項目に基づいて点検工事が必要な機器の点検工事計画を作成する点検工事計画作成手段と、前記点検計画データベースに記憶された定期検査の実施時期、点検項目に基づいて当該定期検査で実施される検査計画を作成する検査計画作成手段とからなる日程管理手段と、
前記点検工事計画作成手段で作成された点検工事計画の日程及び前記検査計画作成手段で作成された検査計画の日程を記憶する日程記憶手段と、を有し、
前記日程管理手段は、前記検査計画作成手段が前記日程記憶手段に記憶された点検工事計画の日程を取得し、点検工事計画の日程と検査計画の日程をリンクさせて点検工事が必要な機器の検査を点検工事終了後に実施するように検査計画を作成し、
前記検査要領書作成手段が、前記様式取得手段で取得した検査要領書の様式データ、前記記載事項取得手段で取得した検査要領書の記載事項データ及び前記日程記憶手段に記憶された点検工事計画と検査計画の日程に基づいて検査対象の検査要領書を作成する検査要領書作成システム。
Inspection plan database that stores the period of periodic inspections and inspection items for each inspection target of equipment, format database that stores the format data of inspection procedures according to the classification of inspection targets, and entry data described in the inspection procedures A database of items that are stored by item,
An inspection object extraction means for extracting an inspection object that is a period of execution of the periodic inspection from the inspection plan database;
Form acquisition means for acquiring form data of the inspection procedure corresponding to the classification of the inspection object extracted by the inspection object extraction means from the form database, and description item data of the inspection procedure corresponding to the extracted inspection object In addition to having an inspection procedure document preparation means comprising a description item acquisition means acquired from a description item database ,
Inspection work plan creation means for creating an inspection work plan for equipment requiring inspection work based on the inspection period and inspection items stored in the inspection plan database, and periodic inspection stored in the inspection plan database. A schedule management means comprising an inspection plan preparation means for preparing an inspection plan to be executed in the periodic inspection based on the implementation time and inspection items ;
Schedule storage means for storing the schedule of the inspection construction plan created by the inspection construction plan creation means and the schedule of the inspection plan created by the inspection plan creation means ,
The schedule management means acquires the schedule of the inspection work plan stored in the schedule storage means by the inspection plan creation means , links the schedule of the inspection work plan and the schedule of the inspection plan, and requires the inspection work Create an inspection plan to carry out inspection after the completion of inspection work ,
The inspection procedure preparation means has the inspection procedure form stored in the schedule data, the format data of the inspection procedure acquired by the format acquisition unit, the description item data of the inspection procedure acquired by the description item acquisition unit, and the schedule storage unit; inspection procedure drafting system to create the inspection manual procedures to be inspected based on the schedule of the inspection plan.
定期検査時に指摘された指摘事項を入力する指摘事項入力手段と、前記指摘事項入力手段から入力された指摘事項に基づいて指摘を受けた検査要領書の記載事項を修正する記載事項修正手段を備えた請求項1に記載の検査要領書作成システム。   It is provided with indication item input means for inputting indication items pointed out at the time of periodic inspection, and entry item correction means for correcting the entry items in the inspection procedure received from the indication items from the indication item input means. The inspection procedure making system according to claim 1. 検査要領書に記載した事項が互いに関連のある複数の検査要領書を関連付けて記憶する検査要領書記憶手段を備え、前記記載事項修正手段が修正する記載事項に関連のある検査要領書を前記検査要領書記憶手段から抽出するようにした請求項2に記載の検査要領書作成システム。   The inspection procedure storage means for storing a plurality of inspection procedures that are related to each other in the items described in the inspection procedure is provided, and the inspection procedure related to the items to be corrected by the description correction unit is 3. The inspection guideline creation system according to claim 2, wherein the inspection guidebook creation system is extracted from the guideline storage means. 前記記載事項修正手段が、関連のある複数の検査要領書の記載事項を同時に修正するようにした請求項3に記載の検査要領書作成システム。   4. The inspection procedure creation system according to claim 3, wherein the description modification means corrects the descriptions of a plurality of related inspection procedures simultaneously. 前記記載事項修正手段が、前記記載事項データベースに記憶された記載事項データの内容を修正するデータベース修正手段を有する請求項2乃至4の何れかに記載の検査要領書作成システム。   5. The inspection procedure document creation system according to claim 2, wherein the description item correction means includes database correction means for correcting the content of description item data stored in the description item database. 前記指摘事項入力手段から入力された指摘事項を記憶する指摘事項記憶手段を有し、検査要領書に記載した事項と前記指摘事項の整合性をチェックするチェック手段を備えた請求項2乃至5の何れかに記載の検査要領書作成システム。   6. An indication item storage unit for storing an indication item input from the indication item input unit, and a check unit for checking the consistency between the item described in the inspection procedure and the indication item. The inspection guideline creation system described in any one. 前記点検工事計画作成手段で作成された点検工事計画の日程が変更になった場合に、前記日程管理手段が、該点検工事計画の日程の変更に対応して検査計画の日程を修正するようにした請求項1乃至6の何れかに記載の検査要領書作成システム。   When the schedule of the inspection construction plan created by the inspection construction plan creation means is changed, the schedule management means corrects the schedule of the inspection plan in response to the change of the schedule of the inspection construction plan. 7. The inspection procedure creation system according to any one of claims 1 to 6.
JP2007210609A 2007-08-13 2007-08-13 Inspection guideline creation system Expired - Fee Related JP5191185B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007210609A JP5191185B2 (en) 2007-08-13 2007-08-13 Inspection guideline creation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007210609A JP5191185B2 (en) 2007-08-13 2007-08-13 Inspection guideline creation system

Publications (2)

Publication Number Publication Date
JP2009043205A JP2009043205A (en) 2009-02-26
JP5191185B2 true JP5191185B2 (en) 2013-04-24

Family

ID=40443856

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007210609A Expired - Fee Related JP5191185B2 (en) 2007-08-13 2007-08-13 Inspection guideline creation system

Country Status (1)

Country Link
JP (1) JP5191185B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7441747B2 (en) 2020-07-17 2024-03-01 株式会社神戸製鋼所 Maintenance plan formulation support system and maintenance plan formulation support method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09114868A (en) * 1995-10-17 1997-05-02 Hitachi Ltd Method for utilizing check list for preparing document
JP3654711B2 (en) * 1996-06-21 2005-06-02 南条装備工業株式会社 Molding method and molding apparatus for insert molded product
JPH1083408A (en) * 1996-09-06 1998-03-31 Toshiba Corp Inspection record managing device and management system
JP4653320B2 (en) * 2001-01-25 2011-03-16 慶和 白石 Database design system, database design method, and display method
JP3936915B2 (en) * 2003-01-09 2007-06-27 株式会社日立製作所 Pressure test support system
JP2006214994A (en) * 2005-02-07 2006-08-17 Toshiba Corp Work man-hour control system in nuclear power station

Also Published As

Publication number Publication date
JP2009043205A (en) 2009-02-26

Similar Documents

Publication Publication Date Title
US9229445B2 (en) Mobility product traceability building system and production line operation controlling method
Boring et al. Guideline for operational nuclear usability and knowledge elicitation (GONUKE)
US20130179354A1 (en) Automated System for Commissioning Verification, Progress Tracking and Punchlist Resolution of Oil and Gas Production Facilities
CN111815099B (en) Assembly line production management method and system
US20120331380A1 (en) System for preparing and managing service manual, and method and record medium for preparing or managing service manual
JP5191185B2 (en) Inspection guideline creation system
Blagorazumov et al. The background to the development of the information system for aviation security oversight in Russia
CN113094800B (en) Engineering quality supervision method and system in municipal engineering supervision
JP5822555B2 (en) Inspection and repair support device and method
CN103034917A (en) Device and method for designing material tracking system
KR20210038222A (en) Manegement system and method for defueled condtion long term in-service inspection of nuclear power plant
Spilka et al. Integration of management systems on the chosen example
CN111260284B (en) Nuclear power station material remote acceptance method, system and storage medium
US20050159834A1 (en) Device and method for handling installation and testing instructions
US20220004952A1 (en) Method for supporting the configuration changeover of an operating area of a machine for packaging products in general
JP2009223771A (en) Step management system having isolation management function and method thereof
US20140048600A1 (en) Landing lights for multi-purpose configurable voting system
CN109978340A (en) One kind correcting system and method based on visual ammunition mispairing
KR20150019832A (en) Ship inspection automation system
Sano et al. Advancement of Manufacturing and Quality Control by Shop Digitalization
Brunnengraeber et al. The Role of Integration in NDT Quality Assurance Chain
JP7226121B2 (en) AUTOMATIC TEST SCENARIO GENERATION METHOD AND DEVICE FOR CONTROL SOFTWARE, AND COMPUTER PROGRAM
JPS60204071A (en) Maintenance and inspection device of equipment
JP6796828B2 (en) Construction quality inspection system and method
JP4769832B2 (en) Test support system and test support program for integration work system

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090618

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111011

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120619

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120918

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121120

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20121126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130118

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130129

R150 Certificate of patent or registration of utility model

Ref document number: 5191185

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160208

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160208

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees